EP4121985A1 - System and method for continous diagnostics of railway infrastructure - Google Patents

System and method for continous diagnostics of railway infrastructure

Info

Publication number
EP4121985A1
EP4121985A1 EP20828119.6A EP20828119A EP4121985A1 EP 4121985 A1 EP4121985 A1 EP 4121985A1 EP 20828119 A EP20828119 A EP 20828119A EP 4121985 A1 EP4121985 A1 EP 4121985A1
Authority
EP
European Patent Office
Prior art keywords
rail
control device
monitoring data
monitoring
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP20828119.6A
Other languages
German (de)
English (en)
French (fr)
Inventor
Laura MALATESTA
Andrea PIRAN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Thermit Italiana SRL
Original Assignee
Thermit Italiana SRL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thermit Italiana SRL filed Critical Thermit Italiana SRL
Publication of EP4121985A1 publication Critical patent/EP4121985A1/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/40Maintenance of things
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or train
    • B61L1/02Electric devices associated with track, e.g. rail contacts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L23/00Control, warning or like safety means along the route or between vehicles or trains
    • B61L23/04Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
    • B61L23/042Track changes detection
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/50Trackside diagnosis or maintenance, e.g. software upgrades
    • B61L27/53Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N29/00Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
    • G01N29/04Analysing solids
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N29/00Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object
    • G01N29/14Investigating or analysing materials by the use of ultrasonic, sonic or infrasonic waves; Visualisation of the interior of objects by transmitting ultrasonic or sonic waves through the object using acoustic emission techniques
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry
    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16YINFORMATION AND COMMUNICATION TECHNOLOGY SPECIALLY ADAPTED FOR THE INTERNET OF THINGS [IoT]
    • G16Y40/00IoT characterised by the purpose of the information processing
    • G16Y40/10Detection; Monitoring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/02Indexing codes associated with the analysed material
    • G01N2291/025Change of phase or condition
    • G01N2291/0258Structural degradation, e.g. fatigue of composites, ageing of oils
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2291/00Indexing codes associated with group G01N29/00
    • G01N2291/26Scanned objects
    • G01N2291/262Linear objects
    • G01N2291/2623Rails; Railroads

