ensuring
dike
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR1701125A
Other languages
French (fr)
Inventor
Richard Dziewolski
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR1701125A priority Critical patent/FR3072980A1/en
Publication of FR3072980A1 publication Critical patent/FR3072980A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/102Permanently installed raisable dykes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

L'invention concerne des dispositifs et procédés de construction de digues flottantes et habitables à vocation touristique permettant de protéger les rives des zones touristiques à forte densité d'habitat qui risquent, dans un proche avenir, d'être inondés par : - la montée des océans résultant de réchauffement de la planète, des marrées de plus en plus importantes et des tsunamis, - des crues provoquées par des orages violents conduisant à des inondations des zones habitables fortement bétonnées et souvent en pente, ne possédant ni réseaux d'eaux pluviales de capacité suffisante, ni bassins de rétention, ni murs de soutènement stables. Cette invention permet non seulement de protéger le littoral par extension du territoire sur la mer, mais également elle permet d'améliorer, la qualité architecturale et fonctionnelle recherchée par la population, la rentabilité des investissements et facilitant la liaison avec une plate-forme barge implantées au large des côtes.The invention relates to devices and methods for constructing floating and habitable dikes for tourist purposes to protect the banks of tourist areas with high density of habitat that risk, in the near future, to be flooded by: - the rise of oceans resulting from global warming, increasing tides and tsunamis, - floods caused by violent thunderstorms leading to flooding of highly confined and often sloping habitable areas with no rainwater networks sufficient capacity, neither retention basins nor stable retaining walls. This invention not only protects the coastline by extension of the territory on the sea, but also it improves, the architectural and functional quality sought by the population, the profitability of investments and facilitating the connection with a platform barge implanted offshore.

Description

L'invention concerne un dispositif et un procédé de construction de digues flottantes et habitables à vocation touristique permettant de protéger le littoral contre la montée des eaux.The invention relates to a device and a method for building floating and habitable dykes for tourist purposes, making it possible to protect the coastline against rising waters.

Etat de la TechniqueState of the art

Les rives des zones touristiques à forte densité d’habitat risquent, dans un proche avenir, d’être inondées par :The shores of tourist areas with a high density of habitat are likely, in the near future, to be flooded by:

- la montée des océans résultant d’un réchauffement de la planète, de vagues et raz de marrées, de tempêtes - typhon de plus en plus violents et de tsunamis et, de crues provoqués par des orages conduisant à des inondations des zones habitables fortement bétonnées et souvent en pente, ne possédant ni réseaux d'eaux pluviales de capacité suffisante, ni bassins de rétention, ni murs de soutènements stables.- the rise of the oceans resulting from global warming, waves and tidal waves, increasingly violent typhoons and tsunamis and, floods caused by thunderstorms leading to flooding of heavily concrete habitable areas and often sloping, having neither rainwater networks of sufficient capacity, nor retention basins, nor stable retaining walls.

Les dernières recherches scientifiques démontrent que le réchauffement de la planète, mis en évidence dans le cadre de la COP21, provoquent l'élévation inéluctable des océans dans les zones où les terrains constructibles sont de plus en plus rares, résultant en grande partie de l'aménagement du territoire basé sur la spécialisation des équipements provoquant des émissions de gaz à effet de serre et la pollution des eaux.The latest scientific research shows that global warming, highlighted in the context of COP21, is causing the inevitable rise of the oceans in areas where building land is increasingly scarce, resulting largely from the spatial planning based on the specialization of equipment causing greenhouse gas emissions and water pollution.

L’accroissement de la population sur le littoral pose de nombreux problèmes techniques et écologiques, incompatibles avec les notions de développement durable et de respect de l'environnement, tels que :The increase in population on the coast poses many technical and ecological problems, incompatible with the concepts of sustainable development and respect for the environment, such as:

Manque de terrains constructibles ;Lack of building land;

Saturation des routes ;Road congestion;

Pollution de l'air et des eaux ;Air and water pollution;

Manque d'eau potable ;Lack of potable water;

Difficultés croissantes de raccordement aux réseaux (eaux usées, eau potable, électricité, déchets, etc.) ;Growing difficulties in connecting to networks (wastewater, drinking water, electricity, waste, etc.);

Bétonnage des espaces verts et des forêts dans l'arrière-pays pour la création d'habitats individuels, des grands centres commerciaux, ou de zones industrielles (accessibles uniquement en voiture) ;Concreting of green spaces and forests in the hinterland for the creation of individual habitats, large shopping centers, or industrial zones (accessible only by car);

Modification du climat conduisant, dans un proche avenir, à la montée des océans et à l'inondation des plages, des routes et des constructions en bord de mer.Climate change leading, in the near future, to the rise of the oceans and the flooding of beaches, roads and constructions by the sea.

Par ailleurs, le développement, en bordure du littoral, d'un tourisme, en attente d'activités sportives culturelles et d'évasion, nécessite l'adaptation rapide des équipements hôteliers existants et des plages en fonction des exigences d’une clientèle internationale.In addition, the development, along the coast, of tourism, awaiting cultural sports and escape, requires the rapid adaptation of existing hotel facilities and beaches according to the requirements of an international clientele.

Les plus beaux sites du bord de mer, les plus recherchés par la clientèle, sont saturés et ne permettent plus de nouveaux aménagements.The most beautiful seaside sites, the most sought after by customers, are saturated and no longer allow new developments.

Les plages non aménagées, mal entretenues et étroites ainsi que les difficultés de parking le long des routes nécessiteraient des travaux importants d'aménagement, non seulement pour la protection des zones devenues inondables (routes, plages, habitats et zones industrielles) du fait de la montée du niveau de la mer, mais également pour répondre aux besoins touristiques.Unmanaged, poorly maintained and narrow beaches as well as parking difficulties along the roads would require significant development work, not only for the protection of areas that have become flooded (roads, beaches, habitats and industrial areas) due to the sea level rise, but also to meet tourist needs.

Le problème d'aménagement du bord de mer devient essentiel :The problem of developing the seaside becomes essential:

- soit nous acceptons les inondations, la réduction du territoire de nos villes et de nos pays en déménageant la population, les activités industrielles, touristiques et commerciales (émigration climatique dans différentes parties du monde) ;- either we accept the floods, the reduction of the territory of our cities and our countries by moving the population, industrial, tourist and commercial activities (climatic emigration in different parts of the world);

- soit nous cherchons des solutions nouvelles en contribuant à l'extension du territoire sur la mer.- either we are looking for new solutions by contributing to the extension of the territory on the sea.

Ces solutions nouvelles sont basées sur une technologie de constructions offshore. Elles sont principalement constituées :These new solutions are based on offshore construction technology. They mainly consist of:

- de digues flottantes et habitables et exploitables commercialement, pour protéger les zones inondables ;- floating and habitable dykes that can be used commercially to protect flood-prone areas;

- de villes flottantes intégrées, autonomes en énergie non polluantes pour loger la population et les activités.- integrated floating cities, autonomous in non-polluting energy to house the population and activities.

Le problème de l'aménagement du territoire en bordure de la mer et des rivières concerne différentes spécialités et différents aspects et doit avoir une vision à au moins cent ans ce qui n'est pas le cas actuellement pour une grande quantité de sites au bord de littoral.The problem of spatial planning along the sea and rivers concerns different specialties and different aspects and must have a vision at least a hundred years old, which is not currently the case for a large number of sites along the littoral.

Les techniques actuelles de construction de digues, réalisées en remblais ou en 10 béton, en bordure de la mer ou des rivières, dans les zones fortement urbanisées posent un certain nombre de difficultés :Current techniques for building dykes, embankments or concrete, along the sea or rivers, in highly urbanized areas pose a number of difficulties:

- Les aménagements situés sur les rives, constitués de routes, plages et habitations “pieds dans l'eau sont souvent inondés ;- The developments located on the banks, consisting of roads, beaches and houses “feet in the water are often flooded;

- Ces constructions implantées sur les rives, nécessitent la démolition et la 15’ construction de digues sur de nouvelles fondations à la place des fondations anciennes en mauvais état ;- These constructions located on the banks, require the demolition and the 15 ’construction of dikes on new foundations instead of old foundations in poor condition;

- Les digues réalisées au large de côtes utilisant des techniques traditionnelles posent des difficultés résultant de la nécessité de réalisation d’ouvrages, sous le niveau de la mer, étanches et résistants à la corrosion pour une durée au moins de 20 100 ans;- Dykes made off the coast using traditional techniques pose difficulties resulting from the need to build structures, below sea level, waterproof and resistant to corrosion for a period of at least 20,100 years;

- Les conceptions de ces digues, réalisées au large des côtes, abordant uniquement les problèmes techniques, sont difficiles à amortir et à faire accepter, par la population locale et les touristes qui cherchent des solutions esthétiques, préservant l’environnement et la qualité de la vie de la population (promenades avec vue sur mer, espaces verts, plages, parkings).- The designs of these dykes, made off the coast, tackling only technical problems, are difficult to absorb and gain acceptance by the local population and tourists who seek aesthetic solutions, preserving the environment and the quality of the life of the population (walks with sea view, green spaces, beaches, parking lots).

