Prior art keywords
section
pipe
support
additional
pipe section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR1907668A
Other languages
French (fr)
Inventor
Hervé PESENTI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bouygues Travaux Publics SAS
Original Assignee
Bouygues Travaux Publics SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bouygues Travaux Publics SAS filed Critical Bouygues Travaux Publics SAS
Priority to FR1907668A priority Critical patent/FR3098425A1/en
Priority to PCT/EP2020/069429 priority patent/WO2021005174A1/en
Publication of FR3098425A1 publication Critical patent/FR3098425A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)
  • Drilling And Boring (AREA)

Abstract

La présente invention concerne un outillage (6) pour le montage d’une conduite de marinage (1) d’un tunnelier comprenant :- un premier support (10), configuré pour recevoir une première section (3) de la conduite de marinage (1), - un deuxième support (20), fixé solidairement au premier support (10) et configuré pour recevoir une section supplémentaire (5) de la conduite de marinage (1) et - un système de positionnement (30) de la section supplémentaire (5) par rapport à la première section (3) en vue d’aligner ladite section supplémentaire (5) par rapport à la première section (3). Figure pour l’abrégé : Fig. 2The present invention relates to a tool (6) for mounting a marinating pipe (1) of a tunnel boring machine comprising: - a first support (10), configured to receive a first section (3) of the marinating pipe ( 1), - a second support (20), integrally fixed to the first support (10) and configured to receive an additional section (5) of the pickling pipe (1) and - a positioning system (30) of the additional section (5) with respect to the first section (3) to align said additional section (5) with respect to the first section (3). Figure for the abstract: Fig. 2

Description

Montage d’une conduite de marinage d’un tunnelierAssembly of a mucking pipe for a tunnel boring machine

L’invention concerne de manière générale le forage d’un tunnel, et plus particulièrement l’évacuation des déblais gérés par un tel forage, notamment dans le cas d’un tunnelier à pression de boue.The invention relates generally to the drilling of a tunnel, and more particularly to the evacuation of the cuttings managed by such drilling, in particular in the case of a mud pressure tunnel boring machine.

On connaît des machines de creusement de tunnels, appelées tunneliers, qui comportent une structure mobile de grandes dimensions consistant en une grande usine mobile à l’avant de laquelle est disposé un bouclier ayant une section compatible avec la future section en adéquation avec la forme définitive du tunnel (tunnel de section circulaire, bilobé, etc.)Tunnel digging machines are known, called tunnel boring machines, which comprise a large mobile structure consisting of a large mobile plant in front of which is placed a shield having a section compatible with the future section in line with the final shape. of the tunnel (tunnel of circular section, bilobed, etc.)

La partie antérieure du bouclier qui vient en contact avec le front de taille pour réaliser la découpe de la formation géologique traversée par le tunnel comporte une roue de coupe supportant des outils de travail qui est entraînée en rotation à une vitesse variable et qui est couplée à une poussée que l’on adapte à la nature du terrain à creuser.The front part of the shield which comes into contact with the working face to cut the geological formation through which the tunnel passes comprises a cutting wheel supporting working tools which is driven in rotation at a variable speed and which is coupled to a thrust that is adapted to the nature of the ground to be dug.

La roue de coupe travaille en pression. Elle est montée à l'avant d'une chambre, dite chambre d'abattage, selon le sens de déplacement du tunnelier. La partie arrière du tunnelier, dénommée train suiveur, comprend, outre différents appareils permettant la circulation des fluides entre le tunnel et la surface (sortie du tunnel), l'ensemble des dispositifs de pilotage, de sécurité et de mise en place de voussoirs constitutifs du tunnel. De la boue (« slurry » en anglais) est injectée sous pression à l'avant du front de taille à partir de la chambre d'abattage. Cette boue a pour fonction de lubrifier la roue de coupe, d'assurer la stabilité des parois de l'excavation et, lors de son trajet de retour jusqu'à la surface, de fluidifier le transport des matériaux (le marin) issus de l'excavation.The cutting wheel works under pressure. It is mounted at the front of a chamber, called the cutting chamber, depending on the direction of movement of the tunnel boring machine. The rear part of the tunnel boring machine, called the follower train, includes, in addition to various devices allowing the circulation of fluids between the tunnel and the surface (tunnel exit), all the control, safety and installation devices of constituent segments of the tunnel. Mud ("slurry" in English) is injected under pressure in front of the working face from the cutting chamber. This mud has the function of lubricating the cutting wheel, ensuring the stability of the walls of the excavation and, during its return trip to the surface, to smooth the transport of materials (the sailor) from the 'excavation.

De manière connue en soi, le marin est transporté de la roue de coupe à la surface par une ou plusieurs conduites de marinage. Chaque conduite de marinage comprend une canalisation de sortie, raccordée à la tête de coupe du tunnelier, une section aval, fixe et rigide, raccordée à une station de traitement des boues et un tuyau flexible raccordant la canalisation de sortie et la section aval. Pour permettre l’avancement du tunnelier, le tuyau flexible est plié de sorte à créer un jeu entre la canalisation et la section aval, puis se déplie progressivement au cours de l’avancement du tunnelier jusqu’à être sensiblement allongé. Une section supplémentaire de conduite, rigide, est ensuite rapportée et insérée entre le tuyau flexible et la section aval. Le tuyau flexible est alors replié et le tunnelier peut poursuivre son avancée.In a manner known per se, the sailor is transported from the cutter wheel to the surface by one or more marinating pipes. Each mucking pipe comprises an outlet pipe, connected to the cutting head of the tunnel boring machine, a fixed and rigid downstream section, connected to a sludge treatment station and a flexible pipe connecting the outlet pipe and the downstream section. To allow the tunnel boring machine to advance, the flexible pipe is bent so as to create a clearance between the pipeline and the downstream section, then gradually unfolds as the tunnel boring machine advances until it is substantially elongated. An additional rigid pipe section is then added and inserted between the flexible pipe and the downstream section. The flexible pipe is then folded up and the tunnel boring machine can continue its advance.

Toutefois, le montage de la section supplémentaire est long et nécessite une manutention lourde. En effet, la section supplémentaire doit être suspendue et manipulée à l’aide de palans à chaîne par les opérateurs. Une fois la section supplémentaire à proximité de la section aval, un ou plusieurs opérateurs doivent l’aligner avec la section aval avant de la raccorder en position, en tenant simultanément un collier de serrage, des boulons et une clé à choc. L’opération de raccordement nécessite en outre que les opérateurs supportent et maintiennent en position les deux sections de conduite en vis-à-vis pendant le serrage du collier et la fixation des boulons, ce qui est difficile compte-tenu de l’encombrement des sections de conduite et leur poids. Par ailleurs, cette opération est délicate puisqu’il est nécessaire que tous ces éléments soient assemblés précisément pour garantir le montage du collier. En cas d’échec, ces différentes étapes doivent être réitérées.However, the assembly of the additional section is long and requires heavy handling. Indeed, the additional section must be suspended and handled using chain hoists by the operators. Once the additional section is close to the downstream section, one or more operators must align it with the downstream section before connecting it in position, simultaneously holding a hose clamp, bolts and an impact wrench. The connection operation also requires the operators to support and hold in position the two pipe sections facing each other during the tightening of the collar and the fixing of the bolts, which is difficult given the size of the pipe sections and their weight. Moreover, this operation is delicate since it is necessary that all these elements be assembled precisely to guarantee the mounting of the collar. In case of failure, these different steps must be repeated.

Un but de l’invention est de proposer une solution pour le montage d’une section de conduite de marinage qui soit plus simple, plus facile à manipuler pour les opérateurs, plus sure et garantisse le bon positionnement des différentes sections de la conduite.An object of the invention is to propose a solution for mounting a section of marinating pipe which is simpler, easier to handle for the operators, safer and guarantees the correct positioning of the different sections of the pipe.

Il est à cet effet proposé, selon un premier aspect de l’invention un outillage pour le montage d’une conduite de marinage d’un tunnelier, la conduite de marinage comprenant :
- une canalisation de sortie, raccordée à une tête de coupe du tunnelier,
- une première section de conduite et
- un tuyau flexible, raccordant la canalisation de sortie et la première section de conduite.
It is for this purpose proposed, according to a first aspect of the invention, a tool for mounting a mucking pipe of a tunnel boring machine, the mucking pipe comprising:
- an outlet pipe, connected to a cutting head of the tunnel boring machine,
- a first pipe section and
- a flexible pipe, connecting the outlet pipe and the first pipe section.

En particulier, l’outillage comprend :
- un premier support, configuré pour recevoir la première section de conduite,
- un deuxième support, fixé solidairement au premier support et configuré pour recevoir une section supplémentaire de conduite et
- un système de positionnement de la section supplémentaire par rapport à la première section de conduite en vue d’aligner ladite section supplémentaire par rapport à la première section de conduite.
In particular, the tooling includes:
- a first support, configured to receive the first pipe section,
- a second support, integrally fixed to the first support and configured to receive an additional pipe section and
- A system for positioning the additional section with respect to the first pipe section in order to align said additional section with respect to the first pipe section.

Certaines caractéristiques préférées mais non limitatives de cet outillage sont les suivantes, prises individuellement ou en combinaison :
- le système de positionnement comprend un actionneur configuré pour translater la section supplémentaire par rapport à la première section de conduite.
Some preferred but non-limiting features of this tooling are as follows, taken individually or in combination:
- the positioning system comprises an actuator configured to translate the additional section relative to the first pipe section.

- l’actionneur comprend une crémaillère et une roue dentée, ou au moins un vérin et un chariot.- the actuator comprises a rack and a toothed wheel, or at least a cylinder and a carriage.

- le système de positionnement comprend des moyens de centrage de la première section de conduite et/ou de la deuxième section de conduite par rapport à l’outillage.- the positioning system comprises means for centering the first pipe section and/or the second pipe section with respect to the tool.

- les moyens de centrage comprennent une surface configurée pour venir en contact avec la première section de conduite et/ou la deuxième section de conduite en deux zones d’appui distinctes, la surface pouvant par exemple comprendre deux pans inclinés de sorte à former un V.- the centering means comprise a surface configured to come into contact with the first section of pipe and/or the second section of pipe in two distinct support zones, the surface possibly comprising, for example, two faces inclined so as to form a V .

- le premier support comprend un socle et une pince montée sur le socle et configurée pour bloquer en translation et en rotation la première section de conduite par rapport au socle.- The first support comprises a base and a clamp mounted on the base and configured to block in translation and in rotation the first pipe section with respect to the base.

- l’outillage comprend en outre un réceptacle configuré pour recevoir une portion de collier de serrage pour la fixation de la section supplémentaire sur la première section de conduite, ledit réceptacle étant mobile entre une position escamotée, dans laquelle la portion de collier s’étend à distance de la section supplémentaire et une position de verrouillage dans laquelle la portion de collier est appliquée contre la section supplémentaire et la section aval de sorte à permettre leur fixation.- the tooling further comprises a receptacle configured to receive a clamp portion for fixing the additional section to the first pipe section, said receptacle being movable between a retracted position, in which the clamp portion extends away from the additional section and a locking position in which the collar portion is applied against the additional section and the downstream section so as to allow their attachment.

Selon un deuxième aspect, l’invention propose un procédé de montage d’une conduite de marinage d’un tunnelier à l’aide d’un outillage comme décrit ci-dessus, ledit procédé comprenant les étapes suivantes :
- placer la première section de conduite sur le premier support,
- placer la section supplémentaire sur le deuxième support,
- positionner la section supplémentaire par rapport à la première section de conduite de sorte à ligner ladite section supplémentaire par rapport à la première section de conduite.
According to a second aspect, the invention proposes a method for mounting a mucking pipe of a tunnel boring machine using a tool as described above, said method comprising the following steps:
- place the first pipe section on the first support,
- place the additional section on the second support,
- positioning the additional section with respect to the first pipe section so as to align said additional section with respect to the first pipe section.

Certaines caractéristiques préférées mais non limitatives de ce procédé de montage sont les suivantes, prises individuellement ou en combinaison :
- l’étape de positionnement comprend une sous-étape de translation de la section supplémentaire par rapport à la première section de conduite.
Certain preferred but non-limiting characteristics of this assembly method are the following, taken individually or in combination:
- the positioning step includes a sub-step of translation of the additional section relative to the first pipe section.

- la sous-étape de translation est réalisée en déplaçant la section supplémentaire, la première section de conduite restant fixe.- the translation sub-step is carried out by moving the additional section, the first pipe section remaining fixed.

- l’étape de positionnement comprend une sous-étape de placement de la première section de conduite dans une position de référence par rapport au premier support.- the positioning step comprises a sub-step of placing the first pipe section in a reference position with respect to the first support.

- l’étape de positionnement comprend une sous-étape de placement de la section supplémentaire dans une position de référence par rapport au premier support.- the positioning step includes a sub-step of placing the additional section in a reference position relative to the first support.

