ES2214107A1 - Pile decapitated system, has concrete mass part adhered to upper part, hollow element placed facing pressure element and including corrugated tube or plastic roller that is arranged in plane of breakage part fixed to armature part - Google Patents
Pile decapitated system, has concrete mass part adhered to upper part, hollow element placed facing pressure element and including corrugated tube or plastic roller that is arranged in plane of breakage part fixed to armature partInfo
- Publication number
- ES2214107A1 ES2214107A1 ES200201862A ES200201862A ES2214107A1 ES 2214107 A1 ES2214107 A1 ES 2214107A1 ES 200201862 A ES200201862 A ES 200201862A ES 200201862 A ES200201862 A ES 200201862A ES 2214107 A1 ES2214107 A1 ES 2214107A1
- Authority
- ES
- Spain
- Prior art keywords
- pile
- plane
- breakage
- concrete
- hollow element
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Sistema de descabezado de pilotes y elementos de pantalla.Piles and elements debeheading system screen.
La invención se refiere a un sistema de descabezado de pilotes y elementos de pantalla que consiste en provocar un plano o sección de rotura sensiblemente perpendicular a la dirección del pilote y elemento de pantalla, plano próximo al extremo superior del pilote.The invention relates to a system of headings of piles and screen elements consisting of cause a plane or section of break substantially perpendicular to the direction of the pile and screen element, plane close to the top end of the pile.
Normalmente los pilotes poseen una sección circular, aunque tal sección podría ser otra cualquiera, de forma que en estos casos el nombre más adecuado sería llamarlos módulos o elementos de pantalla.Normally the piles have a section circular, although such a section could be any other, so that in these cases the most appropriate name would be to call them modules or screen elements.
Se trata pues de realizar un descabezado con una intervención limpia y rápida, con una reducida y casi nula mano de obra y sin utilizar apenas herramientas ni perforaciones. El sistema de la invención además es muy preciso al poder situar tal plano de rotura con precisión a la altura que se desee.It is therefore to perform a head with a clean and fast intervention, with a reduced and almost null hand of work and without using just tools or perforations. The system of the invention is also very precise to be able to locate such breakage plane precisely to the desired height.
El descabezado es muy aconsejable y en muchos casos necesario, llevado a cabo debido al hecho de que cuando se vierte el hormigón dentro de los profundos huecos realizados previamente en el suelo, parte de la tierra y otros residuos desprendidos del interior de esos huecos, son arrastrados hacia arriba durante el vertido del hormigón dentro de los huecos hasta la parte superior de la masa de hormigón, quedándose entonces tales restos concentrados y mezclados precisamente con la parte superior de la masa de hormigón, correspondiendo tal parte superior con el tramo de pilote a descabezar.Heading is very advisable and in many necessary cases, carried out due to the fact that when pour the concrete into the deep holes made previously in soil, part of the land and other waste detached from the interior of these holes, they are dragged towards up during the pouring of concrete into the gaps until the upper part of the concrete mass, then remaining such remains concentrated and mixed precisely with the top of the concrete mass, such upper part corresponding to the section of pile to decapitate.
Por lo tanto, como es evidente esta parte superior del pilote al incluir restos de tierra y otros residuos no poseerá el mismo grado de resistencia y calidad exigidos que el resto del pilote y por lo tanto se hace necesario el descabezado o eliminación de esa parte superior del pilote.Therefore, as this part is evident top of the pile by including traces of dirt and other debris not It will have the same degree of resistance and quality required as the rest of the pile and therefore it is necessary to decapitate or removal of that top of the pile.
El sistema de descabezado tradicional resulta ser un sistema rudimentario que exige de una entretenida y dura mano de obra donde es preciso utilizar herramientas que producen un gran desgaste físico para el usuario, como pueden ser martillos neumáticos y otros, herramientas estas que exigen además una gran concentración.The traditional decapping system results be a rudimentary system that demands entertaining and hard labor force where it is necessary to use tools that produce a great physical wear for the user, such as hammers tires and others, these tools that also require a large concentration.
Otros inconvenientes es que cuando se ha realizado el descabezado, los tramos libres de las barras verticales de la armadura longitudinal de los pilotes que asoman superiormente, han sufrido deformaciones y golpes que repercutirán después negativamente para realizar operaciones de encepado y otras.Other drawbacks is that when it has done the heading, the free sections of the bars verticals of the longitudinal reinforcement of the piles that appear superiorly, they have suffered deformations and blows that will impact then negatively to perform wrapping operations and others.
