ES2764387T3 - Support method to support an armor construction - Google Patents

Support method to support an armor construction Download PDF

Info

Publication number
ES2764387T3
ES2764387T3 ES16183778T ES16183778T ES2764387T3 ES 2764387 T3 ES2764387 T3 ES 2764387T3 ES 16183778 T ES16183778 T ES 16183778T ES 16183778 T ES16183778 T ES 16183778T ES 2764387 T3 ES2764387 T3 ES 2764387T3
Authority
ES
Spain
Prior art keywords
support
reinforcement construction
construction
positions
spacer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
ES16183778T
Other languages
Spanish (es)
Inventor
Helmut Stofner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Progress Holding AG
Original Assignee
Progress Holding AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Progress Holding AG filed Critical Progress Holding AG
Application granted granted Critical
Publication of ES2764387T3 publication Critical patent/ES2764387T3/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • B28B23/024Supporting means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • B28B15/005Machines using pallets co-operating with a bottomless mould; Feeding or discharging means for pallets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B17/00Details of, or accessories for, apparatus for shaping the material; Auxiliary measures taken in connection with such shaping
    • B28B17/0063Control arrangements
    • B28B17/0081Process control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0056Means for inserting the elements into the mould or supporting them in the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/20Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups of material other than metal or with only additional metal parts, e.g. concrete or plastics spacers with metal binding wires
    • E04C5/203Circular and spherical spacers
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/04Mats

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Architecture (AREA)
  • Automation & Control Theory (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Método de apoyo (21) para apoyar una construcción de armadura (1, 2) en la fabricación de piezas de hormigón prefabricadas, en donde - en un primer paso de método (23) se preparan datos para la construcción de armadura (1, 2) diseñada para la pieza de hormigón prefabricada que hay que fabricar, - en un segundo paso de método (24), en una instalación de cálculo (3) electrónica programable, se calculan posiciones (33, 34) para apoyar la construcción de armadura (1, 2) en función de los datos preparados de la construcción de armadura (1, 2), - en un tercer paso de método (25), para el apoyo de la construcción de armadura (1, 2) en las posiciones (33, 34) calculadas se sitúan soportes espaciadores (4), caracterizado por el paso: - en un cuarto paso de método (26) sobre los soportes espaciadores (4) se coloca una construcción de armadura (1, 2) fabricada según los datos.Support method (21) to support a reinforcement construction (1, 2) in the manufacture of precast concrete parts, where - in a first method step (23) data are prepared for the reinforcement construction (1, 2 ) designed for the precast concrete part to be manufactured, - in a second method step (24), in a programmable electronic calculation facility (3), positions (33, 34) are calculated to support the reinforcement construction ( 1, 2) based on the prepared data of the truss construction (1, 2), - in a third method step (25), for the support of the truss construction (1, 2) in the positions (33 , 34) calculated, spacer supports (4) are placed, characterized by the step: - in a fourth method step (26) on the spacer supports (4) a reinforcement construction (1, 2) manufactured according to the data is placed.

Description

DESCRIPCIÓNDESCRIPTION

Método de apoyo para apoyar una construcción de armaduraSupport method to support an armor construction

El invento se refiere a un método de apoyo para apoyar una construcción de armadura y a un método de fabricación para fabricar piezas de hormigón prefabricadas.The invention relates to a bearing method for supporting a reinforcement construction and to a manufacturing method for manufacturing precast concrete parts.

Para en la fabricación de piezas de hormigón prefabricadas poder asegurar que los elementos de armadura allí insertados presentan un suficiente recubrimiento de hormigón, sobre un suelo inferior se colocan manualmente soportes espaciadores en forma de, por ejemplo, anillos o tiras de plástico de diferentes tamaños y sobre ellos, entonces, los elementos de armadura. Con ello la colocación manual de los soportes espaciadores se produce en base a valores de experiencia lo que tiene como consecuencia que en parte se utilicen demasiados soportes espaciadores. Con ello aumento el peligro de formación de espacios huecos, puesto que los soportes espaciadores junto con los elementos de armadura son recubiertos con el hormigón lo que actúa desventajosamente en la calidad de la pieza de hormigón prefabricada. Además, con ello se ocasionan mayores costes porque por un lado se utilizan soportes espaciadores innecesarios y por otro lado al reciclar las piezas de hormigón prefabricadas se necesita una mayor inversión para extraer de nuevo los soportes espaciadores de la pieza de hormigón prefabricada.In order to ensure that the reinforcement elements inserted therein have sufficient concrete cover, in the manufacture of precast concrete parts, spacer supports in the form of, for example, plastic rings or strips of different sizes are placed manually on a lower floor and on them, then, the armor elements. With this, the manual placement of the spacer supports is produced based on experience values, which results in part from using too many spacer supports. This increases the risk of formation of hollow spaces, since the spacer supports together with the reinforcement elements are covered with concrete, which acts disadvantageously on the quality of the precast concrete part. Furthermore, this results in higher costs because, on the one hand, unnecessary spacer supports are used and, on the other hand, when recycling the precast concrete parts, a greater investment is needed to extract the spacer supports from the precast concrete part again.

El documento DE 3420806 A1 se refiere a la fabricación de una armadura a partir de varias barras de alambre que se cruzan.DE 3420806 A1 relates to the manufacture of a reinforcement from several intersecting wire rods.

El documento DE 4031 384 C1 publica un método para ordenar con seguridad en su sitio piezas de montaje sobre un palé.DE 4031 384 C1 publishes a method for securely ordering mounting parts on a pallet in place.

El documento DE 41 35 581 A1 publica la reivindicación de una construcción de armadura mediante orugas expandibles o espumantes, en donde por influencia del proceso de expansión o espumación se realizan separaciones diferentes.Document DE 41 35 581 A1 publishes the claim for an armature construction by means of expandable or foaming tracks, where different separations are carried out by influence of the expansion or foaming process.

El documento DE 1918965 A1 publica un dispositivo para colocar orejetas de anclaje.DE 1918965 A1 publishes a device for attaching anchor lugs.

El documento EP 1273407 A1 publica un robot para colocar un imán. El documento DE 19651 933 C1 publica un robot para encofrar.EP 1273407 A1 publishes a robot for attaching a magnet. DE 19651 933 C1 publishes a formwork robot.

La misión del presente invento consiste en presentar un método de apoyo, mejorado con respecto al estado de la técnica, de una construcción de armadura y un método de fabricación para la fabricación de piezas de hormigón prefabricadas que aprovecha este método de apoyo, en donde el método de apoyo acorde con el invento se destaca especialmente por una mejor calidad de las piezas de hormigón prefabricadas, un ahorro de costes así como un reciclado de las piezas de hormigón prefabricadas respetuoso con el medio ambiente.The mission of the present invention is to present a support method, improved with respect to the state of the art, of a reinforcement construction and a manufacturing method for the manufacture of precast concrete pieces that takes advantage of this support method, where the The support method according to the invention is particularly notable for better quality of precast concrete parts, cost savings as well as environmentally friendly recycling of precast concrete parts.

Esta misión será resuelta por las características de las reivindicaciones 1 y 9.This mission will be solved by the characteristics of claims 1 and 9.

