ES2333636B1 - PRE-MANUFACTURED SEMIRRESISTENT MODULE FOR CONSTRUCTION AND PROCEDURE ASSEMBLY ON THE WORK OF THE SAME. - Google Patents

PRE-MANUFACTURED SEMIRRESISTENT MODULE FOR CONSTRUCTION AND PROCEDURE ASSEMBLY ON THE WORK OF THE SAME. Download PDF

Info

Publication number
ES2333636B1
ES2333636B1 ES200802879A ES200802879A ES2333636B1 ES 2333636 B1 ES2333636 B1 ES 2333636B1 ES 200802879 A ES200802879 A ES 200802879A ES 200802879 A ES200802879 A ES 200802879A ES 2333636 B1 ES2333636 B1 ES 2333636B1
Authority
ES
Spain
Prior art keywords
prefabricated
module
floor
beams
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
ES200802879A
Other languages
Spanish (es)
Other versions
ES2333636A1 (en
Inventor
Julio Cesar Moreno Cano
Angel Moreno Cano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to ES200802879A priority Critical patent/ES2333636B1/en
Priority to EP09380161.1A priority patent/EP2175088B1/en
Publication of ES2333636A1 publication Critical patent/ES2333636A1/en
Application granted granted Critical
Publication of ES2333636B1 publication Critical patent/ES2333636B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34807Elements integrated in a skeleton
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34815Elements not integrated in a skeleton
    • E04B1/3483Elements not integrated in a skeleton the supporting structure consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B2001/34892Means allowing access to the units, e.g. stairs or cantilevered gangways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Módulo semirresistente prefabricado para construcción y procedimiento de montaje en obra del mismo. Y procedimiento de montaje.Prefabricated semi-resistant module for construction and assembly procedure on site. Y assembly procedure

Consiste en un proceso de fabricación de módulos semirresistentes de uso residencial, equipamiento, industrial, etc., que contienen parte de la estructura, jaula de rigidez y transporte cerramientos, instalaciones y acabados idóneos para procesos industrializados, y un procedimiento de montaje en obra sobre pórticos y prefabricados, que van completando la estructura y el edificio terminado de forma progresiva tanto en planta como en altura hasta el límite que marque el programa de construcción.It consists of a module manufacturing process semi-resistant residential, equipment, industrial, etc., containing part of the structure, stiffness and transport cage enclosures, installations and finishes suitable for processes industrialized, and a work assembly procedure on porches and prefabricated, which are completing the structure and the building progressively completed both on floor and in height to the limit marked by the construction program.

Description

Módulo semirresistente prefabricado para construcción y procedimiento de montaje en obra del mismo.Prefabricated semi-resistant module for construction and assembly procedure on site.

Objeto de la invenciónObject of the invention

La presente invención, según se expresa en el enunciado de esta memoria descriptiva, se refiere a un módulo semirresistente prefabricado para construcción y procedimiento para su montaje en obra de manera que define un característico sistema constructivo modular. Se encuentra dentro del sector de la construcción industrializada.The present invention, as expressed in the set forth in this specification, refers to a module semi-resistant prefabricated building and procedure for its assembly on site in a way that defines a characteristic system modular construction. It is within the sector of the industrialized construction

El módulo semirresistente prefabricado puede ser para uso residencial, equipamiento, industrial, etc. y el procedimiento de montaje en obra se realiza sobre pórticos de estructura prefabricados. Así, el sistema definido por el módulo semirresistente y su procedimiento de montaje tiene la ventaja de una rápida ejecución de la obra (tanto la fabricación del módulo en cadena de montaje, como el proceso de ejecución/montaje en obra), de un importante abaratamiento de costos de obra y de que todos los materiales empleados son fácilmente reutilizables y reciclables.The prefabricated semi-resistant module can be for residential use, equipment, industrial, etc. and the assembly procedure on site is performed on porches of prefabricated structure. Thus, the system defined by the module semi-resistant and its assembly procedure has the advantage of Rapid execution of the work (both module manufacturing in assembly line, such as the process of execution / assembly on site), of a significant reduction in construction costs and that all  Materials used are easily reusable and recyclable

La invención se encuentra dentro del campo técnico de la construcción, concretamente dentro de la técnica constructiva modular.The invention is within the field construction technician, specifically within the technique modular construction.

       \vskip1.000000\baselineskip\ vskip1.000000 \ baselineskip
    
Antecedentes de la invenciónBackground of the invention

En la actualidad los sistemas constructivos modulares o prefabricados se pueden englobar dentro de tres grupos que se caracterizan, bien porque:Currently building systems Modular or prefabricated can be included in three groups which are characterized, well because:

a.- Están totalmente ejecutados en fábrica mediante materiales ligeros tanto en cerramientos como en estructura que sólo permiten su aplicación en viviendas unifamiliares o construcciones de una o dos plantas, siendo muy difícil su aplicación a viviendas plurifamiliares en altura en edificios de varias plantas.a.- They are fully factory executed by lightweight materials both in enclosures and in structure that only allow its application in homes single-family or constructions of one or two floors, being very difficult to apply to multi-family homes in height in multi-storey buildings.

b.- Se trata de sistemas prefabricados para edificios en altura que se centran en la estructura y los cerramientos.b.- These are prefabricated systems for tall buildings that focus on the structure and the enclosures

c.- O bien se trata de sistemas modulares totalmente acabados caracterizados por ser módulos autorresistentes de un considerable peso que dificultan su transporte y puesta en obra, generalmente de estructura y de hormigón armado aporticada o de muros de carga con un concepto de construcción "apilable". Dichos sistemas, aunque reducen de forma muy importante el plazo de ejecución, hacen que la diferencia de presupuesto de la obra ejecutada respecto a sistemas tradicionales de construcción sea pequeña o incluso superior.c.- Either it is modular systems fully finished characterized by being self-resistant modules of a considerable weight that hinder their transport and put in work, generally of structure and reinforced concrete contributed or of load-bearing walls with a "stackable" construction concept. These systems, although they significantly reduce the term of execution, make the difference in the budget of the work executed with respect to traditional construction systems be Small or even superior.

Los sistemas constructivos del grupo "a" están compuestos de estructuras malladas ligeras de chapa plegada galvanizada y "forjado" de tablero hidrófugo de aglomerado de madera de los que existen en muchos sistemas de los que se comercializan actualmente.The constructive systems of the group "a" They are composed of lightweight mesh structures of folded sheet galvanized and "forged" waterproof chipboard board wood of those that exist in many systems of which They currently market.

Los sistemas constructivos del grupo "b" están compuestos de estructuras-cerramientos realizados in situ caracterizados por proyectar hormigón-gunitado sobre paneles aislantes con armadura de acero, siendo el propio cerramiento estructural tanto en vertical (muro), como en horizontal (forjado), realizándose el resto de la obra in situ por procedimientos tradicionales (instalaciones, revestimiento, etc. ...).The construction systems of the group "b" are composed of structures-enclosures made in situ characterized by projecting concrete-gunite on insulating panels with steel reinforcement, the structural enclosure itself being both vertical (wall), horizontal (forged), performing the rest of the work in situ by traditional procedures (installations, coating, etc. ...).

