ES2394569A1 - Method for the construction of lower steps and lower step built with said method (Machine-translation by Google Translate, not legally binding) - Google Patents
Method for the construction of lower steps and lower step built with said method (Machine-translation by Google Translate, not legally binding) Download PDFInfo
- Publication number
- ES2394569A1 ES2394569A1 ES201030345A ES201030345A ES2394569A1 ES 2394569 A1 ES2394569 A1 ES 2394569A1 ES 201030345 A ES201030345 A ES 201030345A ES 201030345 A ES201030345 A ES 201030345A ES 2394569 A1 ES2394569 A1 ES 2394569A1
- Authority
- ES
- Spain
- Prior art keywords
- walls
- foundation
- precast
- underpass
- lintel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 238000004873 anchoring Methods 0.000 claims abstract description 30
- 238000004140 cleaning Methods 0.000 claims abstract description 15
- 239000002184 metal Substances 0.000 claims abstract description 7
- 229910052751 metal Inorganic materials 0.000 claims abstract description 7
- 230000015572 biosynthetic process Effects 0.000 claims abstract description 5
- 238000009434 installation Methods 0.000 claims abstract description 4
- 230000000295 complement effect Effects 0.000 claims description 4
- 238000009415 formwork Methods 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 238000009412 basement excavation Methods 0.000 claims description 3
- 239000011440 grout Substances 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 22
- 229910052742 iron Inorganic materials 0.000 description 11
- 238000011065 in-situ storage Methods 0.000 description 2
- 238000010409 ironing Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Joining Of Building Structures In Genera (AREA)
- Foundations (AREA)
Abstract
Description
- MÉTODO PARA LA CONSTRUCCIÓN DE PASOS INFERIORES Y PASO INFERIOR METHOD FOR THE CONSTRUCTION OF LOWER PASSAGES AND LOWER PASSAGE
- CONSTRUIDO CON DICHO MÉTODO BUILT WITH SUCH METHOD
- 5 5
- CAMPO TÉCNICO DE LA INVENCIÓN TECHNICAL FIELD OF THE INVENTION
- La presente invención pertenece al campo técnico de la construcción y edificación, The present invention belongs to the technical field of construction and building,
- más concretamente a la construcción de pasos inferiores, y más concretamente a la more specifically to the construction of underpasses, and more specifically to the
- construcción de pasos inferiores de forma segura, impidiendo la caída de los muros construction of underpasses safely, preventing the fall of the walls
- 1 O 1 O
- prefabricados durante su montaje, hasta la colocación del dintel sobre éstos. precast during assembly, until the lintel is placed on them.
- ANTECEDENTES DE LA INVENCIÓN BACKGROUND OF THE INVENTION
- Actualmente, la forma de principal de construcción de pasos inferiores consiste Currently, the main form of underpass construction consists of
- 15 fifteen
- principalmente en el montaje de muros prefabricados sobre hormigón de limpieza. mainly in the assembly of precast walls on cleaning concrete.
- Posteriormente se ferralla la zona del hormigón de limpieza en la que van dispuestos Subsequently, the cleaning concrete area in which they are arranged is ferralled.
- los muros prefabricados, y a continuación se realiza el hormigonado de cimentación. the precast walls, and then the foundation concreting is carried out.
- Después se colocan sobre los muros prefabricados las semilosas prefabricadas, y se Then the precast semi-slabs are placed on the precast walls, and
- realiza un relleno de hormigón "in situ" sobre dichas semilosas, para obtener el dintel performs a concrete filling "in situ" on these semilosas, to obtain the lintel
- 20 twenty
- del paso inferior sobre los muros prefabricados. of the underpass on the precast walls.
- Este método de construcción de pasos inferiores presenta una serie de problemas, This underpass construction method presents a number of problems,
- siendo el principal el de la seguridad durante el montaje de dicho paso inferior. Cada the main one being that of safety during the assembly of said underpass. Every
- uno de los muros prefabricados que componen las paredes verticales del paso inferior one of the precast walls that make up the vertical walls of the underpass
- apoyan sobre el hormigón de limpieza exclusivamente en dos patas de unos 20 they rest on the cleaning concrete exclusively on two legs of about 20
- 25 25
- centímetros de anchura, dispuestas al principio y final de cada muro. Debido a esto, centimeters wide, arranged at the beginning and end of each wall. Because of this,
- cada uno de los muros prefabricados resulta totalmente inestable, por lo que deben each of the precast walls is totally unstable, so they must
- atirantarse y apuntalarse, con puntales que no siempre son comprobados para tether and prop up, with struts that are not always proven to
- soportar empujes de viento mientras están plantados sin el dintel superior. En muchas withstand wind blows while planted without the upper lintel. In many
- ocasiones estos puntales son insuficientes para soportar empujes del viento, y en Sometimes these props are insufficient to withstand the force of the wind, and in
- 30 30
- otras ocasiones los puntales se plantan sobre terreno blando, o mojado, o en general other times the struts are planted on soft or wet ground, or in general
- inestable, lo que convierte en inútil al puntal y deja a los muros inestables e inseguros. unstable, making the prop useless and leaving the walls unstable and insecure.
