FR2949026A1 - POWER SUPPLY CONTROL DEVICE, POWER SUPPLY SYSTEM, AND METHOD FOR CONTROLLING POWER SUPPLY OF CHARGER AND VEHICLE - Google Patents

POWER SUPPLY CONTROL DEVICE, POWER SUPPLY SYSTEM, AND METHOD FOR CONTROLLING POWER SUPPLY OF CHARGER AND VEHICLE Download PDF

Info

Publication number
FR2949026A1
FR2949026A1 FR1055711A FR1055711A FR2949026A1 FR 2949026 A1 FR2949026 A1 FR 2949026A1 FR 1055711 A FR1055711 A FR 1055711A FR 1055711 A FR1055711 A FR 1055711A FR 2949026 A1 FR2949026 A1 FR 2949026A1
Authority
FR
France
Prior art keywords
vehicle
charger
power supply
priority
control unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1055711A
Other languages
French (fr)
Other versions
FR2949026B1 (en
Inventor
Hiroshige Asada
Takashi Kanamori
Shinya Taguchi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Publication of FR2949026A1 publication Critical patent/FR2949026A1/en
Application granted granted Critical
Publication of FR2949026B1 publication Critical patent/FR2949026B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/10Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles characterised by the energy transfer between the charging station and the vehicle
    • B60L53/14Conductive energy transfer
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L50/00Electric propulsion with power supplied within the vehicle
    • B60L50/10Electric propulsion with power supplied within the vehicle using propulsion power supplied by engine-driven generators, e.g. generators driven by combustion engines
    • B60L50/16Electric propulsion with power supplied within the vehicle using propulsion power supplied by engine-driven generators, e.g. generators driven by combustion engines with provision for separate direct mechanical propulsion
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/30Constructional details of charging stations
    • B60L53/305Communication interfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/64Optimising energy costs, e.g. responding to electricity rates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/65Monitoring or controlling charging stations involving identification of vehicles or their battery types
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/18Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules
    • B60L58/20Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries of two or more battery modules having different nominal voltages
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/70Interactions with external data bases, e.g. traffic centres
    • B60L2240/72Charging station selection relying on external data
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/80Time limits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2250/00Driver interactions
    • B60L2250/20Driver interactions by driver identification
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/48The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/72Electric energy management in electromobility
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • Y02T90/167Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S30/00Systems supporting specific end-user applications in the sector of transportation
    • Y04S30/10Systems supporting the interoperability of electric or hybrid vehicles
    • Y04S30/14Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing

Abstract

Des chargeurs (1) sont connectables avec des véhicules (6). Un dispositif de commande d'alimentation électrique commande un circuit de commutation (2) pour connecter une ligne d'alimentation en énergie électrique (9) à un chargeur parmi les chargeurs (1). Une unité de stockage du dispositif de commande d'alimentation électrique associe des informations concernant une priorité à chacun des véhicules (6) et stocke les informations associées dans celle-ci. Lorsque les véhicules (6) sont simultanément connectés à différents chargeurs (1), une unité de commande du dispositif de commande d'alimentation électrique commande le circuit de commutation (2) pour connecter la ligne d'alimentation en énergie électrique (9) de façon préférentielle à un chargeur parmi les différents chargeurs (1). Ce chargeur parmi les différents chargeurs (1) est connecté à un véhicule parmi les véhicules (6) auquel une priorité la plus élevée est attribuée.Chargers (1) are connectable with vehicles (6). A power control device controls a switching circuit (2) for connecting an electrical power supply line (9) to a charger among the chargers (1). A storage unit of the power control device associates priority information with each of the vehicles (6) and stores associated information therein. When the vehicles (6) are simultaneously connected to different chargers (1), a control unit of the power supply control device controls the switching circuit (2) to connect the electrical power supply line (9) of preferentially to a charger among the different chargers (1). This charger among the different chargers (1) is connected to a vehicle among the vehicles (6) to which a highest priority is attributed.

Description

DISPOSITIF DE COMMANDE D'ALIMENTATION ÉLECTRIQUE, SYSTÈME D'ALIMENTATION ÉLECTRIQUE ET PROCÉDÉ POUR COMMANDER UNE ALIMENTATION ÉLECTRIQUE D'UN CHARGEUR ET D'UN VÉHICULE POWER SUPPLY CONTROL DEVICE, POWER SUPPLY SYSTEM, AND METHOD FOR CONTROLLING POWER SUPPLY OF CHARGER AND VEHICLE

La présente invention concerne un dispositif de commande d'alimentation électrique et un système d'alimentation électrique. La présente invention concerne en outre un procédé pour commander une alimentation électrique d'un chargeur et d'un véhicule. The present invention relates to a power supply control device and a power supply system. The present invention further relates to a method for controlling a power supply of a charger and a vehicle.

Conventionnellement, un véhicule connu comporte une batterie rechargeable en tant que source électrique propre à accumuler de l'énergie électrique pour entrainer en déplacement le véhicule. En particulier, un véhicule rechargeable est configuré pour charger une batterie rechargeable à partir d'une alimentation électrique à l'extérieur du véhicule automobile. Un véhicule électrique (EV) et un véhicule hybride rechargeable (PHV) sont des exemples connus de véhicule rechargeable. Il existe de multiples manières de charger une batterie rechargeable d'un véhicule rechargeable. Par exemple, les publications de demande de brevet japonais non examinées 2008-117444, 10-80071, et 2008-247080 décrivent des méthodes pour charger des véhicules à partir d'une source d'alimentation électrique. Conventionally, a known vehicle has a rechargeable battery as a source of electricity to accumulate electrical energy to drive the vehicle in motion. In particular, a rechargeable vehicle is configured to charge a rechargeable battery from a power supply outside the motor vehicle. An electric vehicle (EV) and a plug-in hybrid vehicle (PHV) are known examples of a rechargeable vehicle. There are many ways to charge a rechargeable battery from a rechargeable vehicle. For example, unexamined Japanese patent application publications 2008-117444, 10-80071, and 2008-247080 describe methods for charging vehicles from a power source.

Particulièrement, la publication de demande de brevet japonais non examinée 2008-117444 décrit un appareil d'alimentation électrique dans lequel des batteries rechargeables de multiples véhicules sont connectées en parallèle avec une source d'alimentation électrique pour charger simultanément plusieurs batteries rechargeables. Dans ce cas, la source d'alimentation électrique doit posséder une puissance importante afin de charger les batteries rechargeables simultanément et un utilisateur qui possède l'appareil d'alimentation électrique doit passer un contrat avec un fournisseur d'énergie électrique pour consommer une puissance importante. Les frais de contrat de base pour l'électricité peuvent donc être élevés. D'autre part, la publication de brevet non examinée japonaise 10-80071 décrit une unité de commande propre à décaler des instants de charge de plusieurs véhicules afin de réduire la puissance d'une source d'alimentation électrique. Particulièrement, un ordre de charge de batteries secondaires est déterminé selon des périodes de temps de charge des batteries rechargeables. Cependant, l'ordre de charge des batteries secondaires est déterminé selon les périodes de temps de charge qui ne reflète pas nécessairement une intention d'un utilisateur d'un véhicule. Au vu de ce qui précède et d'autres problèmes, un objet de la présente invention est de proposer un dispositif de commande d'alimentation électrique et un système d'alimentation électrique, chacun configurés pour établir un ordre pour charger des batteries rechargeables de multiples véhicules à partir d'une source d'alimentation électrique afin de faciliter l'utilisation d'un véhicule par un utilisateur. Un objet de la présente invention est de proposer un procédé pour commander une alimentation électrique d'un chargeur et d'un véhicule. Particularly, Japanese Unexamined Patent Application Publication No. 2008-117444 discloses a power supply apparatus in which rechargeable batteries of multiple vehicles are connected in parallel with a power source to simultaneously charge multiple rechargeable batteries. In this case, the power source must have a large power to charge the rechargeable batteries simultaneously and a user who owns the power supply device must enter into a contract with an electric power supplier to consume a significant amount of power. . Basic contract costs for electricity can therefore be high. On the other hand, Japanese Unexamined Patent Publication 10-80071 discloses a control unit for shifting charging times of a plurality of vehicles to reduce the power of a power source. Particularly, a charge order of secondary batteries is determined according to periods of charging time of the rechargeable batteries. However, the charge order of the secondary batteries is determined according to the periods of charging time that does not necessarily reflect an intention of a user of a vehicle. In view of the foregoing and other problems, an object of the present invention is to provide a power control device and a power supply system, each configured to establish an order to charge multiple rechargeable batteries. vehicles from a power source to facilitate the use of a vehicle by a user. An object of the present invention is to provide a method for controlling a power supply of a charger and a vehicle.

Selon un aspect de la présente invention, un dispositif de commande d'alimentation électrique est proposé pour commander un circuit de commutation pour connecter une ligne d'alimentation en énergie électrique à un chargeur sélectionné parmi une pluralité de chargeurs, la pluralité de chargeurs étant connectables avec une pluralité de véhicules, le dispositif de commande d'alimentation électrique comprenant une unité de stockage configurée pour attribuer des informations concernant une priorité à chacun d'au moins une partie de la pluralité de véhicules et configurée pour stocker les informations associées dans celle-ci. Le dispositif de commande d'alimentation électrique comprend en outre une unité de commande configurée pour commander le circuit de commutation, lorsqu'au moins certains parmi la pluralité de véhicules sont connectés simultanément à différents chargeurs, afin de connecter la ligne d'alimentation en énergie électrique de façon préférentielle à un chargeur parmi les différents chargeurs, ce chargeur parmi les différents chargeurs étant connecté à un véhicule parmi la pluralité de véhicules, auquel une priorité la plus élevée est attribuée. According to one aspect of the present invention, a power supply control device is provided for controlling a switching circuit for connecting an electrical power supply line to a charger selected from a plurality of chargers, the plurality of chargers being connectable. with a plurality of vehicles, the power supply controller comprising a storage unit configured to assign priority information to each of at least a portion of the plurality of vehicles and configured to store the associated information in the plurality of vehicles; this. The power supply control device further comprises a control unit configured to control the switching circuit, when at least some of the plurality of vehicles are simultaneously connected to different chargers, in order to connect the power supply line. preferentially to a charger among the different chargers, this charger among the different chargers being connected to a vehicle among the plurality of vehicles, to which a higher priority is assigned.

Le dispositif de commande d'alimentation électrique comprend la pluralité de chargeurs comprenant un premier chargeur et un second chargeur (1), dans lequel la pluralité de véhicules comprend un premier véhicule et un second véhicule, dans lequel le dispositif de commande est dans une condition dans laquelle le circuit de commutation connecte la ligne d'alimentation en énergie électrique au premier chargeur, qui est connecté au premier véhicule, et le second véhicule est nouvellement connecté au second chargeur, l'unité de commande étant configurée pour : faire en sorte que le circuit de commutation maintienne la ligne d'alimentation en énergie électrique connectée au premier chargeur lorsque la priorité attribuée au premier véhicule est supérieure à la priorité attribuée au second véhicule ; et faire en sorte que le circuit de commutation commute la ligne d'alimentation en énergie électrique pour être connectée au second chargeur lorsque la priorité attribuée au second véhicule est supérieure à la priorité attribuée au premier véhicule. Le dispositif de commande d'alimentation électrique comprend l'unité de stockage est configurée pour stocker une priorité à laquelle est associée attribuée une période de validité, et dans lequel le dipositif de commande est dans une condition dans laquelle un véhicule parmi la pluralité de véhicules est connecté à un chargeur parmi la pluralité de chargeurs, et l'instant est en dehors d'une période de validité associée à une priorité de ce véhicule, l'unité de commande étant configurée pour empêcher la ligne d'alimentation en énergie électrique d'être connectée à ce chargeur, indépendamment du fait qu'un autre véhicule est connecté à un chargeur autre que ce chargeur. Le dispositif de commande d'alimentation électrique comprend la pluralité de chargeurs comprenant un premier chargeur et un second chargeur, dans lequel la pluralité de véhicules comprend un premier véhicule et un second véhicule, dans lequel le dispositif de commande est dans une première condition dans laquelle le premier véhicule est connecté au premier chargeur, le second véhicule est connecté au second chargeur, une période de validité est associée à une priorité attribuée au premier véhicule, et une période de validité n'est pas associée à une priorité attribuée au second véhicule, l'unité de commande étant configurée pour faire en sorte que le circuit de commutation connecte la ligne d'alimentation en énergie électrique au second chargeur à un instant en dehors de la période de validité de la priorité attribuée au premier véhicule, et après la première condition, dans une seconde condition dans laquelle l'instant est dans la période de validité de la priorité attribuée au premier véhicule (6), l'unité de 30 commande (55) étant configurée pour : faire en sorte que le circuit de commutation commute la ligne d'alimentation en énergie électrique pour être connectée au premier chargeur lorsque la priorité attribuée au premier véhicule est supérieure à la priorité attribuée au second véhicule ; et faire en sorte que le circuit de commutation maintienne la ligne d'alimentation en énergie électrique connectée au second chargeur lorsque la priorité attribuée au second véhicule est supérieure à la priorité attribuée au premier véhicule. Le dispositif de commande d'alimentation électrique comprend en outre un système d'alimentation électrique configuré pour connecter une ligne d'alimentation en énergie électrique à un chargeur sélectionné parmi une pluralité de chargeurs comprenant un premier chargeur et un second chargeur connectables avec des véhicules, le système d'alimentation électrique étant configuré pour faire en sorte que le circuit de commutation, dans une condition dans laquelle le système d'alimentation électrique fait en sorte qu'un circuit de commutation connecte la ligne d'alimentation en énergie électrique au premier chargeur connecté à un véhicule, commute la ligne d'alimentation en énergie électrique pour qu'elle soit connectée au second chargeur lorsqu'un autre véhicule est connecté au second chargeur, une priorité supérieure à une priorité du premier chargeur étant auparavant attribuée au second chargeur. Le système d'alimentation électrique comprenant : - le circuit de commutation configuré pour connecter la ligne d'alimentation en énergie électrique à un chargeur sélectionné parmi la pluralité de chargeurs ; - une unité de stockage configurée pour attribuer des informations concernant une priorité à chaque chargeur d'au moins une partie de la pluralité de chargeurs ; l'unité de stockage étant configurée pour stocker les informations attribuées ; et - une unité de commande configurée pour faire en sorte que le circuit de commutation, lorsqu'au moins une partie de la pluralité de chargeurs est simultanément connectée à des véhicules, connecte la ligne d'alimentation en énergie électrique à un chargeur parmi la pluralité de chargeurs, une priorité la plus élevée étant attribuée à ce chargeur. Selon un aspect de la présente invention, un procédé est proposé pour commander une alimentation électrique d'un véhicule parmi un premier véhicule et un second véhicule à partir d'un chargeur parmi un premier chargeur et un second chargeur, le procédé comprenant l'étape qui consiste à faire en sorte qu'un circuit de commutation connecte la ligne d'alimentation en énergie électrique au premier chargeur connecté au premier véhicule. Le procédé comprend en outre l'étape qui consiste à faire en sorte que le circuit de commutation commute la ligne d'alimentation en énergie électrique pour qu'elle soit connectée au second chargeur lorsque le second véhicule est connecté au second chargeur et lorsqu'une priorité attribuée au second véhicule est supérieure à une priorité attribuée au premier véhicule. Selon un aspect de la présente invention, un procédé est proposé pour commander une alimentation électrique à un véhicule parmi un premier véhicule et un second véhicule à partir d'un chargeur parmi un premier chargeur et un second chargeur, le procédé comprenant l'étape qui consiste à faire en sorte qu'un circuit de commutation connecte la ligne d'alimentation en énergie électrique au premier chargeur connecté au premier véhicule. Le procédé comprend en outre l'étape qui consiste à faire en sorte que le circuit de commutation commute la ligne d'alimentation en énergie électrique pour qu'elle soit connectée au second chargeur lorsqu'un autre véhicule est nouvellement connecté au second chargeur et lorsqu'une priorité attribuée au second chargeur est supérieure à une priorité attribuée au premier chargeur. Les objets, caractéristiques et avantages ci-dessus et autres de la présente invention deviendront évidents à partir de la description détaillée suivante réalisée en faisant référence aux dessins joints. Sur les dessins : la figure 1 est un schéma de principe qui représente un système d'alimentation électrique ; la figure 2 est un schéma de principe qui représente un dispositif de commande d'alimentation électrique du système d'alimentation électrique ; la figure 3 est une vue qui représente un exemple d'informations de condition d'alimentation électrique ; la figure 4 est un schéma qui représente des données de file d'attente et des données de case invalide ; la figure 5 est un organigramme qui représente un programme pour commander un circuit de commutation selon les données de file d'attente ; la figure 6 est un organigramme qui représente un programme pour réécrire les données de file d'attente et les données de case invalide selon des données d'une condition d'alimentation électrique stockées dans une unité de stockage de conditions d'alimentation électrique ; la figure 7 est un organigramme qui représente une procédure pour charger des véhicules A et B selon un exemple 1 ; la figure 8 est un graphique qui représente un changement d'une quantité de charge d'une batterie de chacun des véhicules A et B selon l'exemple 1 ; la figure 9 est un organigramme qui représente une procédure pour charger des véhicules A et B selon un exemple 2 ; la figure 10 est un graphique qui représente un changement d'une quantité de charge d'une batterie de chacun des véhicules A et B selon l'exemple 2 ; la figure 11 est un organigramme qui représente une procédure pour charger des véhicules B et C selon un exemple 3 ; la figure 12 est un graphique qui représente un changement d'une quantité de charge d'une batterie de chacun des véhicules B et C selon l'exemple 3 ; la figure 13 est un graphique qui représente un changement d'une quantité de charge d'une batterie de chacun des véhicules B et D selon un exemple 4 ; la figure 14 est une vue qui représente un exemple d'informations de conditions d'alimentation électrique selon un deuxième mode de réalisation ; la figure 15 est un organigramme qui représente un programme pour réécrire les données de file d'attente et les données de case invalide selon le deuxième mode de réalisation ; la figure 16 est un organigramme qui représente une procédure pour charger des véhicules A et B selon un exemple 5 ; et la figure 17 est un graphique qui représente un changement d'une quantité de charge d'une batterie de chacun des véhicules A et B selon l'exemple 5. The power control device comprises the plurality of chargers comprising a first charger and a second charger (1), wherein the plurality of vehicles comprises a first vehicle and a second vehicle, wherein the controller is in a condition. wherein the switching circuit connects the power supply line to the first charger, which is connected to the first vehicle, and the second vehicle is newly connected to the second charger, the control unit being configured to: the switching circuit maintains the power supply line connected to the first charger when the priority assigned to the first vehicle is greater than the priority assigned to the second vehicle; and causing the switching circuit to switch the power supply line to be connected to the second charger when the priority assigned to the second vehicle is greater than the priority assigned to the first vehicle. The power supply controller includes the storage unit configured to store a priority assigned a validity period, and wherein the control device is in a condition in which one of the plurality of vehicles is connected to one of the plurality of chargers, and the instant is outside a validity period associated with a priority of that vehicle, the control unit being configured to prevent the electrical power supply line from to be connected to this charger, regardless of whether another vehicle is connected to a charger other than that charger. The power control device comprises the plurality of chargers comprising a first charger and a second charger, wherein the plurality of vehicles comprises a first vehicle and a second vehicle, wherein the controller is in a first condition in which the first vehicle is connected to the first loader, the second vehicle is connected to the second loader, a validity period is associated with a priority assigned to the first vehicle, and a validity period is not associated with a priority assigned to the second vehicle, the control unit being configured to cause the switching circuit to connect the power supply line to the second charger at a time outside the validity period of the priority assigned to the first vehicle, and after the first condition, in a second condition in which the moment is in the vali period said first vehicle (6), the control unit (55) being configured to: cause the switching circuit to switch the power supply line to be connected to the first charger when the priority assigned to the first vehicle is greater than the priority assigned to the second vehicle; and causing the switching circuit to maintain the power supply line connected to the second charger when the priority assigned to the second vehicle is greater than the priority assigned to the first vehicle. The power control device further includes a power supply system configured to connect an electrical power supply line to a charger selected from a plurality of chargers including a first charger and a second charger connectable with vehicles, the power supply system being configured to cause the switching circuit, in a condition in which the power supply system causes a switching circuit to connect the power supply line to the first charger connected to a vehicle, switches the power supply line to be connected to the second charger when another vehicle is connected to the second charger, a priority higher than a priority of the first charger is previously assigned to the second charger. The power supply system comprising: - the switching circuit configured to connect the power supply line to a charger selected from the plurality of chargers; a storage unit configured to assign priority information to each loader of at least a portion of the plurality of loaders; the storage unit being configured to store the assigned information; and a control unit configured to cause the switching circuit, when at least a portion of the plurality of chargers is simultaneously connected to vehicles, to connect the power supply line to one of the plurality of chargers. loaders, with the highest priority being assigned to this loader. According to one aspect of the present invention, a method is provided for controlling a power supply of a vehicle from a first vehicle and a second vehicle from a charger from a first charger and a second charger, the method comprising the step of which consists in causing a switching circuit to connect the power supply line to the first charger connected to the first vehicle. The method further comprises the step of causing the switching circuit to switch the power supply line to connect to the second charger when the second vehicle is connected to the second charger and when a priority assigned to the second vehicle is greater than a priority assigned to the first vehicle. According to one aspect of the present invention, a method is provided for controlling a power supply to a vehicle from a first vehicle and a second vehicle from a charger from a first charger and a second charger, the method comprising the step of is to ensure that a switching circuit connects the power supply line to the first charger connected to the first vehicle. The method further includes the step of causing the switching circuit to switch the power supply line to connect to the second charger when another vehicle is newly connected to the second charger and when a priority assigned to the second loader is greater than a priority assigned to the first loader. The above and other objects, features and advantages of the present invention will become apparent from the following detailed description made with reference to the accompanying drawings. In the drawings: Fig. 1 is a block diagram showing a power supply system; Fig. 2 is a block diagram showing a power supply control device of the power supply system; Fig. 3 is a view showing an example of power supply condition information; Fig. 4 is a diagram showing queued data and invalid case data; Fig. 5 is a flow chart showing a program for controlling a switching circuit according to the queue data; Fig. 6 is a flowchart showing a program for rewriting the queue data and invalid box data according to data of a power supply condition stored in a power supply storage unit; Fig. 7 is a flow chart showing a procedure for loading vehicles A and B according to Example 1; Fig. 8 is a graph showing a change in a charge amount of a battery of each of vehicles A and B according to Example 1; Fig. 9 is a flow chart showing a procedure for loading vehicles A and B according to Example 2; Fig. 10 is a graph showing a change in a charge amount of a battery of each of vehicles A and B according to Example 2; Fig. 11 is a flow chart showing a procedure for loading vehicles B and C according to Example 3; Fig. 12 is a graph showing a change in a charge quantity of a battery of each of vehicles B and C according to Example 3; Fig. 13 is a graph showing a change in a charge amount of a battery of each of vehicles B and D according to Example 4; Fig. 14 is a view showing an example of power supply condition information according to a second embodiment; Fig. 15 is a flowchart showing a program for rewriting the queue data and invalid case data according to the second embodiment; Fig. 16 is a flow chart showing a procedure for loading vehicles A and B according to Example 5; and Fig. 17 is a graph showing a change in a charge amount of a battery of each of vehicles A and B according to Example 5.

Premier mode de réalisation Dans la partie qui suit, le premier mode de réalisation va être décrit. La figure 1 représente un système d'alimentation électrique connexe au présent premier mode de réalisation. Le système d'alimentation électrique comprend de multiples chargeurs 1, un circuit de commutation 2, une unité de communication d'alimentation électrique 3, et un dispositif de commande d'alimentation électrique 5. Le dispositif de commande d'alimentation électrique 5 se trouve dans une maison 4. First Embodiment In the following part, the first embodiment will be described. Fig. 1 shows a power supply system related to the present first embodiment. The power supply system comprises multiple chargers 1, a switching circuit 2, a power supply communication unit 3, and a power supply control device 5. The power supply control device 5 is located in a house 4.

Le système d'alimentation électrique est configuré pour charger de multiples véhicules rechargeables 6. Chacun des multiples véhicules rechargeables 6 comprend une batterie 7 et une unité de communication de véhicule 8. La batterie 7 est une batterie rechargeable configurée pour être chargée à plusieurs reprises. L'unité de communication de véhicule 8 est, par exemple, un réseau local (LAN) sans fil pour des communications sans fil. La batterie 7 est configurée pour accumuler une énergie électrique, par exemple, de 8 kWh à 16 kWh au maximum. Le véhicule rechargeable 6 utilise l'électricité accumulée dans la batterie 7 en tant qu'énergie pour se déplacer . Particulièrement, le véhicule rechargeable 6 consomme l'électricité de la batterie 7 pour entraîner un moteur (non représenté) pour ainsi se déplacer avec la force motrice du moteur. Un tel véhicule électrique (EV) et un tel véhicule hybride (HV) sont des véhicules connus qui consomment de l'électricité accumulée dans la batterie 7 en tant que source d'énergie pour se déplacer. Un véhicule électrique se déplace seulement avec une force motrice d'un moteur entraîné avec l'électricité accumulée dans la batterie 7. Un véhicule hybride se déplace avec une force motrice d'un moteur entraînée avec de l'électricité accumulée dans la batterie 7, et une force motrice d'un moteur à combustion interne. L'unité de communication de véhicule 8 est, par exemple, un réseau local (LAN) sans fil propre à communiquer sans fil en champ proche avec l'unité de communication d'alimentation électrique 3. L'unité de communication de véhicule 8 stocke des informations concernant une identité de véhicule 8a pour identifier de façon unique le véhicule sur lequel l'unité de communication de véhicule 8 est montée. L'unité de communication de véhicule 8 est configurée pour transmettre des informations concernant l'identité de véhicule 8a à l'unité de communication d'alimentation électrique 3 lorsque l'unité de communication de véhicule 8 est à une distance permettant de communiquer avec l'unité de communication d'alimentation électrique 3. L'unité de communication de véhicule 8 détecte une quantité de charge de la batterie 7 par l'intermédiaire d'un procédé généralement connu. La quantité de charge de la batterie 7 correspond à une énergie électrique accumulée dans la batterie 7. L'unité de communication de véhicule 8 transmet à plusieurs reprises un groupe d'information concernant l'identité de véhicule 8a du véhicule automobile et des informations concernant la quantité de charge de la batterie 7 à l'unité de communication d'alimentation électrique 3, lorsque l'unité de communication est dans la distance de communication l'unité de communication d'alimentation électrique 3. Par exemple, l'unité de communication de véhicule 8 transmet périodiquement le groupe de l'identité de véhicule 8a à des intervalles de temps d'une minute. Dans l'exemple de la figure 1, les véhicules rechargeables 6 sont au nombre de deux. Il est noté que trois véhicules rechargeables, ou plus, peuvent être chargés en utilisant le système d'alimentation électrique. Les multiples chargeurs 1 sont, par exemple, situés dans un parc de stationnement adjacent à la maison 4. Dans l'exemple de la figure 1, les chargeurs sont au nombre de deux. Il est noté que trois chargeurs, ou plus, peuvent être prévus. Chacun des multiples chargeurs 1 est connectable avec un véhicule parmi les véhicules rechargeables 6 par l'intermédiaire d'une ligne électrique. Chacun des chargeurs 1 comporte un mécanisme de détection connu permettant de détecter si la prise de la ligne électrique est insérée dans une ouverture de prise (non représentée) prévue dans le dispositif d'alimentation en électricité. Selon le résultat de détection, chacun des chargeurs 1 envoie périodiquement au dispositif de commande d'alimentation électrique 5, par l'intermédiaire du circuit de commutation 2, un signal qui spécifie si la prise est insérée ou si elle n'est pas insérée. En variante, chacun des chargeurs 1 peut envoyer un tel signal lorsque le résultat de détection change. Le circuit de commutation 2 est, par exemple, situé dans la maison 4. Le circuit de commutation 2 est un circuit électrique pour connecter une ligne d'alimentation en énergie électrique 9 avec un chargeur parmi les multiples chargeurs 1. La ligne d'alimentation en énergie électrique 9 s'étend à l'extérieur afin de fournir de l'électricité pour la charge. Par exemple, la ligne d'alimentation en énergie électrique 9 peut provenir d'une ligne électrique d'un fournisseur d'énergie électrique. Les chargeurs 1 sont configurés pour commuter un état de connexion avec la ligne d'alimentation en énergie électrique 9. Le circuit de commutation 2 est configuré pour commuter un dispositif connecté à la ligne d'alimentation en énergie électrique 9 selon une commande du dispositif de commande d'alimentation électrique 5. Le circuit de commutation 2 peut par exemple être un circuit de relais de type connu. The power supply system is configured to charge multiple rechargeable vehicles 6. Each of the multiple rechargeable vehicles 6 includes a battery 7 and a vehicle communication unit 8. The battery 7 is a rechargeable battery configured to be repeatedly charged. The vehicle communication unit 8 is, for example, a wireless local area network (LAN) for wireless communications. The battery 7 is configured to accumulate electrical energy, for example, from 8 kWh to 16 kWh maximum. The rechargeable vehicle 6 uses the electricity accumulated in the battery 7 as energy to move. In particular, the rechargeable vehicle 6 consumes the electricity of the battery 7 to drive a motor (not shown) to thus move with the motive force of the engine. Such an electric vehicle (EV) and such a hybrid vehicle (HV) are known vehicles that consume electricity accumulated in the battery 7 as a source of energy to move. An electric vehicle moves only with a driving force of a motor driven with the electricity accumulated in the battery 7. A hybrid vehicle moves with a driving force of a motor driven with electricity accumulated in the battery 7, and a driving force of an internal combustion engine. The vehicle communication unit 8 is, for example, a wireless local area network (LAN) capable of communicating wirelessly in the near field with the power supply communication unit 3. The vehicle communication unit 8 stores information relating to a vehicle identity 8a for uniquely identifying the vehicle on which the vehicle communication unit 8 is mounted. The vehicle communication unit 8 is configured to transmit vehicle identity information 8a to the power supply communication unit 3 when the vehicle communication unit 8 is at a distance to communicate with the vehicle. Power supply communication unit 3. The vehicle communication unit 8 detects a charge quantity of the battery 7 via a generally known method. The amount of charge of the battery 7 corresponds to an electrical energy accumulated in the battery 7. The vehicle communication unit 8 transmits several times a group of information concerning the vehicle identity 8a of the motor vehicle and information concerning the amount of charge of the battery 7 to the power supply communication unit 3, when the communication unit is in the communication distance the power supply communication unit 3. For example, the charging unit Vehicle communication 8 periodically transmits the vehicle identity group 8a at time intervals of one minute. In the example of Figure 1, the rechargeable vehicles 6 are two in number. It is noted that three or more rechargeable vehicles can be charged using the power supply system. The multiple chargers 1 are, for example, located in a parking lot adjacent to the house 4. In the example of Figure 1, the chargers are two in number. It is noted that three or more chargers may be provided. Each of the multiple chargers 1 is connectable with a vehicle among the rechargeable vehicles 6 via a power line. Each of the chargers 1 has a known detection mechanism for detecting whether the plug of the power line is inserted into a tap hole (not shown) provided in the power supply device. According to the detection result, each of the chargers 1 sends periodically to the power control device 5, via the switching circuit 2, a signal which specifies whether the plug is inserted or not inserted. Alternatively, each of the chargers 1 can send such a signal when the detection result changes. The switching circuit 2 is, for example, located in the house 4. The switching circuit 2 is an electrical circuit for connecting an electric power supply line 9 with a charger among the multiple chargers 1. The power supply line electrical energy 9 extends outside to provide electricity for the load. For example, the power supply line 9 may come from a power line of an electric power supplier. The chargers 1 are configured to switch a state of connection with the electrical power supply line 9. The switching circuit 2 is configured to switch a device connected to the electrical power supply line 9 according to a control of the device. 5. The switching circuit 2 may for example be a relay circuit of known type.

