FR2801912A1 - Flagged road comprises foundation course, reception bed for flags and jointing material filling flag spaces - Google Patents

Flagged road comprises foundation course, reception bed for flags and jointing material filling flag spaces Download PDF

Info

Publication number
FR2801912A1
FR2801912A1 FR9915209A FR9915209A FR2801912A1 FR 2801912 A1 FR2801912 A1 FR 2801912A1 FR 9915209 A FR9915209 A FR 9915209A FR 9915209 A FR9915209 A FR 9915209A FR 2801912 A1 FR2801912 A1 FR 2801912A1
Authority
FR
France
Prior art keywords
sep
bed
paved
pavement according
paved pavement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR9915209A
Other languages
French (fr)
Other versions
FR2801912B1 (en
Inventor
Bernard Febvre
Michel Pirot
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCREG SA
Original Assignee
SCREG SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCREG SA filed Critical SCREG SA
Priority to FR9915209A priority Critical patent/FR2801912B1/en
Publication of FR2801912A1 publication Critical patent/FR2801912A1/en
Application granted granted Critical
Publication of FR2801912B1 publication Critical patent/FR2801912B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/003Pavings made of prefabricated single units characterised by material or composition used for beds or joints; characterised by the way of laying

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The flagged road comprises a foundation course (1), a flag reception bed (2), a flag layer (3) and a jointing material (4) filling the spaces between the flags. An Independent claim is also included for the process used to build the road.

Description


Figure img00010001

Figure img00010001

La <SEP> présente <SEP> invention <SEP> est <SEP> relative <SEP> <B>à</B> <SEP> une <SEP> chaussée
<tb> pavée <SEP> du <SEP> type <SEP> comprenant <SEP> une <SEP> assise, <SEP> un <SEP> lit <SEP> de <SEP> réception <SEP> de
<tb> pavés, <SEP> une <SEP> couche <SEP> pavés <SEP> disposée <SEP> sur <SEP> ce <SEP> lit, <SEP> et <SEP> un
<tb> matériau <SEP> de <SEP> jointoiement <SEP> emplissant <SEP> les <SEP> espaces <SEP> situés <SEP> entre
<tb> les <SEP> pavés.
<tb> La <SEP> chaussée <SEP> pavée <SEP> suivant <SEP> l'invention <SEP> est <SEP> routière
<tb> ou <SEP> piétonne, <SEP> et <SEP> le <SEP> <B> </B> <SEP> pavés <SEP> <B> </B> <SEP> s'entend <SEP> au <SEP> sens <SEP> large,
<tb> c'est-à-dire <SEP> qu'il <SEP> englobe <SEP> les <SEP> pavés <SEP> proprement <SEP> dits <SEP> et <SEP> les
<tb> dalles.
<tb> Les <SEP> chaussées <SEP> pavées <SEP> se <SEP> développent <SEP> <B>à</B> <SEP> nouveau <SEP> dans
<tb> le <SEP> cadre <SEP> des <SEP> aménagements <SEP> de <SEP> centre-ville <SEP> et <SEP> d'opérations <SEP> de
<tb> <B> </B> <SEP> prestige <SEP> <B> .</B> <SEP> Ces <SEP> chaussées, <SEP> <B>plus</B> <SEP> onéreuses <SEP> que <SEP> les
<tb> chaussées <SEP> traditionnelles <SEP> en <SEP> enrobés, <SEP> se <SEP> doivent <SEP> donc <SEP> d'être
<tb> réalisées <SEP> avec <SEP> le <SEP> minimum <SEP> de <SEP> défauts <SEP> et <SEP> doivent <SEP> être
<tb> pérennes <SEP> dans <SEP> le <SEP> temps.
<tb> Les <SEP> méthodes <SEP> généralement <SEP> utilisées <SEP> pour <SEP> réaliser
<tb> les <SEP> chaussées <SEP> pavées <SEP> sont <SEP> les <SEP> suivantes.
<tb> <B>(1)</B> <SEP> Après <SEP> réalisation <SEP> de <SEP> l'assise <SEP> de <SEP> chaussée <SEP> en
<tb> béton <SEP> de <SEP> ciment, <SEP> grave-ciment <SEP> ou <SEP> analogue <SEP> (couramment <SEP> une
<tb> dalle <SEP> de <SEP> 20 <SEP> <B>à <SEP> 28</B> <SEP> cm <SEP> épaisseur), <SEP> les <SEP> pavés <SEP> sont <SEP> posés <SEP> sur
<tb> un <SEP> mortier <SEP> hydraulique <SEP> d'environ <SEP> 4 <SEP> cm <SEP> d'épaisseur. <SEP> Les <SEP> pavés
<tb> sont <SEP> incrustés <SEP> et <SEP> calés <SEP> dans <SEP> ce <SEP> mortier. <SEP> Après <SEP> pose <SEP> de
<tb> l'ensemble <SEP> du <SEP> pavage <SEP> joints <SEP> entre <SEP> pavés <SEP> sont <SEP> réalisés <SEP> <B>à</B>
<tb> l'aide <SEP> d'un <SEP> mortier <SEP> ciment <SEP> fin <SEP> et <SEP> liquide.
<tb> Cette <SEP> technique <SEP> très <SEP> répandue <SEP> présente <SEP> les
<tb> inconvénients <SEP> suivants <SEP> <B>:</B>
<tb> <B>e</B> <SEP> Il <SEP> faut <SEP> attendre <SEP> le <SEP> temps <SEP> de <SEP> séchage <SEP> de <SEP> l'assise
<tb> avant <SEP> de <SEP> pouvoir <SEP> mettre <SEP> en <SEP> oeuvre <SEP> les <SEP> pavés, <SEP> et <SEP> il <SEP> faut
<tb> ensuite <SEP> attendre <SEP> un <SEP> temps <SEP> de <SEP> séchage <SEP> pour <SEP> le <SEP> mortier <SEP> de <SEP> pose
<tb> et <SEP> pour <SEP> les <SEP> joints.
<tb> En <SEP> l'absence <SEP> de <SEP> temps <SEP> de <SEP> séchage <SEP> suffisants, <SEP> on
<tb> obtient <SEP> une <SEP> rupture <SEP> interfaces <SEP> pavé/mortier <SEP> ou/et <SEP> dans
<tb> les <SEP> joints. <SEP> Pour <SEP> des <SEP> travaux <SEP> urbains, <SEP> ce <SEP> point <SEP> est <SEP> souvent
<tb> critique.

