FR3002014A1 - Conveyer chain for use in lifting gear, has terminal point attached to load at certain distance to allow operator to handle chain, and recovery device extending chain and tensioned between upper point and endpoint when load is lifted - Google Patents

Conveyer chain for use in lifting gear, has terminal point attached to load at certain distance to allow operator to handle chain, and recovery device extending chain and tensioned between upper point and endpoint when load is lifted Download PDF

Info

Publication number
FR3002014A1
FR3002014A1 FR1300305A FR1300305A FR3002014A1 FR 3002014 A1 FR3002014 A1 FR 3002014A1 FR 1300305 A FR1300305 A FR 1300305A FR 1300305 A FR1300305 A FR 1300305A FR 3002014 A1 FR3002014 A1 FR 3002014A1
Authority
FR
France
Prior art keywords
chain
load
point
lifting
lifting chain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1300305A
Other languages
French (fr)
Other versions
FR3002014B1 (en
Inventor
Gilles Seurre
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Financiere Cbr Fr
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR1300305A priority Critical patent/FR3002014B1/en
Publication of FR3002014A1 publication Critical patent/FR3002014A1/en
Application granted granted Critical
Publication of FR3002014B1 publication Critical patent/FR3002014B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/125Chain-type slings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • B66C1/14Slings with hooks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The chain has a tension recovery device (2) arranged between an upper point and an intermediate point, where the chain reduces distance between the upper point and the intermediate point when the chain is at rest and subjected to own weight. A terminal point is attached to a load (5) at certain distance to allow an operator to handle the chain to easily extend the distance between the upper point and the terminal point to fix the load. The tension recovery device extends the chain, and is tensioned between the upper point and an endpoint when the load is lifted.

Description

DESCRIPTION La présente invention consiste à insérer un tendeur sur une des chaines de levage obligeant l'ensemble de la chaine d'une part à être raccourci en longueur sans charge avec un mou en partie supérieure et d'autre part d'avoir la facilité pour l'operateur d'ex tendre la longueur de chaine pour un accrochage ayant une tension permanente du crochet avant levage. Actuellement et principalement dans le domaine professionnel du bâtiment et travaux publique, BTP, pour effectuer le levage d'une charge le grutier doit déposer une partie des chaînes de levage sur la charge avec les crochets en dessous de l'amas de chaîne obligeant l'operateur à lever, par la chaîne, le crochet sous l'amas de des trois autres chaînes pour pouvoir crocheter la charge. Cette opération nécessite parfois de monter sur la charge avec tous les risques d'accident et de faire un faux mouvement en tirant de travers la chaine sous les trois autres. Une fois sorti le premier crochet il faut faire le tri des trois autres chaînes en soulevant les crochets pour une accroche symétrique des quatre chaines sur la charge. L'operateur doit souvent se faire aider pour démêler l'amas de chaîne pour les repartir à chaque coin sans vrillage de la chaîne et de tenir les quatre crochets en bonne position pour ne pas coincer le crochet ou la chaine de travers. Le levage du moufle, de la part du grutier quand les quatre crochets sont attachés est de veiller à lever doucement le moufle pour ne pas être gêné par l'accroche inopinée des autres chaines et crochets sur la charge tout en s'assurant de la sécurité des opérateurs. Lors de la dépose de la charge, le grutier doit descendre son moufle suffisamment bas pour pouvoir décrocher les crochets laissant un moue de chaine sur la charge et l'operateur doit veiller à décrocher et refermer le crochet laissant les quatre chaines et crochets sur la charge. Pour ne pas raccrocher la charge lors du levage du moufle, souvent l'opérateur doit accompagner les chaînes en les soulevant, en les accompagnants, entrainant un risque d'accident ou de raccrochage de la charge. L'opération d'accrochage et décrochage d'une charge avec des chaines à crochet nécessite une vigilance du grutier et de l'opérateur en matière de sécurité à la personne et à la charge entrainant des risques d'accident et aussi une perte de temps et de rendement. L'invention vise à remédier à ces problèmes.DESCRIPTION The present invention consists in inserting a tensioner on one of the lifting chains forcing the entire chain on the one hand to be shortened in length without load with a slack in the upper part and on the other hand to have the facility to the operator ex stretches the chain length for a hooking having a permanent tension of the hook before lifting. Currently and mainly in the professional field of building and public works, BTP, to carry out the lifting of a load the crane operator must deposit a part of the chains of lifting on the load with the hooks below the pile of chain obliging the operator to raise, by the chain, the hook under the heap of the other three chains to be able to pick the load. This operation sometimes requires to climb on the load with all the risks of accident and make a wrong move by pulling the chain under the other three. Once out the first hook it is necessary to sort the other three chains by lifting the hooks for a symmetrical grip of the four chains on the load. The operator often needs to be helped to untangle the pile of chain to start at each corner without twisting the chain and hold the four hooks in a good position to avoid catching the hook or chain across. The lifting of the mitten, on the part of the crane operator when the four hooks are attached is to make sure to lift the mittle gently so as not to be bothered by the unexpected attachment of the other chains and hooks on the load while ensuring the safety operators. When removing the load, the crane operator must lower his muffle low enough to pick up the hooks leaving a chain pout on the load and the operator must make sure to unhook and close the hook leaving the four chains and hooks on the load . To avoid hanging up the load when lifting the block, often the operator must accompany the chains by lifting them, accompanying them, causing a risk of accident or hang-up of the load. The operation of hooking and unhooking a load with hook chains requires a vigilance of crane operator and the operator in terms of personal safety and the load resulting in risks of accident and also a waste of time and yield. The invention aims to remedy these problems.

Elle consiste en une chaîne de levage comprenant un point supérieur, un point intermédiaire et un point terminal, caractérisée en ce qu'elle comporte, entre le point supérieur et le point intermédiaire, un dispositif de reprise de tension permettant, lorsque la chaîne est au repos et n'est soumise qu'à son propre poids, de réduire la distance entre le point supérieur et le point intermédiaire et ainsi laisser le point terminal à distance d'une charge à lever afin de permettre à un operateur manipulant la chaîne de levage d'étendre facilement la distance entre le point supérieur et le point terminal afin de faciliter l'accrochage de la charge à lever, le dispositif de reprise de tension s'allongeant et la chaîne étant mise en tension entre le point supérieur et le point terminal lorsque la charge est soulevée. Le dispositif de reprise de tension peut être protégé par un dispositif de protection qui peut être une gaine en plastique annelé. Le dispositif de reprise de tension peut être constitué d'un vérin, d'un ressort ou d'un câble élastique.It consists of a lifting chain comprising an upper point, an intermediate point and an end point, characterized in that it comprises, between the upper point and the intermediate point, a voltage recovery device allowing, when the chain is at rest and is subject only to its own weight, to reduce the distance between the upper point and the intermediate point and thus leave the end point remote from a load to lift to allow an operator handling the lifting chain to easily extend the distance between the upper point and the end point to facilitate attachment of the load to be lifted, the voltage recovery device extending and the chain being tensioned between the upper point and the end point when the load is raised. The voltage recovery device may be protected by a protective device which may be a corrugated plastic sheath. The voltage recovery device may consist of a jack, a spring or an elastic cable.