Lorsque l'un ou l'autre des véhicules rechargeables 6 est connecté à un chargeur connecté à la ligne d'alimentation en puissance électrique 9, la batterie 7 du véhicule rechargeable peut être chargée avec de l'électricité fournie par l'intermédiaire de la ligne d'alimentation en énergie électrique 9. Dans le présent exemple, la batterie 7 peut accumuler une énergie électrique de 8 kWh à 16 kWh, comme décrit ci-dessus. Donc, dans le présent exemple, la ligne d'alimentation en énergie électrique 9 est capable de fournir de l'électricité d'environ 1500 W afin de compléter la charge de la batterie 7 pendantun temps prédéterminé. L'unité de communication d'alimentation électrique 3 est située à l'intérieur de la maison 4 ou à l'extérieur de la maison 4. Lorsqu'un véhicule rechargeable 6 se trouve dans le parc de stationnement, dans lequel les multiples chargeurs 1 sont prévus, l'unité de communication d'alimentation électrique 3 peut communiquer avec l'unité de communication de véhicule 8 du véhicule rechargeable 6. L'unité de communication d'alimentation électrique 3 reçoit des informations par l'intermédiaire d'une communication avec l'unité de communication de véhicule 8 et envoie les informations reçues au dispositif de commande d'alimentation électrique 5. L'unité de communication d'alimentation électrique 3 est configurée pour transmettre un signal à l'unité de communication de véhicule 8 selon une commande du dispositif de commande d'alimentation électrique 5. Le dispositif de commande d'alimentation électrique 5 est configuré pour obtenir des informations à partir de l'unité de communication d'alimentation électrique 3 et commander le circuit de commutation 2 selon les informations obtenues et des informations stockées auparavant concernant une priorité de chacun des véhicules afin de commuter le chargeur alimenté en électricité pour la charge. When one or the other of the rechargeable vehicles 6 is connected to a charger connected to the electric power supply line 9, the battery 7 of the rechargeable vehicle can be charged with electricity supplied via the Electrical power supply line 9. In the present example, the battery 7 can accumulate electrical energy from 8 kWh to 16 kWh, as described above. Thus, in the present example, the electric power supply line 9 is capable of supplying electricity of about 1500 W in order to complete the charging of the battery 7 for a predetermined time. The power supply communication unit 3 is located inside the house 4 or outside the house 4. When a refillable vehicle 6 is in the parking lot, in which the multiple chargers 1 are provided, the power supply communication unit 3 can communicate with the vehicle communication unit 8 of the rechargeable vehicle 6. The power supply communication unit 3 receives information via a communication with the vehicle communication unit 8 and sends the received information to the power supply control device 5. The power supply communication unit 3 is configured to transmit a signal to the vehicle communication unit 8 according to a control of the power supply control device 5. The power supply control device 5 is configured to obtain information from the one 3 and control the switching circuit 2 according to the information obtained and previously stored information relating to a priority of each of the vehicles in order to switch the charger supplied with electricity for the load.

La figure 2 est un schéma qui représente le dispositif de commande d'alimentation électrique 5. Le dispositif de commande d'alimentation électrique 5 comprend une unité d'opération 51, une unité d'affichage 52, une unité d'horloge et de calendrier 53, une unité de stockage de conditions d'alimentation électrique 54, et une unité de commande 55. L'unité d'opération 51 est configurée pour recevoir une opération d'un utilisateur du système d'alimentation électrique et du véhicule rechargeable 6 et envoyer un signal, qui spécifie le contenu de l'opération reçue, à l'unité de commande 55. L'unité d'affichage 52 est un dispositif d'affichage tel qu'un affichage à cristaux liquides configuré pour indiquer un caractère et une image pour fournir des informations à un utilisateur selon une commande de l'unité de commande 55. L'unité d'horloge et de calendrier 53 est configurée pour obtenir une date et un temps actuels et envoyer des informations concernant la date et le temps actuels obtenus à l'unité de commande 55. L'unité d'horloge et de calendrier 53 stocke des informations de calendrier qui comprennent une date (année, mois, jour) associée à des informations indiquant si la date est un jour férié y compris un samedi, un dimanche, un jour de congé, des vacances d'été, et analogues. Selon les informations de calendrier, l'unité d'horloge et de calendrier 53 envoie des informations qui indiquent si le jour d'aujourd'hui est un jour férié et des informations qui indiquent si jour qui suit est un jour férié à l'unité de commande 55. L'unité de stockage de conditions d'alimentation électrique 54 est un support de stockage réinscriptible, tel qu'une mémoire flash. L'unité de stockage de conditions d'alimentation électrique 54 est configurée pour stocker des informations de condition d'alimentation électrique entrées par un utilisateur en utilisant l'unité d'opération 51. Les informations de conditions d'alimentation électrique comprennent des informations concernant une priorité attribuée à chacun des multiples véhicules rechargeables 6. La figure 3 est un graphique qui représente un exemple des informations de conditions d'alimentation électrique. Dans le présent exemple des informations de conditions d'alimentation électrique, l'identité de véhicule de chacun des quatre véhicules rechargeables est associée aux informations de priorité. Particulièrement, les priorités 2, 1, 3, 3 sont respectivement attribuées aux identités de véhicule des véhicules A, B, C, D. Lorsque la valeur de la priorité est plus importante, la priorité du véhicule est plus importante. À savoir, le véhicule avec un numéro plus important possède une priorité plus élevée. Une période de validité de la priorité peut être spécifiée arbitrairement pour les informations concernant la priorité. Dans l'exemple de la figure 3, une période de validité n'est pas spécifiée pour la priorité de chacun des véhicules A et B. Dans le présent exemple, la priorité de chacun des véhicules A et B est régulièrement valide. Au contraire, une période de validité est spécifiée pour la priorité de chacun des véhicules C et D. Dans le présent exemple, la priorité de chacun des véhicules C et D est valide seulement dans la période de validité spécifiée. Fig. 2 is a diagram showing the power supply control device 5. The power supply control device 5 comprises an operation unit 51, a display unit 52, a clock and calendar unit 53, a power supply storage unit 54, and a control unit 55. The operation unit 51 is configured to receive an operation from a user of the power supply system and the rechargeable vehicle 6 and send a signal, which specifies the contents of the received operation, to the control unit 55. The display unit 52 is a display device such as a liquid crystal display configured to indicate a character and a display. image to provide information to a user according to a command from the control unit 55. The clock and calendar unit 53 is configured to obtain a current date and time and to send date information and the current time obtained at the control unit 55. The clock and calendar unit 53 stores calendar information that includes a date (year, month, day) associated with information indicating whether the date is a day holiday including a Saturday, a Sunday, a day off, a summer vacation, and the like. According to the calendar information, the clock and calendar unit 53 sends information that indicates whether today's day is a public holiday and information that indicates whether the following day is a public holiday at the unit. 55. The power condition storage unit 54 is a rewritable storage medium, such as a flash memory. The power condition storage unit 54 is configured to store power supply condition information entered by a user using the operation unit 51. The power supply condition information includes information about a priority assigned to each of the multiple rechargeable vehicles 6. Figure 3 is a graph which shows an example of the power supply condition information. In the present example of the power condition information, the vehicle identity of each of the four rechargeable vehicles is associated with the priority information. In particular, the priorities 2, 1, 3, 3 are respectively assigned to the vehicle identities of the vehicles A, B, C, D. When the value of the priority is higher, the priority of the vehicle is greater. Namely, the vehicle with a larger number has a higher priority. A validity period of the priority may be arbitrarily specified for the priority information. In the example of FIG. 3, a period of validity is not specified for the priority of each of the vehicles A and B. In the present example, the priority of each of the vehicles A and B is regularly valid. On the contrary, a validity period is specified for the priority of each of the vehicles C and D. In the present example, the priority of each of the vehicles C and D is valid only within the specified validity period.

L'unité de stockage de conditions d'alimentation électrique 54 stocke en outre auparavant des informations concernant une identité de chargeur pour identifier chaque chargeur 1 de façon unique. Un utilisateur peut ajouter les informations concernant l'identité de chargeur en utilisant l'unité d'opération 51. De cette manière, lorsqu'un chargeur est ajouté, l'identité de chargeur du chargeur supplémentaire peut être facilement enregistrée. L'unité de commande 55 est un micro-ordinateur comprenant une unité centrale de traitement (CPU), une mémoire vive (RAM), une mémoire morte (ROM), et analogue. La CPU lit un programme stocké dans la ROM et exécute le programme dans la RAM afin de réaliser diverses opérations. Durant l'exécution des diverses opérations, l'unité de commande 55 commande arbitrairement le circuit de commutation 2 et l'unité d'affichage 52 pour obtenir des informations de l'unité d'opération 51 et de l'unité d'horloge et de calendrier 53. L'unité de commande 55 réalise en outre la lecture et l'écriture d'informations en fonction de l'unité de stockage de conditions d'alimentation électrique 54. L'unité de commande 55 échange en outre un signal avec l'unité de communication d'alimentation électrique 3. Dans la partie qui suit, le fonctionnement du système d'alimentation électrique va être décrite. D'abord, l'établissement d'une connexion sans fil entre l'unité de communication de véhicule 8 du véhicule rechargeable 6 et la ligne d'alimentation en énergie électrique 9 va être décrite. L'unité de communication d'alimentation électrique 3 transmet à plusieurs reprises à intervalle de temps prédéterminé, tel qu' l seconde, un signal d'invitation à émettre, sur une distance de communication qui couvre les emplacements des multiples chargeurs 1. Lorsque le véhicule rechargeable 6 entre dans la distance de communication de l'unité de communication d'alimentation électrique 3, l'unité de communication de véhicule 8 reçoit le signal d'invitation à émettre. Ainsi, l'unité de communication de véhicule 8 transmet un signal de demande de connexion à l'unité de communication d'alimentation électrique 3 pour demander une connexion sans fil avec l'unité de communication d'alimentation électrique 3. Le signal de demande de connexion peut comprendre l'identité de véhicule 8a et une clef de sécurité, telle qu'une clef WEP Wired Equivalent Privacy chiffrée, utilisée pour la certification dans un réseau local (LAN) sans fil et analogue. The power condition storage unit 54 further stores information about a loader identity to uniquely identify each loader 1. A user can add the charger identity information using the operation unit 51. In this way, when a charger is added, the charger ID of the additional charger can be easily registered. The control unit 55 is a microcomputer comprising a central processing unit (CPU), a random access memory (RAM), a read only memory (ROM), and the like. The CPU reads a program stored in the ROM and runs the program in the RAM to perform various operations. During the execution of the various operations, the control unit 55 arbitrarily controls the switching circuit 2 and the display unit 52 to obtain information from the operation unit 51 and the clock unit and The control unit 55 also reads and writes information according to the power supply condition storage unit 54. The control unit 55 further exchanges a signal with the power supply communication unit 3. In the following part, the operation of the power supply system will be described. First, the establishment of a wireless connection between the vehicle communication unit 8 of the rechargeable vehicle 6 and the electric power supply line 9 will be described. The power supply communication unit 3 transmits several times at a predetermined time interval, such as the second, an invitation signal, over a communication distance which covers the locations of the multiple chargers 1. When the Rechargeable vehicle 6 enters the communication distance of the power supply communication unit 3, the vehicle communication unit 8 receives the polling signal. Thus, the vehicle communication unit 8 transmits a connection request signal to the power supply communication unit 3 to request a wireless connection with the power supply communication unit 3. The request signal The connection method may include the vehicle identity 8a and a security key, such as an encrypted WEP Wired Equivalent Privacy key, used for certification in a wireless local area network (LAN) and the like.

L'unité de communication d'alimentation électrique 3 reçoit le signal de demande de connexion et détermine si le signal reçu de demande de connexion comprend une clef de sécurité. Lorsque le signal reçu de demande de connexion comprend une clef de sécurité, l'unité de communication d'alimentation électrique 3 permet une connexion avec l'unité de communication de véhicule 8. Dans ce cas, l'unité de communication d'alimentation électrique 3 transmet en outre un signal, qui spécifie une permission de la connexion, à l'unité de communication de véhicule 8. Dès lors, l'unité de communication d'alimentation électrique 3 considère un signal qui est transmis à partir de l'unité de communication de véhicule 8 et qui comprend l'identité de véhicule 8a comme étant un signal autorisé. À savoir, l'unité de communication d'alimentation électrique 3 considère l'identité de véhicule comme une identification de véhicule autorisée. Une connexion sans fil entre l'unité de communication d'alimentation électrique 3 et l'unité de communication de véhicule 8 est donc établie. The power supply communication unit 3 receives the connection request signal and determines whether the received connection request signal comprises a security key. When the received connection request signal comprises a security key, the power supply communication unit 3 allows a connection with the vehicle communication unit 8. In this case, the power supply communication unit 3 further transmits a signal, which specifies a permission of the connection, to the vehicle communication unit 8. Therefore, the power supply communication unit 3 considers a signal which is transmitted from the unit vehicle communication system 8 and which comprises the vehicle identity 8a as an authorized signal. Namely, the power supply communication unit 3 considers the vehicle identity as an authorized vehicle identification. A wireless connection between the power supply communication unit 3 and the vehicle communication unit 8 is therefore established.

En variante, lorsque l'unité de communication d'alimentation électrique 3 reçoit un signal de demande de connexion et détermine qu'une clef incluse dans le signal de demande de connexion n'est pas autorisée, l'unité de communication d'alimentation électrique 3 ne permet pas de connexion avec l'unité de communication de véhicule 8. Dès lors, l'unité de communication d'alimentation électrique 3 considère un signal qui est transmis à partir de l'unité de communication de véhicule 8 et qui comprend l'identité de véhicule 8a comme une identification de véhicule non autorisée et ignore le signal. À savoir, l'unité de communication d'alimentation électrique 3 élimine un signal non autorisé sans réaliser d'opération pour le signal non autorisé. Dans ce cas, l'unité de communication d'alimentation électrique 3 et l'unité de communication de véhicule 8 n'établissent aucune connexion sans fil entre elles. De cette manière, le système d'alimentation électrique considère seulement l'unité de communication de véhicule 8 d'un véhicule, qui est auparavant enregistré avec une clef de sécurité, comme étant un partenaire de communication autorisé. Alternatively, when the power supply communication unit 3 receives a connection request signal and determines that a key included in the connection request signal is not allowed, the power supply communication unit 3 does not allow connection with the vehicle communication unit 8. Therefore, the power supply communication unit 3 considers a signal that is transmitted from the vehicle communication unit 8 and which includes the vehicle identity 8a as an unauthorized vehicle identification and ignores the signal. That is, the power supply communication unit 3 eliminates an unauthorized signal without performing operation for the unauthorized signal. In this case, the power supply communication unit 3 and the vehicle communication unit 8 do not establish any wireless connection between them. In this way, the power supply system considers only the vehicle communication unit 8 of a vehicle, which is previously registered with a security key, as being an authorized communication partner.

Donc, le système d'alimentation électrique fonctionne pour empêcher un établissement erroné d'une connexion sans fil avec un véhicule non autorisé en raison d'une détermination erronée qu'un tel véhicule non autorisé stationné dans un parc de stationnement d'une maison voisine serait un véhicule autorisé. Thus, the power supply system operates to prevent erroneous establishment of a wireless connection with an unauthorized vehicle due to an erroneous determination that such unauthorized vehicle parked in a parking lot of a neighboring house would be an authorized vehicle.

Maintenant, le fonctionnement de l'unité de commande 55 va être décrite en détail. Pour commencer, une opération pour stocker des informations de conditions d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54 va être décrite. Un utilisateur réalise d'abord une opération prédéterminée pour enregistrer des informations de conditions d'alimentation électrique dans l'unité d'opération 51. En réponse à la présente opération, l'unité de commande 55 fait en sorte que l'unité d'affichage 52 affiche un écran pour demander à un utilisateur d'entrer une condition d'alimentation électrique. Un utilisateur manipule ensuite l'unité d'affichage 52 pour entrer un ou plusieurs groupes d'une identité de véhicule et d'une priorité. Ainsi, l'unité de commande 55 associe l'identification de véhicule entrée avec la priorité entrée dans chaque groupe et stocke l'identité de véhicule et la priorité associées dans l'unité de stockage de conditions d'alimentation électrique 54. Une opération de l'unité de commande 55 pour charger le véhicule rechargeable va à présent être décrite. La figure 4 est un schéma qui représente des données de file d'attente 20 et des données de case invalide 30. Les données de file d'attente 20 sont formées par l'unité de commande 55 dans la RAM pour la présente opération. Les données de file d'attente 20 stockent des entités de chargeur 21 et 22 dans l'ordre. Chacune des entités de chargeur 21 et 22 correspond à un chargeur parmi les multiples chargeurs 1. Chacune des entités de chargeur 21 et 22 comprend une identité de chargeur et des informations concernant une priorité d'un chargeur correspondant. Un procédé pour générer les entités de chargeur 21 et 22 va être décrit plus bas. Now, the operation of the control unit 55 will be described in detail. To begin, an operation for storing power condition information in the power condition storage unit 54 will be described. A user first performs a predetermined operation to record power condition information in the operation unit 51. In response to the present operation, the control unit 55 causes the unit to display 52 displays a screen to prompt a user to enter a power condition. A user then manipulates the display unit 52 to enter one or more groups of a vehicle identity and a priority. Thus, the control unit 55 associates the entered vehicle identification with the priority entered in each group and stores the associated vehicle identity and priority in the power condition storage unit 54. the control unit 55 for charging the rechargeable vehicle will now be described. Fig. 4 is a diagram showing queue data 20 and invalid box data 30. The queue data 20 is formed by the control unit 55 in the RAM for the present operation. The queue data 20 stores loader entities 21 and 22 in order. Each of the charger entities 21 and 22 corresponds to one of the multiple chargers 1. Each of the charger entities 21 and 22 includes a charger identity and priority information of a corresponding charger. A method for generating the loader entities 21 and 22 will be described below.

L'ordre des entités de chargeur 21 et 22 dans les données de file d'attente 20 définit les priorités de charge. Un chargeur correspondant à l'entité de chargeur 21 en tête des données de file d'attente 20 est un objet auquel une première priorité est attribuée et qui est destiné à être connecté à la ligne d'alimentation en énergie électrique 9. Un autre chargeur correspondant à l'entité de chargeur 22 dans la deuxième place des données de file d'attente 20 est un objet auquel la deuxième priorité est attribuée et qui est destiné à être connecté à la ligne d'alimentation en énergie électrique 9. The order of the loader entities 21 and 22 in the queue data 20 defines the load priorities. A charger corresponding to the charger entity 21 at the head of the queue data 20 is an object to which a first priority is assigned and which is intended to be connected to the electrical power supply line 9. Another charger corresponding to the charger entity 22 in the second place of the queue data 20 is an object to which the second priority is assigned and which is intended to be connected to the electrical power supply line 9.

Dans l'exemple de la figure 4, deux entités de chargeur correspondant à deux parmi les multiples chargeurs sont stockées dans les données de file d'attente 20. Il est noté que le nombre des entités de chargeur dans les données de file d'attente 20 peut changer de zéro au nombre total des chargeurs inclus dans le système d'alimentation électrique. De façon similaire, une entité de chargeur 31 est stockée dans les données de case invalide 30. Contrairement aux données de file d'attente 20, l'entité de chargeur 31 stockée dans les données de case invalide 30 peut être ajoutée à un ordre et peut être exclue d'un ordre. Dans l'exemple de la figure 4, une entité de chargeur correspondant à un chargeur parmi les multiples chargeurs est stockée dans les données de case invalide 30. Il est noté que le nombre des entités de chargeur dans les données de case invalide 30 peut changer de zéro au nombre total des chargeurs inclus dans le système d'alimentation électrique. Comme décrit ci-dessus, lorsqu'un véhicule est connecté à un chargeur parmi les multiples chargeurs 1, une entité de chargeur correspondant à ce chargeur sera générée. En outre, cette entité de chargeur générée sera stockée dans les données de file d'attente 20 ou dans les données de case invalide 30. Le fait qu'une entité de chargeur soit stockée dans les données de file d'attente 20 ou dans les données de case invalide 30 est déterminé suivant qu'une priorité de l'entité de chargeur est valide ou invalide à cet instant. L'emplacement de stockage d'une entité de chargeur change donc au fur et à mesure que le temps avance. Lorsque ce véhicule est déconnecté de ce chargeur, l'entité de chargeur correspondant à ce chargeur est effacée des données de file d'attente 20 ou des données de case invalide 30. De façon similaire, lorsque la batterie 7 de ce véhicule est entièrement chargée, l'entité de chargeur correspondant à ce chargeur est effacée des données de file d'attente 20. L'unité de commande 55 exécute un programme 100 représenté sur la figure 5 et un programme 200 représenté sur la figure 6 pour commander une charge d'un véhicule rechargeable en utilisant les données de file d'attente 20 et les données de case invalide 30. Le programme 100 représenté sur la figure 5, est une commande de commutation permettant de commander le circuit de commutation 2 selon les données de file d'attente 20. Le programme 200 représenté sur la figure 6 est une opération de mot d'ordre permettant de réécrire les données de file d'attente 20 et les données de case invalide 30 sur la base de données d'une condition d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54. L'unité de commande 55 est configurée pour exécuter les programmes 100 et 200 en parallèle et à plusieurs reprises. Lors de l'exécution du programme 100, l'unité de commande 55 exécute des opérations des étapes 110, 120, 140 à plusieurs reprises jusqu'à ce qu'une identité de chargeur d'une entité de chargeur en tête des données de file d'attente 20 change ou jusqu'à ce que la batterie 7 actuellement connectée à la ligne d'alimentation en énergie électrique 9 soit complètement chargée. Lors de l'exécution du programme 200, l'unité de commande 55 exécute des opérations des étapes 210, 245, 260 à plusieurs reprises jusqu'à ce qu'un véhicule soit nouvellement connecté à un des chargeurs 1, jusqu'à un instant de commencement ou un instant de fin d'une période de validité d'une entité de chargeur dans les données de file d'attente 20 ou les données de case invalide 30, ou jusqu'à ce que l'un ou l'autre des chargeurs 1 soit déconnecté d'un véhicule. In the example of Figure 4, two loader entities corresponding to two of the multiple loaders are stored in the queue data 20. It is noted that the number of loader entities in the queue data 20 can change from zero to the total number of chargers included in the power system. Similarly, a loader entity 31 is stored in the invalid slot data 30. Unlike the queue data 20, the loader entity 31 stored in the invalid slot data 30 can be added to an order and can be excluded from an order. In the example of Fig. 4, a charger entity corresponding to one of the multiple chargers is stored in the invalid slot data 30. It is noted that the number of charger entities in the invalid case data 30 may change. from zero to the total number of chargers included in the power system. As described above, when a vehicle is connected to one of the multiple chargers 1, a charger entity corresponding to that charger will be generated. In addition, this generated loader entity will be stored in queue data 20 or in invalid box data 30. Whether a loader entity is stored in queue data 20 or in Invalid case data is determined according to whether a priority of the feeder entity is valid or invalid at this time. The storage location of a feeder entity changes as time advances. When this vehicle is disconnected from this charger, the charger entity corresponding to this charger is erased from the queue data 20 or invalid slot data 30. Similarly, when the battery 7 of this vehicle is fully charged the charger entity corresponding to this charger is cleared from the queue data 20. The control unit 55 executes a program 100 shown in FIG. 5 and a program 200 shown in FIG. a rechargeable vehicle using the queue data 20 and the invalid box data 30. The program 100 shown in FIG. 5 is a switching command for controlling the switching circuit 2 according to the data of the queue. 20. The program 200 shown in Fig. 6 is a password operation for rewriting the queue data 20 and the invalid case data 30 on the basis of The control unit 55 is configured to execute the programs 100 and 200 in parallel and repeatedly. When executing program 100, control unit 55 performs operations of steps 110, 120, 140 repeatedly until a loader identity of a feeder entity at the head of the queue data standby 20 changes or until the battery 7 currently connected to the power supply line 9 is fully charged. During the execution of the program 200, the control unit 55 performs operations of the steps 210, 245, 260 several times until a vehicle is newly connected to one of the chargers 1, until a moment beginning or end time of a period of validity of a loader entity in the queue data 20 or the invalid box data 30, or until one or the other chargers 1 is disconnected from a vehicle.

Dans la partie qui suit, une opération de l'unité de commande 55 selon le présent mode de réalisation réalisée en exécutant le programme 100 et le programme 200 va être décrite en détail pour de multiples exemples. Lorsque le système d'alimentation électrique a démarré, la ligne d'alimentation en énergie électrique 9 est connectée à un objet de connexion non chargé. L'objet de connexion non chargé n'est connecté à aucun des chargeurs du système d'alimentation électrique. Par exemple, l'objet de connexion non chargé est un terminal qui n'est connecté électriquement qu'à la ligne d'alimentation en énergie électrique 9. In the following, an operation of the control unit 55 according to the present embodiment performed by executing the program 100 and the program 200 will be described in detail for multiple examples. When the power supply system has started, the power supply line 9 is connected to an unloaded connection object. The unloaded connection object is not connected to any of the chargers in the power supply system. For example, the unloaded connection object is a terminal that is electrically connected only to the power supply line 9.

Exemple 1 Priorité de Véhicule A, Véhicule B Connecté après Connexion de Véhicule A Dans l'exemple 1, des informations de conditions d'alimentation électrique stockées dans l'unité de stockage de conditions d'alimentation électrique 54 sont dans l'état de la figure 3. Particulièrement, un véhicule A (véhicule rechargeable) est d'abord connecté à un chargeur P parmi les chargeurs 1. Après cela, un véhicule B est connecté à un chargeur Q parmi les chargeurs 1 autre que le chargeur P, alors que le véhicule A est connecté au chargeur P. Dans le présent exemple, le véhicule A est équivalent à un premier véhicule, le véhicule B est équivalent à un second véhicule, le chargeur P est équivalent à un premier chargeur, et le chargeur Q est équivalent à un second chargeur. Comme représenté sur la figure 3, la priorité du véhicule A est 2, et la priorité du véhicule B est 1. La priorité du véhicule A est donc supérieure à la priorité du véhicule B. Une période de validité n'est pas spécifiée pour la priorité de chacun des véhicules AetB. À savoir, la priorité de chacun des véhicules A et B est régulièrement valide. La figure 7 est un organigramme qui représente une procédure pour charger chacun des véhicules A et B dans ce cas. La figure 8 est un graphique qui représente un changement d'une quantité de charge de la batterie 7 de chacun des véhicules A et B au fur et à mesure que le temps avance. Sur la figure 8, un trait 41 représente une quantité de charge de la batterie 7 du véhicule A, et un trait 42 représente une quantité de charge de la batterie 7 du véhicule B. Dans la partie qui suit, une opération dans l'exemple 1 va être décrite en faisant référence aux figures 5 à 8. Pour commencer, lorsqu'un véhicule n'est connecté à aucun des chargeurs du système d'alimentation électrique, le nombre des entités de chargeur stockées dans les données de file d'attente 20 et les données de case invalide 30 est zéro. Dans cette condition, le véhicule A se rapproche du chargeur P et s'arrête au chargeur P. Comme décrit ci-dessus, lorsque le véhicule A se rapproche du chargeur P et s'arrête au chargeur P, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule A et l'unité de communication d'alimentation électrique 3. Il est supposé qu'une clef de sécurité de l'unité de communication d'alimentation électrique 3 est enregistrée dans l'unité de communication de véhicule 8 du véhicule A. Comme décrit ci-dessus, par l'intermédiaire de la connexion sans fil, l'unité de communication d'alimentation électrique 3 considère l'identité de véhicule du véhicule A comme étant une identification de véhicule autorisée. Ensuite, à l'étape 305 de la figure 7, à un temps TO (figure 8), un utilisateur connecte le véhicule A au chargeur P. Ainsi, le chargeur P détecte qu'une prise d'une ligne électrique est insérée dans une ouverture de prise du dispositif automobile et notifie le dispositif de commande d'alimentation électrique 5 de la détection de l'insertion de la prise de la ligne électrique. En réponse à la notification, à l'étape 210 de la figure 6, l'unité de commande 55 détermine qu'un véhicule nouvellement connecté existe. Le traitement passe ensuite à l'étape 220. À l'étape 220 (étape 310 de la figure 7), l'unité de commande 55 obtient une identité de véhicule du véhicule nouvellement connecté. Une identité de véhicule d'un véhicule qui a établi une dernière connexion sans fil avec l'unité de communication d'alimentation électrique 3 est utilisée en tant qu'identité de véhicule du véhicule nouvellement connecté. Durant une période après qu'une connexion sans fil ait été établie entre l'unité de communication de véhicule 8 du véhicule A et l'unité de communication d'alimentation électrique 3 et avant que le véhicule A soit connecté au chargeur P, une autre connexion sans fil est difficile à établir entre l'unité de communication de véhicule 8 d'autres véhicules et l'unité de communication d'alimentation électrique 3. Ceci est dû au fait qu'il est très rare que deux véhicules s'arrêtent simultanément dans le même parc de stationnement. Donc, une identité de véhicule correcte peut être presque toujours obtenue en utilisant une identité de véhicule d'un véhicule qui a établi une dernière connexion sans fil avec l'unité de communication d'alimentation électrique 3 en tant qu'identité de véhicule du véhicule nouvellement connecté. Ensuite, à l'étape 230 (étape 315 de la figure 7), l'unité de commande 55 lit des informations concernant une priorité, qui est attribuée à l'identité de véhicule obtenue, à partir d'informations de condition d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54. La priorité lue actuellement est 2, et une période de validité n'est pas spécifiée. Ensuite, à l'étape 240, l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté P selon les informations lues concernant la priorité. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. Particulièrement, l'unité de commande 55 lit l'identité de chargeur du chargeur nouvellement connecté P à partir de l'unité de stockage de condition d'alimentation électrique 54. L'unité de commande 55 génère ainsi une entité de chargeur comprenant l'identité de chargeur et la priorité, qui sont lues à partir de l'unité de stockage de conditions d'alimentation électrique 54 à l'étape 230. À savoir, l'entité de chargeur d'un chargeur en question est constituée de données qui comprennent une identité de chargeur dudit chargeur et une priorité du véhicule actuellement connecté au chargeur en question. Example 1 Vehicle Priority A, Vehicle B Connected After Vehicle Connection A In Example 1, power supply condition information stored in the power condition storage unit 54 is in the state of the In particular, a vehicle A (rechargeable vehicle) is first connected to a charger P among the chargers 1. After that, a vehicle B is connected to a charger Q among the chargers 1 other than the charger P, while the vehicle A is connected to the charger P. In the present example, the vehicle A is equivalent to a first vehicle, the vehicle B is equivalent to a second vehicle, the charger P is equivalent to a first charger, and the charger Q is equivalent to a second charger. As shown in FIG. 3, the priority of the vehicle A is 2, and the priority of the vehicle B is 1. The priority of the vehicle A is therefore greater than the priority of the vehicle B. A validity period is not specified for the vehicle. priority of each of the AetB vehicles. Namely, the priority of each of vehicles A and B is regularly valid. Fig. 7 is a flowchart showing a procedure for loading each of vehicles A and B in this case. Fig. 8 is a graph showing a change in a charge amount of battery 7 of each of vehicles A and B as time progresses. In FIG. 8, a line 41 represents a charge quantity of the battery 7 of the vehicle A, and a line 42 represents a charge quantity of the battery 7 of the vehicle B. In the following part, an operation in the example 1 will be described with reference to FIGS. 5 to 8. To begin, when a vehicle is not connected to any of the chargers of the power supply system, the number of charger entities stored in the queue data 20 and the invalid box data 30 is zero. In this condition, the vehicle A approaches the magazine P and stops at the magazine P. As described above, when the vehicle A approaches the charger P and stops at the charger P, a wireless connection is established between the vehicle communication unit 8 of the vehicle A and the power supply communication unit 3. It is assumed that a security key of the power supply communication unit 3 is registered in the communication unit. vehicle communication 8 of the vehicle A. As described above, via the wireless connection, the power supply communication unit 3 considers the vehicle identity of the vehicle A as an authorized vehicle identification. . Then, in step 305 of FIG. 7, at a time TO (FIG. 8), a user connects the vehicle A to the charger P. Thus, the charger P detects that a plug of a power line is inserted into a opening socket of the automotive device and notifies the power supply control device 5 of the detection of the insertion of the plug of the power line. In response to the notification, in step 210 of FIG. 6, the control unit 55 determines that a newly connected vehicle exists. Processing then proceeds to step 220. In step 220 (step 310 of Fig. 7), the control unit 55 obtains a vehicle identity of the newly connected vehicle. A vehicle identity of a vehicle that has established a last wireless connection with the power supply communication unit 3 is used as the vehicle identity of the newly connected vehicle. During a period after a wireless connection has been established between the vehicle communication unit 8 of the vehicle A and the power supply communication unit 3 and before the vehicle A is connected to the charger P, another wireless connection is difficult to establish between the vehicle communication unit 8 of other vehicles and the power supply communication unit 3. This is due to the fact that it is very rare for two vehicles to stop simultaneously in the same parking lot. Thus, a correct vehicle identity can almost always be obtained by using a vehicle identity of a vehicle that has established a last wireless connection with the power supply communication unit 3 as the vehicle vehicle identity. newly connected. Then, in step 230 (step 315 of Fig. 7), the control unit 55 reads information about a priority, which is assigned to the obtained vehicle identity, from power condition information. in the power supply storage unit 54. The priority currently read is 2, and a validity period is not specified. Then, in step 240, the control unit 55 generates a charger entity of the newly connected loader P according to the information read about the priority. Thus, the control unit 55 stores the generated charger entity in the queue data 20 or the invalid box data 30. Particularly, the control unit 55 reads the charger ID of the newly connected charger. P from the power condition storage unit 54. The control unit 55 thus generates a loader entity comprising the loader identity and the priority, which are read from the storage unit. of power supply conditions 54 in step 230. Namely, the charger entity of a charger in question is data which comprises a charger identity of said charger and a priority of the vehicle currently connected to the charger in question. .

