ES241730A3 - Improvements in the procedimeities for prefabricated building (Machine-translation by Google Translate, not legally binding)
- Google Patents
Improvements in the procedimeities for prefabricated building (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Edificaciones Mecanizadas S A
Original Assignee
Edificaciones Mecanizadas S A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Edificaciones Mecanizadas S AfiledCriticalEdificaciones Mecanizadas S A
Priority to ES0241730ApriorityCriticalpatent/ES241730A3/en
Publication of ES241730A3publicationCriticalpatent/ES241730A3/en
Manufacture process of prefabricated buildings, essentially characterized by comprising a general process, consisting of various phases, namely an analytical study and preparation of the project to break it down into parts, each of which must correspond to an integral type that is repeat in the general construction, which for this reason is reduced to the repetition of these parts and their coupling, the study and preparation of types of ceramic pieces in accordance with the parts that are planned in the division of the first phase, the preparation of accessories such as frames, channeling or other steps and in a second phase, the molding to obtain the aforementioned parts, which is done by placing the ceramic pieces in suitable molds on the floor, leaving between them the openings trim with the frames, shelves and sconces, then proceeding to the pouring of the concrete transported by crane bridge in cald casting, the concrete sliding through the joints between the ceramic pieces and the holes they have in their body, so that, after setting, there is a strong inner rib and an exterior covering that is left in conclusion including the facade in its decorative part, the molding takes place in series and the molded parts are lifted with the crane for its previous storage, using for this purpose various coupling pieces that are occluded in the molded mass. (Machine-translation by Google Translate, not legally binding)
ES0241730A1958-05-051958-05-05Improvements in the procedimeities for prefabricated building (Machine-translation by Google Translate, not legally binding)
ExpiredES241730A3
(en)
Improvements in or relating to prefabricated units for building space-confining constructions such as walls, partitions, floors and ceilings, and methods for making and using same
Procedure for the manufacture of a new prefabricated board for the construction and decoration of buildings and premises (Machine-translation by Google Translate, not legally binding)
Mold designed for the manufacture of prefabricated structural elements for the formation of ceilings. (Machine-translation by Google Translate, not legally binding)