Otros inconvenientes es que una vez realizado el descabezado, la superficie libre del pilote presenta evidentes irregularidades debido al método de descabezado utilizado que resulta ser bastante destructivo.Other drawbacks is that once the decapitated, the free surface of the pile shows obvious irregularities due to the header method used that It turns out to be quite destructive.
Tampoco debemos olvidar los riesgos derivados de las herramientas utilizadas para el operario durante la dura tarea del descabezado.Nor should we forget the risks arising from the tools used for the operator during the hard task of the headless.
Con el fin de alcanzar los objetivos y evitar los inconvenientes mencionados en los apartados anteriores, la invención propone un sistema de descabezado que se caracteriza en principio porque la cabeza o parte superior del pilote a descabezar se realiza a partir de un plano o sección de rotura preparado con anterioridad a la formación completa del pilote, sin emplear perforación alguna.In order to achieve the objectives and avoid the drawbacks mentioned in the previous sections, the invention proposes a headless system that is characterized in principle because the head or top of the pile to decapitate it is done from a plane or section of break prepared with prior to full pile formation, without employing any drilling
Para ello, previamente sobre la armadura metálica del pilote se fija al menos un elemento tubular flexible dispuesto en correspondencia con ese plano de rotura de manera que por lo menos uno de los extremos de tal elemento tubular será accesible desde el exterior, una vez que ha fraguado y secado la masa de hormigón del conjunto del pilote, incluida su cabeza o parte superior a descabezar. Los elementos tubulares se dispondrán en. disposición concéntrica o en espiral o con cualquier otra disposición contenida en el plano de rotura, de manera que en cualquiera de los casos existirá un espacio más que suficiente para el vertido del hormigón.To do this, previously on the armor The metal of the pile is fixed at least one flexible tubular element arranged in correspondence with that plane of breakage so that at least one of the ends of such a tubular element will be accessible from the outside, once it has set and dried the concrete mass of the pile assembly, including its head or Top to decapitate. The tubular elements will be arranged in. concentric or spiral arrangement or with any other arrangement contained in the breakage plane, so that in either case there will be more than enough space to the pouring of concrete.
También, previamente al vertido del hormigón, para la formación del pilote se protegen los tramos de barras verticales de la armadura que se elevan por encima del plano de rotura. De esta manera evitamos que la masa de hormigón correspondiente con la cabeza del pilote se adhiera a la rugosidad de tales tramos de barras.Also, prior to pouring concrete, for the formation of the pile the sections of bars are protected vertical armor that rise above the plane of break. In this way we prevent the concrete mass corresponding with the pile head adheres to the roughness of such sections of bars.
La protección de esos tramos de barras se puede realizar mediante cualquier medio, aunque preferentemente se protegerán mediante elementos tubulares.The protection of these sections of bars can be be carried out by any means, although preferably They will protect by tubular elements.
También debemos indicar que los elementos tubulares flexibles dispuestos en el plano de rotura se sujetarán o anclarán a la armadura metálica del pilote mediante pasadores de anclaje que evitarán desplazamientos durante el hormigonado, a la vez que tales elementos tubulares se protegerán de forma adecuada mediante sellado en obra que evitará la entrada de hormigón en el interior de tales elementos tubulares.We must also indicate that the elements flexible tubulars arranged in the plane of breakage will be held or they will anchor to the metallic reinforcement of the pile by means of pins anchor that will prevent displacement during concreting, to the since such tubular elements will be adequately protected by sealing on site that will prevent the entry of concrete into the interior of such tubular elements.
Todas las fases descritas para llevar a cabo el descabezado, así como el resto de las fases posteriores, se realizan esencialmente en la propia obra durante la formación de los pilotes. En cualquier caso se trata de incorporar y fijar los elementos tubulares contenidos en la sección de rotura sobre la estructura o armadura metálica que formará parte del conjunto de los pilotes o módulos de pantalla.All phases described to carry out the Headed, as well as the rest of the later phases, it perform essentially on the work itself during the formation of The piles. In any case it is about incorporating and fixing the tubular elements contained in the break section on the metal structure or armor that will be part of the set of the piles or display modules.