Un emplacement de stockage d'une entité de chargeur générée est déterminé sur la base d'une priorité incluse dans une entité de chargeur. Particulièrement, lorsqu'une période de validité n'est pas spécifiée dans une priorité incluse dans une entité de chargeur et lorsqu'il y a un blanc dans un ordre, le véhicule est considéré comme étant immédiatement chargé. Ainsi, l'entité de chargeur est stockée dans les données de file d'attente 20. De plus, lorsqu'une période de validité est spécifiée dans une priorité incluse dans une entité de chargeur et lorsque la date actuelle est dans la période valide, le véhicule est également considéré comme étant immédiatement chargé. L'entité de chargeur est ainsi stockée dans les données de file d'attente 20. En variante, lorsqu'une période de validité est spécifiée dans une priorité incluse dans une entité de chargeur et lorsque la date actuelle est en dehors de la période de validité, le véhicule n'est pas considéré comme étant immédiatement chargé, même lorsqu'il y a un blanc dans un ordre. Ainsi, l'entité de chargeur est stockée dans les données de case invalide 30. A storage location of a generated loader entity is determined based on a priority included in a loader entity. Especially, when a validity period is not specified in a priority included in a feeder entity and when there is a blank in an order, the vehicle is considered to be immediately loaded. Thus, the loader entity is stored in the queue data 20. In addition, when a validity period is specified in a priority included in a loader entity and when the current date is in the valid period, the vehicle is also considered to be immediately loaded. The loader entity is thus stored in the queue data 20. Alternatively, when a validity period is specified in a priority included in a loader entity and when the current date is outside the payload period. validity, the vehicle is not considered to be immediately loaded even when there is a blank in an order. Thus, the loader entity is stored in the invalid slot data 30.

Un ordre d'une entité de chargeur dans les données de file d'attente 20 est déterminé sur la base d'une valeur d'une priorité incluse dans l'entité de chargeur. Donc, des entités de chargeur sont stockées dans l'ordre à partir de la priorité la plus élevée (tête) à la priorité la plus basse. Lorsque des entités de chargeur avec la même priorité existent, une entité parmi les entités de chargeur, qui est stockée dans les données de file d'attente 20 avant l'autre entité parmi les entités de chargeur, est prioritaire et mise sur le côté plus élevé dans l'ordre. Dans le présent exemple, l'unité de commande 55 génère une entité de chargeur du chargeur P. La priorité du chargeur P est la priorité 2 du véhicule A, et une période de validité n'est pas spécifiée pour l'entité de chargeur. Donc, l'unité de commande 55 stocke l'entité de chargeur du chargeur P dans les données de file d'attente 20. À cet instant, le nombre des entités de chargeur est zéro dans les données de file d'attente 20. Donc, à l'étape 320 de la figure 7, l'unité de commande 55 stocke l'entité de chargeur du chargeur P en tête dans l'ordre de la file d'attente des données de file d'attente 20. An order of a loader entity in the queue data 20 is determined based on a value of a priority included in the loader entity. Therefore, loader entities are stored in order from the highest priority (head) to the lowest priority. When loader entities with the same priority exist, one of the loader entities, which is stored in the queue data prior to the other one of the loader entities, has priority and is put on the plus side. elevated in order. In the present example, the control unit 55 generates a charger entity of the charger P. The priority of the charger P is the priority 2 of the vehicle A, and a validity period is not specified for the charger entity. Therefore, the control unit 55 stores the loader loader entity P in the queue data 20. At this point, the number of loader entities is zero in the queue data 20. Therefore in step 320 of FIG. 7, the control unit 55 stores the loader loader entity P in the lead in the order of the queue of the queue data 20.

Ensuite, à l'étape 110 de la figure 5, l'unité de commande 55 lit une identité de chargeur d'une entité de chargeur en tête des données de file d'attente 20. À l'étape 120, l'unité de commande 55 compare ensuite l'identité de chargeur lue à l'étape immédiatement précédente 110 à une identité de chargeur lue à l'étape précédente supplémentaire 110. Ainsi, l'unité de commande 55 détermine si l'identité de chargeur est changée. À savoir, l'unité de commande 55 détermine si le chargeur en tête dans les données de file d'attente 20 est changé. Lorsqu'il est déterminé que le chargeur en tête dans les données de file d'attente 20 est inchangé, le traitement passe à l'étape 140. En variante, lorsqu'il est déterminé que le chargeur en tête dans les données de file d'attente 20 est changé, le traitement passe à l'étape 130. Dans le présent exemple, une entité de chargeur n'existe pas dans les données de file d'attente 20 à l'étape précédente supplémentaire 110 ou à l'étape immédiatement précédente 110. Donc, l'identité de chargeur actuellement obtenue est une valeur nulle. De plus, l'identité de chargeur obtenue à l'étape immédiatement précédente 110 est l'identité de chargeur du chargeur P. L'unité de commande 55 détermine donc que l'identité de chargeur est changée. Ainsi, le traitement passe à l'étape 130. Next, in step 110 of FIG. 5, the control unit 55 reads a loader identity of a loader entity at the head of the queue data 20. In step 120, the control 55 then compares the feeder identity read from the immediately preceding step 110 to a feeder identity read from the additional previous step 110. Thus, the control unit 55 determines whether the feeder identity is changed. That is, the control unit 55 determines whether the overhead loader in the queue data 20 is changed. When it is determined that the overhead loader in the queue data 20 is unchanged, the process proceeds to step 140. Alternatively, when it is determined that the loader is in the lead in the queue data. wait 20 is changed, processing proceeds to step 130. In the present example, a loader entity does not exist in the queue data 20 in the previous additional step 110 or step immediately. Therefore, the current loader identity is a null value. In addition, the charger identity obtained in the immediately preceding step 110 is the charger ID of the charger P. The control unit 55 therefore determines that the charger identity is changed. Thus, the processing proceeds to step 130.

Ensuite, à l'étape 130, l'unité de commande 55 réalise une commande de commutation du circuit de commutation 2. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P, qui correspond à l'entité de chargeur en tête dans l'ordre des données de file d'attente 20. Ainsi, la destination connectée de la ligne d'alimentation en énergie électrique 9 est commutée au chargeur P. De cette manière, à l'étape 325, la charge du chargeur P au véhicule A est commencée par l'intermédiaire de la ligne d'alimentation en énergie électrique 9. À cet instant, une quantité de charge de la batterie 7 du véhicule A est A0 (figure 8). Comme représenté par le trait 41 d'un temps TO à un temps Tl sur la figure 8, la batterie 7 du véhicule A est chargée, et la quantité de charge de la batterie 7 augmente au fur et à mesure que le temps avance. Particulièrement, la batterie 7 du véhicule A est chargée après le commencement de la charge du véhicule A jusqu'à ce qu'un autre véhicule soit connecté à un autre chargeur du système d'alimentation électrique. Then, in step 130, the control unit 55 performs a switching control of the switching circuit 2. In particular, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger P, which corresponds to the charger entity at the head in the order of the queue data 20. Thus, the connected destination of the power supply line 9 is switched to the charger P In this way, in step 325, charging of the charger P to the vehicle A is started via the electric power supply line 9. At this time, a charge amount of the battery 7 of the vehicle A is A0 (Figure 8). As represented by the line 41 of a time TO at a time T1 in FIG. 8, the battery 7 of the vehicle A is charged, and the charge amount of the battery 7 increases as the time advances. Particularly, the battery 7 of the vehicle A is charged after the start of the charging of the vehicle A until another vehicle is connected to another charger of the power supply system.

De cette manière, grâce à l'exécution du programme 100, l'unité de commande 55 détermine que la batterie 7 actuellement chargée à l'étape 140 n'est pas complètement chargée, alors que la quantité de charge de la batterie 7 augmente du temps TO au temps Tl. Ainsi, le traitement retourne à nouveau à l'étape 110, et l'unité de commande 55 obtient l'identité de chargeur en tête dans la file d'attente. Ensuite, à l'étape 120, l'unité de commande 55 détermine qu'il n'y a aucun changement de l'identité de chargeur. Ainsi, l'unité de commande 55 répète l'opération pour retourner à l'étape 140. Comme décrit ci-dessus, l'unité de communication de véhicule 8 du véhicule A transmet à plusieurs reprises des informations concernant la quantité de charge de la batterie 7 du véhicule A à l'identité de véhicule licite. L'unité de commande 55 détermine si la batterie 7 du véhicule A est complètement chargée sur la base des informations concernant la quantité de charge reçues à partir de l'unité de communication d'alimentation électrique 3 conjointement à l'identité de véhicule licite. Au vu de la présente opération, l'unité de commande 55 peut stocker une quantité de charge de la batterie 7 de chaque véhicule lorsque la batterie 7 est complètement chargée. Les informations concernant la quantité de charge transmises à partir de l'unité de communication de véhicule 8 peuvent spécifier un taux de la présente quantité de charge par rapport à la quantité de charge lorsque la batterie 7 est complètement chargée. De cette manière, à l'étape 245, l'unité de commande 55 détermine si une quelconque des conditions suivantes (1) et (2) est satisfaite par l'exécution du programme 200, alors que la quantité de charge de la batterie 7 augmente du temps TO au temps Tl. Lorsqu'au moins une des conditions (1) et (2) est satisfaite, le traitement passe à l'étape 250. En variante, lorsqu'aucune des conditions (1) et (2) n'est satisfaite, le traitement passe à l'étape 260. (1) La période de validité de la priorité de l'entité de chargeur dans les données de file d'attente se termine. (2) La période de validité de la priorité de l'entité de chargeur dans les données de case invalide commence. À savoir, l'unité de commande 55 détermine si la validité de la priorité change au fur et à mesure que le temps avance. Dans le présent exemple, il n'y a aucune entité de chargeur dans les données de case invalide 30, et une période de validité n'est pas spécifiée pour la priorité de l'entité de chargeur du chargeur P dans les données de file d'attente 20. Donc, aucune des conditions (1) et (2) n'est satisfaite. Ainsi, le traitement passe à l'étape 260. À l'étape 260, l'unité de commande 55 détermine si au moins une connexion entre un chargeur et un véhicule est libérée sur la base d'un signal qui provient de chaque chargeur. Lorsqu'au moins une connexion est libérée, le traitement passe à l'étape 270. En variante, lorsqu'aucune connexion n'est libérée, le traitement retourne à l'étape 210. Dans le présent exemple, une connexion n'est pas libérée, et le traitement retourne à l'étape 210. En outre, dans le présent exemple, un autre véhicule n'est pas nouvellement connecté à un chargeur du temps TO au temps Tl. Donc, l'étape 210 réalise une détermination négative, et le traitement passe à nouveau à l'étape 245. De cette manière, chacune des étapes 210, 240, 260 réalise une détermination négative du temps TO jusqu'au temps Tl. Ainsi, le véhicule A continue à être chargé, alors qu'il n'y a aucun changement des données de file d'attente 20 et des données de case invalide 30. Il est supposé ici que le véhicule B se rapproche du chargeur Q et s'arrête au chargeur Q. Comme décrit ci-dessus, lorsque le véhicule B se rapproche du chargeur Q et s'arrête au chargeur Q, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule B et l'unité de communication d'alimentation électrique 3. Il est supposé qu'une clef de sécurité de l'unité de communication d'alimentation électrique 3 est enregistrée dans l'unité de communication de véhicule 8 du véhicule B. Comme décrit ci-dessus, par l'intermédiaire de la connexion sans fil, l'unité de communication d'alimentation électrique 3 considère l'identité de véhicule du véhicule B comme étant une identification de véhicule autorisée. Ensuite, à l'étape 330 de la figure 7, à un temps Tl (figure 8), un utilisateur connecte le véhicule B au chargeur Q. Ainsi, le chargeur Q détecte qu'une prise d'une ligne électrique est insérée dans une ouverture de prise du dispositif automobile et notifie le dispositif de commande d'alimentation électrique 5 de la détection de l'insertion de la prise de la ligne électrique. En réponse à la notification, à l'étape 210 de la figure 6, l'unité de commande 55 détermine qu'un véhicule nouvellement connecté existe. Le traitement passe ensuite à l'étape 220. À l'étape 220 (étape 335 de la figure 7), l'unité de commande 55 obtient une identité de véhicule du véhicule nouvellement connecté, à savoir, le véhicule B. Ensuite, à l'étape 230 (étape 340 de la figure 7), l'unité de commande 55 lit des informations concernant une priorité, qui est associée à l'identité de véhicule obtenue du véhicule B, à partir d'informations de conditions d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54. La priorité actuellement lue est 1, et une période de validité n'est pas spécifiée. Ensuite, à l'étape 240, l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté Q selon les informations lues concernant la priorité, de façon similaire à l'entité de chargeur du chargeur P. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. À savoir, l'entité de chargeur du chargeur Q est constituée de données qui comprennent une identité de chargeur du chargeur Q et une priorité du véhicule B actuellement connecté au chargeur Q. Dans le présent exemple, la priorité de l'entité de chargeur du chargeur Q est la priorité 1 du véhicule B, et une période de validité n'est pas spécifiée. Donc, l'entité de chargeur du chargeur Q est stockée dans les données de file d'attente 20. En outre à cet instant, les données de file d'attente 20 comprennent seulement l'entité de chargeur du chargeur P avec la priorité 2. Donc, à l'étape 345 de la figure 7, l'unité de commande 55 stocke l'entité de chargeur du chargeur Q dans la seconde place dans l'ordre des données de file d'attente 20. Dans la présente condition, l'entité de chargeur du chargeur Q est stockée dans les données de file d'attente 20. Même dans la présente condition, il n'y a aucun changement de l'identité de chargeur de l'entité de chargeur en tête dans les données de file d'attente 20. Donc, à l'étape 120 de la figure 5, une détermination négative est réalisée, et la commande de commutation de l'étape 130 n'est pas réalisée. À savoir, la charge du véhicule A avec une priorité plus élevée que celle du véhicule B continue. La charge du véhicule B ne commence pas à cet instant. Au temps Tl, la quantité de charge du véhicule B est B0. Après cela, la charge du véhicule A continue. Au temps T2 sur la figure 8, la quantité de charge de la batterie 7 du véhicule A augmente jusqu'à Amax, et la batterie 7 est complètement chargée. Ainsi, à l'étape 140 de la figure 5 (étape 350 de la figure 7), l'unité de commande 55 détermine que la batterie 7 est complètement chargée. Ensuite, à l'étape 150 (étape 355 de la figure 7), l'unité de commande 55 efface l'entité de chargeur en tête dans les données de file d'attente 20 à partir des données de file d'attente 20. De cette manière, l'entité de chargeur du chargeur P est effacée. Par conséquent, l'entité de chargeur du chargeur Q devient une entité de chargeur en tête dans l'ordre des données de file d'attente 20. À l'étape suivante 110, l'unité de commande 55 obtient l'identité de chargeur du chargeur Q en tant qu'identité de chargeur de l'entité de chargeur en tête dans les données de file d'attente 20. L'unité de commande 55 détermine ensuite qu'il y a un changement de l'identité de chargeur obtenue à l'étape 120 et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur Q, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 360 de la figure 7, l'objet chargé est changé pour devenir véhicule B. Ainsi, la charge du véhicule B est commencée. Les données de file d'attente 20 ne changent pas à moins qu'un autre véhicule soit connecté au chargeur 1. Comme représenté par le trait 42 de la figure 8, la charge du véhicule B continue, et la quantité de charge de la batterie 7 augmente. Enfin, à l'étape 365, au temps T3, la quantité de charge de la batterie 7 du véhicule B augmente jusqu'à Bmax, et la batterie 7 est complètement chargée. Ainsi, à l'étape 140, l'unité de commande 55 détermine que la batterie 7 du véhicule B est complètement chargée, et, à l'étape 150, l'unité de commande 55 efface l'entité de chargeur du chargeur Q en tête dans les données de file d'attente 20. À l'étape suivante 110, l'unité de commande 55 obtient des données nulles en tant qu'identité de chargeur de l'entité de chargeur en tête dans les données de file d'attente 20. Ensuite, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue à l'étape 120, et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 connecte la ligne d'alimentation en énergie électrique 9 à un objet de connexion non chargé correspondant aux données nulles. Ainsi, la charge du véhicule B est achevée. Comme décrit ci-dessus, il est supposé que le premier véhicule (véhicule A) est connecté au premier chargeur (chargeur P), et le circuit de commutation 2 fait en sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au premier chargeur (chargeur P). Dans une telle condition, au temps T 1 de la figure 8, lorsque le second véhicule (véhicule B) est nouvellement connecté au second chargeur (chargeur 0) et lorsque la priorité attribuée au premier véhicule (véhicule A) dans l'unité de stockage de condition d'alimentation électrique 54 est supérieure à la priorité attribuée au second véhicule (véhicule B) dans l'unité de stockage de condition d'alimentation électrique 54, l'unité de commande 55 fait en sorte que le circuit de commutation 2 maintienne la destination connectée de la ligne d'alimentation en énergie électrique 9 au premier chargeur (chargeur P). Après que la charge du véhicule A est achevée au temps T2, l'unité de commande 55 fait en sorte que le circuit de commutation 2 commute la destination connectée de la ligne d'alimentation en énergie électrique 9 au chargeur Q, commençant ainsi la charge du véhicule B. In this way, by executing the program 100, the control unit 55 determines that the battery 7 currently charged in step 140 is not fully charged, whereas the charge amount of the battery 7 increases by time TO at time T1. Thus, the process returns to step 110 again, and control unit 55 obtains the identity of forward loader in the queue. Then, in step 120, the control unit 55 determines that there is no change in the charger identity. Thus, the control unit 55 repeats the operation to return to step 140. As described above, the vehicle communication unit 8 of the vehicle A repeatedly transmits information regarding the amount of charge of the battery 7 of vehicle A to the lawful vehicle identity. The control unit 55 determines whether the battery 7 of the vehicle A is fully charged based on the amount of charge information received from the power supply communication unit 3 together with the lawful vehicle identity. In view of the present operation, the control unit 55 can store a charge amount of the battery 7 of each vehicle when the battery 7 is fully charged. The information regarding the amount of charge transmitted from the vehicle communication unit 8 may specify a rate of the present amount of charge relative to the amount of charge when the battery 7 is fully charged. In this way, in step 245, the control unit 55 determines whether any of the following conditions (1) and (2) are satisfied by the execution of the program 200, while the amount of charge of the battery 7 increases from the time TO to the time T1. When at least one of the conditions (1) and (2) is satisfied, the processing proceeds to step 250. In a variant, when none of the conditions (1) and (2) is satisfied, processing proceeds to step 260. (1) The validity period of the priority of the loader entity in the queue data terminates. (2) The validity period of the feeder entity priority in the invalid slot data begins. Namely, the control unit 55 determines whether the validity of the priority changes as the time advances. In the present example, there is no loader entity in the invalid slot data 30, and a validity period is not specified for the loader loader entity priority P in the queue data. 20. Therefore, none of the conditions (1) and (2) are satisfied. Thus, processing proceeds to step 260. In step 260, the control unit 55 determines whether at least one connection between a charger and a vehicle is released based on a signal from each charger. When at least one connection is released, the process proceeds to step 270. Alternatively, when no connection is released, the process returns to step 210. In the present example, a connection is not released, and the process returns to step 210. In addition, in the present example, another vehicle is not newly connected to a TO loader at time T1. Thus, step 210 performs a negative determination, and the process goes back to step 245. In this manner, each of steps 210, 240, 260 performs a negative determination of time TO until time T1. Thus, vehicle A continues to be charged, while there is no change in the queue data 20 and the invalid box data 30. Here it is assumed that the vehicle B approaches the charger Q and stops at the charger Q. As described above, when the vehicle B approaches the charger Q and stops at the charger Q, a conne The wireless communication is established between the vehicle communication unit 8 of the vehicle B and the power supply communication unit 3. It is assumed that a security key of the power supply communication unit 3 is stored in the vehicle communication unit 8 of the vehicle B. As described above, via the wireless connection, the power supply communication unit 3 considers the vehicle identity of the vehicle B as being an authorized vehicle identification. Next, in step 330 of FIG. 7, at a time T1 (FIG. 8), a user connects the vehicle B to the charger Q. Thus, the charger Q detects that a plug of a power line is inserted into a opening socket of the automotive device and notifies the power supply control device 5 of the detection of the insertion of the plug of the power line. In response to the notification, in step 210 of FIG. 6, the control unit 55 determines that a newly connected vehicle exists. Processing then proceeds to step 220. In step 220 (step 335 of FIG. 7), the control unit 55 obtains a vehicle identity of the newly connected vehicle, namely, the vehicle B. Then, at step 230 (step 340 of Fig. 7), the control unit 55 reads information about a priority, which is associated with the obtained vehicle identity of the vehicle B, from power condition information. in the power supply storage unit 54. The current read priority is 1, and a validity period is not specified. Then, in step 240, the control unit 55 generates a charger entity of the newly connected loader Q according to the information read about the priority, similarly to the feeder unit of the loader P. Thus, the unit controller 55 stores the generated feeder entity in the queue data 20 or the invalid box data 30. Namely, the charger entity of the charger Q is data which includes a charger loader ID Q and a priority of the vehicle B currently connected to the charger Q. In the present example, the priority of the charger entity of the charger Q is the priority 1 of the vehicle B, and a validity period is not specified. Therefore, the loader entity of the loader Q is stored in the queue data 20. In addition at this time, the queue data 20 includes only the loader entity of the loader P with the priority 2 Thus, in step 345 of Fig. 7, the control unit 55 stores the charger unit of the charger Q in the second place in the order of the queue data 20. In this condition, the loader entity of the loader Q is stored in the queue data 20. Even in the present condition, there is no change in the loader identity of the feeder entity in the data head Thus, in step 120 of Fig. 5, a negative determination is made, and the switching command of step 130 is not performed. Namely, the load of the vehicle A with a higher priority than that of the vehicle B continues. Vehicle B does not start charging at this time. At time T1, the charge amount of vehicle B is B0. After that, the load of vehicle A continues. At time T2 in FIG. 8, the charge amount of battery 7 of vehicle A increases to Amax, and battery 7 is fully charged. Thus, in step 140 of FIG. 5 (step 350 of FIG. 7), the control unit 55 determines that the battery 7 is fully charged. Then, in step 150 (step 355 of Fig. 7), the control unit 55 clears the overhead feeder entity in the queue data from the queue data 20. In this way, the charger entity of the charger P is erased. Therefore, the charger entity of the charger Q becomes a charger entity at the head in the order of the queue data 20. In the next step 110, the control unit 55 obtains the identity of the charger of the loader Q as loader identity of the overhead loader entity in the queue data 20. The control unit 55 then determines that there is a change in the loader identity obtained in step 120 and, in step 130, the control unit 55 performs the switching control. In particular, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger Q, which corresponds to the charger identity obtained in the immediately preceding step 110. this way, in step 360 of FIG. 7, the loaded object is changed to become vehicle B. Thus, the load of the vehicle B is started. The queue data 20 does not change unless another vehicle is connected to the charger 1. As shown by line 42 in Fig. 8, the load of the vehicle B continues, and the amount of charge of the battery 7 increases. Finally, at step 365, at time T3, the charge amount of the battery 7 of the vehicle B increases to Bmax, and the battery 7 is fully charged. Thus, in step 140, the control unit 55 determines that the battery 7 of the vehicle B is fully charged, and in step 150 the control unit 55 clears the charger entity of the charger Q by in the queue data 20. In the next step 110, the control unit 55 obtains null data as the loader entity of the overhead feeder entity in the queue data. 20. Then, the control unit 55 determines that there is a change in the charger identity obtained in step 120, and in step 130, the control unit 55 performs the control of switching. In particular, the control unit 55 connects the power supply line 9 to an unloaded connection object corresponding to the null data. Thus, the load of the vehicle B is completed. As described above, it is assumed that the first vehicle (vehicle A) is connected to the first charger (charger P), and the switching circuit 2 causes the power supply line 9 to be connected to the first charger (P charger). In such a condition, at the time T 1 of FIG. 8, when the second vehicle (vehicle B) is newly connected to the second charger (charger 0) and when the priority assigned to the first vehicle (vehicle A) in the storage unit of power condition 54 is greater than the priority assigned to the second vehicle (vehicle B) in the power condition storage unit 54, the control unit 55 causes the switching circuit 2 to maintain the connected destination of the electric power supply line 9 to the first charger (charger P). After the charge of the vehicle A is completed at time T2, the control unit 55 causes the switching circuit 2 to switch the connected destination from the power supply line 9 to the charger Q, thereby starting charging. of the vehicle B.

Exemple 2 Priorité de Véhicule A, Véhicule A Connecté après Connexion de Véhicule B Dans la partie qui suit, une opération du système d'alimentation électrique selon l'exemple 2 va être décrite. Dans le présent exemple 2, des informations de condition d'alimentation électrique représentées sur la figure 3 sont stockées dans l'unité de stockage de condition d'alimentation électrique 54. Le véhicule B est d'abord connecté au chargeur P. Après cela, le véhicule A est connecté au chargeur Q, alors que le véhicule B est connecté au chargeur P. À savoir, dans le présent exemple 2, un ordre de connexion du véhicule A et du véhicule B est différent de celui dans l'exemple 1. Dans le présent exemple 2, le véhicule B est équivalent à un premier véhicule, le véhicule A est équivalent à un second véhicule, le chargeur P est équivalent à un premier chargeur, et le chargeur Q est équivalent à un second chargeur. Example 2 Priority of Vehicle A, Vehicle Connected After Connection of Vehicle B In the following, an operation of the power supply system according to Example 2 will be described. In the present example 2, power supply condition information shown in FIG. 3 is stored in the power supply condition storage unit 54. The vehicle B is first connected to the charger P. After that, the vehicle A is connected to the charger Q, while the vehicle B is connected to the charger P. Namely, in this example 2, a connection order of the vehicle A and the vehicle B is different from that in example 1. In the present example 2, the vehicle B is equivalent to a first vehicle, the vehicle A is equivalent to a second vehicle, the charger P is equivalent to a first charger, and the charger Q is equivalent to a second charger.

La figure 9 est un organigramme qui représente une procédure pour charger chacun des véhicules A et B dans ce cas. La figure 10 est un graphique qui représente un changement d'une quantité de charge de la batterie 7 de chacun des véhicules A et B au fur et à mesure que le temps avance. Sur la figure 10, un trait 43 représente une quantité de charge de la batterie 7 du véhicule A, et un trait 44 représente une quantité de charge de la batterie 7 du véhicule B. Dans la partie qui suit, une opération dans l'exemple 2 va être décrite en faisant référence aux figures 5, 6, 9, 10. D'abord, lorsqu'un véhicule n'est connecté à aucun des chargeurs du système d'alimentation électrique, le nombre des entités de chargeur stockée dans les données de file d'attente 20 et les données de case invalide 30 est zéro. Comme décrit ci-dessus, lorsque le véhicule B se rapproche du chargeur P et s'arrête au chargeur P, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule B et l'unité de communication d'alimentation électrique 3. Ensuite, à l'étape 405 de la figure 9, à un temps T10 (figure 10), un utilisateur connecte le véhicule B au chargeur P. Ainsi, le chargeur P détecte qu'une prise d'une ligne électrique est insérée dans l'ouverture de prise du dispositif automobile et notifie le dispositif de commande d'alimentation électrique 5 de la détection de l'insertion. En réponse à la notification, à l'étape 210 de la figure 6, l'unité de commande 55 détermine qu'un véhicule nouvellement connecté existe. Ensuite, le traitement passe à l'étape 220. À l'étape 220 (étape 410 de la figure 9), l'unité de commande 55 obtient une identité de véhicule du véhicule nouvellement connecté. Ensuite, à l'étape 230 (étape 415 de la figure 9), l'unité de commande 55 lit des informations concernant une priorité, qui est attribuée à l'identité de véhicule obtenue du véhicule B, à partir d'informations de conditions d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54. La priorité actuellement lue est 1, et une période de validité n'est pas spécifiée. Ensuite, à l'étape 240, l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté P selon les informations lues concernant la priorité. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. À savoir, l'entité de chargeur du chargeur P est constituée de données qui comprennent une identité de chargeur du chargeur P et une priorité du véhicule B actuellement connecté au chargeur P. Fig. 9 is a flow chart showing a procedure for loading each of vehicles A and B in this case. Fig. 10 is a graph showing a change in a charge amount of battery 7 of each of vehicles A and B as time progresses. In FIG. 10, a line 43 represents a charge quantity of the battery 7 of the vehicle A, and a line 44 represents a charge quantity of the battery 7 of the vehicle B. In the following part, an operation in the example 2 will be described with reference to FIGS. 5, 6, 9, 10. First, when a vehicle is not connected to any of the chargers of the power supply system, the number of charger entities stored in the data Queue 20 and invalid case data 30 is zero. As described above, when the vehicle B approaches the charger P and stops at the charger P, a wireless connection is established between the vehicle communication unit 8 of the vehicle B and the power supply communication unit. 3. Then, in step 405 of FIG. 9, at a time T10 (FIG. 10), a user connects the vehicle B to the charger P. Thus, the charger P detects that a plug of a power line is inserted in the engagement aperture of the automobile device and notifies the power supply control device 5 of the detection of the insertion. In response to the notification, in step 210 of FIG. 6, the control unit 55 determines that a newly connected vehicle exists. Thereafter, processing proceeds to step 220. In step 220 (step 410 of Fig. 9), the control unit 55 obtains a vehicle identity of the newly connected vehicle. Then, in step 230 (step 415 of Fig. 9), the control unit 55 reads information about a priority, which is assigned to the obtained vehicle identity of the vehicle B, from condition information. in the power supply storage unit 54. The priority currently read is 1, and a validity period is not specified. Then, in step 240, the control unit 55 generates a charger entity of the newly connected loader P according to the information read about the priority. Thus, the controller 55 stores the generated charger entity in the queue data 20 or the invalid box data 30. Namely, the charger entity of the charger P is comprised of data that includes a loader loader identity P and a priority of vehicle B currently connected to charger P.