- El tiempo que están los muros en esta posición es muy elevado, en ocasiones durante The time that the walls are in this position is very high, sometimes during
- varias semanas, e incluso meses, por lo que el riesgo de accidente es importante. Si el several weeks, and even months, so the risk of an accident is significant. If he
- paso inferior tiene dos vanos, el muro central hay que atirantarlo y apuntalarlo dentro underpass has two spans, the central wall must be tied and propped up inside
- 35 35
- de uno de los vanos o contra los exteriores, con el peligro adicional ello conlleva. of one of the openings or against the exteriors, with the additional danger this entails.
- Una vez colocados todos los muros prefabricados se realiza el ferrallado para la Once all the prefabricated walls are in place, the ironing is carried out for the
- posterior cimentación, teniendo en cuenta que los muros pesan más de 1 O toneladas subsequent foundation, bearing in mind that the walls weigh more than 10 tonnes
- cada uno, sujetos con tirantes y puntales. Este ferrallado debe conectarse a la each one fastened with braces and struts. This ironwork must be connected to the
- armadura que traen los muros en su parte inferior entre las patas, por lo que teniendo armor that the walls bring in their lower part between the legs, so having
- 5 5
- en cuenta estas patas, en las que no existe unión al ferrallado, siempre queda un Keep in mind these legs, in which there is no connection to the ironwork, there is always a
- porcentaje elevado de muro sin anclaje, lo que origina posibles problemas futuros de high percentage of wall without anchorage, which causes possible future problems of
- inestabilidad o riesgo de accidentes. instability or risk of accidents.
- Posteriormente se realiza el hormigonado de la ferralla, originando la cimentación, Subsequently the concreting of the ironwork is carried out, originating the foundation,
- teniendo en cuenta para esto que los muros están apuntalados y atirantados. Si el taking into account for this that the walls are propped up and cable-stayed. If he
- 1 O 1 O
- paso inferior es de dos vanos, hay que poner especial atención en la ejecución de la underpass is two spans, special attention must be paid to the execution of the
- ferralla y hormigonado de la cimentación, ya que el muro central está sujeto con ironwork and concreting of the foundation, since the central wall is fastened with
- puntales y tirantes dentro de uno de los vanos. props and braces inside one of the bays.
- A continuación se disponen las semilosas prefabricadas sobre la parte superior de los Next, the precast semilosas are arranged on the upper part of the
- muros prefabricados y se rellena de hormigón "in situ" encima de aquellas, teniendo precast walls and concrete is filled "in situ" on top of them, taking
- 15 fifteen
- que encofrar en muchas ocasiones si los muros y la primera y/o la última semilosa no that formwork on many occasions if the walls and the first and / or the last semilosa do not
- llevan incorporado un encofrado. Además, en muchas ocasiones, entre las semilosas they have a formwork incorporated. In addition, on many occasions, among the semilosas
- se pierde lechada de la aplicada en el hormigonado, lo que origina una pérdida en la grout is lost from that applied in the concreting, which causes a loss in the
- resistencia del hormigón del dintel. lintel concrete strength.
- Era por tanto deseable un método de construcción de pasos inferiores eficiente y que An efficient underpass construction method was therefore desirable and
- 20 twenty
- evitara los inconvenientes existentes en el anterior método de construcción del estado will avoid the inconveniences existing in the previous method of state building
- de la técnica. of technique.
- DESCRIPCIÓN DE LA INVENCIÓN DESCRIPTION OF THE INVENTION
- 25 25
- La presente invención resuelve los problemas existentes en el estado de la técnica The present invention solves the problems existing in the state of the art
- mediante un método para la construcción de pasos inferiores que está compuesto por using a method for the construction of underpasses that is composed of
- varias etapas. various stages.
- En primer lugar, lógicamente se necesita la excavación del terreno en el que se va a First of all, logically the excavation of the land in which you are going to
- construir el paso inferior, y después la aplicación de hormigón de limpieza en el terreno build the underpass, and then apply cleaning concrete on the ground
- 30 30
- excavado para poder construir sobre él. excavated to be able to build on it.