D’autres caractéristiques, buts et avantages de l’invention ressortiront de la description qui suit, qui est purement illustrative et non limitative, et qui doit être lue en regard des dessins annexés sur lesquels :
Other characteristics, objects and advantages of the invention will emerge from the description which follows, which is purely illustrative and not limiting, and which must be read in conjunction with the appended drawings in which:

Les figures 1a à 1d illustrent le montage d’une section supplémentaire d’une conduite de marinage lors de l’avancée d’un tunnelier conforme à un mode de réalisation de l’invention. FIGS. 1a to 1d illustrate the mounting of an additional section of a mucking pipe during the advancement of a tunnel boring machine according to one embodiment of the invention.

La figure 2 est une vue de côté d’un exemple de réalisation d’un outillage conforme à l’invention, lors de la fixation d’une section supplémentaire d’une conduite de marinage sur une section aval de la conduite de marinage. Figure 2 is a side view of an embodiment of a tool according to the invention, when fixing an additional section of a marinating pipe on a downstream section of the marinating pipe.

La figure 3 est une vue de face et en transparence de l’outillage de la figure 2, sur laquelle a été représentée la section aval de la conduite de marinage. Figure 3 is a front view and in transparency of the tool of Figure 2, on which has been shown the downstream section of the marinating pipe.

La figure 4 est une vue de dessus et en transparence de l’outillage de la figure 2, sur laquelle les sections de conduite ont été omises. Figure 4 is a top and transparent view of the tooling of Figure 2, in which the pipe sections have been omitted.

La figure 5 est un organigramme d’étapes d’un exemple de réalisation d’un procédé selon un mode de réalisation de l’invention. FIG. 5 is a flowchart of steps of an exemplary embodiment of a method according to one embodiment of the invention.

Sur l’ensemble des figures, les éléments similaires portent des références identiques.In all the figures, similar elements bear identical references.

De manière classique, un tunnelier comprend, en partie avant, un bouclier ayant une section sensiblement circulaire dont le diamètre correspond au diamètre du tunnel dont on réalise le creusement. Le bouclier loge une roue de coupe qui vient en contact avec le front de taille pour creuser le tunnel et qui est mobile en rotation autour d’un axe.Conventionally, a tunnel boring machine comprises, in the front part, a shield having a substantially circular section whose diameter corresponds to the diameter of the tunnel which is being excavated. The shield houses a cutting wheel which comes into contact with the working face to dig the tunnel and which is rotatable around an axis.

Le tunnelier comporte en outre un train suiveur s’étendant derrière le bouclier et qui avance en même temps que la roue de coupe lors du creusement du tunnel.The tunnel boring machine further comprises a follower train extending behind the shield and which advances at the same time as the cutting wheel during the digging of the tunnel.

De manière connue en soi, la roue de coupe est montée à l'avant d'une chambre d’abattage. De la boue est injectée sous pression à l'avant du front d'attaque à partir de la chambre d'abattage, et le marin est transporté de la roue de coupe à la surface par une ou plusieurs conduites de marinage.In a manner known per se, the cutting wheel is mounted at the front of a felling chamber. Mud is injected under pressure ahead of the leading edge from the cutting chamber, and the mariner is transported from the cutter wheel to the surface by one or more mucking lines.

Chaque conduite de marinage 1 comprend une canalisation de sortie 2, raccordée à la tête de coupe du tunnelier (au niveau de la chambre d’abattage), une section de conduite aval 3 raccordée à une station de traitement des boues et un tuyau flexible 4 raccordant la canalisation de sortie et la section aval.Each mucking pipe 1 comprises an outlet pipe 2, connected to the cutting head of the tunnel boring machine (at the level of the cutting chamber), a downstream pipe section 3 connected to a sludge treatment station and a flexible pipe 4 connecting the outlet pipeline and the downstream section.

Les figures 1a à 1d illustrent le montage d’une section supplémentaire 5 d’une conduite de marinage 1 lors de l’avancée d’un tunnelier.Figures 1a to 1d illustrate the assembly of an additional section 5 of a mucking pipe 1 during the advancement of a tunnel boring machine.

Sur la figure 1a, le tuyau flexible 4 est tendu entre la canalisation de sortie 2 et la section aval 3 de la conduite de marinage 1. Il n’y a donc plus de jeu suffisant pour permettre au tunnelier de poursuivre son avancée, la section aval 3 étant fixe.In FIG. 1a, the flexible pipe 4 is stretched between the outlet pipe 2 and the downstream section 3 of the mucking pipe 1. There is therefore no longer sufficient clearance to allow the tunnel boring machine to continue its advance, the section downstream 3 being fixed.

Le tuyau flexible 4 est alors séparé de la section aval 3 puis plié de sorte à recréer un jeu (figure 1b).The flexible pipe 4 is then separated from the downstream section 3 then bent so as to recreate a clearance (FIG. 1b).

Une section supplémentaire 5 est ensuite rapportée entre le tuyau flexible 4 et la section aval 3 de la conduite (figure 1c).An additional section 5 is then added between the flexible pipe 4 and the downstream section 3 of the pipe (FIG. 1c).

La section de conduite aval 3 et la section supplémentaire 5 sont rigides.The downstream pipe section 3 and the additional section 5 are rigid.

Enfin, la section supplémentaire 5 est raccordée au tuyau flexible 4 et à la section aval 3, de sorte à remettre la chambre d’abattage et la station de traitement des boues en communication fluidique. Le tunnelier peut ensuite reprendre le creusement et avancer.Finally, the additional section 5 is connected to the flexible pipe 4 and to the downstream section 3, so as to put the slaughter chamber and the sludge treatment station back into fluid communication. The TBM can then resume digging and move forward.

Afin de simplifier le montage de la section supplémentaire 5 sur la section aval 3 de la conduite de marinage 1, l’invention propose un outillage 6 comprenant :
- un premier support 10, configuré pour recevoir la section aval 3 de la conduite de marinage 1,
- un deuxième support 20, fixé solidairement au premier support 10 et configuré pour recevoir la section supplémentaire 5 et
- un système de positionnement 30 de la section supplémentaire 5 par rapport à la section aval 3 de la conduite de marinage 1 en vue d’aligner ladite section supplémentaire 5 par rapport à la section aval 3.
In order to simplify the assembly of the additional section 5 on the downstream section 3 of the marinating pipe 1, the invention proposes a tool 6 comprising:
- a first support 10, configured to receive the downstream section 3 of the marinating pipe 1,
- a second support 20, fixed integrally to the first support 10 and configured to receive the additional section 5 and
- a positioning system 30 of the additional section 5 with respect to the downstream section 3 of the marinating pipe 1 in order to align said additional section 5 with respect to the downstream section 3.