Résumé de l'inventionSummary of the invention

La présente invention propose un nouveau concept de construction de digue 30 appliquant une technologie utilisée dans les plateformes offshore à destination pétrolière, pour l’extension et la protection du territoire, au lieu de la réduction du territoire résultant de la montée des eaux provoquée par le réchauffement de la planète (CO2 = effet de serre).The present invention proposes a new concept of dam construction 30 applying a technology used in offshore platforms for oil, for the extension and the protection of the territory, instead of the reduction of the territory resulting from the rising waters caused by the global warming (CO2 = greenhouse effect).

Avantageusement :Advantageously:

La digue selon ce concept permet de protéger le littoral contre la montée des eaux et inondations, en réalisant une extension du territoire sur la mer par digues flottantes à plusieurs niveaux.The dyke according to this concept makes it possible to protect the coastline against rising water and floods, by achieving an extension of the territory on the sea by floating dikes on several levels.

La digue longeant les zones à protéger est décomposée en plusieurs tronçons partiellement préfabriqués dans un site de construction.The dam along the areas to be protected is broken down into several partially prefabricated sections in a construction site.

Les dimensions de chaque tronçon préfabriqué sont définies en fonction de l’aménagement intérieur projeté défini par les utilisateurs, des caractéristiques du site de construction, et du poids en remorquage définissant le tirant d’eau à la sortie du site de préfabrication et à l’approche des zones de mouillage et d’installation à proximité des rives à protéger.The dimensions of each prefabricated section are defined according to the planned interior layout defined by the users, the characteristics of the construction site, and the towing weight defining the draft at the exit of the prefabrication site and at approach to mooring and installation areas near the banks to be protected.

Cette dernière contrainte impose la réduction du poids des tronçons à remorquer. Avantageusement, le procédé de l’invention permet la réalisation d’une enveloppe extérieure en contact direct avec l’eau de mer, en structure mixte acier-béton où la structure acier assurant le coffrage participant à la résistance et à l’étanchéité est partiellement enrobé de béton armé situé à l’extérieur pour éviter la corrosion de l’acier.This last constraint requires the reduction of the weight of the sections to be towed. Advantageously, the method of the invention allows the production of an outer envelope in direct contact with seawater, in a mixed steel-concrete structure where the steel structure ensuring the formwork contributing to the resistance and the sealing is partially coated with reinforced concrete located outside to prevent corrosion of the steel.

Chaque tronçon constituant l’enveloppe extérieure est composé :Each section constituting the outer envelope is composed:

- de radier - fond en structure mixte ;- to strike - bottom in mixed structure;

- des parois extérieures en structure mixte bétonnées à une hauteur minimale définie en fonction d’un tirant d’eau en remorquage et de hauteurs des houles en remorquage ;- external walls in mixed structure concreted to a minimum height defined according to a draft in tow and heights of swells in tow;

- de raidisseurs horizontaux encastrés dans le radier formant des cloisons en béton armé délimitant des zones de ballasts et augmentant la résistance du radier ;- horizontal stiffeners embedded in the raft forming reinforced concrete partitions delimiting zones of ballasts and increasing the resistance of the raft;

- d’un plancher haut des ballasts formant le plancher des parkings ;- a high floor of the ballasts forming the floor of the car parks;

- de compartiments enfermant des tubes d’acier, constituant un dispositif de guidage, de réglage et de descente des tubes, assurant après le forage, la descente et le bétonnage, et l’encastrement de la digue dans les dans le sol.- compartments enclosing steel tubes, constituting a device for guiding, adjusting and lowering the tubes, ensuring after drilling, the descent and concreting, and the embedding of the dike in them in the ground.

Les tronçons préfabriqués sont remorqués sur un site d’implantation avec les tubes d’acier en position haute, immobilisés dans les compartiments à l’aide d’un mécanisme nouveau.The prefabricated sections are towed to an installation site with the steel tubes in the high position, immobilized in the compartments using a new mechanism.

Avantageusement la digue conçue et réalisée selon le principe de l’invention permet améliorer la rentabilité des investissements et la qualité architecturale et fonctionnelle du littoral, par l’intégration d’équipements publics et touristiques 5 recherchés par les investisseurs, les habitants de la région et les touristes, tels que :Advantageously, the dyke designed and constructed according to the principle of the invention makes it possible to improve the profitability of investments and the architectural and functional quality of the coast, by the integration of public and tourist facilities 5 sought by investors, the inhabitants of the region and tourists, such as:

- des promenades, espaces verts sur différents niveaux avec vue sur mer ;- walks, green spaces on different levels with sea views;

- des restaurants, bars et commerces ;- restaurants, bars and shops;

- des vestiaires et sanitaires ;- changing rooms and toilets;

- des plages flottantes, piscines ou ports ;- floating beaches, swimming pools or harbors;

- des parkings sur plusieurs niveaux ;- car parks on several levels;

- des extensions des routes existantes en bordure de littoral.- extensions of existing roads along the coast.

Dans des variantes de réalisation, des habitats dans des étages supérieurs peuvent être intégrés dans la structure, avec des façades résistantes à des pressions 15 ‘ extrêmes (vent, houle, tsunami).In alternative embodiments, habitats in upper floors can be integrated into the structure, with façades resistant to extreme 15 ‘pressures (wind, swell, tsunami).

Avantageusement l'invention permet de protéger la mer contre la pollution par des eaux venant des zones habitables ou industrielles implantées sur des terrains en pente, situés en bordure de littoral, par des installations prévues au niveau des 20 ballasts, de type :Advantageously, the invention makes it possible to protect the sea against pollution by water coming from habitable or industrial zones located on sloping land, situated at the edge of the coast, by installations provided at the level of the ballasts, of the type:

- bassins de rétention et de filtrations des eaux de pluies polluées, venant des zones habitables et industriels en pente ;- retention and filtration basins for polluted rainwater coming from sloping residential and industrial areas;

- réutilisation des eaux filtrées pour l'arrosage des plantes vertes, sanitaires des plages et des restaurants ;- reuse of filtered water for watering green plants, sanitary facilities on beaches and restaurants;

- bassins de stockage, de filtration et de réutilisation des eaux pluviales venant de digues ;- basins for storage, filtration and reuse of rainwater from dikes;

- locaux techniques divers recherchés par la ville ;- various technical premises sought by the city;

- panneaux solaires thermiques et photovoltaïques pour la production d’électricité et pour assurer le chauffage et la ventilation des locaux habitables.- thermal and photovoltaic solar panels for the production of electricity and for the heating and ventilation of habitable rooms.

Pour obtenir les résultats recherchés, la présente invention propose un procédé de fabrication de digues flottantes, habitables et à plusieurs étages, protégeant le littoral contre la montée des eaux et des inondations, consistant en :To obtain the desired results, the present invention provides a method of manufacturing floating, habitable and multi-storey dikes, protecting the coastline against rising water and flooding, consisting of:

- une préfabrication en usine de caissons correspondants aux parties de la digue qui sont en contact direct avec l'eau de mer, et aux structures intérieures de la digue assurant sa résistance ;- prefabrication in the factory of boxes corresponding to the parts of the dike which are in direct contact with seawater, and to the internal structures of the dike ensuring its resistance;

- un remorquage des caissons préfabriqués sur un site d’installation; et- towing of the prefabricated caissons at an installation site; and

- montage et assemblage sur le site d’installation des caissons.- assembly and assembly on the installation site of the boxes.

Selon des modes de réalisation :According to embodiments:

- les caissons préfabriqués comprennent des parois immergées, étanches, soumises à la corrosion, réalisées en structure mixte acier- béton assurant une très bonne résistance mécanique et très bonne résistance à la corrosion, et composées :- the prefabricated boxes include immersed, waterproof walls, subject to corrosion, produced in a mixed steel-concrete structure ensuring very good mechanical resistance and very good corrosion resistance, and composed of:

- de tôle acier située à l'intérieur assurant l'étanchéité et non soumise à la corrosion par l'eau de mer ;- sheet steel located inside ensuring sealing and not subject to corrosion by seawater;

- de raidisseurs en cornières soudées sur la tôle assurant l’adhérence du béton sur l'acier et augmentant la résistance des parois ;- angle stiffeners welded to the sheet ensuring the adhesion of concrete to steel and increasing the resistance of the walls;

- de raidisseurs - cadres en T alvéolaires soudés sur la tôle assurant la résistance des parois ;- cellular T-stiffeners welded to the sheet ensuring the resistance of the walls;

- d’une armature transversale et longitudinale ;- a transverse and longitudinal reinforcement;

- de béton avec adjonction de produit assurant l’étanchéité du béton ;- of concrete with the addition of a product ensuring the waterproofing of the concrete;

- d’un coffrage extérieur, collaborant en béton poli avec adjonction d'un composant à base de résine évitant l’éclatement du béton et la corrosion des armatures.- an external formwork, collaborating in polished concrete with the addition of a resin-based component preventing the concrete from bursting and corrosion of the reinforcements.