Según ellas, está previsto que en el método de apoyo para apoyar una construcción de armadura en la fabricación de piezas de hormigón prefabricadas:According to them, it is foreseen that in the support method to support a reinforcement construction in the manufacture of precast concrete parts:

- en un primer paso de método se preparan datos de una construcción de armadura diseñada para la pieza de hormigón prefabricada que hay que fabricar,- in a first method step, data is prepared from a reinforcement construction designed for the precast concrete part to be manufactured,

- en un segundo paso de método, en una instalación de cálculo electrónica programable, se calculan posiciones para apoyar la construcción de armadura, en función de los datos preparados de la construcción de armadura,- in a second method step, in a programmable electronic calculation facility, positions are calculated to support the reinforcement construction, based on the prepared data of the reinforcement construction,

- en un tercer paso de método, para el apoyo de la construcción de armadura se sitúan soportes espaciadores sobre las posiciones calculadas,- in a third method step, to support the reinforcement construction, spacer supports are placed on the calculated positions,

- en un cuarto paso de método sobre los soportes espaciadores se coloca la construcción de armadura fabricada según los datos.- in a fourth method step on the spacer supports the reinforcement construction manufactured according to the data is placed.

Con ello, por que en el curso del segundo paso de método se calculan las posiciones para apoyar la construcción de armadura y después en el curso del tercer paso de método los soportes espaciadores son colocados en las posiciones calculadas, queda asegurado que se utiliza una cantidad óptima de soportes espaciadores y que estos están colocados en las posiciones óptimas. Con ello se pueden fabricar piezas de hormigón prefabricadas por unidades con un recubrimiento de hormigón adecuado y menos espacios huecos, reducir los costes y proteger el medio ambiente al reciclar al final de la vida útil de las piezas de hormigón prefabricadas.With this, because in the course of the second method step the positions are calculated to support the reinforcement construction and then in the course of the third method step the spacer supports are placed in the calculated positions, it is ensured that a quantity is used optimal spacer supports and that these are placed in the optimal positions. This enables precast concrete parts to be manufactured in units with a suitable concrete coating and fewer voids, reducing costs and protecting the environment by recycling at the end of the useful life of precast concrete parts.

Sobre los datos preparados en el curso del primer paso de método de una construcción de armadura diseñada para la pieza de hormigón prefabricada que hay que fabricar, puede tratarse por ejemplo de la construcción, la geometría y el peso de la construcción de armadura. De manera típica las construcciones de armaduras utilizadas están construidas a partir de barras longitudinales, barras transversales y/o soportes de malla, en donde en función de la pieza de hormigón prefabricada pueden estar previstos vaciados para, por ejemplo, ventanas o puertas. Los contornos exteriores de la construcción de armadura pueden reproducir los contornos exteriores de la pieza de hormigón prefabricada que hay que fabricar, o sea por ejemplo, superficies inclinadas o similares. Los soportes de malla que suelen ser utilizados presentan en general una disposición superior y una disposición inferior y entre ambas, unas correas que discurren diagonalmente. La exacta construcción del soporte de malla puede formar también una parte de los datos presentados. También juegan un papel el diámetro y la composición material de las barras longitudinales y transversales o del soporte de malla utilizados así como la disposición relativa de estos elementos.On the data prepared in the course of the first method step of a reinforcement construction designed for the precast concrete part to be manufactured, it may be for example the construction, the geometry and the weight of the reinforcement construction. Typically the reinforcement constructions used are constructed from longitudinal bars, cross bars and / or mesh supports, where depending on the precast concrete part can be provided with castings for eg windows or doors. The outer contours of the reinforcement construction can reproduce the outer contours of the precast concrete part to be manufactured, that is, for example, inclined surfaces or the like. The mesh supports that are usually used generally have an upper and a lower arrangement and, between them, straps that run diagonally. The exact construction of the mesh support may also form a part of the data presented. The diameter and material composition of the longitudinal and transverse bars or of the mesh support used as well as the relative arrangement of these elements also play a role.

Todos estos datos pueden ser preparados en el curso del primer paso de método, en concreto en forma de un archivo CAD. Pero la expresión “preparar” comprende también soluciones en las cuales los datos son generados en el curso del primer paso de método desde una instalación de cálculo electrónica programable o ser obtenidos a partir de un banco de datos. Además, puede tratarse de la misma instalación de cálculo electrónica programable que también se utiliza en el segundo paso de método.All these data can be prepared in the course of the first method step, specifically in the form of a CAD file. But the expression "prepare" also includes solutions in which the data is generated in the course of the first method step from a programmable electronic calculation facility or obtained from a data bank. In addition, it can be the same programmable electronic calculation facility that is also used in the second method step.

El cálculo de las posiciones para apoyar la construcción de armadura realizado en el curso del segundo paso de método puede tener en cuenta también otros parámetros adicionales a los datos de la construcción de armadura preparados en el curso del primer paso de método, por ejemplo, la capacidad de carga de los soportes espaciadores utilizados para el apoyo de la construcción de armadura.The calculation of the positions to support the reinforcement construction performed in the course of the second method step may also take into account other parameters in addition to the reinforcement construction data prepared in the course of the first method step, for example, the load capacity of spacer supports used to support reinforcement construction.

El cálculo de las posiciones puede realizarse de diferentes maneras:The calculation of the positions can be done in different ways:

Es posible, por ejemplo, que se manejen de manera diversificada diferentes tipos de elementos prefabricados. Por ejemplo, basándose en modelos estáticos simplificados hechos a medida para cada tipo de elemento, se podría desarrollar un algoritmo que sea adecuado para el cálculo de la posición.For example, it is possible for different types of precast elements to be handled in a diversified manner. For example, based on simplified static models made to measure for each type of element, an algorithm could be developed that is suitable for calculating position.

En concreto es posible en el curso del cálculo, en primer lugar colocar los soportes espaciadores en posiciones que aparecen adecuadas a cada tipo de elemento, a continuación determinar el comportamiento de combado de la construcción de armadura dependiendo de los datos preparados de esa construcción de armadura y comprobar si este comportamiento de combado corresponde a los valores límite predeterminados. Según sea el resultado de esta comprobación las posiciones de los soportes espaciadores son desplazadas de manera iterativa y de nuevo se calcula el comportamiento de combado y se compara con los valores límite. Estos pasos son realizados hasta que no se pueda obtener ninguna mejora sustancial, es decir, reducción del número de soportes espaciadores y al mismo tiempo comportamientos de combado de la construcción de armadura todavía tolerables.Specifically it is possible in the course of the calculation, firstly to place the spacer supports in positions that appear appropriate to each type of element, then to determine the warping behavior of the reinforcement construction depending on the data prepared from that reinforcement construction. and check if this warping behavior corresponds to the default limit values. Depending on the result of this check, the positions of the spacer supports are displaced iteratively, and the warping behavior is again calculated and compared with the limit values. These steps are carried out until no substantial improvement can be obtained, that is, reduction in the number of spacer supports and at the same time armor construction buckling behaviors still tolerable.

También se ha destacado como favorable, durante el cálculo en función del comportamiento de combado de la construcción de armadura, calcular los momentos de giro ejercidos y compararlos con los valores límites predeterminados.During the calculation based on the warping behavior of the reinforcement construction, it was also highlighted as favorable to calculate the torques exerted and compare them with the predetermined limit values.

Como complemento o como alternativa, durante el cálculo de las posiciones para apoyar la construcción de armadura en el curso del segundo paso de método, la construcción de armadura puede ser dividida en zonas de soporte, en donde a cada zona de soporte se le asocia exactamente un distanciador. Así es que se ha demostrado como ventajoso desplazar iterativamente los límites de las zonas de soporte durante el cálculo de las posiciones para apoyar la construcción de armadura en el curso del segundo paso de método.As a complement or as an alternative, during the calculation of the positions to support the reinforcement construction in the course of the second method step, the reinforcement construction can be divided into support zones, where each support zone is associated exactly a spacer. Thus, it has been shown to be advantageous to iteratively shift the boundaries of the support zones during position calculation to support reinforcement construction in the course of the second method step.