Los sistemas constructivos del grupo "c" están compuestos por cajones estructurales de hormigón armado totalmente acabados, calculados para resistir varios cajones apoyados unos sobre otros apilándose varias plantas de los que existen varias patentes en función de los sistemas de anclaje de unos módulos con otros y los sistemas de paso y conexión de las instalaciones como por ejemplo las patentes con número de publicación ES 2 094 179 T3, ES 2 098 090 T3, ES 2 090 175 T3.The constructive systems of the "c" group they are composed of structural reinforced concrete drawers fully finished, calculated to withstand several drawers leaning on each other stacking several plants of which there are several patents depending on the anchoring systems of some modules with others and the systems of passage and connection of the facilities such as patents with number of Publication ES 2 094 179 T3, ES 2 098 090 T3, ES 2 090 175 T3.

Así, era deseable contar con un módulo prefabricado semirresistente susceptible de ser unido por pórticos de acero (completándose así el sistema estructural) y posteriormente a otros módulos similares o iguales dispuestos tanto lateralmente como encima, para la construcción de edificios y un método de montaje en obra de dicho módulo que fuera de rápida ejecución de la obra, tanto la fabricación del módulo en la cadena de montaje, como el proceso de ejecución/montaje en obra, a la vez que se consiguieran importantes abaratamientos de costes de obra y que todos los materiales empleados sean fácilmente reutilizables y/o reciclables.Thus, it was desirable to have a module semi-resistant prefabricated that can be joined by porches of steel (thus completing the structural system) and subsequently to other similar or equal modules arranged both laterally as above, for the construction of buildings and a quick assembly method of said module work execution, both module manufacturing in the chain assembly, such as the process of execution / assembly on site, at the same time that significant reductions in construction costs were achieved and that all the materials used are easily reusable and / or recyclable.

       \vskip1.000000\baselineskip\ vskip1.000000 \ baselineskip
    
Descripción de la invenciónDescription of the invention

El módulo semirresistente prefabricado de la presente invención se realiza en fábrica mediante el sistema de "cadena de montaje" de acuerdo con el siguiente procedimiento.The prefabricated semi-resistant module of the This invention is carried out at the factory by means of the system of "assembly line" according to the following process.

Sobre vigas-jácenas de perfilería de acero laminado, preferentemente aceros laminados en caliente establecidos en norma UNE EN 10025, en especial de S235 a 5450, norma UNE EN 10210 y conformados en frío UNE EN 10219 según CTE-SE-Acero, que forma "parte" de la estructura del edificio, se ejecuta un forjado ligero compuesto de chapa colaborante (cualquiera de los productos existentes en el mercado), que se suelda o atornilla a dichas vigas sobre las que se vierte un hormigón ligero de árido expandido, preferentemente arlita o similar y mallazo, preferentemente de acero.About beams-jácenas of rolled steel profiles, preferably rolled steels in hot set in standard UNE EN 10025, especially from S235 to 5450, UNE EN 10210 standard and cold formed UNE EN 10219 according CTE-SE-Steel, which forms "part" of the building structure, a floor is executed lightweight composite sheet metal (any of the products existing on the market), which is welded or screwed to said beams on which a lightweight expanded aggregate concrete is poured, preferably arlite or similar and mesh, preferably of steel.

Este tipo de forjado ya existente permite rebajar el peso propio del mismo alrededor de un 50%, y en luces que faciliten su posterior transporte alrededor de 3 m., los cantos son de aproximadamente unos 12 cm.This type of existing floor slab allows reduce its own weight by about 50%, and in lights that facilitate its subsequent transport around 3 m., edges are about 12 cm.

Sobre este forjado se ejecuta una "jaula" de perfilería, preferentemente de acero laminado, que permite, por un lado arriostrar la tabiquería prefabricada y, por otro, servir de herraje de grúa para su posterior transporte y puesta en obra.On this floor a "cage" is executed profiling, preferably rolled steel, which allows, by on one side, bracing the prefabricated partitions and, on the other, serving as crane hardware for subsequent transport and commissioning.

Sobre dicha "jaula" y forjado ligero se ejecuta la tabiquería mediante perfilería, preferentemente de acero galvanizado, y panel, preferentemente de cartón, yeso o cualquiera de los sistemas existentes en el mercado, con la diferencia de que en vez de ir arriostrada a forjado interior inferior o suelo y superior o techo, va arriostrada a un forjado ligero inferior y a una "jaula" de perfilería metálica de acero laminado mediante perfilería de acero galvanizado adicional que posteriormente servirá para la sujeción de las placas ligeras que formarán el techo del módulo.On said "cage" and light forged it executes the partitioning by profiling, preferably steel  galvanized, and panel, preferably cardboard, plaster or any of the existing systems in the market, with the difference that instead of being braced to lower interior floor or floor and upper or roof, is braced to a lower light floor and to a "cage" of rolled steel metal profiles by additional galvanized steel profiles that later It will serve to hold the light plates that will form the module roof.

Una vez realizada la tabiquería tanto de divisiones interiores, medianeras y trasdosados de fachada, se montan las instalaciones de saneamiento en PVC o similar bajo el forjado, derivaciones a desagües y tramos de planta de bajantes principales, de manera que en este momento se proyecta todo el bajo del forjado y las vigas con espuma ignífuga, posteriormente se monta el agua fría y caliente en Polibutileno o similar que permite una elaboración industrializada o "kit", la electricidad y telecomunicaciones, mediante canaletas, conductos, tubos y cableado por techo, que en función del uso obtendrán el mayor grado posible de prefabricación o industrialización.Once the partition of both interior divisions, medians and facade transdos, se they install the sanitation facilities in PVC or similar under the forged, drainage referrals and downspouts sections main, so that at this moment the whole bass is projected of the slab and the beams with fire retardant foam, later it mount the hot and cold water in Polybutylene or similar that allows an industrialized elaboration or "kit", electricity and telecommunications, through gutters, ducts, pipes and wiring per ceiling, which depending on the use will obtain the highest possible degree of prefabrication or industrialization.

Tras las instalaciones se ejecutarán los revestimientos de solerías y aplacados de zonas húmedas mediante adhesivos de propiedades elastoméricas.After the installations, the floor coverings and cladding of wet areas by adhesives of elastomeric properties.

El siguiente paso en el procedimiento de montaje se remite a los paños de fachada prefabricados con la carpintería exterior completa y resto del paño a partir de la cámara aislante acabado con cualquier tipo de revestimiento recomendándose los prefabricados y modulares ligeros, el paño de fachadas se arriostra a la "jaula" de perfilería metálica y a malla de la perfilería de galvanizado de tabiques.The next step in the assembly procedure refers to prefabricated facade cloths with carpentry complete exterior and rest of the cloth from the insulating chamber finished with any type of coating, recommending Prefabricated and lightweight modular, the facade cloth braces to the "cage" of metal profiles and mesh profiles galvanized partitions.