Dans le présent exemple, la priorité de l'entité de chargeur du chargeur P est la priorité 1 du véhicule B, et une période valide n'est pas spécifiée. Donc, l'entité de chargeur du chargeur P est stockée dans les données de file d'attente 20. À cet instant, le nombre des entités de chargeur est zéro dans les données de file d'attente 20. Donc, à l'étape 420 de la figure 9, l'unité de commande 55 stocke l'entité de chargeur du chargeur P en tête dans l'ordre de la file d'attente des données de file d'attente 20. À l'étape 110 de la figure 5, l'unité de commande 55 lit l'identité de chargeur du chargeur P en tête dans les données de file d'attente 20. Ensuite, à l'étape 120, l'unité de commande 55 détermine que l'identité de chargeur au début de la file d'attente est changée de la valeur nulle à l'identité de chargeur du chargeur P. Ensuite, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 425 de la figure 9, l'objet chargé est changé pour devenir le véhicule B. Ainsi, la charge du véhicule B est commencée. Après cela, aucun véhicule sauf le véhicule B n'est connecté au chargeur du temps T10 au temps Ti 1 sur la figure 10, et donc il n'y a aucun changement de la file d'attente. Ainsi, comme représenté par le trait 44 sur la figure 10, la charge du véhicule B continue d'augmenter la quantité de charge de la batterie 7 du véhicule B. Il est supposé ici que le véhicule A se rapproche du chargeur Q et s'arrête au chargeur Q. Comme décrit ci-dessus, lorsque le véhicule A se rapproche du chargeur Q et s'arrête au chargeur Q, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule A et l'unité de communication d'alimentation électrique 3. Par l'intermédiaire de la connexion sans fil, l'unité de communication d'alimentation électrique 3 considère l'identité de véhicule du véhicule A comme étant une identification de véhicule autorisée. Ensuite, à l'étape 430 de la figure 9, à un temps T11 (figure 10), un utilisateur connecte le véhicule A au chargeur Q. Ainsi, à l'étape 210 de la figure 6, l'unité de commande 55 détermine qu'un véhicule nouvellement connecté existe sur la base du signal qui provient du chargeur Q. Ensuite, le traitement passe à l'étape 220. À l'étape 220 (étape 435 de la figure 9), l'unité de commande 55 obtient l'identité de véhicule du véhicule nouvellement connecté, à savoir, le véhicule A. In the present example, the priority of the charger entity of the charger P is the priority 1 of the vehicle B, and a valid period is not specified. Therefore, the loader entity of the loader P is stored in the queue data 20. At this point, the number of loader entities is zero in the queue data 20. Therefore, at step 420 of FIG. 9, the control unit 55 stores the loader loader entity P in the lead in the order of the queue of the queue data 20. At the step 110 of FIG. 5, the control unit 55 reads the charger ID of the charger P overhead in the queue data 20. Then, in step 120, the control unit 55 determines that the charger identity at the beginning of the queue is changed from the null value to the charger ID of the charger P. Then, in step 130, the control unit 55 performs the switching command. Particularly, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger P, which corresponds to the charger identity obtained in the immediately preceding step 110. in this way, in step 425 of Fig. 9, the loaded object is changed to vehicle B. Thus, the load of vehicle B is started. After that, no vehicle except the vehicle B is connected to the time charger T10 at time Ti 1 in Fig. 10, and thus there is no change in the queue. Thus, as represented by the line 44 in FIG. 10, the load of the vehicle B continues to increase the amount of charge of the battery 7 of the vehicle B. It is assumed here that the vehicle A approaches the charger Q and Q. As described above, when the vehicle A approaches the charger Q and stops at the charger Q, a wireless connection is established between the vehicle communication unit 8 of the vehicle A and the unit. 3. Through the wireless connection, the power supply communication unit 3 considers the vehicle identity of the vehicle A as an authorized vehicle identification. Then, in step 430 of FIG. 9, at a time T11 (FIG. 10), a user connects the vehicle A to the charger Q. Thus, at the step 210 of FIG. 6, the control unit 55 determines that a newly connected vehicle exists on the basis of the signal from the charger Q. Thereafter, the process proceeds to step 220. In step 220 (step 435 of FIG. 9), the control unit 55 obtains the vehicle identity of the newly connected vehicle, namely, vehicle A.

Ensuite, à l'étape 230 (étape 440 de la figure 9), l'unité de commande 55 lit des informations concernant une priorité, qui est associée à l'identité de véhicule obtenue du véhicule A, à partir d'informations de conditions d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54. La priorité actuellement lue est 2, et une période de validité n'est pas spécifiée. Then, at step 230 (step 440 of Fig. 9), the control unit 55 reads information about a priority, which is associated with the obtained vehicle identity of the vehicle A, from condition information. in the power supply storage unit 54. The priority currently read is 2, and a validity period is not specified.

Ensuite, à l'étape 240, l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté Q selon les informations lues concernant la priorité, de façon similaire à l'entité de chargeur du chargeur P. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. À savoir, l'entité de chargeur du chargeur Q est constituée de données qui comprennent une identité de chargeur du chargeur Q et une priorité du véhicule A actuellement connecté au chargeur Q. Dans le présent exemple, la priorité de l'entité de chargeur du chargeur Q est la priorité 2 du véhicule A, et une période de validité n'est pas spécifiée. Donc, l'entité de chargeur du chargeur Q est stockée dans les données de file d'attente 20. En outre, à cet instant, les données de file d'attente 20 comprennent seulement l'entité de chargeur du chargeur P avec la priorité 1. Donc, à l'étape 445 de la figure 9, l'unité de commande 55 stocke l'entité de chargeur du chargeur Q en tête dans les données de file d'attente 20. Ainsi, l'ordre de l'entité de chargeur du chargeur Q est rétrogradé à la seconde place dans l'ordre. À l'étape 110 de la figure 5, l'unité de commande 55 lit l'identité de chargeur du chargeur P en tête dans les données de file d'attente 20. Ensuite, à l'étape 120, l'unité de commande 55 détermine que l'identité de chargeur au début de la file d'attente est changée de l'identité de chargeur du chargeur P à l'identité de chargeur du chargeur Q, et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur Q, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 447 de la figure 9, l'objet chargé est changé du véhicule B au véhicule A. Ainsi, la charge du véhicule A est commencée, et la charge du véhicule B est terminée. Après cela, la charge du véhicule A continue. Au temps T12 sur la figure 10, la quantité de charge de la batterie 7 du véhicule A augmente jusqu'à Amax, et la batterie 7 est complètement chargée. Ainsi, à l'étape 140 de la figure 5 (étape 450 de la figure 7), l'unité de commande 55 détermine que la batterie 7 est complètement chargée. Ensuite, à l'étape 150 (étape 455 de la figure 7), l'unité de commande 55 efface l'entité de chargeur en tête dans les données de file d'attente 20 à partir des données de file d'attente 20. De cette manière, l'entité de chargeur du chargeur Q est effacée. Par conséquent, l'entité de chargeur du chargeur P devient une entité de chargeur en tête dans l'ordre des données de file d'attente 20. À l'étape suivante 110, l'unité de commande 55 obtient l'identité de chargeur du chargeur P en tant qu'identité de chargeur de l'entité de chargeur en tête dans les données de file d'attente 20. Ensuite, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue à l'étape 120 et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 460 de la figure 9, l'objet chargé est à nouveau changé pour devenir le véhicule B. Ainsi, la charge du véhicule B est commencée. Les données de file d'attente 20 ne changent pas à moins qu'un autre véhicule soit connecté au chargeur 1. Comme représenté par le trait 44 de la figure 10, la charge du véhicule B continue, et la quantité de charge de la batterie 7 augmente. Enfin, à l'étape 465, au temps T13, la quantité de charge de la batterie 7 du véhicule B augmente jusqu'à Bmax, et la batterie 7 est complètement chargée. Ainsi, à l'étape 140, l'unité de commande 55 détermine que la batterie 7 du véhicule B est complètement chargée. Ainsi, à l'étape 150, l'unité de commande 55 efface l'entité de chargeur du chargeur P en tête dans les données de file d'attente 20. À l'étape suivante 110, l'unité de commande 55 obtient des données nulles en tant qu'identité de chargeur de l'entité de chargeur en tête dans les données de file d'attente 20. Ensuite, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue à l'étape 120 et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée à un objet de connexion non chargé correspondant aux données nulles. Then, in step 240, the control unit 55 generates a charger entity of the newly connected loader Q according to the information read about the priority, similarly to the feeder unit of the loader P. Thus, the unit controller 55 stores the generated feeder entity in the queue data 20 or the invalid box data 30. Namely, the charger entity of the charger Q is data which includes a charger loader ID Q and a priority of the vehicle A currently connected to the charger Q. In the present example, the priority of the loader entity of the charger Q is the priority 2 of the vehicle A, and a validity period is not specified. Therefore, the charger entity of the charger Q is stored in the queue data 20. In addition, at this time, the queue data 20 includes only the charger entity of the charger P with the priority 1. Thus, in step 445 of FIG. 9, the control unit 55 stores the loader entity of the top loader Q in the queue data 20. Thus, the order of the entity charger charger Q is demoted to second place in order. In step 110 of FIG. 5, the control unit 55 reads the charger ID of the P charger at the beginning in the queue data 20. Then, in step 120, the control unit 55 determines that the feeder identity at the beginning of the queue is changed from the charger identity of the charger P to the charger identity of the charger Q, and, in step 130, the control unit 55 performs the switching command. In particular, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger Q, which corresponds to the charger identity obtained in the immediately preceding step 110. in this way, in step 447 of FIG. 9, the loaded object is changed from the vehicle B to the vehicle A. Thus, the load of the vehicle A is started, and the load of the vehicle B is completed. After that, the load of vehicle A continues. At time T12 in FIG. 10, the charge amount of battery 7 of vehicle A increases to Amax, and battery 7 is fully charged. Thus, in step 140 of FIG. 5 (step 450 of FIG. 7), the control unit 55 determines that the battery 7 is fully charged. Then, in step 150 (step 455 of Fig. 7), the control unit 55 clears the overhead feeder entity in the queue data 20 from the queue data 20. In this way, the charger entity of the charger Q is erased. Therefore, the charger entity of the charger P becomes a charger entity in the lead in the order of the queue data 20. In the next step 110, the control unit 55 obtains the identity of the charger of the loader P as loader identity of the overheader entity in the queue data 20. Then, the control unit 55 determines that there is a change of the loader identity obtained in step 120 and, in step 130, the control unit 55 performs the switching control. Particularly, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger P, which corresponds to the charger identity obtained in the immediately preceding step 110. in this way, in step 460 of Fig. 9, the charged object is again changed to become the vehicle B. Thus, the load of the vehicle B is started. The queue data 20 does not change unless another vehicle is connected to the charger 1. As shown by line 44 in Fig. 10, the load of the vehicle B continues, and the amount of charge of the battery 7 increases. Finally, in step 465, at time T13, the charge amount of the battery 7 of the vehicle B increases to Bmax, and the battery 7 is fully charged. Thus, in step 140, the control unit 55 determines that the battery 7 of the vehicle B is fully charged. Thus, in step 150, the control unit 55 clears the charger entity of the P charger at the beginning of the queue data 20. At the next step 110, the control unit 55 obtains null data as charger ID of the overhead feeder entity in the queue data 20. Next, the control unit 55 determines that there is a change in the loader identity obtained in step 120 and, in step 130, the control unit 55 performs the switching control. Particularly, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to an unloaded connection object corresponding to the null data.

Comme décrit ci-dessus, il est supposé que le premier véhicule (véhicule B) est connecté au premier chargeur (chargeur P), et le circuit de commutation 2 fait en sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au premier chargeur (chargeur P). Dans une telle condition, au temps Ti 1 de la figure 10, lorsque le second véhicule (véhicule A) est nouvellement connecté au second chargeur (chargeur Q) et lorsque la priorité attribuée au second véhicule (véhicule A) dans l'unité de stockage de condition d'alimentation électrique 54 est supérieure à la priorité attribuée au premier véhicule (véhicule B) dans l'unité de stockage de conditions d'alimentation électrique 54, l'unité de commande 55 fait en sorte que le circuit de commutation 2 commute la destination de connexion de la ligne d'alimentation en énergie électrique 9 du premier chargeur (chargeur P) au second chargeur (chargeur Q). Ainsi, la charge du véhicule B est interrompue, et la charge du véhicule A est commencée. Après que la charge du véhicule A est achevée au temps T12, l'unité de commande 55 fait en sorte que le circuit de commutation 2 commute la destination de connexion de la ligne d'alimentation en énergie électrique 9, du second chargeur (chargeur Q) au premier chargeur (chargeur P), recommençant ainsi la charge du véhicule B. Dans les opérations des exemples 1 et 2, il est supposé que le premier véhicule est connecté au premier chargeur et est chargé. Dans une telle condition, le second véhicule est connecté au second chargeur. Dans ce cas, lorsque le premier véhicule possède une priorité plus élevée, la charge du premier véhicule est continuée. En variante, lorsque le second véhicule possède une priorité plus élevée, la destination de charge est changée pour devenir le second véhicule, et ainsi le second véhicule est chargé. As described above, it is assumed that the first vehicle (vehicle B) is connected to the first charger (charger P), and the switching circuit 2 causes the power supply line 9 to be connected to the first charger (P charger). In such a condition, at the time Ti 1 of FIG. 10, when the second vehicle (vehicle A) is newly connected to the second charger (charger Q) and when the priority assigned to the second vehicle (vehicle A) in the storage unit of power condition 54 is greater than the priority assigned to the first vehicle (vehicle B) in the power condition storage unit 54, the control unit 55 causes the switching circuit 2 to switch the connection destination of the power supply line 9 of the first charger (charger P) to the second charger (charger Q). Thus, the load of the vehicle B is interrupted, and the load of the vehicle A is started. After the charging of the vehicle A is completed at time T12, the control unit 55 causes the switching circuit 2 to switch the connection destination of the electric power supply line 9 of the second charger (charger Q ) to the first charger (charger P), thus starting the charging of the vehicle B. In the operations of examples 1 and 2, it is assumed that the first vehicle is connected to the first charger and is charged. In such a condition, the second vehicle is connected to the second charger. In this case, when the first vehicle has a higher priority, the load of the first vehicle is continued. Alternatively, when the second vehicle has a higher priority, the load destination is changed to become the second vehicle, and so the second vehicle is loaded.

Exemple 3 Priorité de Véhicule C (avec Période de validité), Véhicule B Connecté après Connexion de Véhicule C Dans la partie qui suit, une opération du système d'alimentation électrique selon l'exemple 3 va être décrite. Dans le présent exemple 3, l'unité de stockage de conditions d'alimentation électrique 54 stocke des informations de conditions d'alimentation électrique représentées sur la figure 3. Le véhicule C est d'abord connecté au chargeur P avant des heures creuses nocturnes. Ensuite, le véhicule B est connecté au chargeur Q avant les heures creuses nocturnes, alors que le véhicule C est connecté au chargeur P. Après cela, le temps s'écoule pour être dans les heures creuses nocturnes. Dans le présent exemple 3, le véhicule C est équivalent à un premier véhicule, le véhicule B est équivalent à un second véhicule, le chargeur P est équivalent à un premier chargeur, et le chargeur Q est équivalent à un second chargeur. Comme représenté sur la figure 3, la priorité du véhicule C est 3, et la priorité du véhicule B est 1. Donc, la priorité du véhicule C est supérieure à la priorité du véhicule B. Une période de validité n'est pas spécifiée pour la priorité du véhicule B, et une période de validité est spécifiée pour la priorité du véhicule C. Particulièrement, des heures creuses nocturnes sont spécifiées en tant que période de validité à la priorité du véhicule C. Les heures creuses nocturnes sont, par exemple, de 23h00 à 7h00 le jour suivant. Par exemple, une telle période de validité est spécifiée pour un véhicule principalement utilisé pour le trajet aller-retour quotidien de la maison au travail, comme cela est exemplifié par le véhicule C. Il suffit qu'un tel véhicule principalement utilisé pour le trajet aller-retour quotidien de la maison au travail soit chargé avant de partir au travail le jour suivant. Il est noté que lorsque la charge est achevée bien plus tôt que le commencement de l'utilisation en tant que tel, la quantité de charge peut diminuer en raison d'autodécharge électrique au fur et à mesure que le temps avance. Donc, dans ce cas, la batterie est de préférence chargée durant les heures creuses nocturnes, pendant lesquelles la facturation d'électricité est réduite, et la charge de la batterie est de préférence interdite pendant une période avant les heures creuses nocturnes. Example 3 Vehicle Priority C (with Period of Validity), Vehicle B Connected After Vehicle Connection C In the following, an operation of the power supply system according to Example 3 will be described. In the present example 3, the power supply storage unit 54 stores power supply condition information shown in FIG. 3. The vehicle C is first connected to the charger P before night off hours. Then, the vehicle B is connected to the charger Q before the off-peak hours, while the vehicle C is connected to the charger P. After that, the time elapses to be in the off-peak hours. In the present example 3, the vehicle C is equivalent to a first vehicle, the vehicle B is equivalent to a second vehicle, the charger P is equivalent to a first charger, and the charger Q is equivalent to a second charger. As shown in FIG. 3, the priority of the vehicle C is 3, and the priority of the vehicle B is 1. Therefore, the priority of the vehicle C is greater than the priority of the vehicle B. A validity period is not specified for the priority of the vehicle B, and a validity period is specified for the priority of the vehicle C. Especially, nocturnal off-peak hours are specified as a period of validity at the priority of the vehicle C. Night-time off-peak hours are, for example, from 23:00 to 07:00 the next day. For example, such a period of validity is specified for a vehicle mainly used for the daily round trip from home to work, as exemplified by the vehicle C. It is sufficient that such a vehicle mainly used for the one-way trip - Daily return from home to work be charged before leaving for work the next day. It is noted that when the charge is completed much sooner than the commencement of use as such, the amount of charge may decrease due to electrical self discharge as time progresses. Thus, in this case, the battery is preferably charged during the off-peak hours, during which the electricity bill is reduced, and the charging of the battery is preferably prohibited for a period before the off-peak hours.

Dans ce cas, il est supposé que la batterie est chargée seulement dans les heures creuses nocturnes. De plus, il est supposé qu'un certain temps existe après qu'un utilisateur revient du travail et avant les heures creuses, durant lesquelles la facturation d'électricité est réduite. Même dans ce cas, il est plus commode pour un utilisateur de connecter le véhicule au chargeur immédiatement après le retour de l'utilisateur du travail, plutôt que d'attendre le commencement des heures creuses nocturnes et de connecter un véhicule à un chargeur après le commencement des heures creuses nocturnes. La figure 11 est un organigramme qui représente une procédure pour charger chacun des véhicules B et C dans ce cas. La figure 12 est un graphique qui représente un changement d'une quantité de charge de la batterie 7 de chacun des véhicules B et C au fur et à mesure que le temps avance. Sur la figure 12, un trait 45 représente une quantité de charge de la batterie 7 du véhicule B, et un trait 46 représente une quantité de charge de la batterie 7 du véhicule C. Dans la partie qui suit, une opération dans l'exemple 3 va être décrite en faisant référence aux figures 5, 6, 11, 12. D'abord, lorsqu'un véhicule n'est connecté à aucun des chargeurs du système d'alimentation électrique, le nombre des entités de chargeur stocké dans les données de file d'attente 20 et les données de case invalide 30 est zéro. Comme décrit ci-dessus, lorsque le véhicule C se rapproche du chargeur P et s'arrête au chargeur P, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule C et l'unité de communication d'alimentation électrique 3. Ensuite, à l'étape 505 de la figure 11, à un temps T20 (figure 12), un utilisateur connecte le véhicule C au chargeur P. Le temps T20 est en dehors des heures creuses nocturnes. À l'étape 210 de la figure 6, l'unité de commande 55 détermine qu'un véhicule nouvellement connecté existe sur la base d'un signal qui provient du chargeur P. Ensuite, le traitement passe à l'étape 220. À l'étape 220 (étape 510 de la figure 11), l'unité de commande 55 obtient une identité de véhicule du véhicule nouvellement connecté, et, à l'étape 230 (étape 515 de la figure 11), l'unité de commande 55 lit des informations concernant une priorité, qui est attribuée à l'identité de véhicule obtenue du véhicule C, à partir d'informations de conditions d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54. La priorité actuellement lue est 3, et la période de validité est spécifiée comme étant les heures creuses nocturnes. Ensuite, à l'étape 240 (étape 520 de la figure 11), l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté P selon les informations lues concernant la priorité. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. L'entité de chargeur du chargeur P est constituée de données qui comprennent une identité de chargeur du chargeur P et une priorité du véhicule C actuellement connecté au chargeur P. Dans le présent exemple, la priorité de l'entité de chargeur du chargeur P est la priorité 3 du véhicule C, et la période de validité est spécifiée comme étant les heures creuses nocturnes. Donc, au temps T20, l'unité de commande 55 stocke l'entité de chargeur du chargeur P dans les données de case invalide 30. Dans l'état présent, les données de file d'attente 20 sont toujours vides. L'unité de commande 55 réalise donc à plusieurs reprises des déterminations négatives aux étapes 120 et 140 grâce à l'exécution du programme 100 de la figure 5. Par conséquent, la ligne d'alimentation en énergie électrique 9 n'est pas connectée au chargeur P, et la batterie 7 du véhicule C n'est pas chargée. Après cela, le véhicule B se rapproche du chargeur Q et s'arrête au chargeur Q avant les heures creuses nocturnes, alors que la batterie 7 du véhicule C n'est pas chargée. Ainsi, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule B et l'unité de communication d'alimentation électrique 3. Ensuite, à l'étape 525 de la figure 1l, à un temps T21 (figure 12) avant les heures creuses nocturnes, un utilisateur connecte le véhicule B au chargeur Q. Ainsi, à l'étape 210 de la figure 6, l'unité de commande 55 détermine qu'un véhicule nouvellement connecté existe sur la base du signal qui provient du chargeur Q. Ensuite, le traitement passe à l'étape 220. À l'étape 220 (étape 530 de la figure 11), l'unité de commande 55 obtient l'identité de véhicule du véhicule nouvellement connecté B. Ensuite, à l'étape 230 (étape 535 de la figure 11), l'unité de commande 55 lit des informations concernant une priorité, qui est attribuée à l'identité de véhicule obtenue du véhicule B, à partir d'informations de conditions d'alimentation électrique dans l'unité de stockage de conditions d'alimentation électrique 54. La priorité actuellement lue est 1, et une période de validité n'est pas spécifiée. Ensuite, à l'étape 240, l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté Q selon les informations lues concernant la priorité, de façon similaire à l'entité de chargeur du chargeur P. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. À savoir, l'entité de chargeur du chargeur Q est constituée de données qui comprennent une identité de chargeur du chargeur Q et une priorité du véhicule B actuellement connecté au chargeur Q. Dans le présent exemple, la priorité de l'entité de chargeur du chargeur Q est la priorité 1 du véhicule B, et une période de validité n'est pas spécifiée. Donc, l'entité de chargeur du chargeur Q est stockée dans les données de file d'attente 20. À cet instant, le nombre des entités de chargeur est zéro dans les données de file d'attente 20. Donc, à l'étape 540 de la figure 1l, l'unité de commande 55 stocke l'entité de chargeur du chargeur Q en tête dans l'ordre de la file d'attente des données de file d'attente 20. À l'étape 110 de la figure 5, l'unité de commande 55 lit l'identité de chargeur du chargeur Q en tête dans les données de file d'attente 20. Ensuite, à l'étape 120, l'unité de commande 55 détermine que l'identité de chargeur au début de la file d'attente est changée de la valeur nulle à l'identité de chargeur du chargeur Q. In this case, it is assumed that the battery is charged only in the off-peak hours. In addition, it is assumed that some time exists after a user returns from work and before off-peak hours, during which electricity billing is reduced. Even in this case, it is more convenient for a user to connect the vehicle to the loader immediately after the user's return from work, rather than wait for the start of the off-peak hours and connect a vehicle to a loader after the beginning of the nocturnal hollow hours. Fig. 11 is a flowchart showing a procedure for loading each of vehicles B and C in this case. Fig. 12 is a graph showing a change in a charge amount of battery 7 of each of vehicles B and C as time progresses. In FIG. 12, a line 45 represents a charge quantity of the battery 7 of the vehicle B, and a line 46 represents a charge quantity of the battery 7 of the vehicle C. In the following part, an operation in the example 3 will be described with reference to FIGS. 5, 6, 11, 12. First, when a vehicle is not connected to any of the chargers of the power supply system, the number of charger entities stored in the data Queue 20 and invalid case data 30 is zero. As described above, when the vehicle C approaches the charger P and stops at the charger P, a wireless connection is established between the vehicle communication unit 8 of the vehicle C and the power supply communication unit. 3. Next, at step 505 of Fig. 11, at a time T20 (Fig. 12), a user connects the vehicle C to the charger P. The time T20 is outside the off-peak hours. In step 210 of FIG. 6, the control unit 55 determines that a newly connected vehicle exists on the basis of a signal from the charger P. Thereafter, the process proceeds to step 220. In step 220 (step 510 of Fig. 11), the control unit 55 obtains a vehicle identity of the newly connected vehicle, and in step 230 (step 515 of Fig. 11) the control unit 55 reads information about a priority, which is attributed to the vehicle identity obtained from the vehicle C, from power supply condition information in the power supply storage unit 54. The priority currently being read is 3, and the validity period is specified as the night off hours. Then, in step 240 (step 520 of Fig. 11), the control unit 55 generates a charger entity of the newly connected loader P according to the information read about the priority. Thus, the controller 55 stores the generated charger entity in the queue data 20 or the invalid box data 30. The charger entity of the charger P consists of data that includes a charger identity of the charger P and a priority of the vehicle C currently connected to the charger P. In the present example, the priority of the charging entity of the charger P is the priority 3 of the vehicle C, and the period of validity is specified as the hours nocturnal hollow. Thus, at time T20, the control unit 55 stores the charger loader entity P in the invalid slot data 30. In the present state, the queue data 20 is always empty. The control unit 55 therefore repeatedly carries out negative determinations in steps 120 and 140 by executing the program 100 of FIG. 5. As a result, the electric power supply line 9 is not connected to the charger P, and the battery 7 of the vehicle C is not charged. After that, the vehicle B approaches the charger Q and stops at the charger Q before the off-peak hours, while the battery 7 of the vehicle C is not charged. Thus, a wireless connection is established between the vehicle communication unit 8 of the vehicle B and the power supply communication unit 3. Then, at the step 525 of FIG. 11, at a time T21 (FIG. 12) before the off-peak hours, a user connects the vehicle B to the charger Q. Thus, in step 210 of FIG. 6, the control unit 55 determines that a newly connected vehicle exists on the basis of the signal which from the charger Q. Thereafter, the processing proceeds to step 220. In step 220 (step 530 of Fig. 11), the control unit 55 obtains the vehicle identity of the newly connected vehicle B. Next, in step 230 (step 535 of Fig. 11), the control unit 55 reads information about a priority, which is assigned to the obtained vehicle identity of the vehicle B, from condition information of power supply in the power condition storage unit 54. The priority currently read is 1, and a validity period is not specified. Then, in step 240, the control unit 55 generates a charger entity of the newly connected loader Q according to the information read about the priority, similarly to the feeder unit of the loader P. Thus, the unit controller 55 stores the generated feeder entity in the queue data 20 or the invalid box data 30. Namely, the charger entity of the charger Q is data which includes a charger loader ID Q and a priority of the vehicle B currently connected to the charger Q. In the present example, the priority of the charger entity of the charger Q is the priority 1 of the vehicle B, and a validity period is not specified. Therefore, the loader entity of the loader Q is stored in the queue data 20. At this point, the number of the loader entities is zero in the queue data 20. Therefore, at step 540 of FIG. 11, the control unit 55 stores the loader loader entity Q at the head in the order of the queue of the queue data 20. At the step 110 of FIG. 5, the control unit 55 reads the loader ID of the top loader Q in the queue data 20. Next, in step 120, the control unit 55 determines that the loader identity at the beginning of the queue is changed from the null value to the charger ID of the Q loader.

Ensuite, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur Q, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 545 de la figure 11, la charge du véhicule B est commencée par l'intermédiaire du chargeur Q. Après cela, la charge du véhicule B est continuée. Dans la présente condition, à l'étape 550 de la figure 1l, il est supposé que le temps s'écoule pour être dans les heures creuses nocturnes au temps T22 de la figure 12. À l'étape 245 de la figure 6, l'unité de commande 55 détermine qu'il s'agit de la période de validité de l'entité de chargeur du chargeur P dans les données de case invalide 30. Ensuite, le traitement passe à l'étape 250. À l'étape 250, l'unité de commande 55 actualise un contenu dans les données de file d'attente 20 et les données de case invalide 30. Particulièrement, l'unité de commande 55 déplace l'entité de chargeur du chargeur P des données de case invalide 30 aux données de file d'attente 20. La priorité de l'entité de chargeur du chargeur P est supérieure à la priorité de l'entité de chargeur du chargeur Q. Donc, à l'étape 555 de la figure 1l, l'unité de commande 55 stocke l'entité de chargeur du chargeur P en tête dans les données de file d'attente 20. Ainsi, l'ordre de l'entité de chargeur du chargeur Q est rétrogradé à la seconde place dans l'ordre. À l'étape 120 de la figure 5, l'unité de commande 55 détermine que l'identité de chargeur au début de la file d'attente est changée de l'identité de chargeur du chargeur Q à l'identité de chargeur du chargeur P. Ensuite, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 560 de la figure 1l, l'objet chargé est changé du véhicule B au véhicule C. Ainsi, la charge du véhicule C est commencée, et la charge du véhicule B est terminée. Then, in step 130, the control unit 55 performs the switching control. In particular, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger Q, which corresponds to the charger identity obtained in the immediately preceding step 110. In this way, at step 545 of FIG. 11, the load of the vehicle B is started via the charger Q. After that, the load of the vehicle B is continued. In this condition, in step 550 of FIG. 11, it is assumed that the time elapses to be in the off-peak hours at time T22 of FIG. 12. At step 245 of FIG. control unit 55 determines that this is the period of validity of the loader P charger entity in the invalid slot data 30. Thereafter, the process proceeds to step 250. In step 250 the control unit 55 updates content in the queue data 20 and the invalid box data 30. Particularly, the control unit 55 moves the charger loader entity P of the invalid box data 30 to the queue data 20. The priority of the charger entity of the charger P is greater than the priority of the charger entity of the charger Q. Thus, in step 555 of FIG. control 55 stores the loader entity of the P loader at the head in the queue data 20. Thus, the order of the Q charger feeder entity is downgraded to second place in order. In step 120 of FIG. 5, the control unit 55 determines that the feeder identity at the beginning of the queue is changed from the charger identity of the charger Q to the charger loader identity. P. Then, in step 130, the control unit 55 performs the switching control. Particularly, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger P, which corresponds to the charger identity obtained in the immediately preceding step 110. In this way, in step 560 of Fig. 11, the loaded object is changed from vehicle B to vehicle C. Thus, the load of vehicle C is started, and the load of vehicle B is completed.

Après cela, la charge du véhicule C est poursuivie. Les heures creuses nocturnes se terminent au temps T23 de la figure 12 (étape 565 de la figure 11). Dans l'état présent, à l'étape 245 de la figure 6, l'unité de commande 55 détermine que la période de validité de l'entité de chargeur du chargeur P dans les données de file d'attente 20 se termine. Ensuite, le traitement passe à l'étape 250. À l'étape 250, l'unité de commande 55 actualise un contenu des données de file d'attente 20 et des données de case invalide 30. Particulièrement, à l'étape 570 de la figure 1l, l'unité de commande 55 déplace l'entité de chargeur du chargeur P des données de file d'attente 20 aux données de case invalide 30. Ainsi, l'ordre de l'entité de chargeur du chargeur Q est remonté jusqu'en tête dans l'ordre. Ainsi, à l'étape 120 de la figure 5, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue. Ensuite, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur Q. De cette manière, à l'étape 575 de la figure 11, l'objet chargé est à nouveau changé pour devenir le véhicule B. Ainsi, la charge du véhicule C est terminée, et la charge du véhicule B est recommencée. After that, the load of the vehicle C is continued. The nocturnal off-peak hours end at time T23 of Figure 12 (step 565 of Figure 11). In the present state, in step 245 of FIG. 6, the control unit 55 determines that the period of validity of the loader charger entity P in the queue data 20 ends. Thereafter, the processing proceeds to step 250. In step 250, the control unit 55 updates a content of the queue data 20 and invalid case data 30. Particularly, at step 570 of In FIG. 11, the control unit 55 moves the charger loader entity P from the queue data 20 to the invalid box data 30. Thus, the order of the loader entity of the charger Q is reassembled. up to the head in order. Thus, in step 120 of FIG. 5, the control unit 55 determines that there is a change in the obtained charger identity. Then, in step 130, the control unit 55 performs the switching control. In particular, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger Q. In this way, in step 575 of FIG. is again changed to become the vehicle B. Thus, the load of the vehicle C is over, and the load of the vehicle B is restarted.

