ES311195A1 - Improvements introduced in the construction of boat helmets. (Machine-translation by Google Translate, not legally binding)
- Google Patents
Improvements introduced in the construction of boat helmets. (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Technology and Engineering Co
Original Assignee
Exxon Research and Engineering Co
Esso Research and Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxon Research and Engineering Co, Esso Research and Engineering CofiledCriticalExxon Research and Engineering Co
Priority to ES0311195ApriorityCriticalpatent/ES311195A1/en
Publication of ES311195A1publicationCriticalpatent/ES311195A1/en
Improvements introduced in the construction of hulls of ships in which there is a considerable difference between the waterline with cargo and the waterline in ballast, characterized by providing a bulbous prow that extends forward, placed in such a way that a a considerable part, although smaller than the bow, remains above the waterline in ballast and the nose is below the waterline in ballast. (Machine-translation by Google Translate, not legally binding)
ES0311195A1965-03-301965-03-30Improvements introduced in the construction of boat helmets. (Machine-translation by Google Translate, not legally binding)
ExpiredES311195A1
(en)