Figure img00020001
The <SEP> present <SEP> invention <SEP> is <SEP> relative <SEP><B> to <SEP> a <SEP> pavement
<tb> Keys <SEP> of the <SEP> type <SEP> including <SEP> a <SEP> seated, <SEP> a <SEP> reads <SEP> of <SEP> receipt <SEP> of
<tb> tiles, <SEP> a <SEP><SEP> layer <SEP> tiles arranged <SEP> on <SEP> this <SEP> reads, <SEP> and <SEP> a
<tb> material <SEP> of <SEP> jointing <SEP> filling <SEP><SEP> spaces <SEP> located <SEP> between
<tb> the <SEP> tiles.
<tb> The <SEP> pavement <SEP> paved <SEP> next <SEP> the invention <SEP> is <SEP> road
<tb> or <SEP> pedestrian, <SEP> and <SEP> the <SEP><B></B><SEP> Keys <SEP><B></B><SEP> means <SEP> at <SEP> meaning <SEP> wide,
<tb> that is <SEP> that it <SEP> encompasses <SEP> the <SEP> blocks <SEP> properly <SEP> said <SEP> and <SEP> them
<tb> slabs.
<tb><SEP> Pavements <SEP> paved <SEP> se <SEP> develop <SEP><B> to <SEP> new <SEP> in
<tb><SEP> Framework <SEP> of <SEP><SEP> Facilities <SEP> Downtown <SEP> and <SEP> of <SEP> Operations
<tb><B><B><B><B><B><B><B><B>.<B><B><B><B><B><B><B><B><B><B><B><B><B><B><B>SEP> that <SEP>
<tb> pavements <SEP> traditional <SEP> in <SEP> coated, <SEP> se <SEP> must <SEP> so <SEP> to be
<tb> performed <SEP> with <SEP> the <SEP> minimum <SEP> of <SEP> defects <SEP> and <SEP> must <SEP> be
<tb> perennials <SEP> in <SEP> the <SEP> time.
<tb> The <SEP> methods <SEP> typically <SEP> used <SEP> for <SEP> realize
<tb><SEP> paved <SEP> paved <SEP> are <SEP> the following <SEP>.
<tb><B> (1) </ b><SEP> After <SEP> realization <SEP> of <SEP> the <SEP> course of <SEP> pavement <SEP> in
<tb> concrete <SEP> of <SEP> cement, <SEP> severe-cement <SEP> or <SEP> analogue <SEP> (commonly <SEP> a
<tb> slab <SEP> of <SEP> 20 <SEP><B> to <SEP> 28 </ B><SEP> cm <SEP> thickness), <SEP><SEP> blocks <SEP> are <SEP> poses <SEP> on
<tb> a <SEP> hydraulic <SEP> mortar <SEP> of about <SEP> 4 <SEP> cm <SEP> thickness. <SEP> The <SEP> pavers
<tb> are <SEP> inlaid <SEP> and <SEP> set <SEP> in <SEP> this <SEP> mortar. <SEP> After <SEP> asks <SEP> to
<tb> The <SEP> set of <SEP> tiling <SEP> seals <SEP> between <SEP> Keys <SEP> are <SEP> made <SEP><B> to </ B>
<tb> the help <SEP> of a <SEP> mortar <SEP> cement <SEP> end <SEP> and <SEP> liquid.
<tb> This <SEP> technique <SEP> very <SEP> widespread <SEP> presents <SEP> the
<tb> following <SEP> disadvantages <SEP><B>:</B>
<tb><B> e </ B><SEP> It <SEP> must <SEP> wait <SEP> the <SEP> time <SEP> of <SEP> drying <SEP> of <SEP> the seat
<tb> before <SEP> of <SEP> can <SEP> put <SEP> in <SEP> work <SEP><SEP> blocks, <SEP> and <SEP> it <SEP> must
<tb> then <SEP> wait <SEP> a <SEP> time <SEP> of <SEP> drying <SEP> for <SEP> the <SEP> mortar <SEP> of <SEP> poses
<tb> and <SEP> for <SEP> joined <SEP>.
<tb> In <SEP> the absence <SEP> of <SEP> time <SEP> of <SEP> drying <SEP> sufficient, <SEP> on
<tb> gets <SEP> a <SEP> break <SEP> SEP <SEP> Interfaces <SEP> or <SEP> Interfaces
<tb> the <SEP> joints. <SEP> For <SEP> of <SEP> city <SEP> jobs, <SEP> this <SEP><SEP> point is <SEP> often
<tb> critical.
Figure img00020001

La <SEP> mise <SEP> en <SEP> oeuvre <SEP> des <SEP> pavés <SEP> et <SEP> des <SEP> joints <SEP> est
<tb> impossible <SEP> par <SEP> temps <SEP> très <SEP> froid. <SEP> En <SEP> effet, <SEP> gel <SEP> nocturne
<tb> important <SEP> au <SEP> jeune <SEP> âge <SEP> casse <SEP> de <SEP> façon <SEP> irréversible <SEP> le <SEP> début
<tb> des <SEP> liaisons <SEP> cristallines <SEP> des <SEP> matériaux <SEP> hydrauliques.
<tb> Les <SEP> réparations <SEP> nécessitent <SEP> le <SEP> blocage <SEP> de <SEP> toute
<tb> circulation <SEP> pendant <SEP> plusieurs <SEP> jours <SEP> sur <SEP> les <SEP> zones <SEP> reprises.
<tb> <B>0</B> <SEP> Cette <SEP> technique <SEP> est <SEP> très <SEP> favorable <SEP> au
<tb> développement <SEP> de <SEP> la <SEP> fissuration <SEP> hydraulique <SEP> qui <SEP> entraîne
<tb> des <SEP> ruptures <SEP> de <SEP> joints <SEP> et <SEP> ensuite <SEP> des <SEP> dégrada- <SEP> tions <SEP> de <SEP> la
<tb> chaussée <SEP> car <SEP> les <SEP> pavés <SEP> ne <SEP> sont <SEP> plus <SEP> calés <SEP> les <SEP> uns <SEP> par
<tb> rapport <SEP> aux <SEP> autres.
<tb> (2) <SEP> Après <SEP> réalisation <SEP> de <SEP> l'assise <SEP> de <SEP> chaussée <SEP> en
<tb> matériau <SEP> traité <SEP> avec <SEP> un <SEP> liant <SEP> hydraulique, <SEP> béton, <SEP> grave ciment <SEP> analogue <SEP> comme <SEP> dans <SEP> la <SEP> technique <SEP> précédente, <SEP> les
<tb> pavés <SEP> sont <SEP> posés <SEP> sur <SEP> un <SEP> lit <SEP> de <SEP> sable. <SEP> Ce <SEP> lit, <SEP> d'épaisseur
<tb> 4cm <SEP> environ, <SEP> permet <SEP> l'incrustation <SEP> et <SEP> le <SEP> calage <SEP> en <SEP> fond <SEP> des
<tb> pavés. <SEP> joints <SEP> sont <SEP> réalisés <SEP> avec <SEP> un <SEP> mortier <SEP> hydraulique
<tb> assez <SEP> liquide, <SEP> ou <SEP> bien <SEP> avec <SEP> un <SEP> sable <SEP> et <SEP> de <SEP> l'émulsion <SEP> de
<tb> bitume.
<tb> Cette <SEP> technique <SEP> largement <SEP> employée <SEP> est <SEP> parfois
<tb> abandonnée <SEP> pour <SEP> les <SEP> raisons <SEP> suivantes <SEP> <B>:</B>
<tb> <B>e</B> <SEP> Le <SEP> nettoyage <SEP> est <SEP> difficile <SEP> en <SEP> effet, <SEP> si <SEP> les
<tb> joints <SEP> sont <SEP> dégradés, <SEP> l'eau <SEP> s'infiltre <SEP> sous <SEP> les <SEP> pavés <SEP> et
<tb> déplace <SEP> <B>'</B> <SEP> la <SEP> longue <SEP> le <SEP> sable, <SEP> et <SEP> de <SEP> ce <SEP> fait <SEP> l'ensemble <SEP> des
<tb> pavés <SEP> bouge. <SEP> De <SEP> nombreuses <SEP> villes <SEP> emploient <SEP> régulièrement
<tb> des <SEP> arroseuses <SEP> haute <SEP> pression <SEP> qui <SEP> dégradent <SEP> <B>à</B> <SEP> la <SEP> longue <SEP> la
<tb> chaussée.
<tb> Lors <SEP> des <SEP> réparations, <SEP> de <SEP> vastes <SEP> zones <SEP> doivent
<tb> être <SEP> reprises <SEP> pour <SEP> s'assurer <SEP> de <SEP> la <SEP> présence <SEP> correcte <SEP> du <SEP> lit
<tb> de <SEP> sable.
<tb> <B>*</B> <SEP> Le <SEP> joint, <SEP> si <SEP> celui-ci <SEP> est <SEP> en <SEP> mortier, <SEP> est <SEP> sujet <SEP> <B>à</B>
<tb> la <SEP> fissuration <SEP> en <SEP> tant <SEP> que <SEP> matériau <SEP> hydraulique.