Por último, tras la fase de sellado de juntas, colocación de las placas de techo y pintado, se colocan los aparatos sanitarios, grifería y mecanismos eléctricos, quedando el módulo totalmente terminado para su carga sobre un camión o medio de transporte mediante grúa que anclará en la "jaula" de perfilería metálica, coincidiendo los puntos de cuelgue de grúa y anclajes con los puntos de apoyo que tendrá la estructura definitiva. El módulo terminado se transporta hasta el solar, de aquí que el tamaño idóneo del mismo sea inferior a 3 m. x 12 m. con un peso total aproximado de 10 Tm.. Se entiende que estos datos deben ser considerados en conjunto, sólo a modo de ejemplo y que refieren a una forma de realización preferente.Finally, after the joint sealing phase, placement of the ceiling and painted plates, the sanitary appliances, taps and electrical mechanisms, leaving the fully finished module for loading onto a truck or medium of transport by crane that will anchor in the "cage" of metal profiles, coinciding with the crane hanging points and anchors with the support points that the structure will have definitive The finished module is transported to the site, from here that the ideal size of it is less than 3 m. x 12 m. with a total weight of approximately 10 tons. It is understood that this data they should be considered together, just as an example and that refer to a preferred embodiment.

Además, el módulo terminado tiene forma preferentemente de paralelepípedo rectangular. El procedimiento de montaje del módulo o módulos se ejecuta totalmente en el solar, comenzando por la cimentación que requerirá cálculo en función de las características del terreno y que en la mayoría de los casos será una cimentación tradicional por zapata aislada arriostrada de hormigón armado, ya que el sistema se caracteriza por su ligereza con una transmisión de cargas a cimentación del orden del 50% de las que correspondería a una construcción tradicional.In addition, the finished module is shaped preferably rectangular parallelepiped. The procedure of Module assembly or modules runs entirely on the site, starting with the foundation that will require calculation based on the characteristics of the land and that in most cases it will be a traditional foundation by insulated shoe braced from reinforced concrete, since the system is characterized by its lightness with a transmission of foundation loads of the order of 50% of those that would correspond to a traditional construction.

Sobre la cimentación se ejecuta el resto del sistema estructural por plantas, alternando el montaje de los pórticos por planta con la colocación de los módulos terminados del edificio uniéndolos tras el momento de colocación de planta mediante uniones atornilladas o soldadas, quedando en este momento la estructura completa mediante el siguiente procedimiento.On the foundation the rest of the structural system by plants, alternating the assembly of porches per floor with the placement of the finished modules of the building joining them after plant placement through bolted or welded joints, remaining at this time the complete structure by the following procedure.

Sobre las zapatas se colocarán pórticos prefabricados de aceros laminados en caliente establecidos en norma UNE EN 10025, en especial de S 235 a S 450, norma UNE EN 10210 y conformados en frío UNE EN 10219 según CTE-SE-Acero al igual que el acero de los pilares y jácenas o vigas principales. Sobre dichos pórticos se colocan apoyados sobre las vigas principales de acero laminado, los módulos y se unen el pórtico y la viga principal del módulo, quedando la estructura completada. A continuación se unen entre sí, mediante tornillería o soldadura, las "jaulas" de acero laminado de los distintos módulos que configuren el edificio en la misma planta y, a su vez, se unen las "jaulas" con pilares del pórtico. Posteriormente se conectan las instalaciones entre los distintos módulos.Porches will be placed on the shoes prefabricated hot rolled steels established in standard UNE EN 10025, especially from S 235 to S 450, standard UNE EN 10210 and cold formed UNE EN 10219 according CTE-SE-Steel just like steel of the pillars and jácenas or main beams. About said porches they are placed supported on the main beams of rolled steel, the modules and join the gantry and the main beam of the module, leaving the structure completed. Then they join each other, by means of screws or welding, the "cages" of steel laminate of the different modules that make up the building in the same plant and, in turn, join the "cages" with pillars of the portico. Subsequently, the facilities are connected between the different modules

Una vez colocada una planta se procede del mismo modo en la planta superior y en la contigua, atornillando o soldando los pórticos superiores adyacentes a la estructura ya ejecutada que forma parte del edificio terminado.Once placed a plant comes from it mode on the top and next floor, screwing or welding the upper frames adjacent to the structure and executed that is part of the finished building.

El sistema se repite, tanto en una misma planta, como en altura, como lo requiera el programa de la obra, respetando juntas de dilatación, hasta llegar a la medianera de fachada, que se resuelve como la fachada del módulo prefabricado, es decir, medianera de fachada prefabricada con la carpintería exterior completa y el resto de la medianera, a partir de la cámara aislante, acabado con cualquier tipo de revestimiento, recomendándose los prefabricados y modulares ligeros, la medianera de fachada se arriostra a la "jaula" de perfilería metálica y a la malla de perfilería de galvanizado, o hasta llegar a, cubierta del edificio, que se resuelve como el forjado prefabricado ligero del módulo, es decir, forjado compuesto de chapa colaborante que se suelda o atornilla a vigas, en particular a las vigas del último pórtico sobre las que se vierte un hormigón ligero de árido expandido, preferentemente arlita o similar y mallazo, preferentemente de acero o cualquier otro sistema de forjado o prefabricado existente en el mercado, que se impermeabiliza con especial cuidado de solapes y refuerzos en las juntas de forjados y se aísla térmicamente. Dicho último pórtico se coloca como los demás, y tiene la función, por un lado de completar el sistema estructural del módulo semirresistente que tiene debajo y por otro lado soportará el forjado de cubierta.The system is repeated, both on the same floor, as in height, as the program of the work requires, respecting expansion joints, until reaching the mediator of facade, which is resolved as the facade of the prefabricated module, is that is to say, prefabricated facade with carpentry complete exterior and the rest of the party, from the chamber insulating, finished with any type of coating, recommending the prefabricated and lightweight modular, the medianera facade braces the "cage" of metal profiles and to galvanized grid mesh, or until you reach, cover of the building, which is solved as the lightweight precast floor of the module, that is to say, forged composed of collaborating sheet that welds or bolts to beams, in particular to the beams of the last gantry on which a light aggregate concrete is poured expanded, preferably arlite or similar and mesh, preferably of steel or any other forging system or prefabricated existing in the market, which is waterproofed with special care of overlaps and reinforcements in floor joints and  It is thermally insulated. Said last porch is placed as the other, and has the function, on the one hand to complete the system structural of the semi-resistant module that has underneath and on the other side will support the roof slab.

Por último, sólo resta sellar en obra las uniones exteriores de fachadas entre módulos, y módulos con estructura, mediante proyectado ignífugo en pilares y vigas, y colocación de piezas especiales de tapajuntas de material ligero con unión atornillada, en "clic", o adhesiva con siliconas o similar, quedando el edificio terminado.Finally, it only remains to seal on site the exterior joints of facades between modules, and modules with structure, by projected fire retardant on pillars and beams, and placement of special lightweight flashing parts with screw connection, in "click", or adhesive with silicones or similar, leaving the building finished.

