ES2726248A1 - PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding) - Google Patents

PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding) Download PDF

Info

Publication number
ES2726248A1
ES2726248A1 ES201830326A ES201830326A ES2726248A1 ES 2726248 A1 ES2726248 A1 ES 2726248A1 ES 201830326 A ES201830326 A ES 201830326A ES 201830326 A ES201830326 A ES 201830326A ES 2726248 A1 ES2726248 A1 ES 2726248A1
Authority
ES
Spain
Prior art keywords
foundation
post
piece
prefabricated
phase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
ES201830326A
Other languages
Spanish (es)
Inventor
Fragüet Jesus Montaner
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Structural Concrete and Steel SL
Original Assignee
Structural Concrete and Steel SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Structural Concrete and Steel SL filed Critical Structural Concrete and Steel SL
Priority to ES201830326A priority Critical patent/ES2726248A1/en
Publication of ES2726248A1 publication Critical patent/ES2726248A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • E02D27/425Foundations for poles, masts or chimneys specially adapted for wind motors masts
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Sustainable Energy (AREA)
  • Sustainable Development (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The present specification refers, as its title indicates, to a prefabricated post foundation that comprises a single piece of prefabricated foundation with concrete and metal slab, inserted into the ground and related to the post to be supported by a removable mechanical connection with the lower end of said post. The invention presented provides the main advantage of being made in a single piece, significantly simplifying the assembly time, with the consequent economic savings, in addition to the fact that when using removable mechanical joints, the easy and rapid disassembly of the post is facilitated, allowing its reuse in another location, if necessary. (Machine-translation by Google Translate, not legally binding)

Description

DESCRIPCIONDESCRIPTION

Cimiento prefabricado para postesPrefabricated post foundation

La presente memoria descriptiva se refiere, como su título indica, a un cimiento prefabricado para postes que comprende una única pieza de cimentación prefabricada con hormigón y forjado metálico, inserta en el suelo y relacionada con el poste a sustentar mediante una unión mecánica removible con el extremo inferior de dicho poste.The present specification refers, as its title indicates, to a prefabricated post foundation that comprises a single piece of prefabricated foundation with concrete and metal slab, inserted into the ground and related to the post to be supported by a removable mechanical connection with the lower end of said post.

Campo de la invenciónField of the Invention

La invención se refiere al campo de los cimientos prefabricados para instalación de postes .The invention relates to the field of prefabricated foundations for pole installation.

Estado actual de la TécnicaCurrent state of the art

En la actualidad es frecuente la utilización de postes o torres de elevada altura para el soporte de estructuras, quepueden ser de iluminación, videovigilancia, fotografía, alarma, instalaciones meteorológicos, medidores de parámetros de contaminación del aire, ahuyentadores de aves, etc..., o una combinación de ellas. Estos postes puede ser de distintos materiales, metálicos, de madera, de hormigón, con una o varias secciones, y requieren de una oportuna cimentación para mantener su verticalidad, lo cual es especialmente relevante en el caso de postes de gran altura.At present, the use of high-rise poles or towers for the support of structures is frequent, which can be lighting, video surveillance, photography, alarm, meteorological installations, air pollution parameter meters, bird scarers, etc ... , or a combination of them. These posts can be of different materials, metal, wood, concrete, with one or several sections, and require a timely foundation to maintain their verticality, which is especially relevant in the case of high-rise posts.

En la Patente ES2476599 “Anclaje de una torre de una instalación de energía eólica" podemos encontrar descrito el procedimiento de cimentación convencionalmente utilizado, con realización de la zapata de cimentación in situ por hormigonado. Con el consiguiente problema de tiempo de fraguado hasta poder utilizarla. Algunos postes utilizan anclajes a la zapata de cimentación, como el descrito en la Patente ES1038770 “Anclaje perfeccionado para postes de hormigón", utilizando una placa metálica auxiliar. Algunos otros fabricados en hormigón armado pueden incluir un pié en el propio hormigón con perforaciones para el montaje.In Patent ES2476599 "Anchorage of a tower of a wind power installation" we can find described the conventionally used foundation procedure, with realization of the foundation shoe in situ by concreting. With the consequent problem of setting time until it can be used. Some posts use anchors to the foundation shoe, such as the one described in Patent ES1038770 " Improved anchor for concrete posts", using an auxiliary metal plate. Some others made of reinforced concrete may include a foot in the concrete itself with perforations for mounting.