Figure img00030001
The <SEP> setting <SEP> in <SEP> work <SEP> of <SEP> blocks <SEP> and <SEP> of <SEP> seals <SEP> is
<tb> impossible <SEP> by <SEP> time <SEP> very <SEP> cold. <SEP> In <SEP> effect, <SEP> freeze <SEP> nocturnal
<tb> important <SEP> in <SEP> young <SEP> age <SEP> case <SEP> of <SEP> way <SEP> irreversible <SEP><SEP> start
<tb><SEP> bonds <SEP> crystalline <SEP> hydraulic <SEP> materials <SEP>.
<tb><SEP> repairs <SEP> require <SEP> the <SEP> blocking <SEP> of <SEP> any
<tb> circulation <SEP> for <SEP> several <SEP> days <SEP> on <SEP><SEP><SEP> zones.
<tb><B> 0 </ B><SEP> This <SEP> technique <SEP> is <SEP> very <SEP> favorable <SEP> at
<tb> development <SEP> of <SEP><SEP> cracking <SEP> hydraulic <SEP> which <SEP> results
<tb><SEP> breaks <SEP> of <SEP> joints <SEP> and <SEP> then <SEP> of <SEP> degrade <SEP><SEP> of <SEP>
<tb> pavement <SEP> because <SEP><SEP> blocks <SEP> no <SEP> are <SEP> more <SEP> set <SEP><SEP> a <SEP> by
<tb> report <SEP> to <SEP> others.
<tb> (2) <SEP> After <SEP> realization <SEP> of <SEP> the <SEP> course of <SEP><SEP> pavement in
<tb><SEP> treated <SEP> material with <SEP> a <SEP> hydraulic <SEP> binder, <SEP> concrete, <SEP> severe <SEP> analog <SEP> as <SEP> in <SEP> the previous <SEP> technical <SEP>, <SEP> the
<tb> blocks <SEP> are <SEP> set <SEP> on <SEP> a <SEP> reads <SEP> from <SEP> sand. <SEP> This <SEP> bed, <SEP> thick
<tb> 4cm <SEP> approximately, <SEP> allows <SEP> overlay <SEP> and <SEP><SEP> setting <SEP> in <SEP> background <SEP> of
<tb> cobblestones. <SEP> joints <SEP> are <SEP> realized <SEP> with <SEP> a <SEP> mortar <SEP> hydraulic
<tb> enough <SEP> liquid, <SEP> or <SEP> well <SEP> with <SEP> one <SEP> sand <SEP> and <SEP> of <SEP> the <SEP> emulsion
<tb> bitumen.
<tb> This <SEP> technique <SEP> widely <SEP> employed <SEP> is <SEP> sometimes
<tb> aborted <SEP> for <SEP> the following <SEP><SEP> reasons <SEP><B>:</B>
<tb><B> e </ B><SEP> The <SEP> cleanup <SEP> is <SEP> difficult <SEP> in <SEP> effect, <SEP> if <SEP>
<tb> joints <SEP> are <SEP> degraded, <SEP> water <SEP> infiltrates <SEP> under <SEP><SEP> blocks <SEP> and
<tb> moves <SEP><B>'<SEP> the <SEP> long <SEP> the <SEP> sand, <SEP> and <SEP> of <SEP> this <SEP> does <SEP > the <SEP> set of
<tb> Keys <SEP> moves. <SEP> From <SEP> many <SEP> cities <SEP> use <SEP> regularly
<tb><SEP> sprinklers <SEP> high <SEP> pressure <SEP> which <SEP> degrade <SEP><B> to </ B><SEP><SEP> long <SEP> la
<tb> pavement.
<tb> When <SEP><SEP> repairs, <SEP> of <SEP> large <SEP><SEP> zones must
<tb> be <SEP> times <SEP> for <SEP> ensure <SEP> of <SEP> the <SEP> presence <SEP> correct <SEP> of <SEP> reads
<tb> of <SEP> sand.
<tb><B> * </ B><SEP> The <SEP> join, <SEP> if <SEP> this <SEP> is <SEP> in <SEP> mortar, <SEP> is <SEP> subject <SEP><B> to </ B>
<tb> the <SEP> cracking <SEP> in <SEP> both <SEP> and <SEP> hydraulic <SEP> material.
Figure img00030001