Après cela, à l'étape 580 de la figure 1l, il est supposé que le véhicule B est déconnecté du chargeur Q avant que la batterie 7 du véhicule B soit complètement chargée. Dans ce cas, à l'étape 260 de la figure 6, l'unité de commande 55 détermine que la connexion entre le chargeur Q et le véhicule est libérée sur la base d'un signal envoyé à partir du chargeur Q. Le signal envoyé à partir du chargeur Q spécifie que la connexion est libérée . Ensuite, à l'étape 270 (étape 585 de la figure 11), l'unité de commande 55 efface l'entité de chargeur du chargeur Q à partir des données de file d'attente 20 (ou des données de case invalide 30). Ainsi, à l'étape 120 de la figure 5, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue. Ensuite, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée à un objet de connexion non chargé correspondant aux données nulles. Comme décrit ci-dessus, la période de validité de la priorité peut être spécifiée pour la priorité du véhicule C, qui peut être stockée dans l'unité de stockage de conditions d'alimentation électrique 54. Lorsque le véhicule C est connecté au chargeur P et à un instant en dehors de la période de validité de la priorité du véhicule C, qui est du temps T20 jusqu'au temps T22, l'unité de commande 55 empêche l'établissement de la connexion entre la ligne d'alimentation en énergie électrique 9 et le chargeur P, indépendamment de l'existence d'un véhicule connecté à un chargeur autre que le chargeur P. Même lorsque seulement un véhicule est connecté à un chargeur, il n'est pas nécessairement préféré que le véhicule soit chargé immédiatement. Par exemple, comme décrit ci-dessus, il est plus pratique qu'un utilisateur puisse connecter un véhicule, qui est principalement utilisé pour le trajet aller-retour quotidien de la maison au travail, à un chargeur immédiatement après le retour du travail de l'utilisateur. De plus, la charge peut être réalisée à bas coût lorsque le véhicule est chargé après le commencement des heures creuses nocturnes. En considération de ceci, comme décrit ci-dessus, la période de validité peut être réglée à la priorité attribuée au véhicule C. Ainsi, indépendamment du fait qu'un autre véhicule soit connecté à un chargeur autre qu'un chargeur connecté au véhicule C, ce chargeur peut être empêché d'être connecté à la ligne d'alimentation en énergie électrique à un instant en dehors de la période de validité de la priorité. Au contraire, à un instant autre que les heures creuses nocturnes, le véhicule B, dont l'utilisation régulière est très vraisemblable, est chargé de façon plus préférentielle que le véhicule C à chaque fois qu'il est connecté. Il est supposé que le premier véhicule (véhicule C) est connecté au premier chargeur (chargeur P), le second véhicule (véhicule B) est connecté au second chargeur (chargeur Q), la période de validité est spécifiée pour la priorité attribuée au premier véhicule (véhicule C), et la période de validité n'est pas spécifiée pour la priorité attribuée au second véhicule (véhicule B) dans l'unité de stockage de conditions d'alimentation électrique 54. Dans l'état présent, l'unité de commande 55 fait en sorte que le circuit de commutation 2 connecte la ligne d'alimentation en énergie électrique 9 au second chargeur (chargeur Q) à un instant en dehors de la période de validité de la priorité attribuée au premier véhicule (véhicule C). La période de validité s'étend du temps T21 jusqu'au temps T22. Après cela, le temps passe et est dans la période de validité de la priorité attribuée au premier véhicule (véhicule C). Dans l'état présent, lorsque la priorité attribuée au premier véhicule (véhicule C) est supérieure à la priorité attribuée au second véhicule (véhicule B), l'unité de commande 55 fait en sorte que le circuit de commutation 2 commute la ligne d'alimentation en énergie électrique 9 vers le premier chargeur (chargeur P). After that, in step 580 of Fig. 11, it is assumed that the vehicle B is disconnected from the charger Q before the battery 7 of the vehicle B is fully charged. In this case, in step 260 of FIG. 6, the control unit 55 determines that the connection between the charger Q and the vehicle is released on the basis of a signal sent from the charger Q. The signal sent from the Q loader specifies that the connection is released. Then, at step 270 (step 585 of FIG. 11), the control unit 55 clears the charger entity of the charger Q from the queue data 20 (or invalid slot data 30). . Thus, in step 120 of FIG. 5, the control unit 55 determines that there is a change in the obtained charger identity. Then, in step 130, the control unit 55 performs the switching control. Particularly, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to an unloaded connection object corresponding to the null data. As described above, the validity period of the priority can be specified for the priority of the vehicle C, which can be stored in the power supply storage unit 54. When the vehicle C is connected to the charger P and at a time outside the period of validity of the priority of the vehicle C, which is from time T20 to time T22, the control unit 55 prevents the establishment of the connection between the power supply line 9 and the charger P, regardless of the existence of a vehicle connected to a charger other than the charger P. Even when only one vehicle is connected to a charger, it is not necessarily preferred that the vehicle is loaded immediately . For example, as described above, it is more convenient for a user to connect a vehicle, which is mainly used for the daily round trip from home to work, to a loader immediately after returning from work. 'user. In addition, the load can be performed at low cost when the vehicle is loaded after the start of the off-peak hours. In consideration of this, as described above, the validity period can be set to the priority assigned to the vehicle C. Thus, regardless of whether another vehicle is connected to a charger other than a charger connected to the vehicle C , this charger can be prevented from being connected to the power supply line at a time outside the period of validity of the priority. On the contrary, at a time other than the off-peak hours, the vehicle B, whose regular use is very likely, is loaded more preferentially than the vehicle C each time it is connected. It is assumed that the first vehicle (vehicle C) is connected to the first charger (charger P), the second vehicle (vehicle B) is connected to the second charger (charger Q), the validity period is specified for the priority assigned to the first vehicle (vehicle C), and the period of validity is not specified for the priority assigned to the second vehicle (vehicle B) in the power supply storage unit 54. In the present state, the unit The control circuit 55 causes the switching circuit 2 to connect the power supply line 9 to the second charger (charger Q) at a time outside the period of validity of the priority assigned to the first vehicle (vehicle C). . The validity period extends from time T21 to time T22. After that, the time passes and is in the period of validity of the priority assigned to the first vehicle (vehicle C). In the present state, when the priority assigned to the first vehicle (vehicle C) is greater than the priority assigned to the second vehicle (vehicle B), the control unit 55 causes the switching circuit 2 to switch the transmission line. supply of electrical energy 9 to the first charger (charger P).

Il est noté que, comme cela n'est pas explicitement décrit dans le présent exemple, durant la période de validité de la priorité attribuée au premier véhicule (véhicule C) du temps T22 jusqu'au temps T23, lorsque la priorité attribuée au second véhicule (véhicule B) est supérieure à la priorité attribuée au premier véhicule (véhicule C), l'unité de commande 55 fait en sorte que le circuit de commutation 2 maintienne la destination de connexion de la ligne d'alimentation en énergie électrique 9 vers le second chargeur (chargeur Q). It is noted that, as is not explicitly described in this example, during the period of validity of the priority assigned to the first vehicle (vehicle C) from time T22 to time T23, when the priority assigned to the second vehicle (vehicle B) is greater than the priority assigned to the first vehicle (vehicle C), the control unit 55 causes the switching circuit 2 to maintain the connection destination of the electric power supply line 9 towards the second charger (charger Q).

Exemple 4 Priorité de Véhicule D (avec Période de validité), Véhicule A Connecté après Connexion de Véhicule B Dans la partie qui suit, une opération du système d'alimentation électrique selon l'exemple 4 va être décrite. Dans le présent exemple 4, l'unité de stockage de conditions d'alimentation électrique 54 stocke des informations de conditions d'alimentation électrique représentées sur la figure 3. Il est supposé qu'un véhicule D est connecté au chargeur P pendant une période autre qu'une période du matin au soir durant un jour férié. De plus, il est supposé que le véhicule B est connecté au chargeur Q pendant la nuit tous les jours de semaine. Comme représenté sur la figure 3, la priorité du véhicule D est 3, et la priorité du véhicule B est 1. Donc, la priorité du véhicule D est supérieure à la priorité du véhicule B. Une période de validité n'est pas spécifiée pour la priorité du véhicule B, et une période de validité est spécifiée pour la priorité du véhicule D. Particulièrement, la période de validité est spécifiée d'un temps de commencement durant la nuit immédiatement avant un jour férié, tel que 19h00, à un temps de commencement durant la nuit immédiatement avant un jour de semaine. Par exemple, une telle période de validité est spécifiée pour un véhicule principalement utilisé durant un jour férié, comme cela est exemplifié par le véhicule D. Il suffit que la charge du véhicule D, qui est principalement utilisé durant un jour férié, soit achevée durant la matinée d'un jour férié. Lorsque la charge du véhicule D est achevée bien avant la matinée d'un jour férié, la batterie 7 du véhicule D est maintenue dans un état de charge complète pendant une période prolongée avant son utilisation en tant que tel. Lorsque la batterie 7 du véhicule D est bien chargée et maintenue de façon continue dans un tel état pendant une période prolongée, la durée de vie de la batterie 7 du véhicule D peut être réduite. Donc, il n'est pas souhaitable d'achever la charge de la batterie 7 du véhicule D quelques ou plusieurs jours avant un jour férié. Plutôt, il est souhaitable d'achever la charge de la batterie 7 du véhicule D durant une période qui commence la nuit immédiatement avant un jour férié et se termine la matinée du jour férié. Il est souhaitable d'achever la charge de la batterie 7 du véhicule D durant la période qui commence la nuit immédiatement avant le jour férié et se termine la matinée du jour férié. Cependant, il n'est pas pratique qu'un utilisateur soit obligé d'attendre la nuit immédiatement avant le jour férié pour connecter le véhicule D à un chargeur. À savoir, il est plus pratique qu'utilisateur puisse connecter le véhicule D au chargeur immédiatement après le stationnement du véhicule D, même plusieurs jours avant le jour férié. La figure 13 est un graphique qui représente une charge dans une quantité de charge de la batterie 7 de chacun des véhicules B et D au fur et à mesure que le temps avance dans le cas présent. Sur la figure 13, un trait 47 représente une quantité de charge de la batterie 7 du véhicule B, et un trait 48 représente une quantité de charge de la batterie 7 du véhicule D. Les parties de trait continu de chacun des traits 47 et 48 représentent un état dans lequel le véhicule correspondant est connecté au chargeur. Les parties de trait pointillé de chacun des traits 47 et 48 représentent un état dans lequel le véhicule correspondant est déconnecté du chargeur et consomme de l'électricité de la batterie 7 alors qu'il se déplace. Dans la partie qui suit, une opération dans l'exemple 4 va être décrite en faisant référence aux figures 5, 6, 13. D'abord, le véhicule D est connecté au chargeur P pendant des jours de semaine à l'exception de la nuit d'un jour avant un jour férié. La priorité du véhicule D actuellement stockée dans l'unité de stockage de conditions d'alimentation électrique 54 est spécifiée dans une période qui va d'un temps de commencement durant la nuit immédiatement avant un jour férié, tel que 19h00, à un temps de commencement durant la nuit immédiatement avant un jour de semaine. Donc, durant cette période, l'entité de chargeur du chargeur P est dans les données de case invalide 30 et n'est pas déplacée dans les données de file d'attente 20. Ainsi, la ligne d'alimentation en énergie électrique 9 n'est pas connectée au chargeur P, et le véhicule D n'est pas chargé. D'autre part, la quantité de charge du véhicule B diminue lorsqu'il est utilisé pendant un jour de semaine à l'exception de la nuit d'un jour avant un jour férié. Au temps T51 lorsque le véhicule B est connecté au chargeur Q, l'unité de commande 55 génère l'entité de chargeur du chargeur Q aux étapes 210 à 240 de la figure 6. La priorité de l'entité de chargeur est la priorité du véhicule B. Donc, la valeur de la priorité de l'entité de chargeur est 1, et la période de validité n'est pas spécifiée. Example 4 Vehicle Priority D (with Period of Validity), Vehicle Connected After Vehicle Connection B In the following, an operation of the power supply system according to Example 4 will be described. In the present example 4, the power supply storage unit 54 stores power supply condition information shown in FIG. 3. It is assumed that a vehicle D is connected to the charger P for a period other than than a period from morning to evening on a holiday. In addition, it is assumed that the vehicle B is connected to the charger Q during the night every weekday. As shown in FIG. 3, the priority of the vehicle D is 3, and the priority of the vehicle B is 1. Therefore, the priority of the vehicle D is greater than the priority of the vehicle B. A period of validity is not specified for the priority of the vehicle B, and a validity period is specified for the priority of the vehicle D. Especially, the validity period is specified with a start time during the night immediately before a holiday, such as 19:00, at a time from beginning to night immediately before a weekday. For example, such a period of validity is specified for a vehicle primarily used on a holiday, as exemplified by vehicle D. It is sufficient if the load of vehicle D, which is mainly used during a holiday, is completed during the morning of a holiday. When the charge of the vehicle D is completed well before the morning of a holiday, the battery 7 of the vehicle D is maintained in a complete state of charge for a prolonged period before its use as such. When the battery 7 of the vehicle D is well charged and maintained continuously in such a state for an extended period, the life of the battery 7 of the vehicle D can be reduced. Therefore, it is undesirable to complete the charging of the battery 7 of the vehicle D a few days before a holiday. Rather, it is desirable to complete the charge of the battery 7 of the vehicle D during a period that begins the night immediately before a holiday and ends the morning of the holiday. It is desirable to complete the charging of the battery 7 of the vehicle D during the period which begins the night immediately before the holiday and ends the morning of the holiday. However, it is not practical for a user to have to wait for the night immediately before the holiday to connect the vehicle D to a charger. Namely, it is more convenient for the user to connect the vehicle D to the loader immediately after the parking of the vehicle D, even several days before the holiday. Fig. 13 is a graph showing a charge in a charge amount of battery 7 of each of vehicles B and D as time progresses in the present case. In FIG. 13, a line 47 represents a charge quantity of the battery 7 of the vehicle B, and a line 48 represents a charge quantity of the battery 7 of the vehicle D. The continuous line portions of each of the lines 47 and 48 represent a state in which the corresponding vehicle is connected to the charger. The dashed line portions of each of lines 47 and 48 represent a state in which the corresponding vehicle is disconnected from the charger and consumes electricity from battery 7 as it moves. In the following part, an operation in example 4 will be described with reference to FIGS. 5, 6, 13. First, the vehicle D is connected to the charger P for days of the week with the exception of the night one day before a holiday. The priority of the vehicle D currently stored in the power condition storage unit 54 is specified in a period ranging from a start time during the night immediately before a holiday, such as 19:00, to a time of beginning at night immediately before a weekday. Thus, during this period, the charger entity of the charger P is in the invalid box data 30 and is not moved in the queue data 20. Thus, the electrical power supply line 9 n is not connected to charger P, and vehicle D is not loaded. On the other hand, the load amount of vehicle B decreases when it is used on a weekday, except for the night of a day before a holiday. At time T51 when the vehicle B is connected to the charger Q, the control unit 55 generates the charger entity of the charger Q in steps 210 to 240 of FIG. 6. The priority of the charger entity is the priority of the vehicle B. Therefore, the priority value of the loader entity is 1, and the validity period is not specified.

Dans ce cas, l'entité de chargeur du chargeur Q est stockée en tête dans l'ordre des données de file d'attente 20. Par l'intermédiaire de l'opération des étapes 120 et 130 de la figure 6, l'unité de commande 55 commande le circuit de commutation 2 pour connecter la ligne d'alimentation en énergie électrique 9 au chargeur Q. Par conséquent, la charge du véhicule B est commencée. La charge est terminée au temps T52 lorsque le véhicule B est déconnecté du chargeur Q ou lorsque la batterie 7 du véhicule B est complètement chargée. Au temps T53, il est supposé s'agir de la nuit d'un jour avant un jour férié lorsque le véhicule B est connecté au chargeur Q et chargé à partir de la ligne d'alimentation en énergie électrique 9 par l'intermédiaire du chargeur Q. À l'étape 245 de la figure 6, l'unité de commande 55 détermine qu'il s'agit de la période de validité de l'entité de chargeur du chargeur P dans les données de case invalide 30. Ensuite, le traitement passe à l'étape 250. L'unité de commande 55 obtient des informations à partir de l'unité d'horloge et de calendrier 53 et détermine si le jour actuel et le jour suivant sont un jour férié ou un jour de semaine selon les informations obtenues. À l'étape 250, l'unité de commande 55 déplace l'entité de chargeur du chargeur P des données de case invalide 30 aux données de file d'attente 20. La priorité 3 de l'entité de chargeur du chargeur P est supérieure à la priorité 1 de l'entité de chargeur du chargeur Q. Donc, l'unité de commande 55 stocke l'entité de chargeur du chargeur P en tête dans les données de file d'attente 20. Ainsi, l'ordre de l'entité de chargeur du chargeur Q est rétrogradé à la seconde place dans l'ordre. À l'étape 120 de la figure 5, l'unité de commande 55 détermine que l'identité de chargeur au début de la file d'attente est changée de l'identité de chargeur du chargeur Q à l'identité de chargeur du chargeur P. Ensuite, à l'étape 130, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P. De cette manière, l'objet chargé est changé du véhicule B au véhicule D. Ainsi, la charge du véhicule D est commencée, et la charge du véhicule B est terminée. In this case, the charger entity of the charger Q is stored at the top in the order of the queue data 20. Via the operation of steps 120 and 130 of FIG. The control circuit 55 controls the switching circuit 2 to connect the power supply line 9 to the charger Q. As a result, the load of the vehicle B is started. The charge is terminated at time T52 when the vehicle B is disconnected from the charger Q or when the battery 7 of the vehicle B is fully charged. At time T53, it is assumed to be the night of a day before a holiday when the vehicle B is connected to the charger Q and charged from the power supply line 9 via the charger Q. In step 245 of FIG. 6, the control unit 55 determines that it is the period of validity of the loader entity of the loader P in the invalid case data 30. Then the processing proceeds to step 250. The control unit 55 obtains information from the clock and calendar unit 53 and determines whether the current day and the following day are a holiday or a weekday according to the information obtained. In step 250, the control unit 55 moves the charger loader entity P from the invalid slot data 30 to the queue data 20. The priority 3 of the charger entity of the charger P is greater than at priority 1 of the charger entity of the charger Q. Thus, the control unit 55 stores the loader entity of the loader P first in the queue data 20. Thus, the order of the Q charger feeder entity is downgraded to second place in order. In step 120 of FIG. 5, the control unit 55 determines that the feeder identity at the beginning of the queue is changed from the charger identity of the charger Q to the charger loader identity. P. Then, in step 130, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger P. In this way, the charged object is changed from the vehicle B to the vehicle D. Thus, the load of the vehicle D is started, and the load of the vehicle B is completed.

Après cela, la charge du véhicule D est continuée. Au temps T54, lorsque le véhicule D est déconnecté du chargeur P durant la matinée du jour férié, à l'étape 260 de la figure 6, l'unité de commande 55 détermine que le chargeur P est déconnecté du véhicule sur la base d'un signal envoyé à partir du chargeur P. Le présent signal envoyé à partir du chargeur P spécifie que la connexion est libérée . Ensuite, à l'étape 270, l'unité de commande 55 efface l'entité de chargeur du chargeur P à partir des données de file d'attente 20. Ainsi, l'ordre de l'entité de chargeur du chargeur Q est remonté jusqu'en tête dans l'ordre des données de file d'attente 20. À l'étape 120 de la figure 5, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue, et, à l'étape 130, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur Q. De cette manière, l'objet chargé est changé pour devenir le véhicule B. Ainsi, la charge du véhicule B est recommencée. After that, the load of the vehicle D is continued. At time T54, when the vehicle D is disconnected from the loader P during the morning of the holiday, in step 260 of FIG. 6, the control unit 55 determines that the loader P is disconnected from the vehicle on the basis of a signal sent from the charger P. The present signal sent from the charger P specifies that the connection is released. Then, in step 270, the control unit 55 clears the charger unit of the charger P from the queue data 20. Thus, the order of the charger entity of the charger Q is reassembled to the head in the order of the queue data 20. In step 120 of FIG. 5, the control unit 55 determines that there is a change in the obtained charger identity, and in step 130, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger Q. In this way, the charged object is changed to become the vehicle B. Thus, the load of vehicle B is restarted.

Après cela, il est supposé que, au temps T55, le véhicule D retourne au parc de stationnement durant la soirée du jour férié, et le véhicule D est connecté au chargeur P. Dans ce cas, à l'étape 210 de la figure 6, l'unité de commande 55 détermine que le véhicule D est nouvellement connecté au chargeur P. Ensuite, à l'étape 220, l'unité de commande 55 obtient l'identité de véhicule du véhicule nouvellement connecté D. Ensuite, à l'étape 230, l'unité de commande 55 lit la priorité du véhicule D à partir de l'unité de stockage de conditions d'alimentation électrique 54, et, à l'étape 240, l'unité de commande 55 génère l'entité de chargeur de chargeur P. La période de validité est spécifiée pour l'entité de chargeur actuellement générée. De plus, il s'agit actuellement dans la période de validité. After that, it is assumed that, at time T55, the vehicle D returns to the parking lot during the evening of the holiday, and the vehicle D is connected to the charger P. In this case, in step 210 of FIG. , the control unit 55 determines that the vehicle D is newly connected to the charger P. Then, in step 220, the control unit 55 obtains the vehicle identity of the newly connected vehicle D. Next, at the step 230, the control unit 55 reads the priority of the vehicle D from the power supply storage unit 54, and in step 240 the control unit 55 generates the loader loader P. The validity period is specified for the currently generated loader entity. In addition, it is currently in the validity period.

Donc, l'entité de chargeur actuellement générée est stockée dans les données de file d'attente 20. En outre, la priorité de l'entité de chargeur actuellement générée du chargeur P est supérieure à la priorité de l'entité de chargeur du chargeur Q. Donc, l'entité de chargeur du chargeur P est stockée en tête des données de file d'attente 20. Ainsi, l'entité de chargeur du chargeur Q est rétrogradée à la seconde place dans l'ordre. Ainsi, à l'étape 120 de la figure 5, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue. Ensuite, à l'étape 130, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P. De cette manière, l'objet chargé est changé pour devenir le véhicule D. Ainsi, la charge du véhicule D est commencée, et la charge du véhicule B est terminée. Après cela, au temps T56 durant la matinée du second jour férié, il est supposé que les deux véhicules B et D sont déconnectés des chargeurs correspondants. Dans ce cas, à l'étape 260 de la figure 6, l'unité de commande 55 détermine que des connexions entre les chargeurs P, Q et les véhicules sont libérées sur la base de signaux envoyés à partir des chargeurs P, Q. Les signaux envoyés à partir des chargeurs P, Q spécifient que les connexions sont libérées . Ensuite, à l'étape 270, l'unité de commande 55 efface les entités de chargeur des chargeurs P, Q des données de file d'attente 20. Par conséquent, les données de file d'attente 20 sont vides. Ainsi, à l'étape 120 de la figure 5, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue. Ensuite, à l'étape 130, la ligne d'alimentation en énergie électrique 9 est connectée à l'objet de connexion non chargé correspondant aux données nulles. Ainsi, la charge des véhicules B et D est terminée. Après cela, au temps T57 durant le second jour férié, il est supposé que le véhicule B retourne d'abord au parc de stationnement, et le véhicule B est connecté au chargeur Q. Dans ce cas, aux étapes 210 à 240 de la figure 6, l'unité de commande 55 génère l'entité de chargeur du chargeur Q. La priorité de l'entité de chargeur est la priorité du véhicule B, et la période de validité n'est pas spécifiée. Dans ce cas, les données de file d'attente 20 à cet instant sont vides. Donc, l'entité de chargeur du chargeur Q est stockée en tête dans l'ordre des données de file d'attente 20. Par l'intermédiaire de l'opération des étapes 120 et 130 de la figure 6, l'unité de commande 55 commande le circuit de commutation 2 pour connecter la ligne d'alimentation en énergie électrique 9 au chargeur Q. Par conséquent, la charge du véhicule B est commencée. Après cela, au temps T58 de la nuit durant le second jour férié, il est supposé que le véhicule D retourne au parc de stationnement, et le véhicule D est connecté au chargeur P. Dans ce cas, aux étapes 210 à 240 de la figure 6, l'unité de commande 55 génère l'entité de chargeur du chargeur P. La priorité de l'entité de chargeur est la priorité du véhicule D, et la période de validité est spécifiée. Dans le présent exemple, le second jour férié est le jour avant un jour de semaine. Donc, le temps T58 durant la nuit du second jour férié est en dehors de la période de validité. Ainsi, l'entité de chargeur du chargeur P est stockée dans les données de case invalide 30, et la charge de véhicule B est continuée. Comme décrit ci-dessus, la période de validité de la priorité peut être spécifiée pour la priorité du véhicule D, qui peut être stockée dans l'unité de stockage de conditions d'alimentation électrique 54. Lorsque le véhicule D est connecté au chargeur P et à un instant en dehors de la période de validité de la priorité du véhicule D, qui est du temps T51 jusqu'au temps T53, l'unité de commande 55 empêche l'établissement de la connexion de la ligne d'alimentation en énergie électrique 9 d'être réglée au chargeur P, indépendamment de l'existence d'un véhicule connecté à un chargeur autre que le chargeur P. Même lorsque seulement un véhicule est connecté à un chargeur, il n'est pas nécessairement préféré que le véhicule soit chargé immédiatement. Par exemple, comme décrit ci-dessus, il est pratique qu'un utilisateur puisse connecter un véhicule, qui est principalement utilisé durant un jour férié, à un chargeur immédiatement après que le véhicule soit mis en stationnement. De plus, la charge peut être réalisée à bas coût lorsque le véhicule est chargé durant le jour avant un jour férié. En considération de ceci, comme décrit ci-dessus, la période de validité peut être fixée à la priorité attribuée au véhicule D. Ainsi, indépendamment du fait qu'un autre véhicule soit connecté à un chargeur autre qu'un chargeur connecté au véhicule D, ce chargeur peut être empêché d'être placé à la destination de connexion de la ligne d'alimentation en énergie électrique à un instant en dehors de la période de validité de la priorité. L'attribution d'un véhicule à un chargeur n'affecte pas l'opération décrite ci- dessus. A savoir, l'ordre d'un véhicule destiné être chargé est déterminé par la priorité attribuée à un véhicule. L'ordre des véhicules destinés à être chargés n'est pas déterminé par le chargeur qui est connecté à chaque véhicule. En outre, dans les exemples, l'unité de commande 55 fait en sorte que l'unité d'affichage 52 indique l'identité de véhicule du véhicule et des informations concernant la quantité de charge de la batterie 7 du véhicule lors de la réception d'informations concernant l'identité de véhicule et la quantité de charge à partir de l'unité de communication de véhicule 8 de chaque véhicule, qui est connecté à un chargeur, par l'intermédiaire de l'unité de communication d'alimentation électrique 3. Therefore, the currently generated loader entity is stored in the queue data 20. In addition, the priority of the loader entity currently generated from the loader P is greater than the priority of the loader loader entity. Q. So the loader loader entity P is stored at the top of the queue data 20. Thus, the loader entity of the loader Q is demoted to the second place in the order. Thus, in step 120 of FIG. 5, the control unit 55 determines that there is a change in the obtained charger identity. Then, in step 130, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger P. In this way, the charged object is changed to become the vehicle D. Thus, the load of the vehicle D is started, and the load of the vehicle B is completed. After that, at time T56 on the morning of the second holiday, it is assumed that both vehicles B and D are disconnected from the corresponding chargers. In this case, in step 260 of FIG. 6, the control unit 55 determines that connections between the chargers P, Q and the vehicles are released on the basis of signals sent from the chargers P, Q. signals sent from P, Q loaders specify that connections are released. Then, in step 270, the control unit 55 clears the loader entities of the P, Q loaders from the queue data 20. Therefore, the queue data 20 is empty. Thus, in step 120 of FIG. 5, the control unit 55 determines that there is a change in the obtained charger identity. Then, in step 130, the power supply line 9 is connected to the unloaded connection object corresponding to the null data. Thus, the load of vehicles B and D is completed. After that, at the time T57 during the second holiday, it is assumed that the vehicle B returns first to the parking lot, and the vehicle B is connected to the charger Q. In this case, in steps 210 to 240 of the figure 6, the control unit 55 generates the charger entity of the charger Q. The priority of the charger entity is the priority of the vehicle B, and the validity period is not specified. In this case, the queue data 20 at this time is empty. Therefore, the charger entity of the charger Q is stored at the top in the order of the queue data 20. Via the operation of steps 120 and 130 of FIG. 55 controls the switching circuit 2 to connect the electric power supply line 9 to the charger Q. As a result, the load of the vehicle B is started. After that, at time T58 of the night during the second holiday, it is assumed that the vehicle D returns to the parking lot, and the vehicle D is connected to the loader P. In this case, at steps 210 to 240 of the figure 6, the control unit 55 generates the charger entity of the charger P. The priority of the charger entity is the priority of the vehicle D, and the validity period is specified. In this example, the second holiday is the day before a weekday. Therefore, the time T58 during the night of the second holiday is outside the validity period. Thus, the charger entity of the charger P is stored in the invalid slot data 30, and the vehicle load B is continued. As described above, the validity period of the priority can be specified for the priority of the vehicle D, which can be stored in the power supply storage unit 54. When the vehicle D is connected to the charger P and at a time outside the period of validity of the priority of the vehicle D, which is from the time T51 to the time T53, the control unit 55 prevents the establishment of the connection of the power supply line 9 to be charged to the charger P, regardless of the existence of a vehicle connected to a charger other than the charger P. Even when only one vehicle is connected to a charger, it is not necessarily preferred that the vehicle be loaded immediately. For example, as described above, it is convenient for a user to connect a vehicle, which is primarily used on a holiday, to a charger immediately after the vehicle is parked. In addition, the load can be performed at low cost when the vehicle is loaded during the day before a holiday. In consideration of this, as described above, the validity period can be set to the priority assigned to the vehicle D. Thus, regardless of whether another vehicle is connected to a charger other than a charger connected to the vehicle D , this charger can be prevented from being placed at the connection destination of the electric power supply line at a time outside the period of validity of the priority. Assigning a vehicle to a loader does not affect the operation described above. Namely, the order of a vehicle to be loaded is determined by the priority assigned to a vehicle. The order of vehicles to be loaded is not determined by the charger that is connected to each vehicle. Further, in the examples, the control unit 55 causes the display unit 52 to indicate the vehicle's vehicle identity and information about the amount of charge of the vehicle battery 7 upon reception. information concerning the vehicle identity and the amount of charge from the vehicle communication unit 8 of each vehicle, which is connected to a charger, via the power supply communication unit 3.

Ainsi, un utilisateur peut obtenir la quantité de charge de la batterie 7 même lorsqu'il se trouve dans la maison 4. Dans ce cas, en plus de la quantité de charge ou au lieu de la quantité de charge, l'unité de commande 55 peut faire en sorte que l'unité d'affichage 52 indique une distance de déplacement prévue correspondant à la quantité de charge. La distance de déplacement prévue, correspondant à une certaine quantité de charge, est une valeur prévue d'une distance totale, selon laquelle le véhicule avec la certaine quantité de charge de la batterie 2 peut se déplacer avant que la quantité de charge de la batterie 7 devienne nulle, sans charge supplémentaire de la batterie 7. La distance de déplacement prévue est, par exemple, une valeur obtenue en divisant la quantité de charge par un taux de consommation d'électricité. Le taux de consommation d'électricité est une énergie électrique de la batterie 2 que le véhicule consomme lorsqu'il se déplace sur une distance de déplacement unitaire. Le taux de consommation d'électricité peut être une valeur fixe ou peut être entré par un utilisateur utilisant l'unité d'opération 51 dans chaque véhicule. Thus, a user can get the amount of charge of the battery 7 even when it is in the house 4. In this case, in addition to the amount of charge or instead of the amount of charge, the control unit 55 may cause the display unit 52 to indicate a predicted travel distance corresponding to the amount of load. The expected travel distance, corresponding to a certain amount of charge, is a predicted value of a total distance, according to which the vehicle with the certain amount of charge of the battery 2 can move before the charge amount of the battery 7 becomes zero, without additional charge of the battery 7. The intended distance of travel is, for example, a value obtained by dividing the amount of charge by a consumption rate of electricity. The rate of electricity consumption is an electrical energy of the battery 2 that the vehicle consumes as it travels a unit traveling distance. The power consumption rate may be a fixed value or may be entered by a user using the operation unit 51 in each vehicle.