Le dispositif de reprise de tension peut être fixé à la chaîne de levage par des crochets ou des mousquetons. L'invention concerne également un dispositif de reprise de tension destiné à être monté entre un point supérieur et un point intermédiaire d'une telle chaîne de levage afin de créer entre le point supérieur et le point intermédiaire une première partie de chaîne sans charge et offrant du mou, la distance entre supérieur et intermédiaire étant raccourcie par rapport à la longueur de la première partie de chaîne , et une seconde partie de chaîne entre le point intermédiaire et un point terminal, libre et soumise à la gravité, le mou offert par le dispositif à la première partie de chaîne permettant à l'operateur d'étendre facilement la distance entre le point supérieur et le point terminal afin de faciliter l'accrochage de la charge. L'invention concerne enfm un engin de levage équipé d'au moins une telle chaîne de levage. L'invention sera mieux comprise au moyen des figures annexées : La figure 1 représente la chaîne de levage(1) au repos, équipée d'un dispositif de reprise de tension(2) La figure 2 représente la chaîne de levage(1) fixée à la charge(5) à lever, la charge étant encore poser au sol et la chaîne n'étant pas en tension La figure 3 représente deux chaînes de levage(1) en tension, soulevant une charge(5). En référence au dessin figure 1, il représente la chaine(1) sans charge accrochée au crochet en partie basse(C) avec son mou de chaine en partie supérieur provoqué par la tension du tendeur accroché d'une part en partie haute(A) sur l'anneau de la chaine(1) et d'autre part sur la partie intermédiaire (B) laissant la deuxième partie de chaine pendu par son propre poids. Le grutier aura descendu l'ensemble pour que la charge(5), étant en attende d'être accrochée par l'utilisateur, se situe à une distance inferieur à la distance étiré du mou de chaine.The tensioning device can be attached to the lifting chain by hooks or carabiners. The invention also relates to a voltage recovery device intended to be mounted between an upper point and an intermediate point of such a lifting chain in order to create between the upper point and the intermediate point a first portion of chain without load and offering slack, the distance between upper and intermediate being shortened with respect to the length of the first chain portion, and a second chain portion between the intermediate point and a terminal point, free and subject to gravity, the slack offered by the device at the first part of the chain allowing the operator to easily extend the distance between the upper point and the end point to facilitate the attachment of the load. The invention relates to a lifting machine equipped with at least one such lifting chain. The invention will be better understood by means of the appended figures: FIG. 1 shows the lifting chain (1) at rest, equipped with a tensioning device (2). FIG. 2 shows the lifting chain (1) attached. to the load (5) to be lifted, the load still being laid on the ground and the chain not being tensioned. FIG. 3 shows two lifting chains (1) in tension, lifting a load (5). Referring to the drawing figure 1, it shows the chain (1) without load hooked to the bottom hook (C) with its chain slack in the upper part caused by the tension of the tensioner hanging on the one hand in the upper part (A) on the ring of the chain (1) and on the other hand on the intermediate part (B) leaving the second chain part hung by its own weight. The crane operator will have lowered the assembly so that the load (5), being waiting to be hooked by the user, is at a distance less than the stretched distance of the slack chain.