- les caissons préfabriqués sont équipés d’un système de réglage permettant d'assurer et de régler la descente de tubes d'ancrage en cours de remorquage.- the prefabricated caissons are equipped with an adjustment system to ensure and adjust the descent of the anchor tubes during towing.

- le système de réglage permet de plus d’assurer la descente de la digue en cours de construction sur le site d’installation.- the adjustment system also makes it possible to ensure the descent of the dyke under construction at the installation site.

- le système de réglage permet d'assurer l’ancrage de la digue dans le sol sur le site d’installation.- the adjustment system ensures the anchoring of the dike in the ground at the installation site.

- le montage et l’assemblage sur site comprend au moins une opération de forage dans le sol jusqu’à un niveau défini par calcul, un encastrement de tubes d’ancrage dans le sol par bétonnage, une pose sur remblais ou un laissé en flottaison, des opérations de finitions des étages supérieurs et des abords extérieurs.- on-site assembly and assembly includes at least one drilling operation in the ground up to a level defined by calculation, embedding of anchoring tubes in the ground by concreting, laying on embankments or left floating , operations to finish the upper floors and the surrounding area.

- le système de réglage est une structure en béton armé étanche composée des éléments suivants :- the adjustment system is a waterproof reinforced concrete structure composed of the following elements:

- un tube et un élément de guidage et de verrouillage du tube ;- a tube and a tube guiding and locking element;

- un guidage supérieur et inférieur par une bague d'appui sandwich collé assurant le glissement et la transmission des efforts horizontaux du tube, et constitué de :- an upper and lower guide by a glued sandwich support ring ensuring the sliding and the transmission of the horizontal forces of the tube, and consisting of:

- une structure en acier raidi et scellé dans les parois en béton ;- a stiffened steel structure sealed in the concrete walls;

- néoprène ;- neoprene;

- téflon ; et- Teflon; and

- des cales et goussets supportant le poids du tube.- wedges and gussets supporting the weight of the tube.

- le système de réglage assure le maintien en position haute de tube et permet la descente progressive du tube à l'aide de quatre bagues grippes comportant plusieurs dents coniques et quatre vérins hydrauliques comprimant le tube avec une pression variable en enfonçant les grippes dans les parois du tube.- the adjustment system ensures that the tube is held in the high position and allows the tube to be lowered gradually using four gripper rings comprising several conical teeth and four hydraulic cylinders compressing the tube with variable pressure by pushing the grippers into the walls of the tube.

- le contrôle du système de réglage est effectué à l’aide d’un programme informatique spécifique.- the control of the adjustment system is carried out using a specific computer program.

L’invention couvre aussi une digue flottante, habitable et à plusieurs étages, protégeant le littoral contre la montée des eaux et des inondations obtenue par le procédé revendiqué.The invention also covers a floating, habitable and multi-storey dike, protecting the coastline against rising water and flooding obtained by the claimed process.

Description des figuresDescription of the figures

La Figure 1 représente une vue en perspective de digues et d’une liaison avec une plateforme-barge ;Figure 1 shows a perspective view of dikes and a connection with a platform-barge;

La Figure 2 représente une coupe transversale d'un tronçon de la digue pour deux solutions de hauteur A et B, ainsi que les phases de remorquage et d'installation sur site des éléments préfabriqués de la digue ;Figure 2 shows a cross section of a section of the dike for two solutions of height A and B, as well as the phases of towing and installation on site of the prefabricated elements of the dike;

La Figure 3 représente des exemples d’aménagement de différents niveaux ;Figure 3 shows examples of layouts of different levels;

La Figure 4 donne des détails du remorquage et de l'installation sur site d'un module préfabriqué de la digue ;Figure 4 provides details of towing and on-site installation of a prefabricated dike module;

La Figure 5 représente des détails du dispositif de guidage, de freinage de la descente et du verrouillage des tubes en acier ;Figure 5 shows details of the device for guiding, braking the descent and locking the steel tubes;

La Figure 6 représente les parois des éléments préfabriqués de la digue en contact direct avec l'eau de mer, réalisées en structure mixte acier - béton ; etFigure 6 shows the walls of the prefabricated elements of the dike in direct contact with seawater, made in a mixed steel - concrete structure; and

La Figure 7 représente une application de l'invention pour une digue flottante à plusieurs niveaux.Figure 7 shows an application of the invention for a floating dike on several levels.

Description détaillée de l’inventionDetailed description of the invention

Avantageusement la présente invention préconise l’implantation de digues offshore à une distance suffisante des berges, en tenant compte du tirant d'eau des éléments préfabriqués en remorquage, du dispositif facilitant l'installation sur site et de la qualité du fond de la mer.Advantageously, the present invention recommends the installation of offshore dykes at a sufficient distance from the banks, taking into account the draft of the prefabricated elements in tow, the device facilitating installation on site and the quality of the seabed.

Avantageusement la présente invention préconise la décomposition des digues en caissons préfabriqués réalisés en usine, (chantier naval ou yard) dont les dimensions intérieures sont adaptées aux dimensions de parkings, des possibilités de préfabrication en usine et de type de remorquages.Advantageously, the present invention recommends breaking down the dikes into prefabricated caissons made in the factory (shipyard or yard), the internal dimensions of which are adapted to the dimensions of the car parks, possibilities of prefabrication in the factory and type of towing.

Avantageusement chaque élément préfabriqué, peut être réalisé, soit en structure en béton armé ou précontraint étanche, soit en acier, soit en structure mixte acier béton.Advantageously, each prefabricated element can be produced either in a reinforced reinforced or prestressed concrete structure, or in steel, or in a mixed steel concrete structure.

Avantageusement pour d’assurer une parfaite étanchéité et une bonne résistance à la corrosion pour une durée de vie supérieure à 100 ans, la présente invention préconise la réalisation de la partie de la digue qui est en contact direct avec l'eau de mer en structure mixte acier - béton ; l’acier assurant la résistance et l’étanchéité et le béton assurant la protection de l'acier contre la corrosion.Advantageously, in order to ensure perfect sealing and good corrosion resistance for a service life of more than 100 years, the present invention recommends making the part of the dam which is in direct contact with the seawater in structure. mixed steel - concrete; the steel ensuring the resistance and the sealing and the concrete ensuring the protection of the steel against corrosion.

Cette étanchéité et cette résistance à la corrosion sont difficiles à obtenir pour des structures en béton (reprise de bétonnage, fixation des banches, retrait du béton etc.) et des structures en acier (protection contre la corrosion pour une durée de vie de la digue = 100 ans).This tightness and resistance to corrosion are difficult to obtain for concrete structures (resumption of concreting, fixing of formwork, removal of concrete, etc.) and steel structures (protection against corrosion for a lifetime of the dam. = 100 years).

Avantageusement les éléments préfabriqués adaptés au remorquage sont composés des éléments suivants :Advantageously, the prefabricated elements suitable for towing are composed of the following elements:

- Radier constituant le fond,- Radar constituting the bottom,

- Bordées formant les parois extérieures,- Borders forming the outer walls,

- Double-fond (en cas de digues flottantes subissant des pressions hydrostatiques et hydrodynamiques importantes) enfermant les compartiments de ballastage et les réservoirs de stockage, assurant une bonne résistance à la flexion due à la pression hydrostatique et hydrodynamique en service et en cours de remorquage,- Double bottom (in the case of floating dikes undergoing significant hydrostatic and hydrodynamic pressures) enclosing the ballast compartments and the storage tanks, ensuring good resistance to bending due to hydrostatic and hydrodynamic pressure in service and during towing ,

- Compartiments enfermant les tubes de guidage.- Compartments enclosing the guide tubes.

Avantageusement la hauteur des caissons remorqués est définie en fonction :Advantageously, the height of the towed boxes is defined according to:

- de la profondeur de l’immersion,- the depth of the immersion,

- de la hauteur de la houle extrême,- the height of the extreme swell,

- de la hauteur des marées,- the height of the tides,

- de montée des eaux estimée de l’océan dans le site d'implantation,- estimated sea level rise in the implantation site,

- de la hauteur estimée de vagues de tsunami (dans les zones sismiques).- the estimated height of tsunami waves (in seismic zones).

Avantageusement les éléments préfabriqués de la digue en contact direct avec l'eau de mer sont réalisés en béton étanche dont la surface extérieure formant le coffrage collaborant réalisé en mélange composite, est poli pour éviter l'éclatement du béton et la corrosion des armatures.Advantageously, the prefabricated elements of the dike in direct contact with seawater are made of waterproof concrete, the external surface of which forms the collaborating formwork made of composite mixture, is polished to prevent the concrete from bursting and the corrosion of the reinforcements.

Avantageusement les épaisseurs des parois sont variables et justifiées par calcul en fonction du site d'implantation et des efforts des pressions hydrostatiques et hydrodynamiques.Advantageously, the thicknesses of the walls are variable and justified by calculation as a function of the site of implantation and of the forces of hydrostatic and hydrodynamic pressures.

Avantageusement les compartiments enfermant les tubes en acier comportent un dispositif permettant :Advantageously, the compartments enclosing the steel tubes include a device allowing:

- le blocage des tubes en cours de remorquage en position haute ;- blocking of the tubes during towing in the high position;

- la descente des tubes par glissement dans les guides pour encrage des tubes dans le sol (forage et bétonnage) ;- lowering the tubes by sliding in the guides for anchoring the tubes in the ground (drilling and concreting);

- le guidage de la descente du caisson en cours d'installation et de construction ; et- guiding the descent of the box during installation and construction; and

- l’encastrement des tubes dans les caissons en fin de construction.- the embedding of the tubes in the boxes at the end of construction.

Avantageusement le nombre de tubes de guidage et la longueur d’ancrage dans le sol peuvent être adaptés au site d'implantation et justifiés par calcul en fonction des différents paramètres, notamment les efforts horizontaux et verticaux repris par :Advantageously, the number of guide tubes and the length of anchoring in the ground can be adapted to the site of implantation and justified by calculation according to different parameters, in particular the horizontal and vertical forces taken up by:

- frottement et pression sur le radier et sur le sol comprimé par le poids de la digue ;- friction and pressure on the raft and on the soil compressed by the weight of the dam;

- cisaillement, traction ou compression des piles et du sol ; et- shearing, traction or compression of the piers and the ground; and

- butée sur les structures en béton armé sur les rives.- stop on reinforced concrete structures on the banks.

Avantageusement en cours de remorquage les tubes de guidage sont mis en position haute et maintenus par un dispositif nouveau faisant partie de l’invention ;Advantageously during towing, the guide tubes are placed in the high position and maintained by a new device forming part of the invention;

Avantageusement le procédé de l’invention permet une facilité et une simplification de l’installation sur site par la réalisation des étapes suivantes :Advantageously, the method of the invention allows ease and simplification of the installation on site by carrying out the following steps:

- implantation des digues au large de côtes à une distance choisie en fonction de la profondeur de la mer adaptée au tirant d'eau de caissons préfabriqués ;- installation of dykes off the coast at a distance chosen according to the depth of the sea adapted to the draft of prefabricated caissons;

- préparation du fond de la mer par la réalisation de remblais ;- preparation of the seabed by the creation of embankments;

- positionnement de la digue à l'emplacement définitif ;- positioning of the dam at the final location;

- encrage à l’aide de câbles ;- inking using cables;

- descente de tubes de guidage ;- lowering of guide tubes;

- forage à une profondeur définie par calcul ;- drilling to a depth defined by calculation;

- mise en place des armatures et bétonnage des tubes assurant l'ancrage des caissons ;- installation of reinforcements and concreting of the tubes ensuring the anchoring of the caissons;

- travaux sur le site : structure et aménagement des différents niveaux, symétriquement pour assurer la descente progressive des caissons en fonction de l'avancement de la construction ;- work on the site: structure and layout of the different levels, symmetrically to ensure the gradual descent of the caissons according to the progress of construction;

- glissement des tubes dans les guides en téflon, le contrôle de la descente et le verrouillage étant assuré par un dispositif contrôlé par ordinateur faisant l’objet de la présente invention ;- Sliding of the tubes in the Teflon guides, the control of the descent and the locking being ensured by a device controlled by computer forming the object of the present invention;

- l’augmentation du poids des tronçons préfabriqués au fur et à mesure du bétonnage et de l’aménagement intérieur, assure la descente progressive et la symétrique de la digue ;- the increase in the weight of the prefabricated sections as the concreting and interior layout progresses, ensures the gradual and symmetrical descent of the dyke;

- pose des caissons sur les remblais ;- placing boxes on the embankments;

- blocage et encastrement des tubes en fin de construction par verrouillage ou/et bétonnage pour assurer la transmission des efforts ;- blocking and embedding of the tubes at the end of construction by locking or / and concreting to ensure the transmission of forces;

- finition des aménagements extérieurs et intérieurs ;- finishing of exterior and interior fittings;

- réalisation des autres tronçons suivant le même procédé pour assurer la continuité de la digue sur toute la distance à protéger, tout en assurant une bonne étanchéité des joints entre les tronçons réalisés ;- realization of the other sections according to the same process to ensure the continuity of the dam over the entire distance to be protected, while ensuring a good seal of the joints between the sections made;

Les digues peuvent être soit en ligne droite, soit en courbe en fonction du contour du littoral existant.The dikes can be either in a straight line or in a curve depending on the contour of the existing coastline.

La figure 1 représente une vue en perspective d’une digue et d’une liaison avec une plateforme - barge. Cette barge peut être conforme à celle décrite dans la demande de brevet français du déposant, publiée sous le numéro 3037089.Figure 1 shows a perspective view of a breakwater and a connection with a platform - barge. This barge may conform to that described in the French patent application of the applicant, published under the number 3037089.

- La vue 1A représente la partie immergée avec un tunnel (1), une passerelle (2), des piles (3) et une structure du fond des ports de la barge (4).- View 1A represents the submerged part with a tunnel (1), a walkway (2), piers (3) and a structure at the bottom of the ports of the barge (4).

- La vue 1B représente la plateforme-barge, et l’aménagement des berges par extension sur la mer, et est constituée de :- View 1B represents the barge platform, and the arrangement of the banks by extension to the sea, and consists of:

- une digue (5) constituée de plusieurs tronçons préfabriqués, comportant dans cet exemple, 3 niveaux de circulation de piétons, des plages, des commerces, des restaurants et parkings ;- a dike (5) made up of several prefabricated sections, comprising in this example, 3 levels of pedestrian circulation, beaches, shops, restaurants and parking lots;

- un bâtiment d’entrée (6) recevant la passerelle et le tunnel ;- an entrance building (6) receiving the gangway and the tunnel;

- une extension de la route (7) par deux voies dans chaque sens, un terre-plein central avec espaces verts, deux pistes cyclables et deux trottoirs.- an extension of the road (7) by two lanes in each direction, a central reservation with green spaces, two cycle paths and two sidewalks.

La figure 2 représente une coupe transversale d'un tronçon de la digue pour deux solutions de hauteur A et B ainsi que les phases de remorquage et d'installation sur le site des éléments préfabriqués de la digue (A1 et B1),FIG. 2 represents a cross section of a section of the dike for two solutions of height A and B as well as the towing and installation phases on the site of the prefabricated elements of the dike (A1 and B1),

Les façades côté mer (dont la hauteur h est prédéfinie) et les structures (plages, terrasses et pontons flottants) sont dimensionnées pour supporter la pression de la houle, la montée des eaux, et le vent extrême (tsunami dans les zones sismiques).The sea side façades (whose height h is predefined) and the structures (beaches, terraces and floating pontoons) are dimensioned to withstand the pressure of the swell, the rising of the waters, and the extreme wind (tsunami in seismic zones).

La hauteur des façades côté mer est définie, en fonction :The height of the sea side façades is defined according to:

- de la profondeur de l’immersion,- the depth of the immersion,

- de la hauteur de la houle extrême,- the height of the extreme swell,

- de la hauteur des marées,- the height of the tides,

- de montée des eaux estimée de l’océan dans le site d'implantation,- estimated sea level rise in the implantation site,

- de la hauteur estimée de vagues de tsunami (dans les zones sismiques).- the estimated height of tsunami waves (in seismic zones).