Un tel outillage 6 permet ainsi de supprimer les manipulations de la section supplémentaire 5 avec le palan à chaîne, puisque la section supplémentaire 5 est amenée sur le deuxième support 20 puis alignée grâce au système de positionnement 30. En simplifiant l’alignement des sections, leur positionnement relatif peut également être amélioré lors de leur raccordement.Such a tool 6 thus makes it possible to eliminate manipulations of the additional section 5 with the chain hoist, since the additional section 5 is brought onto the second support 20 then aligned thanks to the positioning system 30. By simplifying the alignment of the sections, their relative positioning can also be improved during their connection.

Dans ce qui suit, on désignera par « axe longitudinal X » un axe passant par le premier support 10 qui est sensiblement parallèle à l’axe de révolution de la section aval 3 de la conduite, par « axe vertical Z » un axe comprise dans le plan normal à l’axe longitudinal X et qui est sensiblement normal au sol sur lequel est posé le premier support 10 de l’outillage 6, et par « axe transversal Y » un axe perpendiculaire à l’axe vertical Z et à l’axe longitudinal X.In what follows, the term "longitudinal axis X" will denote an axis passing through the first support 10 which is substantially parallel to the axis of revolution of the downstream section 3 of the pipe, the term "vertical axis Z" an axis included in the plane normal to the longitudinal axis X and which is substantially normal to the ground on which the first support 10 of the tool 6 is placed, and by "transverse axis Y" an axis perpendicular to the vertical axis Z and to the longitudinal axis X.

Le premier support 10 peut notamment comprendre une embase 11 configurée pour recevoir la section aval 3 et une pince 12 configurée pour bloquer en translation et en rotation la section aval 3 par rapport au premier support 10. La pince 12 peut par exemple être montée mobile en rotation autour d’un axe sensiblement parallèle à l’axe de rotation.The first support 10 may in particular comprise a base 11 configured to receive the downstream section 3 and a clamp 12 configured to lock the downstream section 3 in translation and in rotation with respect to the first support 10. The clamp 12 may for example be mounted so as to rotation around an axis substantially parallel to the axis of rotation.

Dans l’exemple de réalisation illustré sur les figures, le premier support 10 comprend un socle 13 sur lequel est fixée l’embase 11 configurée pour recevoir la section aval 3 et un bras 14 s’étendant depuis le socle 13 suivant une direction sensiblement parallèle à l’axe vertical Z, le long de la section aval 3. La pince 12 est montée à rotation sur le bras 14 et sur l’embase 11 de sorte à serrer la section aval 3 contre l’embase 11 et à la maintenir ainsi en position par rapport au premier support 10. Le cas échéant, le bras 14 peut lui-même être monté mobile à rotation par rapport au socle 13, soit via une liaison pivot dont l’axe est parallèle à l’axe longitudinale X, soit via une liaison rotule. La pince 12 peut notamment être actionnée par un bloc hydraulique 15.In the exemplary embodiment illustrated in the figures, the first support 10 comprises a base 13 on which is fixed the base 11 configured to receive the downstream section 3 and an arm 14 extending from the base 13 in a substantially parallel direction. to the vertical axis Z, along the downstream section 3. The clamp 12 is rotatably mounted on the arm 14 and on the base 11 so as to clamp the downstream section 3 against the base 11 and to hold it thus in position with respect to the first support 10. If necessary, the arm 14 can itself be mounted rotatably with respect to the base 13, either via a pivot connection whose axis is parallel to the longitudinal axis X, or via a ball joint. Clamp 12 can in particular be actuated by a hydraulic block 15.

Le deuxième support 20 quant à lui comprend une embase 21 configurée pour recevoir la section supplémentaire 5. L’embase 21 est solidaire du premier support 10 de sorte à faciliter l’alignement de la section supplémentaire 5 avec la section aval 3, le premier support 10 servant de référence pour le positionnement du deuxième support 20. Pour cela, dans une forme de réalisation, l’embase 21 du deuxième support 20 peut par exemple être montée sur le socle 13 du premier support 10. En variante, l’embase 21 du deuxième support 20 peut être montée sur un socle distinct qui est rapporté et fixé sur le socle 13 du premier support 10.The second support 20 for its part comprises a base 21 configured to receive the additional section 5. The base 21 is integral with the first support 10 so as to facilitate the alignment of the additional section 5 with the downstream section 3, the first support 10 serving as a reference for the positioning of the second support 20. For this, in one embodiment, the base 21 of the second support 20 can for example be mounted on the base 13 of the first support 10. Alternatively, the base 21 of the second support 20 can be mounted on a separate base which is attached and fixed to the base 13 of the first support 10.

Dans l’exemple de réalisation illustré sur les figures, le socle 13 du deuxième support 20 est commun avec celui du premier support 10.In the embodiment illustrated in the figures, the base 13 of the second support 20 is common with that of the first support 10.

Dans une forme de réalisation, le système de positionnement 30 comprend des moyens de centrage de la section aval 3 de la conduite de marinage 1 par rapport au premier support 10. Avantageusement, les moyens de centrage permettent de définir une position de référence pour la section aval 3 suivant l’axe vertical Z et l’axe transversal Y, simplifiant ensuite les opérations d’alignement de la section supplémentaire 5 par rapport à la section aval 3.In one embodiment, the positioning system 30 comprises means for centering the downstream section 3 of the marinating pipe 1 with respect to the first support 10. Advantageously, the centering means make it possible to define a reference position for the section downstream 3 along the vertical axis Z and the transverse axis Y, then simplifying the operations of aligning the additional section 5 with respect to the downstream section 3.

De préférence, le système de positionnement 30 comprend à la fois des moyens de centrage de la section aval 3 de la conduite de marinage 1 et des moyens de centrage de la section supplémentaire 5 pour faciliter leur alignement et la fixation de la section supplémentaire 5 sur la section aval 3.Preferably, the positioning system 30 comprises both means for centering the downstream section 3 of the marinating pipe 1 and means for centering the additional section 5 to facilitate their alignment and the fixing of the additional section 5 on the downstream section 3.