Definitions

  • the present invention relates to a system and a method for continuous diagnostics of the railway infrastructure.
  • Railway infrastructure means the structure defined by two side-by-side rails defining a track which in turn defines a route for a railway locomotion
  • the rails are defined by a number of elements (straight, curved and the like) welded together.
  • the rails thus defined are subject to a number of potentially harmful events during the year.
  • cyclic control systems are known such as, for example, the use of 0 a diagnostic train, i.e., a railway locomotion means configured to measure the tracks in order to verify the status and integrity thereof, or for example the cyclical intervention of technicians who can use measurement means which allow to evaluate the extent of the possible defect.
  • one of the problems emerging from the prior art is a discontinuous control which can lead to both mild and disastrous events of a completely undesirable nature in the interval which occurs between one check and the other.
  • the technical task of the present invention is therefore to provide a system and a method for continuous diagnostics of the railway infrastructure which are able to overcome the drawbacks arisen from the known art mentioned above.
  • the object of the present invention is therefore to provide a system and a method for continuous diagnosis of the railway infrastructure which allow to obtain an accurate and effective diagnosis about the conditions of the railway infrastructure.
  • a further object of the present invention is therefore to provide a system and a method for continuous diagnosis of the railway infrastructure which allow to precisely identify where an anomaly is present.
  • an object of the present invention is to provide a system and a method for continuous diagnostics of the railway infrastructure which allow to improve the safety of the railway infrastructure.
  • the specified technical task and the specified aims are substantially achieved by a method and a system for continuous diagnostics of the railway infrastructure, comprising the technical specifications set out in one or more of the appended claims.
  • the dependent claims correspond to possible embodiments of the invention.
  • the present invention includes providing a system for continuous diagnostics of the railway infrastructure comprising at least one control device of the rail, installed on the rail itself and configured for continuous monitoring of the rail, at least one peripheral unit, installed in a peripheral area of the rail, communicating with the control device and configured to send monitoring data obtained from the control device and a processing unit configured to receive the monitoring data from the peripheral unit and to analyse the data in real time so as to obtain a status condition of the rail pertaining to the at least one control device and to communicate it to an operator or other user dealing with the maintenance of the rail.
  • the present invention provides a method for continuous diagnostics of the railway infrastructure, preferably using a system as above, comprising the steps of:
  • Figure 1 is a schematic representation of a system which forms the object of the present invention
  • Figure 2 is a schematic representation of an operation of a component of the system of figure 1 ;
  • railway infrastructure “F” means the structure defined by two side-by-side rails “R” defining a track which in turn defines a route for a railway locomotion means.
  • the rails “R” are defined by a number of elements (straight, curved and the like) welded together (the term elements may be understood as beams or other elements used to make the rail “R”).
  • the system 1 comprises at least one control device 2 of the rail “R”, at least one peripheral unit 3 installed in a peripheral area to the rail “R” and a processing unit 4.
  • the at least one control device 2 is configured for the continuous monitoring of the rail “R”.
  • the control device 2 is configured to obtain monitoring data pertaining to the rail “R” on which it is installed.
  • the control device 2 is configured for the diagnostics of a point of the track (in particular the rail “R”) and interfaces with the rail “R” (i.e. , one or more of the elements defining the rail “R”) by means of the aid of a sensor.
  • the control device 2 comprises a sensor, preferably of the passive ultrasonic type, to detect the possible presence of defects or cracks in the rail “R” (or in the specific section of rail “R”).
  • the control device 2 may be configured to monitor the rail “R” near a portion of the rail “R” pertaining to an installation point of the control device 2 on the rail “R”.
  • control device 2 is installed near a respective junction point of the rail “R” or a welding point of the rail “R”.
  • control device 2 is configured to perform a “short range” type diagnostic.
  • SR short range
  • the control device 2 can be configured to monitor a portion of rail “R” between two welding points of rail “R” defining a span “C” of rail “R” itself. Therefore, the control device 2 is configured to perform a “long range” type diagnostic. Since the span “C” can also be several tens of meters long and therefore defines an area between two joints of the rail “R”, the control device 2 is therefore configured to work at such distances. In figure 2, the entire extension of the span “C” is indicated as a “long range” diagnostic area, but it should be underlined that this area can also be represented by reduced intervals comprised in the span “C”. For example, a reduced range of the span “C” can be understood as a diagnostic range which does not take into account portions already diagnosed by the “short range” type diagnostic and schematically identified in figure 2 with the symbol “C1”.
  • control device 2 defines a distance between the control device 2 itself and any defect (if present). Thereby, among the monitoring data there are also spatial data related to where to identify the crack (or other defect) along the entire length of the span “C” with respect to where the control device 2 is located.
  • the control device 2 can also perform “short range” type diagnostics and “long range” type diagnostics simultaneously.
  • control device 2 is configured to perform a continuous diagnostic check of the critical points of the rail “R” (i.e. , of the railway infrastructure “F”).
  • critical points refers to those areas of the rail “R” which suffer continuous stresses due to external events such as the passage of trains or other railway vehicles or the increase in heat with the consequent expansion of the rail “R” itself.
  • the system 1 comprises a plurality of control devices 2 for each welding point of the rail “R”.
  • Each control device 2 is configured to send respective rail “R” monitoring data pertaining to a section of rail “R” under the competence of the control device 2.
  • each control device 2 is configured to perform a “short range” and/or “long range” type diagnostic pertaining to elements aligned with each other and joined to define the rail “R”.
  • control devices 2 are able to communicate with each other so as to precisely identify where the possible defects of the rail “R” (cracks and the like) are located.
  • two control devices 2 located at the ends of the same element i.e., at the respective junction/welding points
  • the defect is in the middle of the two control devices 2 (i.e., in the middle of the span “C”), for example, both control devices 2 would simultaneously send a datum related to the defect indicating the location thereof precisely and unequivocally.
  • the control device 2 may be provided with means for self-feeding the same.
  • the control device 2 can be equipped with energy harvesting systems which define accumulators which exploit, for example, the vibrations of the rails “R” and/or temperature changes to obtain energy and/or other energy storage systems.
  • control device 2 can be placed in communication with a user interface device so as to perform calibrations, data analysis and any reconfigurations.
  • the system 1 is equipped with control devices 2 for each rail “R” defining the track.
  • the at least one peripheral unit 3 communicates with the at least one control device 2 and is configured to send monitoring data obtained from the control device 2.
  • the peripheral unit 3 is configured to collect monitoring data from the control devices 2. Furthermore, the peripheral unit 3 may be configured to pre-process data so as to send pre-processed data. Preferably, such pre-processing involves identifying the control device 2 from which the monitoring data has been sent and then adding name-type information about the control device 2 and spatial-type information about the positioning of any defect along the rail “R”. Such spatial and name association may also be performed on-site directly by the control device 2. Preferably, the peripheral unit 3 is configured to communicate with the central unit 4 and any other mobile devices (such as smartphones, tablets and the like).
  • the peripheral unit 3 may be provided with means for autonomous feeding of the power harvesting - power storage type.
  • the peripheral unit 3 may be provided with means for self-feeding 3a.
  • the peripheral unit 3 is equipped with solar cells for self-feeding the peripheral unit 3 itself.
  • the peripheral unit 3 may be physically made in the form of a cabinet which can be installed for any type of installation along the railway line.
  • the peripheral unit 3 may be installed on a pole arranged near the track defined by the rails “R”.
  • the at least one peripheral unit 3 is configured to communicate with a group of control devices 2 of the plurality of control devices 2 installed along the rail “R”.
  • the peripheral unit 3 is configured to receive and communicate the monitoring data of each control device 2 to the processing unit 4.
  • the system 1 preferably comprises a plurality of peripheral units 3 each configured to communicate with a respective group of control devices 2.
  • each peripheral unit 3 receives monitoring data pertaining to a section of rail “R”.
  • the processing unit 4 is configured to receive the monitoring data from the peripheral unit 3 and analyse it in real time. Thereby, the processing unit 4 is able to obtain a condition status of the rail pertaining to the at least one control device 2 and communicate it to an operator or other user dealing with the maintenance of the rail “R”.
  • processing unit 4 can be understood as a single electronic device, suitably programmed to perform the described functionalities, and/or the various modules which may correspond to hardware entities and/or software routines which are part of the programmed device. Alternatively or in addition, such functionalities may be performed by a plurality of electronic devices on which the aforesaid functional modules may be distributed.
  • processing unit 4 may use one or more processors for executing the instructions contained in the memory modules.
  • the processing unit 4 may comprise a continuous power supply, an AC/DC power supply, a modem (preferably of the 4G type) for communication, a switch for connection management, two redundant servers for availability and tasked with evaluating the overall status of the system 1 and/or of the railway infrastructure “F” and a user interface (i.e., a user interface device such as the screen of a PC or other similar device) to interact with one or more operators.
  • a user interface i.e., a user interface device such as the screen of a PC or other similar device
  • the processing unit 4 analyses the data and determines if and where a control device 2 has detected a problem.
  • the processing unit 4 may therefore be configured to analyse the monitoring data to identify whether a defect in the rail has been detected by the control device 2 and to assess an extent of the defect.
  • the processing unit When no damage or other problem is revealed, the processing unit will provide this information to the operator. For example, by means of the user interface device, the processing unit 4 will send a “green” alarm which identifies the absence of anomaly along the section of rail “R”. In other words, the processing unit 4 communicates a condition status identifying a rail “R” in good conditions.
  • the processing unit 4 will send a “yellow” alarm identifying a problem which requires scheduled maintenance. In other words, the processing unit 4 communicates a status condition identifying a rail “R” in non-optimal conditions for the correct circulation of vehicles.
  • the processing unit 4 will send a “red” type alarm which requires immediate maintenance. In other words, the processing unit 4 communicates a status condition identifying a rail “R” in dangerous/very dangerous conditions.
  • the processing unit 4 is configured to provide an identification number and a position of the peripheral unit 3 and the specific control device 2 so as to know where the problem occurred and where to intervene.
  • the processing unit 4 may also be configured to filter the monitoring data so as to distinguish a false alarm due to possible noise in the monitoring of the rail “R” by the control device 2.
  • the processing unit 4 is equipped with software and/or data filtering devices so as to isolate erroneous data which may lead to an unjustified report. For example, it is possible that the passage of a train can stress the sensors of the control devices 2 and cause an incorrect reading of the status of the rail “R” (i.e. , a diagnosis corrupted by the passage of the train) to occur and the processing unit 4 is therefore configured to prevent a false alarm from being signalled by analysing the received data in real time.
  • the processing unit 4 may be further configured to record the monitoring data so as to define an event database suitable for performing a predictive analysis to obtain a predictive status condition of the rail “R” pertaining to the at least one control device 2 and communicate it to the operator or other user dealing with the maintenance of the rail “R”.
  • the processing unit 4 is able to process the data obtained from the peripheral units 3 and to define the specific alarms of the analysis in real time as well as to record such data so as to know a history of data obtained from a specific control device 2 (or from a specific peripheral unit 3) and understand when it is possible that a type of damage/failure may occur again.