Las zonas comunes de comunicación vertical, como escaleras y ascensores, se realizan "a posteriori" mediante sistemas prefabricados o "kits" existentes autoportantes que se unen al edificio permitiendo el acceso a las distintas plantas, creando en la unión una zona accesible por la que discurrirán en vertical las instalaciones generales comunitarias del edificio en shunts (bajantes verticales) y canalizaciones prefabricadas colgadas de la estructura del edificio desde los locales o armarios prefabricados de cada instalación o servicio en planta baja.The common areas of vertical communication, such as stairs and elevators, are carried out " a posteriori " by means of prefabricated systems or existing self-supporting "kits" that join the building allowing access to the different floors, creating in the union an accessible area through which the general community facilities of the building will run vertically in shunts (vertical downspouts) and prefabricated pipes hung from the building structure from the prefabricated premises or cabinets of each installation or service on the ground floor.

Las instalaciones generales comunitarias del edificio van incluidas en el propio módulo y discurren por el techo de la zona común en el que están las puertas de acceso a las viviendas y que forman parte del módulo. Además cabe señalar que las bajantes verticales citadas tendrán sus registros y armarios de conexión prefabricados dentro del mismo.The general community facilities of building are included in the module itself and run through the roof  of the common area where the access doors to the homes and that are part of the module. It should also be noted that the mentioned vertical downpipes will have their records and cabinets of prefabricated connection within it.

Así, tomando como base los módulos semirresistentes es destacable que es posible la fabricación de un edificio sin mayores limitaciones en sus dimensiones de longitud y anchura, no existiendo por tanto limitación ya que no son apilables, siendo más bien un mecano en el que se monta parte de la estructura contenida en el módulo que siempre es la misma (con las mismas cargas) con el resto de la estructura: pórticos de pilares y jácenas, que sí es variable en función de la altura, sobre todo los pilares por el número de plantas que soporten (en un edificio de seis plantas las tres últimas serán iguales que un edificio de tres plantas) y en función del viento y el sismo también variarán los arriostramientos de cruces de San Andrés adicionales que requiera el conjunto del edificio en función de su situación y zona sísmica.Thus, based on the modules semi-resistant it is remarkable that it is possible to manufacture a building without major limitations in its length dimensions and width, therefore there is no limitation since they are not stackable, being rather a meccano in which part of the structure contained in the module that is always the same (with the same loads) with the rest of the structure: pillars and jácenas, which is variable depending on the height, especially pillars for the number of plants they support (in a building of six floors the last three will be the same as a three building plants) and depending on the wind and the earthquake will also vary Additional San Andres cross bracings that require the whole building depending on its situation and area seismic

A continuación para facilitar una mejor comprensión de esta memoria descriptiva y formando parte de la misma se acompañan unas figuras en las que con carácter ilustrativo y no limitativo se ha representado el objeto de la invención.Next to facilitate a better understanding of this descriptive report and being part of the same are accompanied by figures in which with an illustrative character  and not limiting the object of the invention has been represented.

Breve descripción de los dibujosBrief description of the drawings

Figura 1.- Muestra una vista en planta de la disposición de unas vigas-jácenas (1), y forjado ligero (2) y una jaula (3) en el proceso para la fabricación del módulo semirresistente prefabricado.Figure 1.- Shows a plan view of the arrangement of beams-jácenas (1), and forged lightweight (2) and a cage (3) in the process for manufacturing the semi-resistant prefabricated module.

Figuras 2a y 2b.- Muestran respectivas vistas en planta de dos módulos semirresistentes que incorporan una tabiquería prefabricada (4), sanitarios y fachadas.Figures 2a and 2b.- They show respective views in  plant of two semi-resistant modules that incorporate a prefabricated partition walls (4), sanitary ware and facades.

Figura 3.- Muestra una vista en perspectiva de la disposición de las vigas-jácenas (1), el forjado ligero (2) y la jaula (3).Figure 3.- Shows a perspective view of the layout of the beams-jácenas (1), the floor slab lightweight (2) and the cage (3).

Figura 4.- Muestra una vista en sección del forjado ligero (2) de la figura 3 con la inclusión de una aplicación de espuma ignífuga 21.Figure 4.- Shows a sectional view of the lightweight forging (2) of Figure 3 with the inclusion of a flame retardant foam application 21.

Figuras 5a y 5b. - Muestran unas vistas en perspectiva de dos módulos terminados con revestimientos y techos listos para ser adosados y un detalle de las distintas capas que conforman las fachadas.Figures 5a and 5b. - Show views in perspective of two modules finished with coverings and ceilings ready to be attached and a detail of the different layers that make up the facades.

Figura 6.- Muestra el transporte de un módulo mediante un camión 8.Figure 6.- Shows the transport of a module by a truck 8.

Figura 7.- Muestra una vista en perspectiva de dos módulos correspondientes a las figuras 5a y 5b, ya adosados y con sus correspondientes barandillas 7a que se colocarán a posteriori en la obra previo transporte. Incluye además un detalle de una barandilla acabada para su colocación en los módulos.Figure 7.- Shows a perspective view of two modules corresponding to Figures 5a and 5b, already attached and with their corresponding railings 7a that will be placed afterwards in the previous transport work. It also includes a detail of a finished railing for placement in the modules.

Figura 8.- Muestra una vista esquemática de la cimentación de una primera planta de pórticos 10 prefabricados que se realizan "in situ".Figure 8.- Shows a schematic view of the foundation of a first prefabricated gantry plant 10 that is carried out " in situ ".

Figura 9.- Muestra un esquema de cómo se acopla un módulo sobre la cimentación de la primera planta de pórticos 10 prefabricados.Figure 9.- Shows a scheme of how it fits a module on the foundation of the first gantry floor 10 prefabricated

Figura 10.- Muestra un esquema de cómo se acopla un segundo módulo sobre la cimentación y la primera planta de pórticos 10 prefabricados con el módulo de la figura 9.Figure 10.- Shows a scheme of how it fits a second module on the foundation and the first floor of prefabricated frames 10 with the module of figure 9.

Figura 11.- Muestra un esquema del acople de una segunda planta de pórticos 10 como continuación del montaje de lo mostrado en la figura anterior 10.Figure 11.- Shows a diagram of the coupling of a  second floor of porches 10 as a continuation of the assembly of the shown in the previous figure 10.

Figura 12.- Muestra un esquema de cómo se acopla un tercer módulo sobre la segunda planta de pórticos 10 de la figura 11.Figure 12.- Shows a diagram of how it fits a third module on the second floor of porches 10 of the figure 11.

Figura 13.- Muestra un esquema de cómo se acopla un cuarto módulo sobre la estructura de la figura 12.Figure 13.- Shows a scheme of how it fits a fourth module on the structure of figure 12.

Figura 14.- Muestra un esquema de cómo se acopla una tercera planta de pórticos prefabricados a la estructura de la figura 13.Figure 14.- Shows a scheme of how it fits a third floor of prefabricated porches to the structure of the figure 13.

Figura 15.- Muestra un esquema de cómo se acopla un quinto módulo a la estructura de la figura 14.Figure 15.- Shows a scheme of how it fits a fifth module to the structure of figure 14.

Figura 16.- Muestra un esquema de cómo se acopla un sexto módulo a la estructura de la figura 15.Figure 16.- Shows a diagram of how it fits a sixth module to the structure of figure 15.

Figura 17.- Muestra un esquema de cómo se acopla una cuarta planta de pórticos prefabricados a la estructura de la figura 16.Figure 17.- Shows a diagram of how it fits a fourth floor of prefabricated porches to the structure of the figure 16.

Figura 18.- Muestra un esquema del núcleo de viviendas de la figura 17 con cubierta.Figure 18.- Shows an outline of the core of housing of figure 17 with cover.

Figura 19.- Muestra un esquema del núcleo de viviendas de la figura 18 con medianeras.Figure 19.- Shows an outline of the core of houses of figure 18 with medians.

Figura 20.- Muestra un esquema de una bloque de viviendas en forma de "H" compuesto por cuatro núcleos de viviendas similares a los de la figura 18 y con zonas comunes, escaleras, ascensores e instalaciones comunitarias generales.Figure 20.- Shows a diagram of a block of "H" shaped homes composed of four cores of similar homes to those in figure 18 and with common areas, stairs, elevators and general community facilities.

Descripción de la forma de realización preferidaDescription of the preferred embodiment

Considerando la numeración adoptada en las figuras, como un modo de realización preferente se aplicará el sistema de construcción modular a la construcción de un edificio 14 plurifamiliar de viviendas VPO (Vivienda de Protección Oficial) de dos dormitorios de tres plantas de altura con solución tipológica de bloque "H" de doce viviendas.Considering the numbering adopted in the figures, as a preferred embodiment the modular construction system to the construction of a building 14 multi-family housing VPO (Official Protection Housing) of two three-story high bedrooms with typological solution of block "H" of twelve houses.

Como primera fase se realizan en fábrica dos módulos distintos de 3 x 12 m que, una vez montados en obra y unidos, formarán una vivienda de dos dormitorios.As the first phase two factory are carried out modules other than 3 x 12 m which, once mounted on site and together, they will form a two bedroom house.

El proceso de ejecución material se realiza en fábrica mediante cadena de montajes sobre parte de la estructura definitiva, concretamente vigas-jácenas 1, vigas transversales 13 y forjado ligero 2, pudiéndose prescindir de las vigas transversales 13.The material execution process is carried out in factory through assembly line on part of the structure definitively, specifically beams-jácenas 1, beams transversal 13 and light forging 2, being able to do without cross beams 13.

Así, la figura 1 muestra la disposición de las vigas-jácenas 1, vigas transversales 13 y del forjado ligero 2 definiendo la superficie base de uno de los dos módulos, siendo las vigas-jácenas 1 y vigas transversales 13 preferentemente de perfilería de acero laminado y el forjado ligero 2 compuesto de una chapa colaborante 17 soldada o atornillada a las jácenas 1 y sobre dicha chapa colaborante 17 se vierte un hormigón ligero 18, preferentemente de árido expandido y mallazo 19, tal y como ilustra el corte transversal de la figura 4.Thus, Figure 1 shows the arrangement of the beam-beams 1, cross beams 13 and of lightweight forging 2 defining the base surface of one of the two modules, being beams-jácenas 1 and beams cross sections 13 preferably of rolled steel profiles and the light slab 2 composed of a welded plate 17 welded or bolted to jácenas 1 and on said collaborating plate 17 is pour a light concrete 18, preferably expanded aggregate and mesh 19, as illustrated by the cross section of the figure Four.

En la figura 3 se ve cómo sobre el forjado ligero 2 se realiza una jaula 3 de perfilería metálica. Mediante el concepto de "jaula" se rigidiza cada módulo, permitiendo la realización completa de tabiquerías 4, fachadas 5 interiores e instalaciones 6 y un fácil transporte y montaje en obra.Figure 3 shows how on the floor lightweight 2 a cage 3 of metal profiles is made. Through the  "cage" concept stiffens each module, allowing the complete realization of partitions 4, facades 5 interiors and 6 installations and easy transport and assembly on site.

Como se ve en las figuras 2a y 2b, sobre la jaula 3 y el forjado ligero 2 se realiza la tabiquería prefabricada 4, mediante perfilería y paneles arriostrados al forjado ligero 2 y a la jaula 3 mediante perfilería adicional.As seen in Figures 2a and 2b, on the cage 3 and the light slab 2 the prefabricated partition is made  4, by means of profiles and panels braced to the light slab 2 and to cage 3 by additional profiling.

También cabe la posibilidad de disponer primero las vigas-jácenas, sobre éstas realizar la jaula y después realizar el forjado ligero.It is also possible to have first the beams-jácenas, on these make the cage and then perform the light slab.

En las figuras 5a, 5b y 7 muestran las instalaciones de saneamiento 6 que se montan una vez arriostrada la tabiquería prefabricada 4 y bajo el forjado ligero 2 se montan derivaciones, desagües y tramos de planta de bajantes principales.In figures 5a, 5b and 7 show the sanitation facilities 6 that are mounted once the bracing  prefabricated partition 4 and under light slab 2 are mounted shunts, drains and sections of downspouts main.

Luego se procede a proyectar la parte inferior del forjado ligero 2 y las vigas-jácenas 1 con una espuma ignífuga 21 y se procede al montaje de una elaboración industrializada o "kit" de agua fría y caliente, electricidad y telecomunicaciones, mediante canaletas, conductos, tubos y cableado por techó fijada al mismo.Then proceed to project the bottom of the light slab 2 and the beams-jácenas 1 with a fire retardant foam 21 and the assembly of an elaboration is carried out industrialized or "kit" of hot and cold water, electricity and telecommunications, through gutters, pipes, tubes and ceiling wiring fixed to it.

Finalmente se realizan los revestimientos 7 de suelo, techo y paredes y aplacado de zonas húmedas mediante adhesivos de propiedades elastoméricas.Finally the coverings 7 of floor, ceiling and walls and cladding of wet areas through adhesives of elastomeric properties.

Además, se montan los paños de fachada 5 prefabricados que comprenden la carpintería exterior completa 5a y, a partir de una cámara aislante 5b, un acabado interior 5c con revestimiento de forma tal que los paños de fachada 5 se arriostren a la jaula 3 y a una malla 5d de la perfilería de la tabiquería prefabricada 4.In addition, facade cloths 5 are mounted prefabricated comprising the complete exterior carpentry 5a and, from an insulating chamber 5b, an interior finish 5c with cladding so that the facade cloths 5 are bracing to cage 3 and a 5d mesh of the partition wall profiles prefabricated 4.

Por último, se sellan las juntas, se colocan las placas de techo y se pinta. Además, se colocan los sanitarios, grifería y mecanismos eléctricos.Finally, the joints are sealed, the  ceiling plates and paints. In addition, the toilets are placed, faucets and electrical mechanisms.

Además, se preparan unas barandillas 7a que se ven en la figura 7 y que se entregan por separado para su colocación a posteriori, in situ, en la obra.In addition, railings 7a are prepared which are seen in Figure 7 and delivered separately for subsequent placement , in situ , on site.