Por lo que se refiere a la colocación del soporte espaciador en las posiciones calculadas en el curso del tercer paso de método se han declarado como ventajosas las siguientes soluciones:As regards the positioning of the spacer support in the positions calculated in the course of the third method step, the following solutions have been declared as advantageous:

Por un lado la colocación puede ser realizada manualmente, en donde para marcar las posiciones puede ser empleado un dispositivo de marcado. En este caso puede tratarse por ejemplo de un plotter o de un láser de pintar modulado o similar.On the one hand, the placement can be carried out manually, where a marking device can be used to mark the positions. In this case it may be for example a plotter or a modulated paint laser or the like.

Por otro lado la colocación puede realizarse automáticamente por ejemplo, mediante un autómata de colocación. Entonces, en el curso del cuarto proceso de método sobre los soportes espaciadores colocados se deposita una construcción de armadura prefabricada de acuerdo con los datos.On the other hand, placement can be carried out automatically, for example, by means of a placement automat. Then, in the course of the fourth method process on a placed spacer supports a precast reinforcement construction is deposited according to the data.

Con esto se termina en esencia el método de apoyo para apoyar una construcción de armadura. Para ahora fabricar una pieza de hormigón prefabricada en otra secuencia, en un siguiente paso de método la construcción de armadura depositada sobre los soportes espaciadores es embebida en una masa de hormigón junto con los soportes espaciadores.This essentially ends the support method for supporting an armor construction. To now manufacture a precast concrete part in another sequence, in a next method step the reinforcement construction deposited on the spacer supports is embedded in a concrete mass together with the spacer supports.

Con preferencia, en el curso del tercer paso de método los soportes espaciadores son colocados sobre un palé provisto con elementos de encofrado y el método de fabricación es llevado a cabo sobre una instalación circulante sobre palés. Formas de realización ventajosas están definidas en las reivindicaciones dependientes 2 a 8. Preferably, in the course of the third method step, the spacer supports are placed on a pallet provided with formwork elements and the manufacturing method is carried out on a circulating installation on pallets. Advantageous embodiments are defined in dependent claims 2 to 8.

A continuación se explican más detalladamente otros detalles y ventajas del presente invento, sobre la base de la descripción de las figuras y por referencia a los dibujos. Se muestra:Other details and advantages of the present invention are explained in more detail below, on the basis of the description of the figures and with reference to the drawings. It shows:

La Figura 1, un diagrama de flujo para representar cada uno de los pasos del método de apoyo o del de fabricación,Figure 1, a flow chart to represent each of the steps of the support method or the manufacturing method,

la Figura 2a, una construcción de armadura a modo de ejemplo, basada en la cual se describe una posible estrategia de cálculo para el cálculo de las posiciones para los soportes espaciadores.Figure 2a, an exemplary reinforcement construction, based on which a possible calculation strategy for calculating the positions for the spacer supports is described.

la Figura 2b, la construcción de armadura según la figura 2a apoyada con una hilera de soportes espaciadores,Figure 2b, the reinforcement construction according to figure 2a supported by a row of spacer supports,

la Figura 3a, otro ejemplo de una construcción de armadura apoyada con una hilera de soportes espaciadores,Figure 3a, another example of an armature construction supported with a row of spacer supports,

la Figura 3b, un extracto de la construcción de armadura según la figura 3a,Figure 3b, an extract of the reinforcement construction according to figure 3a,

la Figura 4, un dispositivo de separación para la alimentación intermedia de los soportes espaciadores que van a ser colocados,Figure 4, a separation device for the intermediate feeding of the spacer supports to be placed,

las Figuras 5a - 5d, una secuencia de posiciones del dispositivo de separación para ilustración de su forma de actuar,Figures 5a-5d, a sequence of positions of the separation device to illustrate its way of acting,

la Figura 6a, una forma de realización preferida de un autómata de colocación estacionario para la realización del método de apoyo acorde con el invento,Figure 6a, a preferred embodiment of a stationary positioning automaton for carrying out the support method according to the invention,

la Figura 6b, un ejemplo de realización de un autómata de colocación desplazable para la realización del método de apoyo acorde con el invento,FIG. 6b shows an exemplary embodiment of a moveable positioning automat for carrying out the support method according to the invention,

la Figura 7, una construcción preferida de una estación de carga de un autómata de colocación, la Figura 8, un perno de centrado para el almacenamiento de soportes espaciadores colocados uno encima de otro, como puede ser previsto en la estación de carga según la figura 7.FIG. 7 shows a preferred construction of a charging station for a positioning automat; FIG. 8 a centering bolt for storing spacer supports placed one on top of the other, as can be provided in the charging station according to FIG. 7.

La figura 1 muestra esquemáticamente, sobre la base de un diagrama de flujo, el desarrollo del método de apoyo 21 para apoyar una construcción de armadura durante la fabricación de piezas de hormigón prefabricadas, en donde:Figure 1 schematically shows, on the basis of a flow diagram, the development of the support method 21 to support a reinforcement construction during the manufacture of precast concrete parts, where:

- en un primer paso de método 23 se preparan datos de una construcción de armadura diseñada para la pieza de hormigón prefabricada que hay que fabricar,- in a first method step 23, data of a reinforcement construction designed for the precast concrete part to be manufactured are prepared,

- en un segundo paso de método 24, en una instalación de cálculo electrónica programable, se calculan posiciones para apoyar la construcción de armadura, en función de los datos preparados de la construcción de armadura,- in a second method step 24, in a programmable electronic calculation facility, positions are calculated to support the reinforcement construction, based on the prepared data of the reinforcement construction,

- en un tercer paso de método 25, para el apoyo de la construcción de armadura se sitúan soportes espaciadores sobre las posiciones calculadas, y- in a third method step 25, to support the reinforcement construction, spacer supports are placed on the calculated positions, and

- en un cuarto paso de método 26, sobre los soportes espaciadores se coloca la construcción de armadura fabricada según los datos.- in a fourth step of method 26, on the spacer supports the reinforcement construction manufactured according to the data is placed.

El método de apoyo 21 para apoyar una construcción de armadura puede ser integrado en el método de fabricación 22 para la fabricación de piezas de hormigón prefabricadas, en donde en un paso de método 27 que se une a continuación de los pasos de método 23 a 26 del método de apoyo 21, la construcción de armadura colocada sobre los soportes espaciadores es embebida en una masa de hormigón.The supporting method 21 for supporting a reinforcement construction can be integrated into the manufacturing method 22 for the manufacture of precast concrete parts, wherein in a method step 27 which is joined following the method steps 23 to 26 of support method 21, the reinforcement construction placed on the spacer supports is embedded in a concrete mass.

La figura 2a muestra esquemáticamente en una vista en planta superior un ejemplo de una construcción de armadura 1 la cual está construida para la fabricación de una pieza de hormigón prefabricada en forma de una cubierta de polistirol. La construcción de armadura 1 se compone de varias barras 28 longitudinales, esencialmente orientadas perpendiculares a las barras 29 transversales así como soportes de malla 30, que por ejemplo pueden estar construidas a partir de una disposición de correas superior y una disposición de correas inferior y correas diagonales que discurren entre ellas. Los datos de esta construcción de armadura 1 son preparados en el curso del primer paso de método 23. En un segundo paso de método 24, en una instalación de cálculo electrónica programable se calculan, en función de los datos de la construcción de armadura 1 preparados, las posiciones 33 y 34 (véase la figura 2b) para el apoyo de la construcción de armadura 1.Figure 2a schematically shows in an upper plan view an example of a reinforcement construction 1 which is built for the manufacture of a precast concrete part in the form of a polystyrene roof. The reinforcement construction 1 is composed of several longitudinal bars 28, essentially oriented perpendicular to the transverse bars 29 as well as mesh supports 30, which for example can be constructed from an upper belt arrangement and a lower belt and belt arrangement diagonals running between them. The data of this armature construction 1 is prepared in the course of the first step of method 23. In a second step of method 24, in a programmable electronic computing facility they are calculated, based on the data of the armature construction 1 prepared , positions 33 and 34 (see figure 2b) to support reinforcement construction 1.

