EP4500566A1 - Verfahren zur betätigung eines laststufenschalters sowie laststufenschaltervorrichtung - Google Patents
Verfahren zur betätigung eines laststufenschalters sowie laststufenschaltervorrichtungInfo
- Publication number
- EP4500566A1 EP4500566A1 EP23735969.0A EP23735969A EP4500566A1 EP 4500566 A1 EP4500566 A1 EP 4500566A1 EP 23735969 A EP23735969 A EP 23735969A EP 4500566 A1 EP4500566 A1 EP 4500566A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- control device
- load tap
- current
- tap changer
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H9/00—Details of switching devices, not covered by groups H01H1/00 - H01H7/00
- H01H9/0005—Tap change devices
- H01H9/0038—Tap change devices making use of vacuum switches
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H9/00—Details of switching devices, not covered by groups H01H1/00 - H01H7/00
- H01H9/54—Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere
- H01H9/56—Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere for ensuring operation of the switch at a predetermined point in the AC cycle
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H9/00—Details of switching devices, not covered by groups H01H1/00 - H01H7/00
- H01H9/0005—Tap change devices
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H9/00—Details of switching devices, not covered by groups H01H1/00 - H01H7/00
- H01H9/0005—Tap change devices
- H01H2009/0061—Monitoring tap change switching devices
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H9/00—Details of switching devices, not covered by groups H01H1/00 - H01H7/00
- H01H9/54—Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere
- H01H9/56—Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere for ensuring operation of the switch at a predetermined point in the AC cycle
- H01H2009/566—Circuit arrangements not adapted to a particular application of the switching device and for which no provision exists elsewhere for ensuring operation of the switch at a predetermined point in the AC cycle with self learning, e.g. measured delay is used in later actuations
Definitions
- the invention relates to a method for operating an on-load tap changer and an on-load tap changer device.
- switches there are a variety of switches in substations for different tasks and with different requirements. In order to operate the respective switches, they must be driven via a drive system. These switches include, among other things, on-load tap changers, diverter switches, selectors, double turners, turners, preselectors, circuit breakers, load switches or disconnectors.
- on-load tap changers are used for uninterrupted switching between different winding taps of an electrical equipment, such as a power transformer. This allows, for example, the transformation ratio of the transformer or the inductance of the choke to be changed.
- On-load tap changers are usually operated using a combination of motor drive and spring energy storage. Actuation takes place immediately after the switching command, i.e. at any time. The occurrence of inrush is ignored here.
- the invention proposes a method for actuating an on-load tap changer by means of a drive, a sensor and a control device, comprising the following steps: receiving a switching command for actuating the on-load tap changer by the control device;
- the method is based on the idea of monitoring the current flow within the tap transformer, on-load tap changer or vacuum interrupter, before or after a switching command and detecting any inrush that occurs before the on-load tap changer is actually actuated.
- the distances between the current zero crossings are then determined based on the current zero crossings determined in the past or after the switching command.
- a characteristic value derived from these distances is compared with a limit value. If the limit value is adhered to, inrush can be ruled out so that the actuation can be carried out safely and reliably. However, if an inrush occurs before or after the switching command, the operation is canceled or paused. Inrush in the sense of the invention is to be understood as the occurrence of irregularities in the current flow.
- the actuation of the on-load tap changer is not started immediately, but rather the past current curve or the current curve after the switching command is checked for irregularities. The actual actuation only takes place when no irregularities have been detected.
- the current flow can be recorded in any way.
- the current curve is recorded via one or more sensors on the tap transformer or on-load tap changer and transmitted to the control device.
- the recorded current curve is processed in the control device, evaluated and several successive points in time in the current curve are determined.
- the times are current zero crossings.
- at least three consecutive times at which the current is zero are determined.
- the starting time is determined in the course of the current.
- the past current profile is determined by the starting time or the future current profile is determined by the starting time.
- the past current curve before the start time is either already stored in the control device or is saved after the start time.
- several distances between the several successive times of the current zero crossings are determined by means of a control device. For three points in time, two distances are determined. In particular, the distance between the first and the second time and the distance between the second and the third time are determined.
- a parameter is determined from the several distances using a control device.
- the parameter can be a ratio, average, etc.
- the characteristic value is compared with a limit value using a control device.
- the limit value is stored in the control device. The limit can be adjusted manually or automatically.
- the on-load tap changer is actuated by activating the drive using a control device if the parameter meets or falls below the limit value.
- the actual actuation is paused or aborted if the characteristic value exceeds the limit value. Pausing or suspending the operation can take, for example, several seconds, for example 1 to 10 seconds. After pausing, the current curve is recorded again and the process is repeated until an operation is possible.
- an on-load tap changer device comprising: an on-load tap changer; a sensor; a drive; a control device; wherein the control device is set up and designed to receive a switching command for actuating the on-load tap changer; to record a current curve via the sensor; to determine several consecutive times for current zero crossings of the current curve; to determine several intervals between the times of current zero crossings; to derive a parameter from the several distances; to compare the parameter with a limit value; to cancel or pause the operation by the control device, if the parameter exceeds the limit value;
- the on-load tap changer is operated using the drive if the parameter is within or below the limit value.
- the on-load tap changer device has an on-load tap changer with a diverter switch and a selector.
- the diverter switch has at least one vacuum interrupter.
- the on-load tap changer device has a drive, a sensor and a control device.
- the on-load tap changer device makes it possible to check the current flow before actuating the on-load tap changer and thus ensure safe operation when inrush occurs.
- the control device is designed and set up to detect, store and process a current curve via a sensor or several sensors permanently during operation of the step transformer, i.e. before a switching command. For this purpose, it has a corresponding computing unit and/or a processor and/or a memory.
- the control device is designed and set up to detect, store and process a current curve via one or more sensors after a switching command. For this purpose, it has a corresponding computing unit and/or a processor and/or a memory.
- control device is designed and set up to control the drive, which in turn operates the on-load tap changer.
- Figure 1 shows a step transformer with an on-load tap changer
- Figure 2 shows a process sequence
- FIG. 3 is a diagram to explain the method
- Figure 4 shows another diagram of a further embodiment to explain the method.
- FIG. 1 shows an on-load tap changer device 1.
- the on-load tap changer device 1 comprises a control device 2, at least one sensor 5 and an on-load tap changer 4.
- the control device 2 is connected to a drive 3 of the on-load tap changer 4.
- the control device 2 is set up and designed to control the drive 3 so that it operates the on-load tap changer 4.
- the control device 2 is connected to a sensor 5 or several sensors 5, which measures a current that passes through the Step transformer 7, a vacuum interrupter 6 or the on-load tap changer 4 flows.
- the control device 2 is designed and set up to detect, measure and evaluate the current detected by the sensor 5 or the sensors 5. In particular, the control device 2 determines the current curve, i.e. when the current has or assumes the value zero and at what frequency this happens.
- the sensor 5 can be arranged, for example, on the step transformer 7, in particular on the high-voltage side 8 or the low-voltage side 9. Furthermore, a sensor 5 can be arranged in the on-load tap changer 4, directly on the vacuum interrupter 6 or at any other position that is suitable for detecting the course of the current.
- the control device 2 records the current curve permanently before an actuation or only when a switching command has been received in the control device 2.
- the control unit 2 accordingly has a computing unit and/or a processor and/or a memory.
- the drive 3 is mechanically connected to the on-load tap changer 4 and thus also to the vacuum interrupter 6 via a drive train 10.
- the drive is set up and designed to operate the on-load tap changer or to execute the switching command from the control unit.
- the control device 2 can be arranged as an independent device on the step transformer 7 or in a control room. Furthermore, the control device 2 can be designed as part of a drive control of the on-load tap changer 4 or as part of a voltage regulator. The control device 2 is designed and set up to control the drive 3.
- the step transformer 7 has a main winding 11 and a control winding 12.
- the on-load tap changer 4 is connected to the control winding 12 via the winding taps 13.
- the main winding 11 and the control winding 12 are arranged on the high-voltage side 8 (in rare cases also on the low-voltage side).
- the step transformer 7 has an undervoltage winding 14, which is inductively coupled to the main winding 11 and the control winding 12.
- Figure 2 shows a flowchart of a method for operating an on-load tap changer.