  • the at least one control device 2, the peripheral unit 3 and the processing unit 4 are equipped with a wireless communication system 5 for sending and/or receiving monitoring data.
  • the system 1 leverages a wireless communication protocol.
  • a type of optic fibre communication between the peripheral unit 3 and the processing unit 4 may also be used.
  • the communication in the system 1 is based on a hierarchical and asynchronous exchange between the control device 2, the peripheral unit 3 and the processing unit 4 unless justified, command-like exceptions direct the processing unit 4 to the control device 2.
  • the system 1 disclosed above allows to obtain a continuous and objective monitoring of the detection of the possible defect of the rail “R”.
  • the system 1 disclosed above allows to obtain a predictive diagnostics based on the analysis and processing of the monitoring data.
  • the system 1 is operated with any type of non-destructive sensors which allow the monitoring data to be obtained for the analysis.
  • the system 1 allows to obtain a diagnostic by means of non destructive controls.
  • the system 1 disclosed above allows to improve the safety of the railway infrastructure “F” with a detection of the defect before the breakage occurs.
  • the present invention also relates to a method for the continuous diagnostics of defects of the rails “R”.
  • the method may preferably be used with a system 1 according to one or more of the previously described embodiments.
  • the method which will be disclosed below may be understood as the execution of software integrated into a system 1 as described above.
  • the method comprises a first step of continuously monitoring a rail “R”.
  • monitoring data may be obtained by at least one control device 2 installed on the rail “R”.
  • This step is preferably performed by monitoring the rail “R” near at least one installation point of the at least one control device 2 (preferably a welding point of the rail “R”).
  • This step is preferably performed by monitoring at least a portion of rail between two welding (or junction) points of the rail “R” defining a span “C” of the rail “R” itself. Thereby, the monitoring step allows to define a distance between the at least one control device 2 and the defect, if present.
  • the monitoring step can be carried out by simultaneously monitoring both the span “C” and monitoring the portion near the installation points of the at least one control device 2.
  • the method further comprises sending the monitoring data of the at least one control device 2 to at least one peripheral unit 3.
  • the method comprises sending a plurality of monitoring data to the at least one control device 2 obtained by a group of control devices 2 associated with the peripheral unit 3.
  • the method further comprises sending the monitoring data from the at least one peripheral unit 3 to a processing unit 4.
  • the method comprises sending a plurality of monitoring data from a plurality of peripheral units 3 (associated with as many groups of control devices 2) to the processing unit 4.
  • the method involves analysing the monitoring data in real time by means of the processing unit 4 and obtaining a status condition of the monitored rail “R”.
  • the method further involves communicating the status condition to an operator or other user dealing with the maintenance of the rail “R”.
  • the method also comprises an intervention step on the rail “R”, if a defect of the rail “R” has been detected from the status condition, and a step of evaluating the extent of the defect.
  • the method involves sending a “green” alarm which identifies the absence of anomaly along the section of rail “R”. In other words, the method involves communicating a status condition identifying a rail “R” in good conditions.
  • the method involves sending a “yellow” alarm identifying a problem which requires scheduled maintenance.
  • the method involves communicating a status condition identifying a rail “R” in non-optimal conditions for the correct circulation of vehicles.
  • the method involves sending a “red” type alarm which requires immediate maintenance.
  • the method involves communicating a status condition identifying a rail “R” in dangerous/very dangerous conditions.
  • the method preferably further comprises a step of filtering the monitoring data so as to distinguish a false defect due to possible noise during the monitoring step of the rail “R”.
  • the method further comprises a step of recording the monitoring data, defining an event database related to the recorded monitoring data and a step of predictive analysis of the database to obtain a predictive status condition of the rail “R” related to the at least one control device 2 and communicate it to the operator or other user dealing with the maintenance of the rail “R”.
  • the steps of communicating the monitoring data occur by means of a wireless communication system 5.
  • the method described above allows to obtain a continuous and objective monitoring of the detection of the possible defect of the rail “R”.
  • the method described above allows to obtain a predictive diagnostic based on the analysis and processing of the monitoring data.
  • the method described above is operated with any type of non-destructive sensors which allow the monitoring data to be obtained for the analysis.
  • the method allows to obtain a diagnostic by non-destructive controls.
  • the method described above allows to improve the safety of the railway infrastructure “F” with a detection of the defect before the breakage occurs.
  • the present invention is therefore able to overcome the drawbacks arising from the prior art.
  • the present invention allows to obtain an accurate and effective diagnostic about the conditions of the railway infrastructure.
  • the present invention allows to precisely identify where an anomaly is present along the railway infrastructure “F”.
  • the present invention allows to improve the safety of the railway infrastructure “F”.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Mechanical Engineering (AREA)
  • Computing Systems (AREA)
  • Tourism & Hospitality (AREA)
  • Biochemistry (AREA)
  • Chemical & Material Sciences (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Acoustics & Sound (AREA)
  • General Business, Economics & Management (AREA)
  • Economics (AREA)
  • Analytical Chemistry (AREA)
  • Marketing (AREA)
  • Strategic Management (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Biomedical Technology (AREA)
  • Automation & Control Theory (AREA)
  • Primary Health Care (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
EP20828119.6A 2020-03-19 2020-12-02 System and method for continous diagnostics of railway infrastructure Pending EP4121985A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
IT102020000005797A IT202000005797A1 (it) 2020-03-19 2020-03-19 Sistema e metodo per la diagnostica continua dell’infrastruttura ferroviaria
PCT/IB2020/061353 WO2021186236A1 (en) 2020-03-19 2020-12-02 System and method for continous diagnostics of railway infrastructure