En el caso concreto, el tipo de elemento es dominado por las cinco líneas longitudinales en las cuales se concentra la armadura longitudinal y en las que están situados los soportes de malla 30. Una suposición lógica como punto de partida para el cálculo consiste en situar los soportes espaciadores exclusivamente a lo largo de estas cinco líneas principales en dirección longitudinal 33. Entonces varios soportes espaciadores 4 son distribuidos a modo de ensayo, a lo largo de estas líneas longitudinales y se calcula en modo aproximación el comportamiento de combado de estas líneas longitudinales, sin tener en cuenta las barras transversales 29, y se comparan con los valores límite predeterminados. A continuación se desplazan iterativamente las posiciones 33 y 34 de los soportes espaciadores 4, se calcula de nuevo el comportamiento de combado y se compara con los valores límite y así tantas veces hasta que se ha calculado la separación máxima 31 del primer soporte espaciador 4 desde el comienzo de la construcción de armadura 1 así como la separación máxima 32 del soporte espaciador 4 uno debajo de otro a lo largo de la línea longitudinal, con un comportamiento de combado todavía tolerable. Los valores 31 y 32 son calculados por ello con una cierta tolerancia que depende de la separación 44 de las barras 29 transversales, puesto que por motivos estáticos es lógico no colocar los soportes espaciadores 4 exactamente sobre las posiciones dadas por 31 y 32, sino desplazarlos hasta el punto de cruce situado más próximo.In the specific case, the type of element is dominated by the five longitudinal lines in which the longitudinal reinforcement is concentrated and in which the mesh supports 30 are located. A logical assumption as a starting point for the calculation is to locate the Spacer supports exclusively along these five main lines in the longitudinal direction 33. Then several spacer supports 4 are distributed by way of test along these longitudinal lines and the warping behavior of these longitudinal lines is calculated in approximation mode, disregarding the cross bars 29, and are compared with the predetermined limit values. Subsequently, positions 33 and 34 of the spacer supports 4 are iteratively displaced, the warping behavior is calculated again and compared with the limit values, and so on until the maximum separation 31 of the first spacer support 4 has been calculated from the start of the reinforcement construction 1 as well as the maximum spacing 32 of the spacer support 4 one below the other along the longitudinal line, with a still tolerable buckling behavior. Values 31 and 32 are therefore calculated with a certain tolerance that depends on the spacing 44 of the crossbars 29, since for reasons It is logical not to place the spacer supports 4 exactly on the positions given by 31 and 32, but to move them to the closest crossing point.

Sobre la base de este método de cálculo es posible calcular un juego de posiciones 33, 34 esencialmente óptimas para apoyar la construcción de armadura 1 en función de los datos de la construcción de armadura 1 preparados, en donde este juego de posiciones 33, 34 asegura un número mínimo de soportes espaciadores 4 para al mismo tiempo un comportamiento de combado tolerable de la construcción de armadura 1, lo cual consecuentemente actúa sobre la calidad de la pieza de hormigón prefabricada que hay que fabricar.On the basis of this calculation method it is possible to calculate a set of positions 33, 34 essentially optimal to support the reinforcement construction 1 based on the prepared reinforcement construction 1 data, where this set of positions 33, 34 ensures a minimum number of spacer supports 4 for at the same time a tolerable warping behavior of the reinforcement construction 1, which consequently acts on the quality of the precast concrete part to be manufactured.

En un tercer paso de método 25 se colocan ahora los soportes espaciadores 4 en las posiciones 33 y 34 para el apoyo de la construcción de armadura 1 calculadas. En un cuarto proceso de método 26, una construcción de armadura 1 calculada de acuerdo con los datos, es depositada sobre los soportes espaciadores 4. El resultado de estos tercer y cuarto pasos de método 25 o 26 está representado esquemáticamente en la figura 2b, en donde adicionalmente también están expuestos los contornos interiores de los elementos de encofrado 10, los cuales corresponden al contorno exterior de una pieza de hormigón prefabricada fabricada por embebido en una masa de hormigón de la construcción de armadura 1 depositada sobre los soportes espaciadores 4 y el endurecimiento de la masa de hormigón.In a third method step 25, the spacer supports 4 are now placed at positions 33 and 34 to support the calculated reinforcement construction 1. In a fourth method process 26, an armature construction 1 calculated according to the data is deposited on the spacer supports 4. The result of these third and fourth method steps 25 or 26 is schematically represented in Figure 2b, in where additionally the internal contours of the formwork elements 10 are also exposed, which correspond to the external contour of a prefabricated concrete part manufactured by embedded in a concrete mass of the reinforcement construction 1 deposited on the spacer supports 4 and the hardening of the concrete mass.

La figura 3a muestra otro ejemplo de una construcción de armadura 2 en forma de una estera que está construida a partir de barras longitudinales 28 y barras transversales 29. La estera presenta un vaciado 35 para una ventana y un vaciado 36 para una puerta así como una superficie inclinada 43.Figure 3a shows another example of a truss construction 2 in the form of a mat that is constructed from longitudinal bars 28 and transverse bars 29. The mat has a recess 35 for a window and a recess 36 for a door as well as a inclined surface 43.

En el curso del primer paso de método 23 los datos de esta construcción de armadura 2 son preparados en forma de datos CAD.In the course of the first method step 23 the data from this reinforcement construction 2 is prepared in the form of CAD data.

En un segundo paso de método 24, en una instalación de cálculo electrónica programable se calculan las posiciones 33 y 34 para el apoyo de la construcción de armadura 2 en función de estos datos preparados de la construcción de armadura 2.In a second method step 24, positions 33 and 34 are calculated for the support of reinforcement construction 2 in a programmable electronic calculation facility based on these data prepared from reinforcement construction 2.

Para ello, como se muestra en la figura 3b, la estera es dividida en zonas 5 de soporte, en donde a cada zona 5 de soporte se le asocia exactamente un soporte espaciador 4 el cual como minimo soporta una barra longitudinal 28 o una barra transversal 29. Cada una de estas barras soportadas se comba hacia abajo partiendo de un punto de apoyo. Este combado depende en esencia del peso propio de la barra soportada y del peso de las barras soportadas soldadas. En el curso del cálculo se exige que no se puede sobrepasar un máximo de momento de giro parametrizable, en donde el momento de giro depende del diámetro de la barra soportada. La carga de las barras soportadas es repartida sobre todas las barras soportadas. Se calcula cada barra soportada que se apoya sobre un soporte espaciador. En otros pasos cada barra soportada es considerada a su vez como barra de soporte y calculada hasta que todas las barras son soportadas. El combado de las barras soportadas depende de su diámetro y del peso de las barras soldadas y del momento de giro que resulta de ello.For this, as shown in Figure 3b, the mat is divided into support areas 5, where each support area 5 is associated exactly with a spacer support 4 which at least supports a longitudinal bar 28 or a cross bar 29. Each of these supported bars buckles down from a fulcrum. This buckling essentially depends on the proper weight of the supported bar and the weight of the welded supported bars. In the course of the calculation, it is required that a maximum parameterizable moment of rotation cannot be exceeded, where the moment of rotation depends on the diameter of the supported bar. The load of the supported bars is distributed over all the supported bars. Each supported bar that rests on a spacer support is calculated. In other steps each supported bar is considered in turn as a support bar and calculated until all bars are supported. The buckling of the supported bars depends on their diameter and on the weight of the welded bars and on the resulting moment of rotation.