<B>e</B> <SEP> Lorsque <SEP> des <SEP> matériaux <SEP> hydrauliques <SEP> sont <SEP> utilisés,
<tb> il <SEP> est <SEP> indispensable <SEP> d'attendre <SEP> les <SEP> temps <SEP> nécessaire <SEP> <B>à</B> <SEP> leur
<tb> séchage, <SEP> avant <SEP> pouvoir <SEP> livrer <SEP> <B>à</B> <SEP> la <SEP> circulation <SEP> la <SEP> zone
<tb> construite <SEP> ou <SEP> reconstruite.
<tb> L'invention <SEP> a <SEP> pour <SEP> but <SEP> de <SEP> former <SEP> une <SEP> chaussée <SEP> pavée
<tb> qui <SEP> puisse <SEP> être <SEP> réalisée <SEP> et <SEP> réparée <SEP> facilement <SEP> et <SEP> rapidement
<tb> de <SEP> façon <SEP> fiable, <SEP> qui <SEP> résiste <SEP> bien <SEP> aux <SEP> opérations <SEP> de
<tb> nettoyage <SEP> et <SEP> qui <SEP> soit <SEP> pérenne <SEP> dans <SEP> le <SEP> temps.
<tb> <B>A</B> <SEP> cet <SEP> effet, <SEP> l'invention <SEP> a <SEP> pour <SEP> objet <SEP> une <SEP> chaussée
<tb> pavée <SEP> du <SEP> type <SEP> précité, <SEP> caractérisée <SEP> en <SEP> ce <SEP> que <SEP> le <SEP> lit <SEP> est
<tb> constitué <SEP> d'un <SEP> enrobé <SEP> dense <SEP> de <SEP> granulométrie <SEP> <B>O/D,</B> <SEP> et <SEP> en <SEP> ce
<tb> que <SEP> le <SEP> matériau <SEP> jointoiement <SEP> est <SEP> un <SEP> mélange <SEP> d'un <SEP> liant
<tb> bitumineux <SEP> et <SEP> d'agrégats <SEP> de <SEP> dimension <SEP> au <SEP> plus <SEP> égale <SEP> <B>-à <SEP> D.</B>
<tb> La <SEP> chaussée <SEP> pavée <SEP> suivant <SEP> l'invention <SEP> peut
<tb> comporter <SEP> une <SEP> ou <SEP> plusieurs <SEP> des <SEP> caractéristiques <SEP> suivantes,
<tb> prises <SEP> isolément <SEP> <B>ou</B> <SEP> suivant <SEP> toutes <SEP> leurs <SEP> combinaisons
<tb> techniquement <SEP> possibles <SEP> <B>:</B>
<tb> <B>-</B> <SEP> les <SEP> agrégats <SEP> du <SEP> matériau <SEP> de <SEP> jointoiement
<tb> constituent <SEP> un <SEP> sable <SEP> <B>;</B>
<tb> <B>-</B> <SEP> le <SEP> matériau <SEP> de <SEP> jointoiement <SEP> est <SEP> un <SEP> enrobé <SEP> dense <SEP> de
<tb> granulométrie <SEP> <B><U>0/d</U></B> <SEP> avec <SEP> <B><U>d</U> <SEP> :9 <SEP> B</B>
<tb> <B><U>d</U> <SEP> < <SEP> D <SEP> ;</B>
<tb> <B>D</B> <SEP> est <SEP> compris <SEP> entre <SEP> <B>6</B> <SEP> et <SEP> 14 <SEP> mm
<tb> <B><U>d</U></B> <SEP> est <SEP> compris <SEP> entre <SEP> 2 <SEP> et <SEP> <B>6</B> <SEP> mm
<tb> l'assise <SEP> est <SEP> en <SEP> grave-bitume, <SEP> en <SEP> enrobé <SEP> <B>à</B> <SEP> haut
<tb> module <SEP> ou <SEP> en <SEP> béton <SEP> bitumineux <SEP> <B>;</B>
<tb> <B>-</B> <SEP> l'assise <SEP> est <SEP> en <SEP> béton <SEP> de <SEP> ciment <SEP> ou <SEP> en <SEP> grave
<tb> traitée <SEP> avec <SEP> un <SEP> liant <SEP> hydraulique <SEP> <B>;</B> <SEP> et
<tb> <B>-</B> <SEP> l'épaisseur <SEP> du <SEP> lit <SEP> est <SEP> d'environ <SEP> 4 <SEP> <B>à <SEP> _155</B> <SEP> cm.
<tb> L'invent' <SEP> a <SEP> également <SEP> pour <SEP> objet <SEP> un <SEP> procédé <SEP> de
<tb> réalisation <SEP> d'une <SEP> chaussée <SEP> pavée <SEP> telle <SEP> que <SEP> définie <SEP> ci dessus. <SEP> Suivant <SEP> ce <SEP> procédé, <SEP> le <SEP> lit <SEP> et <SEP> le <SEP> matériau <SEP> de
<tb> jointoiement <SEP> sont <SEP> mis <SEP> en <SEP> oeuvre <SEP> <B>à</B> <SEP> froid, <SEP> chacun <SEP> <B>à</B> <SEP> partir