- A continuación se procede al montaje de ferralla de cimentación sobre el hormigón de Next, the foundation iron is assembled on the concrete of
- limpieza, pudiendo incluso ferrallarse fuera de su ubicación y colocarse en ella por cleaning, it can even be ironed out of its location and placed in it by
- tramos. De esta forma no existe ningún elemento que impida su total y libre montaje, al sections. In this way there is no element that prevents its total and free assembly, at the
- contrario de lo que sucede en el ferrallado del método de construcción del estado de la contrary to what happens in the ferrallado of the method of construction of the state of the
- técnica, en el que las propias patas de los muros impiden un cómodo ferrallado, al technique, in which the legs of the walls themselves prevent comfortable ironwork, as
- hacerse este ferrallado después de situar los muros. be done this ironwork after placing the walls.
- Posteriormente, y sobre esta ferralla de cimentación, se instalan unos medios de Subsequently, and on this foundation ferralla, means of
- anclaje para los muros prefabricados del paso inferior. anchor for precast underpass walls.
- 5 5
- Después se realiza el hormigonado de la ferralla de cimentación, dando lugar con esto Then the concreting of the foundation iron is carried out, giving rise to this
- a la cimentación del paso inferior. De esta forma, el hormigonado se realiza de manera to the foundation of the underpass. In this way, the concreting is carried out in a
- cómoda, sin tener ningún muro colocado, ni apoyado ni apuntalado. comfortable, without having any wall in place, neither supported nor propped up.
- Tras realizar esta cimentación, se fijan los muros prefabricados sobre ésta mediante After making this foundation, the precast walls are fixed on it by
- los medios de anclaje. the anchoring means.
- 1 O 1 O
- De forma preferente, los medios de anclaje consisten en unos tornillos colocados Preferably, the anchoring means consist of screws placed
- mediante unas plantillas de chapa sobre la ferralla de cimentación. De esta forma, using sheet metal templates on the foundation steel. Thus,
- durante la etapa de colocación de los muros prefabricados sobre la cimentación, se during the laying stage of the precast walls on the foundation,
- anclan unos pies de pilar dispuestos en la parte inferior de dichos muros prefabricados they anchor some pillar feet arranged at the bottom of said precast walls
- a los tornillos de los medios de anclaje. to the screws of the anchoring means.
- 15 fifteen
- Posteriormente se lleva a cabo la colocación de semilosas prefabricadas sobre los Subsequently, the precast semilosas is placed on the
- muros prefabricados, teniendo estas semilosas ferralla, la cual pasa a hormigonarse prefabricated walls, having these semi-woven iron, which happens to be concreted
- para la formación del dintel, y la finalización con ello del paso inferior. for the formation of the lintel, and the completion with it of the underpass.
- La presente invención también incluye como objeto el paso inferior construido The present invention also includes as an object the underpass constructed
- utilizando el método descrito anteriormente. Por tanto, este paso inferior tendrá dos o using the method described above. Therefore this underpass will have two or
- 20 twenty
- más paredes verticales paralelas formadas cada una de ellas por una pluralidad de more parallel vertical walls each formed by a plurality of
- muros prefabricados, los cuales están dispuestos uno a continuación de otro, y que se prefabricated walls, which are arranged one after the other, and which
- fijan a una cimentación mediante medios de anclaje. Esta cimentación está formada they are fixed to a foundation by anchoring means. This foundation is formed
- por hormigón dispuesto en ferralla de cimentación, la cual está dispuesta a su vez en for concrete arranged in foundation iron, which is in turn arranged in
- hormigón de limpieza aplicado sobre un terreno excavado. Por último, el paso inferior cleaning concrete applied to excavated soil. Finally, the underpass
- 25 25
- objeto de la presente invención cuenta con un dintel dispuesto sobre los muros object of the present invention has a lintel arranged on the walls
- prefabricados, que está formado por hormigón dispuesto en ferralla de dintel, colocada precast, which consists of concrete arranged in lintel ferralla, placed
- en una pluralidad de semilosas prefabricadas dispuestas sobre los muros in a plurality of precast semi-slabs arranged on the walls
- prefabricados. precast.
- Preferentemente, los medios de anclaje consisten en unos tornillos colocados Preferably, the anchoring means consist of screws placed
- 30 30
- mediante unas plantillas de chapa sobre la ferralla de cimentación. Adicionalmente, los using sheet metal templates on the foundation steel. Additionally, the
- muros prefabricados presentan en su parte inferior unos pies de pilar que se anclan a prefabricated walls have pillar feet at the bottom that are anchored to
- los tornillos de los medios de anclaje. De esta forma los muros prefabricados quedan the screws of the anchoring means. In this way the precast walls are
- totalmente asegurados y fijados a la ferralla de cimentación por medio de las plantillas, fully secured and attached to the foundation iron by means of the templates,
- los tornillos, y los pies de pilar de los propios muros. the screws, and the pillar feet of the walls themselves.
A continuación, para facilitar la comprensión de la invención, a modo ilustrativo pero no limitativo se describirá una realización de la invención que hace referencia a una serie In the following, to facilitate understanding of the invention, by way of illustration but not limitation, an embodiment of the invention will be described with reference to a series
5 de figuras. La figura 1 muestra una vista del método objeto de la presente invención en el que se ha realizado la etapa del montaje de ferralla de cimentación sobre el hormigón de limpieza. La figura 2 es una vista en detalle de una realización particular de los medios de 5 of figures. Figure 1 shows a view of the method object of the present invention in which the step of assembling the foundation iron on the cleaning concrete has been carried out. Figure 2 is a detail view of a particular embodiment of the means of
1 O anclaje dispuestos sobre la ferralla de cimentación. La figura 3 muestra una vista del método de las figuras anteriores en el que se ha realizado la etapa del hormigonado de la ferralla dando lugar a la cimentación. La figura 4 es una vista del método de las figuras anteriores en el que se ha realizado la etapa de la fijación de los muros prefabricados sobre la cimentación mediante los 1 Or anchorage arranged on the foundation ferralla. Figure 3 shows a view of the method of the previous figures in which the concreting stage of the ferralla has been carried out, giving rise to the foundation. Figure 4 is a view of the method of the previous figures in which the stage of fixing the precast walls to the foundation has been carried out by means of the
15 medios de anclaje. La figura 5 es una vista del método de las figuras anteriores en el que se ha realizado la etapa de colocación de una realización particular de semilosas prefabricadas sobre los muros prefabricados. La figura 6 es una vista del método objeto de la presente invención con todas sus 15 anchoring means. Figure 5 is a view of the method of the previous figures in which the step of laying a particular embodiment of precast semi-slabs on the precast walls has been carried out. Figure 6 is a view of the method object of the present invention with all its
20 etapas realizadas que muestra los elementos esenciales del paso inferior. La figura 7 muestra una realización particular de una fijación de unos pies de pilar del muro prefabricado a los tornillos de los medios de anclaje. En estas figuras se hace referencia a un conjunto de elementos que son: 20 stages performed showing the essential elements of the underpass. Figure 7 shows a particular embodiment of a fixing of pillar feet of the precast wall to the screws of the anchoring means. In these figures reference is made to a set of elements that are:
1. hormigón de limpieza 1. cleaning concrete
- 25 2. ferralla de cimentación 25 2. foundation iron
- 3. 3.
- muros prefabricados precast walls
- 4. Four.
- semilosas prefabricadas precast semilosas
- 5. 5.
- dintel del paso inferior underpass lintel
- 6. 6.
- plantillas de chapa de los medios de anclaje anchor means sheet metal templates
- 30 7. tornillos de los medios de anclaje 30 7. screws of the anchoring means
- 8. 8.
- parte inferior de los muros prefabricados bottom of precast walls
- 9. 9.
- pies de pilar 1O. cimentación pillar feet 1O. foundation
11. medios machihembrados en los laterales de los muros prefabricados 35 12. ferralla de dintel 11. tongue-and-groove means on the sides of the precast walls 35 12. lintel ferralla
- 13. murete vertical 13. vertical wall
- DESCRIPCIÓN DE REALIZACIONES PREFERENTES DE LA INVENCIÓN DESCRIPTION OF PREFERRED EMBODIMENTS OF THE INVENTION
- 5 5
- Tal y como se puede observar en las figuras, el objeto de la presente invención es un As can be seen in the figures, the object of the present invention is a
- método para la construcción de pasos inferiores compuesto por varias etapas. method for the construction of underpasses consisting of several stages.
- En primer lugar, lógicamente, se realiza la excavación del terreno en el que se va a First, logically, the excavation of the land in which the
- construir el paso inferior, y se aplica hormigón de limpieza 1 en el terreno excavado build the underpass, and cleanup concrete 1 is applied to the excavated ground
- sobre el que se va a construir. A continuación se realiza el montaje de la ferralla de on which to build. Then the assembly of the ferralla of
- 1 O 1 O
- cimentación 2 sobre el hormigón de limpieza 1, donde se va a construir el paso foundation 2 on the cleaning concrete 1, where the step is to be built
- inferior, tal y como se puede observar en la figura 1. Incluso, se podría montar la lower, as can be seen in figure 1. You could even mount the
- ferralla de cimentación 2 en cualquier lugar fuera de su ubicación, y posteriormente irlo foundation iron 2 anywhere outside its location, and then go
- colocando sobre el hormigón de limpieza 1 por tramos, para facilitar el montaje. placing on the cleaning concrete 1 in sections, to facilitate assembly.