Plus particulièrement, les références suivantes représentent :More particularly, the following references represent:

(1) des parkings dont le plan d'aménagement détermine la largeur intérieure de la digue ;(1) car parks whose layout plan determines the interior width of the dike;

(1a) un double-fond comportant les ballasts et les réservoirs de stockage augmentant la résistance du fond de flotteur et les bassins de stockage de filtration et de réutilisation des eaux pluviales des digues ;(1a) a double bottom comprising ballasts and storage tanks increasing the resistance of the float bottom and the storage tanks for filtration and reuse of rainwater from dikes;

(2) des locaux techniques, vestiaires, sanitaires, locaux de plagistes, des bars ;(2) technical rooms, locker rooms, toilets, beach attendants, bars;

(3) des restaurants, bars et commerces ;(3) restaurants, bars and shops;

(4) et (5) des promenades, solariums, espaces verts sur différents niveaux avec vue sur mer ;(4) and (5) walks, solariums, green spaces on different levels with sea views;

(6) des plages flottantes sur pontons ;(6) floating beaches on pontoons;

(8) des tubes en acier remplis du béton armé servant de guidage de descente et d'encastrement de la digue ;(8) steel tubes filled with reinforced concrete to guide the descent and embedding of the dike;

(9) des bassins de rétention et de filtration des eaux de pluie des zones habitables en pente ;(9) rainwater retention and filtration basins in sloping habitable areas;

(10) des piscines ou ports côté mer ;(10) swimming pools or ports on the sea side;

R1 une route existante en bordure de littoral souvent inondée ;R1 an existing road along the often flooded coastline;

R2 des routes après extension ;R2 roads after extension;

R3 une extension de la construction sur la mer.R3 an extension of construction on the sea.

La figure 3 représente des exemples d’aménagement sur différents niveaux. Il est montré :Figure 3 shows examples of layouts on different levels. He is shown :

(A) : un double fond ;(A): a double bottom;

(B) : une entrée de parkings et plages, pontons et piscines ;(B): an entrance to parking lots and beaches, pontoons and swimming pools;

(C) : un niveau de promenades P2 avec commerces, restaurants, bars et vues sur mer pour promeneurs ;(C): a level of P2 walks with shops, restaurants, bars and sea views for walkers;

(D) : un niveau de promenades P1 ou coulée verte avec vue sur mer, réservée aux coureurs et marcheurs ;(D): a level of P1 walks or green flow with sea view, reserved for runners and walkers;

(R) : des restaurants, bars et commerces.(R): restaurants, bars and shops.

Plus particulièrement, les références suivantes représentent :More particularly, the following references represent:

(1) des ballasts et réservoirs ;(1) ballasts and tanks;

(2) des compartiments enfermant les tubes de guidage ;(2) compartments enclosing the guide tubes;

(3) des parkings ;(3) parking lots;

(4) une double rampe ;(4) a double ramp;

(5) une entrée et sortie de parkings ;(5) entry and exit to parking lots;

(6) des plages sur consoles et promenades P3 ;(6) beaches on consoles and P3 walks;

(7) des plages sur pontons flottants ;(7) beaches on floating pontoons;

(8) des escaliers et ascenseurs intérieurs ;(8) interior stairs and elevators;

(9) des escaliers extérieurs ;(9) exterior stairs;

(10) des piscines en eau de mer protégées de méduses et de requins ;(10) seawater pools protected from jellyfish and sharks;

(11 ) un brise lames et protection des piscines.(11) breakwater and protection of swimming pools.

La figure 4 donne des détails relatifs au remorquage et à l'installation sur site d'un module préfabriqué de la digue. Il est montré la coupe par compartiment assurant le guidage de tube d’ancrage dans différentes phases d’installation :Figure 4 provides details of towing and on-site installation of a prefabricated dike module. It is shown the section by compartment ensuring the guidance of the anchor tube in different phases of installation:

(A) le remorquage et le positionnement des tronçons sur un remblai compacté ;(A) towing and positioning of the sections on a compacted embankment;

(B) la construction sur le site , aménagement, des niveaux supérieurs, descente des éléments en fonction d’augmentation du poids, la pose du caisson sur les remblais compactés , le forage dans le sol et descente des tubes , la mise en place des armatures et le bétonnage de tubes d’ancrage ;(B) construction on site, layout, upper levels, lowering of the elements as a function of increase in weight, installation of the box on the compacted embankments, drilling into the ground and lowering of the tubes, installation of reinforcement and concreting of anchor tubes;

(C) la variante de la conception : possibilité de remplacement du remblai par des portes coulissantes à double paroi, en inox, enfoncées dans le sol pour protéger le littoral contre la montée des eaux (grandes marées, tsunami, ouragans)(C) variant of the design: possibility of replacing the embankment with double-walled sliding doors, made of stainless steel, sunk into the ground to protect the coastline against rising water (high tides, tsunami, hurricanes)

Plus particulièrement, les références suivantes représentent :More particularly, the following references represent:

(1) un caisson préfabriqué remorqué assurant l'étanchéité des sous-sols ;(1) a towed prefabricated box ensuring the watertightness of the basements;

(2) un compartiment enfermant le tube et le dispositif de guidage de descente, de verrouillage et d’encastrement des tubes dans le caisson ;(2) a compartment enclosing the tube and the device for guiding the descent, locking and embedding of the tubes in the box;

(3) un guidage inférieur assurant la butée et le glissement d’un tube ;(3) a lower guide ensuring the stop and the sliding of a tube;

(4) un guidage supérieur assurant le glissement d’un tube et le verrouillage en position haute pour le remorquage (voir détail figure 5) ;(4) an upper guide ensuring the sliding of a tube and the locking in the high position for towing (see detail in figure 5);

(5) le fond de la mer ;(5) the bottom of the sea;

(6) des remblais compactés ;(6) compacted embankments;

(7) une fermeture-porte de type “guillotine à double parois en inox avec ballasts permettant l’ouverture ou la fermeture ;(7) a “double-hung stainless steel guillotine-type door closure with ballasts for opening or closing;

(8) un appui des portes dans le fond, en béton armé ;(8) door support in the background, in reinforced concrete;

(9) un tube en acier rempli de béton armé ;(9) a steel tube filled with reinforced concrete;

(10) un local remplit de béton armé en fin des travaux de gros œuvre.(10) a room filled with reinforced concrete at the end of the structural work.

En variante, le local (10) n’est pas rempli de béton, permettant à la digue de suivre les marrés en glissant dans les bagues (guides 3 et 4).Alternatively, the room (10) is not filled with concrete, allowing the dam to follow the tides by sliding in the rings (guides 3 and 4).

La figure 5 représente le détail le dispositif de guidage, de freinage de la descente et de verrouillage des tubes en acier. Il est montré :FIG. 5 shows the detail of the device for guiding, braking the descent and locking the steel tubes. He is shown :

(A) une vue en plan = coupe horizontale ;(A) a plan view = horizontal section;

(B) une coupe transversale C-C.(B) a cross section C-C.

(D) détail du dispositif de guidage (2) (fig. 5-D-2 ) et de verrouillage (6) (Figure 5- B -6 )(D) detail of the guide (2) (fig. 5-D-2) and locking device (6) (Figure 5- B -6)

Plus particulièrement, les références suivantes représentent :More particularly, the following references represent:

(1) une structure en béton armé étanche renforcé par structure métallique, enfermant le tube et le dispositif de guidage et de verrouillage du tube (fig. 5-A-1 et 5-B-1) ;(1) a reinforced reinforced concrete structure reinforced by a metallic structure, enclosing the tube and the device for guiding and locking the tube (fig. 5-A-1 and 5-B-1);

(2) un guidage supérieur et inférieur “bague d'appui sandwich collé (fig. 5-D-2 assurant le glissement et la transmission des efforts horizontaux du tube constitué de :(2) upper and lower guide “glued sandwich support ring (fig. 5-D-2 ensuring the sliding and the transmission of the horizontal forces of the tube made up of:

(3) une structure en acier raidi et scellé dans les parois en béton (Fig.5 - 3 D-3) (4) du néoprène (Fig. .5-D-4) (5) du téflon (fig.5 - D-5) (6) un dispositif de verrouillage du tube, piloté par ordinateur, assurant le maintien en position haute du tube et permettant la descente progressive du tube à l'aide de 4 bagues grippes (4) (Fig. 5 - B-4, Fig.5-D-6 et fig. 5-A-4) comportant plusieurs dents = grippes et 4 vérins hydrauliques (8) ( fig. 5-A-8,fig.5-B-8 et fig. 5-D-8. comprimant le tube avec une pression variable (verrouillage et/ou glissement) en enfonçant les grippes =dents coniques (7) fig. 5-D-7 dans les parois du tube. Voir détail (D) Calage - gousset supportant le poids du tube. (fig. 5-D-10)(3) a steel structure stiffened and sealed in the concrete walls (Fig. 5 - 3 D-3) (4) of neoprene (Fig. .5-D-4) (5) of teflon (fig. 5 - D-5) (6) a tube locking device, controlled by computer, ensuring that the tube is held in the high position and allowing the tube to be lowered progressively using 4 gripper rings (4) (Fig. 5 - B -4, Fig.5-D-6 and Fig. 5-A-4) comprising several teeth = grippers and 4 hydraulic cylinders (8) (fig. 5-A-8, fig.5-B-8 and fig. 5-D-8 compressing the tube with variable pressure (locking and / or sliding) by pushing the grippers = conical teeth (7) Fig. 5-D-7 into the walls of the tube See detail (D) gusset supporting the weight of the tube (fig. 5-D-10)