Este cálculo se realiza para zonas 5 de soporte en cada una de las cuales hay situado un soporte espaciador 4. El reparto en las zonas 5 de soporte se realiza por ejemplo partiendo desde un lado de la construcción de armadura 2. El tamaño inicial de cada zona 5 de soporte es parametrizable. En función del resultado de cálculo para una barra de una zona 5 de soporte, durante el cálculo se modifica iterativamente el tamaño de la zona 5 de soporte para llegar lo más cerca posible al límite del momento de giro predeterminado. Los límites 16 de cada zona 5 de soporte están predeterminados por un lado por los límites de la construcción de armadura 2 exteriores e interiores (vaciados para ventanas, puertas o similares) y por otro lado por las cargas calculadas y los límites resultantes de ellas para otras zonas 5 de soporte.This calculation is performed for support zones 5 in each of which a spacer support 4 is located. The distribution in the support zones 5 is carried out, for example, starting from one side of the reinforcement construction 2. The initial size of each Support zone 5 is parameterizable. Depending on the calculation result for a bar of a support area 5, during the calculation the size of the support area 5 is iteratively modified to get as close as possible to the limit of the predetermined torque. The limits 16 of each support zone 5 are predetermined on the one hand by the limits of the exterior and interior reinforcement construction 2 (recesses for windows, doors or the like) and on the other hand by the calculated loads and the resulting limits for them other support areas 5.

Además hay que indicar que en el cálculo de las posiciones 33 y 34 se tiene en cuenta la capacidad máxima de carga del soporte espaciador 4.Furthermore, it should be noted that the maximum load capacity of the spacer support 4 is taken into account when calculating positions 33 and 34.

Para el apoyo de las construcciones de armadura 1, 2 es posible utilizar soportes espaciadores 4 con una superficie de apoyo 40 del tipo malla en la que están previstos pasos, y con varios apoyos 42 que sobresalen de la superficie de apoyo 40 que pueden estar situados tanto en el borde exterior como también en la zona central en la superficie de apoyo 40, en donde mediante la superficie de apoyo 40 y los apoyos 42 exteriores se define un volumen ficticio del soporte espaciador 4 (véase también la figura 4). Algunos de los pasos están situados en la superficie de apoyo 40 de tal manera que como mínimo ofrecen sitio para apoyos 42 de otro soporte espaciador 4 de igual construcción y con ello se pueden apilar como mínimo dos soportes espaciadores 4 uno en otro y el volumen ficticio común de los soportes espaciadores 4 apilados aumenta insignificativamente respecto del volumen ficticio de un soporte espaciador 4, en donde los soportes espaciadores 4 apilados se encuentran, por principio, en igual posición y solamente están girados o desplazados uno respecto de otro de manera que sus superficie de apoyo 40 se apoyan paralelas una sobre otra. For the support of the reinforcement constructions 1, 2 it is possible to use spacer supports 4 with a support surface 40 of the mesh type in which steps are provided, and with several supports 42 that protrude from the support surface 40 that may be located both at the outer edge and also in the central area on the bearing surface 40, whereby the bearing surface 40 and the outer bearings 42 define a dummy volume of the spacer holder 4 (see also FIG. 4). Some of the passages are located in the support surface 40 in such a way that at least they offer space for supports 42 of another spacer support 4 of the same construction and with this, at least two spacer supports 4 can be stacked on each other and the dummy volume common of the stacked spacer supports 4 increases insignificantly with respect to the dummy volume of a spacer support 4, where the stacked spacer supports 4 are, in principle, in the same position and are only rotated or displaced relative to each other so that their surfaces bearing 40 rest parallel to one another.

De esta manera es posible colocar numerosos soportes espaciadores 4 unos junto a otros ahorrando espacio. En el presente caso la superficie de apoyo 40 en forma de malla está construida circular. Los soportes 42 forman la dimensión que define la cubierta de hormigón. Según sea la cubierta de hormigón de la construcción de armadura 1, 2 que se necesita, los soportes 42 puede ser más largos o más cortos.In this way it is possible to place numerous spacer supports 4 next to each other saving space. In the present case, the mesh-shaped support surface 40 is circular. The supports 42 form the dimension that defines the concrete cover. Depending on the concrete cover of the reinforcement construction 1, 2 that is needed, the supports 42 can be longer or shorter.

En la figura 4 está representada una pila construida de manera con soportes espaciadores 4 situados unos sobre otros o unos dentro de otros. Para colocar los soportes espaciadores 4 en las posiciones calculadas en el curso del tercer paso de método 25 los soportes espaciadores 4 apilados pueden ser almacenados en un paso intermedio en un dispositivo diferenciador 8. Este dispositivo diferenciador 8 consiste en un tubo de centrado 37 con el que los soportes espaciadores 4 se mantienen centrados. Los soportes espaciadores 4 son levantados hacia arriba mediante un tope 39.In FIG. 4 a stack constructed in such a way with spacer supports 4 positioned one above the other or one inside the other is shown. To place the spacer supports 4 in the positions calculated in the course of the third method step 25, the stacked spacer supports 4 can be stored in an intermediate step in a differentiating device 8. This differentiating device 8 consists of a centering tube 37 with the that the spacer supports 4 are kept centered. The spacer supports 4 are lifted upwards by a stop 39.

En la posición de partida que está representada en la figura 4 o en la 5a la pila de soportes espaciadores está apoyada sobre el tope 39. Un diferenciador 38 separa además el soporte espaciador 4 inferior del segundo soporte espaciador 4 por abajo. Para poder encajar en el tope 39 o en el diferenciador 38 los soportes espaciadores 4 presentan circunferencialmente un voladizo 45 en forma anular.In the starting position shown in FIG. 4 or 5a, the stack of spacer supports is supported on the stop 39. A differentiator 38 further separates the lower spacer support 4 from the second spacer support 4 from below. In order to be able to fit in the stop 39 or in the differentiator 38, the spacer supports 4 have an annular cantilever 45.

Para ahora liberar el soporte espaciador 4 inferior a una posición 33, 34 calculada, el tope 39 es movido radialmente hacia afuera de manera que el soporte espaciador 4 con el voladizo 45 ya no está apoyado sobre el tope 39 (véase la figura 5b). Después de la liberación de este soporte espaciador 4 el tope 39 es llevado hacia atrás nuevamente a su posición original (véase la figura 5c). A continuación el diferenciador 38 es movido radialmente hacia afuera. Con ello la pila de soportes espaciadores cae hacia abajo sobre el tope 39 (véase la figura 5d). finalmente el diferenciador 38 es llevado hacia atrás a su posición original según la figura 5a.To now release the lower spacer bracket 4 to a calculated position 33, 34, the stop 39 is moved radially outward so that the spacer bracket 4 with the overhang 45 is no longer supported on the stop 39 (see Figure 5b). After the release of this spacer support 4, the stop 39 is brought back to its original position again (see figure 5c). The differentiator 38 is then moved radially outward. The stack of spacer supports thereby falls down onto the stop 39 (see FIG. 5d). finally the differentiator 38 is brought back to its original position according to figure 5a.

Para facilitar la colocación del separador espaciador 4 en las posiciones calculadas 33, 34 en el curso del tercer paso de método 25 puede estar previsto un dispositivo de marcado, que por ejemplo puede tratarse de un plotter el cual señala al soporte espaciador 4 las posiciones calculadas 33, 34 sobre un palé. Como alternativa el dispositivo de marcado puede comprender también un láser modulable con el que se señalan las posiciones 33, 34 calculadas para el soporte espaciador 4 o secuencialmente una tras otra o simultáneamente. En otra secuencia una persona de servicio puede colocar el soporte espaciador 4 en las posiciones 33, 34 calculadas, que han sido marcadas por medio del dispositivo de marcado.In order to facilitate the positioning of the spacer spacer 4 in the calculated positions 33, 34 in the course of the third method step 25, a marking device may be provided, for example a plotter which points to the spacer support 4 the calculated positions 33, 34 on a pallet. As an alternative, the marking device may also comprise a modular laser with which the positions 33, 34 calculated for the spacer support 4 are indicated, either sequentially one after the other or simultaneously. In another sequence a service person can place the spacer support 4 at the calculated positions 33, 34, which have been marked by means of the marking device.

