ES2415985A1 - Procedure of construction of a building and building obtained (Machine-translation by Google Translate, not legally binding) - Google Patents
Procedure of construction of a building and building obtained (Machine-translation by Google Translate, not legally binding) Download PDFInfo
- Publication number
- ES2415985A1 ES2415985A1 ES201330039A ES201330039A ES2415985A1 ES 2415985 A1 ES2415985 A1 ES 2415985A1 ES 201330039 A ES201330039 A ES 201330039A ES 201330039 A ES201330039 A ES 201330039A ES 2415985 A1 ES2415985 A1 ES 2415985A1
- Authority
- ES
- Spain
- Prior art keywords
- building
- page
- art
- line
- execution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/32—Arched structures; Vaulted structures; Folded structures
- E04B1/3211—Structures with a vertical rotation axis or the like, e.g. semi-spherical structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/08—Vaulted roofs
- E04B7/10—Shell structures, e.g. of hyperbolic-parabolic shape; Grid-like formations acting as shell structures; Folded structures
- E04B7/102—Shell structures
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
Abstract
Description
Procedimiento de construcción de una edificación y edificación obtenida. Procedure for building a building and building obtained.
La presente invención se refiere a un procedimiento constructivo por el que se construye una edificación compacta y la edificación construida por este procedimiento de construcción. La invención es de aplicación en el ámbito de la edificación, especialmente en el ámbito de la edificación residencial. The present invention relates to a construction process by which a compact building is constructed and the building constructed by this construction procedure. The invention is applicable in the field of building, especially in the field of residential building.
En el estado de técnica se conocen diferentes métodos para construcción de edificaciones mediante módulos, de modo que se edifica una edificación de forma rápida y económica, reduciendo plazos de ejecución respecto la edificación tradicional. In the state of the art different methods are known for building construction by means of modules, so that a building is built quickly and economically, reducing execution times with respect to the traditional building.
Esta manera de construir por módulo requiere la construcción de los módulos específicamente para cada edificación, lo que requiere estudios específicos de cada edificación a construir, lo que implica grandes costes de dichos estudios específicos. De dicho estudio específico se obtiene los requisitos para la construcción de módulos específicos, que ensamblados durante la construcción de la edificación dan lugar a la edificación que se desea construir. This way of building by module requires the construction of the modules specifically for each building, which requires specific studies of each building to be built, which implies high costs for these specific studies. From this specific study the requirements for the construction of specific modules are obtained, which assembled during the construction of the building give rise to the building that is desired to be built.
La normalización de los módulos, posibilita la reducción de costes de fabricación, ya que se construyen los módulos mediante fabricación en serie y evita tener que realizar estudios específicos para cada módulo en las diferentes edificaciones que se desea construir. The standardization of the modules, allows the reduction of manufacturing costs, since the modules are constructed by mass production and avoids having to carry out specific studies for each module in the different buildings that you want to build.
El hecho de tener los módulos para la construcción normalizados, también reduce el plazo de ejecución, ya que no es necesario un estudio de la edificación a construir y de los módulos a ejecutar para su posterior colocación en una posición específica dentro de la edificación, sino que al ser todos los módulos iguales, es más sencilla la ejecución en obra. Having standardized building modules also reduces the execution period, since a study of the building to be built and the modules to be executed is not necessary for its subsequent placement in a specific position within the building, but that since all modules are the same, it is easier to execute on site.
La presente invención se refiere a un procedimiento de construcción de una edificación que comprende los siguientes pasos: The present invention relates to a building construction process comprising the following steps:
- --
- ejecución de una cimentación; foundation execution;
- --
- colocación de unas placas de aislante termo-acústico y de una pieza superior en la que apoyan todas las placas de aislante termo-acústico, dando forma a una estructura envolvente; placement of thermo-acoustic insulation plates and a top piece on which all thermo-acoustic insulation plates support, giving shape to an enveloping structure;
- --
- colocación de una armadura sobre las placas de aislante termo-acústico; placement of a reinforcement on the thermo-acoustic insulation plates;
- --
- apertura de huecos en la armadura, mediante el corte de la armadura; opening of gaps in the armor, by cutting the armor;
- --
- colocación de refuerzos de armadura en las esquinas de los huecos de la armadura; placement of reinforcements in the corners of the holes in the reinforcement;
- --
- hormigonado de la estructura envolvente; concreting of the envelope structure;
- --
- ejecución de las instalaciones; installation execution;
- --
- colocación de revestimiento interior cubriendo el interior de la estructura envolvente; placement of inner lining covering the inside of the wrapping structure;
- --
- ejecución de la compartimentación interior, ejecución de carpintería interior y exterior y colocación de sanitarios. execution of interior compartmentalization, execution of interior and exterior carpentry and installation of toilets.