Publications (1)

Publication Number Publication Date
EP4121985A1 true EP4121985A1 (en) 2023-01-25

Family

ID=70978357

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20828119.6A Pending EP4121985A1 (en) 2020-03-19 2020-12-02 System and method for continous diagnostics of railway infrastructure

Country Status (3)

Country Link
EP (1) EP4121985A1 (it)
IT (1) IT202000005797A1 (it)
WO (1) WO2021186236A1 (it)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19826421C1 (de) * 1998-06-16 2000-03-09 Siemens Ag Verfahren und Vorrichtung zum Nachweis eines Defekts einer Führungsschiene
ITGE20130055A1 (it) * 2013-06-06 2014-12-07 Si Consulting S R L Apparato per la misura e la gestione della tensione meccanica della lunga rotaia saldata.
EP2862778B1 (en) * 2013-10-15 2017-01-04 Bayern Engineering GmbH & Co. KG Method for generating measurement results from sensor signals
WO2020002019A1 (en) * 2018-06-28 2020-01-02 Konux Gmbh Smart sensor data transmission in railway infrastructure

Also Published As

Publication number Publication date
WO2021186236A1 (en) 2021-09-23
IT202000005797A1 (it) 2021-09-19

Similar Documents

Publication Publication Date Title
CN109001649B (zh) 一种电源智能诊断系统及保护方法
EP1242923B1 (en) A process for the monitoring and diagnostics of data from a remote asset
KR101057047B1 (ko) 원격 디바이스를 감시 및 진단하기 위한 시스템
CN110360461B (zh) 压力管道监测系统、方法、装置和计算机可读存储介质
CN108848008B (zh) 一种变电站远动装置在线故障诊断方法
CN104090252B (zh) 一种电缆型故障指示器的综合检测系统和方法
CN115826563B (zh) 一种基于plc机柜的远程故障监测系统及方法
CN116824731A (zh) 一种火电厂智能巡检方法和设备
CN107643147A (zh) 一种蒸汽泄漏跟踪定位检测方法及装置
KR101448012B1 (ko) 스프링와셔 및 도체를 이용한 볼트 및 너트의 풀림 상태 검지 장치
CN109240253A (zh) 一种在线设备诊断及预防性维护方法及系统
EP4121985A1 (en) System and method for continous diagnostics of railway infrastructure
CN117221145A (zh) 基于物联网平台的设备故障预测性维护系统
CN116754022A (zh) 电缆隧道的在线检测应急预警方法及系统
JP2001084035A (ja) 運転監視システム
CN2854536Y (zh) 电缆测温在线智能巡检装置
KR101218012B1 (ko) 복합 신호 분석을 이용한 숏 브라스팅용 임펠러 모터 상태진단 장치 및 방법
JPH07128098A (ja) 計装設備遠隔診断システム
CN112445680A (zh) 一种数据中心机房服务器远程监测与检修系统和方法
JP2000079839A (ja) 衝撃計測装置
CN116597327B (zh) 基于无人机的水利设施隐患排查系统
EP4121984A1 (en) Control device for continuous diagnostics of railway infrastructure
CN112186893B (zh) 一种基于大数据分析的安防预警方法
KR102553444B1 (ko) 변전소 진단 시스템의 자동 시험 장치 및 자동 시험 방법
CN112163011B (zh) 一种基于电力数据的线路性能分析方法

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: UNKNOWN

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20220808

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230513

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20240304