Como alternativa o como complemento a ella, la colocación del soporte espaciador 4 en las posiciones 33, 34 calculadas en el curso del tercer paso de método 25 puede realizarse por medio de un autómata de colocación. La figura 6a muestra un ejemplo de un autómata de colocación 6 de este tipo, el cual está construido estacionario. Esto significa que un palé sobre el cual deben colocarse soportes espaciadores 4 en las posiciones 33, 34 calculadas se desplaza con respecto al autómata de colocación 6 estacionario.As an alternative or as a complement to it, the positioning of the spacer support 4 in the positions 33, 34 calculated in the course of the third method step 25 can be carried out by means of a positioning automaton. Figure 6a shows an example of such a positioning automat 6, which is built stationary. This means that a pallet on which spacer supports 4 must be placed at the calculated positions 33, 34 is displaced with respect to the stationary positioning automat 6.

También es posible el prever un autómata de colocación 6 estacionario, de este tipo sobre una estación de una instalación de palés circulantes. Para ello los palés 11 se desplazan a lo largo o transversalmente desde una estación hasta la siguiente de la instalación de palés circulantes. En el ejemplo representado el desplazamiento del palé 11 se produce en dirección longitudinal 33.It is also possible to provide a stationary positioning automaton 6 of this type on a station of a circulating pallet installation. For this, the pallets 11 move along or transversely from one station to the next of the installation of circulating pallets. In the example shown, the displacement of the pallet 11 occurs in the longitudinal direction 33.

Para depositar los soportes espaciadores 4 en las posiciones 33, 34 anteriormente calculadas están previstos dos dispositivos de colocación 19, cada uno de los cuales presenta uno de los dispositivos diferenciadores 8 prescritos. Para el control de una determinada posición 33, 34 el palé 11 se mueve en dirección longitudinal 33 y uno de los dispositivos de colocación 19 se mueve en la dirección transversal 34 a lo largo de una viga transversal 17. Para ello está prevista una unidad de control 20 para el control de los movimientos de los dispositivos de colocación 19. Según una forma de realización preferida esta unidad de control 20 puede controlar también el movimiento del palé 11. Además la unidad de control 20 puede tratarse de una instalación de cálculo 3 electrónica programable la cual en el curso del segundo paso de método 24 calcula las posiciones 33, 34 para el apoyo de la construcción de armadura 1, 2 en función de los datos preparados de la construcción de armadura 1, 2.To place the spacer supports 4 in the previously calculated positions 33, 34, two positioning devices 19 are provided, each of which has one of the prescribed differentiating devices 8. For the control of a certain position 33, 34 the pallet 11 moves in the longitudinal direction 33 and one of the positioning devices 19 moves in the transverse direction 34 along a transverse beam 17. For this purpose, a unit for control 20 for controlling the movements of the positioning devices 19. According to a preferred embodiment, this control unit 20 can also control the movement of the pallet 11. Furthermore, the control unit 20 can be an electronic computing installation 3 programmable which in the course of the second method step 24 calculates the positions 33, 34 for the support of the reinforcement construction 1, 2 based on the prepared data of the reinforcement construction 1, 2.

Según sea la potencia necesaria puede estar previsto un autómata de colocación 6 como este al que pueden estar asociadas varias vigas paralelas una a otra, que están situadas transversalmente a la dirección de marcha del palé 11 y en las cuales se apoyan pudiendo desplazarse uno o varios dispositivos de colocación 19.Depending on the power required, a positioning automat 6 such as this may be provided, to which several beams parallel to each other may be associated, which are located transversely to the direction of travel of the pallet 11 and on which they rest, and one or more of them can be moved. positioning devices 19.

La figura 6b muestra esquemáticamente un ejemplo de un autómata de colocación 7 construido para poder desplazarse. En este caso el palé permanece en una posición determinada durante la colocación de los soportes espaciadores 4 en las posiciones 33, 34 calculadas y los dispositivos de colocación 19 se desplazan tanto en dirección longitudinal 33 como en dirección transversal 34 con respecto al palé 11. También en este caso, según se la potencia de colocación, pueden estar previstas varias vigas paralelas en las cuales están situados uno o varios dispositivos de colocación 19. Figure 6b schematically shows an example of a positioning automaton 7 built to be able to move. In this case the pallet remains in a certain position during the placement of the spacer supports 4 in the calculated positions 33, 34 and the positioning devices 19 move both in the longitudinal 33 and in the transverse 34 direction with respect to the pallet 11. Also in this case, depending on the laying power, several parallel beams may be provided in which one or more laying devices 19 are located.

Cada uno de los autómatas de colocación 6, 7 representados en las figuras 6a y 6b puede comprender también una estación de carga para el rellenado de los soportes espaciadores 4 que hay que colocar en el curso del tercer paso de método 25. La estación de carga puede ser utilizada también para tener preparados diferentes tipos de soportes espaciadores 4 de manera que sea posible de manera simple un cambio entre dos diferentes tipos de soportes espaciadores 4.Each of the positioning automata 6, 7 represented in Figures 6a and 6b may also comprise a charging station for filling the spacer supports 4 to be placed in the course of the third method step 25. The charging station it can also be used to have prepared different types of spacer supports 4 so that a change between two different types of spacer supports 4 is simply possible.

Una estación de carga 9 de este tipo está representada en la figura 7. La estación de carga 9 comprende un almacén con varios, en este caso concreto tres, platos giratorios 12 cada uno de los cuales presenta una zona de llenado 13 y una zona de vaciado 14. Por ello, el almacén puede ser al mismo tiempo llenado con nuevos soportes espaciadores 4 por una persona de servicio por la zona de llenado 13 del plato giratorio 12, mientras que la otra mitad del almacén, es decir la zona de vaciado 14 del plato giratorio 14 está dispuesta para la extracción del soporte espaciador 4. El almacén está construido ventajosamente de manera que se almacena suficiente número de soportes espaciadores 4 para la producción del día. Para extraer nuevos soportes espaciadores 4 el dispositivo de colocación 19 se desplaza sobre una pila de soportes espaciadores preparada en el almacén y aloja uno en el dispositivo diferenciador 8. La estación de carga 9 puede estar construida de manera que soportes espaciadores 4 con diferentes alturas pueden estar disponibles en almacenes situados contiguos uno a otro.A loading station 9 of this type is shown in FIG. 7. The loading station 9 comprises a warehouse with several, in this particular case three, turntables 12 each of which has a filling area 13 and a loading area emptying 14. For this reason, the warehouse can at the same time be filled with new spacer supports 4 by a service person through the filling area 13 of the turntable 12, while the other half of the warehouse, that is to say the emptying area 14 of the turntable 14 is arranged for the extraction of the spacer support 4. The warehouse is advantageously constructed so that a sufficient number of spacer supports 4 are stored for the day's production. In order to extract new spacer supports 4, the positioning device 19 moves on a stack of spacer supports prepared in the warehouse and houses one in the differentiating device 8. The loading station 9 can be constructed so that spacer supports 4 with different heights can be available in warehouses located next to each other.

En lugar de platos giratorios pueden utilizarse también, por ejemplo, uno o varios cajones.Instead of turntables, for example, one or more drawers can also be used.