Deuxième mode de réalisation Maintenant, le deuxième mode de réalisation va être décrit. En particulier, la différence entre le deuxième mode de réalisation et le premier mode de réalisation va être décrite en détail. Particulièrement, dans le présent deuxième mode de réalisation, une priorité n'est pas attribuée à chaque véhicule mais est attribuée à chaque chargeur. Ainsi, la priorité de charge est déterminée selon les priorités des chargeurs. La structure du système d'alimentation électrique du présent mode de réalisation est sensiblement équivalente à celle du premier mode de réalisation. Second Embodiment Now, the second embodiment will be described. In particular, the difference between the second embodiment and the first embodiment will be described in detail. Particularly, in the present second embodiment, a priority is not assigned to each vehicle but is assigned to each loader. Thus, the load priority is determined according to the priorities of the loaders. The structure of the power supply system of the present embodiment is substantially equivalent to that of the first embodiment.

Contrairement au premier mode de réalisation, la priorité des informations de conditions d'alimentation électrique stockées dans l'unité de stockage de conditions d'alimentation électrique 54 du dispositif de commande d'alimentation électrique 5 n'est pas associée à chaque identité de véhicule mais est associée à l'identité de chargeur de chaque chargeur. Une période de validité peut être spécifiée arbitrairement pour une priorité, de façon similaire au premier mode de réalisation. La figure 14 représente un exemple d'informations de conditions d'alimentation électrique stockées dans l'unité de stockage de conditions d'alimentation électrique 54 selon le présent deuxième mode de réalisation. Dans le présent exemple des informations de conditions d'alimentation électrique, des informations concernant une priorité sont attribuées à chacun parmi quatre chargeurs P, Q, R, S des multiples chargeurs 1 du système d'alimentation électrique. Particulièrement, des priorités de 2, 1, 3, 3 sont respectivement attribuées aux identités de chargeur des chargeurs P, Q, R, S. Une période de validité n'est pas spécifiée pour la priorité de chacun des chargeurs P et Q. Dans le présent exemple, la priorité de chacun des chargeurs P et Q est régulièrement valide. Au contraire, une période de validité est spécifiée pour la priorité de chacun des chargeurs R et S. Dans le présent exemple, la priorité de chacun des chargeurs R et S est valide seulement dans la période de validité spécifiée. L'unité de commande 55 est configurée pour exécuter le programme 100 représenté sur la figure 5, de façon similaire au premier mode de réalisation. En outre, l'unité de commande 55 est configurée pour exécuter un programme 600 représenté sur la figure 15, au lieu du programme 200 représenté sur la figure 6. L'unité de commande 55 est configurée pour exécuter à plusieurs reprises les programmes 100 et 600 en parallèle. Les éléments spécifiés par les mêmes numéros de référence sur les figures 6, 15 possèdent des fonctions équivalentes. Dans la partie qui suit, une opération de l'unité de commande 55 selon le présent mode de réalisation, réalisée en exécutant le programme 100 et le programme 600 va être décrite en détail comme exemple. De façon similaire au premier mode de réalisation, lorsque le système d'alimentation électrique est démarré, la ligne d'alimentation en énergie électrique 9 est connectée à un objet de connexion non chargé. In contrast to the first embodiment, the priority of the power supply condition information stored in the power supply storage unit 54 of the power control device 5 is not associated with each vehicle identity. but is associated with the charger identity of each charger. A validity period may be arbitrarily specified for a priority, similarly to the first embodiment. Fig. 14 shows an example of power supply condition information stored in the power supply storage unit 54 according to the present second embodiment. In the present example of the power supply condition information, priority information is assigned to each of four P, Q, R, S chargers of multiple chargers 1 of the power supply system. Specifically, priorities of 2, 1, 3, 3 are respectively assigned to the charger IDs of the chargers P, Q, R, S. A validity period is not specified for the priority of each of the chargers P and Q. In In the present example, the priority of each of the chargers P and Q is regularly valid. Instead, a validity period is specified for the priority of each of the R and S loaders. In this example, the priority of each of the R and S loaders is valid only within the specified validity period. The control unit 55 is configured to execute the program 100 shown in Fig. 5, similarly to the first embodiment. Further, the control unit 55 is configured to execute a program 600 shown in Fig. 15, instead of the program 200 shown in Fig. 6. The control unit 55 is configured to repeatedly execute the programs 100 and 600 in parallel. The elements specified by the same reference numbers in FIGS. 6, 15 have equivalent functions. In the following part, an operation of the control unit 55 according to the present embodiment, performed by executing the program 100 and the program 600 will be described in detail as an example. Similarly to the first embodiment, when the power supply system is started, the power supply line 9 is connected to an unloaded connection object.

Exemple 5 Priorité de Chargeur P, Chargeur P Connecté après Connexion de Chargeur Q Dans le présent exemple 5, des informations de conditions d'alimentation électrique représentées sur la figure 14 sont stockées dans l'unité de stockage de conditions d'alimentation électrique 54. Un véhicule rechargeable B 10 est d'abord connecté au chargeur Q. Après cela, le véhicule A est connecté au chargeur P, alors que le véhicule B est connecté au chargeur Q. Donc, dans le présent exemple, le chargeur Q est équivalent à un premier chargeur, et le chargeur P est équivalent à un second chargeur. Example 5 Charger Priority P, Loader P Connected After Charger Connection Q In the present example 5, power supply condition information shown in Fig. 14 is stored in the power supply storage unit 54. A rechargeable vehicle B 10 is first connected to the charger Q. After that, the vehicle A is connected to the charger P, while the vehicle B is connected to the charger Q. So, in this example, the charger Q is equivalent to a first charger, and the charger P is equivalent to a second charger.

La figure 16 est un organigramme qui représente une procédure pour charger chacun des véhicules A et B dans ce cas. La figure 17 est un graphique qui représente un changement d'une quantité de charge de la batterie 7 de chacun des véhicules A et B au fur et à mesure que le temps avance. Sur la figure 17, un trait 61 représente une quantité de charge de la batterie 7 du véhicule A, et un trait 62 représente une quantité de charge de la batterie 7 du véhicule B. Dans la partie qui suit, une opération de l'exemple 5 va être décrite en faisant référence aux figures 5, 15, 16, 17. D'abord, lorsqu'un véhicule n'est connecté à aucun des chargeurs du système d'alimentation électrique, le nombre des entités de chargeur stocké dans les données de file d'attente 20 et les données de case invalide 30 est zéro. Comme décrit ci-dessus, lorsque le véhicule B se rapproche du chargeur Q et s'arrête au chargeur Q, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule B et l'unité de communication d'alimentation électrique 3. Fig. 16 is a flowchart showing a procedure for loading each of vehicles A and B in this case. Fig. 17 is a graph showing a change in a charge amount of battery 7 of each of vehicles A and B as time progresses. In FIG. 17, a line 61 represents a charge quantity of the battery 7 of the vehicle A, and a line 62 represents a charge quantity of the battery 7 of the vehicle B. In the following part, an operation of the example 5 will be described with reference to FIGS. 5, 15, 16, 17. First, when a vehicle is not connected to any of the chargers of the power supply system, the number of charger entities stored in the data Queue 20 and invalid case data 30 is zero. As described above, when the vehicle B approaches the charger Q and stops at the charger Q, a wireless connection is established between the vehicle communication unit 8 of the vehicle B and the power supply communication unit. Electric 3.

Ensuite, à l'étape 705 de la figure 16, à un temps T70 (figure 17), un utilisateur connecte le véhicule B au chargeur Q. Ainsi, le chargeur Q détecte qu'une prise d'une ligne électrique est insérée dans une ouverture de prise du dispositif automobile et notifie le dispositif de commande d'alimentation électrique 5 de la détection de l'insertion de la prise de la ligne électrique. En réponse à la notification, à l'étape 210 de la figure 15, l'unité de commande 55 détermine qu'un véhicule nouvellement connecté au chargeur Q existe. Ensuite, le traitement passe à l'étape 620. À l'étape 620, l'unité de commande 55 obtient une identité de chargeur du chargeur Q, qui est nouvellement connecté au véhicule, à partir de l'unité de stockage de conditions d'alimentation électrique 54. Then, at step 705 of FIG. 16, at a time T70 (FIG. 17), a user connects the vehicle B to the charger Q. Thus, the charger Q detects that a plug of a power line is inserted into a opening socket of the automotive device and notifies the power supply control device 5 of the detection of the insertion of the plug of the power line. In response to the notification, in step 210 of FIG. 15, the control unit 55 determines that a newly connected vehicle to the charger Q exists. Thereafter, the processing proceeds to step 620. In step 620, the control unit 55 obtains a charger identity of the charger Q, which is newly connected to the vehicle, from the storage condition unit of the power supply 54.

Ensuite, à l'étape 630 (étape 715 de la figure 16), l'unité de commande 55 lit des informations concernant une priorité, qui est attribuée à l'identité de chargeur obtenue, à partir d'informations de conditions d'alimentation électriques concernant l'unité de stockage de conditions d'alimentation électrique 54. La priorité actuellement lue est 1, et une période de validité n'est pas spécifiée. Next, in step 630 (step 715 of Fig. 16), the control unit 55 reads information about a priority, which is assigned to the obtained charger identity, from power condition information. The priority currently read is 1, and a period of validity is not specified.

Ensuite, à l'étape 240, l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté Q selon les informations lues concernant la priorité. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. À savoir, l'entité de chargeur du chargeur Q est constituée de données qui comprennent une identité de chargeur du chargeur Q et une priorité du chargeur Q. Particulièrement, dans l'entité de chargeur générée du chargeur Q, la priorité est 1, et une période de validité n'est pas spécifiée. Donc, l'entité de chargeur du chargeur Q est stockée dans les données de file d'attente 20. À cet instant, le nombre des entités de chargeur est zéro dans les données de file d'attente 20. Donc, à l'étape 720 de la figure 16, l'unité de commande 55 stocke l'entité de chargeur du chargeur Q en tête dans l'ordre de la file d'attente des données de file d'attente 20. À l'étape 110 de la figure 5, l'unité de commande 55 lit l'identité de chargeur du chargeur Q en tête dans les données de file d'attente 20. Ensuite, à l'étape 120, l'unité de commande 55 détermine que l'identité de chargeur au début de la file d'attente est changée de la valeur nulle à l'identité de chargeur du chargeur Q, et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur Q, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 725 de la figure 16, l'objet chargé est changé pour devenir le véhicule B. Ainsi, la charge du véhicule B par l'intermédiaire du chargeur Q est commencée. Then, in step 240, the control unit 55 generates a charger entity of the newly connected loader Q according to the information read about the priority. Thus, the control unit 55 stores the generated charger entity in the queue data 20 or the invalid box data 30. Namely, the charger entity of the charger Q is comprised of data which includes a Charger Loader Identity Q and Loader Priority Q. Specifically, in the loader entity generated from Loader Q, the priority is 1, and a validity period is not specified. Therefore, the loader entity of the loader Q is stored in the queue data 20. At this point, the number of the loader entities is zero in the queue data 20. Therefore, at step 720 of Fig. 16, the control unit 55 stores the loader loader entity Q at the head in the order of the queue queue data 20. At step 110 of the figure 5, the control unit 55 reads the loader ID of the top loader Q in the queue data 20. Next, in step 120, the control unit 55 determines that the loader identity at the beginning of the queue is changed from zero to the charger ID of the charger Q, and in step 130 the control unit 55 performs the switch command. In particular, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger Q, which corresponds to the charger identity obtained in the immediately preceding step 110. in this way, in step 725 of Fig. 16, the loaded object is changed to vehicle B. Thus, charging of vehicle B via charger Q is started.

Après cela, aucun véhicule sauf le véhicule B n'est connecté au chargeur du temps T70 jusqu'au temps T71 sur la figure 17, et donc il n'y a aucun changement de la file d'attente. Ainsi, comme représenté par le trait 62 sur la figure 17, la charge du véhicule B continue d'augmenter la quantité de charge de la batterie 7 du véhicule B. Il est supposé ici que le véhicule A se rapproche du chargeur P et s'arrête au chargeur P. Comme décrit ci-dessus, lorsque le véhicule A se rapproche du chargeur P et s'arrête au chargeur P, une connexion sans fil est établie entre l'unité de communication de véhicule 8 du véhicule A et l'unité de communication d'alimentation électrique 3. Ensuite, à l'étape 730 de la figure 16, à un temps T71 (figure 17), un utilisateur connecte le véhicule A au chargeur P. À l'étape 210 de la figure 15, l'unité de commande 55 détermine qu'un véhicule, qui est nouvellement connecté au chargeur P, existe sur la base d'un signal qui provient du chargeur P. Ensuite, le traitement passe à l'étape 620. À l'étape 620, l'unité de commande 55 obtient l'identité de chargeur du chargeur P. Ensuite, à l'étape 630 (étape 740 de la figure 16), l'unité de commande 55 lit des informations concernant une priorité, qui est attribuée à l'identité de chargeur obtenue du chargeur P, à partir d'informations de conditions d'alimentation électrique concernant l'unité de stockage de conditions d'alimentation électrique 54. La priorité actuellement lue est 2, et une période de validité n'est pas spécifiée. Ensuite, à l'étape 240, l'unité de commande 55 génère une entité de chargeur du chargeur nouvellement connecté P selon les informations lues concernant la priorité. Ainsi, l'unité de commande 55 stocke l'entité de chargeur générée dans les données de file d'attente 20 ou les données de case invalide 30. À savoir, l'entité de chargeur du chargeur P est constituée de données qui comprennent l'identité de chargeur du chargeur P et la priorité du chargeur P. Dans le présent exemple, la priorité de l'entité de chargeur du chargeur P est 2, et une période de validité n'est pas spécifiée. Donc, l'entité de chargeur du chargeur P est stockée dans les données de file d'attente 20. En outre, à cet instant, les données de file d'attente 20 comprennent l'entité de chargeur du chargeur Q avec la priorité 1. Donc, à l'étape 745 de la figure 16, l'unité de commande 55 stocke l'entité de chargeur du chargeur P en tête dans les données de file d'attente 20. Ainsi, l'ordre de l'entité de chargeur du chargeur Q est rétrogradé à la seconde place dans l'ordre. À l'étape 110 de la figure 5, l'unité de commande 55 lit l'identité de chargeur du chargeur P en tête dans les données de file d'attente 20. Ensuite, à l'étape 120, l'unité de commande 55 détermine que l'identité de chargeur au début de la file d'attente est changée de l'identité de chargeur du chargeur Q à l'identité de chargeur du chargeur P, et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 747 de la figure 16, l'objet chargé est changé du véhicule B au véhicule A. Ainsi, la charge du véhicule A par l'intermédiaire du chargeur P est commencée. After that, no vehicle except the vehicle B is connected to the T70 time charger until the time T71 in FIG. 17, and thus there is no change in the queue. Thus, as represented by the line 62 in FIG. 17, the load of the vehicle B continues to increase the quantity of charge of the battery 7 of the vehicle B. It is assumed here that the vehicle A approaches the charger P and stopping at the charger P. As described above, when the vehicle A approaches the charger P and stops at the charger P, a wireless connection is established between the vehicle communication unit 8 of the vehicle A and the unit 3. Then, in step 730 of FIG. 16, at a time T71 (FIG. 17), a user connects the vehicle A to the charger P. In step 210 of FIG. control unit 55 determines that a vehicle, which is newly connected to the charger P, exists on the basis of a signal from the charger P. Thereafter, the process proceeds to step 620. In step 620, the control unit 55 obtains the charging identity of the charger P. Then, in step 630 (step 74 0 of Fig. 16), the control unit 55 reads information about a priority, which is attributed to the charger identity obtained from the charger P, from power supply condition information relating to the storage unit. storage of power supply conditions 54. The priority currently read is 2, and a validity period is not specified. Then, in step 240, the control unit 55 generates a charger entity of the newly connected loader P according to the information read about the priority. Thus, the controller 55 stores the generated charger entity in the queue data 20 or the invalid box data 30. Namely, the charger entity of the charger P consists of data that includes the Charger Charger ID P and Charger Priority P. In this example, the priority of Charger Loader entity P is 2, and a validity period is not specified. Therefore, the charger entity of the charger P is stored in the queue data 20. In addition, at this time, the queue data 20 includes the charger entity of the charger Q with priority 1 Thus, in step 745 of Fig. 16, the control unit 55 stores the loader loader entity P overhead in the queue data 20. Thus, the order of the payload entity charger charger Q is demoted to second place in order. In step 110 of FIG. 5, the control unit 55 reads the charger ID of the P charger at the beginning in the queue data 20. Then, in step 120, the control unit 55 determines that the feeder identity at the beginning of the queue is changed from the charger identity of the charger Q to the charger identity of the charger P, and in step 130 the control unit 55 performs the switching command. Particularly, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger P, which corresponds to the charger identity obtained in the immediately preceding step 110. In this way, in step 747 of FIG. 16, the loaded object is changed from the vehicle B to the vehicle A. Thus, the load of the vehicle A via the magazine P is started.

Après cela, la charge du véhicule A continue. Au temps T72 sur la figure 17, la quantité de charge de la batterie 7 du véhicule A augmente jusqu'à Amax, et la batterie 7 est complètement chargée. Ainsi, à l'étape 140 de la figure 5 (étape 750 de la figure 16), l'unité de commande 55 détermine que la batterie 7 est complètement chargée. Ensuite, à l'étape 150 (étape 755 de la figure 16), l'unité de commande 55 efface l'entité de chargeur en tête dans les données de file d'attente 20 à partir des données de file d'attente 20. De cette manière, l'entité de chargeur du chargeur P est effacée. Par conséquent, l'entité de chargeur du chargeur Q devient une entité de chargeur en tête dans l'ordre des données de file d'attente 20. À l'étape suivante 110, l'unité de commande 55 obtient l'identité de chargeur du chargeur Q en tant qu'identité de chargeur de l'entité de chargeur en tête dans les données de file d'attente 20. Ensuite, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue à l'étape 120, et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur Q, qui correspond à l'identité de chargeur obtenue à l'étape immédiatement précédente 110. De cette manière, à l'étape 760 de la figure 16, l'objet chargé est à nouveau changé pour devenir le véhicule B. Ainsi, la charge du véhicule B est commencée. After that, the load of vehicle A continues. At time T72 in Fig. 17, the charge amount of battery 7 of vehicle A increases to Amax, and battery 7 is fully charged. Thus, in step 140 of FIG. 5 (step 750 of FIG. 16), the control unit 55 determines that the battery 7 is fully charged. Then, in step 150 (step 755 of Fig. 16), the control unit 55 clears the overhead feeder entity in the queue data from the queue data 20. In this way, the charger entity of the charger P is erased. Therefore, the charger entity of the charger Q becomes a charger entity at the head in the order of the queue data 20. In the next step 110, the control unit 55 obtains the identity of the charger of the charger Q as charger ID of the overhead charger entity in the queue data 20. Next, the control unit 55 determines that there is a change of the charger identity obtained in step 120, and in step 130, the control unit 55 performs the switching control. In particular, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to the charger Q, which corresponds to the charger identity obtained in the immediately preceding step 110. in this way, in step 760 of Fig. 16, the loaded object is again changed to become the vehicle B. Thus, the load of the vehicle B is started.

Les données de file d'attente 20 ne changent pas à moins qu'un autre véhicule soit connecté au chargeur 1. Comme représenté par le trait 62 de la figure 17, la charge du véhicule B continue, et la quantité de charge de la batterie 7 augmente. Enfin, à l'étape 765, au temps T73, la quantité de charge de la batterie 7 du véhicule B augmente jusqu'à Bmax, et la batterie 7 est complètement chargée. Ainsi, à l'étape 140, l'unité de commande 55 détermine que la batterie 7 du véhicule B est complètement chargée. Ainsi, à l'étape 150, l'unité de commande 55 efface l'entité de chargeur du chargeur Q en tête dans les données de file d'attente 20. À l'étape suivante 110, l'unité de commande 55 obtient des données nulles en tant qu'identité de chargeur de l'entité de chargeur en tête dans les données de file d'attente 20. Ensuite, l'unité de commande 55 détermine qu'il y a un changement de l'identité de chargeur obtenue à l'étape 120, et, à l'étape 130, l'unité de commande 55 réalise la commande de commutation. Particulièrement, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée à un objet de connexion non chargé correspondant aux données nulles. Dans le présent exemple, la priorité du second chargeur (chargeur P) a été définie auparavant pour être supérieure à la priorité du premier chargeur (chargeur Q) dans l'unité de stockage de conditions d'alimentation électrique 54. De plus, il est supposé que la ligne d'alimentation en énergie électrique 9 est connectée au premier chargeur (chargeur Q), auquel le véhicule B est connecté, et le second chargeur (chargeur P) est connecté à un autre véhicule A. Dans ce cas, l'unité de commande 55 commute la destination d'alimentation en électricité (destination chargée) du circuit de commutation 2 au second chargeur (chargeur P). Plus particulièrement, il est supposé que les véhicules sont simultanément connectés à chacun des chargeurs P et Q. Dans ce cas, l'unité de commande 55 commande le circuit de commutation 2 de sorte que la ligne d'alimentation en énergie électrique 9 soit connectée au chargeur P, auquel la priorité la plus élevée est attribuée dans l'unité de stockage de conditions d'alimentation électrique 54. Il existe une tendance à déterminer une priorité de chacun parmi de multiples chargeurs. Particulièrement, il existe une exigence concernant l'utilisation d'un certain chargeur parmi de multiples chargeurs pour charger une batterie avec la priorité la plus élevée et l'utilisation d'un autre chargeur parmi les multiples chargeurs pour charger une autre batterie avec une priorité plus basse. Afin de satisfaire une telle exigence, comme décrit ci-dessus, des priorités sont respectivement établies pour les multiples chargeurs. De plus, l'unité de commande 55 commande la destination de connexion, à savoir, la destination d'alimentation en électricité de la ligne d'alimentation en énergie électrique 9 dans l'ordre selon la priorité. De cette manière, une telle exigence pour déterminer la priorité de charge de chacun des chargeurs est satisfaite. Ainsi, l'utilisation d'un véhicule par un utilisateur peut être améliorée. Dans l'exemple, à l'étape 745, lorsqu'une priorité attribuée au chargeur Q est plus élevée que la priorité du chargeur P dans l'unité de stockage de conditions d'alimentation électrique 54, le chargeur P est stocké à la seconde place dans les données de file d'attente 20. Après cela, la charge du véhicule B par l'intermédiaire du chargeur Q est poursuivie jusqu'à ce que la batterie 7 du véhicule B soit complètement chargée. The queue data 20 does not change unless another vehicle is connected to the charger 1. As shown by line 62 in Fig. 17, the load of the vehicle B continues, and the amount of charge of the battery 7 increases. Finally, at step 765, at time T73, the charge amount of the battery 7 of the vehicle B increases to Bmax, and the battery 7 is fully charged. Thus, in step 140, the control unit 55 determines that the battery 7 of the vehicle B is fully charged. Thus, in step 150, the control unit 55 clears the charger entity of the top loader Q in the queue data 20. In the next step 110, the control unit 55 obtains null data as charger ID of the overhead feeder entity in the queue data 20. Next, the control unit 55 determines that there is a change in the loader identity obtained in step 120, and in step 130, the control unit 55 performs the switching control. Particularly, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected to an unloaded connection object corresponding to the null data. In the present example, the priority of the second charger (charger P) has been previously set to be greater than the priority of the first charger (charger Q) in the power supply storage unit 54. In addition, it is assuming that the power supply line 9 is connected to the first charger (charger Q), to which the vehicle B is connected, and the second charger (charger P) is connected to another vehicle A. In this case, the control unit 55 switches the power supply destination (destination loaded) of the switching circuit 2 to the second charger (charger P). More particularly, it is assumed that the vehicles are simultaneously connected to each of the chargers P and Q. In this case, the control unit 55 controls the switching circuit 2 so that the power supply line 9 is connected. to the charger P, to which the highest priority is assigned in the power supply storage unit 54. There is a tendency to determine a priority of each of multiple chargers. In particular, there is a requirement for the use of a certain charger among multiple chargers to charge a battery with the highest priority and the use of another charger among multiple chargers to charge another battery with priority lower. In order to satisfy such a requirement, as described above, priorities are set for the multiple loaders respectively. In addition, the control unit 55 controls the connection destination, i.e., the power supply destination of the electric power supply line 9 in order according to the priority. In this way, such a requirement for determining the load priority of each of the chargers is satisfied. Thus, the use of a vehicle by a user can be improved. In the example, at step 745, when a priority assigned to the charger Q is higher than the priority of the charger P in the power supply storage unit 54, the charger P is stored at the second In this case, charging of the vehicle B via the charger Q is continued until the battery 7 of the vehicle B is fully charged.

Il est supposé que le véhicule B soit connecté au chargeur R ou S, à un instant en dehors de la période de validité de la priorité attribuée au chargeur R ou S, auquel le véhicule B est connecté, dans l'unité de stockage de conditions d'alimentation électrique 54. Dans ce cas, indépendamment du fait qu'un autre véhicule est connecté à un chargeur autre que les chargeurs R et S, l'unité de commande 55 empêche la destination de connexion de la ligne d'alimentation en énergie électrique 9 d'être dirigée vers le chargeur R ou S, auquel le véhicule B est connecté. Plus particulièrement, il est supposé que le véhicule B est connecté au premier chargeur (chargeur R ou S), et un autre véhicule A est connecté au second chargeur (chargeur P). De plus, dans l'unité de stockage de conditions d'alimentation électrique 54, une période de validité est spécifiée pour une priorité attribuée au premier chargeur (chargeur R ou S), et une période de validité n'est pas spécifiée pour une priorité attribuée au second chargeur (chargeur P). Dans ce cas, à un instant en dehors de la période de validité de la priorité attribuée au premier chargeur (chargeur R ou S), l'unité de commande 55 fait en sorte que le circuit de commutation 2 connecte la ligne d'alimentation en énergie électrique 9 au second chargeur (chargeur P). Après cela, l'instant est supposé être dans la période de validité de la priorité attribuée au premier chargeur (chargeur R ou S). Dans ce cas, lorsque la priorité attribuée au premier chargeur (chargeur R ou S) est supérieure à la priorité attribuée au second chargeur (chargeur P), l'unité de commande 55 fait en sorte que le circuit de commutation 2 commute la destination de connexion de la ligne d'alimentation en énergie électrique 9 vers le premier chargeur (chargeur R ou S). En variante, lorsque la priorité attribuée au second chargeur (chargeur P) est supérieure à la priorité attribuée au premier chargeur (chargeur R ou S), l'unité de commande 55 fait en sorte que le circuit de commutation 2 maintienne la destination de connexion de la ligne d'alimentation en énergie électrique 9 au second chargeur (chargeur P). Le présent inventeur a noté que, même lorsque seulement un véhicule est connecté à un chargeur, un utilisateur n'exige pas nécessairement de charger le véhicule immédiatement. Par exemple, comme décrit ci-dessus, un véhicule utilisé pour le trajet aller-retour quotidien de la maison au travail et un véhicule principalement utilisé durant un jour férié peuvent coïncider avec la présente supposition. Afin de satisfaire une telle exigence, comme décrit ci-dessus, une période de validité peut être spécifiée pour une priorité attribuée au chargeur R ou S. Dans ce cas, à un instant en dehors de la période de validité de la priorité, l'unité de commande 55 peut empêcher une destination de connexion de la ligne d'alimentation en énergie électrique d'être dirigée vers le chargeur R ou S, indépendamment du fait qu'un autre véhicule soit connecté à un autre chargeur. Donc, il suffit qu'un utilisateur connecte un véhicule au chargeur R ou S pour charger le véhicule uniquement pendant la période de validité. Une attribution d'un véhicule à un chargeur n'affecte pas l'opération décrite ci-dessus. À savoir, l'ordre d'un véhicule destiné à être à une destination de connexion de la ligne d'alimentation en énergie électrique 9 est déterminé seulement par la priorité attribuée à chaque véhicule. L'ordre d'un véhicule destiné à être une destination de connexion de la ligne d'alimentation en énergie électrique 9 n'est pas déterminé par le chargeur qui est connecté à chaque véhicule. En outre, dans l'exemple, l'unité de commande 55 fait en sorte que l'unité d'affichage 52 indique l'identité de véhicule du véhicule et des informations concernant la quantité de charge de la batterie 7 du véhicule lors de la réception d'informations concernant l'identité de véhicule et la quantité de charge à partir de l'unité de communication de véhicule 8 de chaque véhicule, qui est connecté à un chargeur, par l'intermédiaire de l'unité de communication d'alimentation électrique 3. It is assumed that the vehicle B is connected to the charger R or S, at a time outside the period of validity of the priority assigned to the charger R or S, to which the vehicle B is connected, in the storage unit of conditions In this case, regardless of whether another vehicle is connected to a charger other than the chargers R and S, the control unit 55 prevents the connection destination of the power supply line. electrical 9 to be directed to the charger R or S, to which the vehicle B is connected. More particularly, it is assumed that the vehicle B is connected to the first charger (charger R or S), and another vehicle A is connected to the second charger (charger P). In addition, in the power condition storage unit 54, a validity period is specified for a priority assigned to the first loader (loader R or S), and a validity period is not specified for a priority. assigned to the second charger (charger P). In this case, at a time outside the period of validity of the priority assigned to the first charger (charger R or S), the control unit 55 causes the switching circuit 2 to connect the power supply line. electrical energy 9 to the second charger (charger P). After that, the moment is assumed to be within the validity period of the priority assigned to the first loader (R or S loader). In this case, when the priority assigned to the first charger (charger R or S) is greater than the priority assigned to the second charger (charger P), the control unit 55 causes the switching circuit 2 to switch the destination of connection of the power supply line 9 to the first charger (charger R or S). Alternatively, when the priority assigned to the second charger (charger P) is greater than the priority assigned to the first charger (charger R or S), the control unit 55 causes the switching circuit 2 to maintain the connection destination. from the power supply line 9 to the second charger (charger P). The present inventor has noted that even when only one vehicle is connected to a charger, a user does not necessarily require charging the vehicle immediately. For example, as described above, a vehicle used for the daily round trip from home to work and a vehicle used primarily on a holiday may coincide with this assumption. In order to satisfy such a requirement, as described above, a validity period may be specified for a priority assigned to the R or S loader. In this case, at a time outside the period of validity of the priority, the The control unit 55 can prevent a destination of connection of the power supply line from being directed to the charger R or S, regardless of whether another vehicle is connected to another charger. Therefore, it is sufficient for a user to connect a vehicle to the R or S charger to charge the vehicle only during the validity period. An assignment of a vehicle to a loader does not affect the operation described above. Namely, the order of a vehicle to be at a connection destination of the electric power supply line 9 is determined solely by the priority assigned to each vehicle. The order of a vehicle intended to be a connection destination of the electric power supply line 9 is not determined by the charger that is connected to each vehicle. In addition, in the example, the control unit 55 causes the display unit 52 to indicate the vehicle's vehicle identity and information about the amount of charge of the battery 7 of the vehicle at the time of transmission. receiving information about the vehicle identity and the amount of charge from the vehicle communication unit 8 of each vehicle, which is connected to a charger, through the power communication unit Electric 3.

Ainsi, un utilisateur peut obtenir la quantité de charge de la batterie 7 même lorsqu'il se trouve dans la maison 4. Dans ce cas, en plus de la quantité de charge ou au lieu de la quantité de charge, l'unité de commande 55 peut faire en sorte que l'unité d'affichage 52 indique une distance de déplacement prévue correspondant à la quantité de charge. Thus, a user can get the amount of charge of the battery 7 even when it is in the house 4. In this case, in addition to the amount of charge or instead of the amount of charge, the control unit 55 may cause the display unit 52 to indicate a predicted travel distance corresponding to the amount of load.