Par exemple, la surface d’appui 31, 32 de chaque embase 11, 21 qui reçoit la section supplémentaire 5 (respectivement, la section aval 3) peut assurer la fonction de centrage de la section supplémentaire 5 (respectivement, de la section aval 3). Pour cela, la surface d’appui 31, 32 peut être configurée pour venir en contact avec la section supplémentaire 5 (respectivement, la section aval 3) en deux zones distinctes, de préférence symétriques par rapport à un plan vertical parallèle à l’axe longitudinal X. Typiquement, chaque surface d’appui 31, 32 peut comprendre deux pans inclinés (voir figures 3 et 4) de sorte à former un V. Les pans inclinés de la surface d’appui 31, 32 peuvent se rejoindre le long d’une ligne ou être séparés par une gorge. Une telle surface d’appui 31, 32 permet ainsi de placer la section aval 3 et la section supplémentaire 5 dans des positions de référence suivant les axes vertical et transversal.For example, the support surface 31, 32 of each base 11, 21 which receives the additional section 5 (respectively, the downstream section 3) can ensure the function of centering the additional section 5 (respectively, the downstream section 3 ). For this, the support surface 31, 32 can be configured to come into contact with the additional section 5 (respectively, the downstream section 3) in two distinct zones, preferably symmetrical with respect to a vertical plane parallel to the axis longitudinal X. Typically, each bearing surface 31, 32 may comprise two inclined faces (see FIGS. 3 and 4) so as to form a V. The inclined faces of the bearing surface 31, 32 may meet along 'a line or be separated by a groove. Such a support surface 31, 32 thus makes it possible to place the downstream section 3 and the additional section 5 in reference positions along the vertical and transverse axes.

Une surface d’appui 31, 32 en forme de V permet en outre de centrer les sections de conduite 3, 5 indépendamment de leur diamètre.A support surface 31, 32 in the form of a V also makes it possible to center the pipe sections 3, 5 independently of their diameter.

Le système de positionnement 30 est configuré pour déplacer la section supplémentaire 5 par rapport à la section aval 3 suivant l’axe longitudinal X en vue de placer la section supplémentaire 5 à une distance adaptée de la section aval 3 pour permettre leur fixation mutuelle.The positioning system 30 is configured to move the additional section 5 relative to the downstream section 3 along the longitudinal axis X in order to place the additional section 5 at a suitable distance from the downstream section 3 to allow their mutual fixing.

Pour cela, dans une forme de réalisation, le système de positionnement 30 comprend un actionneur configuré pour translater la section supplémentaire 5 par rapport à la première section de conduite. Par exemple, l’actionneur peut comprendre une crémaillère 33 qui est montée sur l’embase 21 de sorte à s’étendre parallèlement à l’axe longitudinal X, et une roue dentée 34 associée, montée mobile en rotation autour d’un axe transversal Y sur le socle 13 du deuxième support 20 et pouvant être actionnée par exemple par une manivelle 35 ou mise en rotation par un moteur. La rotation de la roue dentée 34 a alors pour effet de déplacer la crémaillère 33 et donc l’embase 21 du deuxième support 20 (qui supporte la section supplémentaire 5) le long de l’axe longitudinal X afin de rapprocher ou d’éloigner ladite embase 21 du premier support 10 (et donc la section supplémentaire 5 de la section aval 3). De manière équivalente, on comprendra bien sûr que la roue dentée 34 pourrait être montée sur l’embase 21 du deuxième support 20 tandis que la crémaillère 33 est montée fixe sur le socle 13.For this, in one embodiment, the positioning system 30 comprises an actuator configured to translate the additional section 5 relative to the first pipe section. For example, the actuator may comprise a rack 33 which is mounted on the base 21 so as to extend parallel to the longitudinal axis X, and an associated toothed wheel 34, mounted rotatably about a transverse axis Y on the base 13 of the second support 20 and can be actuated for example by a crank 35 or rotated by a motor. The rotation of the toothed wheel 34 then has the effect of moving the rack 33 and therefore the base 21 of the second support 20 (which supports the additional section 5) along the longitudinal axis X in order to bring said base 21 of the first support 10 (and therefore the additional section 5 of the downstream section 3). Equivalently, it will of course be understood that the toothed wheel 34 could be mounted on the base 21 of the second support 20 while the rack 33 is mounted fixed on the base 13.

En variante, l’actionneur comprend un chariot roulant monté fixement sur l’embase 21 et configuré pour coulisser sur le sol ainsi qu’un vérin de translation configuré pour déplacer le chariot roulant par rapport au sol afin de translater la section supplémentaire 5 par rapport à la première section de conduite.As a variant, the actuator comprises a rolling carriage fixedly mounted on the base 21 and configured to slide on the ground as well as a translation cylinder configured to move the rolling carriage relative to the ground in order to translate the additional section 5 relative to to the first pipe section.

L’outillage 6 permet ainsi de faciliter grandement le positionnement de la section aval 3 de la conduite de marinage 1 par rapport à la section supplémentaire 5.The tool 6 thus makes it possible to greatly facilitate the positioning of the downstream section 3 of the marinating pipe 1 with respect to the additional section 5.

L’outillage 6 comprend en outre un réceptacle 22 configuré pour recevoir une portion inférieure d’un collier 7 de serrage pour la fixation de la section supplémentaire 5 sur la section aval 3. Le réceptacle 22 peut notamment être mobile en translation entre une position escamotée, dans laquelle la portion inférieure du collier 7 s’étend à distance de la section supplémentaire 5 de sorte à permettre sa mise en place sur l’embase 21 et son positionnement par rapport à la section aval 3, et une position de verrouillage dans laquelle la portion inférieure du collier 7 est appliquée contre la section supplémentaire 5 et la section aval 3 de sorte à permettre leur fixation mutuelle.The tool 6 further comprises a receptacle 22 configured to receive a lower portion of a clamping collar 7 for fixing the additional section 5 to the downstream section 3. The receptacle 22 can in particular be movable in translation between a retracted position , in which the lower portion of the collar 7 extends at a distance from the additional section 5 so as to allow its installation on the base 21 and its positioning relative to the downstream section 3, and a locking position in which the lower portion of the collar 7 is applied against the additional section 5 and the downstream section 3 so as to allow their mutual attachment.

Par exemple, le réceptacle 22 peut être monté sur un vérin 23, fixé sur le socle 13 du deuxième support 20 et mobile entre la position escamotée et la position de verrouillage. Ici, le vérin 23 présente donc une direction de translation sensiblement parallèle à l’axe vertical Z. Le cas échéant, le système de positionnement comprend également un chariot sur lequel est monté le vérin 23. Ce chariot est alors actionné par un vérin de translation associé afin de le translater lors de la mise en position de la section supplémentaire 5.For example, the receptacle 22 can be mounted on a jack 23, fixed to the base 13 of the second support 20 and movable between the retracted position and the locking position. Here, the cylinder 23 therefore has a direction of translation substantially parallel to the vertical axis Z. If necessary, the positioning system also comprises a carriage on which the cylinder 23 is mounted. This carriage is then actuated by a translation cylinder associated in order to translate it when positioning the additional section 5.

