FR2529613A1 - Wide tunnel or gallery driving sectioned hewing -involves two sections simultaneously alternately hewnand lined while mutually sealed - Google Patents
Wide tunnel or gallery driving sectioned hewing -involves two sections simultaneously alternately hewnand lined while mutually sealed Download PDFInfo
- Publication number
- FR2529613A1 FR2529613A1 FR8311177A FR8311177A FR2529613A1 FR 2529613 A1 FR2529613 A1 FR 2529613A1 FR 8311177 A FR8311177 A FR 8311177A FR 8311177 A FR8311177 A FR 8311177A FR 2529613 A1 FR2529613 A1 FR 2529613A1
- Authority
- FR
- France
- Prior art keywords
- section
- curtain
- shearer
- hewing
- face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 claims abstract description 4
- 238000000034 method Methods 0.000 claims description 10
- 238000005520 cutting process Methods 0.000 claims description 6
- 238000009412 basement excavation Methods 0.000 claims description 4
- 238000009423 ventilation Methods 0.000 claims description 4
- 239000000428 dust Substances 0.000 claims description 3
- 230000007246 mechanism Effects 0.000 claims description 3
- 238000002955 isolation Methods 0.000 claims description 2
- 239000011435 rock Substances 0.000 abstract description 3
- 239000004568 cement Substances 0.000 description 3
- 238000005553 drilling Methods 0.000 description 3
- 238000010008 shearing Methods 0.000 description 3
- 238000010410 dusting Methods 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 210000000056 organ Anatomy 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F1/00—Ventilation of mines or tunnels; Distribution of ventilating currents
- E21F1/14—Air partitions; Air locks
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
L'invention se rapporte à un procedé et à un dispositif pour l'avancement des galeries et tunnels de grande section par havage de deux parties juxtaposées de ltensemble de la section à excaver, les deblais étant évacués de la façon habituelle par l'intermédiaire d'un dispositif de chargement de la haveuse. The invention relates to a method and a device for advancing tunnels and tunnels of large section by havage two juxtaposed parts of the entire section to be excavated, the cuttings being discharged in the usual manner via a loading device for the shearer.
L'invention a pour but d'assurer la sécurité de la section excavée aussi tôt que possible après l'excavation et d'accélérer l'avancement. The invention aims to ensure the safety of the excavated section as soon as possible after excavation and accelerate the advancement.
Cette invention a en effet pour objet un procédé qui consiste essentiellement à excaver et a soutenir alternativement les deux parties de la section, à isoler la partie de la section dans laquelle on effectue le travail de securite et de soutènement de la partie de section dans la- quelle on effectue le travail de havage jusqu'au front de taille et à effectuer le travail de sécurité et de soutènement dans une partie de la section pendant qutn procède au havage de l'autre partie de la section. The object of this invention is a method which essentially consists in excavating and supporting alternately the two parts of the section, isolating the part of the section in which the safety and support work of the section part is carried out in the section. - carry out the cutting work to the cutting edge and perform safety and support work in one part of the section while cutting the other part of the section.