En el procedimiento de construcción de una edificación el hormigonado de la estructura envolvente se realiza en tres fases: In the construction procedure of a building the concrete of the surrounding structure is carried out in three phases:
- --
- una primera fase, en la que se hormigona una sección inferior en todo el perímetro de la estructura envolvente; a first phase, in which a lower section is concreted throughout the perimeter of the envelope structure;
- --
- una segunda fase, en la que se hormigonan unos nervios desde una cara superior de la sección inferior hasta la pieza superior; a second phase, in which nerves are concreted from an upper face of the lower section to the upper part;
- --
- una tercera fase, en la que se hormigonan unos espacios generados entre nervios, desde la sección inferior hasta la pieza superior; a third phase, in which spaces generated between nerves are concreted, from the lower section to the upper part;
En el procedimiento de construcción de una edificación las placas de aislante termo-acústico están formadas por varias piezas que se conectan entre sí para formar las placas de aislante termo-acústico. In the construction procedure of a building the thermo-acoustic insulation plates are formed by several pieces that are connected together to form the thermo-acoustic insulation plates.
En el procedimiento de construcción de una edificación el hormigonado se realiza mediante hormigón proyectado. In the construction procedure of a building the concrete is made by shotcrete.
En el procedimiento de construcción de una edificación la cimentación se ejecuta mediante una losa de hormigón armado. In the construction procedure of a building, the foundation is executed by means of a reinforced concrete slab.
En el procedimiento de construcción de una edificación la cimentación se ejecuta mediante una zapata corrida. In the construction procedure of a building, the foundation is executed by means of a running shoe.
En el procedimiento de construcción de una edificación la armadura está formada por malla electrosoldada. In the construction procedure of a building the armor is formed by welded mesh.
En el procedimiento de construcción de una edificación los refuerzos comprenden barras de acero fijadas a la armadura. In the process of building a building, reinforcements comprise steel bars fixed to the frame.
En el procedimiento de construcción de una edificación los refuerzos se fijan a la armadura mediante soldadura o mediante atado. In the construction procedure of a building, reinforcements are fixed to the reinforcement by welding or by tying.
En la ejecución de las instalaciones del procedimiento de construcción de una edificación se ejecutan rozas en las placas de aislante termo-acústico. In the execution of the facilities of the construction procedure of a building rubs are executed in the plates of thermo-acoustic insulation.
Las rozas ejecutadas en el procedimiento de construcción de una edificación se realizan mediante corte con soplete en las placas de aislante termo-acústico. The rubs executed in the construction procedure of a building are made by torch cutting on the thermo-acoustic insulation plates.
En el procedimiento de construcción de una edificación el revestimiento interior se ejecuta mediante yeso proyectado. In the construction procedure of a building, the interior cladding is executed by projected plaster.
La edificación obtenida según el procedimiento de construcción que comprende una sección en forma de cúpula y una planta circular. The building obtained according to the construction procedure comprising a dome-shaped section and a circular plan.
En la edificación la planta comprende un centro en el que convergen los elementos a través de los que se obtiene la compartimentación de la edificación. In the building the plant comprises a center in which the elements converge through which the compartmentalization of the building is obtained.
La edificación comprende un pasillo anular situado en el perímetro exterior de la planta circular que da acceso a diferentes estancias de la edificación. The building comprises an annular corridor located on the outer perimeter of the circular plan that gives access to different rooms of the building.
La edificación comprende un distribuidor central a través del que se accede a diferentes estancias de la edificación. The building comprises a central distributor through which different rooms of the building are accessed.
Para completar la descripción y con objeto de ayudar a una mejor comprensión de las características del invento, se acompaña a esta memoria descriptiva, como parte integrante de la misma, un conjunto de dibujos en dónde con carácter ilustrativo y no limitativo, se ha representado lo siguiente: In order to complete the description and in order to help a better understanding of the characteristics of the invention, this descriptive report is attached, as an integral part thereof, a set of drawings in which with an illustrative and non-limiting nature, the next:
La figura 1 muestra una vista de las primera fases del procedimiento constructivo objeto de la solicitud de Figure 1 shows a view of the first phases of the construction procedure object of the request for
patente, la cimentación. La figura 2 muestra una vista esquemática de la fase del procedimiento constructivo de colocación de placas de aislante termo-acústico. patent, foundation. Figure 2 shows a schematic view of the phase of the construction process of placing plates thermo-acoustic insulation
La figura 3 muestra una vista esquemática de la fase de armado del procedimiento constructivo de la solicitud de Figure 3 shows a schematic view of the assembly phase of the construction procedure of the application for
patente. La figura 4 muestra una vista esquemática de la fase de apertura de huecos y colocación de refuerzos del procedimiento constructivo de la solicitud de patente. patent. Figure 4 shows a schematic view of the opening phase of holes and reinforcement placement of the construction procedure of the patent application.
La figura 5 muestra una vista esquemática de la fase de hormigonado del procedimiento constructivo de la Figure 5 shows a schematic view of the concreting phase of the construction process of the
solicitud de patente. La figura 6 muestra una vista esquemática de la de la fase de compartimentación del procedimiento constructivo de la solicitud de patente. patent request. Figure 6 shows a schematic view of the partitioning phase of the construction procedure of the patent application.
La figura 7 muestra una vista esquemática de las tres fases en que se realiza el hormigonado de la estructura envolvente de la edificación objeto de la solicitud de patente. La figura 8 muestra una vista en sección de la edificación objeto de la solicitud de patente. La figura 9 muestra una vista lateral de la edificación objeto de la solicitud de patente. Figure 7 shows a schematic view of the three phases in which the structure concreting is performed envelope of the building object of the patent application. Figure 8 shows a sectional view of the building object of the patent application. Figure 9 shows a side view of the building object of the patent application.
La figura 10 muestra una vista en perspectiva de la edificación objeto de la solicitud de patente. La figura 11 muestra una vista de la planta de la primera realización de la edificación objeto de la solicitud de patente. Figure 10 shows a perspective view of the building object of the patent application. Figure 11 shows a plan view of the first embodiment of the building object of the request for patent.
A continuación se facilita un listado de las referencias numéricas empleadas en las figuras representadas: The following is a list of the numerical references used in the represented figures:
1.- edificación, 1.- building,
2.- cimentación, 2.- foundation,
3.- placas de aislante termo-acústico, 3.- thermo-acoustic insulation plates,
3’.- piezas que componen una placa de aislante termo-acústico, 3 ’.- parts that make up a thermo-acoustic insulation plate,
4.- pieza superior, 4.- upper part,
5.- armadura, 5.- armor,
6.- huecos, 6.- gaps,
7.- refuerzos, 7.- reinforcements,
8.- sección inferior, 8.- lower section,
9.- nervios, 9.- nerves,
10.- espacios, 10.- spaces,
11.- centro, 11.- center,
12.- pasillo anular, 12.- ring aisle,
14.- estructura envolvente. 14.- envelope structure.
A continuación se expone una descripción de un ejemplo de realización preferente de la invención, haciendo alusión a las referencias de las figuras. A description of a preferred embodiment of the invention is described below, referring to the references of the figures.
El objeto de la presente solicitud de patente es un procedimiento constructivo de una edificación (1) unifamiliar compacta. Dicho procedimiento constructivo comprende al menos las siguientes fases: The object of the present patent application is a constructive procedure of a compact single-family building (1). Said construction process comprises at least the following phases:
- --
- Ejecución de una cimentación (2) (observable en la figura 1), la cual en una realización preferente de la invención se ejecuta mediante una losa de hormigón armado. Execution of a foundation (2) (observable in Figure 1), which in a preferred embodiment of the invention is executed by means of a reinforced concrete slab.
- --
- Colocación de unas placas de aislante termo-acústico (3) y de una pieza superior (4) (observable en la figura 2) en la que apoyan todas las placas de aislante termo-acústico (3), dando forma a una estructura envolvente (14) con un perímetro circular. Estas placas de aislante termo-acústico (3) se emplean a modo de encofrado perdido en el hormigonado posterior. Placement of thermo-acoustic insulation plates (3) and an upper part (4) (observable in Figure 2) on which all thermo-acoustic insulation plates (3) rest, giving shape to an enveloping structure ( 14) with a circular perimeter. These thermo-acoustic insulation plates (3) are used as a formwork lost in the subsequent concreting.
- --
- Colocación de una armadura (5) (observable en la figura 3) sobre las placas de aislante termo-acústico (3), esta armadura (5) en la realización preferente de la invención está formada por malla electrosoldada. Placing a reinforcement (5) (observable in Figure 3) on the thermo-acoustic insulation plates (3), this reinforcement (5) in the preferred embodiment of the invention is formed by electro-welded mesh.
- --
- Apertura de huecos (6) en la armadura (5), mediante el corte de la malla electrosoldada. Opening of holes (6) in the reinforcement (5), by cutting the welded mesh.
- --
- Colocación de refuerzos (7) de armadura en las esquinas de los huecos (6) de la armadura (5) (observable en la figura 4), dichos refuerzos (7), en la realización preferente de la invención son barras de acero. Placing reinforcements (7) of reinforcement in the corners of the recesses (6) of the reinforcement (5) (observable in Figure 4), said reinforcements (7), in the preferred embodiment of the invention are steel bars.