Para almacenar la pila de soportes espaciadores en la estación de carga 9 puede estar previstos pernos de centrado 15 que pueden encajar en una correspondiente abertura 41 central en la superficie de apoyo 40 del soporte espaciador 4 (véase la figura 4). De esta manera una pila de soportes espaciadores puede ser almacenada en una posición almacén predeterminada.Centering bolts 15 can be provided to store the stack of spacer supports 9 in the loading station 9, which can fit into a corresponding central opening 41 in the bearing surface 40 of the spacer support 4 (see FIG. 4). In this way a stack of spacer supports can be stored in a predetermined warehouse position.

Básicamente se puede pensar en que el dispositivo de colocación 19 toma una determinada pila de soportes espaciadores, utiliza una parte de los soportes espaciadores 4 de la pila, es decir en el curso del tercer paso de método 25 los coloca en posiciones 33, 34 previamente calculadas y los soportes espaciadores 4 no utilizados los deposita de nuevo en una posición almacén para tomar otro tipo de soporte espaciador, por ejemplo con otra altura. Basically it can be thought that the positioning device 19 takes a certain stack of spacer supports, uses a part of the spacer supports 4 of the stack, that is, in the course of the third step of method 25 it places them in positions 33, 34 previously calculated and the unused spacer supports 4 places them back in a warehouse position to take another type of spacer support, for example with a different height.

Claims (9)

REIVINDICACIONES 1. Método de apoyo (21) para apoyar una construcción de armadura (1, 2) en la fabricación de piezas de hormigón prefabricadas, en donde1. Support method (21) to support a reinforcement construction (1, 2) in the manufacture of precast concrete parts, where - en un primer paso de método (23) se preparan datos para la construcción de armadura (1, 2) diseñada para la pieza de hormigón prefabricada que hay que fabricar,- in a first method step (23) data is prepared for the reinforcement construction (1, 2) designed for the precast concrete part to be manufactured, - en un segundo paso de método (24), en una instalación de cálculo (3) electrónica programable, se calculan posiciones (33, 34) para apoyar la construcción de armadura (1, 2) en función de los datos preparados de la construcción de armadura (1,2),- in a second method step (24), in a programmable electronic calculation facility (3), positions (33, 34) are calculated to support the reinforcement construction (1, 2) based on the prepared construction data armor (1,2), - en un tercer paso de método (25), para el apoyo de la construcción de armadura (1, 2) en las posiciones (33, 34) calculadas se sitúan soportes espaciadores (4), caracterizado por el paso:- in a third method step (25), to support the reinforcement construction (1, 2) at the calculated positions (33, 34), spacer supports (4) are located, characterized by the step: - en un cuarto paso de método (26) sobre los soportes espaciadores (4) se coloca una construcción de armadura (1, 2) fabricada según los datos.- in a fourth method step (26) on the spacer supports (4) a reinforcement construction (1, 2) manufactured according to the data is placed. 2. Método de apoyo (21) según la reivindicación 1, en donde en el curso del tercer paso de método (25) los soportes espaciadores (4) se colocan sobre un palé (11) con elementos de encofrado (10).2. Support method (21) according to claim 1, wherein in the course of the third method step (25) the spacer supports (4) are placed on a pallet (11) with formwork elements (10). 3. Método de apoyo (21) según la reivindicación 1 ó 2, en donde las posiciones (33, 34) sobre las que han sido colocados los soportes espaciadores (4) en el curso del tercer paso de método (25) son marcadas mediante un dispositivo de marcado, que como mínimo comprende un láser.3. Support method (21) according to claim 1 or 2, wherein the positions (33, 34) on which the spacer supports (4) have been placed in the course of the third method step (25) are marked by a marking device, which at least comprises a laser. 4. Método de apoyo (21) según una de las reivindicaciones 1 a 3, en donde en el curso del tercer paso de método (25) los soportes espaciadores (4) que van a ser colocados en las posiciones (33, 34) calculadas para el apoyo de la construcción de armadura (1, 2) son extraídos como minimo de un dispositivo diferenciador (8) preferiblemente automatizado.4. Support method (21) according to one of claims 1 to 3, wherein in the course of the third method step (25) the spacer supports (4) to be placed in the calculated positions (33, 34) to support the reinforcement construction (1, 2) they are extracted as a minimum of a differentiating device (8) preferably automated. 5. Método de apoyo (21) según una de las reivindicaciones 1 a 4, en donde durante el cálculo de las posiciones (33, 34) para el apoyo de la construcción de armadura (1,2) en el curso del segundo paso de método (24), la construcción de armadura (1, 2) es dividida en zonas de soporte (5), en donde a cada zona de soporte (5) se le asigna exactamente un soporte espaciador (4).5. Support method (21) according to one of claims 1 to 4, wherein during the calculation of the positions (33, 34) for supporting the reinforcement construction (1,2) in the course of the second step of method (24), the reinforcement construction (1, 2) is divided into support areas (5), where each support area (5) is assigned exactly one spacer support (4). 6. Método de apoyo (21) en donde durante el cálculo de las posiciones (33, 34) para el apoyo de la construcción de armadura (1,2) en el curso del segundo paso de método (24), los límites de las zonas de soporte (5) son desplazados iterativamente.6. Support method (21) where during the calculation of the positions (33, 34) for the support of the reinforcement construction (1,2) in the course of the second method step (24), the limits of the support areas (5) are moved iteratively. 7. Método de apoyo (21) según una de las reivindicaciones 1 a 6, en donde el cálculo de las posiciones (33, 34) para el apoyo de la construcción de armadura (1,2) en el curso del segundo paso de método (24) se realiza teniendo en cuenta7. Support method (21) according to one of claims 1 to 6, wherein the calculation of the positions (33, 34) for the support of the reinforcement construction (1,2) in the course of the second method step (24) is done taking into account - la construcción de la construcción de armadura (1, 2),- the construction of the armature construction (1, 2), - la geometría de la construcción de armadura (1, 2),- the geometry of the reinforcement construction (1, 2), - el peso de la construcción de armadura (1, 2),- the weight of the armor construction (1, 2), - el comportamiento de combado de la construcción de armadura (1, 2),- the buckling behavior of the reinforcement construction (1, 2), - los momentos de giro ejercidos en función del comportamiento de combado de la construcción de armadura (1, 2), y/o- the turning moments exerted as a function of the warping behavior of the reinforcement construction (1, 2), and / or - la capacidad de carga de los soportes (4) utilizados para el apoyo de la construcción de armadura (1, 2) en los pasos de método consecutivos.- the load capacity of the supports (4) used to support the reinforcement construction (1, 2) in the consecutive method steps. 8. Método de apoyo (21) según una de las reivindicaciones 1 a 7, en donde la colocación de los soportes espaciadores (4) en las posiciones (33, 34) calculadas en el curso del tercer paso de método (25) se realiza mediante un autómata de colocación (6. 7).8. Support method (21) according to one of claims 1 to 7, wherein the positioning of the spacer supports (4) in the positions (33, 34) calculated in the course of the third method step (25) is carried out by means of a placement automat (6. 7). 9. Método de fabricación para la fabricación de piezas de hormigón prefabricadas, en donde en primer lugar el método de apoyo (21) para el apoyo de la construcción de armadura (1, 2) se realiza según una de las reivindicaciones 1 a 8, y en un consiguiente paso de método (27) la construcción de armadura (1, 2) colocada sobre los soportes espaciadores (4) es embebida en una masa de hormigón, en donde preferiblemente el método de fabricación (22) es realizado en una instalación de palés circulante. 9. Manufacturing method for the manufacture of precast concrete parts, wherein firstly the support method (21) for supporting the reinforcement construction (1, 2) is carried out according to one of claims 1 to 8, and in a subsequent method step (27) the reinforcement construction (1, 2) placed on the spacer supports (4) is embedded in a concrete mass, where preferably the manufacturing method (22) is carried out in an installation of circulating pallets.
ES16183778T 2015-08-17 2016-08-11 Support method to support an armor construction Active ES2764387T3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ATA50726/2015A AT517094B1 (en) 2015-08-17 2015-08-17 Supporting method for supporting a reinforcement construction