La figure 6 représente les parois des éléments préfabriqués de la digue en contact direct avec l'eau de mer, ^alisées en structure mixte acier-béton et composées de :FIG. 6 represents the walls of the prefabricated elements of the dike in direct contact with seawater, made in a mixed steel-concrete structure and composed of:

(1) - une tôle acier située à l'intérieur assurant l'étanchéité et coffrage collaborant, et non soumise à la corrosion par l'eau de mer,(fig.6-1) (2) - des raidisseurs en cornières soudées sur la tôle assurant l’adhérence du béton sur l'acier ; (fig.6-2) (3) - des raidisseurs-cadres alvéolaires soudés sur la tôle assurant la résistance des parois ; (fig.6-3) (4) - une armature transversale et longitudinale ; (fig.6-4) (5) - du béton avec adjonction de produit assurant l’étanchéité ; (fig.6-5) (6) - un coffrage extérieur collaborant fixé sur les armatures, en béton poli ou autre matériau avec adjonction d'un composant à base de résine évitant éclatement du béton et la corrosion des armatures, l’ensemble participant à la résistance et assurant l'étanchéité des parois et la protection contre la corrosion d'une durée supérieure à 100 ans sans entretien extérieur.(fig.6-6)(1) - a steel sheet located inside ensuring sealing and collaborating formwork, and not subject to corrosion by seawater, (fig. 6-1) (2) - stiffeners in angle iron welded on the sheet ensuring the adhesion of concrete to steel; (fig. 6-2) (3) - cellular frame stiffeners welded to the sheet ensuring the resistance of the walls; (fig. 6-3) (4) - a transverse and longitudinal reinforcement; (fig.6-4) (5) - concrete with the addition of waterproofing product; (fig. 6-5) (6) - a collaborating external formwork fixed on the reinforcements, in polished concrete or other material with the addition of a resin-based component preventing the concrete from bursting and corrosion of the reinforcements, the whole participating resistance and ensuring the tightness of the walls and protection against corrosion for a period of more than 100 years without external maintenance (fig. 6-6)

La figure 7 représente le détail des portes représentés sur la figure 4-C-7 et décrites à la page 14 de permettant de remplir plusieurs fonctions selon le type d'encastrement de la digue dans les piles (tubes remplis du béton et encastrés dans le sol) et des appuis de la digue au fond : sur le remblai ou en flottaison (fig. 5- C-7 ).Figure 7 represents the detail of the doors represented on figure 4-C-7 and described on page 14 allowing to fulfill several functions according to the type of embedding of the dam in the piers (tubes filled with concrete and embedded in the soil) and dike supports at the bottom: on the embankment or in waterline (fig. 5- C-7).

Une première solution consiste en l’encastrement des piles dans la digue :A first solution consists of embedding the piles in the dike:

- par remplissage du local (10) fig.7-A-10 par béton armé (encastrement définitif sans possibilité de réglage du tirant d'eau) ;- by filling the room (10) fig. 7-A-10 with reinforced concrete (permanent embedding without the possibility of adjusting the draft);

- par blocage d'encastrement par vérins (fig.5-B-6 et fig. 7 - 4 (encastrement avec possibilités de réglage du tirant d’eau) ; et- by embedding blocking by cylinders (fig.5-B-6 and fig. 7 - 4 (embedding with draft adjustment possibilities); and

- possibilités de fermeture ou d'ouverture des portes - guillotine.- possibilities of closing or opening doors - guillotine.

Une deuxième solution consiste au glissement des piles dans les bagues de glissement (fig. (3) permettant la montée ou la descente de la digue en fonction des marées. Un tel dispositif est adapté aux marées de +/- 3 m.A second solution consists in sliding the stacks in the sliding rings (fig. (3) allowing the rise or fall of the dyke according to the tides. Such a device is suitable for tides of +/- 3 m.

La figure 7 A et B illustre une application de l'invention pour une digue flottante à plusieurs niveaux, avec le tirant d’eau et les marrés de + - 3m, reliée avec le littoral par des passerelles articulées permettant les mouvements de la digue et permettant en cas de besoins de fermer les portes pour protéger le littoral contre de fortes marées ou un tsunami. Dans le cas de l'encastrement des tubes dans la digue par bétonnage ou verrouillage, la digue et les fondations doivent résister aux efforts de soulèvements résultants de la poussée d’Archimède.FIG. 7 A and B illustrates an application of the invention for a floating dike on several levels, with the draft and the tides of + - 3m, connected with the coast by articulated walkways allowing the movements of the dike and allowing if necessary to close the doors to protect the coastline against strong tides or a tsunami. In the case of the embedding of the tubes in the dam by concreting or locking, the dam and the foundations must resist the lifting forces resulting from the Archimedes push.

Il est montré :He is shown :

(A) fig. 7- A une coupe transversale à marée basse (-3m) ;(A) fig. 7- Has a cross section at low tide (-3m);

(B) fig. 7- B une coupe transversale à marée haute (+3m) ;(B) fig. 7- B a cross section at high tide (+ 3m);

(C) le détail de portes guillotine commandées par ballastage ; où(C) detail of guillotine doors controlled by ballasting; or

T est le tirant d'eau et M la montée des eaux marrées.T is the draft and M the rise of tidal waters.

Plus particulièrement, les références suivantes représentent :More particularly, the following references represent:

(1) une structure en béton armé étanche enfermant le tube et le dispositif de guidage et de verrouillage du tube ; (fig.7-A-1 et 7-B-1) (2) un compartiment enfermant le tube et le dispositif de guidage de descente, de verrouillage et de l'encastrement des tubes dans le caisson ; (fig.7-A-2 et 7-B-2) (3) un guidage assurant la butée et le glissement de tube ; (fig.7-A-3 et 7-B-3) (4) un verrouillage à l'aide de vérins (voir détail figure 5) (fig.7-A-4 et 7-B-4) (5) le fond de la mer ;(fig.7-A-5 et 7-B-5) (7) la fermeture-portes de type “guillotine “ à double paroi en inox avec ballasts permettant ouverture ou fermeture ; (fig.7-A-7 et 7-B-7 ) (8) les appuis des portes dans le fond en béton armé ; (fig. 7-A-8 et 7-B-8) (9) un tube en acier rempli de béton armé encastré dans le sol ; (fig. 7-A-9 et 7-B-9) (10) un local rempli de béton armé pour assurer l'encastrement. (fig.9-A-10 et 9-B-(1) a waterproof reinforced concrete structure enclosing the tube and the tube guiding and locking device; (fig. 7-A-1 and 7-B-1) (2) a compartment enclosing the tube and the device for guiding the descent, locking and embedding of the tubes in the box; (fig.7-A-2 and 7-B-2) (3) a guide ensuring the stop and the tube sliding; (fig. 7-A-3 and 7-B-3) (4) locking using cylinders (see detail in figure 5) (fig. 7-A-4 and 7-B-4) (5) the bottom of the sea; (fig.7-A-5 and 7-B-5) (7) the double-walled stainless steel “door hung” type door closers with ballasts for opening or closing; (fig.7-A-7 and 7-B-7) (8) the door supports in the reinforced concrete bottom; (fig. 7-A-8 and 7-B-8) (9) a steel tube filled with reinforced concrete embedded in the ground; (fig. 7-A-9 and 7-B-9) (10) a room filled with reinforced concrete to ensure embedding. (fig. 9-A-10 and 9-B-

10)10)

Plus en détail, (fiq.7-C) montre les portes guillotine submersibles à ballastage :In more detail, (fiq. 7-C) shows the submersible guillotine doors with ballast:

(12) une paroi de la structure mixte acier béton (voir détail figure 6) composée de :(12) a wall of the mixed steel concrete structure (see detail in figure 6) composed of:

(71) de la tôle acier située à l'intérieur assurant l'étanchéité et non soumise à la corrosion par l'eau de mer ;(71) of the steel sheet located inside ensuring sealing and not subject to corrosion by sea water;

(72) un raidisseur en cornières soudées sur la tôle assurant l’adhérence du béton sur l'acier ;(72) a stiffener in angles welded to the sheet ensuring the adhesion of the concrete on the steel;

(73) des raidisseurs-cadres alvéolaires soudés sur la tôle assurant la résistance des parois ;(73) cellular frame stiffeners welded to the sheet ensuring the resistance of the walls;