- “before an on-load tap changer is actuated” means that the detection of irregular current curves can take place before a switching command or even after a switching command. Before a switching command, the connection is drive is carried out permanently during operation. If an irregularity is already detected here, the operation is aborted immediately after the switching command or it is paused for a specified time and the process is run again until an operation can be carried out.
- the control device 2 receives a switching command at a starting time TO for actuating the on-load tap changer 4.
- the switching command can either be a manual switching command or also come from a voltage regulator.
- a current curve is recorded via a sensor 5 and transmitted to the control device.
- the current curve can be recorded both after the switching command and before the switching command.
- a next step 32 several successive times T1, T2, T3, Tx with current zero crossings of the current curve 20 are determined by the control device.
- T1, T2, T3, Tx are determined by the control device.
- the newly recorded current curve or the current curve before the switching command is used.
- the distances A1, A2, Ax are determined based on the times T1, T2, T3, Tx of the current zero crossings.
- a characteristic value K is formed based on the distances A1, A2, Ax.
- a next step 35 the determined characteristic value K is compared with a limit value G. If the limit value G is maintained or undershot by the characteristic value K, the actual actuation of the on-load tap changer 4 takes place in the next step 36. For this purpose, the control device 2 controls the drive 3 accordingly.
- the actuation is aborted in a next step 37.
- the limit value G is exceeded in the next step 38, the actuation can be paused for a certain time and the process can be started again.
- FIG. 3 serves to illustrate the method according to the invention.
- the current curve t over time (in ms) within a step transformer is shown on the X axis.
- the Y-axis shows the level of the current I in amperes.
- the course of the current or the course of the current is sinusoidal or approximately sinusoidal.
- the curve of the current profile 20 intersects the X-axis in the current zero crossings. This means that flows at these times T1, T2, T3, Tx no current through the tap transformer and the vacuum interrupter 6 or the on-load tap changer 4.
- a switching command for actuating or beginning to actuate the on-load tap changer 4 is received in the control unit 2.
- This time is assumed to be the possible starting time TO of a load switchover. Starting from this starting time TO, at least three next times T1, T2 and T3 of the next current zero crossings are determined.
- the distances A1 and A2 between the determined times T1, T2, T3 are determined. Specifically, the first distance A1 between the first and the second times T1, T2 and the second distance A2 between the second and the third times T2 and T3 are determined. The distances A1 and A2 indicate how much time has passed between the points in time.
- a parameter K is determined based on the sections A1, A2, Ax. For example, the sections A1 and A2 or all of the determined sections can be placed in a relationship to one another. Ideally, for example, A1 and A2 are the same size and the ratio is therefore one.
- the parameter K it is compared with a limit value G. If the parameter K exceeds the limit value G, the operation is aborted or paused. Pausing means that the circuit is suspended for a defined time and the procedure is then carried out again. If the limit value is maintained or fallen below, the on-load tap changer is actuated by means of the drive, which is controlled by the control device.
- the current curve is carried out based on three times T1, T2, T3, i.e. three current zero crossings.
- T1, T2, T3 i.e. three current zero crossings.
- the way in which a characteristic value K is determined and how the limit value G is defined can also be adjusted as desired.
- Figure 4 serves to illustrate the method according to the invention according to a further embodiment.
- the current curve t over time (in ms) within a step transformer is shown on the X axis.
- the Y-axis shows the level of the current I in amperes.
- the course of the current or the course of the current is sinusoidal or approximately sinusoidal.
- the curve of the current curve intersects the X-axis with the current zero crossing corridors. This means that no current flows through the tap transformer and the vacuum interrupter 6 or the on-load tap changer 4 at these times T1, T2, T3, Tx.
- a switching command for actuation or the start of actuation of the on-load tap changer 4 is received in the control unit 2 .
- This time is assumed to be the start time TO of a load changeover. Starting from this starting time TO, at least three times T1, T2 and T3 of the past current zero crossings are determined, i.e. before the starting time TO. This is possible because the current curve was already monitored and recorded before the switching command.
- the distances A1 and A2 between the determined times T1, T2, T3 are determined. Specifically, the first distance A1 between the first and the second times T1, T2 and the second distance A2 between the second and the third times T2 and T3 are determined. The distances A1 and A2 indicate how much time has passed between the points in time.
- a parameter K is determined based on the sections A1, A2, Ax. For example, the sections A1 and A2 or all of the determined sections can be placed in a relationship to one another. Ideally, for example, A1 and A2 are the same size and the ratio is therefore one.
- the parameter K it is compared with a limit value G. If the parameter K exceeds the limit value G, the operation is aborted or paused. Pausing means that the circuit is suspended for a defined time and the procedure is then carried out again. If the limit value is maintained or fallen below, the on-load tap changer is actuated by means of the drive, which is controlled by the control device.
- the current curve is carried out based on three times T1, T2, T3, i.e. three current zero crossings.
- T1, T2, T3 i.e. three current zero crossings.
- the way in which a characteristic value K is determined and how the limit value G is defined can also be adjusted as desired.
- the method makes it possible to check the current curve for irregularities before a switching command and also immediately afterwards.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Control Of Electrical Variables (AREA)
- Protection Of Transformers (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102022117587.1A DE102022117587A1 (de) | 2022-07-14 | 2022-07-14 | Verfahren zur Betätigung eines Laststufenschalters sowie Laststufenschaltervorrichtung |
| PCT/EP2023/066605 WO2024012813A1 (de) | 2022-07-14 | 2023-06-20 | Verfahren zur betätigung eines laststufenschalters sowie laststufenschaltervorrichtung |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP4500566A1 true EP4500566A1 (de) | 2025-02-05 |
| EP4500566C0 EP4500566C0 (de) | 2025-12-17 |
| EP4500566B1 EP4500566B1 (de) | 2025-12-17 |
Family
ID=87067097
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP23735969.0A Active EP4500566B1 (de) | 2022-07-14 | 2023-06-20 | Verfahren zur betätigung eines laststufenschalters sowie laststufenschaltervorrichtung |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20250336622A1 (de) |
| EP (1) | EP4500566B1 (de) |
| JP (1) | JP2025522009A (de) |
| KR (1) | KR20250036742A (de) |
| CN (1) | CN119422219A (de) |
| DE (1) | DE102022117587A1 (de) |
| WO (1) | WO2024012813A1 (de) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4730372A1 (de) * | 2024-10-18 | 2026-04-22 | Maschinenfabrik Reinhausen GmbH | Laststufenschalter für ein elektrisches netz |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE870454C (de) * | 1942-11-17 | 1953-03-12 | Siemens Ag | Synchron in Abhaengigkeit von der Spannung unter Last arbeitende Stufenregeleinrichtung fuer Transformatoren oder Drosseln |
| US3735243A (en) * | 1972-04-03 | 1973-05-22 | Gen Electric | Control system for tap changer with vacuum interrupter |
| DE19530776C1 (de) * | 1995-08-22 | 1996-12-12 | Reinhausen Maschf Scheubeck | Verfahren zur Überwachung eines Lastumschalters für einen Stufenschalter |
| GB2435943A (en) * | 2006-03-08 | 2007-09-12 | Areva T & D Sa | Hybrid on-load tap changer |
| DE102015225314A1 (de) * | 2015-12-15 | 2017-06-22 | Siemens Aktiengesellschaft | Regelbarer Ortsnetztransformator |
-
2022
- 2022-07-14 DE DE102022117587.1A patent/DE102022117587A1/de active Pending
-
2023
- 2023-06-20 KR KR1020247043335A patent/KR20250036742A/ko active Pending
- 2023-06-20 JP JP2025500941A patent/JP2025522009A/ja active Pending
- 2023-06-20 WO PCT/EP2023/066605 patent/WO2024012813A1/de not_active Ceased
- 2023-06-20 CN CN202380046085.4A patent/CN119422219A/zh active Pending
- 2023-06-20 US US18/871,501 patent/US20250336622A1/en active Pending
- 2023-06-20 EP EP23735969.0A patent/EP4500566B1/de active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2025522009A (ja) | 2025-07-10 |
| WO2024012813A1 (de) | 2024-01-18 |
| EP4500566C0 (de) | 2025-12-17 |
| KR20250036742A (ko) | 2025-03-14 |
| EP4500566B1 (de) | 2025-12-17 |
| CN119422219A (zh) | 2025-02-11 |