Publications (1)

Publication Number Publication Date
ES2764387T3 true ES2764387T3 (en) 2020-06-03

Family

ID=56682045

Family Applications (2)

Application Number Title Priority Date Filing Date
ES16183778T Active ES2764387T3 (en) 2015-08-17 2016-08-11 Support method to support an armor construction
ES19155066T Active ES2934348T3 (en) 2015-08-17 2016-08-11 Placement or installation automaton

Family Applications After (1)

Application Number Title Priority Date Filing Date
ES19155066T Active ES2934348T3 (en) 2015-08-17 2016-08-11 Placement or installation automaton

Country Status (7)

Country Link
EP (2) EP3165340B1 (en)
CN (1) CN106476134B (en)
AT (1) AT517094B1 (en)
DK (2) DK3517268T3 (en)
ES (2) ES2764387T3 (en)
HU (1) HUE060833T2 (en)
PL (2) PL3165340T3 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102019200401A1 (en) * 2019-01-15 2020-07-16 Herbert Wintersteiger Method and device for positioning concrete installation elements on a formwork base, and concrete installation element for use in combination with the device
DE102019125300A1 (en) * 2019-09-19 2021-03-25 Häussler Innovation GmbH Method for the reinforcement of a reinforced concrete component
AT17865U1 (en) * 2020-11-25 2023-05-15 Progress Maschinen & Automation Ag Method for calculating production parameters of at least one reinforcement
CN113021609B (en) * 2021-03-11 2023-06-02 珠海筑享云科技有限公司 Production device for concrete prefabricated part
CN112976288B (en) * 2021-04-14 2022-06-07 展鹏(福建)工贸有限公司 Production method of automatic brick production line
CN113232121B (en) * 2021-05-27 2022-04-19 湖南德禹建设有限公司 Intelligent trolley assembly line rectangular aqueduct translation system and prefabricating method
CN113276268B (en) * 2021-06-24 2022-06-07 广东省第十一建设有限公司 Heat preservation laying device is used in prefabricated wall brick processing
CN113894926B (en) * 2021-08-20 2023-03-14 广东碧品居建筑工业化有限公司 Reinforcing bar net piece is place and is gone into integrative equipment of mould
CN113927733A (en) * 2021-11-19 2022-01-14 上海世微智能科技有限公司 Production and preparation method of prefabricated external wall panel

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1449612A (en) 1964-12-16 1966-05-06 Portable machine, with manual, electric or other operation for laying, aligning, adjusting and leveling all tiles and mosaics on the surface
DE1918965A1 (en) * 1969-04-15 1970-11-12 Heinrich Geisel Arrangement and device for arranging the anchoring eyelets in artificial stone surrounds
DE3420806A1 (en) * 1984-06-04 1985-12-05 Hugo 8831 Dollnstein Bittlmayer METHOD FOR REINFORCING CONCRETE PANELS AND DEVICE FOR CARRYING OUT THE METHOD
JPH062333B2 (en) * 1987-05-21 1994-01-12 三菱マテリアル株式会社 Method for manufacturing multi-type fixing device for prestressed concrete
DE3911514A1 (en) * 1989-04-08 1990-10-11 Fil Maschinenfabrik Franz Filz Device for producing reinforcements of double walls provided for building purposes
DE4031384C1 (en) * 1990-10-04 1992-01-30 Hugo 8831 Dollnstein De Bittlmayer
DE4135581A1 (en) * 1991-10-29 1993-05-06 Wiehofsky, Fritz, 8913 Schondorf, De Reinforced construction plate - has spaced grids embedded in coating mass covering base plate, grids are kept apart by distance holders of swellable material
DE19651933C1 (en) * 1996-12-14 1997-11-27 Ebawe Maschinenbau Gmbh Method of encasing plate-shaped pre-cast concrete parts, with shuttering robot
AT411037B (en) * 2001-07-05 2003-09-25 Ebawe Anlagentechnik Gmbh MAGNET SET ROBOT
AT506747B1 (en) 2008-05-13 2011-01-15 Progress Maschinen & Automation Ag METHOD FOR PRODUCING CONCRETE PREPARATION ELEMENTS WHERE THE MANUFACTURE OF THE COMPONENTS ON PALLET SHAPES IS CARRIED OUT
ITUD20080189A1 (en) 2008-08-21 2010-02-22 Stefano Miani EQUIPMENT FOR LAYING TILES AND / OR DECORATIVE ELEMENTS AND ITS PROCEDURE
CN203198053U (en) * 2013-03-25 2013-09-18 马鞍山十七冶工程科技有限责任公司 Positioning supporting frame of steel reinforcement framework in light wallboard

Also Published As

Publication number Publication date
ES2934348T3 (en) 2023-02-21
AT517094A4 (en) 2016-11-15
EP3517268B1 (en) 2022-10-19
DK3165340T3 (en) 2020-01-20
EP3165340B1 (en) 2019-10-02
AT517094B1 (en) 2016-11-15
CN106476134B (en) 2020-08-04
DK3517268T3 (en) 2023-01-16
PL3517268T3 (en) 2023-02-27
HUE060833T2 (en) 2023-04-28
CN106476134A (en) 2017-03-08
PL3165340T3 (en) 2020-03-31
EP3165340A2 (en) 2017-05-10
EP3165340A3 (en) 2017-08-16
EP3517268A1 (en) 2019-07-31

Similar Documents

Publication Publication Date Title
ES2764387T3 (en) Support method to support an armor construction
CN112407637B (en) Stack storage assembly
ES2780624T3 (en) Method to extract a target container stored in a storage system
JP6667521B2 (en) Production equipment for producing multiple parts simultaneously and productively
US8028485B2 (en) Module having displacement bodies for the production of concrete elements
US10202770B2 (en) Reinforcing element and method for producing a reinforcing element
FI3374291T3 (en) Picking systems and methods
US20170321421A9 (en) Prefabricated modular rebar modules and methods of using the same
US10421608B2 (en) Frame structure for a multi-level container handling and storage facility
EP2012616B1 (en) Assembly for and method of housing an object, such as fuel cell balance of plant equipment, for transport to and storage at a user location
WO2015055967A3 (en) Method for loading and unloading a space located on a vehicle
KR20220103144A (en) Methods, systems and computer programs for controlling an automated storage and retrieval system while rebuilding its physical design
US20170362846A1 (en) Modular storage system
CN106315097A (en) Control method of automatic storage, sorting and loading system for unmanned aerial vehicle express delivery
JPS63212607A (en) Control method for line row type warehouse and line row type warehouse employing said method
CN206569477U (en) Fork truck axle assembly transports holder device
Bujak et al. Can the increasing of energy consumption of information interchange be a factor that reduces the total energy consumption of a logistic warehouse system?
JP2005331359A (en) System for storing radioactive substance canister
JP6155656B2 (en) Parking facilities
JP6370900B2 (en) A device for repairing damage to the base of water filled containers
JP6550505B1 (en) Automatic warehouse system
ES2306549B1 (en) DEVICE FOR THE TRANSPORT OF MATERIALS IN CONSTRUCTION WORKS.
CN203667610U (en) Arrangement structure of circulating multi-material automatic distributing plant
Pypno Multi-storey automated over ground garage for cars-solution of parking problems in big urban areas
JP2007248060A (en) Method for evaluating safety of air pallet transportation device