Figure img00040001
<B> e </ B><SEP> When <SEP><SEP><SEP> hydraulic <SEP> materials are <SEP> used,
<tb> it <SEP> is <SEP> necessary <SEP> to wait <SEP> the <SEP> time <SEP> necessary <SEP><B> to </ B><SEP> their
<tb> drying, <SEP> before <SEP> can <SEP> deliver <SEP><B> to <SEP> the <SEP> traffic <SEP><SEP> zone
<tb> built <SEP> or <SEP> rebuilt.
<tb> The invention <SEP> has <SEP> for <SEP> purpose <SEP> of <SEP> form <SEP> a <SEP> pavement <SEP> paved
<tb> which <SEP> can <SEP> be <SEP> performed <SEP> and <SEP> repaired <SEP> easily <SEP> and <SEP> quickly
<SE>SEP> reliable <SEP>, <SEP> which <SEP> resists <SEP> well <SEP> with <SEP><SEP>
<tb> cleaning <SEP> and <SEP> which <SEP> is <SEP> perennial <SEP> in <SEP> the <SEP> time.
<tb><B> A </ B><SEP> this <SEP> effect, <SEP> the invention <SEP> a <SEP> for <SEP> object <SEP> a <SEP> pavement
<tb> paved <SEP> of the <SEP> type <SEP> above, <SEP> characterized <SEP> in <SEP> this <SEP> that <SEP><SEP> read <SEP> is
<tb> constituted <SEP> of a <SEP> coated <SEP> dense <SEP> of <SEP> granulometry <SEP><B> O / D, </ B><SEP> and <SEP> in <SEP > this
<tb> that <SEP> the <SEP> material <SEP> jointing <SEP> is <SEP> a <SEP> mixing <SEP> of a <SEP> binding
<tb> bitumen <SEP> and <SEP> Aggregates <SEP> from <SEP> dimension <SEP> to <SEP> plus <SEP> equals <SEP><B> -to <SEP> D. </ B >
<tb> The <SEP> pavement <SEP> paved <SEP> next <SEP> the invention <SEP> can
<tb> include <SEP> one <SEP> or <SEP> multiple <SEP> of the following <SEP><SEP> characteristics,
<tb> taken <SEP> alone <SEP><B> or <SEP> next <SEP> all <SEP> their <SEP> combinations
<tb> technically <SEP> possible <SEP><B>:</B>
<tb><B> - </ B><SEP><SEP> aggregates <SEP> of the <SEP> material <SEP> of <SEP> pointing
<tb> make <SEP> one <SEP> sand <SEP><B>;</B>
<tb><B> - <SEP> the <SEP> material <SEP> of <SEP> jointing <SEP> is <SEP> a <SEP> coated <SEP> dense <SEP> of
<tb> granulometry <SEP><B><U> 0 / d </ U><SEP> with <SEP><B><U> d </ U><SEP>: 9 <SEP> B </ B>
<tb><B><U></U><SEP><<SEP> D <SEP>;</B>
<tb><B> D </ B><SEP> is <SEP> understood <SEP> between <SEP><B> 6 </ B><SEP> and <SEP> 14 <SEP> mm
<tb><B><U> d </ U></B><SEP> is <SEP> understood <SEP> between <SEP> 2 <SEP> and <SEP><B> 6 </ B><SEP> mm
<tb> the <SEP> course is <SEP> in <SEP> severe-bitumen, <SEP> in <SEP> enrobed <SEP><B> to </ B><SEP> up
<tb> module <SEP> or <SEP> in <SEP> concrete <SEP> bituminous <SEP><B>;</B>
<tb><B> - </ B><SEP> the <SEP> course is <SEP> in <SEP> concrete <SEP> of <SEP> cement <SEP> or <SEP> in <SEP> serious
<tb> processed <SEP> with <SEP> a <SEP> binder <SEP> hydraulic <SEP><B>;</B><SEP> and
<tb><B> - <SEP> The <SEP> thickness of <SEP> reads <SEP> is <SEP> from about <SEP> 4 <SEP><B> to <SEP> _155 </ B><SEP> cm.
<tb> The invented <SEP> has <SEP> also <SEP> for <SEP> object <SEP> a <SEP> process <SEP> of
<tb> realization <SEP> of a <SEP> pavement <SEP> paved <SEP> such <SEP> as <SEP> defined <SEP> above. <SEP> Next <SEP> This <SEP> process, <SEP><SEP> reads <SEP> and <SEP> the <SEP><SEP> material
<tb> jointing <SEP> are <SEP> set <SEP> in <SEP> work <SEP><B> to </ B><SEP> cold, <SEP> each <SEP><B> to </ B ><SEP> from
Figure img00040001