| DE102022117587A1 (de) | 2024-01-25 |
| US20250336622A1 (en) | 2025-10-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DE60125579T2 (de) | Kontaktlose stromversorgungseinrichtung und abzweigdose zur verwendung dafür | |
| DE102012107446B4 (de) | Lastumschalter, Laststufenschalter und Verfahren zum Umschalten eines Laststufenschalters | |
| EP4500566B1 (de) | Verfahren zur betätigung eines laststufenschalters sowie laststufenschaltervorrichtung | |
| EP2981979B1 (de) | Verfahren zur durchführung eines umschaltvorgangs in einem laststufenschalter | |
| EP3963619B1 (de) | Verfahren zum durchführen einer umschaltung von mindestens zwei schaltmitteln eines betriebsmittels und antriebssystem für mindestens zwei schaltmittel in einem betriebsmittel | |
| EP3963618A1 (de) | Verfahren zum durchführen einer umschaltung von mindestens einem schaltmittel eines betriebsmittels und antriebssystem für mindestens ein schaltmittel eines betriebsmittels | |
| EP3365906B1 (de) | Regelbarer ortsnetztransformator | |
| EP3262664B1 (de) | Verfahren zum ändern der aktiven windungszahl einer regelwicklung in einer elektrischen anlage und elektrische anlage mit einer regelwicklung | |
| AT412635B (de) | Schaltung zum stellen und überwachen einer weiche mit mehreren drehstrom-weichenantrieben | |
| AT501582B1 (de) | Verfahren zur regelung der elektrischen spannung in elektrischen versorgungsnetzen sowie einrichtung zur durchführung des verfahrens | |
| CH701585B1 (de) | Verfahren zum Nachstellen einer Löschspule. | |
| DE102012103735A1 (de) | Erdschluss-System | |
| DE69928393T2 (de) | Verfahren zur Steuerung des Betriebs eines Schaltgeräts | |
| EP4500567B1 (de) | Verfahren zur betätigung eines laststufenschalters sowie laststufenschaltervorrichtung | |
| DE102020116684B4 (de) | Verfahren zum Schalten eines elektrischen Verbrauchers, Verwendung eines Testsignals zur Detektion einer Stellung eines elektrischen Schalters, Detektionsanordnung, Schalteinrichtung und korrespondierende Schaltanordnung | |
| DE102019112713A1 (de) | Schalteranordnung und verfahren zum sicheren betrieb einer schalteranordnung | |
| WO2025124755A1 (de) | Verfahren zur überwachung einer umschaltung eines laststufenschalters mittels antriebseinheit und antriebseinheit | |
| EP4333010A1 (de) | Verfahren zum einschalten eines relais zum bewirken eines minimalen einschaltstroms | |
| WO2020148326A1 (de) | Filtervorrichtung für ein energienetz, filternetzwerk und verfahren zum betrieb einer filtervorrichtung | |
| WO2023217517A1 (de) | Verfahren und vorrichtung zum ändern eines übersetzungsverhältnisses, einer impedanz oder einer zur erregung verwendeten spannung | |
| WO2025016693A1 (de) | Verfahren zum betätigen einer laststufenschaltervorrichtung und laststufenschaltervorrichtung | |
| WO2022161678A1 (de) | Anlage zur induktiven übertragung elektrischer leistung und verfahren zum betreiben einer anlage | |
| DE19808595A1 (de) | Anordnung mit einem elektrischen Verbraucher in Reihe mit zwei steuerbaren Halbleiteranordnungen | |
| EP0138744A2 (de) | Verfahren zur Abschaltung eines Dreiphasensystems im Kurzschlussfall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20241029 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| INTG | Intention to grant announced |
Effective date: 20250929 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: F10 Free format text: ST27 STATUS EVENT CODE: U-0-0-F10-F00 (AS PROVIDED BY THE NATIONAL OFFICE) Effective date: 20251217 Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502023002529 Country of ref document: DE |
|
| U01 | Request for unitary effect filed |
Effective date: 20260108 |
|
| U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT RO SE SI Effective date: 20260115 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260317 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20251217 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20260317 |