Una vez realizados todos o algunos de los módulos que conformarán el edificio, son transportados al solar donde se erigirá el edificio. Allí, se define el procedimiento de montaje en obra de cada módulo semirresistente prefabricado que formará parte del edificio que se desea construir.Once all or some of the modules that will make up the building, are transported to the site where the building will be erected. There, the procedure of assembly on site of each prefabricated semi-resistant module that It will be part of the building you want to build.

Las figuras 8 a 20 ilustran este procedimiento donde, tal y como ilustra la figura 8 lo primero que se hace es la cimentación 9 del solar y colocación de una primera planta de pórticos 10 de pilares y jácenas o vigas principales. En una realización preferentemente la primera planta de pórticos 10 es de acero laminado de 6 m de luz libre, 3 m de altura y distancia entre pórticos de 5 m.Figures 8 to 20 illustrate this procedure where, as Figure 8 illustrates, the first thing that is done is the foundation 9 of the site and placement of a first floor of 10 porches of pillars and jácenas or main beams. In a preferably, the first floor of porches 10 is of 6 m free rolled steel, 3 m high and distance between 5 m porches.

A partir de la figura 9 y hasta la 20 se van mostrando cada paso de la construcción del edificio de la realización preferente, es decir, que en la figura 9 se acopla un primer módulo sobre la cimentación 9 y primera planta de pórticos 10 prefabricados de la figura 8 anterior.From figure 9 and until 20 they leave showing each step of the building construction of the preferred embodiment, that is, in Figure 9 a coupling is coupled first module on foundation 9 and first floor of porches 10 prefabricated from figure 8 above.

En la figura 10 se acopla un segundo módulo a la estructura de la figura 9 anterior y además se muestra la colocación de las barandillas 7a.In figure 10 a second module is attached to the  structure of figure 9 above and also shows the placement of railings 7a.

En la figura 11 se coloca una segunda planta de pórticos 10 prefabricados a la estructura de la figura anterior 10.In figure 11 a second floor of 10 prefabricated frames to the structure of the previous figure 10.

En la figura 12 se muestra cómo se acopla un tercer módulo sobre la estructura de la figura anterior 11.Figure 12 shows how a coupling is coupled third module on the structure of the previous figure 11.

En la figura 13 se esquematiza cómo se acopla un cuarto módulo sobre la estructura de la figura 12 anterior, destacándose además que ya se han colocado las barandillas 7a.Figure 13 shows how a coupling is coupled.  fourth module on the structure of figure 12 above, standing out also that the railings 7a have already been placed.

En la figura 14 se coloca una tercera planta de pórticos 10 prefabricados a la estructura de la figura 13 anterior.In figure 14 a third floor of prefabricated frames 10 to the structure of figure 13 previous.

La figura 15 muestra la colocación de un quinto módulo en la estructura de la figura 14 anterior.Figure 15 shows the placement of a fifth module in the structure of figure 14 above.

La figura 16 muestra la colocación de un sexto módulo a la estructura de la figura 15 anterior, con la correspondiente colocación de barandillas 7a.Figure 16 shows the placement of a sixth module to the structure of figure 15 above, with the corresponding placement of railings 7a.

La figura 17 muestra la colocación de una cuarta planta de pórticos prefabricados sobre la estructura de la figura anterior 16.Figure 17 shows the placement of a fourth  prefabricated gantry plant on the structure of the figure previous 16.

La figura 18 muestra la colocación de la cubierta 14a sobre la estructura de la figura 17 anterior y la figura 19 añade la colocación de medianeras 14b.Figure 18 shows the placement of the cover 14a on the structure of Figure 17 above and the Figure 19 adds the placement of medians 14b.

Así queda definido un núcleo de viviendas.This is how a housing nucleus is defined.

La figura 20 ilustra cuatro núcleos de viviendas conformando un bloque de viviendas en forma de "H" 16 donde también se han ilustrado de forma esquemática zonas comunes 15, como ascensores, escaleras e instalaciones comunitarias en general.Figure 20 illustrates four housing cores  forming an "H" shaped housing block 16 where common areas have also been schematically illustrated 15, such as elevators, stairs and community facilities in general.

Cabe señalar que en la figura 6 se muestra un camión 8 para transportar los distintos módulos.It should be noted that Figure 6 shows a Truck 8 to transport the different modules.

En la figura 9 por ejemplo, se muestran unas uniones estructurales 11 para unir cada módulo sobre los pórticos 10.In Figure 9 for example, some are shown structural joints 11 to join each module on the porches 10.

A su vez en la figura 13 se muestra una conexión 12 de instalaciones 6 de saneamiento y ventilación.In turn, a connection is shown in Figure 13 12 of 6 sanitation and ventilation facilities.

La figura 7 muestra unas instalaciones 20 de kits prefabricados de electricidad, teleco y fontanería sobre el techo de los módulos.Figure 7 shows installations 20 of prefabricated kits of electricity, teleco and plumbing on the roof of the modules.

Claims (10)

1. Módulo semirresistente prefabricado para construcción, susceptible de ser unido a otros módulos similares o iguales dispuestos tanto lateralmente como encima, que está caracterizado porque se fabrica según el siguiente procedimiento:1. Prefabricated semi-resistant module for construction, capable of being joined to other similar or equal modules arranged both laterally and above, which is characterized in that it is manufactured according to the following procedure: - Disponer al menos dos vigas-jácenas (1) de acero laminado y dos bordes arriostrantes de forjado que definen el perímetro de la base del módulo;- Have at least two beams-jácenas (1) of rolled steel and two edges floor bracing that define the perimeter of the base of the module; - Sobre las vigas-jácenas (1) de perfilería de acero laminado ejecutar un forjado ligero (2) compuesto de una chapa colaborante (17), que se suelda o atornilla a dichas vigas (1) y sobre dicha chapa colaborante (17) de vierte un hormigón ligero (18) de árido expandido y mallazo (19) dando como resultado el forjado ligero (2);- On the beams-jácenas (1) of rolled steel profiles run a light slab (2) composed of a collaborating plate (17), which is welded or screwed to said beams (1) and on said collaborating sheet (17) of pouring a lightweight concrete (18) of expanded aggregate and mesh (19) giving as a result the light slab (2); - Sobre el forjado ligero (2) realizar una jaula (3) de perfilería metálica que utiliza, por un lado para arriostrar una tabiquería prefabricada (4) y, por otro, de herraje de grúa para su posterior transporte y puesta en obra;- On the light slab (2) make a cage (3) of metal profiles that you use, on the one hand to bracing a prefabricated partition wall (4) and, on the other, hardware of crane for later transport and commissioning; - Sobre la jaula (3) y el forjado ligero (2) realizar la tabiquería prefabricada (4) mediante perfilería y panel arriostrados al forjado ligero (2) y a la jaula (3) mediante perfilería adicional;- On the cage (3) and the light floor (2) make the prefabricated partition (4) using profiles and panel  braced to the light floor (2) and the cage (3) by additional profiling; - Una vez arriostrada la tabiquería prefabricada (4) montar instalaciones de saneamiento (6) y bajo el forjado ligero (2) derivaciones a desagües y tramos de planta de bajantes principales;- Once the prefabricated partition wall is braced (4) install sanitation facilities (6) and under the slab light (2) shunts and drains of downspouts main; - Posteriormente proyectar la parte inferior del forjado ligero (2) y las vigas (1) con espuma ignífuga (21).- Subsequently project the bottom of the  Light forged (2) and the beams (1) with flame retardant foam (21). - Proceder al montaje de una elaboración industrializada o "kit" de agua fría y caliente, electricidad y telecomunicaciones, mediante canaletas, conductos, tubos y cableado por techo;- Proceed with the assembly of an elaboration industrialized or "kit" of hot and cold water, electricity and telecommunications, through gutters, pipes, tubes and ceiling wiring; - Realizar los revestimientos (7) de suelo y aplacado de zonas húmedas mediante adhesivos de propiedades elastoméricas;- Make the floor coverings (7) and damping of wet areas using property adhesives elastomeric; - Montar paños de fachada (5) prefabricados que comprenden carpintería exterior completa (5a) y, a partir de una cámara aislante (5b) un acabado de revestimiento (5c), de forma tal que los paños de fachada (5) se arriostran a la jaula (3) y a una malla (5d) de la perfilería de la tabiquería prefabricada (4);- Assemble prefabricated facade cloths (5) that they include complete exterior carpentry (5a) and, from a insulating chamber (5b) a coating finish (5c), in such a way that the facade cloths (5) are braced to the cage (3) and to a mesh (5d) of the prefabricated partition wall profiles (4); - Sellar juntas, colocar placas de techo y pintar, además de colocar sanitarios, griferías y mecanismos eléctricos.- Seal joints, place ceiling plates and paint, in addition to placing toilets, faucets and mechanisms electric
         \vskip1.000000\baselineskip\ vskip1.000000 \ baselineskip
      