- --
- Hormigonado de una primera fase, en la que se hormigona una sección inferior (8) en todo el perímetro de la estructura envolvente (14), el hormigonado, en la realización preferente de la invención, se realiza mediante hormigón proyectado. Concreting of a first phase, in which a lower section (8) is concreted throughout the perimeter of the envelope structure (14), the concreting, in the preferred embodiment of the invention, is carried out by shotcrete.
- --
- Hormigonado de una segunda fase, en la que se hormigonan unos nervios (9) desde la cara superior de la sección inferior (8) hasta la pieza superior (4), el hormigonado, en la realización preferente de la invención, se realiza mediante hormigón proyectado. Concreting of a second phase, in which nerves (9) are concreted from the upper face of the lower section (8) to the upper part (4), the concreting, in the preferred embodiment of the invention, is carried out by concrete projected.
- --
- Hormigonado de una tercera fase, en la que se hormigonan los espacios (10) generados entre nervios (9), desde la sección inferior (8) hasta la pieza superior (4), el hormigonado, en la realización preferente de la invención, se realiza mediante hormigón proyectado; con esta tercera fase de hormigonado queda ejecutada la estructura envolvente (14) en su totalidad. Concreting of a third phase, in which the spaces (10) generated between ribs (9) are concreted, from the lower section (8) to the upper part (4), the concreting, in the preferred embodiment of the invention, is made by shotcrete; With this third phase of concreting, the entire structure (14) is executed.
- --
- Ejecución de las instalaciones (por ejemplo electricidad y fontanería) para la ejecución de dichas instalaciones se realizan rozas en las placas de aislante termo-acústico (3), realizando dichas rozas mediante corte con soplete en las placas de aislante termo-acústico (3). Execution of the installations (for example, electricity and plumbing) for the execution of said installations, rubs are made on the thermo-acoustic insulation plates (3), said rubs are made by torch cutting on the thermo-acoustic insulation plates (3) .
- --
- Colocación de revestimiento interior cubriendo las rozas y el interior de la estructura envolvente (14) mediante yeso proyectado o algún otro tipo de mortero de revestimiento. Placement of interior lining covering the rubbing and the interior of the surrounding structure (14) by means of projected plaster or some other type of coating mortar.
- --
- Ejecución de la compartimentación interior (observable en la figura 6), acabado de instalaciones, ejecución de carpintería interior y exterior, colocación de sanitarios y pintado de la estructura envolvente (14). Execution of the interior compartmentalization (observable in figure 6), finishing of installations, execution of interior and exterior carpentry, installation of sanitary ware and painting of the surrounding structure (14).
En la ejecución de las instalaciones, está incluida la preparación de la estructura envolvente (14) para que la edificación (1) pueda tener, como una opción en su construcción, una instalación fotovoltaica y un equipo de aprovechamiento de agua de lluvia. Dicho equipo de aprovechamiento de agua cuenta con un depósito y un equipo de cloración del agua acumulada. In the execution of the facilities, the preparation of the envelope structure (14) is included so that the building (1) can have, as an option in its construction, a photovoltaic installation and a rainwater harvesting equipment. Said water utilization equipment has a reservoir and accumulated water chlorination equipment.
La cimentación (2) de la realización preferente de la invención, en la ejecución del primer paso del procedimiento constructivo, comprende un armado y un espesor, que se calculan específicamente para cada emplazamiento, según los resultados de un estudio geotécnico del suelo en el que se va a emplazar la edificación (1). The foundation (2) of the preferred embodiment of the invention, in the execution of the first step of the construction process, comprises an assembly and a thickness, which are calculated specifically for each site, according to the results of a geotechnical study of the soil in which the building (1) will be located.
En una realización alternativa de la cimentación (2), dicha cimentación (2) puede realizarse mediante la ejecución de una zapata corrida. In an alternative embodiment of the foundation (2), said foundation (2) can be carried out by executing a running shoe.
En una realización alternativa las placas de aislante termo-acústico (3) están formadas por varias piezas (3’) que se unen entre sí, dando forma a las citadas placas de aislante termo-acústico (3). In an alternative embodiment the thermo-acoustic insulation plates (3) are formed by several pieces (3 ’) that join together, forming the said thermo-acoustic insulation plates (3).
Las mallas electrosoldadas de la armadura (5) están formadas por dos sistemas de elementos, que se cruzan entre sí perpendicularmente y cuyos puntos de contacto están unidos mediante soldadura, formando de esta manera una cuadrícula. The electrowelded meshes of the reinforcement (5) are formed by two systems of elements, which cross each other perpendicularly and whose contact points are joined by welding, thus forming a grid.