Dans le présent mode de réalisation, il n'est pas nécessaire que le véhicule rechargeable 6 comprenne l'unité de communication de véhicule 8. En variante, même lorsque le véhicule rechargeable 6 comprend l'unité de communication de véhicule 8, il n'est pas nécessaire que l'unité de communication de véhicule 8 transmette une identité de véhicule, comme l'unité de commande 55 n'utilise pas l'identité de véhicule pour déterminer le chargeur qui doit être une destination de connexion de la ligne d'alimentation en énergie électrique 9. Dans ce cas, il n'est pas nécessaire que l'unité de commande 55 indique l'identité de véhicule et la quantité de charge sur l'unité d'affichage 52. In the present embodiment, it is not necessary for the rechargeable vehicle 6 to comprise the vehicle communication unit 8. Alternatively, even when the refillable vehicle 6 comprises the vehicle communication unit 8, it does not It is not necessary for the vehicle communication unit 8 to transmit a vehicle identity, as the control unit 55 does not use the vehicle identity to determine the loader which must be a connection destination of the vehicle line. In this case, it is not necessary for the control unit 55 to indicate the vehicle identity and the quantity of charge on the display unit 52.

Autre mode de réalisation Comme décrit ci-dessus, bien que des modes de réalisation aient été décrits, la portée de la présente invention n'est pas limitée aux modes de réalisation. La portée de la présente invention comprend diverses formes, qui peuvent produire une fonction de chaque sujet de la présente invention. Par exemple, dans le premier mode de réalisation, lorsque des entités de chargeur avec la même priorité sont stockées dans les données de file d'attente 20, une priorité plus élevée est attribuée à l'entité de chargeur stockée dans les données de file d'attente 20 avant l'autre entité de chargeur, à savoir, elle est stockée à un ordre plus élevée dans l'ordre des données de file d'attente 20. L'ordre de l'entité de chargeur peut ne pas être déterminé de cette manière. Par exemple, lorsque les entités de chargeur avec la même priorité sont stockées dans les données de file d'attente 20, l'unité de commande 55 peut changer l'ordre des entités de chargeur à la ronde dans les données de file d'attente 20 à un intervalle régulier. Particulièrement, par exemple, il est supposé que seulement deux entités de chargeur qui comprennent une entité de chargeur du chargeur P et une entité de chargeur du chargeur Q sont stockées dans les données de file d'attente 20. Dans ce cas, un premier état est établi de sorte que l'entité de chargeur du chargeur Q soit à la seconde place dans l'ordre, et l'entité de chargeur du chargeur P soit en tête dans l'ordre. De plus, un second état est en variante établi de sorte que l'entité de chargeur du chargeur P soit à la seconde place dans l'ordre, et l'entité de chargeur du chargeur Q soit en tête dans l'ordre. Ainsi, le premier état et le second état sont établis en alternance à un intervalle prédéterminé. Alternative Embodiment As described above, although embodiments have been described, the scope of the present invention is not limited to the embodiments. The scope of the present invention comprises various forms, which can produce a function of each subject of the present invention. For example, in the first embodiment, when loader entities with the same priority are stored in the queue data 20, a higher priority is assigned to the loader entity stored in the queue data. waiting before the other loader entity, i.e., it is stored at a higher order in the order of the queue data 20. The order of the loader entity may not be determined from this way. For example, when the loader entities with the same priority are stored in the queue data 20, the control unit 55 can change the order of the loader entities to the round in the queue data. 20 at a regular interval. Specifically, for example, it is assumed that only two loader entities that include a loader loader entity P and a charger loader entity Q are stored in the queue data 20. In this case, a first state is set so that the loader entity of the loader Q is in the second place in order, and the loader entity of the loader P is leading in order. In addition, a second state is alternatively set so that the loader loader entity P is in the second place in the order, and the loader loader entity Q is ahead in order. Thus, the first state and the second state are alternately set at a predetermined interval.

De cette manière, lorsque des véhicules auxquels la même priorité est attribuée dans l'unité de stockage de conditions d'alimentation électrique 54 sont simultanément connectés à des chargeurs, un taux d'augmentation d'une quantité de charge de la batterie 7 de chacun des véhicules devient sensiblement uniforme. En outre, dans le deuxième mode de réalisation, l'unité de commande 55 du dispositif de commande d'alimentation électrique 5 établit une priorité d'un chargeur et commande le circuit de commutation 2 selon la priorité. La structure et le procédé ne sont pas limités à ceux-ci, comme décrit ci-dessus. Par exemple, l'opération du deuxième mode de réalisation peut être réalisée lorsque le circuit de commutation 2 comporte une structure de circuit configurée pour régler le chargeur Q pour qu'il soit une destination de connexion de la ligne d'alimentation en énergie électrique 9 avec priorité plus élevée que celle du chargeur P. Dans ce cas, une priorité est attribuée à chaque chargeur selon une structure de circuit du circuit de commutation 2. En outre, dans ce cas, le dispositif de commande d'alimentation électrique 5 peut être omis. À savoir, seulement le circuit de commutation 2 peut servir de système d'alimentation électrique. Dans les modes de réalisation ci-dessus, un chargeur détecte une connexion à un véhicule, et envoie ainsi un signal, qui spécifie une existence de connexion, au dispositif de commande d'alimentation électrique 5. De cette manière, le dispositif de commande d'alimentation électrique 5 peut détecter une connexion entre un véhicule et un chargeur. Il est noté que le dispositif de commande d'alimentation électrique 5 n'est pas limité à la détection d'une connexion entre un véhicule et un chargeur de cette manière. In this way, when vehicles to which the same priority is assigned in the power condition storage unit 54 are simultaneously connected to chargers, a rate of increase of a charge amount of the battery 7 of each vehicles becomes substantially uniform. Further, in the second embodiment, the control unit 55 of the power supply control device 5 prioritizes a loader and controls the switching circuit 2 according to the priority. The structure and method are not limited thereto as described above. For example, the operation of the second embodiment can be performed when the switching circuit 2 includes a circuit structure configured to set the charger Q to be a connection destination of the electrical power supply line 9 with priority higher than that of the charger P. In this case, a priority is assigned to each charger according to a circuit structure of the switching circuit 2. In addition, in this case, the power supply control device 5 may be omitted. Namely, only the switching circuit 2 can serve as a power supply system. In the above embodiments, a charger detects a connection to a vehicle, and thereby sends a signal, which specifies a connection existence, to the power supply control device 5. In this way, the controller Power supply 5 can detect a connection between a vehicle and a charger. It is noted that the power control device 5 is not limited to detecting a connection between a vehicle and a charger in this way.

Par exemple, l'unité de communication de véhicule 8 peut être connectée manuellement à un chargeur par l'intermédiaire d'un câble de télécommunication lorsque le véhicule correspondant est chargé. Dans ce cas, lorsqu'un véhicule est connecté à un certain chargeur par l'intermédiaire d'une ligne d'alimentation en énergie électrique et d'un câble de télécommunication, l'unité de communication de véhicule 8 du véhicule transmet une identité de véhicule à un chargeur par l'intermédiaire du câble de télécommunication. Ainsi, le chargeur envoie l'identité de véhicule reçue au dispositif de commande d'alimentation électrique 5. Ainsi, lors de la réception de l'identité de véhicule, l'unité de commande 55 du dispositif de commande d'alimentation électrique 5 peut détecter que le véhicule, qui a transmis l'identité de véhicule au chargeur, est connecté au chargeur, qui a envoyé l'identité de véhicule au dispositif de commande d'alimentation électrique 5. Par exemple, l'unité de communication de véhicule 8 pour réaliser une communication de ligne électrique ( Power Line Communication ou PLC) par l'intermédiaire de la ligne d'alimentation électrique entre un chargeur et la batterie 7 lorsqu'elle est connectée au chargeur. Dans ce cas, lorsqu'un véhicule est connecté à un certain chargeur par l'intermédiaire d'une ligne d'alimentation en énergie électrique, l'unité de communication de véhicule 8 du véhicule transmet une identité de véhicule à un chargeur par l'intermédiaire de la ligne d'alimentation en énergie électrique. Ainsi, le chargeur envoie l'identité de véhicule reçue au dispositif de commande d'alimentation électrique 5. Ainsi, lors de la réception de l'identité de véhicule, l'unité de commande 55 du dispositif de commande d'alimentation électrique 5 peut détecter que le véhicule, qui a transmis l'identité de véhicule au chargeur, est connecté au chargeur, qui a envoyé l'identité de véhicule au dispositif de commande d'alimentation électrique 5. En outre, lorsque la batterie 7 du véhicule est connectée au chargeur et complètement chargée, l'unité de commande 55 efface l'entité de chargeur du chargeur à partir des données de file d'attente 20 ou des données de case invalide 30. For example, the vehicle communication unit 8 can be manually connected to a charger via a telecommunication cable when the corresponding vehicle is loaded. In this case, when a vehicle is connected to a certain charger via an electric power supply line and a telecommunication cable, the vehicle communication unit 8 of the vehicle transmits an identity of vehicle to a charger via the telecommunication cable. Thus, the charger sends the received vehicle identity to the power control device 5. Thus, upon receipt of the vehicle identity, the control unit 55 of the power control device 5 can detecting that the vehicle, which transmitted the vehicle identity to the charger, is connected to the charger, which sent the vehicle identity to the power control device 5. For example, the vehicle communication unit 8 to perform power line communication (PLC) via the power line between a charger and battery 7 when connected to the charger. In this case, when a vehicle is connected to a certain charger via an electrical power supply line, the vehicle communication unit 8 of the vehicle transmits a vehicle identity to a charger by the vehicle. intermediate of the power supply line. Thus, the charger sends the received vehicle identity to the power control device 5. Thus, upon receipt of the vehicle identity, the control unit 55 of the power control device 5 can detecting that the vehicle, which transmitted the vehicle identity to the charger, is connected to the charger, which sent the vehicle identity to the power control device 5. In addition, when the battery 7 of the vehicle is connected to the loader and fully loaded, the control unit 55 clears the charger loader entity from the queue data 20 or invalid slot data 30.

Après cela, l'unité de commande 55 peut successivement obtenir des informations concernant la quantité de charge de la batterie 7 à partir du véhicule connecté au chargeur correspondant à l'entité de chargeur éliminée. Lorsque l'énergie de la batterie 7 est consommée pour être dans un état de charge non complet, l'unité de commande 55 peut à nouveau stocker l'entité de chargeur du chargeur dans les données de file d'attente 20 ou les données de case invalide 30. Dans ce cas, un contenu de l'entité de chargeur destinée à être stockée est le même qu'un contenu de l'entité de chargeur éliminée. De cette manière, lorsque la batterie 7 consomme de l'énergie en raison de l'autodécharge électrique après être complètement chargée et réduit la quantité de charge, la batterie 7 peut être automatiquement rechargée. After that, the control unit 55 can successively obtain information regarding the amount of charge of the battery 7 from the vehicle connected to the charger corresponding to the removed charger entity. When the power of the battery 7 is consumed to be in an incomplete state of charge, the control unit 55 can again store the loader charger entity in the queue data 20 or the data of the charger. Invalid box 30. In this case, a content of the charger entity to be stored is the same as a content of the downloaded charger entity. In this way, when the battery 7 consumes power due to the electrical self-discharge after being fully charged and reducing the amount of charge, the battery 7 can be automatically recharged.

Dans le premier mode de réalisation, la priorité de chacun des véhicules est constante. En variante, il est noté que la priorité de chacun des véhicules peut être changée dans l'unité de stockage de conditions d'alimentation électrique 54 au fur et à mesure que le temps avance. Dans ce cas, l'unité de commande 55 peut confirmer périodiquement une priorité attribuée à chacun des véhicules connectés à un chargeur. In the first embodiment, the priority of each of the vehicles is constant. Alternatively, it is noted that the priority of each of the vehicles can be changed in the power supply storage unit 54 as time progresses. In this case, the control unit 55 can periodically confirm a priority assigned to each of the vehicles connected to a loader.

Lors de la détection d'un changement de la priorité, l'unité de commande 55 peut changer une destination de stockage d'une entité de chargeur et l'ordre d'une entité de chargeur dans les données de file d'attente 20. Dans le deuxième mode de réalisation, la priorité de chacun des chargeurs est constante. En variante, il est noté que la priorité de chacun des chargeurs peut être changée dans l'unité de stockage de conditions d'alimentation électrique 54 au fur et à mesure que le temps avance. Dans ce cas, l'unité de commande 55 peut confirmer périodiquement une priorité attribuée à chacun des chargeurs connectés à un véhicule. Lors de la détection d'un changement de la priorité, l'unité de commande 55 peut changer une destination de stockage d'une entité de chargeur et l'ordre d'une entité de chargeur dans les données de file d'attente 20. Dans le mode de réalisation, chaque fonction réalisée par l'exécution d'un programme par l'unité de commande 55 peut être réalisée par un autre matériel, tel qu'un réseau FPGA, qui peut programmer une structure de circuit possédant la fonction. Par exemple, il est supposé que le chargeur 1 représenté sur la figure 1 est un dispositif chargeur généralement connu configuré pour charger en appliquant une tension alternative de 100V ou de 200V actuellement fournie à un foyer ordinaire. Upon detecting a change in priority, the control unit 55 may change a storage destination of a loader entity and the order of a loader entity in the queue data 20. In the second embodiment, the priority of each of the chargers is constant. Alternatively, it is noted that the priority of each of the chargers can be changed in the power supply storage unit 54 as time progresses. In this case, the control unit 55 can periodically confirm a priority assigned to each of the chargers connected to a vehicle. Upon detecting a change in priority, the control unit 55 may change a storage destination of a loader entity and the order of a loader entity in the queue data 20. In the embodiment, each function performed by the execution of a program by the control unit 55 can be performed by other hardware, such as an FPGA, which can program a circuit structure having the function. For example, it is assumed that the charger 1 shown in Fig. 1 is a generally known charger device configured to charge by applying a 100V or 200V AC voltage currently supplied to an ordinary fireplace.

Par conséquent, il est supposé que la ligne d'alimentation en énergie électrique 9 est alimentée en courant alternatif CA de 100V ou de 200V. La structure et l'opération décrites ci-dessus peuvent être appliquées sur un dispositif chargeur rapide configuré pour charger en redressant et en augmentant une alimentation en CA pour produire un courant direct à haute tension. Dans ce cas, une fonction principale du chargeur 1 représenté sur la figure 1 est une connexion avec un véhicule, et la ligne d'alimentation en énergie électrique 9 peut servir à fournir un courant direct à haute tension. En résumant les modes de réalisation ci-dessus, un dispositif de commande d'alimentation électrique pour commander un circuit de commutation pour connecter une ligne d'alimentation en énergie électrique à un chargeur commutable sélectionné parmi de multiples chargeurs connectables avec un véhicule comprend : une unité de stockage configurée pour associer des informations concernant une priorité à chacun d'au moins une partie de multiples véhicules et configurée pour stocker les informations associées dans celle-ci ; et une unité de commande configurée pour commander le circuit de commutation, lorsqu'au moins une partie (par exemple, au moins deux) des multiples véhicules sont simultanément connectés à différents chargeurs, afin de connecter une ligne d'alimentation en énergie électrique de façon préférentielle à un chargeur parmi les différents chargeurs, ce chargeur parmi les différents chargeurs étant connecté à un véhicule parmi de multiples véhicules, une priorité la plus élevée dans l'unité de stockage à cet instant étant attribuée à ce véhicule parmi les multiples véhicules. L'inventeur de la présente demande a noté la tendance d'un utilisateur à exiger de déterminer une priorité de charge pour chaque véhicule parmi de multiples véhicules. Particulièrement, un utilisateur peut avoir tendance à exiger de charger un véhicule avec une priorité plus élevée et peut avoir tendance à exiger de retarder la charge d'un autre véhicule. Afin de satisfaire une telle exigence, comme décrit ci-dessus, une unité de stockage est configurée pour attribuer des informations concernant une priorité à chaque véhicule parmi de multiples véhicules et configurée pour stocker les informations associées dans celle-ci. De plus, l'unité de commande est configurée pour commander une destination de connexion, à savoir, une destination d'alimentation en électricité de la ligne d'alimentation en énergie électrique dans un ordre selon la priorité. De cette manière, une telle exigence pour déterminer une priorité de charge de chaque véhicule parmi de multiples véhicules est satisfaite. Ainsi, l'utilisation d'un véhicule par un utilisateur peut être améliorée. Dans une condition dans laquelle : i) un premier véhicule parmi les multiples véhicules est connecté à un premier chargeur parmi les multiples chargeurs ; ii) le circuit de commutation connecte la ligne d'alimentation en énergie électrique au premier chargeur ; et iii) un second véhicule parmi les multiples véhicules est nouvellement connecté à un second chargeur parmi les multiples chargeurs, l'unité de commande est configurée pour : i) faire en sorte que le circuit de commutation maintienne une destination de connexion de la ligne d'alimentation en énergie électrique au premier chargeur lorsqu'une priorité attribuée au premier véhicule dans l'unité de stockage est supérieure à une priorité attribuée au second véhicule dans l'unité de stockage ; et ii) faire en sorte que le circuit de commutation commute la destination connectée de la ligne d'alimentation en énergie électrique au second chargeur lorsque la priorité attribuée au second véhicule est supérieure à la priorité attribuée au premier véhicule. À savoir, il est supposé que le premier véhicule est connecté au premier chargeur et est chargé. Dans une telle condition, le second véhicule est connecté au second chargeur. Dans ce cas, lorsque le premier véhicule possède une priorité plus élevée, la charge du premier véhicule est continuée. En variante, lorsque le second véhicule possède une priorité plus élevée, la destination de chargement est changée pour devenir le second véhicule, et ainsi le second véhicule est chargé. Therefore, it is assumed that the electric power supply line 9 is supplied with 100V AC or 200V AC power. The structure and operation described above can be applied to a fast charger device configured to charge by rectifying and augmenting an AC power supply to produce direct high voltage power. In this case, a main function of the charger 1 shown in Fig. 1 is a connection with a vehicle, and the electric power supply line 9 can be used to provide a high voltage direct current. Summarizing the above embodiments, a power control device for controlling a switching circuit for connecting an electrical power supply line to a switchable charger selected from multiple chargers connectable with a vehicle comprises: a storage unit configured to associate priority information with each of at least a portion of multiple vehicles and configured to store related information therein; and a control unit configured to control the switching circuit, when at least a portion (for example, at least two) of the multiple vehicles are simultaneously connected to different chargers, in order to connect an electrical power supply line in such a way that preferential to a charger among the different chargers, this charger among the different chargers being connected to a vehicle among multiple vehicles, a highest priority in the storage unit at this time being assigned to this vehicle among the multiple vehicles. The inventor of the present application has noted the tendency of a user to demand to determine a load priority for each vehicle among multiple vehicles. Particularly, a user may have a tendency to require charging a vehicle with a higher priority and may have a tendency to require delaying the load of another vehicle. In order to satisfy such a requirement, as described above, a storage unit is configured to assign priority information to each vehicle among multiple vehicles and configured to store associated information therein. In addition, the control unit is configured to control a connection destination, i.e., a power supply destination of the electrical power supply line in a priority order. In this way, such a requirement for determining a load priority of each vehicle among multiple vehicles is satisfied. Thus, the use of a vehicle by a user can be improved. In a condition wherein: i) a first one of the plurality of vehicles is connected to a first one of the plurality of chargers; ii) the switching circuit connects the power supply line to the first charger; and iii) a second one of the plurality of vehicles is newly connected to a second one of the plurality of chargers, the control unit is configured to: i) cause the switching circuit to maintain a connection destination of the line supplying power to the first charger when a priority assigned to the first vehicle in the storage unit is greater than a priority assigned to the second vehicle in the storage unit; and ii) causing the switching circuit to switch the connected destination of the power supply line to the second charger when the priority assigned to the second vehicle is greater than the priority assigned to the first vehicle. Namely, it is assumed that the first vehicle is connected to the first charger and is charged. In such a condition, the second vehicle is connected to the second charger. In this case, when the first vehicle has a higher priority, the load of the first vehicle is continued. Alternatively, when the second vehicle has a higher priority, the loading destination is changed to become the second vehicle, and thus the second vehicle is loaded.

L'unité de stockage est configurée pour stocker la priorité pour laquelle une période de validité de la priorité est spécifiée. Dans une condition dans laquelle : i) un véhicule parmi les multiples véhicules est connecté à un chargeur parmi les multiples chargeurs ; et ii) à un instant qui est en dehors d'une période de validité d'une priorité, qui est attribuée à ce véhicule parmi les multiples véhicules et qui est stockée dans l'unité de stockage, l'unité de commande est configurée pour empêcher la destination de connexion de la ligne d'alimentation en énergie électrique d'être dirigée vers ce chargeur parmi les multiples chargeurs, indépendamment du fait qu'un véhicule soit connecté à un chargeur autre que ce chargeur. The storage unit is configured to store the priority for which a validity period of the priority is specified. In a condition in which: i) a vehicle among the multiple vehicles is connected to a charger among the multiple chargers; and ii) at a time which is outside a period of validity of a priority, which is assigned to that vehicle among the multiple vehicles and which is stored in the storage unit, the control unit is configured to preventing the connection destination of the electrical power supply line from being directed towards this charger among the multiple chargers, regardless of whether a vehicle is connected to a charger other than this charger.

Le présent inventeur a noté que même lorsqu'un seul véhicule est connecté à un chargeur, un utilisateur n'exige pas nécessairement de charger le véhicule immédiatement. Particulièrement, par exemple, il suffit qu'un véhicule principalement utilisé pour le trajet aller-retour quotidien de la maison au travail soit suffisamment chargé avant que le véhicule commence le trajet aller-retour quotidien de la maison au travail le jour suivant. Il peut donc être exigé qu'un tel véhicule principalement utilisé pour le trajet aller-retour quotidien de la maison au travail soit chargé dans une période de faible tarif d'électricité telle que des heures creuses nocturnes et soit empêché d'être chargé pendant une période autre que la période de faible tarif d'électricité. Même en considération d'une telle circonstance, il est pratique qu'un utilisateur puisse connecter le véhicule au chargeur immédiatement après que le retour de l'utilisateur du travail, plutôt que d'attendre le commencement des heures creuses nocturnes et de connecter le véhicule au chargeur après le commencement des heures creuses nocturnes. En considération de ceci, comme décrit ci-dessus, une période de validité peut être spécifiée pour une priorité attribuée à un véhicule. Ainsi, indépendamment du fait qu'un autre véhicule soit connecté à un chargeur autre qu'un chargeur connecté au véhicule, ce chargeur peut être empêché d'être positionné à une destination de connexion de la ligne d'alimentation en énergie électrique à un instant en dehors de la période de validité de la priorité. The present inventor has noted that even when only one vehicle is connected to a charger, a user does not necessarily require charging the vehicle immediately. Particularly, for example, it is sufficient that a vehicle used primarily for the daily round trip from home to work is sufficiently loaded before the vehicle starts the daily round trip from home to work the next day. It may therefore be required that such a vehicle used primarily for the daily round-trip journey from home to work be loaded in a period of low electricity tariff such as off-peak night hours and be prevented from being charged for a period of time. period other than the period of low electricity rate. Even considering such a circumstance, it is convenient for a user to be able to connect the vehicle to the charger immediately after the user's return from work, rather than waiting for the start of the off-peak hours and connecting the vehicle to the charger after the beginning of the off-peak hours. In consideration of this, as described above, a validity period may be specified for a priority assigned to a vehicle. Thus, regardless of whether another vehicle is connected to a charger other than a charger connected to the vehicle, this charger can be prevented from being positioned at a connection destination of the electric power supply line at a time outside the period of validity of the priority.

Dans une condition dans laquelle : i) un premier véhicule parmi les multiples véhicules est connecté à un premier chargeur parmi les multiples chargeurs ; ii) un second véhicule parmi les multiples véhicules est connecté à un second chargeur parmi les multiples chargeurs ; iii) une période de validité est spécifiée pour une priorité attribuée au premier véhicule et stockée dans l'unité de stockage ; et iv) une période de validité n'est pas spécifiée pour une priorité attribuée au second véhicule et stockée dans l'unité de stockage, l'unité de commande peut être configurée pour faire en sorte que le circuit de commutation connecte la ligne d'alimentation en énergie électrique au second chargeur à un instant en dehors de la période de validité de la priorité attribuée au premier véhicule. Après cela, dans une condition dans laquelle il s'agit d'un instant dans la période de validité de la priorité attribuée au premier véhicule, i) l'unité de commande peut être configurée pour faire en sorte que le circuit de commutation commute la destination de connexion de la ligne d'alimentation en énergie électrique au premier chargeur lorsque la priorité attribuée au premier véhicule est supérieure à la priorité attribuée au second véhicule ; et ii) l'unité de commande peut être configurée pour faire en sorte que le circuit de commutation maintienne la destination connectée de la ligne d'alimentation en énergie électrique au second chargeur lorsque la priorité attribuée au second véhicule est supérieure à la priorité attribuée au premier véhicule. Un système d'alimentation électrique est configuré pour connecter une ligne d'alimentation en énergie électrique à un chargeur commutable sélectionné parmi multiples chargeurs connectables avec des véhicules, dans une condition dans laquelle : i) il est fait en sorte qu'un circuit de commutation connecte la ligne d'alimentation en énergie électrique à un premier chargeur parmi les multiples chargeurs, le premier chargeur étant connecté à un véhicule, le système d'alimentation électrique est configuré pour faire en sorte que le circuit de commutation commute une destination d'alimentation en électricité au second chargeur lorsqu'un autre véhicule est connecté à un second chargeur parmi les multiples chargeurs, une priorité supérieure à une priorité du premier chargeur étant auparavant attribuée au second chargeur. In a condition wherein: i) a first one of the plurality of vehicles is connected to a first one of the plurality of chargers; ii) a second one of the multiple vehicles is connected to a second one of the multiple chargers; iii) a validity period is specified for a priority assigned to the first vehicle and stored in the storage unit; and iv) a validity period is not specified for a priority assigned to the second vehicle and stored in the storage unit, the control unit may be configured to cause the switching circuit to connect the line of supplying electric power to the second charger at a time outside the period of validity of the priority assigned to the first vehicle. After that, in a condition in which it is a moment in the period of validity of the priority assigned to the first vehicle, i) the control unit may be configured to cause the switching circuit to switch the destination of connecting the power supply line to the first charger when the priority assigned to the first vehicle is greater than the priority assigned to the second vehicle; and ii) the control unit may be configured to cause the switching circuit to maintain the connected destination of the power supply line to the second charger when the priority assigned to the second vehicle is greater than the priority assigned to the first vehicle. A power supply system is configured to connect an electrical power supply line to a switchable charger selected from multiple chargers connectable with vehicles, in a condition in which: i) a switching circuit is provided; connects the power supply line to a first charger among the plurality of chargers, the first charger being connected to a vehicle, the power supply system is configured to cause the switching circuit to switch a power supply destination. to the second charger when another vehicle is connected to a second one of the plurality of chargers, a priority higher than a priority of the first charger being previously assigned to the second charger.

Le présent inventeur a noté qu'il existe une tendance à déterminer une priorité de chaque chargeur parmi de multiples chargeurs. Particulièrement, il existe une exigence concernant l'utilisation d'un certain chargeur parmi de multiples chargeurs pour charger une batterie avec la priorité la plus élevée et l'utilisation d'un autre chargeur parmi les multiples chargeurs pour charger une autre batterie avec une priorité plus basse. Afin de satisfaire une telle exigence, comme décrit ci-dessus, des priorités peuvent être respectivement établies pour les multiples chargeurs. De plus, l'unité de commande commande la destination de connexion, à savoir, la destination d'alimentation en électricité de la ligne d'alimentation en énergie électrique dans l'ordre de la priorité. De cette manière, une telle exigence concernant la détermination de la priorité de charge de chaque chargeur parmi les chargeurs est satisfaite. Ainsi, l'utilisation d'un véhicule par un utilisateur peut être améliorée. Plus particulièrement, le système d'alimentation électrique peut comprendre : le circuit de commutation configuré pour connecter la ligne d'alimentation en énergie électrique à un chargeur commutable sélectionné parmi les multiples chargeurs ; une unité de stockage configurée pour associer des informations concernant une priorité à chaque chargeur parmi les multiples chargeurs et configurée pour stocker les informations associées dans celle-ci ; et une unité de commande configurée pour faire en sorte que le circuit de commutation, lorsqu'au moins une partie (par exemple, au moins deux) des multiples chargeurs est simultanément connectée à des véhicules correspondants, connecte la ligne d'alimentation en énergie électrique à un chargeur parmi les multiples chargeurs, une priorité la plus élevée dans l'unité de stockage à cet instant étant attribuée à ce chargeur parmi les multiples chargeurs. Les structures ci-dessus des modes de réalisations peuvent être associées le cas échéant. Les traitements ci-dessus tels que des calculs et des déterminations ne sont pas limités à leur exécution par l'unité de commande 55. L'unité de commande peut comporter diverses structures comprenant l'unité de commande 55 représentée en tant qu'exemple. Les traitements ci-dessus tels que des calculs et des déterminations peuvent être réalisés par une quelconque ou de quelconques associations d'un logiciel, d'un circuit électrique, d'un dispositif mécanique, et analogues. Le logiciel peut être stocké dans un support de stockage, et peut être transmis par l'intermédiaire d'un dispositif de transmission tel qu'un dispositif de réseau. Le circuit électrique peut être un circuit intégré, et peut être un circuit distinct tel qu'une logique de matériel configurée avec des éléments électriques ou électroniques ou analogues. Les éléments produisant les traitements ci-dessus peuvent être des éléments distincts et peuvent être partiellement ou entièrement intégrés. Il faut noter que, bien que les procédés des modes de réalisation de la présente invention aient été décrits dans les présentes comme comprenant une séquence spécifique d'étapes, des variantes de modes de réalisation supplémentaires comprenant diverses autres séquences de ces étapes et/ou des étapes supplémentaires non décrites dans les présentes sont prévues pour être au sein des étapes de la présente invention. Diverses modifications et permutations peuvent être apportées de façon 15 diverse aux modes de réalisation ci-dessus sans s'éloigner de l'esprit de la présente invention. The present inventor has noted that there is a tendency to determine a priority of each charger among multiple chargers. In particular, there is a requirement for the use of a certain charger among multiple chargers to charge a battery with the highest priority and the use of another charger among multiple chargers to charge another battery with priority lower. In order to satisfy such a requirement, as described above, priorities can be set for the multiple loaders respectively. In addition, the control unit controls the connection destination, namely, the power supply destination of the power supply line in the order of priority. In this way, such a requirement concerning the determination of the charging priority of each charger among the chargers is satisfied. Thus, the use of a vehicle by a user can be improved. More particularly, the power supply system may comprise: the switching circuit configured to connect the power supply line to a switchable charger selected from multiple chargers; a storage unit configured to associate priority information to each of the multiple loaders and configured to store associated information therein; and a control unit configured to cause the switching circuit, when at least a portion (e.g., at least two) of the multiple chargers are simultaneously connected to corresponding vehicles, to connect the power supply line with electrical power. to a charger among the multiple chargers, a highest priority in the storage unit at this time being assigned to this charger among multiple chargers. The above structures of the embodiments may be associated where appropriate. The above processes such as calculations and determinations are not limited to their execution by the control unit 55. The control unit may comprise various structures including the control unit 55 shown as an example. The above processes such as calculations and determinations may be performed by any or any combination of software, electrical circuitry, mechanical device, and the like. The software may be stored in a storage medium, and may be transmitted through a transmission device such as a network device. The electrical circuit may be an integrated circuit, and may be a separate circuit such as hardware logic configured with electrical or electronic elements or the like. Elements producing the above treatments may be separate elements and may be partially or fully integrated. It should be noted that although the methods of the embodiments of the present invention have been described herein as comprising a specific sequence of steps, alternative embodiments of embodiments including various other sequences of these steps and / or Additional steps not described herein are intended to be within the steps of the present invention. Various modifications and permutations may be made variously to the above embodiments without departing from the spirit of the present invention.