Comme la partie de la section dans laquelle steffec- tue le travail de sécurite et de soutènement est isolée jusqu'au front de taille de la partie de la section dans laquelle s'effectue le travail de havage, la partie de la section située à cote de la haveuse en cours de travail est protégee des blocs de roches qui sont projetés lors du havage, de sorte qu'il est possible d'effectuer le travail de sécurité et de soutènement dans cette partie isolée de la section pendant le travail de la haveuse.Ce procédé n'a pas seulement pour avantage d'abreger le temps nécessaire pour l'avancement, grâce à ltexécution simultanée des travaux de havage et de soutènement, mais surtout d'assurer une meilleure protection du-toit, grâce au soulèvement si- multané d'une partie de la section située à côté de la haveuse en cours de travail.Le toit d'une partie de la section ne présente que la moitié de la largeur du toit complet, la résistance de cette région réduite du toit est donc plus grande que la résistance du toit obtenue lorsque la totali t de l'excavation est réalisée. Le fait que, pendant le travail de la haveuse, on exécute déjà les travaux de protection et de soutènement dans l'autre partie de la section améliore la résistance du toit au-dessus de la haveuse en cours de travail. Le soutènement de la partie de la section située à côte de la haveuse peut etre effectué, par exemple, par la production de trous d'ancrage et la mise en place de boulons d'ancrage dans ces trous, ou encore par projection de ciment. Since the part of the section in which the safety and support work is carried out is insulated to the face of the part of the section in which the cutting work is being done, the part of the section next to the shearer during work is protected from the blocks of rock that are thrown during the shearing, so that it is possible to carry out the safety and support work in this isolated part of the section during the work of the shearer This process not only has the advantage of shortening the time necessary for the advancement, thanks to the simultaneous execution of havage and support works, but especially to ensure a better protection of the roof, thanks to the simultaneous lifting multane of part of the section located next to the shearer during work.The roof of part of the section presents only half the width of the complete roof, the resistance of this reduced area of the roof is t therefore greater than the roof strength obtained when the totality of the excavation is made. The fact that, during the work of the shearer, is already carrying out the protective and retaining work in the other part of the section improves the strength of the roof over the shearer during work. The support of the portion of the section located next to the shear can be performed, for example, by the production of anchor holes and the establishment of anchor bolts in these holes, or by projection of cement.
Selon l'invention, la haveuse est de préférence transférée dans la deuxième partie de la section après une tranche d'avancement qui est plus courte que la longueur de la haveuse. C'est-à-dire que l'on n'excave de préférence qu > u- ne portion relativement courte dans le sens de 1'avancement, que l'on munit ensuite d'un soutènement- pendant que la haveuse travaille dans l'autre partie de la section, de sorte qu'on obtient une sécurité constante au moyen dt soutènement.L'organe d'isolement entre les deux parties de la section doit constituer en particulier une protection contre les projections de blocs pour le personnel qui exécute le soutènement et, selon l'invention, l'organe d'isolement est de préférence avance' jusquau front de taille, au fur et à mesure de l'avancement. Ltisolement entre les deux parties de la section évite également un empoussièrage excessif de la partie de la section dans laquelle on effectue les travaux de soutènement et facilite donc le travail de soutne- ment. According to the invention, the shearer is preferably transferred into the second portion of the section after an advancement slice which is shorter than the length of the shearer. That is, preferably only a relatively short portion in the direction of advance is exchanged, which is then provided with support while the shearer is working in the machine. the other part of the section, so that constant security is obtained by means of support. The isolating organ between the two parts of the section must in particular provide protection against block projections for the personnel performing the support and, according to the invention, the isolation member is preferably advanced to the face of the waist, as the progress. The insulation between the two sections of the section also avoids excessive dusting of the part of the section in which the retaining work is carried out and thus facilitates the work of support.
On connaît, par le DD-PS 132 806 un procédé-pour l'avancement des tailles d'exploitation par tirs de mine dans lequel on travaille dans deux sections juxtaposees, en ce sens que, dans une section, on réalise des trous de mine et on procède au tir et, dans l'autre, on évacue les déblais du tir, cependant qu'entre les deux sections, il subsiste un pilier que l'on fait sauter ultérieurement. Toutefois, ce procédé ne peut pas être utilise, dans le cas de l'avan- cement par havage et il n'oz1re par ailleurs aucune possibilité de protéger une excavation formée par havage aussi tet qu'on le voudrait après sa réalisation. DD-PS 132 806 discloses a process for the advancement of exploitation sizes by blasting in which two juxtaposed sections are worked in that, in one section, blast holes are produced. and the firing is carried out in the other, while between the two sections there is a pillar which is later blown up. However, this method can not be used in the case of hafting and it also does not offer any possibility of protecting a havage-made excavation as much as one would like after its completion.