También se conocen alguno intentos de realizar elementos de cimentación prefabricados, como podemos encontrar por ejemplo descritos en la Patente ES2028614 “Cimiento semiprefabricado para muros o pilares prefabricados", que presenta una caja prefabricada pero que sigue necesitando la realización de la zapata por hormigonado in situ. También se conocen piezas paralelepipédicas como la descrita en la Patente ES1063589 “Base de cimentación prefabricada" o con pluralidad de pilotes paralelepipédicos como en ES2489300 “Cimentación prefabricada para estructuras de plantas termosolares y fotovoltaicas, y procedimiento de realización de la cimentación”, pero todos estos elementos no son apropiados para soporte de postes, especialmente de gran altura., al no tener la misma resistencia de soporte en todos los sentidos.There are also known some attempts to make prefabricated foundation elements, as we can find for example described in Patent ES2028614 "Semi-prefabricated foundation for prefabricated walls or pillars", which presents a prefabricated box but still needs the realization of the shoe by concreting in situ Parallelepipedic pieces are also known as the one described in Patent ES1063589 "Prefabricated foundation base" or with a plurality of parallelepiped piles as in ES2489300 "Prefabricated foundation for structures of thermosolar and photovoltaic plants, and method of making the foundation", but all These elements are not suitable for pole support, especially of high height, as they do not have the same support resistance in all directions.

También se conocen algunos elementos prefabricados para cimentación de torres, como por ejemplo encontramos reivindicados en las Patentes ES2524840 “Sistema de cimentación para torres y procedimiento de instalación del sistema de cimentación para torres", WO2011030199 “Cimentación mejorada para una torre de aerogeneradof’ y ES2448769 “Cimentación, particularmente para una turbina eólica, y turbina eólica", pero estan formadas por una pluralidad de elementos prefabricados que deben ser ensamblados y unidos in situ para conformar la cimentación, y luego hormigonados en algún caso, con lo cual el ahorro de tiempo no es demasiado.Some prefabricated elements for tower foundations are also known, as for example we find claimed in Patents ES2524840 "Foundation system for towers and installation procedure of the foundation system for towers", WO2011030199 "Improved foundation for an aerogeneradof tower" and ES2448769 "Foundation, particularly for a wind turbine, and wind turbine", but are formed by a plurality of prefabricated elements that must be assembled and joined in situ to form the foundation, and then concreted in some cases, thereby saving time is not too much.

Descripción de la invenciónDescription of the invention

Para solventar la problemática existente en la actualidad en cuanto a la cimentación de postes de gran altura, solventando los problemas existentes y mejorando el estado de la técnica actual, se ha ideado el cimiento prefabricado para postes objeto de la presente invención, el cual comprende una única pieza de cimentación prefabricada con hormigón y forjado metálico, inserta en el suelo y relacionada con el poste a sustentar mediante una unión mecánica removible con el extremo inferior de dicho poste.In order to solve the current problem regarding the foundation of high-rise posts, solving existing problems and improving the state of the art, the prefabricated foundation for posts object of the present invention has been devised, which comprises a only piece of foundation prefabricated with concrete and metal slab, inserted into the ground and related to the post to be supported by a removable mechanical joint with the lower end of said post.

Esta pieza de cimentación comprende una parte de anclaje parcialmente hueca en cuya parte superior se hayan verticalmente dispuestas, insertadas en el hormigón, una pluralidad de varillas roscadas, radialmente distribuidas, una parte inferior de soporte, que puede tener planta circular o poligonal, y una pluralidad de refuerzos, radialmente dispuestos con perfil inclinado entre la parte de anclaje y la parte inferior de soporte. De manera alternativa está previsto que también comprenda una caja de registro, con una tapa removible, conectada internamente mediante una conducción hueca con el hueco de la parte de anclaje. This foundation piece comprises a partially hollow anchoring part whose upper part has been arranged vertically, inserted in the concrete, a plurality of threaded rods, radially distributed, a lower support part, which can have a circular or polygonal plan, and a plurality of reinforcements, radially arranged with an inclined profile between the anchoring part and the lower support part. Alternatively, it is provided that it also comprises a registration box, with a removable cover, internally connected by a hollow conduit with the hollow of the anchoring part.