- El siguiente paso es la instalación de unos medios de anclaje sobre la ferralla de The next step is the installation of anchoring means on the iron wire
- 15 fifteen
- cimentación 2, en los que se fijarán los muros prefabricados 3 cuando éstos sean foundation 2, in which the precast walls 3 will be fixed when they are
- colocados. placed.
- Posteriormente se forma la cimentación 1 O, sobre la que irán los muros prefabricados Subsequently, the 1 O foundation is formed, on which the precast walls will go
- 3, mediante el hormigonado de la ferralla de cimentación 2. La figura 3 muestra 3, by concreting the foundation ferralla 2. Figure 3 shows
- realizada la etapa de hormigonado de la ferralla dando lugar a la cimentación 1 O. carried out the concrete stage of the ferralla giving rise to the foundation 1 O.
- 20 twenty
- A continuación, sobre esta cimentación 1 O se fijan los muros prefabricados 3, Next, prefabricated walls 3 are attached to this foundation 1 O,
- mediante los medios de anclaje, como es mostrado en la figura 4. by the anchoring means, as shown in figure 4.
- Una vez están instalados los muros prefabricados 3, sobre éstos, en su parte superior, Once the prefabricated walls 3 are installed, on top of these,
- se colocan las semilosas prefabricadas 4, que comprenden ferralla de dintel 12, que precast semilosas 4 are placed, comprising lintel ferralla 12, which
- posteriormente se hormigona para formar el dintel 5, quedando de esta forma later it is concreted to form lintel 5, thus remaining
- 25 25
- finalizado el paso inferior. Estos últimos pasos se pueden observar en la figura 5, bottom step completed. These last steps can be seen in figure 5,
- donde se ve una colocación de una realización particular de semilosas prefabricadas 4 where a placement of a particular embodiment of precast semi-slabs is seen 4
- sobre los muros prefabricados 3, y en la figura 6, que muestra todas las etapas del on the prefabricated walls 3, and in figure 6, which shows all the stages of
- método de construcción, quedando el paso inferior finalizado. construction method, leaving the bottom step finished.
- La figura 2 muestra una realización preferente del método de construcción del paso Figure 2 shows a preferred embodiment of the step construction method
- 30 30
- inferior, en el que en la etapa de instalación de los medios de anclaje sobre la ferralla lower, in which in the stage of installation of the anchoring means on the ferralla
- de cimentación 2 se colocan unas plantillas de chapa 6 sobre dicha ferralla de of foundation 2 sheet templates 6 are placed on said ferralla of
- cimentación 2, llevando estas plantillas de chapa 6 fijados unos tornillos 7. foundation 2, these sheet templates 6 having screws 7 attached.
- De acuerdo con esta realización preferente del método, en la etapa de colocación de According to this preferred embodiment of the method, in the step of placing
- los muros prefabricados 3 sobre la cimentación 1 O, unos pies de pilar 9 dispuestos en the prefabricated walls 3 on the foundation 1 O, some pillar feet 9 arranged in
- 35 35
- la parte inferior 8 de los muros prefabricados 3 se anclan a los tornillos 7 de los medios the bottom 8 of the precast walls 3 are anchored to the screws 7 of the media
- de anclaje. De esta forma se consigue asegurar los muros prefabricados 3 a la Anchor. In this way it is possible to secure the precast walls 3 to the
- cimentación 1 O hasta que se realice la posterior fijación del dintel 5, lo que impedirá el foundation 1 Or until the subsequent fixing of the lintel 5 is made, which will prevent the
- movimiento e incluso caída de los muros 3, evitando apuntalar o atirantar dichos movement and even fall of the walls 3, avoiding propping or tightening said
- muros 3, lo que mejorará las condiciones de seguridad, y además facilitará el 3 walls, which will improve security conditions, and will also facilitate
- 5 5
- hormigonado de la cimentación, ya que dicho hormigonado se hace anterior a la concreting of the foundation, since said concreting is done prior to
- colocación de los muros 3. laying the walls 3.