Así pues, una vez realizado el profundo hueco en el suelo que ocupará después el pilote, primeramente se introduce la armadura metálica en tal hueco manteniendo una parte superior de tal armadura provisionalmente por encima del nivel del suelo para instalar los elementos tubulares en el plano de rotura, así como los elementos de protección de los tramos de barra superiores de la armadura metálica que se corresponden con la cabeza del pilote.So, once the deep hole in the ground that the pile will occupy later, is first introduced the metal armor in such a hollow while maintaining an upper part of such armor provisionally above ground level to install the tubular elements in the break plane, as well as the protection elements of the upper bar sections of the metal armor that correspond to the head of the pile.
En un paso posterior se introduce la armadura metálica en su totalidad dentro del hueco profundo del suelo hasta la profundidad definida.In a later step the armor is introduced metallic in its entirety in the deep hollow of the ground until The defined depth.
Posteriormente se procederá al hormigonado.Subsequently proceed to concreting.
Una vez que ha fraguado, secado y endurecido suficientemente la masa de hormigón, se liberará el sellado de los elementos tubulares del plano de rotura a fin de introducir por ellos un elemento de presión que produzca una presión expansiva suficiente en ese plano de rotura para separar la cabeza del conjunto del pilote.Once it has set, dried and hardened sufficiently the concrete mass, the sealing of the tubular elements of the rupture plane in order to introduce by they a pressure element that produces an expansive pressure enough in that plane of breakage to separate the head from the pile assembly.
Hemos de recordar que los pilotes de hormigón y en general el hormigón, trabajan a compresión teniendo una gran resistencia bajo tales cargas de compresión. En cambio, la resistencia a tracción es baja, de manera que el descabezado se realiza precisamente por el plano de rotura mediante un esfuerzo de tracción provocado por el elemento expansivo, esfuerzo de tracción que solamente afecta a parte de la sección de hormigón del pilote excluyendo, como es evidente, a las barras verticales de la estructura o armadura metálica que habían sido protegidas previamente mediante los elementos tubulares referidos anteriormente. También se excluye de esa sección de rotura los espacios ocupados por el tubo flexible contenido en tal plano de rotura.We have to remember that concrete piles and in general the concrete, they work under compression having a great resistance under such compression loads. Instead, the tensile strength is low, so that the head is performed precisely by the plane of breakage through an effort of traction caused by the expansive element, tensile stress which only affects part of the concrete section of the pile excluding, of course, the vertical bars of the metal structure or armor that had been protected previously by means of the tubular elements referred to previously. Also excluded from that break section are spaces occupied by the flexible tube contained in such a plane of break.
El elemento de presión que se introduce dentro del tubo flexible ubicado en el plano de rotura será esencialmente un mortero que al secarse se expanda, aunque también podría realizarse mediante un fluido sometiéndolo a presión.The pressure element that is introduced inside of the flexible tube located in the plane of breakage will be essentially a mortar that when dried expands, although it could also be performed using a fluid under pressure.
En cualquier caso, la novedad de la invención es crear previamente al hormigonado del pilote un espacio hueco en un plano sensiblemente perpendicular a la sección del citado pilote, de manera que después del hormigonado y una vez que ha fraguado, secado y endurecido suficientemente, ese espacio hueco se mantiene y es accesible desde el exterior para después introducir dentro de ese espacio hueco un elemento de presión a fin de provocar la rotura por ese plano.In any case, the novelty of the invention is create a hollow space in a pile beforehand plane substantially perpendicular to the section of said pile, so that after concreting and once it has set, dried and hardened sufficiently, that hollow space is maintained and is accessible from the outside and then introduced into that hollow space a pressure element in order to cause the break through that plane.
En un caso particular, el elemento de presión también podría ser un fluido como el agua, de manera que al reducirse su temperatura por debajo de los 0°C de forma natural o provocada artificialmente, el aumento de volumen de ese fluido al solidificarse se producirá la separación de la cabeza del pilote o elemento de pantalla por la sección de rotura.In a particular case, the pressure element it could also be a fluid like water, so that at reduce its temperature below 0 ° C naturally or artificially caused, the increase in volume of that fluid at solidifying will result in the separation of the pile head or Screen element by break section.