Claims (7)

REVENDICATIONS1. Dispositif de commande d'alimentation électrique pour commander un circuit de commutation (2) propre à connecter une ligne d'alimentation en énergie électrique (9) à un chargeur sélectionné parmi une pluralité de chargeurs (1), la pluralité de chargeurs (1) étant connectables avec une pluralité véhicules (6), le dispositif de commande d'alimentation électrique comprenant : une unité de stockage (54) configurée pour attribuer des informations concernant une priorité à chaque véhicule d'au moins une partie de la pluralité de véhicules (6), ladite unité de stockage (54) étant configurée pour stocker les informations attribuées ; et une unité de commande (55) configurée pour commander le circuit de commutation (2), lorsqu'au moins une partie de la pluralité de véhicules (6) est simultanément connectée à différents chargeurs (1), afin de connecter la ligne d'alimentation en énergie électrique (9) de façon préférentielle à un chargeur parmi les différents chargeurs (1), ce chargeur parmi les différents chargeurs (1) étant connecté à un véhicule parmi la pluralité de véhicules (6), auquel une priorité la plus élevée a été attribuée. REVENDICATIONS1. Power supply control device for controlling a switching circuit (2) suitable for connecting an electric power supply line (9) to a charger selected from a plurality of chargers (1), the plurality of chargers (1) being connectable with a plurality of vehicles (6), the power control device comprising: a storage unit (54) configured to assign priority information to each vehicle of at least a portion of the plurality of vehicles ( 6), said storage unit (54) being configured to store the assigned information; and a control unit (55) configured to control the switching circuit (2), when at least a part of the plurality of vehicles (6) is simultaneously connected to different chargers (1), in order to connect the line of electric power supply (9) preferably to a charger among the different chargers (1), this charger among the different chargers (1) being connected to one of the plurality of vehicles (6), to which a highest priority has been awarded. 2. Dispositif de commande d'alimentation électrique selon la revendication 1, dans lequel la pluralité de chargeurs (1) comprend un premier chargeur (1) et un 20 second chargeur (1), dans lequel la pluralité de véhicules (6) comprend un premier véhicule (6) et un second véhicule (6), dans lequel le dispositif de commande est dans une condition dans laquelle le circuit de commutation (2) connecte la ligne d'alimentation en énergie électrique (9) au 25 premier chargeur (1), qui est connecté au premier véhicule (6), et le second véhicule (6) est nouvellement connecté au second chargeur (1), l'unité de commande (55) étant configurée pour : faire en sorte que le circuit de commutation (2) maintienne la ligne d'alimentation en énergie électrique (9) connectée au premier chargeur (1) lorsquela priorité attribuée 30 au premier véhicule (6) est supérieure à la priorité attribuée au second véhicule (6) ; etfaire en sorte que le circuit de commutation (2) commute la ligne d'alimentation en énergie électrique (9) pour être connectée au second chargeur (1) lorsque la priorité attribuée au second véhicule (6) est supérieure à la priorité attribuée au premier véhicule (6). The power control device according to claim 1, wherein the plurality of chargers (1) comprises a first charger (1) and a second charger (1), wherein the plurality of vehicles (6) comprises a first vehicle (6) and a second vehicle (6), wherein the controller is in a condition in which the switching circuit (2) connects the power supply line (9) to the first charger (1). ), which is connected to the first vehicle (6), and the second vehicle (6) is newly connected to the second charger (1), the control unit (55) being configured to: make the switching circuit ( 2) maintains the power supply line (9) connected to the first charger (1) when the priority assigned to the first vehicle (6) is greater than the priority assigned to the second vehicle (6); and causing the switching circuit (2) to switch the power supply line (9) to be connected to the second charger (1) when the priority assigned to the second vehicle (6) is greater than the priority assigned to the first vehicle (6). 3. Dispositif de commande d'alimentation électrique selon la revendication 1, dans lequel l'unité de stockage (54) est configurée pour stocker une priorité à laquelle est associée une période de validité, et dans lequel le dispositif de commande est dans une condition dans laquelle un véhicule parmi la pluralité de véhicules (6) est connecté à un chargeur parmi la pluralité de chargeurs (1), et l'instant est en dehors d'une période de validité associée à une priorité de ce véhicule (6), l'unité de commande (55) étant configurée pour empêcher la ligne d'alimentation en énergie électrique (9) d'être connectée à ce chargeur (1), indépendamment du fait qu'un autre véhicule est connecté à un chargeur autre que ce chargeur. The power supply control device according to claim 1, wherein the storage unit (54) is configured to store a priority with which a validity period is associated, and wherein the controller is in a condition wherein one of the plurality of vehicles (6) is connected to one of the plurality of chargers (1), and the instant is outside a validity period associated with a priority of that vehicle (6), the control unit (55) being configured to prevent the power supply line (9) from being connected to this charger (1), regardless of whether another vehicle is connected to a charger other than this charger. 4. Dispositif de commande d'alimentation électrique selon les revendications 1 ou 3, dans lequel la pluralité de chargeurs (1) comprend un premier chargeur (1) et un second chargeur (1), dans lequel la pluralité de véhicules (6) comprend un premier véhicule (6) et un second véhicule (6), dans lequel le dispositif de commande est dans une première condition dans laquelle le premier véhicule (6) est connecté au premier chargeur (1), le second véhicule (6) est connecté au second chargeur (1), une période de validité est associée à une priorité attribuée au premier véhicule (6), et une période de validité n'est pas associée à une priorité attribuée au second véhicule (6), l'unité de commande (55) étant configurée pour faire en sorte que le circuit de commutation (2) connecte la ligne d'alimentation en énergie électrique (9) au second chargeur (1) à un instant en dehors de la période de validité de la priorité attribuée au premier véhicule (6), et après la première condition, dans une seconde condition dans laquelle l'instant est dans la période de validité de la priorité attribuée au premier véhicule (6), l'unité de commande (55) étant configurée pour :faire en sorte que le circuit de commutation (2) commute la ligne d'alimentation en énergie électrique (9) pour être connectée au premier chargeur (1) lorsque la priorité attribuée au premier véhicule (6) est supérieure à la priorité attribuée au second véhicule (6) ; et faire en sorte que le circuit de commutation (2) maintienne la ligne d'alimentation en énergie électrique (9) connectée au second chargeur (1) lorsque la priorité attribuée au second véhicule (6) est supérieure à la priorité attribuée au premier véhicule (6). The power control device according to claims 1 or 3, wherein the plurality of chargers (1) comprises a first charger (1) and a second charger (1), wherein the plurality of vehicles (6) comprises a first vehicle (6) and a second vehicle (6), wherein the control device is in a first condition in which the first vehicle (6) is connected to the first charger (1), the second vehicle (6) is connected at the second loader (1), a validity period is associated with a priority assigned to the first vehicle (6), and a validity period is not associated with a priority assigned to the second vehicle (6), the control unit (55) being configured to cause the switching circuit (2) to connect the power supply line (9) to the second charger (1) at a time outside the validity period of the priority assigned to the first vehicle (6), and after the first condition, in a second condition in which the time is within the validity period of the priority assigned to the first vehicle (6), the control unit (55) being configured to: make the switching circuit (2) switches the power supply line (9) to be connected to the first charger (1) when the priority assigned to the first vehicle (6) is greater than the priority assigned to the second vehicle (6); and causing the switching circuit (2) to maintain the power supply line (9) connected to the second charger (1) when the priority assigned to the second vehicle (6) is greater than the priority assigned to the first vehicle (6). 5. Système d'alimentation électrique configuré pour connecter une ligne d'alimentation en énergie électrique (9) à un chargeur sélectionné parmi une pluralité de chargeurs (1) comprenant un premier chargeur (1) et un second chargeur (1) connectables avec des véhicules (6), dans lequel ledit système d'alimentation comprend : - un circuit de commutation (2) configuré pour connecter la ligne d'alimentation en énergie électrique (9) à un chargeur sélectionné parmi la pluralité de chargeurs (1) ; - une unité de stockage (54) configurée pour attribuer des informations concernant une priorité à chaque chargeur d'au moins une partie de la pluralité de chargeurs (1) ; l'unité de stockage (54) étant configurée pour stocker les informations attribuées ; et - une unité de commande (55) configurée pour faire en sorte que le circuit de commutation (2), lorsqu'au moins une partie de la pluralité de chargeurs (1) est simultanément connectée à des véhicules (6), connecte la ligne d'alimentation en énergie électrique (9) à un chargeur parmi la pluralité de chargeurs (1), une priorité la plus élevée étant attribuée à ce chargeur (1). dans lequel le système d'alimentation électrique est configuré pour mettre le circuit de commutation (2) dans une condition dans laquelle le système d'alimentation électrique fait en sorte qu'un circuit de commutation (2) connecte la ligne d'alimentation en énergie électrique (9) au premier chargeur (1) connecté à un véhicule, le circuit de commutation (2) étant apte à commuter la ligne d'alimentation en énergie électrique (9) pour qu'elle soit connectée au second chargeur (1) lorsqu'un autre véhicule est connecté au second chargeur (1), une priorité supérieure à une priorité du premier chargeur (1) ayant été auparavant attribuée au second chargeur (1). A power supply system configured to connect an electrical power supply line (9) to a charger selected from a plurality of chargers (1) comprising a first charger (1) and a second charger (1) connectable with vehicles (6), wherein said power system comprises: - a switching circuit (2) configured to connect the power supply line (9) to a charger selected from the plurality of chargers (1); - a storage unit (54) configured to assign priority information to each loader of at least a portion of the plurality of loaders (1); the storage unit (54) being configured to store the assigned information; and a control unit (55) configured to cause the switching circuit (2), when at least a part of the plurality of chargers (1) is simultaneously connected to vehicles (6), to connect the line power supply (9) to a charger among the plurality of chargers (1), a highest priority being assigned to this charger (1). wherein the power supply system is configured to switch the switching circuit (2) into a condition in which the power supply system causes a switching circuit (2) to connect the power supply line. electric (9) to the first charger (1) connected to a vehicle, the switching circuit (2) being adapted to switch the power supply line (9) to be connected to the second charger (1) when another vehicle is connected to the second charger (1), a priority higher than a priority of the first charger (1) having previously been allocated to the second charger (1). 6. Procédé pour commander une alimentation électrique d'un véhicule parmi un premier véhicule (6) et un second véhicule (6) à partir d'un chargeur parmi un premier chargeur (1) et un second chargeur (1), le procédé comprenant les étapes suivantes : faire en sorte qu'un circuit de commutation (2) connecte la ligne d'alimentation en énergie électrique (9) au premier chargeur (1) connecté au premier véhicule (6), et faire en sorte que le circuit de commutation (2) commute la ligne d'alimentation en énergie électrique (9) pour qu'elle soit connectée au second chargeur (1) lorsque le second véhicule (6) est connecté au second chargeur (1) et lorsqu'une priorité attribuée au second véhicule (6) est supérieure à une priorité attribuée au premier véhicule (6). A method for controlling a power supply of a vehicle from a first vehicle (6) and a second vehicle (6) from a charger from a first charger (1) and a second charger (1), the method comprising the following steps: causing a switching circuit (2) to connect the power supply line (9) to the first charger (1) connected to the first vehicle (6), and to make the circuit switching (2) switches the electric power supply line (9) to be connected to the second charger (1) when the second vehicle (6) is connected to the second charger (1) and when a priority assigned to the second vehicle (6) is greater than a priority assigned to the first vehicle (6). 7. Procédé pour commander une alimentation électrique d'un véhicule parmi un premier véhicule (6) et un second véhicule (6) à partir d'un chargeur parmi un premier chargeur (1) et un second chargeur (1), le procédé comprenant les étapes suivantes : faire en sorte qu'un circuit de commutation (2) connecte la ligne d'alimentation en énergie électrique (9) au premier chargeur (1) connecté au premier véhicule (6), et faire en sorte que le circuit de commutation (2) commute la ligne d'alimentation en énergie électrique (9) pour qu'elle soit connectée au second chargeur (1) lorsqu'un autre véhicule est nouvellement connecté au second chargeur (1) et lorsqu'une priorité attribuée au second chargeur (1) est supérieure à une priorité attribuée au premier chargeur (1). A method for controlling a power supply of a vehicle from a first vehicle (6) and a second vehicle (6) from a charger from a first charger (1) and a second charger (1), the method comprising the following steps: causing a switching circuit (2) to connect the power supply line (9) to the first charger (1) connected to the first vehicle (6), and to make the circuit switching (2) switches the power supply line (9) to be connected to the second charger (1) when another vehicle is newly connected to the second charger (1) and when a priority assigned to the second charger (1) charger (1) is greater than a priority assigned to the first charger (1).
FR1055711A 2009-08-05 2010-07-13 POWER SUPPLY CONTROL DEVICE, POWER SUPPLY SYSTEM, AND METHOD FOR CONTROLLING POWER SUPPLY OF CHARGER AND VEHICLE Expired - Fee Related FR2949026B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009182380A JP5062229B2 (en) 2009-08-05 2009-08-05 Power supply controller and power supply system
JP2009182380 2009-08-05

Publications (2)

Publication Number Publication Date
FR2949026A1 true FR2949026A1 (en) 2011-02-11
FR2949026B1 FR2949026B1 (en) 2019-05-31

Family

ID=43430289

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1055711A Expired - Fee Related FR2949026B1 (en) 2009-08-05 2010-07-13 POWER SUPPLY CONTROL DEVICE, POWER SUPPLY SYSTEM, AND METHOD FOR CONTROLLING POWER SUPPLY OF CHARGER AND VEHICLE

Country Status (5)

Country Link
US (1) US8378627B2 (en)
JP (1) JP5062229B2 (en)
CN (1) CN101997321B (en)
DE (1) DE102010030517A1 (en)
FR (1) FR2949026B1 (en)

Families Citing this family (93)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2555369A1 (en) * 2010-03-29 2013-02-06 Sanyo Electric Co., Ltd. Recharging system
US8725330B2 (en) 2010-06-02 2014-05-13 Bryan Marc Failing Increasing vehicle security
JP5617578B2 (en) 2010-12-03 2014-11-05 ソニー株式会社 Power distribution system and power distribution method
KR20120062089A (en) * 2010-12-06 2012-06-14 한국전자통신연구원 Vehicle mobile gateway for controling charging of electric vehicle using mobile terminal, electric vehicle having the same, and method for controling charging of electric vehicle using mobile terminal
US8502498B2 (en) * 2011-01-19 2013-08-06 General Motors Llc Localized charging of electric vehicles
EP2501011A3 (en) * 2011-03-18 2013-03-27 Thomson Licensing Centralised management of the power supply of a plurality of local power grids
US9123035B2 (en) 2011-04-22 2015-09-01 Angel A. Penilla Electric vehicle (EV) range extending charge systems, distributed networks of charge kiosks, and charge locating mobile apps
US10217160B2 (en) 2012-04-22 2019-02-26 Emerging Automotive, Llc Methods and systems for processing charge availability and route paths for obtaining charge for electric vehicles
US9285944B1 (en) 2011-04-22 2016-03-15 Angel A. Penilla Methods and systems for defining custom vehicle user interface configurations and cloud services for managing applications for the user interface and learned setting functions
US8731730B2 (en) 2011-04-27 2014-05-20 Ev Patent Holdings, Llc Electric vehicle clustered charge distribution and prioritization method, system and apparatus
JP5764420B2 (en) * 2011-07-22 2015-08-19 日鉄住金テックスエンジ株式会社 Electric vehicle charging method and equipment
ES2701745T3 (en) 2011-07-26 2019-02-25 Gogoro Inc Apparatus, method and article for the redistribution of energy storage devices, such as batteries, between collection, loading and distribution machines
US8560147B2 (en) 2011-07-26 2013-10-15 Gogoro, Inc. Apparatus, method and article for physical security of power storage devices in vehicles
WO2013016564A2 (en) 2011-07-26 2013-01-31 Gogoro, Inc. Apparatus, method and article for reserving power storage devices at reserving power storage device collection, charging and distribution machines
ES2748199T3 (en) 2011-07-26 2020-03-13 Gogoro Inc Apparatus, method and article for providing information on the availability of energy storage devices in an energy storage device collection, charging and dispensing machine
US10186094B2 (en) 2011-07-26 2019-01-22 Gogoro Inc. Apparatus, method and article for providing locations of power storage device collection, charging and distribution machines
EP2737601B1 (en) 2011-07-26 2020-04-08 Gogoro Inc. Apparatus, method and article for collection, charging and distributing power storage devices, such as batteries
JP5793245B2 (en) 2011-07-26 2015-10-14 ゴゴロ インク Apparatus, method and article for providing vehicle diagnostic data
US9437058B2 (en) 2011-07-26 2016-09-06 Gogoro Inc. Dynamically limiting vehicle operation for best effort economy
EP2737572B1 (en) 2011-07-26 2022-08-24 Gogoro Inc. Thermal management of components in electric motor drive vehicles
ES2967056T3 (en) 2011-07-26 2024-04-25 Gogoro Inc Apparatus, method and article for authentication, security and control of energy storage devices, such as batteries
ES2720202T3 (en) 2011-07-26 2019-07-18 Gogoro Inc Apparatus, method and article for an energy storage device compartment
JP6010619B2 (en) * 2011-07-26 2016-10-19 ゴゴロ インク Apparatus, method, and article for authentication, security, and control of power storage devices such as batteries based on user profiles
WO2013016561A1 (en) 2011-07-26 2013-01-31 Gogoro, Inc. Apparatus, method and article for providing locations of power storage device collection, charging and distribution machines
CN102916455A (en) * 2011-08-05 2013-02-06 金帆新能源科技(上海)有限公司 Novel charging station system
JP5696617B2 (en) * 2011-08-11 2015-04-08 トヨタ自動車株式会社 Charge control device and charge control method
US8643330B2 (en) * 2011-09-02 2014-02-04 Tesla Motors, Inc. Method of operating a multiport vehicle charging system
JP5736546B2 (en) * 2011-09-12 2015-06-17 パナソニックIpマネジメント株式会社 Car charge control device
JP5874268B2 (en) * 2011-09-22 2016-03-02 日産自動車株式会社 Charging apparatus and charging method
JP5392334B2 (en) * 2011-10-07 2014-01-22 日産自動車株式会社 Charger
US8384359B2 (en) * 2011-10-21 2013-02-26 General Electric Company System, charging device, and method of charging a power storage device
WO2013065419A1 (en) * 2011-11-01 2013-05-10 日本電気株式会社 Charging control device, cell management device, charging control method, and recording medium
TW201321230A (en) * 2011-11-16 2013-06-01 Ind Tech Res Inst Charging system and management method of electric vehicles
JP5517313B2 (en) * 2011-12-28 2014-06-11 株式会社豊田自動織機 Vehicle charging system
WO2013110316A1 (en) * 2012-01-23 2013-08-01 Siemens Aktiengesellschaft Apparatus and method for controlling charging at at least two charging stations
JP5723811B2 (en) * 2012-03-13 2015-05-27 株式会社トライネット Electric vehicle charging device and charging system
CN102664447A (en) * 2012-04-26 2012-09-12 华南理工大学 Direct current (DC) charging system of electric automobile and control method thereof
US20150120372A1 (en) * 2012-05-18 2015-04-30 Nec Corporation Electric power control device, electric power control method, and computer program storage medium
MX338059B (en) * 2012-08-02 2016-04-01 Nissan Motor Charging management system for unpiloted conveyance vehicles.
WO2014051039A1 (en) * 2012-09-27 2014-04-03 京セラ株式会社 Management system, management method, and device
US9142978B2 (en) * 2012-11-06 2015-09-22 EV Connect, Inc. Queue prioritization for electric vehicle charging stations
JP6810504B2 (en) 2012-11-16 2021-01-06 ゴゴロ インク Devices, methods and articles for vehicle turn signals
US9854438B2 (en) 2013-03-06 2017-12-26 Gogoro Inc. Apparatus, method and article for authentication, security and control of portable charging devices and power storage devices, such as batteries
US11222485B2 (en) 2013-03-12 2022-01-11 Gogoro Inc. Apparatus, method and article for providing information regarding a vehicle via a mobile device
WO2014164812A1 (en) 2013-03-12 2014-10-09 Gogoro, Inc. Apparatus, method and article for changing portable electrical power storage device exchange plans
US8798852B1 (en) 2013-03-14 2014-08-05 Gogoro, Inc. Apparatus, system, and method for authentication of vehicular components
CN105210257B (en) 2013-03-15 2018-11-13 睿能创意公司 Modular system for being collected and distributing to storage device electric
CN105052003A (en) * 2013-03-29 2015-11-11 日产自动车株式会社 Electricity supply device, vehicle, and contactless electricity supply system
US9301259B2 (en) * 2013-06-05 2016-03-29 Nokia Technologies Oy Apparatus and method for providing device charging information
FR3008246B1 (en) * 2013-07-03 2017-07-07 Schneider Electric Ind Sas SYSTEM FOR ELECTRICALLY CHARGING A PLURALITY OF ELECTRIC VEHICLES AND METHOD FOR DISTRIBUTING THE ELECTRICAL POWER DELIVERED BY AN ELECTRIC POWER SUPPLY OF SUCH A SYSTEM
US9937811B2 (en) 2013-07-19 2018-04-10 Ford Global Technologies, Llc Vehicle authentication for a BEV charger
CN105829160B (en) 2013-08-06 2017-10-24 睿能创意公司 The use of single or multiple battery units is the system and method that electric car is powered
CN108189701B (en) 2013-08-06 2021-10-22 睿能创意公司 Electric vehicle system based on thermal profile adjustment of electric energy storage device
US9124085B2 (en) 2013-11-04 2015-09-01 Gogoro Inc. Apparatus, method and article for power storage device failure safety
ES2837356T3 (en) * 2013-11-06 2021-06-30 Abb Schweiz Ag Electric Vehicle Charger with Distributed Power Converter Arbitration
JP6446045B2 (en) 2013-11-08 2018-12-26 ゴゴロ インク Apparatus, method and article for providing vehicle event data
KR101459968B1 (en) * 2013-11-19 2014-11-10 현대자동차주식회사 Charging demand verification method of a Electric Vehicle and the system thereof
JP6115453B2 (en) * 2013-11-27 2017-04-19 トヨタ自動車株式会社 Non-contact power transmission system and vehicle
EP3097626B1 (en) 2014-01-23 2019-03-20 Gogoro Inc. Systems and methods for utilizing an array of power storage devices, such as batteries
CN106663342A (en) * 2014-02-13 2017-05-10 充电网公司 Performing actions associated with a connected vehicle
ES2721769T3 (en) 2014-08-11 2019-08-05 Gogoro Inc Multidirectional electrical connector and plug
USD789883S1 (en) 2014-09-04 2017-06-20 Gogoro Inc. Collection, charging and distribution device for portable electrical energy storage devices
WO2016036742A1 (en) 2014-09-04 2016-03-10 Gogoro Inc. Apparatus, system, and method for vending, charging, and two-way distribution of electrical energy storage devices
US10845822B2 (en) * 2014-10-31 2020-11-24 Clearpath Robotics Inc. Systems and methods for utilizing fleets of robots
ES2934213T3 (en) 2015-06-05 2023-02-20 Gogoro Inc Systems and methods for vehicle load detection and response
US20170101022A1 (en) * 2015-10-12 2017-04-13 Revitalize Charging Solutions, Inc. Apparatus and method for dual automobile electric charger
US11104246B2 (en) 2015-12-04 2021-08-31 Cyber Switching Solutions, Inc. Electric vehicle charging system interface
US10850627B2 (en) 2015-12-04 2020-12-01 Cyberswitchingpatents, Llc Electric vehicle charging system
US11180034B2 (en) * 2015-12-04 2021-11-23 Cyberswitchingpatents, Llc Electric vehicle charging system with priority charging
US10843581B2 (en) 2015-12-04 2020-11-24 Cyberswitchingpatents, Llc Electric vehicle charging method
US9975446B2 (en) * 2016-02-25 2018-05-22 Ford Global Technologies, Llc Vehicle charge system
US20170373522A1 (en) * 2016-06-23 2017-12-28 Apple Inc. Charging System
US10585440B1 (en) 2017-01-23 2020-03-10 Clearpath Robotics Inc. Systems and methods for using human-operated material-transport vehicles with fleet-management systems
US10272793B2 (en) * 2017-04-04 2019-04-30 Ford Global Technologies, Llc System and method for determining availability of vehicle charging stations
US20210312543A1 (en) 2017-04-05 2021-10-07 State Farm Mutual Automobile Insurance Company Systems and methods for analyzing vehicle financing via blockchain
US10661659B2 (en) 2017-06-21 2020-05-26 Cyberswitchingpatents, LLC. Integrated management of electric vehicle charging and non-electric vehicle fueling
DE102017006678A1 (en) * 2017-07-14 2019-01-17 Drägerwerk AG & Co. KGaA Cascadable multi-loader and method of operation thereof
TWI705013B (en) * 2017-12-29 2020-09-21 英屬開曼群島商睿能創意公司 Exchangeable energy storage device station and method for managing exchangeable energy storage device station
US11200760B2 (en) 2018-01-22 2021-12-14 Clearpath Robotics Inc. Systems and methods for measuring fleets of self-driving industrial vehicles
WO2019144222A1 (en) 2018-01-24 2019-08-01 Clearpath Robotics Inc. Systems and methods for maintaining vehicle state information
US11256270B2 (en) 2018-02-07 2022-02-22 Clearpath Robotics Inc. Communication systems for self-driving vehicles, and methods of providing thereof
DE102018104408A1 (en) * 2018-02-27 2019-08-29 Dr. Ing. H.C. F. Porsche Aktiengesellschaft Method and system for recognizing a vehicle type of a vehicle
JP6960358B2 (en) * 2018-03-06 2021-11-05 本田技研工業株式会社 Vehicle controls, programs and vehicles
CN109165822B (en) * 2018-08-06 2021-12-10 上海顺舟智能科技股份有限公司 Energy supply management system and management method
US10583750B1 (en) * 2018-09-20 2020-03-10 Honda Motor Co., Ltd. Dealership energy management system for charging incoming customer vehicles with inventory vehicles and method thereof
CN112092670B (en) * 2020-09-22 2022-08-05 南京林洋电力科技有限公司 Charging pile queuing and charging management method
US11270243B1 (en) 2020-10-01 2022-03-08 Electricfish Energy Inc. System and method for electrical grid management, risk mitigation, and resilience
KR102339640B1 (en) * 2021-01-25 2021-12-16 (주)블루네트웍스 Method for an electric vehicle charging equipment to determine which electric vehicle to be prioritized for charging and a device using the same
WO2022241056A1 (en) * 2021-05-11 2022-11-17 Electricfish Energy Inc. System and method for electrical grid management, risk mitigation, and resilience
MA53514B1 (en) * 2021-06-08 2023-03-31 Univ Int Rabat Multi-port aggregator for one-way and two-way dc and ac charging stations
CN114264964B (en) * 2021-12-30 2023-10-20 蜂巢能源科技(无锡)有限公司 Method, device, equipment and medium for evaluating battery capacity
JP7285388B1 (en) 2022-07-04 2023-06-01 株式会社エヌジーシー Control device, control method and control system
WO2024009524A1 (en) * 2022-07-04 2024-01-11 日商エレクトロニクス株式会社 Control device, control method, and control system

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5826536A (en) * 1981-08-07 1983-02-17 ダイハツ工業株式会社 Charger for electric vehicle
JPH02110923A (en) 1988-10-19 1990-04-24 Nec Kyushu Ltd Plasma etching device
JP2576901B2 (en) * 1989-06-09 1997-01-29 日本輸送機株式会社 Charging device
US5594318A (en) 1995-04-10 1997-01-14 Norvik Traction Inc. Traction battery charging with inductive coupling
JP3013764B2 (en) 1995-10-03 2000-02-28 三菱自動車工業株式会社 Charge and discharge control device for hybrid electric vehicles
JPH1080071A (en) 1996-09-02 1998-03-24 Japan Storage Battery Co Ltd Charging controller for electric automobile
US7256516B2 (en) * 2000-06-14 2007-08-14 Aerovironment Inc. Battery charging system and method
JP2004364388A (en) * 2003-06-03 2004-12-24 Toshiba Battery Co Ltd Charger of secondary battery and charge control program thereof
DE102004041722A1 (en) * 2004-08-28 2006-03-23 Jungheinrich Aktiengesellschaft Arrangement for charging at least two batteries
WO2008044297A1 (en) * 2006-10-11 2008-04-17 Panasonic Corporation Electronic device and charging control method
JP2008113500A (en) * 2006-10-30 2008-05-15 Shinano Kenshi Co Ltd Power supply system at disaster time
JP2008117444A (en) 2006-11-01 2008-05-22 Matsushita Electric Ind Co Ltd Optical head and optical information processor
JP2008199752A (en) * 2007-02-09 2008-08-28 Kyushu Electric Power Co Inc Charger
JP4144646B1 (en) * 2007-02-20 2008-09-03 トヨタ自動車株式会社 Electric vehicle, vehicle charging device, and vehicle charging system
JP2008247080A (en) 2007-03-29 2008-10-16 Toyota Motor Corp Display system for hybrid vehicle
JP2008312401A (en) 2007-06-18 2008-12-25 Toyota Motor Corp Charge system and vehicle
JP5204470B2 (en) * 2007-12-11 2013-06-05 パナソニック株式会社 Power supply system

Also Published As

Publication number Publication date
FR2949026B1 (en) 2019-05-31
JP2011036096A (en) 2011-02-17
US20110031929A1 (en) 2011-02-10
CN101997321B (en) 2014-07-09
JP5062229B2 (en) 2012-10-31
DE102010030517A1 (en) 2011-02-10
CN101997321A (en) 2011-03-30
US8378627B2 (en) 2013-02-19

Similar Documents

Publication Publication Date Title
FR2949026A1 (en) POWER SUPPLY CONTROL DEVICE, POWER SUPPLY SYSTEM, AND METHOD FOR CONTROLLING POWER SUPPLY OF CHARGER AND VEHICLE
EP2803523B1 (en) Method for dynamic and predictive management of the electrical recharging of batteries
JP5960361B2 (en) Apparatus and method for controlling charge amount balancing operation of secondary battery cell
EP2737591B1 (en) Recharging of a pool of batteries
FR2962605A1 (en) VEHICLE LOADING APPARATUS
CN113949091B (en) Intelligent charging electric vehicle energy networking scheduling method and system
FR3009455A1 (en) CHARGE CONTROL DEVICE FOR VEHICLE
EP2892753A2 (en) Recharging of a pool of batteries
EP3672019A1 (en) Method and device for controlling the battery recharging and discharge of a set of said batteries with partial recharging of a battery
CN111497676A (en) Hybrid vehicle and method for controlling hybrid vehicle
JP2011250641A (en) Charge control device and vehicle with the same
WO2021148726A1 (en) Method and device for controlling an energy storage system, for example a vehicle battery
WO2022037632A1 (en) Battery energy management method and device for hybrid vehicle, and machine-readable storage medium
FR3112997A1 (en) MULTI-POINT SHARED ELECTRIC VEHICLE CHARGING SYSTEM
WO2010097554A1 (en) Device and method for the optimised management of electrical power from an electrochemical storage source on-board a hybrid vehicle
WO2010092296A1 (en) Device and method for managing the level of electric charge during the charging of an electrochemical storage source onboard a vehicle
FR2991104A1 (en) Method for desulphation of e.g. lithium-ion battery, in electrical network of vehicle, involves discharging battery until predetermined load threshold is reached, and changing load of battery until another load threshold is reached
FR2974951A1 (en) Method for controlling parallel charging of direct current batteries of e.g. electric car linked to recharging point, involves continuing charging of two batteries in addition to charging of third battery until all batteries are recharged
KR20190025225A (en) Vehicle battery management method using estimation of solar cell power generation amount
FR2982206A1 (en) DEVICE AND METHOD FOR MANAGING A BATTERY FOR ITS NON-USE DURING A SELECTED DURATION
WO2020089543A1 (en) Device for rapid recharging of electric vehicles via electric rental vehicles
EP3672024A1 (en) Method and device for controlling the battery recharging and discharge of a set of said batteries
FR3008237A1 (en) METHOD AND SYSTEM FOR BATTERY CHARGING
FR3097358A1 (en) ASSISTANCE WITH THE CHARGING OF A VEHICLE, BY PROPOSING OPTIMAL AND ALTERNATIVE CHARGING PLANS ADAPTED TO A LONG TRIP
FR3086592A1 (en) INDUCTION RECHARGE SYSTEM, VIA A WAVE-CONTROLLED MOBILE HOUSING, OF A VEHICLE BATTERY

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7

PLSC Publication of the preliminary search report

Effective date: 20160902

PLFP Fee payment

Year of fee payment: 8

PLFP Fee payment

Year of fee payment: 9

PLFP Fee payment

Year of fee payment: 10

ST Notification of lapse

Effective date: 20210305