En référence au dessin figure 2, il représente la chaine accrochée à la charge(5) et tendu par le tendeur(2) protégé dans sa gaine protectrice(3) accroché en partie haute par son crochet(4h)haut sur l'anneau de la chaine et en partie basse par son crochet(4b)bas sur le maillon de la partie intermédiaire de la chaine laissant la partie basse(11) de la chaine tendu alors que la partie haute(10) constitue le moue de chaine encore extensible.Referring to Figure 2, it shows the chain hooked to the load (5) and stretched by the tensioner (2) protected in its protective sheath (3) hooked at the top by its hook (4h) high on the ring of the chain and in the lower part by its hook (4b) down on the link of the intermediate part of the chain leaving the lower part (11) of the chain stretched while the upper part (10) is still chain pout still extensible.

En référence au dessin figure 3, il représente deux chaines(1) accrochées à la charge(5) et soulevant la charge sans mou de chaine(10). La partie haute de la chaine reprend la tension de la partie basse(11) pour soulever la charge(5), retrouvant la même longueur initial et les mêmes caractéristiques de la chaine sans tendeur, avec une extension maximal mais non destructrice du tendeur(2) protégé dans sa gaine protectrice(3) accroché en partie haute par son crochet(4h)haut sur l'anneau de la chaine et en partie basse par son crochet(4b)bas sur le maillon de la partie intermédiaire de la chaine(1). Le dispositif de reprise de tension ou tendeur de chaine est composé d'un tendeur en caoutchouc synthétique protégé mécaniquement dans une gaine annelée plastique avec un crochet de fixation à chaque extrémité. L'accroche du tendeur est assurée par un crochet à verrouillage à chaque extrémité. Les crochets hauts des deux tendeurs se fixent sur l'anneau s'accrochant au crochet du moufle et supportant les deux chaines de levage. Les crochets bas des deux tendeurs se fixent respectivement sur le dernier tiers de chaine avec crochet. La protection mécanique au repliage soit être assurée par une gaine annelée plastique libre en diamètre autour du tendeur de longueur égale à la longueur du tendeur sans tension. La longueur de la gaine annelée est identique à la longueur du tendeur sans élasticité de façon à protéger mécaniquement les tendeurs lors de l'enlèvement des chaines du moufle sans décrochage des tendeurs. Le diamètre de la gaine annelée doit être supérieur au diamètre de tendeur, permettant ainsi d'être libre et coulissant autour du tendeur offrant aussi en position tendue du tendeur une protection mécanique en partie basse du tendeur.Referring to Figure 3, it shows two chains (1) hooked to the load (5) and lifting the load without chain slack (10). The upper part of the chain takes up the tension of the lower part (11) to lift the load (5), finding the same initial length and the same characteristics of the chain without tensioner, with a maximum but non-destructive extension of the tensioner (2). ) protected in its protective sheath (3) hooked at the top by its hook (4h) high on the ring of the chain and in the lower part by its hook (4b) down on the link of the intermediate part of the chain (1 ). The tensioning device or chain tensioner is composed of a synthetic rubber tensioner mechanically protected in a corrugated plastic sheath with a fastening hook at each end. The tensioner hook is provided by a locking hook at each end. The high hooks of the two tensioners are fixed on the ring clinging to the muffle hook and supporting the two hoisting chains. The bottom hooks of the two tensioners are fixed respectively on the last third of chain with hook. The mechanical protection to the folding is to be ensured by a free plastic corrugated sheath in diameter around the tensioner of length equal to the length of tensioner without tension. The length of the corrugated sheath is identical to the length of the tensioner without elasticity so as to mechanically protect the tensioners during the removal of muffle chains without stalling the tensioners. The diameter of the corrugated sheath must be greater than the diameter of the tensioner, thus allowing to be free and sliding around the tensioner also providing in tensioned position of the tensioner a mechanical protection in the lower part of the tensioner.