Un dispositif pour la mise en oeuvre -du procédé selon l'invention comporte un rideau flexible qui s'étend jusqu'au toit et jusqu'à la sole, ainsi que jusqu'au front de taille, et dont la longueur correspond à au moins la longueur de la haveuse et déborde de préférence d'environ 25 ro au-delà de cette longueur. Un tel rideau souple, qui peut être constitué, par exemple, par une matière plastique armée assure une bonne protection contre les blocs de roche. A device for implementing the method according to the invention comprises a flexible curtain which extends up to the roof and up to the sole, as well as to the face of size, and whose length corresponds to at least the length of the shearing machine and preferably overflows about 25 ro beyond this length. Such a flexible curtain, which may be constituted, for example, by an armed plastic material provides good protection against blocks of rock.
Selon l'invention, il est prévu de préférence sous le toit à peu près au milieu de la section totale de l'excavation, un rail qui s'étend dans la direction longitudinale de la galerie ou du tunnel, qui peut être prolongé vers le front de taille et auquel le rideau est suspendu de façon à pouvoir coulisser dans la direction longitudi- nale, Le prolongement du rail peut être réalisé par un tron çon du rail relié au rail. Toutefois, selon l'invention, le rail est de préférence susceptible d'être allongé de manière télescopique. Selon l'invention, le bord inférieur du rideau peut être lesté, ce qui améliore la stabilité du rideau. According to the invention, a rail extending in the longitudinal direction of the tunnel or tunnel, which can be extended towards the the curtain is slidably suspended in the longitudinal direction. The extension of the rail can be achieved by a section of the rail connected to the rail. However, according to the invention, the rail is preferably capable of being telescopically extended. According to the invention, the lower edge of the curtain can be weighted, which improves the stability of the curtain.
Le rideau peut être avancé vers le front de taille de la manière désirée. Selon l'invention, des deux côtés de la haveuse, est monté ou peut être monté au moins un grappin d'avance du rideau, qui coopere avec ce dernier, et qui comporte, par exemple, un mécanisme à piston de poussée. Ceci offre un allègement considérable car 7 pour etre capable de résister aux projections de pierres, un tel rideau doit présenter un poids relativement grand. Toutefois, selon l'invention, le rideau peut eAtre suspendu à la haveuse elle-même, auquel cas celle-ci comporte sur ces deux côtés des organes de raccordement pour des rails qui s'étendent dans la direction longitudinale de la haveuse et auxquels le rideau peut être suspendu de manière à pouvoir se déplacer en translation longitudinale.Selon l'invention, il est avantageusement prévu dans les deux parties de la section des buses d'aérage qui peuvent être raccor dées sélectivement à un dispositif de dépoussièrage. The curtain can be advanced to the face in the desired manner. According to the invention, on both sides of the cutter, is mounted or can be mounted at least one curtain of the advance gripper, which cooperates with the latter, and which comprises, for example, a thrust piston mechanism. This provides considerable relief because 7 to be able to resist the projections of stones, such a curtain must have a relatively large weight. However, according to the invention, the curtain can be suspended from the shearer itself, in which case it comprises on both sides connecting members for rails which extend in the longitudinal direction of the shearer and to which the The curtain may be suspended so as to be able to move in longitudinal translation. According to the invention, it is advantageously provided in the two parts of the section of the ventilation nozzles which can be connected selectively to a dusting device.
Les caractéristiques et avantages de l'invention ap para1tront d'ailleurs au cours de la description qui va suivre, d'un mode de réalisation représenté aux dessins annexés, et donné uniquement à titre d'exemple. Sur ces dessins
- la Fig. 1 est une vue de dessus des deux parties de la section de la galerie ou du tunnel à creuser
- la Fig. 2 est une vue en coupe transversale
- la Fig. 3 est une vue en coupe longitudinale d'une partie de la section dans laquelle travaille la haveuse
- la Fig. 4 montre schématiquement l'avancement.The features and advantages of the invention will moreover appear during the following description of an embodiment shown in the accompanying drawings, and given solely by way of example. On these drawings
FIG. 1 is a top view of the two parts of the section of the tunnel or tunnel to be excavated
FIG. 2 is a cross-sectional view
FIG. 3 is a longitudinal sectional view of a portion of the section in which the shearer is working
FIG. 4 schematically shows the progress.