2. Módulo semirresistente prefabricado para construcción, según la reivindicación 1, caracterizado porque la perfilería metálica interviniente es de acero.2. Prefabricated semi-resistant module for construction, according to claim 1, characterized in that the intervening metal profiles are made of steel. 3. Módulo semirresistente prefabricado para construcción, según la reivindicación 1, caracterizado porque su tamaño es variable, siendo por razones de transporte una medida idónea inferior a 3 m por 12 m.3. Prefabricated semi-resistant module for construction, according to claim 1, characterized in that its size is variable, being for reasons of transport an ideal measure of less than 3 m by 12 m. 4. Módulo semirresistente prefabricado para construcción, según la reivindicación 1, caracterizado porque los paneles son placas de yeso o cartón.4. Prefabricated semi-resistant module for construction, according to claim 1, characterized in that the panels are plasterboard or cardboard. 5. Procedimiento de montaje en obra del módulo semirrresistente definido en la reivindicación 1, caracterizado porque comprende:5. Work assembly procedure of the semi-resistant module defined in claim 1, characterized in that it comprises: a.- Cimentar (9) el solar donde se colocará el módulo.a.- Cement (9) the site where the module. b.- Colocar sobre la cimentación (9) una primera planta de pórticos (10) prefabricados de pilares y jácenas o vigas principales (1);b.- Place a first on the foundation (9)  prefabricated porch plant (10) of pillars and jácenas or beams main (1); c.- Colocar sobre los pórticos (10), apoyados sobre sus vigas principales (1), los módulos semirresistentes prefabricados definidos en la reivindicación 1, de forma tal que se unan los pórticos (10) con las vigas principales (1) de los módulos;c.- Place on the porches (10), supported on its main beams (1), the semi-resistant modules prefabricated defined in claim 1, such that join the porches (10) with the main beams (1) of the modules; d.- Unir entre sí, mediante tornillería o soldadura, las jaulas (3) de los distintos módulos que configuren una misma planta del edificio (14) y a su vez unir los pilares de los pórticos (10) con las jaulas (3);d.- Join each other, using screws or welding, the cages (3) of the different modules that configure same floor of the building (14) and in turn join the pillars of the porches (10) with the cages (3); e.- Conectar las instalaciones (6) de los distintos módulos;e.- Connect the facilities (6) of the different modules; f.- Una vez finalizada una planta colocar una segunda planta de pórticos (10) y proseguir con los pasos anteriores "c-e";f.- Once a plant is finished, place a second floor of porticos (10) and continue with the steps previous "c-e"; g.- Repetir los pasos b-e anteriores tantas veces como plantas tenga el edificio (14) a construir;g.- Repeat steps b-e previous as many times as plants have the building (14) to build; h.- Repetir los pasos a-e o los pasos b-e según sea el edificio (14) a construir hasta llegar a una medianera (14b) de fachada y hasta a una cubierta (14a) del edificio;h.- Repeat steps a-e or steps b-e according to the building (14) to be built until you reach a facade (14b) of the facade and even a roof (14a) of the building; i.- Sellar las uniones exteriores de fachadas (5) entre distintos módulos mediante proyectado ignífugo en pilares y vigas y mediante la colocación piezas especiales de tapajuntas de material ligero con unión atornillada o adhesivada;i.- Seal the exterior joints of facades (5) between different modules by means of flame retardant projection in pillars and beams and by placing special pieces of flashing of lightweight material with screwed connection or adhesive; j.- Realizar las zonas comunes del edificio (14) mediante sistemas prefabricados autoportantes que se unen al resto de la estructura, creando en la unión una zona accesible por la que discurren en vertical las instalaciones generales comunitarias del edificio en derivación y canalizaciones prefabricadas.j.- Carry out the common areas of the building (14)  by means of prefabricated self-supporting systems that join the rest of the structure, creating in the union an accessible area through which the general community facilities of the branch building and prefabricated pipes.
         \vskip1.000000\baselineskip\ vskip1.000000 \ baselineskip
      
6. Procedimiento, según la reivindicación 5, caracterizado porque la medianera de fachada se fabrica de igual manera que la fachada (5) del módulo semirresistente prefabricado.6. The method according to claim 5, characterized in that the façade media wall is manufactured in the same manner as the façade (5) of the prefabricated semi-resistant module. 7. Procedimiento, según la reivindicación 5, caracterizado porque la cubierta (14a) del edificio (14) se fabrica de igual manera que el forjado ligero (2) del módulo semirresistente prefabricado, con el añadido de un impermeabilizado y un aislamiento término, con refuerzos en solapes y juntas de forjados.Method according to claim 5, characterized in that the roof (14a) of the building (14) is manufactured in the same way as the light slab (2) of the prefabricated semi-resistant module, with the addition of a waterproofing and a term insulation, with reinforcements in overlaps and floor joints. 8. Procedimiento, según la reivindicación 5, caracterizado porque la cimentación (9) es por zapata aislada arriostrada de hormigón armado.Method according to claim 5, characterized in that the foundation (9) is made of insulated braced reinforced concrete footing. 9. Procedimiento, según la reivindicación 5, caracterizado porque las uniones estructurales en obra durante el procedimiento de montaje sean ensambladas por cualquier sistema de atornillado o soldado.9. Method according to claim 5, characterized in that the structural joints on site during the assembly procedure are assembled by any bolting or welding system. 10. Procedimiento, según la reivindicación 5, caracterizado porque los pórticos prefabricados (10) son de perfilería metálica de cualquier tipo.Method according to claim 5, characterized in that the prefabricated frames (10) are of metal profiles of any type.
ES200802879A 2008-10-10 2008-10-10 PRE-MANUFACTURED SEMIRRESISTENT MODULE FOR CONSTRUCTION AND PROCEDURE ASSEMBLY ON THE WORK OF THE SAME. Expired - Fee Related ES2333636B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
ES200802879A ES2333636B1 (en) 2008-10-10 2008-10-10 PRE-MANUFACTURED SEMIRRESISTENT MODULE FOR CONSTRUCTION AND PROCEDURE ASSEMBLY ON THE WORK OF THE SAME.
EP09380161.1A EP2175088B1 (en) 2008-10-10 2009-10-08 Method of installation on site of a prefabricated semi-resistant module for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ES200802879A ES2333636B1 (en) 2008-10-10 2008-10-10 PRE-MANUFACTURED SEMIRRESISTENT MODULE FOR CONSTRUCTION AND PROCEDURE ASSEMBLY ON THE WORK OF THE SAME.