d'un <SEP> mélange <SEP> d'agrégats <SEP> et <SEP> d'au <SEP> moins <SEP> une <SEP> émulsion
<tb> bitumineuse <SEP> aqueuse.
<tb> Suivant <SEP> des <SEP> modes <SEP> de <SEP> mi-se <SEP> en <SEP> oeuvre <SEP> de <SEP> ce <SEP> procédé
<tb> <B>-</B> <SEP> lesdits <SEP> mélanges <SEP> sont <SEP> effectués <SEP> <B>à</B> <SEP> l'avance, <SEP> dans
<tb> une <SEP> centrale <SEP> de <SEP> malaxage <SEP> <B>;</B> <SEP> et
<tb> <B>-</B> <SEP> une <SEP> couche <SEP> d'accrochage, <SEP> notamment <SEP> constituée
<tb> d'une <SEP> émulsion <SEP> bitumineuse <SEP> aqueuse, <SEP> est <SEP> épandue <SEP> l'assise
<tb> avant <SEP> la <SEP> mise <SEP> en <SEP> oeuvre <SEP> du <SEP> lit.
<tb> Un <SEP> exemple <SEP> de <SEP> mise <SEP> en <SEP> oeuvre <SEP> de <SEP> l'invention <SEP> va
<tb> maintenant <SEP> être <SEP> décrit <SEP> en <SEP> regard <SEP> du <SEP> dessin <SEP> annexe <SEP> dont <SEP> la
<tb> Figure <SEP> unique <SEP> représente <SEP> schématiquement, <SEP> coupe
<tb> verticale, <SEP> une <SEP> chaussée <SEP> pavée <SEP> suivant <SEP> l'invention.
<tb> La <SEP> chaussée <SEP> pavée <SEP> représentée <SEP> au <SEP> dessin <SEP> est
<tb> constituée, <SEP> de <SEP> bas <SEP> en <SEP> haut, <SEP> d'une <SEP> assise <SEP> <B>1, <SEP> dl</B> <SEP> lit <SEP> 2 <SEP> et
<tb> <B>dl</B> <SEP> couche <SEP> de <SEP> pavés <SEP> <B>3</B> <SEP> jointoyée <SEP> par <SEP> un <SEP> matériau <SEP> de
<tb> jointoiement <SEP> 4.
<tb> L'assise <SEP> <B>1</B> <SEP> peut <SEP> être <SEP> exécutée <SEP> en <SEP> matériau
<tb> hydraulique <SEP> tel <SEP> qu'un <SEP> béton <SEP> de <SEP> ciment <SEP> ou <SEP> une <SEP> grave <SEP> traitée
<tb> avec <SEP> un <SEP> liant <SEP> hydraulique. <SEP> Elle <SEP> peut <SEP> également, <SEP> de <SEP> façon
<tb> avantageuse, <SEP> être <SEP> constituée <SEP> d'un <SEP> matériau <SEP> bitumineux <SEP> tel
<tb> une <SEP> grave-bitume <SEP> (c'est-à-dire <SEP> un <SEP> enrobé <SEP> bitumineux
<tb> conforme <SEP> <B>à</B> <SEP> la <SEP> norme <SEP> française <SEP> <B>NF</B> <SEP> P <SEP> <B>98-138</B> <SEP> ou <SEP> formule
<tb> voisine), <SEP> un <SEP> enrobé <SEP> <B>à</B> <SEP> haut <SEP> module <SEP> (c'est-à-dire <SEP> conforme <SEP> <B>à</B>
<tb> norme <SEP> française <SEP> <B>NF</B> <SEP> P <SEP> 98-140 <SEP> ou <SEP> de <SEP> formule <SEP> voisine) <SEP> ou <SEP> un
<tb> béton <SEP> bitumineux <SEP> (c'est-à-dire <SEP> un <SEP> enrobé <SEP> conforme <SEP> aux <SEP> normes
<tb> françaises <SEP> <B>NF</B> <SEP> P <SEP> 98-141, <SEP> <B>98-130, <SEP> 98-132</B> <SEP> ou <SEP> <B>98-136</B> <SEP> ou <SEP> de
<tb> formule <SEP> voisine).
<tb> Le <SEP> lit <SEP> 2, <SEP> de <SEP> 4 <SEP> <B>à <SEP> 5</B> <SEP> cm <SEP> d'épaisseur <SEP> <B>f#,</B> <SEP> est <SEP> constitué
<tb> d'un <SEP> enrobé <SEP> dense <SEP> <B>à</B> <SEP> froid.
<tb> On <SEP> entend <SEP> par <SEP> <B> </B> <SEP> enrobé <SEP> dense <SEP> <B> </B> <SEP> un <SEP> mélange <SEP> qui
<tb> contient <SEP> des <SEP> agrégats <SEP> de <SEP> granulométrie <SEP> <B>O/D,</B> <SEP> est-à-dire
<tb> contenant <SEP> des <SEP> fines, <SEP> du <SEP> sable <SEP> (c'est-à-dire <SEP> des <SEP> agrégats <SEP> de
<tb> granulométrie <SEP> inférieure <SEP> <B>à</B> <SEP> 4 <SEP> mm) <SEP> et <SEP> éventuellement <SEP> des
<tb> gravillons <SEP> de <SEP> granulométrie <SEP> supérieure <SEP> <B>à</B> <SEP> 4 <SEP> mm. <SEP> dimension maximale<B>D</B> des agrégats peut être comprise entre<B>6</B> et 14 mm. Ces agrégats sont mélangés, dans une centrale de malaxage,<B>à</B> au moins une émulsion bitumineuse aqueuse, et l'ensemble est en oeuvre <B> à</B> froid<B> ,</B> c'est-à-dire<B>à</B> une température inférieure<B>à</B> 400C environ.
of a <SEP><SEP> mixture of <SEP> and <SEP> aggregates of <SEP> less than <SEP> a <SEP> emulsion
<tb> bituminous <SEP> aqueous.
<tb> Next <SEP> of <SEP> modes <SEP> of <SEP> half <SEP> in <SEP> work <SEP> of <SEP> this <SEP> process
<tb><B> - <SEP> said <SEP><SEP> mixtures are <SEP> performed <SEP><B></B><SEP> in advance, <SEP> in
<tb> a <SEP> Central <SEP> of <SEP> mixing <SEP><B>;</B><SEP> and
<tb><B> - </ B><SEP> a <SEP> layer <SEP> snap, <SEP> including <SEP> constituted
<tb> of <SEP> aqueous bitumen emulsion <SEP>, <SEP> is <SEP> spread <SEP> the seat
<tb> before <SEP><SEP> setting <SEP> in <SEP> work <SEP> of <SEP> reads.
<tb> A <SEP> example <SEP> of <SEP> setting <SEP> in <SEP> work <SEP> of <SEP> the invention <SEP> is going
<tb> now <SEP> be <SEP> describe <SEP> in <SEP> look <SEP> of the <SEP> drawing <SEP> appendix <SEP> of which <SEP> la
<tb> Figure <SEP> single <SEP> represents <SEP> schematically, <SEP> cut
<tb> vertical, <SEP> a <SEP> pavement <SEP> paved <SEP> following <SEP> the invention.
<tb> The <SEP> pavement <SEP> paved <SEP> represented <SEP> at <SEP> drawing <SEP> is
<tb> constituted, <SEP> of <SEP> low <SEP> in <SEP> up, <SEP> of <SEP> seated <SEP><B> 1, <SEP> dl </ B><SEP> reads <SEP> 2 <SEP> and
<tb><B> dl <SEP><SEP> Layer of <SEP> Keys <SEP><B> 3 </ B><SEP> Joined <SEP> with <SEP> a <SEP> material <SEP> of
<tb> pointing <SEP> 4.
<tb> Seating <SEP><B> 1 </ B><SEP> can <SEP> be <SEP> running <SEP> in <SEP> material
<tb> hydraulic <SEP> such <SEP> that a <SEP> concrete <SEP> of <SEP> cement <SEP> or <SEP> a <SEP> serious <SEP> processed
<tb> with <SEP> a <SEP> hydraulic <SEP> binder. <SEP> It <SEP> can <SEP> also, <SEP> of <SEP> way
<tb> advantageous, <SEP> be <SEP> constituted <SEP> of a <SEP> material <SEP> bituminous <SEP> such
<tb> a <SEP> severe-bitumen <SEP> (that is, <SEP> a <SEP> bituminous <SEP>
<tb> compliant <SEP><B> to <SEP> the <SEP> standard <SEP> French <SEP><B> NF </ B><SEP> P <SEP><B> 98- 138 </ B><SEP> or <SEP> formula
<tb> neighbor), <SEP> one <SEP> coated <SEP><B> to </ B><SEP> up <SEP> module <SEP> (that is, <SEP> compliant <SEP ><B> to </ B>
<tb> French <SEP> standard <SEP><B> NF <SE> P <SEP> 98-140 <SEP> or <SEP> of <SEP> neighbor <SEP> formula <SEP> or <SEP> a
<tb> concrete <SEP> bituminous <SEP> (that is, <SEP> a <SEP> coated <SEP> compliant <SEP> with <SEP> standards
<tb> French <SEP><B> NF </ B><SEP> P <SEP> 98-141, <SEP><B> 98-130, <SEP> 98-132 </ B><SEP> or <SEP><B> 98-136 </ B><SEP> or <SEP> of
<tb> neighbor <SEP> formula).
<tb><SEP> reads <SEP> 2, <SEP> from <SEP> 4 <SEP><B> to <SEP> 5 <SEP> cm <SEP> thick <SEP><B> f #, </ B><SEP> is <SEP> made up
<tb> of a <SEP> coated <SEP> dense <SEP><B> to </ B><SEP> cold.
<tb> On <SEP> means <SEP> by <SEP><B></B></B><SEP> coated <SEP> dense <SEP><B></B></b><SEP> a <SEP> mixture <SEP > who
<tb> contains <SEP><SEP> aggregates <SEP> of <SEP> granulometry <SEP><B> O / D, </ B><SEP> that is to say
<tb> containing <SEP> of the <SEP> fines, <SEP> of the <SEP> sand <SEP> (that is <SEP> of the <SEP> aggregates <SEP> of
<tb> particle size <SEP> lower <SEP><B> to </ B><SEP> 4 <SEP> mm) <SEP> and <SEP> optionally <SEP> of
<tb> chippings <SEP> of <SEP> granulometry <SEP> upper <SEP><B> to </ B><SEP> 4 <SEP> mm. <SEP> maximum size <B> D </ B> aggregates can be between <B> 6 </ B> and 14 mm. These aggregates are mixed, in a mixing plant, at least one aqueous bituminous emulsion, and the assembly is used cold to <B>, <B>, </ B> that is, <B> to </ B> a lower temperature <B> to about 400C.