El elemento flexible ubicado en el plano de rotura básicamente podría estar formado, por ejemplo, por los tubos convencionales utilizados como protección de los cables de luz, tuberías de agua en las viviendas, etc.The flexible element located in the plane of breakage could basically be formed, for example, by the pipes Conventional used as protection of light cables, water pipes in homes, etc.
Cabe señalar que la fijación del elemento tubular para llevar a cabo el descabezado también podría fijarse sobre la armadura, antes de introducirla parcialmente dentro del hueco del suelo, es decir, durante el armado de la estructura metálica.It should be noted that the fixation of the element tubular to carry out the heading could also be fixed on the armor, before partially introducing it into the floor hollow, that is, during the assembly of the structure metallic
A continuación para facilitar una mejor comprensión de esta memoria descriptiva y formando parte integrante de la misma se acompañan unas figuras en las que con carácter ilustrativo y no limitativo se ha representado el objeto de la invención.Next to facilitate a better understanding of this descriptive report and being an integral part of the same accompany some figures in which with character illustrative and not limiting the object of the invention.
Figuras 1 a 6.- Muestran unas vistas de las distintas fases del sistema de descabezado de pilotes de la invención.Figures 1 to 6.- Show views of the different phases of the pile head system of the invention.
Figura 7.- Muestra una sección de rotura del pilote o módulo de pantalla por un plano superior que limita la cabeza o parte superior a descabezar.Figure 7.- Shows a break section of the pile or screen module by an upper plane that limits the head or top to decapitate.
A continuación se describe un ejemplo de realización de la invención atendiendo a la numeración adoptada en las figuras.An example of embodiment of the invention according to the numbering adopted in the figures.
Se parte de una armadura metálica 1 que incorpora cualquier pilote o módulo de pantalla, estructura que se introduce inicialmente dentro de un profundo hueco 2 realizado previamente en el suelo, aunque manteniendo provisionalmente la estructura metálica 1 algo elevada con respecto al nivel 3 del suelo, asomando por encima del mismo un tramo superior de tal estructura 1.It starts from a metal armor 1 that incorporates any pile or screen module, structure that is initially introduced into a deep hole 2 made previously on the ground, although provisionally maintaining the metallic structure 1 somewhat elevated with respect to level 3 of the ground, hovering above it an upper section of such structure 1.
Esta posición de la armadura se mantiene mediante un soporte de sustentación 4 que rodea a la armadura 1 y unas cortas patas provisionales 5.This position of the armor is maintained by means of a support support 4 that surrounds the armature 1 and short provisional legs 5.
En esta situación, sobre la parte de la armadura 1 que asoma. por encima del nivel del suelo 3 se coloca un tubo corrugado o rulo de material plástico 6 que se dispondrá en un plano o sección de rotura 7 sensiblemente perpendicular a la dirección vertical de la armadura 1.In this situation, about the part of the armor 1 that appears. above ground level 3 a tube is placed corrugated or curl of plastic material 6 to be arranged in a break plane or section 7 substantially perpendicular to the vertical direction of the armor 1.
Este tubo corrugado 6 se colocará con una disposición concéntrica o en espiral dejando espacios más que suficientes para el vertido del hormigón, a la vez que al menos un extremo 8 del mismo quedará dispuesto por encima del soporte de sustentación provisional 4 enrasado o por fuera de la estructura metálica 1 a fin de tener acceso al interior de ese tubo corrugado después de formarse completamente el conjunto del pilote. Este tubo corrugado 6 se fijará convenientemente a la armadura metálica 1, por ejemplo, mediante varillas transversales 9 y abrazaderas 10, alambres o similar.This corrugated tube 6 will be placed with a concentric or spiral arrangement leaving spaces more than sufficient for concrete pouring, while at least one end 8 thereof will be arranged above the support of Provisional lift 4 flush or outside the structure metal 1 in order to have access to the inside of that corrugated tube after the pile assembly is completely formed. This tube corrugated 6 will be conveniently fixed to metal armor 1, for example, by transverse rods 9 and clamps 10, wires or similar.
Los tramos de barras verticales 11 de la estructura metálica 1 que se encuentran por encima del soporte de sustentación 4 o por encima del plano de rotura 7 se protegen parejamente mediante elementos tubulares 12, por ejemplo en forma de "U".The vertical bar sections 11 of the metal structure 1 that are located above the support of lift 4 or above the break plane 7 are protected evenly by means of tubular elements 12, for example in shape of "U".
