FR3051007B1 - Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous - Google Patents

Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous Download PDF

Info

Publication number
FR3051007B1
FR3051007B1 FR1654073A FR1654073A FR3051007B1 FR 3051007 B1 FR3051007 B1 FR 3051007B1 FR 1654073 A FR1654073 A FR 1654073A FR 1654073 A FR1654073 A FR 1654073A FR 3051007 B1 FR3051007 B1 FR 3051007B1
Authority
FR
France
Prior art keywords
precontrated
interviews
stiffener
manufacturing
floor system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
FR1654073A
Other languages
English (en)
Other versions
FR3051007A1 (fr
Inventor
Jerome Bernay
Arnaud Guillemin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fabemi Qualite
Original Assignee
Fabemi Qualite
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fabemi Qualite filed Critical Fabemi Qualite
Priority to FR1654073A priority Critical patent/FR3051007B1/fr
Priority to MA041305A priority patent/MA41305A/fr
Priority to EP17165695.2A priority patent/EP3241657A1/fr
Publication of FR3051007A1 publication Critical patent/FR3051007A1/fr
Application granted granted Critical
Publication of FR3051007B1 publication Critical patent/FR3051007B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/06Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed for the production of elongated articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B28B17/0036Cutting means, e.g. water jets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/04Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
    • B28B23/043Wire anchoring or tensioning means for the reinforcements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B5/00Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping
    • B28B5/04Producing shaped articles from the material in moulds or on moulding surfaces, carried or formed by, in or on conveyors irrespective of the manner of shaping in moulds moved in succession past one or more shaping stations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/26Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with filling members between the beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/26Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members prestressed
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete
    • E04C3/294Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete of concrete combined with a girder-like structure extending laterally outside the element
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/065Light-weight girders, e.g. with precast parts
    • E04C5/0653Light-weight girders, e.g. with precast parts with precast parts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Composite Materials (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
FR1654073A 2016-05-04 2016-05-04 Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous Active FR3051007B1 (fr)

Priority Applications (3)

Application Number Priority Date Filing Date Title
FR1654073A FR3051007B1 (fr) 2016-05-04 2016-05-04 Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous
MA041305A MA41305A (fr) 2016-05-04 2017-04-10 Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous
EP17165695.2A EP3241657A1 (fr) 2016-05-04 2017-04-10 Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1654073A FR3051007B1 (fr) 2016-05-04 2016-05-04 Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous
FR1654073 2016-05-04

Publications (2)

Publication Number Publication Date
FR3051007A1 FR3051007A1 (fr) 2017-11-10
FR3051007B1 true FR3051007B1 (fr) 2018-05-25

Family

ID=56404137

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1654073A Active FR3051007B1 (fr) 2016-05-04 2016-05-04 Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous

Country Status (3)

Country Link
EP (1) EP3241657A1 (fr)
FR (1) FR3051007B1 (fr)
MA (1) MA41305A (fr)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110871498B (zh) * 2019-11-27 2021-06-29 山东柏源技术有限公司 一种预制构件生产装置
CN112077998A (zh) * 2020-09-17 2020-12-15 河北雄安京德高速公路有限公司 一种二次张拉的预制梁连续施工环形生产线及施工方法
BE1029851B1 (nl) * 2021-10-15 2023-05-15 Betonwerken Vets En Zonen Nv Werkwijze en tafel voor vervaardiging van een betonwelfsel
CN114108869B (zh) * 2021-11-19 2023-03-28 上海建工集团股份有限公司 一种仿夯土古墙及其施工方法
CN114311268A (zh) * 2021-12-31 2022-04-12 中交二航局第四工程有限公司安徽混凝土装配化构件分公司 一种自动化的节段梁浇筑工艺
CN117697945B (zh) * 2023-11-24 2024-09-10 中铁九局集团有限公司 一种混凝土构件多产品共线的生产线及生产方法