Ainsi, l’outillage 6 permet en plus de faciliter la mise en place du collier 7 de serrage.Thus, the tool 6 also makes it easier to put the clamp 7 in place.

Le procédé S de montage de la section supplémentaire 5 de la conduite de marinage 1 sur la section aval 3 peut alors être réalisé conformément aux étapes suivantes.The method S of mounting the additional section 5 of the marinating pipe 1 on the downstream section 3 can then be carried out in accordance with the following steps.

Au cours d’une première étape S1, le tuyau flexible 4 est séparé de la section aval 3 de la conduite de marinage 1 et est replié de sorte à ménager un jeu entre la canalisation de sortie 2 et la conduite de marinage 1.During a first step S1, the flexible pipe 4 is separated from the downstream section 3 of the pickling pipe 1 and is folded so as to create a clearance between the outlet pipe 2 and the pickling pipe 1.

Cette étape de séparation étant conventionnelle, elle ne sera pas davantage décrite ici.This separation step being conventional, it will not be further described here.

Au cours d’une deuxième étape S2, l’outillage 6 est placé à proximité de l’extrémité libre de la section aval 3 de sorte que l’axe longitudinal X du premier support 10 soit sensiblement parallèle à l’axe de révolution de la section aval 3.During a second step S2, the tool 6 is placed close to the free end of the downstream section 3 so that the longitudinal axis X of the first support 10 is substantially parallel to the axis of revolution of the downstream section 3.

La section aval 3 est ensuite positionnée sur le premier support 10 dans une position de référence donnée afin de faciliter l’alignement et la fixation de la section supplémentaire 5 sur la section aval 3. Pour cela, la section aval 3 peut par exemple être centrée par rapport au premier support 10 grâce aux moyens de centrage, typiquement grâce à une surface d’appui 31 en forme de V de l’embase 11. Une telle surface d’appui 31 permet ainsi d’imposer la position de la section aval 3 suivant l’axe vertical Z et l’axe transversal Y.The downstream section 3 is then positioned on the first support 10 in a given reference position in order to facilitate the alignment and fixing of the additional section 5 on the downstream section 3. For this, the downstream section 3 can for example be centered with respect to the first support 10 thanks to the centering means, typically thanks to a V-shaped support surface 31 of the base 11. Such a support surface 31 thus makes it possible to impose the position of the downstream section 3 along the vertical axis Z and the transverse axis Y.

Au cours d’une troisième étape S3, une portion inférieure d’un collier 7 de serrage est placée sur le réceptacle 22 du deuxième support 20.During a third step S3, a lower portion of a clamp 7 is placed on the receptacle 22 of the second support 20.

Le réceptacle 22 est alors en position escamotée.The receptacle 22 is then in the retracted position.

Au cours d’une quatrième étape S4, une section supplémentaire 5 est amenée et placée sur le deuxième support 20, par exemple à l’aide d’un palan à chaîne. La section supplémentaire 5 est de préférence centrée sur l’embase 21, par exemple grâce à des moyens de centrage tels qu’une surface d’appui 32 en forme de V de l’embase 21 du deuxième support 20. En variante, lorsque le deuxième support 20 est dépourvu de moyens de centrage, la section supplémentaire 5 peut positionnée par le ou les opérateurs de sorte à être sensiblement alignée avec la section aval 3.During a fourth step S4, an additional section 5 is brought and placed on the second support 20, for example using a chain hoist. The additional section 5 is preferably centered on the base 21, for example by means of centering means such as a V-shaped bearing surface 32 of the base 21 of the second support 20. As a variant, when the second support 20 has no centering means, the additional section 5 can be positioned by the operator(s) so as to be substantially aligned with the downstream section 3.

Au cours d’une cinquième étape S5, la section supplémentaire 5 est rapprochée ou éventuellement éloignée de la section aval 3. Par exemple, l’embase 21 est déplacée suivant l’axe longitudinal X par le système de positionnement 30 en faisant tourner la manivelle 35 de sorte à faire tourner la roue dentée 34 (ou, en variante, démarre le moteur qui met en rotation la roue dentée 34) qui déplace alors la crémaillère 33 et donc l’embase 21 du deuxième support 20 suivant l’axe longitudinal X. Alternativement, lorsque les moyens de positionnement comprennent un ou plusieurs chariots, les chariots sont déplacés suivant l’axe longitudinal X par le vérin de translation associé.During a fifth step S5, the additional section 5 is brought closer to or possibly moved away from the downstream section 3. For example, the base 21 is moved along the longitudinal axis X by the positioning system 30 by turning the crank 35 so as to rotate the toothed wheel 34 (or, alternatively, starts the motor which rotates the toothed wheel 34) which then moves the rack 33 and therefore the base 21 of the second support 20 along the longitudinal axis X Alternatively, when the positioning means comprise one or more carriages, the carriages are moved along the longitudinal axis X by the associated translation jack.

L’embase 21 est alors déplacée jusqu’à ce que la section supplémentaire 5 soit suffisamment proche de la section aval 3 pour permettre sa fixation.The base 21 is then moved until the additional section 5 is sufficiently close to the downstream section 3 to allow its fixing.

Au cours d’une sixième étape S6, le réceptacle 22 est placé en position de verrouillage, par exemple en actionnant le vérin 23, afin d’appliquer le demi-collier 7 sur la partie inférieure de la section supplémentaire 5 et de la section aval 3. Une portion supérieure de collier 7 complémentaire de la portion inférieure peut alors être rapportée sur leur partie supérieure et fixée par boulonnage sur la portion inférieure qui est appliquée et maintenue en position contre les sections de conduite. La section supplémentaire 5 est alors fixée à la section aval 3 de la conduite de marinage 1 par serrage des portions de collier 7.During a sixth step S6, the receptacle 22 is placed in the locking position, for example by actuating the cylinder 23, in order to apply the half-collar 7 on the lower part of the additional section 5 and of the downstream section 3. An upper portion of collar 7 complementary to the lower portion can then be attached to their upper part and fixed by bolting to the lower portion which is applied and held in position against the pipe sections. The additional section 5 is then fixed to the downstream section 3 of the marinating pipe 1 by tightening the collar portions 7.