(74) une armature transversale et longitudinale ;(74) a transverse and longitudinal reinforcement;

(75) du béton avec adjonction de produit assurant l’étanchéité ;(75) concrete with added sealant;

(76) un coffrage extérieur collaborant fixé sur les armatures, en béton poli ou autre matériau avec adjonction d'un composant à base de résine + téflon ou autre matériau permettent le glissement des portes ;(76) a collaborating external formwork fixed on the frames, in polished concrete or other material with the addition of a resin-based component + teflon or other material allow the sliding of the doors;

(77) un rail en acier inox fixé sur les traverses de la paroi de la digue assurant le guidage de la descente de la porte ;(77) a stainless steel rail fixed to the crosspieces of the wall of the dike guiding the descent of the door;

(78) du téflon collé sur la partie intérieure du rail de guidage assurant le glissement de portes ;(78) Teflon bonded to the inner part of the guide rail ensuring the sliding of doors;

(79) des portes constituées de plusieurs tronçons disposés entre les rails de guidage, réalisées en inox avec raidisseurs et compartiment de ballasts et un dispositif permettant de chasser l'eau et monter la porte ou ouvrir les vannes, remplir les ballasts et descendre les portes.(79) doors made up of several sections arranged between the guide rails, made of stainless steel with stiffeners and ballast compartment and a device for removing water and mounting the door or opening the valves, filling the ballasts and lowering the doors .

Ainsi, la présente invention concerne des dispositifs et procédés de fabrication de digues flottantes, pour protéger le littoral contre la montée des eaux et des inondations.Thus, the present invention relates to devices and methods for manufacturing floating dikes, to protect the coastline against rising water and floods.

Avantageusement la construction de la digue en caisson à plusieurs niveaux est décomposée en quatre phases :Advantageously, the construction of the multi-level box dam is broken down into four phases:

(1) Préfabrication en usine de la partie de la digue qui est difficile à réaliser sur le chantier ;(1) Factory prefabrication of the part of the dyke which is difficult to carry out on site;

(2) Remorquage de la partie préfabriquée avec tubes en position haute et mise en position à proximité des rives à protéger, avec encrage provisoire à l’aide des câbles ;(2) Towing of the prefabricated part with tubes in the high position and positioning in the vicinity of the banks to be protected, with temporary inking using cables;

(3) Installation sur le site : descente des tubes, forage dans le sol jusqu’au niveau défini par calcul et descente progressive des tubes, mise en place des armatures, bétonnage à l’intérieur des tubes et encastrement des tubes dans le sol ;(3) Installation on site: lowering of the tubes, drilling into the ground to the level defined by calculation and progressive lowering of the tubes, fitting of reinforcements, concreting inside the tubes and embedding of the tubes in the ground;

(4) Travaux sur le site : finition des structures des bordés, réalisation des structures intérieures, aménagement intérieur, descente progressive et symétrique de la digue et contrôle de la descente à l’aide de l’ordinateur, pose sur le remblai, réalisation du dispositif l’encastrement des tubes, finitions des étages supérieurs et des abords extérieurs.(4) Work on site: finishing of planking structures, construction of interior structures, interior fittings, gradual and symmetrical descent of the dike and control of the descent using the computer, laying on the embankment, construction of the device for embedding tubes, finishing of upper floors and exterior areas.

Avantageusement les éléments préfabriqués comportent un dispositif permettant :Advantageously, the prefabricated elements include a device allowing:

- d'assurer et régler la descente des tubes d'ancrage en cours de remorquage ;- ensure and adjust the descent of the anchor tubes during towing;

- d'assurer la descente de la digue en cours de construction sur le chantier ;- ensure the descent of the dike during construction on the site;

- d'assurer l'ancrage de la digue dans le sol ;- to ensure the anchoring of the dam in the ground;

- d’assurer le pilotage des opérations d’installation sur le site à l’aide d’un ordinateur.- ensure the management of installation operations on the site using a computer.

Claims (9)

Revendicationsclaims 1. Procédé de fabrication de digues flottantes, habitables et à plusieurs étages, protégeant le littoral contre la montée des eaux et des inondations, consistant en :1. A method of manufacturing floating, habitable and multi-storey dikes protecting the coastline against rising water and flooding, consisting of: - une préfabrication en usine de caissons correspondants aux parties de la digue qui sont en contact direct avec l'eau de mer : Fig.2 : réf. (A1) et (B1) et aux structures intérieures de la digue assurant sa résistance Fig.2 : réf. (A), (A1), (B) et(B1)- a factory prefabrication of caissons corresponding to the parts of the dike which are in direct contact with sea water: Fig. 2: ref. (A1) and (B1) and to the internal structures of the dike ensuring its resistance Fig. 2: ref. (A), (A1), (B) and (B1) - un remorquage des caissons préfabriqués sur un site d’installation : fig.2 réf. (A1)et (B1) et- a towing of the prefabricated caissons on an installation site: fig.2 ref. (A1) and (B1) and - montage et assemblage sur le site d’installation des caissons : Fig. 4 réf. (A) et (B)- assembly and assembly on the installation site of the boxes: Fig. 4 ref. (A) and (B) 2. Le procédé selon la revendication 1 dans lequel les caissons préfabriqués comprennent des parois immergées, étanches, soumises à la corrosion, réalisées en structure mixte acier - béton assurant une très bonne résistance mécanique et très bonne résistance à la corrosion, et composées Fig.6 :2. The method according to claim 1, in which the prefabricated caissons comprise immersed, leaktight walls, subjected to corrosion, produced in a mixed steel-concrete structure ensuring very good mechanical resistance and very good corrosion resistance, and composed FIG. 6: - de tôle acier située à l'intérieur assurant l'étanchéité et non soumise à la corrosion par l'eau de mer : Fig.6 repo. (1)- sheet steel located inside ensuring sealing and not subject to corrosion by seawater: Fig. 6 repo. (1) - de raidisseurs en cornières soudées sur la tôle assurant l’adhérence du béton sur l'acier et augmentant la résistance des parois ; Fig.6 réf. (2)- angle stiffeners welded to the sheet ensuring the adhesion of concrete to steel and increasing the resistance of the walls; Fig. 6 ref. (2) - de raidisseurs - cadres en T alvéolaires soudés sur la tôle assurant la résistance des parois ; Fig.6 réf. (3)- cellular T-stiffeners welded to the sheet ensuring the resistance of the walls; Fig. 6 ref. (3) - d’une armature transversale et longitudinale ; Fig. 6 réf. (4)- a transverse and longitudinal reinforcement; Fig. 6 ref. (4) - de béton avec adjonction de produit assurant l’étanchéité du béton ; Fig.6 réf. (3)- of concrete with the addition of a product ensuring the waterproofing of the concrete; Fig. 6 ref. (3) - d’un coffrage extérieur, collaborant en béton poli avec adjonction d'un composant à base de résine évitant l’éclatement du béton et la corrosion des armatures. Fig.6 réf. (5)- an external formwork, collaborating in polished concrete with the addition of a resin-based component preventing the concrete from bursting and corrosion of the reinforcements. Fig. 6 ref. (5) 3. Le procédé selon la revendication 1 ou 2 dans lequel les caissons préfabriqués sont équipés d’un système de réglage permettant d'assurer et de régler la descente de tubes d'ancrage en cours de remorquage : Fig.3 réf.(A2), Fig.4 réf. (A), (B), (C), Fig.5 réf. (A4), (B4), (B8), (D2), (D6), (D7)3. The method according to claim 1 or 2 in which the prefabricated caissons are equipped with an adjustment system making it possible to ensure and adjust the descent of the anchoring tubes during towing: Fig.3 ref. (A2) , Fig. 4 ref. (A), (B), (C), Fig. 5 ref. (A4), (B4), (B8), (D2), (D6), (D7) 4. Le procédé selon la revendication 3 dans lequel le système de réglage permet de plus d’assurer la descente de la digue en cours de construction sur le site d’installation. Fig.4 réf. (A3) et réf. (B3) et Fig.5 ref. (D))4. The method of claim 3 wherein the adjustment system further ensures the descent of the dam during construction on the installation site. Fig. 4 ref. (A3) and ref. (B3) and Fig. 5 ref. (D)) 5. Le procédé selon la revendication 3 ou 4 dans lequel le système de réglage permet d'assurer l'ancrage de la digue dans le sol sur le site d’installation : FIG.2 repo. (A) et (B) Fig.4 réf.(A) et (B)5. The method according to claim 3 or 4 wherein the adjustment system ensures the anchoring of the dike in the ground on the installation site: FIG.2 repo. (A) and (B) Fig. 4 ref. (A) and (B) 6. Le procédé selon l’une quelconque des revendications 1 à 5 dans lequel le montage et l’assemblage sur site comprend au moins une opération de forage dans le sol jusqu’à un niveau défini par calcul, un encastrement de tubes d’ancrage dans le sol par bétonnage fig.4 réf.(B10), une pose sur remblais : fig.4 réf. (6) ou un laissé en flottaison fig.4 réf.(C), des opérations de finitions des étages supérieurs et des abords extérieurs. Fig.4 réf. (B), Fig.6 ref. (4)6. The method according to any one of claims 1 to 5 wherein the assembly and assembly on site comprises at least one drilling operation in the ground to a level defined by calculation, an embedding of anchoring tubes in the ground by concreting fig. 4 ref. (B10), an installation on embankment: fig. 4 ref. (6) or a float Fig. 4 ref. (C), finishing operations for the upper floors and the outside surroundings. Fig. 4 ref. (B), Fig. 6 ref. (4) 7. Le procédé selon l’une quelconque des revendications 3 à 6 dans lequel le système de réglage est une structure en béton armé étanche composée des éléments suivants :7. The method according to any one of claims 3 to 6 in which the adjustment system is a waterproof reinforced concrete structure composed of the following elements: - des compartiments enfermant les tubes de guidage en béton armé : Fig. 5 réf. (1),- compartments enclosing the reinforced concrete guide tubes: Fig. 5 ref. (1), - un tube : Fig.4 réf. (9) et un élément de guidage : Fig.4 ref. (3) et de verrouillage du tube ; et Fig.4 réf. (2) et Fig. 5 réf.(D7)- a tube: Fig. 4 ref. (9) and a guide element: Fig. 4 ref. (3) and tube locking; and Fig. 4 ref. (2) and Fig. 5 ref. (D7) - un guidage supérieur et inférieur par une bague d'appui sandwich collé assurant le glissement et la transmission des efforts horizontaux du tube : Fig.5 réf. (2,), et constitué de :- an upper and lower guide by a glued sandwich support ring ensuring the sliding and the transmission of the horizontal forces of the tube: Fig.5 ref. (2,), and consisting of: - une structure en acier raidi et scellé dans les parois en béton ; Fig.5 réf.(D3)- a stiffened steel structure sealed in the concrete walls; Fig. 5 ref. (D3) - plaque de compression (« néoprène « ou équivalent) Fig.5 ref. D4)- compression plate ("neoprene" or equivalent) Fig.5 ref. D4) - plaque de glissement (« téflon « ou équivalent) : Fig.5 réf D5. ; et- sliding plate ("Teflon" or equivalent): Fig.5 ref D5. ; and - des cales et goussets supportant le poids du tube. Fiig.5 réf.(B2) et (D10)- wedges and gussets supporting the weight of the tube. Fig. 5 ref. (B2) and (D10) 8. Le procédé selon la revendication 7 dans lequel le système de réglage assure le maintien en position haute de tube en phase de remorquage : Fig.2. (A1), et (B1) et permet la descente progressive du tube à l'aide de quatre bagues grippes comportant : Fig.5 repo. (4) plusieurs dents coniques : Fig. 5 réf. (D7) et quatre vérins hydrauliques : fig.5 réf. (8) comprimant le tube avec une pression variable en enfonçant les grippes Fig. 5 repo. (7), dans les parois du tube. Fig.5 réf.. (9)8. The method according to claim 7 wherein the adjustment system maintains the tube in the high position during the towing phase: Fig.2. (A1), and (B1) and allows the progressive descent of the tube using four gripper rings comprising: Fig. 5 repo. (4) several conical teeth: Fig. 5 ref. (D7) and four hydraulic cylinders: fig.5 ref. (8) compressing the tube with variable pressure by pushing in the grippers Fig. 5 repo. (7), in the walls of the tube. Fig. 5 ref. (9) 9. Une digue flottante, habitable et à plusieurs étages, protégeant le littoral contre la montée des eaux et des inondations obtenues par le procédé selon l’une quelconque des revendications 1 à 8.9. A floating, habitable, multi-storey dike protecting the coastline against rising water and flooding obtained by the process according to any one of claims 1 to 8.
FR1701125A 2017-10-30 2017-10-30 DEVICES AND METHODS FOR CONSTRUCTING FLOATING HABITABLE DIGUES Pending FR3072980A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1701125A FR3072980A1 (en) 2017-10-30 2017-10-30 DEVICES AND METHODS FOR CONSTRUCTING FLOATING HABITABLE DIGUES