Asimismo, está previsto que la parte inferior de soporte pueda llevar opcionalmente una pluralidad de perforaciones verticales pasantes, propiciando una posible unión a un refuerzo de cimentación hormigonado en un pozo perforado por debajo.Likewise, it is provided that the lower support part can optionally carry a plurality of through vertical perforations, causing a possible connection to a concrete foundation reinforcement in a well drilled below.

La unión mecánica removible con el extremo inferior del poste consiste en la introducción de las varillas roscadas de la pieza de cimentación a través de unas perforaciones ubicadas en el extremo inferior del poste y el roscado mediante tuercas. Estas perforaciones ubicadas en el extremo inferior del poste pueden estar realizadas en el propio pie de hormigón del poste, utilizar un aro metálico complementario al poste, o cualquier otra solución constructiva.The removable mechanical connection with the lower end of the post consists of the introduction of the threaded rods of the foundation piece through holes located in the lower end of the post and the threaded by means of nuts. These perforations located at the lower end of the post can be made on the concrete foot of the post itself, using a metal ring complementary to the post, or any other constructive solution.

Este cimiento prefabricado para postes incluye asimismo un procedimiento característico de cimentación en el que primero se realiza la excavación en el suelo de la oportuna zanja, y en caso necesario del pozo de refuerzo de cimentación opcional que posteriormente se hormigona y se dota de las oportunas varillas roscadas, luego se inserta la pieza de cimentación en la zanja excavada, y se enrasa con el nivel del suelo, sujetándose mecánicamente al refuerzo de cimentación en su caso, luego se vierte el material de relleno, normalmente grava, y finalmente se coloca una losa de cierre en hormigón.This prefabricated foundation for poles also includes a characteristic foundation procedure in which first the excavation is carried out in the soil of the opportune trench, and if necessary the optional foundation reinforcement well that later is concreted and provided with the appropriate rods threaded, then the foundation piece is inserted into the excavated ditch, and flush with the ground level, mechanically subjecting to the foundation reinforcement where appropriate, then the filling material is poured, usually gravel, and finally a slab is placed Closed in concrete.

Ventajas de la invenciónAdvantages of the invention

Este cimiento prefabricado para postes que se presenta aporta múltiples ventajas sobre los dispositivos disponibles en la actualidad siendo la más importante que al estar realizado en una única pieza, se simplifica notablemente el tiempo de montaje, con el consiguiente ahorro económico.This prefabricated foundation for poles that is presented provides multiple advantages over the devices currently available, being the most important that being made in a single piece, the assembly time is greatly simplified, with the consequent economic savings.

Otra importante ventaja es que, al utilizar uniones mecánicas removibles, se propicia el fácil y rápido desmontaje, sin causar daños al poste, permitiendo su reutilización en otra ubicación, en caso necesario.Another important advantage is that, by using removable mechanical joints, easy and rapid disassembly is encouraged, without causing damage to the post, allowing its reuse in another location, if necessary.

Otra ventaja de la presente invención es que se evita en la mayor parte de los casos la necesidad de realizar cimentaciones mediante hormigonado in-situ, evitando los tiempos de fraguado y consiguiendo reducir el tiempo total de montaje de la torre, bastante importante en el caso de instalaciones de aeropuertos y similares en las que, por razones de seguridad, no es posible trabajar más que en unos reducidos espacios de tiempo.Another advantage of the present invention is that in most cases the need to make foundations by in-situ concreting is avoided, avoiding setting times and reducing the total tower assembly time, quite important in the case of airport facilities and the like in which, for security reasons, it is not possible to work more than in a short space of time.

En aquellos casos en que por altura o condiciones de resistencia al viento fuera necesario, la pieza de cimentación puede complementarse con una pequeña cimentación de refuerzo ubicada bajo ella.In those cases where, due to height or wind resistance conditions, the foundation piece can be complemented with a small reinforcement foundation located under it.