En la colocación de la armadura (5) se disponen separadores entre dicha armadura (5) y las placas de aislante termo-acústico (3) de modo que, cuando se ejecuta el hormigonado, la armadura (5) cumple los requisitos de recubrimientos mínimos de hormigón exigidos por la legislación correspondiente (en la actualidad el Código Técnico de la Edificación). In the placement of the reinforcement (5), spacers between said reinforcement (5) and the thermo-acoustic insulating plates (3) are arranged so that, when the concreting is executed, the reinforcement (5) meets the minimum coating requirements of concrete required by the corresponding legislation (currently the Technical Building Code).
La fase de colocación de refuerzos (7) en las esquinas de los huecos, (6) en la realización preferente de la invención, se ejecuta mediante soldadura de barras de acero a la armadura (5) en una dirección tal la barra se coloca uniendo vértices opuestos de la cuadrícula de la malla de la armadura (5). En una realización alternativa de la invención, la fase de colocación de refuerzos (7) se realiza mediante atado de barras de acero a la armadura (5). The phase of placing reinforcements (7) in the corners of the holes, (6) in the preferred embodiment of the invention, is carried out by welding steel bars to the reinforcement (5) in a direction such that the bar is placed joining opposite vertices of the grid of the weave mesh (5). In an alternative embodiment of the invention, the reinforcement placement phase (7) is carried out by means of steel bars tied to the reinforcement (5).
También es objeto de la presente solicitud de patente, la edificación (1) obtenida mediante el procedimiento constructivo aquí descrito. The building (1) obtained by the construction process described herein is also the subject of the present patent application.
La edificación (1) comprende una planta circular y una sección en forma de cúpula. The building (1) comprises a circular plan and a dome-shaped section.
La planta de la edificación (1) comprende un centro (11) en el que convergen todos los tabiques a través de los que se ha ejecutado una compartimentación interior, dividiendo en estancias la edificación (1). The building plan (1) comprises a center (11) in which all the partitions converge through which an interior compartmentalisation has been executed, dividing the building (1) into rooms.
La compartimentación interior de la edificación (1), es variable según el uso al que se destina la edificación (1), obteniendo una distribución interior de la edificación (1) diferente. The internal compartmentation of the building (1) is variable according to the use to which the building is intended (1), obtaining a different interior distribution of the building (1).
Existen al menos dos realizaciones de la edificación (1) cuando dicha edificación (1) se destina al uso residencial: There are at least two embodiments of the building (1) when said building (1) is intended for residential use:
- --
- una primera realización (observable en la figura 11) en la que todas las estancias de la edificación (1) son accesibles a través de un pasillo anular (12) situado en el perímetro interior de la planta circular. a first embodiment (observable in figure 11) in which all the rooms of the building (1) are accessible through an annular corridor (12) located in the inner perimeter of the circular plan.
- --
- una segunda realización en la que el acceso a las distintas estancias se realiza por medio de un distribuidor central al que se accede a través de la estancia de mayor tamaño en planta de la edificación (1). a second embodiment in which access to the different rooms is made through a central distributor that is accessed through the larger room on the building floor (1).
En la primera realización de la edificación (1) destinada al uso residencial, se bloquea el pasillo anular (12) bloqueando el acceso de unas estancias a otras, mediante unas puertas correderas. In the first embodiment of the building (1) intended for residential use, the annular corridor (12) is blocked, blocking the access of some rooms to others, by means of sliding doors.
La invención no debe verse limitada a la realización particular descrita en este documento. Expertos en la materia pueden desarrollar otras realizaciones a la vista de la descripción aquí realizada. En consecuencia, el alcance de la invención se define por las siguientes reivindicaciones. The invention should not be limited to the particular embodiment described herein. Experts in the field can develop other embodiments in view of the description made here. Accordingly, the scope of the invention is defined by the following claims.
Claims (18)
- --
- ejecución de una cimentación (2); foundation execution (2);
- --
- colocación de unas placas de aislante termo-acústico (3) y de una pieza superior (4) en la que apoyan todas las placas de aislante termo-acústico (3), dando forma a una estructura envolvente (14); placement of thermo-acoustic insulation plates (3) and an upper part (4) on which all the thermo-acoustic insulation plates (3) rest, giving shape to an enveloping structure (14);
- --
- colocación de una armadura (5) sobre las placas de aislante termo-acústico (3); placement of a reinforcement (5) on the thermo-acoustic insulation plates (3);
- --
- apertura de huecos (6) en la armadura (5), mediante el corte de la armadura (5); opening of gaps (6) in the armor (5), by cutting the armor (5);
- --
- colocación de refuerzos (7) de armadura en las esquinas de los huecos (6) de la armadura (5); placement of reinforcements (7) of reinforcement in the corners of the recesses (6) of the reinforcement (5);
- --
- hormigonado de la estructura envolvente (14); concreting of the envelope structure (14);
- --
- ejecución de las instalaciones; installation execution;
- --
- colocación de revestimiento interior cubriendo el interior de la estructura envolvente (14); placement of inner lining covering the inside of the envelope structure (14);
- --
- ejecución de la compartimentación interior, ejecución de carpintería interior y exterior y colocación de sanitarios. execution of interior compartmentalization, execution of interior and exterior carpentry and installation of toilets.