- Según una realización particular, en esta etapa de fijación de los muros prefabricados According to a particular embodiment, at this stage of fixing the precast walls
- 3 sobre la cimentación 1 O mediante los medios de anclaje, a medida que se van 3 on the foundation 1 Or through the anchoring means, as they go
- colocando los muros prefabricados 3, se realiza una unión lateral entre dichos muros placing the prefabricated walls 3, a lateral connection is made between these walls
- 1 O 1 O
- prefabricados 3 consecutivos mediante medios machihembrados 11, los cuales 3 consecutive prefabricated using tongue and groove means 11, which
- proporcionan una alineación de aquellos uno a continuación de otro. Preferentemente, they provide an alignment of those one after another. Preferably,
- una vez que se han colocado los muros prefabricados 3 sobre la cimentación 1 O, el once the precast walls 3 have been placed on the foundation 1 O, the
- presente método comprende una etapa de relleno con grout de la unión de los tornillos This method includes a step of grouting the bolts together
- 7 de los medios de anclaje a dicha cimentación 1 O, para fijar la unión y hacer más 7 of the anchoring means to said foundation 1 O, to fix the joint and do more
- 15 fifteen
- segura ésta. sure this one.
- El otro objeto de la invención es el paso inferior construido con el método descrito The other object of the invention is the underpass constructed with the described method
- anteriormente, y que por tanto consta de dos paredes verticales paralelas formadas above, and therefore consists of two parallel vertical walls formed
- cada una de ellas por un conjunto de muros prefabricados 3 dispuestos uno a each one of them by a set of prefabricated walls 3 arranged one by
- continuación de otro. continuation of another.
- 20 twenty
- Estos muros prefabricados 3 se unen a una cimentación 1 O mediante medios de These precast walls 3 are attached to a foundation 1 O by means of
- anclaje, estando la cimentación 1 O constituida por hormigón dispuesto en ferralla de anchorage, the foundation being 1 O made up of concrete arranged in iron
- cimentación 2, la cual está dispuesta a su vez en hormigón de limpieza 1 aplicado foundation 2, which is in turn arranged in cleaning concrete 1 applied
- sobre un terreno excavado. on excavated ground.
- Por último, en la parte superior de los muros prefabricados 3, el paso inferior tiene un Finally, at the top of the precast walls 3, the underpass has a
- 25 25
- dintel 5, que está formado por hormigón dispuesto en ferralla de dintel 12. Esta ferralla lintel 5, which is made up of concrete arranged in lintel 12 ferralla. This ferralla
- 12 está colocada en unas semilosas prefabricadas 4 dispuestas sobre los muros 12 is placed on precast semi-slabs 4 arranged on the walls
- prefabricados 3. precast 3.
- Todos estos elementos esenciales del paso inferior realizado con el método All these essential elements of the underpass performed with the method
- anteriormente descrito se pueden observar en las figuras 1 a 7. previously described can be seen in Figures 1 to 7.
- 30 30
- De acuerdo con una realización preferente del paso inferior, los medios de anclaje de According to a preferred embodiment of the underpass, the anchoring means of
- éste están formados por unas plantillas de chapa 6 que se disponen sobre la ferralla it is made up of sheet metal templates 6 that are arranged on the iron
- de cimentación 2, y que llevan fijados unos tornillos, tal y como se aprecia en la figura foundation 2, and which have screws attached, as shown in the figure
- 2. 2.
- Según esta realización, los muros prefabricados 3 tienen en su parte inferior 8 unos According to this embodiment, the prefabricated walls 3 have in their lower part 8 some
- pies de pilar 9 que son complementarios a los tornillos 7 de los medios de anclaje y se pillar feet 9 which are complementary to screws 7 of the anchoring means and are
- anclan a éstos. anchor these.
- Para conseguir la fijación lateral de los muros prefabricados 3 anteriormente descrita, To achieve the lateral fixing of the precast walls 3 previously described,
- 5 5
- estos muros prefabricados 3 tienen elementos machihembrados 11, los cuales son these precast walls 3 have tongue and groove elements 11, which are
- complementarios entre muros 3 consecutivos, y así poder alinear dichos muros 3 uno complementary between consecutive 3 walls, and thus be able to align said walls 3 one
- a continuación de otro. following another.
- Preferentemente, Preferably,
- y tal como se puede observar en las figuras 5 y 6, tanto las and such how I know can observe in the figures 5 and 6, so much the
- semilosas prefabricadas 4 de primera y última línea, como los muros prefabricados 3, first and last line precast semi-slabs 4, such as precast walls 3,
- 1 O 1 O
- en su parte superior, disponen de un murete 13 vertical, formando el conjunto de estos in their upper part, they have a vertical wall 13, forming the set of these
- muretes 13 verticales un encofrado para el hormigonado de la ferralla de dintel 12 de vertical walls 13 a formwork for the concreting of the ferrule of lintel 12 of
- las semilosas 4 y la formación así del dintel 5 del paso inferior. Igualmente, de forma the semilines 4 and the formation of the lintel 5 of the underpass. Similarly,
- preferente, todas las semilosas 4 tienen preferred, all the semilosas 4 have
- en sus laterales un fondo de junta, con el in their sides a gasket bottom, with the
- objeto de evitar la pérdida de lechada al hormigonar la ferralla de dintel 12 para formar object to avoid the loss of grout when concreting the lintel 12 ferralla to form
- 15 fifteen
- el dintel 5. lintel 5.