Au cours d’une septième étape S7, l’outillage 6 peut être retiré. Pour cela, le réceptacle 22 est de préférence ramené en position escamotée puis le premier et le deuxième support 20 sont retirés.During a seventh step S7, the tool 6 can be removed. For this, the receptacle 22 is preferably brought back into the retracted position then the first and the second support 20 are removed.

Au cours d’une huitième étape S8, la section supplémentaire 5 peut être raccordée au tuyau flexible 4. Cette étant conventionnelle elle ne sera pas davantage détaillée ici.During an eighth step S8, the additional section 5 can be connected to the flexible pipe 4. This being conventional, it will not be further detailed here.

Bien entendu, les étapes S3 et S6 sont optionnelles, les portions de collier 7 pouvant être placées manuellement par les opérateurs sur les sections de conduite.Of course, steps S3 and S6 are optional, the collar portions 7 being able to be placed manually by the operators on the pipe sections.

Claims (12)

Outillage (6) pour le montage d’une conduite de marinage (1) d’un tunnelier, la conduite de marinage (1) comprenant :
- une canalisation de sortie (2), raccordée à une tête de coupe du tunnelier,
- une première section de conduite (3) et
- un tuyau flexible (4), raccordant la canalisation de sortie (2) et la première section de conduite (3),
l’outillage (6) étant caractérisé en ce qu’il comprend :
- un premier support (10), configuré pour recevoir la première section de conduite (3),
- un deuxième support (20), fixé solidairement au premier support (10) et configuré pour recevoir une section supplémentaire (5) de conduite et
- un système de positionnement (30) de la section supplémentaire (5) par rapport à la première section de conduite (3) en vue d’aligner ladite section supplémentaire (5) par rapport à la première section de conduite (3).
Tooling (6) for mounting a mucking pipe (1) of a tunnel boring machine, the mucking pipe (1) comprising:
- an outlet pipe (2), connected to a cutting head of the tunnel boring machine,
- a first pipe section (3) and
- a flexible pipe (4), connecting the outlet pipe (2) and the first pipe section (3),
the tool (6) being characterized in that it comprises:
- a first support (10), configured to receive the first pipe section (3),
- a second support (20), integrally fixed to the first support (10) and configured to receive an additional pipe section (5) and
- a positioning system (30) of the additional section (5) relative to the first pipe section (3) in order to align said additional section (5) relative to the first pipe section (3).
Outillage (6) selon la revendication 1, dans lequel le système de positionnement (30) comprend un actionneur (33, 34, 35) configuré pour translater la section supplémentaire (5) par rapport à la première section de conduite (3).Tooling (6) according to Claim 1, in which the positioning system (30) comprises an actuator (33, 34, 35) configured to translate the additional section (5) with respect to the first pipe section (3). Outillage (6) selon la revendication 2, dans lequel l’actionneur (33, 34, 35) comprend une crémaillère (33) et une roue dentée (34), ou au moins un vérin et un chariot.Tooling (6) according to Claim 2, in which the actuator (33, 34, 35) comprises a rack (33) and a toothed wheel (34), or at least one cylinder and a carriage. Outillage (6) selon l’une des revendications 1 à 3, dans lequel le système de positionnement (30) comprend des moyens de centrage (31, 32) de la première section de conduite (3) et/ou de la deuxième section de conduite par rapport à l’outillage (6).Tool (6) according to one of Claims 1 to 3, in which the positioning system (30) comprises means (31, 32) for centering the first section of pipe (3) and/or the second section of conduct relative to the tool (6). Outillage (6) selon la revendication 4, dans lequel les moyens de centrage (31, 32) comprennent une surface configurée pour venir en contact avec la première section de conduite (3) et/ou la deuxième section de conduite en deux zones d’appui distinctes, la surface pouvant par exemple comprendre deux pans inclinés de sorte à former un V.Tooling (6) according to Claim 4, in which the centering means (31, 32) comprise a surface configured to come into contact with the first pipe section (3) and/or the second pipe section in two zones of distinct supports, the surface being able for example to comprise two sloped sides so as to form a V. Outillage (6) selon l’une des revendications 1 à 5, dans lequel le premier support (10) comprend un socle (13) et une pince (12) montée sur le socle (13) et configurée pour bloquer en translation et en rotation la première section de conduite (3) par rapport au socle (13).Tool (6) according to one of claims 1 to 5, in which the first support (10) comprises a base (13) and a clamp (12) mounted on the base (13) and configured to block in translation and in rotation the first pipe section (3) with respect to the base (13). Outillage (6) selon l’une des revendications 1 à 6 comprenant en outre un réceptacle (22) configuré pour recevoir une portion de collier (7) de serrage pour la fixation de la section supplémentaire (5) sur la première section de conduite (3), ledit réceptacle (22) étant mobile entre une position escamotée, dans laquelle la portion de collier (7) s’étend à distance de la section supplémentaire (5) et une position de verrouillage dans laquelle la portion de collier (7) est appliquée contre la section supplémentaire (5) et la section aval de sorte à permettre leur fixation.Tool (6) according to one of claims 1 to 6 further comprising a receptacle (22) configured to receive a portion of clamping collar (7) for fixing the additional section (5) to the first pipe section ( 3), said receptacle (22) being movable between a retracted position, in which the collar portion (7) extends away from the additional section (5) and a locking position in which the collar portion (7) is applied against the additional section (5) and the downstream section so as to allow their fixing. Procédé de montage (S) d’une conduite de marinage (1) d’un tunnelier à l’aide d’un outillage (6) selon l’une des revendications 1 à 7, ledit procédé comprenant les étapes suivantes :
- placer (S2) la première section de conduite (3) sur le premier support (10),
- placer (S4) la section supplémentaire (5) sur le deuxième support (20),
- positionner (S5) la section supplémentaire (5) par rapport à la première section de conduite (3) de sorte à ligner ladite section supplémentaire (5) par rapport à la première section de conduite (3).
Method for mounting (S) a mucking pipe (1) of a tunnel boring machine using a tool (6) according to one of claims 1 to 7, said method comprising the following steps:
- placing (S2) the first pipe section (3) on the first support (10),
- placing (S4) the additional section (5) on the second support (20),
- positioning (S5) the additional section (5) with respect to the first pipe section (3) so as to line up said additional section (5) with respect to the first pipe section (3).
Procédé de montage (S) selon la revendication 8, dans lequel l’étape (S5) de positionnement comprend une sous-étape de translation de la section supplémentaire (5) par rapport à la première section de conduite (3).Assembly method (S) according to claim 8, in which the step (S5) of positioning comprises a sub-step of translation of the additional section (5) with respect to the first pipe section (3). Procédé de montage (S) selon la revendication 9, dans lequel la sous-étape de translation est réalisée en déplaçant la section supplémentaire (5), la première section de conduite (3) restant fixe.Mounting method (S) according to claim 9, in which the translation sub-step is carried out by moving the additional section (5), the first pipe section (3) remaining fixed. Procédé de montage (S) selon l’une des revendications 8 à 10, dans lequel l’étape (S5) de positionnement comprend une sous-étape de placement de la première section de conduite (3) dans une position de référence par rapport au premier support (10).Mounting method (S) according to one of Claims 8 to 10, in which the positioning step (S5) comprises a sub-step of placing the first pipe section (3) in a reference position with respect to the first support (10). Procédé de montage (S) selon la revendication 11, dans lequel l’étape (S5) de positionnement comprend une sous-étape de placement de la section supplémentaire (5) dans une position de référence par rapport au premier support (10).Mounting method (S) according to claim 11, in which the step (S5) of positioning comprises a sub-step of placing the additional section (5) in a reference position with respect to the first support (10).
FR1907668A 2019-07-09 2019-07-09 Assembly of a marinating pipe for a tunnel boring machine Pending FR3098425A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR1907668A FR3098425A1 (en) 2019-07-09 2019-07-09 Assembly of a marinating pipe for a tunnel boring machine
PCT/EP2020/069429 WO2021005174A1 (en) 2019-07-09 2020-07-09 Tool for aligning and mounting a collar on a mucking pipeline for a tunneling machine