- --
- hormigonado de una primera fase, en la que se hormigona una sección inferior (8) en todo el perímetro de la estructura envolvente (14); concreting of a first phase, in which a lower section (8) is concreted throughout the perimeter of the envelope structure (14);
- --
- hormigonado de una segunda fase, en la que se hormigonan unos nervios (9) desde una cara superior de la sección inferior (8) hasta la pieza superior (4); concreting of a second phase, in which nerves (9) are concreted from an upper face of the lower section (8) to the upper part (4);
- --
- hormigonado de una tercera fase, en la que se hormigonan unos espacios (10) generados entre nervios (9), desde la sección inferior (8) hasta la pieza superior (4); concreting of a third phase, in which spaces (10) generated between ribs (9) are concreted, from the lower section (8) to the upper part (4);
- Categoría Category
- 56 Documentos citados Reivindicaciones afectadas 56 Documents cited Claims Affected
- X X
- US 4094110 A (DICKENS LUTHER I et al.) 13.06.1978, columna 1, línea 30 – columna 2, línea 11; columna 2, línea 67 – columna 3, línea 5; columna 3, líneas 15-33; columna 4, líneas 19-35; columna 4, línea 59 – columna 5, línea 25; columna 6, línea 21 – columna 7, línea 12; columna 8, líneas 18-33; figuras. 1,3-13 US 4094110 A (DICKENS LUTHER I et al.) 13.06.1978, column 1, line 30 - column 2, line 11; column 2, line 67 - column 3, line 5; column 3, lines 15-33; column 4, lines 19-35; column 4, line 59 - column 5, line 25; column 6, line 21 - column 7, line 12; column 8, lines 18-33; figures. 1,3-13
- Y Y
- 14-17 14-17
- Y Y
- UCLA: University of California, Los Angeles. [Recuperado el16.07.2013]. Recuperado de internet: <URL:http://web.archive.org/web/20120616063448/http://users.design.ucla.edu/~djvmc/24/ bucky/house.html> 14-16 UCLA: University of California, Los Angeles. [Retrieved on 07/16/2013]. Recovered from the internet: <URL: http: //web.archive.org/web/20120616063448/http: //users.design.ucla.edu/~djvmc/24/ bucky / house.html> 14-16
- Y Y
- ROUNDHOUSES: Blog sobre arquitectura. [Recuperado el 16.07.2013]. Recuperado de internet: <URL:http://web.archive.org/web/20120304100500/http://roundhouses.wordpress.com/ 2012/02/25/une-petite-maison-ronde/> 17 ROUNDHOUSES: Blog about architecture. [Retrieved on 07/16/2013]. Retrieved from the internet: <URL: http: //web.archive.org/web/20120304100500/http: //roundhouses.wordpress.com/ 2012/02/25 / une-petite-maison-ronde /> 17
- Y Y
- US 2365145 A (WALLACE NEFF) 12.12.1944, páginas 2-3; figuras. 1,3-13 US 2365145 A (WALLACE NEFF) 12.12.1944, pages 2-3; figures. 1,3-13
- Y Y
- US 2009126292 A1 (KITAGAWA KATSUYUKI) 21.05.2009, párrafos [0097-0100],[0101-0105],[0107-0112]; figuras. 1,3-13 US 2009126292 A1 (KITAGAWA KATSUYUKI) 21.05.2009, paragraphs [0097-0100], [0101-0105], [0107-0112]; figures. 1,3-13
- A TO
- AU 5931680 A (DIXON D M) 18.12.1980, página 2, línea 16 – página 3, línea 14; página 8, línea 24 – página 9, línea 13; figuras. 1-13 AU 5931680 A (DIXON D M) 18.12.1980, page 2, line 16 - page 3, line 14; page 8, line 24 - page 9, line 13; figures. 1-13
- A TO
- FR 2426122 A1 (COTECHNIPP SA) 14.12.1979, página 1, líneas 7-14; página 2, líneas 12-24; página 2, línea 35 – página 3, línea 23; página 4, línea 11 – página 5, línea 37; figuras. 1-13 FR 2426122 A1 (COTECHNIPP SA) 14.12.1979, page 1, lines 7-14; page 2, lines 12-24; page 2, line 35 - page 3, line 23; page 4, line 11 - page 5, line 37; figures. 1-13
- A TO
- ES 245110 U (NANIA BENVENUTO) 01.03.1980, página 2; página 4, línea 17 – página 5, línea 8; figuras. 1-13 EN 245110 U (NANIA BENVENUTO) 01.03.1980, page 2; page 4, line 17 - page 5, line 8; figures. 1-13
- Categoría de los documentos citados X: de particular relevancia Y: de particular relevancia combinado con otro/s de la misma categoría A: refleja el estado de la técnica O: referido a divulgación no escrita P: publicado entre la fecha de prioridad y la de presentación de la solicitud E: documento anterior, pero publicado después de la fecha de presentación de la solicitud Category of the documents cited X: of particular relevance Y: of particular relevance combined with other / s of the same category A: reflects the state of the art O: refers to unwritten disclosure P: published between the priority date and the date of priority submission of the application E: previous document, but published after the date of submission of the application