A continuación se desprenderá el soporte de sustentación 4, así como las patas 5 sobre las que apoya la armadura metálica 1, introduciendo la misma completamente dentro del hueco 2 del suelo.Then the support of lift 4, as well as the legs 5 on which the metal armor 1, introducing it completely inside from the floor 2 of the floor.
Después de esta fase se verterá el hormigón 13 dentro del hueco 2 del suelo para conformar el pilote completo.After this phase, concrete 13 will be poured inside the hole 2 of the ground to form the entire pile.
Una vez que ha fraguado, secado y endurecido suficientemente el hormigón 13 y pasado el tiempo preciso, por el extremo accesible 8 del tubo corrugado 6 que asoma por alguna parte de la cabeza 14 o parte superior a descabezar, se introducirá un mortero expansivo que producirá al fraguarse la presión expansiva necesaria para provocar la separación de la cabeza 14 por el plano 7 que contiene tal tubo corrugado 6 concéntricamente o en espiral, o con cualquier otra disposición, correspondiendo la sección de rotura 7 con una sección transversal del pilote a la que se debe restar el espacio ocupado por la trayectoria del tubo corrugado 6, varillas transversales 9, así como la sección de los tramos superiores 11 de las barras verticales que forman parte del conjunto de la armadura metálica 1.Once it has set, dried and hardened sufficiently the concrete 13 and past the precise time, by the accessible end 8 of the corrugated tube 6 that appears somewhere of head 14 or upper part to be decapitated, a expansive mortar that will occur when the expansive pressure sets necessary to cause separation of head 14 by plane 7 containing such corrugated tube 6 concentrically or spirally, or with any other provision, corresponding section of break 7 with a cross section of the pile to which it is due subtract the space occupied by the trajectory of the corrugated tube 6, transverse rods 9, as well as the section of the sections 11 of the vertical bars that are part of the metal armor set 1.
Por último y pasado el tiempo preciso se extrae limpiamente la cabeza 14 separada del conjunto del pilote por la sección de rotura 7.Finally and past the precise time is extracted cleanly the head 14 separated from the pile assembly by the breakage section 7.
Con este sistema de descabezado la superficie libre del pilote, así como los tramos libres verticales de la armadura quedarán prácticamente intactos, facilitándose así posteriores operaciones de encepado y otras, así como una mayor calidad en tales operaciones.With this system of decapping the surface free of the pile, as well as the vertical free sections of the armor will remain virtually intact, thus facilitating subsequent wrapping and other operations, as well as greater Quality in such operations.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200201862A ES2214107B1 (en) | 2002-08-06 | 2002-08-06 | PILOT HEADING SYSTEM AND DISPLAY ELEMENTS. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES200201862A ES2214107B1 (en) | 2002-08-06 | 2002-08-06 | PILOT HEADING SYSTEM AND DISPLAY ELEMENTS. |
Publications (2)
Publication Number | Publication Date |
---|---|
ES2214107A1 true ES2214107A1 (en) | 2004-09-01 |
ES2214107B1 ES2214107B1 (en) | 2005-11-01 |
Family
ID=32921724
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES200201862A Expired - Fee Related ES2214107B1 (en) | 2002-08-06 | 2002-08-06 | PILOT HEADING SYSTEM AND DISPLAY ELEMENTS. |
Country Status (1)
Country | Link |
---|---|
ES (1) | ES2214107B1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1981002757A1 (en) * | 1980-03-17 | 1981-10-01 | K Asakura | Method of removing top part of cast-in-place concrete pile |
JPS58185823A (en) * | 1982-04-24 | 1983-10-29 | Nippon Cement Co Ltd | Removal of head of on-site concrete pile |
JPS59228522A (en) * | 1983-06-09 | 1984-12-21 | Tobishima Kensetsu Kk | Treatment work of pile head |
JPS59228523A (en) * | 1983-06-10 | 1984-12-21 | Tobishima Kensetsu Kk | Treatment work for pile head |