Es importante destacar que, además, la pieza de cimentación prefabricada puede incluir la caja de registro necesaria para el conexionado eléctrico, imprescindible en postes de iluminación, vigilancia, etc..., reduciendo aún más el tiempo necesario para el montaje del poste.It is important to note that, in addition, the prefabricated foundation piece can include the registration box necessary for electrical connection, essential in lighting poles, surveillance, etc ..., further reducing the time needed for mounting the pole.

Destacar asimismo que esta cimentación puede utilizarse indistintamente tanto con postes prefabricados de hormigón, en una o en varias partes, como con postes metálicos o de madera.Also note that this foundation can be used interchangeably with both precast concrete posts, in one or several parts, and with metal or wooden posts.

Descripción de las figurasDescription of the figures

Para comprender mejor el objeto de la presente invención, en el plano anexo se ha representado una realización práctica preferencial de un cimiento prefabricado para postes. En dicho plano la figura 1 muestra una vista en alzado de un ejemplo de poste soportado sobre la cimentación objeto de la invención, con un detalle ampliado de la unión entre el pie del extremo inferior del poste con la pieza de cimentación.To better understand the object of the present invention, a preferential practical embodiment of a prefabricated post foundation has been shown in the attached drawing. In said plan, Figure 1 shows an elevation view of an example of a post supported on the foundation object of the invention, with an enlarged detail of the connection between the foot of the lower end of the post with the foundation piece.

En la figura 2 se muestra un detalle ampliado de la unión entre el pie del extremo inferior del poste con la pieza de cimentación en el montaje alternativo con un refuerzo de hormigón ubicado bajo la pieza de cimentación.An enlarged detail of the joint between the foot of the lower end of the post and the foundation piece in the alternative assembly with a concrete reinforcement located under the foundation piece is shown in Figure 2.

En la figura 3 se muestra una vista general en sección de la pieza de cimentación.A general sectional view of the foundation piece is shown in Figure 3.

En la figura 4 se muestra una vista en sección de la pieza de cimentación en la parte de la caja de registro. En la figura 5 podemos ver una vista en planta correspondiente a la pieza de cimentación con planta poligonal. En la figura 6 podemos ver una vista en planta correspondiente a la pieza de cimentación con planta circular. A sectional view of the foundation piece in the part of the registration box is shown in Figure 4. In figure 5 we can see a plan view corresponding to the foundation piece with polygonal plan. In figure 6 we can see a plan view corresponding to the foundation piece with circular plan.

Realización preferente de la invenciónPreferred Embodiment of the Invention

La constitución y características del cimiento prefabricado para postes podrán comprenderse mejor con la siguiente descripción hecha con referencia a las figuras adjuntas.The constitution and characteristics of the prefabricated foundation for posts can be better understood with the following description made with reference to the attached figures.

Según puede apreciarse en la figura 1, se ilustra un ejemplo de realización del cimiento prefabricado para postes, donde vemos que comprende una única pieza de cimentación (2) prefabricada con hormigón y forjado metálico, inserta en el suelo (3) y relacionada con el poste (1) a sustentar mediante una unión mecánica removible con el extremo inferior de dicho poste (1).As can be seen in Figure 1, an example of the prefabricated post foundation is illustrated, where we see that it comprises a single foundation piece (2) prefabricated with concrete and metal slab, inserted into the ground (3) and related to the post (1) to be supported by a removable mechanical connection with the lower end of said post (1).

Está previsto tanto la utilización únicamente de la pieza de cimentación (2), como la utilización de un refuerzo de cimentación, tal y como se muestra en la figura 2, consistente en un pozo (15) relleno de hormigón ubicado bajo la pieza de cimentación (2) y con el cual está relacionado mediante una unión mecánica, permitiendo de esta manera aumentar su resistencia en casos de postes particularmente altos, o lugares con excesivo viento, sin necesidad de aumentar el tamaño de la pieza de cimentación (2).The use of only the foundation piece (2), as well as the use of a foundation reinforcement, as shown in Figure 2, consisting of a well (15) filled with concrete located under the foundation piece is intended (2) and with which it is related by means of a mechanical union, thus allowing to increase its resistance in cases of particularly high posts, or places with excessive wind, without the need to increase the size of the foundation piece (2).