- Una vez descrita de forma clara la invención, se hace constar que las realizaciones Once the invention is clearly described, it is noted that the embodiments
- particulares anteriormente descritas individuals previously described
- son susceptibles de modificaciones de detalle are subject to detailed modifications
- siempre que no alteren el principio fundamental y la esencia de la invención. provided they do not alter the fundamental principle and essence of the invention.
Claims (9)
- 6. 6.
- Paso inferior, según la reivindicación 5, caracterizado porque los medios de anclaje comprenden una pluralidad de plantillas de chapa (6) dispuestas sobre la ferralla de cimentación (2), las cuales llevan fijados una pluralidad de tornillos (7), Underpass, according to claim 5, characterized in that the anchoring means comprise a plurality of sheet metal templates (6) arranged on the foundation wire (2), which have a plurality of screws (7) attached,
- 7. 7.
- Paso inferior, según la reivindicación anterior, caracterizado porque comprende grout en la zona de unión de los tornillos (7) de los medios de anclaje a la cimentación (1 0). Underpass, according to the preceding claim, characterized in that it comprises grout in the area of the screws (7) of the anchoring means to the foundation (1 0).
- 8. 8.
- Paso inferior, según cualquiera de las reivindicaciones 5 a 7, caracterizado porque los muros prefabricados (3) comprenden elementos machihembrados (11 ), que Underpass, according to any of claims 5 to 7, characterized in that the precast walls (3) comprise tongue and groove elements (11), which
- 9. 9.
- Paso inferior, según cualquiera de las reivindicaciones 5 a 8, caracterizado Underpass, according to any of claims 5 to 8, characterized
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201030345A ES2394569B1 (en) | 2010-03-10 | 2010-03-10 | METHOD FOR THE CONSTRUCTION OF LOWER STEPS AND LOWER STEP BUILT WITH SUCH METHOD |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES201030345A ES2394569B1 (en) | 2010-03-10 | 2010-03-10 | METHOD FOR THE CONSTRUCTION OF LOWER STEPS AND LOWER STEP BUILT WITH SUCH METHOD |
Publications (2)
Publication Number | Publication Date |
---|---|
ES2394569A1 true ES2394569A1 (en) | 2013-02-01 |
ES2394569B1 ES2394569B1 (en) | 2013-12-09 |
Family
ID=47528709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES201030345A Withdrawn - After Issue ES2394569B1 (en) | 2010-03-10 | 2010-03-10 | METHOD FOR THE CONSTRUCTION OF LOWER STEPS AND LOWER STEP BUILT WITH SUCH METHOD |
Country Status (1)
Country | Link |
---|---|
ES (1) | ES2394569B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040731A (en) * | 2015-08-18 | 2015-11-11 | 湖南东方红建设集团有限公司 | Assembled integral type reinforced concrete underground comprehensive pipe gallery and production mold thereof |
CN105971007A (en) * | 2016-03-30 | 2016-09-28 | 阜阳金谷快宜居住工科技有限公司 | Split type non-formwork pouring underground comprehensive pipe gallery |
CN106284412A (en) * | 2016-09-29 | 2017-01-04 | 陕西建筑产业投资集团有限公司 | A kind of prefabricated pipe gallery and construction method |
CN106894445A (en) * | 2017-04-11 | 2017-06-27 | 吉林森煌建筑材料集团有限公司 | One kind assembling superposed type pipe gallery and its method of construction |
CN110409492A (en) * | 2019-07-09 | 2019-11-05 | 中铁三局集团建筑安装工程有限公司 | The combination assembled piping lane of one kind more structures containing superposed member and its construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2014212A (en) * | 1978-02-10 | 1979-08-22 | Shaw C B | Culverts |
US4697955A (en) * | 1982-07-30 | 1987-10-06 | Le Clerco Pierre A L M G | Method of constructing reinforced concrete works such as underground galleries, road tunnels, et cetera; pre-fabricated contrete elements for constructing such works |
US6234716B1 (en) * | 1995-11-17 | 2001-05-22 | Carlo Chiaves | Underground structural work including prefabricated elements associated with piles and a process for its production |
WO2004085749A1 (en) * | 2003-03-28 | 2004-10-07 | Carlo Chiaves | Process for the construction of a segment of an open-air work by prefabricated structural members, and prefabricated structural member related thereto |
-
2010
- 2010-03-10 ES ES201030345A patent/ES2394569B1/en not_active Withdrawn - After Issue