La longueur est telle, qu'entre le haut de la chaine de levage où est accroché le crochet de fixation du tendeur et le haut du dernier tiers de la chaine de levage où est accroché l'autre crochet de fixation du tendeur, que le tendeur exerce une force qui fasse remonter le dernier tiers de chaine avec crochet de plus d'un mètre de longueur laissant un mou de chaine en partie supérieure laissant pendre le dernier tiers de chaine avec crochet. Généralement, les professionnels utilisent quatre chaines de levage et cette opération répétée quatre fois avec un léger décalage d'accrochage des crochets de tendeur laisse pendre quatre chaines avec crochet avec un décalage qui détermine l'ordre arbitraire et symétrique des chaines dans l'accrochage à savoir la chaine avant droite, puis la chaine avant gauche, puis la chaine arrière gauche, puis la chaine arrière droite créant un ordre arbitraire d'accrochage nécessaire pour ne pas avoir de vrillage de chaine, et pour avoir une distance égale entre les quatre points de levage et le moufle. Ces quatre chaines pendues légèrement décalées dans un ordre horaire et arbitraire laissant quatre mous de chaine en partie supérieure, permettent à l'operateur de visualiser l'ordre de prise de crochet, car avec le décalage d'accroche le crochet avant droit est au plus bas au-dessous du crochet avant gauche, les deux au-dessous du crochet arrière gauche, et les trois au-dessous du crochet arrière droit, ainsi l'operateur peu allonger sans effort avec tension permanente le crochet bas de la chaine avant droit ayant une longueur d'élasticité d'une longueur du mou de chaine pour un accrochage du crochet sur la charge avec toujours un tension permanente ce qui permet : d'éviter le vrillage de la chaine, de laisser après accrochage manuel une tension de la chaine en ligne avec le crochet, de ne pas avoir de mou sur la charge. Le grutier, après avoir vu l'operateur effectuer l'accroche successive des quatre chaines dans un ordre donné, constate que les quatre crochets sont crochetés et fermés avec tension sans mou de chaine sur la charge dans un ordre symétrique sans chevauchement de chaine et surtout , pour la sécurité, sans personne pour accompagner les chaines lors du levage et peu effectuer un levage toute en sécurité et plus rapidement. Ainsi lors du pré-levage, le grutier s'assure de la diminution de la longueur des mous de chaine en partie haute pour quelles deviennent nuls laissant la tension se reporter sur les chaines et non plus sur les tendeurs. Le levage peu se faire laissant les chaines supporter la charge, retrouvant les mêmes caractéristiques de capacité de charge que sans tendeur en toute sécurité. Au moulage le grutier veillera à descendre la charge jusqu'à obtenir une reprise de la tension des chaines par les tendeurs ainsi laissant un léger mou de chaine et stoppant le moulage il attendra que l'operateur décroche les crochets de chaine avec une légère tension annliauée et sans obligation de refermer les crochets les lâcheront, sans se soucier du mou de chaine, retrouvant les crochets pendus dans le même ordre décalé au-dessus de la charge sans la toucher avec un temps de décrochage rapide et sécuritaire. Le grutier voyant les quatre chaines et crochets libres au-dessus de la charge sans la toucher et sans operateur peu lever très rapidement le moufle sans danger et passer à un autre levage.The length is such that between the top of the lifting chain where is hooked the fastener hook of the turnbuckle and the top of the last third of the hoist chain where is hooked the other fixing hook of the tensioner, that the tensioner exerts a force that brings up the last third of chain with hook more than a meter in length leaving a chain slack in the upper part leaving hanging the last third of chain with hook. Generally, the professionals use four chains of lifting and this operation repeated four times with a slight offset of hooking of the tensioner hooks hangs four chains with hook with a shift which determines the arbitrary and symmetrical order of the chains in the hanging to know the right front chain, then the left front chain, then the left rear chain, then the right rear chain creating an arbitrary order of hooking necessary not to have chain twisting, and to have an equal distance between the four points lifting and mittens. These four chains hanged slightly offset in an arbitrary and hourly order, leaving four soft chains in the upper part, allow the operator to visualize the hooking order, because with the hooking offset the right front hook is at most bottom below the left front hook, the two below the left rear hook, and the three below the right rear hook, so the operator can effortlessly lengthen the bottom hook of the right front chain with a length of elasticity of a length of the chain slack for hooking the hook on the load with always a permanent tension which allows: to avoid twisting of the chain, to leave after manual fastening a tension of the chain in line with the hook, not to have slack on the load. The crane operator, after having seen the operator perform the successive hooking of the four chains in a given order, finds that the four hooks are hooked and closed with tension without chain slack on the load in a symmetrical order without overlapping chain and especially , for the safety, without anyone to accompany the chains during the lifting and to carry out a lifting all in security and more quickly. Thus during the pre-lifting, the crane operator ensures the decrease in the length of chain chases in the upper part for which become zero allowing the tension to refer to the chains and no longer on the turnbuckles. Lifting can be done letting the chains withstand the load, finding the same characteristics of load capacity that without tensioner safely. At the molding the crane operator will take care to lower the load until the tension of the chains is taken up by the tensioners thus leaving a slight slack of chain and stopping the molding it will wait until the operator unhooks the hooks of chain with a slight tension annliauée and without the need to close the hooks will release them, regardless of the chain slack, finding the hooks hanged in the same order shifted over the load without touching it with a quick and safe stall time. The crane driver seeing the four chains and free hooks above the load without touching it and without operator can quickly lift the mitten safely and move to another lift.