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1701125 2017-10-30
FR1701125A FR3072980A1 (en) 2017-10-30 2017-10-30 DEVICES AND METHODS FOR CONSTRUCTING FLOATING HABITABLE DIGUES

Publications (1)

Publication Number Publication Date
FR3072980A1 true FR3072980A1 (en) 2019-05-03

Family

ID=61750169

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1701125A Pending FR3072980A1 (en) 2017-10-30 2017-10-30 DEVICES AND METHODS FOR CONSTRUCTING FLOATING HABITABLE DIGUES

Country Status (1)

Country Link
FR (1) FR3072980A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023014289A3 (en) * 2021-08-06 2023-04-27 Keppel Fels Ltd Nearshore solutions
EP4079995A4 (en) * 2019-12-20 2024-01-24 Ltd. Land Business Co. Flood-resistant facility equipped with flood-resistant barrier

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2113751A5 (en) * 1970-11-02 1972-06-23 Zschokke Conrad Sa
FR2969575A1 (en) * 2010-12-27 2012-06-29 Christoph Bente Floating structure i.e. dike, for protecting exposed zones of Condamine Monaco ports, has main channel opened on lateral faces, and transverse channels that communicate with main channel
WO2016193064A1 (en) * 2015-06-05 2016-12-08 Richard Dziewolski Devices and methods for producing a large-size floating structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2113751A5 (en) * 1970-11-02 1972-06-23 Zschokke Conrad Sa
FR2969575A1 (en) * 2010-12-27 2012-06-29 Christoph Bente Floating structure i.e. dike, for protecting exposed zones of Condamine Monaco ports, has main channel opened on lateral faces, and transverse channels that communicate with main channel
WO2016193064A1 (en) * 2015-06-05 2016-12-08 Richard Dziewolski Devices and methods for producing a large-size floating structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4079995A4 (en) * 2019-12-20 2024-01-24 Ltd. Land Business Co. Flood-resistant facility equipped with flood-resistant barrier
WO2023014289A3 (en) * 2021-08-06 2023-04-27 Keppel Fels Ltd Nearshore solutions

Similar Documents

Publication Publication Date Title
US10081960B2 (en) Methods and apparatus of building construction resisting earthquake and flood damage
US7651298B2 (en) Flood levee and barrier module and system
ES2845001T3 (en) Method and system for a retractable retaining wall system
US7658572B2 (en) Tide apparatus and tide structure
US20130199113A1 (en) Floatable Constructions
US20180170489A1 (en) Devices and methods for producing a large-size floating structure
KR101707302B1 (en) Method of earth dam remodeling for ecology and landscape function
KR101898449B1 (en) Prefabricated Steel Cofferdam with Dual Structure and Construction Method of Cofferdam Thereof
FR3072980A1 (en) DEVICES AND METHODS FOR CONSTRUCTING FLOATING HABITABLE DIGUES
Anderson Amphibious Architecture Living with a Rising Bay
RU2686206C1 (en) Method of erection of underground structures along river bed or canal
EP0082034A1 (en) Construction transportable by sea or by waterway
RU2468151C2 (en) Underwater garage for vehicles and method to construct underwater garage
JP3759118B2 (en) Natural movable ups and downs that can be installed on the coast, rivers, and flat grounds.
JPH0892936A (en) Quay repair method, and transportable retaining wall used in the method
CN114787466A (en) Flood prevention facility with flood prevention enclosure wall
JP2000265450A (en) Artificial ground consisting of porous housing and construction method therefor
Nelson Envisaging the scope of amphibious architecture in below sea level regions of Kuttanad
Hill et al. Pond Urbanism: Floating Urban Districts on Shallow Coastal Groundwater
JPH0886119A (en) Flooding protection wall
KR102586609B1 (en) Construction method of forced synthetic type prefabricated concrete flood barrier
US20240167239A1 (en) Scaled hydropower with seals
Kolios et al. An Award-Winning Multi-Purpose Bridge in the Red Sea: Construction Challenges and Engineering Solutions
Moh et al. Marina barrage–A unique 3-in-1 project in Singapore
Saunders Ocean City-Longport replacement bridge requires precast concrete durability for Harsh marine conditions

Legal Events

Date Code Title Description
PLSC Publication of the preliminary search report

Effective date: 20190503

RN Application for restoration

Effective date: 20190718

IC Decision of the director general to declare irreceivable or to reject an appeal