Les deux parties de la section sont désignées par
A et B. Dans la forme de réalisa-tion selon les Fig. 1 et 2, une haveuse 1 travaille dans la partie A de la section.The two parts of the section are designated by
A and B. In the embodiment-tion according to Figs. 1 and 2, a shearer 1 works in part A of the section.
La partie A de la section est isolée de la partie B par un rideau 2. Le rideau se prolonge jusqutau front de taille 3 et s'étend du toit 4 jusqu'à la sole 5. L'extrémité inférieure 6 du rideau est lestée. Au toit 4 est fixé un rail 7 auquel le rideau 2 est suspendu de-manière à pouvoir coulisser. Sur la haveuse 1 sont fixés des grappins 8 au moyen desquels le rideau 2 peut etre poussé vers l'avant.The portion A of the section is insulated from the portion B by a curtain 2. The curtain extends to the face of size 3 and extends from the roof 4 to the floor 5. The lower end 6 of the curtain is weighted. At the roof 4 is fixed a rail 7 to which the curtain 2 is suspended so as to be slidable. On the shearer 1 are attached grapples 8 by means of which the curtain 2 can be pushed forward.
Ces grappins sont constitués par des mécanismes de poussée hydrauliques à piston.These grapples are constituted by piston hydraulic push mechanisms.
Pendant que la haveuse 1 travaille dans la partie
A de la section, on effectue les travaux de soutènement dans la partie B de la section. Dans cette partie B de la section, on a représenté un chariot 9 de perçage de trous d'ancrage qui perce lestrous de boulons d'ancrage dans le toit. En remplacement de ce chariot de perçage de trous d'ancrage 9, on peut également prévoir dans la partie de section B une machine de projection de ciment.While shearer 1 is working in the game
A section, the work is carried out in part B of the section. In this part B of the section, there is shown a carriage 9 for drilling anchor holes which pierces the holes of anchor bolts in the roof. In place of this anchoring hole drilling carriage 9, it is also possible to provide in the section section B a cement spraying machine.
Après le parcours d'un trajet d'avance déterminé, la haveuse 1 est transférée dans la partie B de la section et le chariot de perçage de trous d'ancrage 9 ou la machine à projeter le ciment, non représentée, dans la partie
A de la section. On fixe alors les grappins 8 au coté gauche de la haveuse 1, puisque, maintenant, le rideau 2 se trouve sur la gauche de cette dernière La haveuse 1 commence maintenant son travail dans la partie B de la section qui est déjà munie de son soutènement et de ses éléments de sécurité. Sur la Fig. 3, on a représenté les boulons d'ancrage 10. Il est visible que la région du toit qui surmonte la haveuse est déjà protégée lorsque la haveuse 1 travaille.After the course of a predetermined advance path, the shear 1 is transferred into the section B portion and the anchor hole drilling carriage 9 or the cement splitter, not shown, in the part
A from the section. The grapples 8 are then attached to the left side of the shearer 1, since, now, the curtain 2 is on the left of the latter. The shearer 1 is now starting work in the part B of the section which is already provided with its support. and its security features. In FIG. 3, there is shown the anchor bolts 10. It is visible that the roof area which overcomes the shearer is already protected when the shearer 1 works.
Dans les deux parties A et B de la section, sont disposées des buses d'aérage 11 et 12 qui peuvent tre raccordées éventuellement à un dispositif de dépoussierage non représenté. Au moyen du aiguillage 13, on peut raccorder au dispositif de dépoussiérage celle des buses d'aérage qui se trouve dans la partie de la section dans laquelle travaille la haveuse 1. 15 désigne une pelle de chargement, articulée sur la haveuse 1, qui reçoit de la façon habituel- le la matière excavée pendant l'avance de la haveuse et la transfère à un transporteur 16 monté sur la haveuse. In the two parts A and B of the section, there are arranged ventilation nozzles 11 and 12 which can be connected optionally to a dust removal device not shown. By means of the switch 13, it is possible to connect to the dust extraction device that of the ventilation nozzles which is in the part of the section in which the shearing machine 1 is working. 15 denotes a loading shovel, articulated on the shearer 1, which receives in the usual way - the material excavated during the advance of the shearer and transfers it to a conveyor 16 mounted on the shearer.