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3128521A (en) * 1959-10-05 1964-04-14 J L Cone Jr C W Cone Apparatus for molding pre-stressed concrete members
GB977175A (en) * 1964-02-11 1964-12-02 Julian Lee Cone Junior Apparatus for moulding pre-stressed concrete members
GB1127219A (en) * 1965-05-19 1968-09-18 Victor Eugene Otto Hennig Molding apparatus and method for concrete products
US3577610A (en) * 1968-04-16 1971-05-04 Little Inc A Apparatus for manufacturing prestressed concrete members
FR2907704B1 (fr) * 2006-10-30 2008-12-26 Rector Lesage Sa Procede de moulage d'un element prefabrique en beton et machine de moulage mettant en oeuvre ledit procede
FR2927565B1 (fr) * 2008-02-18 2012-11-16 Kp1 Procede de fabrication d'une poutre treillis

Also Published As

Publication number Publication date
FR3051007A1 (fr) 2017-11-10
MA41305A (fr) 2021-04-14
EP3241657A1 (fr) 2017-11-08

Similar Documents

Publication Publication Date Title
FR3051007B1 (fr) Procede de fabrication en serie de poutrelles en beton precontraint a raidisseur pour systeme de plancher a poutrelles et entrevous
FR3044467B1 (fr) Dalle lumineuse et procede de fabrication d'une telle dalle lumineuse
EP3306000A4 (fr) Structure préfabriquée à colonnes et plaques en acier léger et béton et procédé de construction associé
FR3042061B1 (fr) Procede, robot mobile et systeme pour la gestion automatisee d’un local de self-stockage
BR112015028030A2 (pt) método e sistema para construção rápida de estrutura de concreto estruturalmente reforçadas usando conjuntos pré-fabricados e métodos de fabricação
EP3733354C0 (fr) Système de construction robotisé et méthode correspondante pour la fabrication d'un bâtiment
FR3006625B1 (fr) Panneau composite pour planchers ou elements d'habillage de paroi, et procede de fabrication d'un tel panneau.
EP3475496A4 (fr) Procédé de construction d'un plancher en béton dans un bâtiment à plusieurs étages
DK3493972T3 (da) Indretning og fremgangsmåde til fremstilling af mindst et tredimensionelt laminat til byggeindustrien
FR3075314B1 (fr) Procede et systeme pour la fabrication d'un decor lumineux
FR3029326B1 (fr) Procede et systeme pour la gestion d’energie
FR3035134B1 (fr) Coffrage, procede de decoffrage, et procede de fabrication d'une portion de batiment
EP3924928A4 (fr) Système de gestion automatisée de projet de construction de bâtiment
FR3044029B1 (fr) Pre-mur pour la construction d'un batiment et procede de fabrication du pre-mur
MA42042A (fr) Panneau de coffrage perdu, assemblage de tels panneaux et procede de realisation de dalle pour plancher en beton
PL3695942T3 (pl) Sposób wytwarzania prefabrykowanych wyrobów betonowych
FR3057594B1 (fr) Plot d’aide a la pose d’elements de plancher tels que des dalles, systeme de plancher sureleve le comprenant et procede de mise en œuvre de celui-ci
DK3540141T3 (da) Beam assembly for composite floor
FR3046559B1 (fr) Procede et installation de fabrication d'un objet tridimensionnel
FR3023502B1 (fr) Procede et installation pour la fabrication d'un element prefabrique en beton, avec tracabilite dudit element prefabrique
EP3419434A4 (fr) Sous-système de distribution de béton pour système de fabrication de béton automatisé
FR3024703B1 (fr) Systeme de transport pour tunnel et procede de gestion d'energie pour un tel systeme de transport
FR3024699B1 (fr) Systeme d’aide a la conduite et procede mis en oeuvre dans un tel systeme
FR3033811B1 (fr) Element de construction prefabrique et procede de fabrication d'un tel element de construction prefabrique
FR3045447B1 (fr) Procede de fabrication d’un materiau composite.

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20171110

PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7

PLFP Fee payment

Year of fee payment: 8

PLFP Fee payment

Year of fee payment: 9