La pieza de cimentación (2), tal y como podemos ver en las figuras 3, 4, 5 y 6, comprendeThe foundation piece (2), as we can see in figures 3, 4, 5 and 6, comprises

- una parte de anclaje (8) parcialmente hueca en cuya parte superior se hayan verticalmente dispuestas, insertadas en el hormigón, una pluralidad de varillas roscadas (4), radialmente distribuidas,- a partially hollow anchoring part (8) in whose upper part a plurality of radially distributed threaded rods (4) are arranged vertically, inserted in the concrete,

- una parte inferior de soporte (9) de mayor tamaño que la parte de anclaje (8), opcionalmente dotada de una pluralidad de perforaciones verticales pasantes (14), radialmente dispuestas cerca de su borde exterior, y- a lower support part (9) larger than the anchoring part (8), optionally provided with a plurality of vertical through holes (14), radially arranged near its outer edge, and

- una pluralidad de refuerzos (10), radialmente dispuestos con perfil inclinado entre la parte de anclaje (8) y la parte inferior de soporte (9).- a plurality of reinforcements (10), radially arranged with an inclined profile between the anchoring part (8) and the lower support part (9).

En la figura 4, 5 y 6 podemos ver una realización alternativa de la pieza de cimentación (2) que comprende además una caja de registro (11) opcional, inserta en el hormigón entre dos refuerzos (10) consecutivos, a la altura de la parte de anclaje (8) y como prolongación de esta, conectada internamente mediante una conducción hueca (12) con el hueco de la parte de anclaje (8), estando dotada esta caja de registro (11) asimismo con una tapa removible (13).In Figure 4, 5 and 6 we can see an alternative embodiment of the foundation piece (2) which also includes an optional registration box (11), inserted into the concrete between two consecutive reinforcements (10), at the height of the Anchoring part (8) and as an extension thereof, internally connected by a hollow conduit (12) with the hollow of the anchoring part (8), this registration box (11) being also provided with a removable cover (13) .

La unión mecánica removible con el extremo inferior del poste (1), como se detalla en la ampliación de la figura 1, consiste en la introducción de las varillas roscadas (4) a través de unas perforaciones ubicadas en el extremo inferior del poste (1), coincidentes en dimensiones, posicionamiento y distribución con las varillas roscadas (4), y el roscado mediante tuercas (7).The removable mechanical connection with the lower end of the post (1), as detailed in the enlargement of Figure 1, consists of the introduction of the threaded rods (4) through perforations located at the lower end of the post (1). ), matching dimensions, positioning and distribution with threaded rods (4), and threaded by nuts (7).

En la figura 5 vemos otra variante de realización en que la parte inferior de soporte (9) de la pieza de cimentación (2) adopta una planta poligonal.In Figure 5 we see another variant embodiment in which the lower support part (9) of the foundation piece (2) adopts a polygonal plant.

En la figura 6 vemos una variante de realización en que la parte inferior de soporte (9) de la pieza de cimentación (2) adopta una planta circular.In Figure 6 we see a variant embodiment in which the lower support part (9) of the foundation piece (2) adopts a circular plan.

Este cimiento prefabricado para postes comprende asimismo un procedimiento característico de cimentación que comprende las siguientes fases sucesivas:This prefabricated post foundation also includes a characteristic foundation procedure comprising the following successive phases:

- una fase de excavación en el suelo (3) de la oportuna zanja,- a phase of excavation in the soil (3) of the appropriate ditch,

- una fase de inserción de la pieza de cimentación (2) en la zanja excavada , y su enrasamiento de la parte superior con el nivel del suelo (3),- a phase of insertion of the foundation piece (2) into the excavated ditch, and its flush of the upper part with the ground level (3),

- una fase de vertido de material de relleno (5), y- a phase of pouring filler material (5), and

- una fase de creación de una losa de cierre (6) en hormigón.- a phase of creating a slab of closure (6) in concrete.