L'enrobé dense peut notamment être fabriqué suivant technique du double enrobage décrite dans les EP-A-552 574 et FR-A-2 <B>623 219.</B> The dense mix can in particular be manufactured according to the double coating technique described in EP-A-552 574 and FR-A-2 <B> 623 219. </ B>

Eventuellement, une couche d'accrochage liquide constituée d'une émulsion bitumineuse aqueuse peut être mise en oeuvre par aspersion entre le support d'assise<B>1</B> et l'enrobé dense<B>à</B> froid 2.  Optionally, a liquid bonding layer consisting of an aqueous bituminous emulsion can be used by sprinkling between the seat support <B> 1 </ B> and the cold mix <B> to </ B> cold 2.

Les pavés<B>3</B> sont posés sur le lit 2, qui forme après régalage une couche souple dans laquelle les pavés s'encastrent et se calent. The pavers <B> 3 </ B> are placed on the bed 2, which after regrading form a flexible layer in which the pavers are embedded and wedge.

Après la pose des pavés, on remplit les espaces séparant ceux-ci avec le matériau de jointement 4. Ce matériau est constitué d'un mélange de sable et d'émulsion bitumineuse aqueuse ou d'un enrobé dense<B>à</B> froid de granulométrie<B>0/d,</B> avec<B><U>d</U></B> :#9 <B>D.</B> De préférence, pour améliorer fluidité du matériau 4, on choisit<B><U>d</U></B> compris entre 2 et<B>6</B> mm, par exemple<B><U>d</U> =</B> 4 mm. After laying the pavers, the spaces separating them are filled with the jointing material 4. This material consists of a mixture of sand and aqueous bituminous emulsion or a dense mix <B> to </ B > cold of particle size <B> 0 / d, </ B> with <B> <U> d </ U> </ B>: # 9 <B> D. </ B> Preferably, to improve fluidity of the material 4, we choose <B> <U> d </ U> </ B> between 2 and <B> 6 </ B> mm, for example <B> <U> d </ U> = </ B> 4 mm.

La chaussée pavée ainsi réalisée présente des avantages importants<B>:</B> <B>e</B> Il existe une bonne cohésion, avec une certaine souplesse, entre les pavés et le matériau 4 ainsi 'entre le lit 2 et l'assise<B>1.</B> Par suite, les risques de dégradations sont limités même en cas de légers déplacements de certains pavés. The cobblestone pavement thus produced has important advantages <B>: </ b> <B> e </ B> There is a good cohesion, with some flexibility, between the pavers and the material 4 as well as between the bed 2 and the seat <B> 1. </ B> As a result, the risk of damage is limited even in case of slight movement of some pavers.

<B>'0</B> Le lit 2 peut être réglé avec une bonne précision et est compact, sans tendance<B>à</B> la fissuration. <B> '0 </ B> The bed 2 can be adjusted with good accuracy and is compact, with no tendency to break.

# Les joints entre pavés ne se fissurent pas.  # The joints between pavers do not crack.

# La chaussée peut être rapidement livrée<B>à</B> la circulation, lors de sa réalisation comme lors des reparations. En effet, les mélanges agrégats-émulsions bitumineuses ne nécessitent pas d'attente importante pour leur séchage, contrairement aux matériaux hydrauliques.  # The pavement can be quickly delivered <B> to traffic during its construction as during repairs. In fact, aggregates-bituminous emulsions do not require significant waiting for their drying, unlike hydraulic materials.

<B>"</B> Le nettoyage haute pression de la chaussee ne detériore pas les joints. <B> "</ B> The high pressure cleaning of the roadway does not damage the joints.

De<B>plus,</B> les mélanges agrégats-émulsions bitumineuses utilisés sont faciles<B>à</B> manipuler et sont même souvent stockables sur le site avant leur mise en oeuvre. <B> plus, </ B> Bituminous aggregate-emulsion mixtures used are easy to manipulate and are often storable at the site before being used.

Claims (1)