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1907668 2019-07-09
FR1907668A FR3098425A1 (en) 2019-07-09 2019-07-09 Assembly of a marinating pipe for a tunnel boring machine

Publications (1)

Publication Number Publication Date
FR3098425A1 true FR3098425A1 (en) 2021-01-15

Family

ID=67999941

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1907668A Pending FR3098425A1 (en) 2019-07-09 2019-07-09 Assembly of a marinating pipe for a tunnel boring machine

Country Status (2)

Country Link
FR (1) FR3098425A1 (en)
WO (1) WO2021005174A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3122347A1 (en) * 2021-04-29 2022-11-04 Vinci Construction Grands Projets Tunnel Boring Line Extension Kit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3778107A (en) * 1972-01-03 1973-12-11 Ameron Inc Remote-controlled boring machine for boring horizontal tunnels and method
US4076130A (en) * 1976-02-27 1978-02-28 Hydrotech International, Inc. Apparatus for mounting a coupling member over a pipe end in a subsea location
US4869358A (en) * 1984-04-02 1989-09-26 Chandler Charles L Conveyor belt system for a continuous mining machine
US20020030398A1 (en) * 2000-03-13 2002-03-14 Drake Ronald D. Method and system for mining hydrocarbon-containing materials
CN104373130A (en) * 2014-11-04 2015-02-25 中交第二航务工程局有限公司 Muck pressure maintaining pumping device of earth pressure balance shield machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3778107A (en) * 1972-01-03 1973-12-11 Ameron Inc Remote-controlled boring machine for boring horizontal tunnels and method
US4076130A (en) * 1976-02-27 1978-02-28 Hydrotech International, Inc. Apparatus for mounting a coupling member over a pipe end in a subsea location
US4869358A (en) * 1984-04-02 1989-09-26 Chandler Charles L Conveyor belt system for a continuous mining machine
US20020030398A1 (en) * 2000-03-13 2002-03-14 Drake Ronald D. Method and system for mining hydrocarbon-containing materials
CN104373130A (en) * 2014-11-04 2015-02-25 中交第二航务工程局有限公司 Muck pressure maintaining pumping device of earth pressure balance shield machine

Also Published As

Publication number Publication date
WO2021005174A1 (en) 2021-01-14

Similar Documents

Publication Publication Date Title
FR2899608A1 (en) DRILLING TOOLS
FR2888859A1 (en) MIXED FLOOR WALL MOUNTING INSTALLATION WITH BINDER AND METHOD OF CORRECTING TRACK OF DRILLING HEAD OF SUCH FACILITY
EP1882781B1 (en) Cutting head for a digging machine
CA2929448A1 (en) Cutting tool holder for a tunnel-boring machine and associated cutting assembly
FR3060046A1 (en) DRILLING MACHINE WITH FOUR DRILLING BODIES
EP3997373B1 (en) Spoil pipe for tunnel boring machine
WO2021005174A1 (en) Tool for aligning and mounting a collar on a mucking pipeline for a tunneling machine
EP1632638A1 (en) Hydraulic drilling apparatus for confined space work
FR2596084A1 (en) DEVICE FOR PUSHING TUBES, PARTICULARLY FOR LOW DIAMETER TUBES
FR2674568A1 (en) HORIZONTAL LOCKING DEVICE AND HORIZONTAL LOCKING METHOD FOR LAYING PIPES IN THE GROUND OF AN INTERNAL DIAMETER WHICH DOES NOT ALLOW CIRCULATION.
EP2204500B1 (en) Excavator with pivoting kelly
EP3241985A1 (en) Tunnel boring machine
FR3050758B1 (en) TBM
FR2461806A1 (en) Digging machine for mines - has digging tool carried on multi-pivoted arm on main frame and chassis
EP1350893B1 (en) Trench cutting wheel and trench cutter comprising at least two trench cutting wheels
FR2898689A1 (en) Property e.g. building, connecting method for e.g. Internet telecommunication, involves disposing longitudinal and transversal optical fiber cables connected to optical fiber line and property, in longitudinal and transversal recesses
FR2663980A1 (en) VERTICAL PERFORATING COLUMN.
EP0061969B1 (en) Tunnelling machine with a tool-holding rotating head, provided with a device for applying lining units
EP1094197A1 (en) Tool assembly for setting and removing the tools in a tunnel boring machine
FR2645584A1 (en) DEVICE FOR EXCAVATING TRANSVERSE GALLERIES WHEN PUNCHING TUNNELS OR GALLERIES
EP2077355B1 (en) Bagger, der in Containern transportiert werden kann
EP0696673B1 (en) Cutting machine to precut a gallery vault
EP2206876A1 (en) Drilling head for drilling machine
FR2615544A1 (en) Method and machine for preparing trenches for cables or the like in all types of ground
EP0558388B1 (en) Method for cutting rock of low cohesion, in particular for making tunnels or galleries and device for carrying out this method

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20210115

RX Complete rejection

Effective date: 20211015