En caso de realizarse un refuerzo de cimentación, sobre el proceso anterior:In case of a foundation reinforcement, on the previous process:

- la fase de excavación en el suelo (3) de la oportuna zanja, se complementa con la excavación de un pozo (15) bajo la ubicación futura de la pieza,- the phase of excavation in the soil (3) of the timely ditch, is complemented by the excavation of a well (15) under the future location of the piece,

- se incorpora una fase intermedia, antes de la fase de inserción de la pieza de cimentación (2) en la zanja excavada, donde el pozo (15) se rellena de hormigón, insertando en su parte superior una pluralidad de varillas roscadas (16), verticalmente dispuestas y coincidentes en posicionamiento y distribución con las perforaciones verticales pasantes (14), y- an intermediate phase is incorporated, before the insertion phase of the foundation piece (2) in the excavated ditch, where the well (15) is filled with concrete, inserting in its upper part a plurality of threaded rods (16) , vertically arranged and coincident in positioning and distribution with the through vertical perforations (14), and

- la fase de inserción de la pieza de cimentación (2) en la zanja excavada se practica además haciendo pasar las varillas roscadas (16) por las perforaciones verticales pasantes (14) de la pieza de cimentación (2), y- the insertion phase of the foundation piece (2) in the excavated ditch is also practiced by passing the threaded rods (16) through the through vertical perforations (14) of the foundation piece (2), and

- se incorpora otra fase intermedia, antes de la fase de vertido de material de relleno (5), de unión mecánica de la pieza de cimentación (2) al pozo (15) relleno de hormigón mediante tuercas (17) en la parte superior de las varillas roscadas (16). - another intermediate phase is incorporated, before the pouring phase of filling material (5), of mechanical connection of the foundation piece (2) to the well (15) filled with concrete by means of nuts (17) in the upper part of the threaded rods (16).

La unión mecánica removible con el extremo inferior del poste (1), como se detalla en la ampliación de la figura 1, consiste en la introducción de las varillas roscadas (4) a través de unas perforaciones ubicadas en el extremo inferior del poste (1), coincidentes en dimensiones, posicionamiento y distribución con las varillas roscadas (4), y el roscado mediante tuercas (7).The removable mechanical connection with the lower end of the post (1), as detailed in the enlargement of Figure 1, consists of the introduction of the threaded rods (4) through perforations located at the lower end of the post (1). ), matching dimensions, positioning and distribution with threaded rods (4), and threaded by nuts (7).

La persona experta en la técnica comprenderá fácilmente que puede combinar características de diferentes realizaciones con características de otras posibles realizaciones, siempre que esa combinación sea técnicamente posible.The person skilled in the art will readily understand that he can combine characteristics of different embodiments with characteristics of other possible embodiments, provided that such combination is technically possible.

Toda la información referida a ejemplos o modos de realización forma parte de la descripción de la invención. All information referring to examples or embodiments is part of the description of the invention.

Claims (1)