- El presente informe ha sido realizado • para todas las reivindicaciones • para las reivindicaciones nº: This report has been prepared • for all claims • for claims no:
- Fecha de realización del informe 16.07.2013 Date of realization of the report 16.07.2013
- Examinador E. Balsera Porris Página 1/4 Examiner E. Balsera Porris Page 1/4
- Novedad (Art. 6.1 LP 11/1986) Novelty (Art. 6.1 LP 11/1986)
- Reivindicaciones 1-17 Reivindicaciones SI NO Claims 1-17 Claims IF NOT
- Actividad inventiva (Art. 8.1 LP11/1986) Inventive activity (Art. 8.1 LP11 / 1986)
- Reivindicaciones 2 Reivindicaciones 1,3-17 SI NO Claims 2 Claims 1,3-17 IF NOT
- Documento Document
- Número Publicación o Identificación Fecha Publicación Publication or Identification Number publication date
- D01 D01
- US 4094110 A (DICKENS LUTHER I et al.) 13.06.1978 US 4094110 A (DICKENS LUTHER I et al.) 13.06.1978
- D02 D02
- UCLA: University of California, Los Angeles.[Recuperado el16.07.2013]. Recuperado de internet: <URL:http://web.archive.org/web/20120616063448/ http://users.design.ucla.edu/~djvmc/24/bucky/house.html> 16.06.2012 UCLA: University of California, Los Angeles. [Retrieved on 07/16/2013]. Recovered from the internet: <URL: http: //web.archive.org/web/20120616063448/ http://users.design.ucla.edu/~djvmc/24/bucky/house.html> 06/16/2012
- D03 D03
- ROUNDHOUSES: Blog sobre arquitectura. [Recuperado el 16.07.2013]. Recuperado de internet: <URL:http://web.archive.org/web/20120304100500/ http://roundhouses.wordpress.com/2012/02/25/une-petite-maisonronde/> 04.03.2012 ROUNDHOUSES: Blog about architecture. [Retrieved on 07/16/2013]. Recovered from internet: <URL: http: //web.archive.org/web/20120304100500/ http://roundhouses.wordpress.com/2012/02/25/une-petite-maisonronde/> 04.03.2012
- D04 D04
- US 2365145 A (WALLACE NEFF) 12.12.1944 US 2365145 A (WALLACE NEFF) 12.12.1944
- D05 D05
- US 2009126292 A1 (KITAGAWA KATSUYUKI) 21.05.2009 US 2009 126292 A1 (KITAGAWA KATSUYUKI) 05/21/2009
- D06 D06
- AU 5931680 A (DIXON D M) 18.12.1980 AU 5931680 A (DIXON D M) 18.12.1980
- D07 D07
- FR 2426122 A1 (COTECHNIPP SA) 14.12.1979 FR 2426122 A1 (COTECHNIPP SA) 14.12.1979
- D08 D08
- ES 245110 U (NANIA BENVENUTO) 01.03.1980 ES 245110 U (NANIA BENVENUTO) 01.03.1980
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201330039A ES2415985B1 (en) | 2013-01-16 | 2013-01-16 | Procedure for building a building and building obtained |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201330039A ES2415985B1 (en) | 2013-01-16 | 2013-01-16 | Procedure for building a building and building obtained |
Publications (2)
Publication Number | Publication Date |
---|---|
ES2415985A1 true ES2415985A1 (en) | 2013-07-29 |
ES2415985B1 ES2415985B1 (en) | 2014-05-27 |
Family
ID=48771779
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES201330039A Expired - Fee Related ES2415985B1 (en) | 2013-01-16 | 2013-01-16 | Procedure for building a building and building obtained |
Country Status (1)
Country | Link |
---|---|
ES (1) | ES2415985B1 (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2365145A (en) * | 1941-04-03 | 1944-12-12 | Neff Wallace | Building construction |
US4094110A (en) * | 1976-03-24 | 1978-06-13 | Radva Plastics Corporation | Building system and method |
FR2426122A1 (en) * | 1978-05-16 | 1979-12-14 | Cotechnipp Sa | Dome shaped building of sectional precast construction - used semi-spherical wall segments between ring beams at head and base |
ES245110U (en) * | 1978-08-16 | 1980-03-01 | Expanded Plastics Material Igloo | |
AU5931680A (en) * | 1979-06-13 | 1980-12-18 | Donald McSporran Dixon | Dome structure |
US20090126292A1 (en) * | 2005-03-10 | 2009-05-21 | Yugenkaisha Japan Tsusyo | Knockdown structure and methods of assembling same |
-
2013