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2014212A (en) * | 1978-02-10 | 1979-08-22 | Shaw C B | Culverts |
US4697955A (en) * | 1982-07-30 | 1987-10-06 | Le Clerco Pierre A L M G | Method of constructing reinforced concrete works such as underground galleries, road tunnels, et cetera; pre-fabricated contrete elements for constructing such works |
US6234716B1 (en) * | 1995-11-17 | 2001-05-22 | Carlo Chiaves | Underground structural work including prefabricated elements associated with piles and a process for its production |
WO2004085749A1 (en) * | 2003-03-28 | 2004-10-07 | Carlo Chiaves | Process for the construction of a segment of an open-air work by prefabricated structural members, and prefabricated structural member related thereto |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105040731A (en) * | 2015-08-18 | 2015-11-11 | 湖南东方红建设集团有限公司 | Assembled integral type reinforced concrete underground comprehensive pipe gallery and production mold thereof |
CN105971007A (en) * | 2016-03-30 | 2016-09-28 | 阜阳金谷快宜居住工科技有限公司 | Split type non-formwork pouring underground comprehensive pipe gallery |
CN106284412A (en) * | 2016-09-29 | 2017-01-04 | 陕西建筑产业投资集团有限公司 | A kind of prefabricated pipe gallery and construction method |
CN106284412B (en) * | 2016-09-29 | 2017-05-31 | 陕西建筑产业投资集团有限公司 | A kind of prefabricated pipe gallery and construction method |
CN106894445A (en) * | 2017-04-11 | 2017-06-27 | 吉林森煌建筑材料集团有限公司 | One kind assembling superposed type pipe gallery and its method of construction |
CN110409492A (en) * | 2019-07-09 | 2019-11-05 | 中铁三局集团建筑安装工程有限公司 | The combination assembled piping lane of one kind more structures containing superposed member and its construction method |
Also Published As
Publication number | Publication date |
---|---|
ES2394569B1 (en) | 2013-12-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2017523330A5 (en) | ||
KR101077821B1 (en) | Tunnel conctruction method using arch pre-cast segmental structural body | |
ES2394569B1 (en) | METHOD FOR THE CONSTRUCTION OF LOWER STEPS AND LOWER STEP BUILT WITH SUCH METHOD | |
BR112016028356B1 (en) | FOUNDATION SYSTEM FOR TOWERS, WIND TURBINE AND/OR WIND TOWER, AND METHOD OF INSTALLATION OF A FOUNDATION SYSTEM FOR TOWERS | |
CN102011597B (en) | Method and structure for supporting weak surrounding rocks of tunnel | |
KR101105092B1 (en) | A precast retaining panel and construction method of the same with half pc type backfill | |
KR100993777B1 (en) | Rahmen structure construction method using precast segment | |
JP2008223370A (en) | Rigidly connecting structure of corner part | |
CN205557537U (en) | Supporting structure of foundation pit | |
CN105002914A (en) | Deformation-controllable prestressed concrete cantilever supporting structure and design and construction method thereof | |
KR20140013497A (en) | Method for constructing block type reinforced retaining wall in cut site | |
KR20110060291A (en) | Made of iron soil retaining plate and its support structure for form and retaining-wall vertical reinforcement | |
KR20120065844A (en) | Retaining wall structure and method thereof | |
JP6192972B2 (en) | Calvert | |
JP5143666B2 (en) | PC bridge erection method | |
JP7197879B2 (en) | Falling rock protection fence | |
ES2835346A1 (en) | Concrete foundation for wind tower and method for its installation (Machine-translation by Google Translate, not legally binding) | |
KR100390369B1 (en) | Construction method of arch structure of subway or common duct in excavating process | |
RU2327008C2 (en) | Bracing of boards of foundation ditch | |
KR102111153B1 (en) | Retaining Wall Panel Structure using PC Strand | |
JP2011089390A (en) | Rigid connection structure of corner section | |
KR100941437B1 (en) | 2 arch tunnel construction method for upper girder void proofing and efficient construction | |
KR20180040095A (en) | Construction method for soil retaining wall using cap slab | |
KR101318201B1 (en) | Self-supported diaphragm wall and self-supproted diaphragm wall construction method | |
AU2016102393A4 (en) | A Method of constructing a column, a tunnel, and a tunnel made from the method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FG2A | Definitive protection |
Ref document number: 2394569 Country of ref document: ES Kind code of ref document: B1 Effective date: 20131209 |
|
FA2A | Application withdrawn |
Effective date: 20140403 |