REIVINDICACIONES 1 - Cimiento prefabricado para postes, caracterizado porque comprende una única pieza de cimentación (2) prefabricada con hormigón y forjado metálico, inserta en el suelo (3) y relacionada con el poste (1) mediante una unión mecánica removible con el extremo inferior de dicho poste (1), comprendiendo esta pieza de cimentación (2)1 - Prefabricated post foundation, characterized in that it comprises a single foundation piece (2) prefabricated with concrete and metal slab, inserted into the ground (3) and connected to the post (1) by means of a removable mechanical joint with the lower end of said post (1), this foundation piece (2) comprising - una parte de anclaje (8) parcialmente hueca en cuya parte superior se hayan verticalmente dispuestas, insertadas en el hormigón, una pluralidad de varillas roscadas (4), radialmente distribuidas,- a partially hollow anchoring part (8) in whose upper part a plurality of radially distributed threaded rods (4) are arranged vertically, inserted in the concrete, - una parte inferior de soporte (9) de mayor tamaño que la parte de anclaje (8), y- a lower support part (9) larger than the anchor part (8), and - una pluralidad de refuerzos (10), radialmente dispuestos con perfil inclinado entre la parte de anclaje (8) y la parte inferior de soporte (9).- a plurality of reinforcements (10), radially arranged with an inclined profile between the anchoring part (8) and the lower support part (9). 2 - Cimiento prefabricado para postes, según la anterior reivindicación, caracterizado porque la pieza de cimentación (2) comprende2 - Prefabricated foundation for posts, according to the preceding claim, characterized in that the foundation piece (2) comprises - una caja de registro (11), inserta en el hormigón entre dos refuerzos (10) consecutivos, a la altura de la parte de anclaje (8) y como prolongación de esta, conectada internamente mediante una conducción hueca (12) con el hueco de la parte de anclaje (8), estando dotada esta caja de registro (11) asimismo con una tapa removible (13).- a registration box (11), inserted into the concrete between two consecutive reinforcements (10), at the height of the anchoring part (8) and as an extension of it, connected internally by a hollow conduit (12) with the hollow of the anchoring part (8), this register box (11) being also provided with a removable cover (13). 3 - Cimiento prefabricado para postes, según cualquiera de las anteriores reivindicaciones, caracterizado porque a parte inferior de soporte (9) de la pieza de cimentación (2) comprende una pluralidad de perforaciones verticales pasantes (14) radialmente dispuestas cerca de su borde exterior.3 - Prefabricated foundation for posts, according to any of the preceding claims, characterized in that the lower support part (9) of the foundation piece (2) comprises a plurality of vertical through holes (14) radially arranged near its outer edge. 4 - Cimiento prefabricado para postes, según cualquiera de las anteriores reivindicaciones, caracterizado porque la parte inferior de soporte (9) de la pieza de cimentación (2) adopta una planta circular.4 - Prefabricated foundation for posts, according to any of the preceding claims, characterized in that the lower support part (9) of the foundation piece (2) adopts a circular plan. 5 - Cimiento prefabricado para postes, según cualquiera de las anteriores reivindicaciones 1 a la 3, caracterizado porque la parte inferior de soporte (9) de la pieza de cimentación (2) adopta una planta poligonal.5 - Prefabricated foundation for posts, according to any of the preceding claims 1 to 3, characterized in that the lower support part (9) of the foundation piece (2) adopts a polygonal plant. 6 - Procedimiento de cimentación para un poste utilizando un cimiento prefabricado para postes, como el descrita en las anteriores reivindicaciones caracterizado porque comprende las siguientes fases sucesivas:6 - Foundation procedure for a post using a prefabricated post foundation, as described in the previous claims, characterized in that it comprises the following successive phases: - una fase de excavación en el suelo (3) de la oportuna zanja,- a phase of excavation in the soil (3) of the appropriate ditch, - una fase de inserción de la pieza de cimentación (2) en la zanja excavada , y su enrasamiento de la parte superior con el nivel del suelo (3),- a phase of insertion of the foundation piece (2) into the excavated ditch, and its flush of the upper part with the ground level (3), - una fase de vertido de material de relleno (5), y- a phase of pouring filler material (5), and - una fase de creación de una losa de cierre (6) en hormigón.- a phase of creating a slab of closure (6) in concrete. 7 - Procedimiento de cimentación para un poste utilizando un cimiento prefabricado para postes, según la anterior reivindicación 6 caracterizado porque, en caso de realizarse un refuerzo de cimentación:7 - Foundation procedure for a post using a prefabricated post foundation, according to the preceding claim 6 characterized in that , in case of a foundation reinforcement: - la fase de excavación en el suelo (3) de la oportuna zanja, se complementa con la excavación de un pozo (15) bajo la ubicación futura de la pieza,- the phase of excavation in the soil (3) of the timely ditch, is complemented by the excavation of a well (15) under the future location of the piece, - se incorpora una fase intermedia, justo antes de la fase de inserción de la pieza de cimentación (2) en la zanja excavada, donde el pozo (15) se rellena de hormigón, insertando en su parte superior una pluralidad de varillas roscadas (16), verticalmente dispuestas y coincidentes en posicionamiento y distribución con las perforaciones verticales pasantes (14),- an intermediate phase is incorporated, just before the insertion phase of the foundation piece (2) in the excavated ditch, where the well (15) is filled with concrete, inserting in its upper part a plurality of threaded rods (16 ), vertically arranged and coincident in positioning and distribution with the through vertical perforations (14), - la fase de inserción de la pieza de cimentación (2) en la zanja excavada se practica además haciendo pasar las varillas roscadas (16) por las perforaciones verticales pasantes (14) de la pieza de cimentación (2), y- the insertion phase of the foundation piece (2) in the excavated ditch is also practiced by passing the threaded rods (16) through the through vertical perforations (14) of the foundation piece (2), and - se incorpora otra fase intermedia, justo antes de la fase de vertido de material de relleno (5), de unión mecánica de la pieza de cimentación (2) al pozo (15) relleno de hormigón mediante tuercas (17) en la parte superior de las varillas roscadas (16). - another intermediate phase is incorporated, just before the phase of pouring of filling material (5), of mechanical attachment of the foundation piece (2) to the well (15) filled with concrete by means of nuts (17) at the top of the threaded rods (16).
ES201830326A 2018-04-02 2018-04-02 PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding) Pending ES2726248A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
ES201830326A ES2726248A1 (en) 2018-04-02 2018-04-02 PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES201830326A ES2726248A1 (en) 2018-04-02 2018-04-02 PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding)