- 2013-01-16 ES ES201330039A patent/ES2415985B1/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2365145A (en) * | 1941-04-03 | 1944-12-12 | Neff Wallace | Building construction |
US4094110A (en) * | 1976-03-24 | 1978-06-13 | Radva Plastics Corporation | Building system and method |
FR2426122A1 (en) * | 1978-05-16 | 1979-12-14 | Cotechnipp Sa | Dome shaped building of sectional precast construction - used semi-spherical wall segments between ring beams at head and base |
ES245110U (en) * | 1978-08-16 | 1980-03-01 | Expanded Plastics Material Igloo | |
AU5931680A (en) * | 1979-06-13 | 1980-12-18 | Donald McSporran Dixon | Dome structure |
US20090126292A1 (en) * | 2005-03-10 | 2009-05-21 | Yugenkaisha Japan Tsusyo | Knockdown structure and methods of assembling same |
Non-Patent Citations (2)
Title |
---|
04/03/2012, ROUNDHOUSES: Blog sobre arquitectura. [Recuperado el 16/07/2013]. Recuperado de internet:<URL:http://web.archive.org/web/20120304100500/http://roundhouses.wordpress.com/2012/02/25/une-petite-maison-ronde/> * |
16/06/2012, UCLA: University of California, Los Angeles. [Recuperado el16/07/2013]. Recuperado de internet:<URL:http://web.archive.org/web/20120616063448/http://users.design.ucla.edu/~djvmc/24/bucky/house.html> * |
Also Published As
Publication number | Publication date |
---|---|
ES2415985B1 (en) | 2014-05-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Di Lorenzo et al. | State-of-the-art on steel exoskeletons for seismic retrofit of existing RC buildings | |
ES2435821T3 (en) | Wind turbine support structure | |
CN103711238A (en) | Assembly-type concrete shear wall structure system buckled and anchored through ring ribs | |
EP3347535B1 (en) | Building system with a load-resisting frame made of reinforced concrete or steel integrated with wooden infill panels | |
ES2368048B1 (en) | ANTIS�? SMICA ALVEOLAR PLATE. | |
ITBO20110611A1 (en) | METHOD FOR REINFORCING A WALL AND CORRESPONDING STRUCTURE REINFORCEMENT SYSTEM | |
ES2415985B1 (en) | Procedure for building a building and building obtained | |
CN102704596A (en) | Combined shear wall with concrete wrapped steel plate dense beam embedded between profile steel overlapped columns and externally wrapping concrete and manufacturing method | |
KR101560712B1 (en) | Reinforcing bar assembly manufacturing method for vertical structural body and construction method of vertical structure using the same | |
Scuderi | Building exoskeletons for the integrated retrofit of social housing | |
Ray et al. | Skyscrapers: origin, history, evolution and future | |
CN102936930B (en) | Built-in type steel column-lattice beam concrete combined shear wall and production method thereof | |
CN203924420U (en) | Assembling ring muscle fastens and is anchored concrete shear wall structure system | |
Giresini et al. | Seismic reinforcement of a rc building with external steel frameworks: the case of the primary school XXV April of Arcola (Italy) | |
JP2009013696A (en) | Seismic strengthening method for existing apartment house | |
Vassallo et al. | Design and Structural Analysis for a Deployable Gridshell Shelter | |
ES2388632B1 (en) | Industrialized building system and construction procedure | |
ES2370581B1 (en) | STRUCTURAL PANELS OF CONCRETE CONCRETE, APPLICABLE FOR USE IN ALL TYPES OF BUILDINGS. | |
Trimble | Design of unique landscape walls and their use in building facades | |
Di Lorenzo et al. | Steel exoskeletons for seismic retrofitting of existing reinforced concrete buildings: State-of-the art and a case study | |
JP6950068B1 (en) | Residential building | |
RU2513231C1 (en) | Building-bridge | |
ES2435243A1 (en) | Prefabricated fojado without formwork (Machine-translation by Google Translate, not legally binding) | |
KR20110063219A (en) | Collective building structure | |
DE3612731A1 (en) | House erected by the composite construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG2A | Definitive protection |
Ref document number: 2415985 Country of ref document: ES Kind code of ref document: B1 Effective date: 20140527 |
|
FD2A | Announcement of lapse in spain |
Effective date: 20220526 |