FR2334806A1 - Bridge structure consolidation system - using mortar injected around tie rod with forged thread to receive nuts abutting plates - Google Patents
Bridge structure consolidation system - using mortar injected around tie rod with forged thread to receive nuts abutting platesInfo
- Publication number
- FR2334806A1 FR2334806A1 FR7538202A FR7538202A FR2334806A1 FR 2334806 A1 FR2334806 A1 FR 2334806A1 FR 7538202 A FR7538202 A FR 7538202A FR 7538202 A FR7538202 A FR 7538202A FR 2334806 A1 FR2334806 A1 FR 2334806A1
- Authority
- FR
- France
- Prior art keywords
- tie rod
- forged
- thread
- bridge structure
- abutting plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The consolidation process is for structures such as bridges and the walls of avenues, a hole being drilled in the transverse direction through the structure to accommodate a tie rod. The tie rod is threaded at the ends to receive locknuts, and passes through a support between it and the structure. The tie rod is pre-stressed, and mortar can be injected into the hole after pre-stressing. The thread can be forged into the rod, preferably for its entire length, the nut having a hemispherical base, preferably split. An additional plate is fitted between each nut and its main support plate, having a central drilling through which the rod passes, and a bell mouth on the nut side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR7538202A FR2334806A1 (en) | 1975-12-12 | 1975-12-12 | Bridge structure consolidation system - using mortar injected around tie rod with forged thread to receive nuts abutting plates |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR7538202A FR2334806A1 (en) | 1975-12-12 | 1975-12-12 | Bridge structure consolidation system - using mortar injected around tie rod with forged thread to receive nuts abutting plates |
Publications (1)
Publication Number | Publication Date |
---|---|
FR2334806A1 true FR2334806A1 (en) | 1977-07-08 |
Family
ID=9163703
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR7538202A Withdrawn FR2334806A1 (en) | 1975-12-12 | 1975-12-12 | Bridge structure consolidation system - using mortar injected around tie rod with forged thread to receive nuts abutting plates |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2334806A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2641295A1 (en) * | 1989-01-03 | 1990-07-06 | Flourens Bruno | METHOD AND DEVICE FOR ANCHORING THE SUPPORT SPACES OF A WALL IN ARMED LAND |
EP2317030A1 (en) * | 2009-10-27 | 2011-05-04 | M Lefevre | Method for reinforcing a masonry or concrete structure by fixing a tension-reinforcement element comprising a titanium rod, and masonry or concrete structure. |
-
1975
- 1975-12-12 FR FR7538202A patent/FR2334806A1/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2641295A1 (en) * | 1989-01-03 | 1990-07-06 | Flourens Bruno | METHOD AND DEVICE FOR ANCHORING THE SUPPORT SPACES OF A WALL IN ARMED LAND |
EP2317030A1 (en) * | 2009-10-27 | 2011-05-04 | M Lefevre | Method for reinforcing a masonry or concrete structure by fixing a tension-reinforcement element comprising a titanium rod, and masonry or concrete structure. |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB540714A (en) | Improvements in or relating to reinforced concrete construction | |
US2695754A (en) | Railway track sleeper | |
GB1470471A (en) | Method of constructing a pre-stressed concrete circular wall | |
ATE19679T1 (en) | PROCEDURE FOR ANCHORING ANCHORING BARS OD. DGL. IN CONCRETE. | |
ES449857A1 (en) | Concrete unit prestressed using tendons stressed before concreting, more particularly a railway sleeper | |
FR2334806A1 (en) | Bridge structure consolidation system - using mortar injected around tie rod with forged thread to receive nuts abutting plates | |
ES341674A1 (en) | Apparatus for anchoring prestressing members in prestressed concrete | |
GB694596A (en) | Method and apparatus for post-tensioning and anchoring reinforcements of concrete | |
GB1468733A (en) | Structural elements of buildings and building frameworks comprising such elements | |
DE69305831D1 (en) | Prefabricated cover plate and method for producing a bridge with such plates | |
GB936416A (en) | Improvements in or relating to construction elements for use in the construction of roads, supports, buildings or other rigid structures | |
GB1278926A (en) | Method of securing a form structure to concrete | |
EP0293781B1 (en) | Plate for the anchorage and tensioning of metal reinforcements in the construction of prestressed reinforced concrete railway sleepers | |
GB1000741A (en) | Process for the production of lattice girders for ferroconcrete ribbed ceilings | |
GB1410226A (en) | Reinforcing device for an element of prestressed concrete and applications thereof | |
DE940608C (en) | Press for applying tensile forces to the tendons in the manufacture of prestressed concrete | |
SU785586A1 (en) | Equipment mounting method | |
GB806119A (en) | Improvements in or relating to prefabricated-sectional structures | |
JPS6429525A (en) | Precast concrete foundation material | |
GB572386A (en) | Improvements in the production of pre-stressed reinforced concrete | |
GB1218512A (en) | Connecting precast concrete structural members | |
GB842739A (en) | Improvements in structural steel sections, trusses and the like | |
JPS646467A (en) | Cast splicing construction method of cloth base and concrete | |
GB709124A (en) | Manufacture of concrete railway sleepers or similar beams | |
JPS57165528A (en) | Fixing device for columnar pier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |