EP3943671A1 - Method and system of dredging of a channel or duct - Google Patents

Method and system of dredging of a channel or duct Download PDF

Info

Publication number
EP3943671A1
EP3943671A1 EP21187029.0A EP21187029A EP3943671A1 EP 3943671 A1 EP3943671 A1 EP 3943671A1 EP 21187029 A EP21187029 A EP 21187029A EP 3943671 A1 EP3943671 A1 EP 3943671A1
Authority
EP
European Patent Office
Prior art keywords
duct
section
container
winch
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP21187029.0A
Other languages
German (de)
French (fr)
Other versions
EP3943671B1 (en
Inventor
Roberto DORIA
Paolo Pacifico DORIA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Trattamenti Ecologici Doria Srl
Original Assignee
Trattamenti Ecologici Doria Srl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Trattamenti Ecologici Doria Srl filed Critical Trattamenti Ecologici Doria Srl
Priority to RS20230885A priority Critical patent/RS64761B1/en
Priority to HRP20231198TT priority patent/HRP20231198T1/en
Priority to SI202130067T priority patent/SI3943671T1/en
Publication of EP3943671A1 publication Critical patent/EP3943671A1/en
Application granted granted Critical
Publication of EP3943671B1 publication Critical patent/EP3943671B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/04Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
    • B08B9/043Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes
    • B08B9/0436Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes provided with mechanical cleaning tools, e.g. scrapers, with or without additional fluid jets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/88Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
    • E02F3/90Component parts, e.g. arrangement or adaptation of pumps
    • E02F3/92Digging elements, e.g. suction heads
    • E02F3/9243Passive suction heads with no mechanical cutting means
    • E02F3/925Passive suction heads with no mechanical cutting means with jets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • E02F5/285Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways with drag buckets or scraper plates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F9/00Arrangements or fixed installations methods or devices for cleaning or clearing sewer pipes, e.g. by flushing
    • E03F9/002Cleaning sewer pipes by mechanical means

Definitions

  • the present invention relates to a method and system of dredging a channel or duct, for example underground, such as a channel belonging to a sewage system, or drains, spillways, etc....
  • a first type provides for the insertion of water jet nozzles, as illustrated, for example, in patent application US20110308552 , which describes a first nozzle head inserted along the duct that sprays jets of water directly along the duct.
  • the first head is exchanged for a second head connected to a cable and is pulled back to the first position.
  • the nozzle is then pulled back to the second position by pulling the cable while the nozzles directed along the pipe towards the second position push the solids forward to the second position for extraction.
  • a sediment collection container which is made to slide along the canal.
  • the operations are usually carried out by accessing the underground channel through pairs of inspection wells that delimit the section of channel to be cleaned. From the first of these wells, a sediment collection container hooked to a first holding cable is lowered into the duct, this container is towed into the duct in the direction of the second well by means of a second cable hooked to the container which is lowered from this second well. Once the container has travelled the full section of channel to be cleaned, it is removed from the second well and emptied into a special collection tank.
  • the container for sediment collection is generally shaped like a slide, and the cables are towed by special winches placed on the surface near these inspection wells.
  • This second modus operandi has the drawback that, having positioned the winches on the surface, the sliding of the towing and holding cables from the wells to the duct can be difficult, since they have to overcome an almost right angle formed between the axis of the well (usually substantially vertical) and that of the channel (usually almost horizontal or slightly inclined). This sliding is even more difficult when, during the dredging step, the container or slide loaded with sediment has to be towed and when this angle has to be overcome between the bottom of the well and the end of the section of the duct by the container.
  • the duct may be an underground duct and the inspection wells are vertical channels for access to the indicated section, or it may be an open duct such as a ditch or a canal that is difficult to access through banks that delimit it equivalent to inspection channels.
  • These means are arranged on the surface above the section of duct.
  • Each winch is connected with a cable C1 or C2 which at its free end (the one not engaged with the respective winch) is connected with a sediment collection container S sliding along the section of duct through these winches and which collects the sediments.
  • These machines M1 and M2 comprise means for moving the winches along the inspection channel or well and positioning them on the bottom of it substantially at the same level as the section of duct to be dredged. Such movement means are advantageously realised by means of a telescopic or articulated arm. Such machines are preferably excavators.
  • the sediment collection container is shaped like a slide or like a bucket provided with a mouth for the collection during the dragging of the sediments and a closed bottom to form a "bag".
  • the method and the system of the present invention are equally applicable in an environmental situation in which the first inspection channel well P1 is an open channel and allows a means to be brought to the level of the quote of the duct to be dredged ( fig. 3a ) or allows the first winch to be lowered more easily to the level of this duct ( fig. 3b ).
  • the method for removing or dredging a section of channel T according to the present invention accessible through at least a first P1 and a second P2 inspection channel which connect and delimit this section of duct to the surface S essentially comprises the steps of:
  • the dredging operations can be carried out in both directions (indifferently from P1 to P2 or from P2 to P1), in order to carry out a subsequent dredging operation it will be sufficient to rotate the container and lower again the winch that lifted the filled container (after it had been emptied) up to the level of the section of duct to be dredged, and tow the container in the opposite direction until it is near the other winch.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Cleaning In General (AREA)
  • Sewage (AREA)
  • Pipeline Systems (AREA)
  • Investigating Or Analyzing Materials By The Use Of Ultrasonic Waves (AREA)

Abstract

Dredging system of a conduit (T), accessible throughh at least a first (PI) and a second (P2) inspection channel or access passage, which connect and delimit this section of conduit to the surface (S), said system comprising machinery (M1,M2) for positioning a respective winch (A1, A2) along each inspection duct on the junction between each inspection well and said duct. These means are arranged on the surface above the section of duct and each winch is connected with a cable or rope (CI, C2) which at its free end is connected with a sediment collection container (S) sliding along the section of duct through these winches and which collects the sediments. These machines (M1, M2) comprise means for moving the winches along the inspection channel and positioning them on the bottom of it substantially at the same level as the section of duct to be dredged.

Description

  • The present invention relates to a method and system of dredging a channel or duct, for example underground, such as a channel belonging to a sewage system, or drains, spillways, etc....
  • It is well known that the municipal sewage networks, which comprise large channels, are in need of maintenance cleaning as a result of the continuous urban expansion and subsequent restorations of the road surface. In fact, often with the arrival of the increasingly heavy summer rains, the central municipal sewers fail to cope with the flow of water, causing flooding and backflow into people's homes.
  • It is therefore necessary to clean these medium to large sewage pipes periodically, even in the presence of running water, i.e. without having to interrupt the function of the sewer. It is necessary to extract large quantities of sediment from pipes buried even several dozen metres underground without running any risk. Normally the machinery performing these operations operates from outside the sewer and from the surface.
  • Several methods are known for cleaning up such ducts. A first type provides for the insertion of water jet nozzles, as illustrated, for example, in patent application US20110308552 , which describes a first nozzle head inserted along the duct that sprays jets of water directly along the duct. The first head is exchanged for a second head connected to a cable and is pulled back to the first position. The nozzle is then pulled back to the second position by pulling the cable while the nozzles directed along the pipe towards the second position push the solids forward to the second position for extraction.
  • In a second modus operandi, a sediment collection container is used which is made to slide along the canal. The operations are usually carried out by accessing the underground channel through pairs of inspection wells that delimit the section of channel to be cleaned. From the first of these wells, a sediment collection container hooked to a first holding cable is lowered into the duct, this container is towed into the duct in the direction of the second well by means of a second cable hooked to the container which is lowered from this second well. Once the container has travelled the full section of channel to be cleaned, it is removed from the second well and emptied into a special collection tank.
  • The container for sediment collection is generally shaped like a slide, and the cables are towed by special winches placed on the surface near these inspection wells.
  • This second modus operandi has the drawback that, having positioned the winches on the surface, the sliding of the towing and holding cables from the wells to the duct can be difficult, since they have to overcome an almost right angle formed between the axis of the well (usually substantially vertical) and that of the channel (usually almost horizontal or slightly inclined). This sliding is even more difficult when, during the dredging step, the container or slide loaded with sediment has to be towed and when this angle has to be overcome between the bottom of the well and the end of the section of the duct by the container.
  • The applicant has solved these drawbacks by realising a system and a method of dredging underground ducts accessible through inspection wells according to the present invention having the characteristics of the appended claims.
  • Further objects, characteristics and advantages of the present invention will become clear from the following detailed description and the appended figures, provided solely by way of non-limiting example, wherein:
    • figure 1 is a schematic view of the system of dredging underground ducts accessible through inspection wells according to the present invention;
    • figure 2 is a schematic view of the step of inserting a winch into the inspection well according to the present invention. Referring to the above figures, the system of dredging a duct T (or a section of it), accessible through at least a first PI and a second P2 inspection channel or access passage, which connect and delimit this section of conduit to the surface S; said system comprises machinery M1 or M2 for positioning a respective winch A1 and A2 along each inspection duct on the junction between each inspection well or inspection channel and said duct.
  • The duct may be an underground duct and the inspection wells are vertical channels for access to the indicated section, or it may be an open duct such as a ditch or a canal that is difficult to access through banks that delimit it equivalent to inspection channels. These means are arranged on the surface above the section of duct. Each winch is connected with a cable C1 or C2 which at its free end (the one not engaged with the respective winch) is connected with a sediment collection container S sliding along the section of duct through these winches and which collects the sediments. These machines M1 and M2 comprise means for moving the winches along the inspection channel or well and positioning them on the bottom of it substantially at the same level as the section of duct to be dredged. Such movement means are advantageously realised by means of a telescopic or articulated arm. Such machines are preferably excavators.
  • Preferably, the sediment collection container is shaped like a slide or like a bucket provided with a mouth for the collection during the dragging of the sediments and a closed bottom to form a "bag". The method and the system of the present invention are equally applicable in an environmental situation in which the first inspection channel well P1 is an open channel and allows a means to be brought to the level of the quote of the duct to be dredged (fig. 3a) or allows the first winch to be lowered more easily to the level of this duct (fig. 3b).
  • The method for removing or dredging a section of channel T according to the present invention accessible through at least a first P1 and a second P2 inspection channel which connect and delimit this section of duct to the surface S essentially comprises the steps of:
    1. a) preparing a first and a second machinery (M1 and M2) for positioning the respective first and second winches (A1 and A2) proximate to the respective first and second inspection channels (C1 and C2),
    2. b) lowering the cable (C1 or C2) of the first or second winch (A1 or A2) into the respective inspection channel (P1 or P2) until it crosses the entire section of duct to be dredged (T) and lifting its end from the other inspection channel (P2 or P1),
    3. c) hooking a sediment collection container (S) to this end of this cable and also hooking it to the cable of the second or first winch (A2 or A1),
    4. d) lowering the two winches (A1 and A2) in the inspection channels (P1 and P2) until they reach substantially the same quote or level as the section of duct to be dredged, so that the container (S) is located at one of the ends of the channel near the respective winch (A1 or A2),
    5. e) towing the container through these winches to the opposite end of this section of duct near the other winch (A2 or A1),
    6. f) lifting the winch that has the container close to itself on the surface (S) for emptying it.
  • After emptying, if the dredging operation must always be carried out in the same direction, i.e. always moving the container in the same direction for dredging (for example from P2 to P1 only), for reasons of slope of the channel or for other reasons, the container itself is brought back, making it cross again the duct to be dredged, near the other winch (A2 or A1) to repeat the steps e), f) above.
  • If, on the other hand, the dredging operations can be carried out in both directions (indifferently from P1 to P2 or from P2 to P1), in order to carry out a subsequent dredging operation it will be sufficient to rotate the container and lower again the winch that lifted the filled container (after it had been emptied) up to the level of the section of duct to be dredged, and tow the container in the opposite direction until it is near the other winch.

Claims (7)

  1. Dredging system of a conduit (T), or a section of it, accessible through at least a first (P1) and a second (P2) inspection channel or access passage, which connect and delimit this section of conduit to the surface (S), such a system comprising:
    • machinery (M1, M2) for positioning a respective winch (A1, A2) along each inspection duct on the junction between each inspection well and said duct,
    • said machinery being arranged on the surface above the section of duct,
    • each winch being connected with a cable (C1, C2) which at its free end is connected with a sediment collection container (S) sliding along the section of duct through these winches and which collects the sediments,
    • these machines (M1, M2) comprising means for moving the winches along the inspection channel and positioning them on the bottom of it substantially at the same level as the section of duct to be dredged.
  2. System according to claim 1, wherein said moving means (M1, M2) comprising a telescopic or articulated arm.
  3. System according to claim 1, wherein said machines are excavators.
  4. System according to claim 1, wherein the sediment collection container is shaped like a slide or like a bucket provided with a mouth for the collection during the dragging of the sediments and a closed bottom to form a "bag".
  5. Method for removing or dredging a section of channel (T) accessible through at least a first (P1) and a second (P2) inspection channel or access passage that connect and delimit this section of duct to the surface (S) essentially includes the steps of:
    a) a) preparing a first and a second machinery (M1, M2) for positioning the respective first and second winches (A1, A2) proximate to the respective first and second inspection channels (C1, C2),
    b) b) lower the cable (C1, C2) of the first or second winch (A1, A2) into the respective inspection channel (P1, P2) until it crosses the entire section of duct to be dredged (T) and lift its end from the other inspection channel (P2, P1),
    c) c) hook a sediment collection container (S) to this end of this cable and also hook it to the cable of the second or first winch (A2, A1),
    d) d) lowering or positioning the two winches (A1, A2) in the inspection channels (P1, P2) until they reach substantially the same quote or level as the section of duct to be dredged, so that the container (S) is located at one of the ends of the channel near the respective winch (A1, A2),
    e) e) towing the container through these winches to the opposite end of this section of duct near the other winch (A2, A1),
    f) f) lift the winch that has the container close to itself on the surface (S) for emptying it.
  6. Method according to claim 5, wherein when the dredging operation is to be carried out by moving the container always in the same direction, after the step f) the container itself is returned, causing it to cross again in the duct to be dredged, near the other winch (A2 or A1) to replicate the steps e), f) above.
  7. Method according to claim 5, in which the dredging operations can be carried out by moving the container (S) in both directions to carry out a subsequent dredging operation, it will be sufficient to rotate the container and trace the winch that raised the stuffing container up to the level of the section of duct to be dredged, and tow the container in the opposite direction up to the other winch.
EP21187029.0A 2020-07-24 2021-07-21 Method and system of dredging of an underground conduit Active EP3943671B1 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
RS20230885A RS64761B1 (en) 2020-07-24 2021-07-21 Method and system of dredging of an underground conduit
HRP20231198TT HRP20231198T1 (en) 2020-07-24 2021-07-21 Method and system of dredging of an underground conduit
SI202130067T SI3943671T1 (en) 2020-07-24 2021-07-21 Method and system of dredging of an underground conduit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
IT102020000017962A IT202000017962A1 (en) 2020-07-24 2020-07-24 METHOD AND SYSTEM OF DREDGING A CHANNEL OR PIPE.

Publications (2)

Publication Number Publication Date
EP3943671A1 true EP3943671A1 (en) 2022-01-26
EP3943671B1 EP3943671B1 (en) 2023-07-12

Family

ID=72709740

Family Applications (1)

Application Number Title Priority Date Filing Date
EP21187029.0A Active EP3943671B1 (en) 2020-07-24 2021-07-21 Method and system of dredging of an underground conduit

Country Status (7)

Country Link
EP (1) EP3943671B1 (en)
DK (1) DK3943671T3 (en)
ES (1) ES2956984T3 (en)
HR (1) HRP20231198T1 (en)
IT (1) IT202000017962A1 (en)
RS (1) RS64761B1 (en)
SI (1) SI3943671T1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115182404A (en) * 2022-08-19 2022-10-14 亿利生态修复股份有限公司 River channel dredging equipment and river channel dredging method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4309128A (en) * 1979-11-26 1982-01-05 Williams Richard Lee Method and apparatus for removing deflection from plastic pipes
US4337096A (en) * 1980-07-14 1982-06-29 Paul L. Pratt Method and implement for cleaning drains
US5639312A (en) * 1991-12-04 1997-06-17 Rufolo; Paul G. Method for cleaning underwater pipes of zebra-mussels or other organism growth therein
US6494437B1 (en) * 1995-10-24 2002-12-17 Mark L. Boyer Boom mounted winch
KR20110045793A (en) * 2009-10-27 2011-05-04 (주) 선암기술연구소 Device for dredge dredging soil managing sewer-pipe
US20110308552A1 (en) 2010-06-17 2011-12-22 Slawko Morris Baziuk Sewer cleaning method
KR101387699B1 (en) * 2013-11-13 2014-04-21 한빛테크원 (주) Drain sludge dredging and recycling equipment, dredging and recycling method using it

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4309128A (en) * 1979-11-26 1982-01-05 Williams Richard Lee Method and apparatus for removing deflection from plastic pipes
US4337096A (en) * 1980-07-14 1982-06-29 Paul L. Pratt Method and implement for cleaning drains
US5639312A (en) * 1991-12-04 1997-06-17 Rufolo; Paul G. Method for cleaning underwater pipes of zebra-mussels or other organism growth therein
US6494437B1 (en) * 1995-10-24 2002-12-17 Mark L. Boyer Boom mounted winch
KR20110045793A (en) * 2009-10-27 2011-05-04 (주) 선암기술연구소 Device for dredge dredging soil managing sewer-pipe
US20110308552A1 (en) 2010-06-17 2011-12-22 Slawko Morris Baziuk Sewer cleaning method
KR101387699B1 (en) * 2013-11-13 2014-04-21 한빛테크원 (주) Drain sludge dredging and recycling equipment, dredging and recycling method using it

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115182404A (en) * 2022-08-19 2022-10-14 亿利生态修复股份有限公司 River channel dredging equipment and river channel dredging method thereof

Also Published As

Publication number Publication date
IT202000017962A1 (en) 2022-01-24
DK3943671T3 (en) 2023-10-02
ES2956984T3 (en) 2024-01-05
EP3943671B1 (en) 2023-07-12
RS64761B1 (en) 2023-11-30
HRP20231198T1 (en) 2024-01-19
SI3943671T1 (en) 2023-12-29

Similar Documents

Publication Publication Date Title
CN107339111B (en) The floating construction method of installation of more PE pipes in large-scale push pipe
CN103669557B (en) Underground conduit dredging engineering method
EP3943671B1 (en) Method and system of dredging of an underground conduit
CN105908826A (en) Urban drainage pipeline capable of conveniently achieving dredging and blocking preventing
CN106337493A (en) Underground bye wash dredging and fishing device and dredging and fishing method thereof
JP4510922B1 (en) How to clean buried sewage pipes
CN215759529U (en) Municipal administration rain sewage pipeline desilting system
KR101170515B1 (en) Device for dredge dredging soil managing sewer-pipe
KR100922777B1 (en) Robot working machine for underground
CN207405642U (en) A kind of foundation pit side-wall underground water water guider
CN109056879A (en) A kind of riverway sludge cleaning plant and construction method
CN101693243B (en) Dredging system of sewage pipeline with large-pipe diameter
WO2023029932A1 (en) Method for passing silt transport pipeline through underwater box culvert
CN216108863U (en) System for barrier is strideed across to drain canal
CN109237199A (en) Underground piping detects non-excavation rehabilitation and dredges maintaining process process
CN104963383B (en) A kind of pressure conduit inverted siphon hydraulic automatism erosion and deposition device
CN212294953U (en) Multi-functional environmental protection waterproof construction
KR100717425B1 (en) Apparatus for sorting sludge sewerage end
CN104563277A (en) Folding gate type washing equipment for drainage network piping
CN110259475A (en) A kind of head is removed obstacles method
CN219527924U (en) Urban drainage pipeline dredging device
CN218713887U (en) Desilting mechanism
CN218346381U (en) Sediment, interception formula drainage valve inspection shaft
CN207812656U (en) A kind of urban underground water drainage pipe net dredger
CN218492679U (en) Anti-silting inverted siphon system

Legal Events

Date Code Title Description
REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20231198T

Country of ref document: HR

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20220725

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: B08B 9/043 20060101ALI20221223BHEP

Ipc: E03F 9/00 20060101ALI20221223BHEP

Ipc: E02F 9/00 20060101ALI20221223BHEP

Ipc: E02F 5/28 20060101ALI20221223BHEP

Ipc: E02F 3/92 20060101ALI20221223BHEP

Ipc: E02F 3/90 20060101AFI20221223BHEP

INTG Intention to grant announced

Effective date: 20230201

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602021003386

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20230929

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20230928

Year of fee payment: 3

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20230401803

Country of ref document: GR

Effective date: 20231113

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20231198T

Country of ref document: HR

Payment date: 20231026

Year of fee payment: 3

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2956984

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20240105

REG Reference to a national code

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20231198

Country of ref document: HR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231112

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231113

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231012

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231112

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SI

Payment date: 20230929

Year of fee payment: 3

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 1587259

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230712

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230731

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602021003386

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230712

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230731

26N No opposition filed

Effective date: 20240415

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230721

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GR

Payment date: 20240617

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: RS

Payment date: 20240619

Year of fee payment: 4

Ref country code: HR

Payment date: 20240620

Year of fee payment: 4

Ref country code: NL

Payment date: 20240613

Year of fee payment: 4

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230721

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240611

Year of fee payment: 4

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20231198

Country of ref document: HR

Payment date: 20240620

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20240711

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240529

Year of fee payment: 4

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20240712

Year of fee payment: 4