Claims (10)

REVENDICATIONS1. Chaîne de levage (1) comprenant un point supérieur (A), un point intermédiaire (B) et un point terminal (C), caractérisée en ce qu'elle comporte, entre le point supérieur (A) et le point intermédiaire (B), un dispositif de reprise de tension (2) permettant, lorsque la chaîne est au repos et n'est soumise qu'à son propre poids, de réduire la distance entre le point supérieur (A) et le point intermédiaire (B) et ainsi laisser le point terminal (C) à distance d'une charge à lever (5) afin de permettre à un operateur manipulant la chaîne de levage (1) d'étendre facilement la distance entre le point supérieur (A) et le point terminal (C) afin de faciliter l'accrochage de la charge à lever (5), le dispositif de reprise de tension (2) s'allongeant et la chaîne (1) étant mise en tension entre le point supérieur (A) et le point terminal (C) lorsque la charge (5) est soulevée.REVENDICATIONS1. Lifting chain (1) comprising an upper point (A), an intermediate point (B) and an end point (C), characterized in that it comprises, between the upper point (A) and the intermediate point (B) a tensioning device (2) which, when the chain is at rest and is only subjected to its own weight, to reduce the distance between the upper point (A) and the intermediate point (B) and thus leaving the end point (C) away from a lifting load (5) to allow an operator manipulating the lifting chain (1) to easily extend the distance between the upper point (A) and the end point ( C) in order to facilitate the attachment of the load to be lifted (5), the tensioning device (2) being lengthened and the chain (1) being tensioned between the upper point (A) and the end point (C) when the load (5) is raised. 2. Chaîne de levage (1) selon la revendication 1, caractérisée en ce que le dispositif de reprise de tension (2) est protégé par un dispositif de protection (3).Lifting chain (1) according to claim 1, characterized in that the voltage recovery device (2) is protected by a protective device (3). 3. Chaîne de levage (1) selon la revendication 2, caractérisée en ce que le dispositif de protection (3) est une gaine en plastique annelé.3. Lifting chain (1) according to claim 2, characterized in that the protective device (3) is a corrugated plastic sheath. 4. Chaîne de levage (1) selon l'une quelconque des revendications précédentes, caractérisée en ce que le dispositif de reprise de tension (2) est constitué d'un vérin.4. Lifting chain (1) according to any one of the preceding claims, characterized in that the voltage recovery device (2) consists of a jack. 5. Chaîne de levage (1) selon l'une quelconque des revendications 1 à 3, caractérisée en ce que le dispositif de reprise de tension (2) est constitué d'un ressort.Lifting chain (1) according to one of claims 1 to 3, characterized in that the tensioning device (2) consists of a spring. 6. Chaîne de levage (1) selon l'une quelconque des revendications 1 à 3, caractérisée en ce que le dispositif de reprise de tension (2) est constitué d'un câble élastique.6. Lifting chain (1) according to any one of claims 1 to 3, characterized in that the voltage recovery device (2) consists of an elastic cable. 7. Chaîne de levage (1) selon l'une quelconque des revendications précédentes, caractérisée en ce que le dispositif de reprise de tension (2) est fixé à la chaîne de levage (1) par des crochets (4).Lifting chain (1) according to one of the preceding claims, characterized in that the tensioning device (2) is fixed to the lifting chain (1) by hooks (4). 8. Chaîne de levage (1) selon l'une quelconque des revendications 1 à 6, caractérisée en ce que le dispositif de reprise de tension (2) est fixé à la chaîne de levage (1) par des mousquetons (4).8. Lifting chain (1) according to any one of claims 1 to 6, characterized in that the tensioning device (2) is attached to the lifting chain (1) by carabiners (4). 9. Dispositif de reprise de tension (2) destiné à être monté entre un point supérieur (A) et un point intermédiaire (B) d'une chaîne de levage (1) selon l'une quelconque des revendications précédentes afin de créer entre le point supérieur (A) et le point intermédiaire (B) une première partie de chaîne (10) sans charge et offrant du mou, la distance entre supérieur (A) et intermédiaire (B) étant raccourcie par rapport à la longueur de la première partie de chaîne (10), et une seconde partie de chaîne (11) entre le point intermédiaire (B) et un point terminal (C), libre et soumise à la gravité,le mou offert par le dispositif (2) à la première partie de chaîne (10) permettant à l'operateur d'étendre facilement la distance entre le point supérieur (A) et le point terminal (C) afin de faciliter l'accrochage de la charge (5).9. Voltage recovery device (2) to be mounted between an upper point (A) and an intermediate point (B) of a lifting chain (1) according to any preceding claim to create between the upper point (A) and the intermediate point (B) a first chain part (10) without load and offering slack, the distance between upper (A) and intermediate (B) being shortened compared to the length of the first part chain (10), and a second chain portion (11) between the intermediate point (B) and an end point (C), free and subject to gravity, the slack provided by the device (2) to the first part chain (10) allowing the operator to easily extend the distance between the upper point (A) and the end point (C) to facilitate the attachment of the load (5). 10. Engin de levage équipé d'au moins une chaîne de levage (1) selon l'une quelconque des revendications 1 à 6Lifting machine equipped with at least one lifting chain (1) according to any one of claims 1 to 6.
FR1300305A 2013-02-12 2013-02-12 LIFTING CHAIN TENSIONER Expired - Fee Related FR3002014B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1300305A FR3002014B1 (en) 2013-02-12 2013-02-12 LIFTING CHAIN TENSIONER

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1300305A FR3002014B1 (en) 2013-02-12 2013-02-12 LIFTING CHAIN TENSIONER

Publications (2)

Publication Number Publication Date
FR3002014A1 true FR3002014A1 (en) 2014-08-15
FR3002014B1 FR3002014B1 (en) 2015-08-07

Family

ID=48795594

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1300305A Expired - Fee Related FR3002014B1 (en) 2013-02-12 2013-02-12 LIFTING CHAIN TENSIONER

Country Status (1)