Publications (2)

Publication Number Publication Date
ES2333636A1 ES2333636A1 (en) 2010-02-24
ES2333636B1 true ES2333636B1 (en) 2011-03-11

Family

ID=41665471

Family Applications (1)

Application Number Title Priority Date Filing Date
ES200802879A Expired - Fee Related ES2333636B1 (en) 2008-10-10 2008-10-10 PRE-MANUFACTURED SEMIRRESISTENT MODULE FOR CONSTRUCTION AND PROCEDURE ASSEMBLY ON THE WORK OF THE SAME.

Country Status (2)

Country Link
EP (1) EP2175088B1 (en)
ES (1) ES2333636B1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6174430B2 (en) * 2013-09-06 2017-08-02 ミサワホーム株式会社 Support structure for incidental structures
DE102018127871B4 (en) * 2018-11-08 2020-07-16 Ernst-Peter Amat Kreft Assembly kit and method for positive and / or non-positive pre-assembly for a frame construction and use
DE102019126126A1 (en) * 2019-09-27 2021-04-01 Werk Eins Gmbh Structure and method of erecting a structure
KR102136077B1 (en) * 2020-03-19 2020-07-21 주식회사 엔알비 Construction method of movable building using modules
DE202020101892U1 (en) 2020-04-06 2020-05-28 Ernst-Peter Amat Kreft Assembly kit for providing a frame structure for residential units and use
DE102020109592A1 (en) 2020-04-06 2021-10-07 Ernst-Peter Amat Kreft Assembly kit and method for providing a frame structure for residential units and use
EP4074908A1 (en) * 2021-04-12 2022-10-19 Grupo Avintia, S.L. Construction system and method for putting same into practice
ES1272154Y (en) * 2021-05-10 2021-10-11 Ind Metalicas Anro S L MODULAR BUILDING IN EXPANDABLE, REMOVABLE AND REUSABLE HEIGHT MADE UP OF PREFABRICATED ELEMENTS
GB2611812B (en) * 2021-10-18 2023-12-20 Larkfleet Group X House Ltd Building for car parks

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1509042A (en) * 1966-11-28 1968-01-12 Industrialized construction process by cell block entirely produced and equipped in the factory for buildings on one or more levels
CH526014A (en) * 1970-04-09 1972-07-31 Etufitec Ets Building produced by assembling prefabricated elements and method for erecting such a building
FR2159196B1 (en) * 1971-11-10 1974-08-02 Seb Usine Adn
DE4115643A1 (en) 1991-05-14 1992-11-19 Eberhard Schrade METHOD AND PRE-PREPARED MODULE FOR THE PRODUCTION OF CONSTRUCTIONS AND BUILDINGS
DE4131125C2 (en) 1991-05-14 1996-07-18 Eberhard Schrade Process for the production of buildings and buildings and prefabricated module for carrying out the process
DE4332793C1 (en) 1993-09-27 1995-01-12 Eberhard Schrade Process for producing structures, and prefabricated module
AU679392B2 (en) * 1994-11-01 1997-06-26 Robert George Warren Method and apparatus for constructing a building
US6038824A (en) * 1998-03-17 2000-03-21 Hamrick, Sr.; William T. Noncombustible transportable building
NO310035B1 (en) * 1998-12-15 2001-05-07 Heimdal Entreprenoer As Building system for building travel
US6675540B1 (en) * 2001-09-12 2004-01-13 Tracy Rokes Portable building for human occupancy
NL1019254C2 (en) * 2001-10-30 2003-05-02 Teha Holding B V House and method for manufacturing.
SE521286C2 (en) * 2002-02-27 2003-10-21 Open House System Ab Modular building, prefabricated volume module and method for making a modular building
AU2006202073A1 (en) * 2005-05-19 2006-12-14 Makulbek Pty Ltd Modular building frame

Also Published As

Publication number Publication date
EP2175088B1 (en) 2014-09-03
EP2175088A3 (en) 2012-07-25
EP2175088A2 (en) 2010-04-14
ES2333636A1 (en) 2010-02-24

Similar Documents

Publication Publication Date Title
ES2333636B1 (en) PRE-MANUFACTURED SEMIRRESISTENT MODULE FOR CONSTRUCTION AND PROCEDURE ASSEMBLY ON THE WORK OF THE SAME.
US9115504B2 (en) System for modular building construction
ES2281289B1 (en) PREFABRICATED SINGLE FAMILY HOUSING OF REINFORCED CONCRETE AND ASSEMBLY PROCEDURE OF THE SAME.
US20160160515A1 (en) System for modular building construction
US6651393B2 (en) Construction system for manufactured housing units
US20160040443A1 (en) Modular Building System
EP1971727B1 (en) Construction of buildings
US4586299A (en) Building system of interconnected block elements
WO2018067067A1 (en) Prefabricated prefinished volumetric construction module
WO2018174825A1 (en) Pre-fabricated pre-finished volumetric construction of a building
RU59088U1 (en) DESIGN OF THE METAL FRAME OF THE CONSTRUCTION VOLUME BLOCK FOR A SMALL BUILDING
US9453332B2 (en) Building system, particularly a residential building
KR101213504B1 (en) Tailor-Made Type Korean House Manufacturing Method for Furniture-style Buildings and Tailor-Made Type Korean House Structure
WO2013014305A1 (en) Modular construction system
KR101086060B1 (en) Prefebrication module
RU2277619C2 (en) Building panels, foundation structure, three-dimensional building structure, methods for three-dimensional building structure erection and building heat insulation
ES2412280B1 (en) MODULAR CONSTRUCTION SYSTEM
ES2450642B1 (en) Industrialized building construction system
EA039137B1 (en) Method for construction of composite frames without collar beams for buildings with kinematic foundations
EP2396478A2 (en) Metal buildings
CZ16786U1 (en) Modular house

Legal Events

Date Code Title Description
EC2A Search report published

Date of ref document: 20100224

Kind code of ref document: A1

FG2A Definitive protection

Ref document number: 2333636

Country of ref document: ES

Kind code of ref document: B1

Effective date: 20110301

FD2A Announcement of lapse in spain

Effective date: 20210928