GB2172842A (en) * | 1985-03-27 | 1986-10-01 | Onoda Cement Co Ltd | Method of trimming pile heads of cast-in-place concrete pilings |
-
2002
- 2002-08-06 ES ES200201862A patent/ES2214107B1/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1981002757A1 (en) * | 1980-03-17 | 1981-10-01 | K Asakura | Method of removing top part of cast-in-place concrete pile |
JPS58185823A (en) * | 1982-04-24 | 1983-10-29 | Nippon Cement Co Ltd | Removal of head of on-site concrete pile |
JPS59228522A (en) * | 1983-06-09 | 1984-12-21 | Tobishima Kensetsu Kk | Treatment work of pile head |
JPS59228523A (en) * | 1983-06-10 | 1984-12-21 | Tobishima Kensetsu Kk | Treatment work for pile head |
GB2172842A (en) * | 1985-03-27 | 1986-10-01 | Onoda Cement Co Ltd | Method of trimming pile heads of cast-in-place concrete pilings |
Non-Patent Citations (5)
Title |
---|
PATENT ABSTRACTS OF JAPAN, Vol. 008, nº 028 (M-274) 07.02.1984 & JP 58185823 A (NIHON CEMENT K.K.) 29.10.1983, resumen; figuras. * |
PATENT ABSTRACTS OF JAPAN, Vol. 008, nº 028 (M-274) 07.02.1984 & JP 58-185823 A (NIHON CEMENT K.K.) 29.10.1983, resumen; figuras. \\ A 2,3 * |
PATENT ABSTRACTS OF JAPAN, Vol. 009, nº 103 (M-377) 08.05.1985 & JP 59228522 A (SUMITOMO CEMENT CO. et al.) 21.12.1984, resumen; figuras. * |
PATENT ABSTRACTS OF JAPAN, Vol. 009, nº 103 (M-377) 08.05.1985 & JP 59228523 A (SUMITOMO CEMENT CO. et al.) 21.12.1984, resumen; figuras. * |
PATENT ABSTRACTS OF JAPAN, Vol. 009, nº 103 (M-377) 08.05.1985 & JP 59-228523 A (SUMITOMO CEMENT CO. et al.) 21.12.1984, resumen; figuras. \\ Y 2,3\\ A 6 * |
Also Published As
Publication number | Publication date |
---|---|
ES2214107B1 (en) | 2005-11-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1738031B1 (en) | Hydraulic pile cap removal | |
CN111851484B (en) | Method for cutting off semi-invasive prestressed anchor cable in supporting pile by rotary drilling rig | |
KR101676814B1 (en) | CFT pile Construction Method and the Shoring Method using the same file | |
JP2007177517A (en) | Earth anchor method | |
US5836124A (en) | Foundation tube for use as a foundation for masts, posts, pillars, etc. | |
KR100803921B1 (en) | Pit working method forr undergrund floor railroad operation of elevator | |
ES2214107B1 (en) | PILOT HEADING SYSTEM AND DISPLAY ELEMENTS. | |
ES2198284T3 (en) | METHOD FOR BUILDING A WATER INSULATION WALL THAT INCREASES SEALING AND FLUENCE LINE. | |
JP5674582B2 (en) | Cast-in-place concrete pile construction method and concrete recovery equipment | |
CN109914444B (en) | Slope supporting mechanism and construction method thereof | |
KR101065330B1 (en) | Construction method for geothermal heat exchanger | |
JP6322490B2 (en) | Pile head treatment method for severing material and site-built pile | |
KR20220130560A (en) | Tunnel construction method and tunnel supporting structure | |
KR100567853B1 (en) | Structure for retaining wall | |
JP2000034731A (en) | Wood fence | |
RU2209268C1 (en) | Process of development of foundation pit | |
JPH09291530A (en) | Method for erecting column | |
KR102529410B1 (en) | Geothermal hole formation method of open-type geothermal heat pump system for installation in building underground space | |
AU2018100163A4 (en) | Reusable Below Ground Post Support | |
JP4177889B2 (en) | Pile head treatment tool for construction pillar and construction method of construction pillar with pile head treatment | |
JPS601451B2 (en) | Water stop mountain stop wall construction method using Benoto pile excavator | |
JP2009121218A (en) | Pile head separating method | |
JPS6122688B2 (en) | ||
ES2633749B2 (en) | Construction procedure of vertical wells with inner lining | |
KR101867340B1 (en) | Earth anchor assembly for soft ground |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EC2A | Search report published |
Date of ref document: 20040901 Kind code of ref document: A1 |
|
FG2A | Definitive protection |
Ref document number: 2214107B1 Country of ref document: ES |
|
FD2A | Announcement of lapse in spain |
Effective date: 20220826 |