Country Link
FR (1) FR3002014B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3035095A1 (en) * 2015-04-17 2016-10-21 Gilles Seurre EXTENDABLE CABLE SLING
FR3065452A1 (en) * 2017-04-24 2018-10-26 Gilles Seurre SLING TENSIONER RETRACTOR
EP3715308A1 (en) * 2019-03-21 2020-09-30 Reinhold Rachinger Stop means for suspending loads on a support means
WO2021064535A1 (en) * 2019-10-03 2021-04-08 Nexter Systems Wheel-handling device and method using such a device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2750060A (en) * 1954-12-08 1956-06-12 Clark Equipment Co Sling attachment for industrial lift trucks
JPS5114974U (en) * 1974-07-19 1976-02-03
JPH0261884U (en) * 1988-10-28 1990-05-09
JPH07215656A (en) * 1994-01-28 1995-08-15 Nkk Corp Hanging jig for crane slinging work
JP2004099193A (en) * 2002-09-04 2004-04-02 Eagle Kuranpu Kk Sling type lifting device
EP1411019A1 (en) * 2002-10-18 2004-04-21 Société d'Applications Electriques et Mecaniques (SAPEM) Handling device for the lifting and tilting of objects

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2750060A (en) * 1954-12-08 1956-06-12 Clark Equipment Co Sling attachment for industrial lift trucks
JPS5114974U (en) * 1974-07-19 1976-02-03
JPH0261884U (en) * 1988-10-28 1990-05-09
JPH07215656A (en) * 1994-01-28 1995-08-15 Nkk Corp Hanging jig for crane slinging work
JP2004099193A (en) * 2002-09-04 2004-04-02 Eagle Kuranpu Kk Sling type lifting device
EP1411019A1 (en) * 2002-10-18 2004-04-21 Société d'Applications Electriques et Mecaniques (SAPEM) Handling device for the lifting and tilting of objects

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3035095A1 (en) * 2015-04-17 2016-10-21 Gilles Seurre EXTENDABLE CABLE SLING
FR3065452A1 (en) * 2017-04-24 2018-10-26 Gilles Seurre SLING TENSIONER RETRACTOR
EP3715308A1 (en) * 2019-03-21 2020-09-30 Reinhold Rachinger Stop means for suspending loads on a support means
WO2021064535A1 (en) * 2019-10-03 2021-04-08 Nexter Systems Wheel-handling device and method using such a device
FR3101574A1 (en) * 2019-10-03 2021-04-09 Nexter Systems WHEEL HANDLING DEVICE AND METHOD USING SUCH A DEVICE

Also Published As

Publication number Publication date
FR3002014B1 (en) 2015-08-07

Similar Documents

Publication Publication Date Title
FR3002014A1 (en) Conveyer chain for use in lifting gear, has terminal point attached to load at certain distance to allow operator to handle chain, and recovery device extending chain and tensioned between upper point and endpoint when load is lifted
JP2013158065A (en) Hook device
US2249907A (en) Pole shifting device
EP2955146A1 (en) Load chain tensioner
US1516564A (en) Rope-gripping device
FR3035095A1 (en) EXTENDABLE CABLE SLING
JP6776026B2 (en) Slinging hand hook stick
JP3125406U (en) Transportation hanger
EP0771931A1 (en) Safety device for ladder and ladder incorporating the same
FR3065452A1 (en) SLING TENSIONER RETRACTOR
US6968878B2 (en) Tree pusher
CN211452782U (en) Simple testing device for krah pipe
US2422848A (en) Tire lifting tool
EP2360030B1 (en) Device for handling a vehicle wheel and wheel-handling method implementing such a device
JP3181627U (en) Lifting aid
US2725991A (en) Devices for setting up telephone and the like poles
FR3073834B1 (en) PORTABLE HANDAGE DEVICE
JP2003306291A (en) Engagement implement for lifting heavy object such as steel plate
JP6018112B2 (en) Handrail for manhole
AU2006201627B2 (en) Lifting hook and safety attachment therefor
EP2692682B1 (en) Method for placing and removing concrete blocks
AU2018101856A4 (en) Post Pulling Plate
FR2670526A1 (en) Device for tearing up pillars, in particular pillars anchored in a mass of concrete
US20140252284A1 (en) Load-Handling Device
NL2009494C2 (en) LIFTING TAPE.

Legal Events

Date Code Title Description
TP Transmission of property

Owner name: FINANCIERE CBR, FR

Effective date: 20140902

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 8

PLFP Fee payment

Year of fee payment: 9

PLFP Fee payment

Year of fee payment: 10

PLFP Fee payment

Year of fee payment: 12

ST Notification of lapse

Effective date: 20231005