<U>REVENDICATIONS</U> <B>1 -</B> Chaussée pavée, du type comprenant une assise lit (2) de réception de pavés, une couche de pavés <B>(3)</B> disposée sur ce lit, et un matériau de jointoiement (4) emplissant les espaces situés entre les pavés, caractérisée en ce le lit (2) est constitué d'un enrobé dense de granulométrie O/D, et en ce que le matériau de jointoiement (4) un mélange d'un liant bitumineux d'agrégats de dimension au plus égale<B>à D.</B> 2<B>-</B> Chaussée pavée suivant la revendication<B>1,</B> caracterisée en ce que les agrégats matériau de jointoiement (4) constituent un sable. <B>3 -</B> Chaussée pavée suivant la revendication<B>1,</B> caractérisée en ce que le matériau de jointoiement (4) est un enrobé dense de granulométrie 0/d, avec<B>-</B> :# <B>D.</B> 4<B>-</B> Chaussée pavée suivant la revendication<B>3,</B> caractérisée en ce que<B><U>d</U> < D.</B> <B>5 -</B> Chaussée pavée suivant l'une quelconque des revendications<B>1 à</B> 4, caractérisée en ce que<B>D</B> est compris entre<B>6</B> et 14 mm. <B>6 -</B> Chaussée pavée suivant la revendication<B>5,</B> caractérisée en ce que d est compris entre 2 et<B>6</B> mm. <B>7 -</B> Chaussée pavée suivant l'une quelconque des revendications<B>1 à 6,</B> caractérisée en ce que l'assise<B>(1)</B> est en grave-bitume, en enrobé<B>à</B> haut module ou en béton bitumineux. <B>8 -</B> Chaussée pavée suivant l'une quelconque des revendications<B>1 à 6,</B> caractérisée en ce que l'assise<B>(1)</B> est en béton de ciment ou en grave traitée avec un liant hydraulique. <B>9 -</B> Chaussée pavée suivant l'une quelconque des revendications<B>1 à 7,</B> caractérisée en ce que l'épaisseur du lit (2) est d'environ 4<B>à 5</B> cm. <B>10 -</B> Procedé de réalisation d'une chaussée pavée suivant l'une quelconque des revendications<B>1 à 9,</B> caractérisé en que le lit (2) et le matériau de jointoiement (4) sont mis en oeuvre <B>à</B> froid, chacun<B>à</B> partir d'un mélange d'agrégats et d'au moins une émulsion bitumineuse aqueuse. <B>il -</B> Procédé suivant la revendication<B>10,</B> caractérisé en ce que lesdits mélanges sont effectués<B>à</B> l'avance, dans une centrale de malaxage. 12<B>-</B> Procedé suivant la revendication<B>10</B> ou<B>il,</B> caractérisé en qu'une couche d'accrochage, notamment constituée d'une émulsion bitumineuse aqueuse, est épandue sur l'assise<B>(1)</B> avant la mise en oeuvre du lit<U>(2).</U><U> CLAIMS </ U> <B> 1 - </ B> Paved pavement, of the type comprising a bed base (2) for receiving blocks, a layer of paving stones <B> (3) </ B> arranged on this bed, and a grouting material (4) filling the spaces between the pavers, characterized in that the bed (2) consists of a dense mix of O / D granulometry, and in that the grouting material (4) ) a mixture of a bituminous binder of aggregates of a size not more than <B> to D. </ B> 2 <B> - </ B> Paved pavement according to claim 1, characterized by in that the grouting material aggregates (4) constitute a sand. <B> 3 - </ B> paved pavement according to claim 1, characterized in that the grouting material (4) is a dense asphalt of 0 / d grain size, with <B> << / B>: # <B> D. </ B> 4 <B> - </ B> Paved pavement according to Claim 3, characterized in that <B> <U> d </ U> <D. </ B> <B> 5 - </ B> Paved pavement according to any of claims <B> 1 to </ B> 4, characterized in that <B> D </ B> is between <B> 6 </ B> and 14 mm. <B> 6 - </ B> Paved pavement according to claim 5, characterized in that d is between 2 and <B> 6 </ B> mm. <B> 7 - </ B> paved pavement according to any of claims <B> 1 to 6, </ B> characterized in that the seat <B> (1) </ B> is in gravity asphalt, asphalt mix, high modulus or asphalt concrete. <B> 8 - </ B> paved pavement according to any one of claims <B> 1 to 6, characterized in that the seat <B> (1) </ B> is made of concrete of cement or gravel treated with a hydraulic binder. <B> 9 - </ B> Paved pavement according to any one of claims 1 to 7, characterized in that the thickness of the bed (2) is about 4 <B> to 5 </ B> cm. <B> 10 - </ B> Method for producing a paved pavement according to any one of claims <B> 1 to 9, characterized in that the bed (2) and the grouting material (4 ) are used <B> to </ B> cold, each <B> to </ B> from a mixture of aggregates and at least one aqueous bituminous emulsion. <B> il - </ B> A method according to claim 10, characterized in that said mixtures are carried out <B> at </ B> in advance, in a mixing plant. 12 <B> - </ B> Process according to claim <B> 10 </ B> or <B> il, </ B> characterized in that a bonding layer, in particular consisting of an aqueous bituminous emulsion, is spread on the bed <B> (1) </ B> before bed <U> (2) is used. </ U>
FR9915209A 1999-12-02 1999-12-02 PAVED PAVEMENT AND ITS MANUFACTURING METHOD Expired - Fee Related FR2801912B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR9915209A FR2801912B1 (en) 1999-12-02 1999-12-02 PAVED PAVEMENT AND ITS MANUFACTURING METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR9915209A FR2801912B1 (en) 1999-12-02 1999-12-02 PAVED PAVEMENT AND ITS MANUFACTURING METHOD

Publications (2)

Publication Number Publication Date
FR2801912A1 true FR2801912A1 (en) 2001-06-08
FR2801912B1 FR2801912B1 (en) 2003-02-21

Family

ID=9552808

Family Applications (1)

Application Number Title Priority Date Filing Date
FR9915209A Expired - Fee Related FR2801912B1 (en) 1999-12-02 1999-12-02 PAVED PAVEMENT AND ITS MANUFACTURING METHOD

Country Status (1)

Country Link
FR (1) FR2801912B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH127733A (en) * 1928-05-24 1928-09-17 Hans Aebli & Co Process for the production of a durable and cheap road surface.
AT219641B (en) * 1959-04-24 1962-02-12 Cement Ind H Kellner & Co Deut Process for the production of highly resilient road surfaces for motor vehicle expressways
EP0814198A1 (en) * 1995-10-12 1997-12-29 Taisei Rotec Corporation Method for constructing block paving
EP0936311A2 (en) * 1998-02-14 1999-08-18 Hyperlast Limited Road refurbishment method and mortar composition

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH127733A (en) * 1928-05-24 1928-09-17 Hans Aebli & Co Process for the production of a durable and cheap road surface.
AT219641B (en) * 1959-04-24 1962-02-12 Cement Ind H Kellner & Co Deut Process for the production of highly resilient road surfaces for motor vehicle expressways
EP0814198A1 (en) * 1995-10-12 1997-12-29 Taisei Rotec Corporation Method for constructing block paving
EP0936311A2 (en) * 1998-02-14 1999-08-18 Hyperlast Limited Road refurbishment method and mortar composition

Also Published As

Publication number Publication date
FR2801912B1 (en) 2003-02-21

Similar Documents

Publication Publication Date Title
TW334490B (en) Method of block paving construction
CN104652261B (en) Expansion joint based on elastic concrete fast repairing method and system
US4324504A (en) Method of sealing bridge deck joints
Garber et al. Guide to cement-based integrated pavement solutions.
Garilli et al. Stone pavement materials and construction methods in Europe and North America between the 19th and 20th century
US20040116557A1 (en) Paving and sealing composition and method of use
JP3364228B2 (en) Drilling opening filling method
US20190360159A1 (en) Composition and method for surface repair
US4815891A (en) Method for repairing an opening formed in and below a section of pavement
US20030213411A1 (en) Self-leveling cement mix for filling up and sealing diggings of channels, trenches, sewages and the like and for building works in general
US6682260B2 (en) Roller compacted concrete paving sealing method
EP0545740A1 (en) Process for double cold mixing of granular material for road construction
FR2801912A1 (en) Flagged road comprises foundation course, reception bed for flags and jointing material filling flag spaces
US2147195A (en) Method of constructing pavements
JP2909929B2 (en) How to build a block pavement
RU2696735C1 (en) Asphalt-concrete coating patching method
US1717445A (en) Waxier h
EP2084115A2 (en) Composition of rolled and compacted concrete reinforced with fibres and including bituminous chippings and method for making a pavement using said composition
CN113235348A (en) Construction method of pavement with high load-resisting capacity
US1071293A (en) Process of making bituminous concrete pavements.
Authority Manual for Low Volume Roads
FR2689051A1 (en) Producing recycled bituminous material - from old asphalt whose coarser particles are coated with bituminous binder before being mixed with fine asphalt particles
RU2011727C1 (en) Transport construction, constructive section of building and of transport construction, method of its erecting, repairing and/or reconstruction and asphalt concrete mixture
KR20040072332A (en) permeable concrete for paving road
JP2002309503A (en) Block pavement and construction method therefor

Legal Events

Date Code Title Description
ST Notification of lapse

Effective date: 20100831