ES215328A1 - Procedure and device for the training of pilot feet or stacas (Machine-translation by Google Translate, not legally binding)
- Google Patents
Procedure and device for the training of pilot feet or stacas (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOCHSTRASSER HEINRICH R
Original Assignee
HOCHSTRASSER HEINRICH R
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOCHSTRASSER HEINRICH RfiledCriticalHOCHSTRASSER HEINRICH R
Priority to ES0215328ApriorityCriticalpatent/ES215328A1/en
Publication of ES215328A1publicationCriticalpatent/ES215328A1/en
Procedure for the formation of feet of piles or stakes for concrete piles that have to be formed in the earth inside the perforation tubes, characterized in that in the tube previously inserted up to the length of the pile that is to be formed in the ground and if the soil is emptied, preferably in a perforating tube, a flat solid body is introduced in advance from below, in the form of a plate or as a preferential form, and which forms the closure of the foot, on which body to form the base of the pile is compacted concrete the tube down high air pressure. (Machine-translation by Google Translate, not legally binding)
ES0215328A1954-05-121954-05-12Procedure and device for the training of pilot feet or stacas (Machine-translation by Google Translate, not legally binding)
ExpiredES215328A1
(en)
Procedure for the deepening of funds before springs and walls of shores of maritime works. (Machine-translation by Google Translate, not legally binding)
Procedure and device for the extraction of the pison body in the construction of pilots for foundations on pilots. (Machine-translation by Google Translate, not legally binding)
Procedure for the manufacture of a foundation pilot with concrete coating on the ground. (Machine-translation by Google Translate, not legally binding)