La Fig. 4 montre schématiquement l'avancement. Dans la partie A de la section, la haveuse a creusé jusqu'au front de travail N . Dans la partie B de la section, dans laquelle les travaux de soutènement ont déjà été exécutés, le front de taille se trouve en B1 Ensuite, la haveuse est transférée dans la partie B de la section et creuse jus quau front B2 indiqué en traits interrompus tandis que, dans la partie A de la section, on procède aux travaux de soute nement. Puis, la haveuse est à nouveau transférée dans la partie A de la section et elle creuse alors jusque au front de taille A2 indiqué en traits interrompus. Fig. 4 schematically shows the progress. In section A of the section, the shearer has dug to N. In part B of the section, in which the retaining work has already been carried out, the face is in B1 Then the shear is transferred to the section B of the section and digs to the front B2 indicated in dashed lines while in Part A of the section, work is carried out. Then, the shearer is again transferred to the section A of the section and then digs up to the A2 face-line indicated in dashed lines.
Sur la Fig. 2, les deux parties A et B de la section forment une calotte sphérique. Lorsqu'il s'agit d'un tunnel de grande hauteur, on creuse la sole 14 ultérieurement,comme indiqué en trait mixte, de la manière désirée. In FIG. 2, the two parts A and B of the section form a spherical cap. In the case of a high-altitude tunnel, the hearth 14 is subsequently hollowed out, as indicated in dotted lines, in the desired manner.
Claims (8)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT0259182A AT374564B (en) | 1982-07-05 | 1982-07-05 | METHOD AND DEVICE FOR DRIVING ROUTES AND TUNNELS |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2529613A1 true FR2529613A1 (en) | 1984-01-06 |
FR2529613B1 FR2529613B1 (en) | 1986-02-14 |
Family
ID=3537044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8311177A Expired FR2529613B1 (en) | 1982-07-05 | 1983-07-05 | METHOD AND DEVICE FOR ADVANCING GALLERIES AND TUNNELS |
Country Status (4)
Country | Link |
---|---|
AT (1) | AT374564B (en) |
DE (1) | DE3321858C2 (en) |
FR (1) | FR2529613B1 (en) |
IT (1) | IT1169535B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503374A (en) * | 2017-08-23 | 2017-12-22 | 中国铁建重工集团有限公司 | A kind of piping lane Operation Van |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT380925B (en) * | 1984-07-16 | 1986-07-25 | Voest Alpine Ag | DEVICE FOR BREAKING OUT BREAKDOWNS WITH ESSENTIAL LEVEL DISASSEMBLY FRONT |
AT381986B (en) * | 1984-08-31 | 1986-12-29 | Voest Alpine Ag | DEVICE FOR SEALING A SECTION OF A SECTION OPEN FROM A BREWING MACHINE |
DE3629364A1 (en) * | 1986-08-29 | 1988-03-10 | Hausherr & Soehne Rudolf | METHOD AND DEVICES FOR DRIVING A DIGITAL DISTANCE WITH A SHORT STAY |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1833368A (en) * | 1930-05-20 | 1931-11-24 | Daniel J O'rourke | Method of and apparatus for tunneling |
US3333896A (en) * | 1965-04-29 | 1967-08-01 | Carbon Fuel Company | Method and apparatus for rock dusting during coal mining operations |
DE2208710B2 (en) * | 1972-02-24 | 1974-07-25 | Maschinenfabrik Moenninghoff, 4630 Bochum | Anchor hole drilling and / or anchor setting device in association with a route advance mask |
GB2075091A (en) * | 1980-05-01 | 1981-11-11 | Ingersoll Rand Co | Mining and bolting method and apparatus |
-
1982
- 1982-07-05 AT AT0259182A patent/AT374564B/en not_active IP Right Cessation
-
1983