Publications (1)

Publication Number Publication Date
ES2726248A1 true ES2726248A1 (en) 2019-10-02

Family

ID=68063120

Family Applications (1)

Application Number Title Priority Date Filing Date
ES201830326A Pending ES2726248A1 (en) 2018-04-02 2018-04-02 PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding)

Country Status (1)

Country Link
ES (1) ES2726248A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7637601U1 (en) * 1976-12-01 1977-03-31 Stewing, Albert, 4270 Dorsten PREFABRICATED COOKER FOUNDATION
WO2007130667A2 (en) * 2006-05-05 2007-11-15 Henderson Allan P Post-tension pile anchor foundation and method therefor
EP2108836A2 (en) * 2007-12-12 2009-10-14 REpower Systems AG Anchoring a tower of a wind energy device
WO2011030199A2 (en) * 2009-09-11 2011-03-17 Stefano Knisel Improved foundation for a wind turbine tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE7637601U1 (en) * 1976-12-01 1977-03-31 Stewing, Albert, 4270 Dorsten PREFABRICATED COOKER FOUNDATION
WO2007130667A2 (en) * 2006-05-05 2007-11-15 Henderson Allan P Post-tension pile anchor foundation and method therefor
EP2108836A2 (en) * 2007-12-12 2009-10-14 REpower Systems AG Anchoring a tower of a wind energy device
WO2011030199A2 (en) * 2009-09-11 2011-03-17 Stefano Knisel Improved foundation for a wind turbine tower

Similar Documents

Publication Publication Date Title
ES2764468B2 (en) FOUNDATION FOR WIND TOWERS
ES2328851T3 (en) PREFABRICATED MODULAR TOWER.
US20160169209A1 (en) Wind turbine and wind turbine foundation
KR100885131B1 (en) A fixing structure of pillar and construction method thereof
KR101137974B1 (en) Method for foundation construction structure of pedestal
ES2673105B1 (en) Method of construction of the foundation of a tower
KR20080092639A (en) Pedestal
ES2726248A1 (en) PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding)
ES1249434U (en) PREFABRICATED FOUNDATION FOR POSTS (Machine-translation by Google Translate, not legally binding)
KR101365236B1 (en) Prefabricated modular foundation for fixing column
US1784568A (en) Anchorage for poles
ES2835346A1 (en) Concrete foundation for wind tower and method for its installation (Machine-translation by Google Translate, not legally binding)
KR20100033750A (en) A fixing structure of electric and construction method thereof
KR100920128B1 (en) A support structure object for a road traffic equipment and construction method
KR100839344B1 (en) Boundary fence
GB2314860A (en) Post support
KR100920127B1 (en) A support structure object for a road traffic equipment and construction method
ES2824448T3 (en) Procedure for placing a wind power installation tower, as well as a corresponding wind power installation
ES2726226B2 (en) PREFABRICATED CONCRETE POST
ES2894337B2 (en) FOUNDATION EXTENSION PROCEDURE IN WIND FARMS
FI13287Y1 (en) Pole support structure
CN221218828U (en) Supporting structure based on foundation pit construction
CN207332425U (en) Power distribution rod erects Anti-inclining bottom ruggedized construction
KR100978910B1 (en) installation structure of prop protection cover
KR20180129409A (en) Composite foundation structure for post and construction method for post using the same

Legal Events

Date Code Title Description
BA2A Patent application published

Ref document number: 2726248

Country of ref document: ES

Kind code of ref document: A1

Effective date: 20191002

PA2A Conversion into utility model

Effective date: 20200122