- 1983-06-16 DE DE3321858A patent/DE3321858C2/en not_active Expired
- 1983-06-24 IT IT21792/83A patent/IT1169535B/en active
- 1983-07-05 FR FR8311177A patent/FR2529613B1/en not_active Expired
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1833368A (en) * | 1930-05-20 | 1931-11-24 | Daniel J O'rourke | Method of and apparatus for tunneling |
US3333896A (en) * | 1965-04-29 | 1967-08-01 | Carbon Fuel Company | Method and apparatus for rock dusting during coal mining operations |
DE2208710B2 (en) * | 1972-02-24 | 1974-07-25 | Maschinenfabrik Moenninghoff, 4630 Bochum | Anchor hole drilling and / or anchor setting device in association with a route advance mask |
GB2075091A (en) * | 1980-05-01 | 1981-11-11 | Ingersoll Rand Co | Mining and bolting method and apparatus |
Non-Patent Citations (2)
Title |
---|
COAL AGE, juillet 1975 J.L. HABBERSTAD et al. "Automated continuous roof support", pages 115-117 * |
TECHNOLOGY NEWS, no. 49, avril 1978 article NTN-78/0422, 2 pages * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503374A (en) * | 2017-08-23 | 2017-12-22 | 中国铁建重工集团有限公司 | A kind of piping lane Operation Van |
Also Published As
Publication number | Publication date |
---|---|
DE3321858C2 (en) | 1986-11-27 |
AT374564B (en) | 1984-05-10 |
ATA259182A (en) | 1983-09-15 |
IT1169535B (en) | 1987-06-03 |
IT8321792A0 (en) | 1983-06-24 |
FR2529613B1 (en) | 1986-02-14 |
DE3321858A1 (en) | 1984-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5333937A (en) | Excavation machine having combined impact hammers and static ripper pick | |
US4065929A (en) | Mine roof support and method in longwall mining of thick mineral seams | |
FR2579264A1 (en) | MACHINE FOR CREATING GALLERIES OR EXTRACTION | |
BE488764A (en) | ||
PL113076B1 (en) | Method of driving and lining an underground gangway andapparatus for driving and lining an underground gangway | |
US4131317A (en) | Mining machine having advancing mine roof supports | |
JP6685214B2 (en) | Tunnel excavation method and tunnel excavator | |
US4310197A (en) | Mining and bolting method and apparatus | |
FR2529613A1 (en) | Wide tunnel or gallery driving sectioned hewing -involves two sections simultaneously alternately hewnand lined while mutually sealed | |
US4232904A (en) | Method and apparatus for deep mining using chain driven in fixed direction | |
AU644257B2 (en) | Launch vehicle for continuous mining apparatus | |
US4328994A (en) | Mining apparatus and method | |
US1998294A (en) | Method of mining | |
FR2530725A1 (en) | METHOD AND INSTALLATION FOR DRILLING AND LEVING EXTRACTION HOLES AND / OR VENTILATION HOLES | |
JP4661806B2 (en) | Tunnel boring machine | |
FR2570435A1 (en) | Method and equipment for mining steep mineral seams, particularly coal seams | |
FR2595406A1 (en) | METHOD AND DEVICE FOR PERFORMING METAL WIRE REINFORCEMENT | |
US3907368A (en) | Kerf cutting machine | |
FR2555660A1 (en) | Steep mine front striding hydraulic supports placing system | |
JP6922025B2 (en) | Tunnel excavator and concrete or mortar spraying method | |
JP2018053586A (en) | Tunnel boring machine | |
JP3529758B2 (en) | Tunnel boring machine and tunnel method | |
RU2163970C1 (en) | Plough complex, support unit, plough set, plough base, plough drive, short loader, gatehead support, movable manipulator | |
FR2688538A1 (en) | Device and method for excavating and concreting a dome roof in the excavation of a tunnel | |
JP3881212B2 (en) | Propulsion method for open tunnel machine and open tunnel machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |