EP3889532A1 - Fluidized bed furnace - Google Patents
Fluidized bed furnace Download PDFInfo
- Publication number
- EP3889532A1 EP3889532A1 EP19889794.4A EP19889794A EP3889532A1 EP 3889532 A1 EP3889532 A1 EP 3889532A1 EP 19889794 A EP19889794 A EP 19889794A EP 3889532 A1 EP3889532 A1 EP 3889532A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- fluidized bed
- space
- reactor
- bed furnace
- furnace
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims abstract description 116
- 229910052742 iron Inorganic materials 0.000 claims abstract description 44
- 239000007789 gas Substances 0.000 claims description 36
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 claims description 30
- 229910052757 nitrogen Inorganic materials 0.000 claims description 15
- 238000010926 purge Methods 0.000 claims description 15
- 239000006185 dispersion Substances 0.000 claims description 8
- 230000004927 fusion Effects 0.000 description 12
- 238000006722 reduction reaction Methods 0.000 description 8
- 239000002245 particle Substances 0.000 description 7
- 239000007787 solid Substances 0.000 description 6
- 239000002994 raw material Substances 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000000155 melt Substances 0.000 description 4
- 238000005054 agglomeration Methods 0.000 description 3
- 230000002776 aggregation Effects 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000002844 melting Methods 0.000 description 2
- 230000008018 melting Effects 0.000 description 2
- 238000000638 solvent extraction Methods 0.000 description 2
- 230000005587 bubbling Effects 0.000 description 1
- 239000002801 charged material Substances 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B15/00—Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
- F27B15/003—Cyclones or chain of cyclones
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B15/00—Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
- F27B15/02—Details, accessories, or equipment peculiar to furnaces of these types
- F27B15/08—Arrangements of devices for charging
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B13/00—Making spongy iron or liquid steel, by direct processes
- C21B13/0033—In fluidised bed furnaces or apparatus containing a dispersion of the material
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B13/00—Making spongy iron or liquid steel, by direct processes
- C21B13/02—Making spongy iron or liquid steel, by direct processes in shaft furnaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B15/00—Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
- F27B15/02—Details, accessories, or equipment peculiar to furnaces of these types
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B15/00—Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
- F27B15/02—Details, accessories, or equipment peculiar to furnaces of these types
- F27B15/09—Arrangements of devices for discharging
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B15/00—Fluidised-bed furnaces; Other furnaces using or treating finely-divided materials in dispersion
- F27B15/02—Details, accessories, or equipment peculiar to furnaces of these types
- F27B15/10—Arrangements of air or gas supply devices
Definitions
- the present disclosure relates to a fluidized bed furnace.
- melt reduction iron manufacturing facility that produces molten iron by using fine iron ore directly, it includes a plurality of fluidized bed furnaces for fluidized reduction treatment of fine iron ore.
- the fluidized bed furnace reduces fine iron ore in powder form to fine reduced iron by using high temperature reducing gas supplied from a melting gas furnace.
- a conventional fluidized bed furnace used fine iron ore with a particle size of substantially less than 8 mm, but recently, the use of ultra-fine iron ore iron with a smaller particle size is required.
- An embodiment provides a fluidized bed furnace that can minimize scattering loss while minimizing fusion problems even though fine iron ores are charged.
- a fluidized bed furnace that can use 100 % of ultra-fine iron ore as a raw material can be provided.
- One aspect of the present invention is to provide a fluidized bed furnace that includes: a lower reactor that forms a first fluidized bed space having a first diameter, and includes a discharge port through which fine reduced iron is discharged; an upper reactor that forms a second fluidized bed space having a second diameter that is greater than the first diameter, and includes a charging port through which fine iron ore is charged; and a tapered portion that forms a connection space that allows communication between the first fluidized bed space and the second fluidized bed space, and directly connects the lower reactor and the upper reactor.
- the second diameter may be 3 to 4 times the first diameter.
- An outer wall of the tapered portion may have an angle of 45 degrees to 75 degrees with a second diameter D2 direction.
- the charging port may be higher than half the height of an outer wall of the upper reactor.
- the discharge port may be lower than half the height of an outer wall 201 of the upper reactor 200 and may extend upward.
- the fluidized bed furnace may further include a porous plate that is disposed between the second fluidized bed space and the connection space, and includes a plurality of through-holes.
- the fluidized bed furnace may further include a stand pipe that extends from the second fluidized bed space through the porous plate to the first fluidized bed space, and is supported by the porous plate.
- the fluidized bed furnace may further include a plurality of nitrogen purge supply pipes disposed along a circumferential direction of an outer wall of the upper reactor.
- the fluidized bed furnace may further include a dispersion plate through which reduced gas supplied to the first fluidized bed space passes.
- a fluidized bed furnace that can minimize scattering loss while minimizing fusion problems even though fine iron ores are charged can be provided.
- a fluidized bed furnace that can use 100 % of ultra-fine iron ore as a raw material can be provided.
- a fluidized bed furnace may be included in a melt reduction iron-manufacturing facility, but is not limited thereto.
- the melt reduction iron-manufacturing facility may include at least one fluidized bed furnace for reducing fine iron ore to fine reduced iron, a compacting device for producing compacted material by pressing fine reduced iron, and a molten gas furnace, but are not limited thereto, and may further include various configurations.
- Fine reduced iron is charged into fluidized bed furnaces, and fine reduced iron reduced from the fluidized bed furnaces can be made into molten iron by being manufactured as compacted material in a compacting device and supplied to a melting gas furnace with coal briquettes.
- the reducing gas generated from the molten gas furnace can be supplied to fluidized bed furnaces.
- FIG. 1 is a perspective view of a fluidized bed furnace according to a first embodiment.
- a fluidized bed furnace 1000 includes a lower reactor 100, an upper reactor 200, a tapered portion 300, and a plurality of nitrogen purge supply pipes 400.
- the lower reactor 100 has a circular cylinder shape, and forms a first fluidized bed space FS1 with a first diameter D1 as a flat area.
- a turbulent fluidized bed (or fast fluidized bed) is formed such that vigorous gas solid mixing may occur.
- the lower reactor 100 includes a discharge port 110 through which fine reduced iron is discharged.
- the fine reduced iron reduced from the fine reduced iron in the first fluidized bed space FS1 of the lower reactor 100 is discharged through the discharge port 110.
- the lower reactor 100 includes a lower reactor 120 that passes reducing gas RG supplied to the first fluidized bed space FS1.
- the lower reactor 100 includes a dispersion plate 120 for passing the reducing gas RG supplied to the first fluidized bed space FS1.
- the dispersion plate 120 includes a plurality of through-holes through which the reducing gas RG passes.
- Reduced gas RG is supplied from a lower portion of the dispersion plate 120, and the reduced gas RG passes through the first fluidized bed space FS1 of the lower reactor 100 and the second fluidized bed space FS2 of the upper reactor 200, and is discharged to the upper portion of the upper reactor 200.
- the reduced gas RG can be generated from the molten gas furnace of the melt reduction iron-manufacturing facility, and the reduced gas RG discharged to the upper portion of the upper reactor 200 can be supplied to the lower portion of another fluidized bed furnace.
- the upper reactor 200 has a circular cylinder shape that has a larger volume compared to the lower reactor 100.
- the upper reactor 200 forms a second fluidized bed space FS2 with a larger second diameter D2 compared to the first diameter D1 as a flat area.
- the second diameter D2 may be 3 to 4 times the first diameter D1.
- a minimum fluidized bed (or a bubbling fluidized bed) is formed due to the lower gas flow rate compared to the gas flow rate of the first fluidized bed space FS1.
- the upper reactor 200 includes a charging port 210 into which fine iron ore is charged.
- Fine iron ore is charged through the charging port 210 in the second fluidized bed space FS2 of the upper reactor 200.
- the charging port 210 is disposed higher than half the height of an outer wall 201 of the upper reactor 200 and extends upward.
- the tapered portion 300 directly connects between the lower reactor 100 and the upper reactor 200.
- the tapered portion 300 forms a connection space CS that communicates between the first fluidized bed space FS1 and the second fluidized bed space FS2.
- An outer wall 301 of the tapered portion 300 may have an angle of 45 degrees to 75 degrees with a second diameter D2 direction.
- the tapered portion 300, the lower reactor 100, and the upper reactor 200 may be integrally formed, but are not limited thereto.
- a plurality of nitrogen purge supply pipes 400 are disposed along the circumferential direction of the outer wall 201 of the upper reactor 200.
- FIG. 2 shows the nitrogen purge supply pipes illustrated in FIG. 1 .
- (A) shows an example of the nitrogen purge supply pipe 400 connected to the upper reactor 200.
- the nitrogen purge supply pipe 400 is disposed on the lower portion of the outer wall 201 of the upper reactor 200, and is adjacent to the outer wall 301 of the tapered portion 300.
- the nitrogen purge supply pipe 400 may extend in the same direction as the extension direction of the outer wall 301 of the tapered portion 300 in order to smooth the flow of the charged material from the upper reactor 200 to the tapered portion 300.
- (B) shows an example of alignment of the plurality of nitrogen purge supply pipes 400 connected to the upper reactor 200.
- each of the plurality of nitrogen purge supply pipes 400 may be disposed to have an angle of 45 degrees with the center of the second fluidized bed space FS2 along the circumference of the outer wall 201 of the upper reactor 200.
- (C) shows another example of alignment of the plurality of nitrogen purge supply pipes 400 connected to the upper reactor 200.
- each of the plurality of nitrogen purge supply pipes 400 may be disposed to have an angle of 30 degrees with the center of the second fluidized bed space FS2 along the circumference of the outer wall 201 of the upper reactor 200.
- FIG. 3 shows the interior of the fluidized bed furnace according to the first embodiment.
- the solid flow can mean the flow of fine iron ore and fine reduced iron
- the solid presence region can mean the presence of fine iron ore and fine reduced iron.
- the calm fluidized bed FB1 formed in the second fluidized bed space FS2 of the upper reactor 200 passes through the connection space CS of the tapered portion 300 and moves to the first fluidized bed space FS1 of the lower reactor 100, which is a turbulent region.
- a turbulent fluidized bed FB2 is formed, thereby causing vigorous gas solid mixing. Accordingly, the occurrence of a fusion phenomenon in which fine reduced iron 102 reduced in the turbulent fluidized bed FB2 aggregates with each other is minimized.
- the fine reduced iron 102 reduced in the lower reactor 100 is discharged to the outside of the lower reactor 100 through the discharge port 110 due to a pressure difference.
- the charge which is the fine iron ore IO1 is reduced in the turbulent fluidized bed condition of the turbulent fluidized bed FB2.
- the reduction occurs rapidly due to a high gas/ore ratio.
- the fine reduced iron 102 reduced in the first fluidized bed space FS1 is discharged through the discharge port 110 due to the pressure difference.
- the fine reduced iron IO2 reduced by vigorous mixing in the first fluidized bed space FS1 of the lower reactor 100 can be scattered to the second fluidized bed space FS2 of the upper reactor 200 together with the reduced gas RG moving to the upper reactor 200.
- the gas flow rate is reduced by the second fluidized bed space FS2 of the upper reactor 200, which is significantly wider than the first fluidized bed space FS1 of the lower reactor 100, the fine reduced iron IO2 scattered into the second fluidized bed space FS2 falls directly by gravity into the first fluidized bed space FS1 in the lower reactor 100.
- a problem of fusion of fine reduced iron IO2 does not occur due to a bubble fluidized bed atmosphere, which is the calm fluidized bed FB1, in the second fluidized bed space FS2 of the upper reactor 200, and in the first fluidized bed space FS1 of the lower reactor 100, the reduction of fine reduced iron IO2 is accelerated to a turbulent fluidized bed atmosphere, which is the turbulent fluidized bed FB2, and is discharged through the discharge port 110 to minimize the problem of fusion of fine reduced iron IO2.
- the fluidized bed furnace 1000 that minimizes scattering loss and minimizes fusion problems is provided.
- the fluidized bed furnace 1000 that can use 100 % of fine iron ore as a raw material is provided.
- FIG. 4 and FIG. 5 a fluidized bed furnace according to a second embodiment will be described.
- parts different from the fluidized bed furnace according to the first embodiment will be described.
- FIG. 4 is a perspective view of a fluidized bed furnace according to a second embodiment.
- a fluidized bed furnace 1002 includes a lower reactor 100, an upper reactor 200, a tapered portion 300, a plurality of nitrogen purge supply pipes 400, and a porous plate 500.
- the porous plate 500 is disposed between a second fluidized bed space FS2 of the upper reactor 200 and a connection space CS of the tapered portion 300, and includes a plurality of through-holes.
- the porous plate 500 is disposed between the second fluidized bed space FS2 and the connection space CS, and serves as a partitioning wall between the second fluidized bed space FS2 and the first fluidized bed space FS1.
- the porous plate 500 may physically separate the upper reactor 200 and the lower reactor 100.
- FIG. 5 shows the interior of the fluidized bed furnace according to the second embodiment.
- the fine reduced iron IO2 reduced in the lower reactor 100 is discharged to the outside of the lower reactor 100 through the discharge port 110 due to a pressure difference.
- the fluidized bed furnace 1002 that minimizes scattering loss and minimizes fusion problems is provided.
- the fluidized bed furnace 1002 that can use 100 % of fine iron ore as a raw material is provided.
- FIG. 6 and FIG. 7 a fluidized bed furnace according to a third embodiment will be described.
- parts different from the fluidized bed furnace according to the first embodiment will be described.
- FIG. 6 is a perspective view of a fluidized bed furnace according to a third embodiment.
- a fluidized bed furnace 1003 includes a lower reactor 100, an upper reactor 200, a tapered portion 300, a plurality of nitrogen purge supply pipes 400, a porous plate 500, and a stand pipe 600.
- the porous plate 500 is disposed between a second fluidized bed space FS2 of the upper reactor 200 and a connection space CS of the tapered portion 300, and includes a plurality of through-holes.
- the porous plate 500 is disposed between the second fluidized bed space FS2 and the connection space CS, and serves as a partitioning wall between the second fluidized bed space FS2 and the first fluidized bed space FS1.
- the porous plate 500 may physically separate the upper reactor 200 and the lower reactor 100.
- the stand pipe 600 extends from the second fluidized bed space FS2 through the porous plate 500 to the first fluidized bed space FS1.
- the stand pipe 600 is supported on the porous plate 500 corresponding to the first fluidized bed space FS1 of the lower reactor 100.
- the stand pipe 600 facilitates the flow of fine iron ore from the upper reactor 200 to the lower reactor 100.
- FIG. 7 shows the interior of the fluidized bed furnace according to the third embodiment.
- the fine reduced iron IO2 reduced in the lower reactor 100 is discharged to the outside of the lower reactor 100 through the discharge port 110 due to a pressure difference.
- the fluidized bed furnace 1003 that minimizes scattering loss and minimizes fusion problems is provided.
- the fluidized bed furnace 1003 that can use 100 % of fine iron ore as a raw material is provided.
- first fluidized bed space FS1 lower reactor 100
- second fluidized bed space FS2 upper reactor 200
- connection space CS tapered portion 300
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Dispersion Chemistry (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Crucibles And Fluidized-Bed Furnaces (AREA)
- Manufacture Of Iron (AREA)
Abstract
Description
- The present disclosure relates to a fluidized bed furnace.
- In general, in the case of a melt reduction iron manufacturing facility that produces molten iron by using fine iron ore directly, it includes a plurality of fluidized bed furnaces for fluidized reduction treatment of fine iron ore.
- The fluidized bed furnace reduces fine iron ore in powder form to fine reduced iron by using high temperature reducing gas supplied from a melting gas furnace.
- A conventional fluidized bed furnace used fine iron ore with a particle size of substantially less than 8 mm, but recently, the use of ultra-fine iron ore iron with a smaller particle size is required.
- However, when a large amount of ultra-fine iron ore is charged into the conventional fluidized bed furnace, problems that a stagnant layer is formed inside the fluidized bed furnace due to interaction between the ultra-fine iron ores, or large particles are formed due to fusion and agglomeration of the ultra-fine iron ore on an inner wall of the fluidized bed furnace, may occur.
- In addition, in the conventional fluidized bed furnaces, extremely fine iron ore with a terminal velocity that is lower than an operating flow rate scattered inside the fluidized bed furnace must be recovered and re-injected by a cyclone inside the fluidized bed furnace, but since the efficiency of the cyclone decreases as the particle size of extremely fine iron ore, which is a scattered particle, decreases, there is a problem that scattering loss increases.
- An embodiment provides a fluidized bed furnace that can minimize scattering loss while minimizing fusion problems even though fine iron ores are charged.
- In addition, a fluidized bed furnace that can use 100 % of ultra-fine iron ore as a raw material can be provided.
- One aspect of the present invention is to provide a fluidized bed furnace that includes: a lower reactor that forms a first fluidized bed space having a first diameter, and includes a discharge port through which fine reduced iron is discharged; an upper reactor that forms a second fluidized bed space having a second diameter that is greater than the first diameter, and includes a charging port through which fine iron ore is charged; and a tapered portion that forms a connection space that allows communication between the first fluidized bed space and the second fluidized bed space, and directly connects the lower reactor and the upper reactor.
- The second diameter may be 3 to 4 times the first diameter.
- An outer wall of the tapered portion may have an angle of 45 degrees to 75 degrees with a second diameter D2 direction.
- The charging port may be higher than half the height of an outer wall of the upper reactor.
- The discharge port may be lower than half the height of an
outer wall 201 of theupper reactor 200 and may extend upward. - The fluidized bed furnace may further include a porous plate that is disposed between the second fluidized bed space and the connection space, and includes a plurality of through-holes.
- The fluidized bed furnace may further include a stand pipe that extends from the second fluidized bed space through the porous plate to the first fluidized bed space, and is supported by the porous plate.
- The fluidized bed furnace may further include a plurality of nitrogen purge supply pipes disposed along a circumferential direction of an outer wall of the upper reactor.
- The fluidized bed furnace may further include a dispersion plate through which reduced gas supplied to the first fluidized bed space passes.
- According to the embodiment, a fluidized bed furnace that can minimize scattering loss while minimizing fusion problems even though fine iron ores are charged can be provided.
- In addition, a fluidized bed furnace that can use 100 % of ultra-fine iron ore as a raw material can be provided.
-
-
FIG. 1 is a perspective view of a fluidized bed furnace according to a first embodiment. -
FIG. 2 shows the nitrogen purge supply pipes illustrated inFIG. 1 . -
FIG. 3 shows the interior of the fluidized bed furnace according to the first embodiment. -
FIG. 4 is a perspective view of a fluidized bed furnace according to a second embodiment. -
FIG. 5 shows the interior of the fluidized bed furnace according to the second embodiment. -
FIG. 6 is a perspective view of a fluidized bed furnace according to a third embodiment. -
FIG. 7 shows the interior of the fluidized bed furnace according to the third embodiment. - The present invention will be described more fully hereinafter with reference to the accompanying drawings, in which exemplary embodiments of the invention are shown. As those skilled in the art would realize, the described embodiments may be modified in various different ways, all without departing from the spirit or scope of the present invention.
- Accordingly, the drawings and description are to be regarded as illustrative in nature and not restrictive. Like reference numerals designate like elements throughout the specification.
- In addition, unless explicitly described to the contrary, the word "comprise", and variations such as "comprises" or "comprising", will be understood to imply the inclusion of stated elements but not the exclusion of any other elements.
- Hereinafter, referring to
FIG. 1 to FIG. 3 , a fluidized bed furnace according to a first embodiment will be described. A fluidized bed furnace may be included in a melt reduction iron-manufacturing facility, but is not limited thereto. - For example, the melt reduction iron-manufacturing facility may include at least one fluidized bed furnace for reducing fine iron ore to fine reduced iron, a compacting device for producing compacted material by pressing fine reduced iron, and a molten gas furnace, but are not limited thereto, and may further include various configurations. Fine reduced iron is charged into fluidized bed furnaces, and fine reduced iron reduced from the fluidized bed furnaces can be made into molten iron by being manufactured as compacted material in a compacting device and supplied to a melting gas furnace with coal briquettes. In addition, the reducing gas generated from the molten gas furnace can be supplied to fluidized bed furnaces.
-
FIG. 1 is a perspective view of a fluidized bed furnace according to a first embodiment. - Referring to
FIG. 1 , a fluidizedbed furnace 1000 according to a first embodiment includes alower reactor 100, anupper reactor 200, atapered portion 300, and a plurality of nitrogenpurge supply pipes 400. - The
lower reactor 100 has a circular cylinder shape, and forms a first fluidized bed space FS1 with a first diameter D1 as a flat area. - In the first fluidized bed space FS1 of the
lower reactor 100, a turbulent fluidized bed (or fast fluidized bed) is formed such that vigorous gas solid mixing may occur. - The
lower reactor 100 includes adischarge port 110 through which fine reduced iron is discharged. - The fine reduced iron reduced from the fine reduced iron in the first fluidized bed space FS1 of the
lower reactor 100 is discharged through thedischarge port 110. - The
lower reactor 100 includes alower reactor 120 that passes reducing gas RG supplied to the first fluidized bed space FS1. - The
lower reactor 100 includes adispersion plate 120 for passing the reducing gas RG supplied to the first fluidized bed space FS1. - The
dispersion plate 120 includes a plurality of through-holes through which the reducing gas RG passes. Reduced gas RG is supplied from a lower portion of thedispersion plate 120, and the reduced gas RG passes through the first fluidized bed space FS1 of thelower reactor 100 and the second fluidized bed space FS2 of theupper reactor 200, and is discharged to the upper portion of theupper reactor 200. The reduced gas RG can be generated from the molten gas furnace of the melt reduction iron-manufacturing facility, and the reduced gas RG discharged to the upper portion of theupper reactor 200 can be supplied to the lower portion of another fluidized bed furnace. - The
upper reactor 200 has a circular cylinder shape that has a larger volume compared to thelower reactor 100. Theupper reactor 200 forms a second fluidized bed space FS2 with a larger second diameter D2 compared to the first diameter D1 as a flat area. - The second diameter D2 may be 3 to 4 times the first diameter D1.
- In the second fluidized bed space FS2 of the
upper reactor 200, a minimum fluidized bed (or a bubbling fluidized bed) is formed due to the lower gas flow rate compared to the gas flow rate of the first fluidized bed space FS1. - The
upper reactor 200 includes acharging port 210 into which fine iron ore is charged. - Fine iron ore is charged through the
charging port 210 in the second fluidized bed space FS2 of theupper reactor 200. - The
charging port 210 is disposed higher than half the height of anouter wall 201 of theupper reactor 200 and extends upward. - The
tapered portion 300 directly connects between thelower reactor 100 and theupper reactor 200. Thetapered portion 300 forms a connection space CS that communicates between the first fluidized bed space FS1 and the second fluidized bed space FS2. - An
outer wall 301 of the taperedportion 300 may have an angle of 45 degrees to 75 degrees with a second diameter D2 direction. - The tapered
portion 300, thelower reactor 100, and theupper reactor 200 may be integrally formed, but are not limited thereto. - A plurality of nitrogen
purge supply pipes 400 are disposed along the circumferential direction of theouter wall 201 of theupper reactor 200. -
FIG. 2 shows the nitrogen purge supply pipes illustrated inFIG. 1 . InFIG. 2 , (A) shows an example of the nitrogenpurge supply pipe 400 connected to theupper reactor 200. - Referring to (A) of
FIG. 2 , the nitrogenpurge supply pipe 400 is disposed on the lower portion of theouter wall 201 of theupper reactor 200, and is adjacent to theouter wall 301 of the taperedportion 300. - The nitrogen
purge supply pipe 400 may extend in the same direction as the extension direction of theouter wall 301 of the taperedportion 300 in order to smooth the flow of the charged material from theupper reactor 200 to the taperedportion 300. - In
FIG. 2 , (B) shows an example of alignment of the plurality of nitrogenpurge supply pipes 400 connected to theupper reactor 200. - Referring to (B) of
FIG. 2 , each of the plurality of nitrogenpurge supply pipes 400 may be disposed to have an angle of 45 degrees with the center of the second fluidized bed space FS2 along the circumference of theouter wall 201 of theupper reactor 200. - In
FIG. 2 , (C) shows another example of alignment of the plurality of nitrogenpurge supply pipes 400 connected to theupper reactor 200. - Referring to (C) of
FIG. 2 , each of the plurality of nitrogenpurge supply pipes 400 may be disposed to have an angle of 30 degrees with the center of the second fluidized bed space FS2 along the circumference of theouter wall 201 of theupper reactor 200. -
FIG. 3 shows the interior of the fluidized bed furnace according to the first embodiment. InFIG. 3 , the solid flow can mean the flow of fine iron ore and fine reduced iron, and the solid presence region can mean the presence of fine iron ore and fine reduced iron. - Referring to
FIG. 3 , when fine iron ore IO1 is charged at the chargingport 210 of theupper reactor 200 of thefluidized bed furnace 1000 where reduced gas RG is injected through thedispersion plate 120, a calm fluidized bed FB1 is formed in the second fluidized bed space FS2 due to the low gas flow rate. - The calm fluidized bed FB1 formed in the second fluidized bed space FS2 of the
upper reactor 200 passes through the connection space CS of the taperedportion 300 and moves to the first fluidized bed space FS1 of thelower reactor 100, which is a turbulent region. - In the first fluidized bed space FS1 of the
lower reactor 100, a turbulent fluidized bed FB2 is formed, thereby causing vigorous gas solid mixing. Accordingly, the occurrence of a fusion phenomenon in which fine reducediron 102 reduced in the turbulent fluidized bed FB2 aggregates with each other is minimized. - The fine reduced
iron 102 reduced in thelower reactor 100 is discharged to the outside of thelower reactor 100 through thedischarge port 110 due to a pressure difference. - In the narrow first fluidized bed space FS1 of the
lower reactor 100, the charge, which is the fine iron ore IO1, is reduced in the turbulent fluidized bed condition of the turbulent fluidized bed FB2. - Since the reduced gas RG and the fine iron ore IO1 are violently mixed by the rapid gas flow in the first fluidized bed space FS1 of the
lower reactor 100, agglomeration of fine reduced iron IO2 reduced on the inner wall oflower reactor 100 or agglomeration of reduced particles by fusion between reduced particles is suppressed. - In the first fluidized bed space FS1 of the
lower reactor 100, the reduction occurs rapidly due to a high gas/ore ratio. The fine reducediron 102 reduced in the first fluidized bed space FS1 is discharged through thedischarge port 110 due to the pressure difference. - The fine reduced iron IO2 reduced by vigorous mixing in the first fluidized bed space FS1 of the
lower reactor 100 can be scattered to the second fluidized bed space FS2 of theupper reactor 200 together with the reduced gas RG moving to theupper reactor 200. However, since the gas flow rate is reduced by the second fluidized bed space FS2 of theupper reactor 200, which is significantly wider than the first fluidized bed space FS1 of thelower reactor 100, the fine reduced iron IO2 scattered into the second fluidized bed space FS2 falls directly by gravity into the first fluidized bed space FS1 in thelower reactor 100. - In the second fluidized bed space FS2 of the
upper reactor 200, heat exchange with fine iron ore IO1 of the room temperature charged from the chargingport 210 results in a lower temperature and gas/ore ratio compared to the first fluidized bed space FS1 of thelower reactor 100 such that a low reduction reaction occurs. - Thus, a problem of fusion of fine reduced iron IO2 does not occur due to a bubble fluidized bed atmosphere, which is the calm fluidized bed FB1, in the second fluidized bed space FS2 of the
upper reactor 200, and in the first fluidized bed space FS1 of thelower reactor 100, the reduction of fine reduced iron IO2 is accelerated to a turbulent fluidized bed atmosphere, which is the turbulent fluidized bed FB2, and is discharged through thedischarge port 110 to minimize the problem of fusion of fine reduced iron IO2. - That is, since the
upper reactor 200, thelower reactor 100, and the taperedportion 300 are included, even though extremely fine iron ore is charged, thefluidized bed furnace 1000 that minimizes scattering loss and minimizes fusion problems is provided. - In addition, since the
upper reactor 200, thelower reactor 100, and the taperedportion 300 are included, thefluidized bed furnace 1000 that can use 100 % of fine iron ore as a raw material is provided. - Hereinafter, referring to
FIG. 4 andFIG. 5 , a fluidized bed furnace according to a second embodiment will be described. Hereinafter, parts different from the fluidized bed furnace according to the first embodiment will be described. -
FIG. 4 is a perspective view of a fluidized bed furnace according to a second embodiment. - Referring to
FIG. 4 , afluidized bed furnace 1002 according to a second embodiment includes alower reactor 100, anupper reactor 200, a taperedportion 300, a plurality of nitrogenpurge supply pipes 400, and aporous plate 500. - The
porous plate 500 is disposed between a second fluidized bed space FS2 of theupper reactor 200 and a connection space CS of the taperedportion 300, and includes a plurality of through-holes. - The
porous plate 500 is disposed between the second fluidized bed space FS2 and the connection space CS, and serves as a partitioning wall between the second fluidized bed space FS2 and the first fluidized bed space FS1. - The
porous plate 500 may physically separate theupper reactor 200 and thelower reactor 100. -
FIG. 5 shows the interior of the fluidized bed furnace according to the second embodiment. - Referring to
FIG. 5 , when fine iron ore IO1 is charged at a chargingport 210 of theupper reactor 200 of thefluidized bed furnace 1002 where reduced gas RG is injected through adispersion plate 120, a calm fluidized bed FB1 is formed in the second fluidized bed space FS2 due to the low gas flow rate. The fine iron ore IO1 is partially reduced in the calm fluidized bed FB1 by theporous plate 500. - After that, when the fine reduced iron IO2 and fine iron ore IO1 that are partially reduced in the second fluidized bed space FS2 pass through the through-holes of the
porous plate 500 and move to thelower reactor 100, a turbulent fluidized bed FB2 is formed in a first fluidized bed space FS1 of thelower reactor 100 due to the fast flow rate, resulting in vigorous gas solid mixing. Accordingly, the occurrence of a fusion phenomenon in which the fine reduced iron IO2 reduced in the turbulent fluidized bed FB2 aggregates is minimized. - The fine reduced iron IO2 reduced in the
lower reactor 100 is discharged to the outside of thelower reactor 100 through thedischarge port 110 due to a pressure difference. - That is, since the
upper reactor 200, thelower reactor 100, the taperedportion 300, and theporous plate 500 are included, even though extremely fine iron ore is charged, thefluidized bed furnace 1002 that minimizes scattering loss and minimizes fusion problems is provided. - Since the
upper reactor 200, thelower reactor 100, the taperedportion 300, and theporous plate 500 are included, thefluidized bed furnace 1002 that can use 100 % of fine iron ore as a raw material is provided. - Hereinafter, referring to
FIG. 6 andFIG. 7 , a fluidized bed furnace according to a third embodiment will be described. Hereinafter, parts different from the fluidized bed furnace according to the first embodiment will be described. -
FIG. 6 is a perspective view of a fluidized bed furnace according to a third embodiment. - Referring to
FIG. 6 , afluidized bed furnace 1003 according to a third embodiment includes alower reactor 100, anupper reactor 200, a taperedportion 300, a plurality of nitrogenpurge supply pipes 400, aporous plate 500, and astand pipe 600. - The
porous plate 500 is disposed between a second fluidized bed space FS2 of theupper reactor 200 and a connection space CS of the taperedportion 300, and includes a plurality of through-holes. - The
porous plate 500 is disposed between the second fluidized bed space FS2 and the connection space CS, and serves as a partitioning wall between the second fluidized bed space FS2 and the first fluidized bed space FS1. - The
porous plate 500 may physically separate theupper reactor 200 and thelower reactor 100. - The
stand pipe 600 extends from the second fluidized bed space FS2 through theporous plate 500 to the first fluidized bed space FS1. Thestand pipe 600 is supported on theporous plate 500 corresponding to the first fluidized bed space FS1 of thelower reactor 100. - The
stand pipe 600 facilitates the flow of fine iron ore from theupper reactor 200 to thelower reactor 100. -
FIG. 7 shows the interior of the fluidized bed furnace according to the third embodiment. - Referring to
FIG. 7 , when fine iron ore IO1 is charged at a chargingport 210 of theupper reactor 200 of thefluidized bed furnace 1003 where reduced gas RG is injected through adispersion plate 120, a calm fluidized bed FB1 is formed in the second fluidized bed space FS2 due to the low gas flow rate. The fine iron ore IO1 is partially reduced in the calm fluidized bed FB1 by theporous plate 500. - In this case, a part of the fine iron ore IO1 disposed in the second fluidized bed space FS2 smoothly moves from the second fluidized bed space FS2 of the
upper reactor 200, which has a low pressure, to the first fluidized bed space FS1 of thelower reactor 100, which has a high pressure, through thestand pipe 600. - After that, when the fine reduced iron IO2 and fine iron ore IO1 that are partially reduced in the second fluidized bed space FS2 pass through the through-holes of the
porous plate 500 and move to thelower reactor 100, a turbulent fluidized bed FB2 is formed in a first fluidized bed space FS1 of thelower reactor 100 due to the fast flow rate, resulting in vigorous gas solid mixing. Accordingly, the occurrence of a fusion phenomenon in which the fine reduced iron IO2 reduced in the turbulent fluidized bed FB2 aggregates with each other is minimized. - The fine reduced iron IO2 reduced in the
lower reactor 100 is discharged to the outside of thelower reactor 100 through thedischarge port 110 due to a pressure difference. - That is, since the
upper reactor 200, thelower reactor 100, the taperedportion 300, theporous plate 500, and thestand pipe 600 are included, even though extremely fine iron ore is charged, thefluidized bed furnace 1003 that minimizes scattering loss and minimizes fusion problems is provided. - In addition, since the
upper reactor 200, thelower reactor 100, the taperedportion 300, theporous plate 500, and thestand pipe 600 are included, thefluidized bed furnace 1003 that can use 100 % of fine iron ore as a raw material is provided. - While this invention has been described in connection with what is presently considered to be practical embodiments, it is to be understood that the invention is not limited to the disclosed embodiments. On the contrary, it is intended to cover various modifications and equivalent arrangements included within the spirit and scope of the appended claims.
- first fluidized bed space FS1,
lower reactor 100, second fluidized bed space FS2,upper reactor 200, connection space CS, taperedportion 300
Claims (9)
- A fluidized bed furnace comprising:a lower reactor that forms a first fluidized bed space having a first diameter, and includes a discharge port through which fine reduced iron is discharged;an upper reactor that forms a second fluidized bed space having a second diameter that is greater than the first diameter, and includes a charging port through which fine iron ore is charged; anda tapered portion that forms a connection space that allows communication between the first fluidized bed space and the second fluidized bed space, and directly connects the lower reactor and the upper reactor,wherein a turbulent fluidized bed is formed in the first fluidized bed space, and a calm fluidized bed having lower a gas flow rate compared to a gas flow rate of the turbulent fluidized bed is formed in the second fluidized bed space.
- The fluidized bed furnace of claim 1, wherein
the second diameter is 3 to 4 times the first diameter. - The fluidized bed furnace of claim 1, wherein
an outer wall of the tapered portion has an angle of 45 degrees to 75 degrees with a second diameter D2 direction. - The fluidized bed furnace of claim 1, wherein the charging port is higher than half the height of an outer wall of the upper reactor.
- The fluidized bed furnace of claim 1, wherein the discharge port is lower than half the height of an outer wall 201 of the upper reactor 200 and extends upward.
- The fluidized bed furnace of claim 1, further comprising a porous plate that is disposed between the second fluidized bed space and the connection space, and includes a plurality of through-holes.
- The fluidized bed furnace of claim 6, further comprising a stand pipe that extends from the second fluidized bed space through the porous plate to the first fluidized bed space, and is supported by the porous plate.
- The fluidized bed furnace of claim 1, further comprising a plurality of nitrogen purge supply pipes disposed along a circumferential direction of an outer wall of the upper reactor.
- The fluidized bed furnace of claim 1, further comprising a dispersion plate through which reduced gas supplied to the first fluidized bed space passes.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020180147506A KR102090550B1 (en) | 2018-11-26 | 2018-11-26 | Fluidized furnace |
PCT/KR2019/016101 WO2020111666A1 (en) | 2018-11-26 | 2019-11-22 | Fluidized bed furnace |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3889532A1 true EP3889532A1 (en) | 2021-10-06 |
EP3889532A4 EP3889532A4 (en) | 2021-12-22 |
EP3889532B1 EP3889532B1 (en) | 2023-05-10 |
Family
ID=69999403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19889794.4A Active EP3889532B1 (en) | 2018-11-26 | 2019-11-22 | Fluidized bed furnace |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3889532B1 (en) |
KR (1) | KR102090550B1 (en) |
CN (1) | CN113167534B (en) |
WO (1) | WO2020111666A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA3237177A1 (en) * | 2021-11-30 | 2023-06-08 | Shoji USHIO | Facility for producing reduced iron and method for producing reduced iron |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0689389B2 (en) * | 1986-03-31 | 1994-11-09 | 新日本製鐵株式会社 | Fluidized bed reduction method for ores |
AU596758B2 (en) * | 1987-11-13 | 1990-05-10 | Jp Steel Plantech Co. | Metal-making apparatus involving the smelting reduction of metallic oxides |
JPH0730375B2 (en) * | 1992-08-04 | 1995-04-05 | 川崎重工業株式会社 | Fluidized bed furnace |
AT405942B (en) * | 1995-03-17 | 1999-12-27 | Voest Alpine Ind Anlagen | METHOD FOR REDUCING FINE ORE AND SYSTEM FOR IMPLEMENTING THE METHOD |
WO1998029574A1 (en) * | 1996-12-28 | 1998-07-09 | Pohang Iron & Steel Co., Ltd. | Fluidized bed type reducing system for reducing fine iron ore |
JPH11181510A (en) * | 1997-12-17 | 1999-07-06 | Kawasaki Heavy Ind Ltd | Fluidized bed reduction furnace and method for reducing powdery and granular ore |
KR100778673B1 (en) * | 2005-12-26 | 2007-11-22 | 주식회사 포스코 | Apparatus for manufacturing molten irons |
-
2018
- 2018-11-26 KR KR1020180147506A patent/KR102090550B1/en active IP Right Grant
-
2019
- 2019-11-22 CN CN201980077736.XA patent/CN113167534B/en active Active
- 2019-11-22 WO PCT/KR2019/016101 patent/WO2020111666A1/en unknown
- 2019-11-22 EP EP19889794.4A patent/EP3889532B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP3889532B1 (en) | 2023-05-10 |
EP3889532A4 (en) | 2021-12-22 |
CN113167534A (en) | 2021-07-23 |
WO2020111666A1 (en) | 2020-06-04 |
CN113167534B (en) | 2023-09-01 |
KR102090550B1 (en) | 2020-03-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR970003636B1 (en) | A furnace for reduction fine coal in the manufacture of iron melts | |
EP3889532B1 (en) | Fluidized bed furnace | |
KR19980051236A (en) | Three-stage Fluidized Bed Reduction Apparatus for Ferrous Iron Ore with X-Type Circulation Tube | |
JP2021505838A (en) | Charge system for shaft melt reduction furnace | |
JPH0860215A (en) | Fluidized bed furnace and smelting reduction apparatus using it | |
AU615535B2 (en) | Method for the production of metals, particularly ferroalloys, by direct reduction and a column for treating particulate materials with gas | |
KR20090068689A (en) | Reducing furnace and apparatus for manufacturing molten iron comprising the same | |
JP2620793B2 (en) | Preliminary reduction furnace for smelting reduction | |
JP2006291255A (en) | Method for operating blast furnace | |
WO1992012264A1 (en) | Fluidized bed preliminary reducing furnace for raw material comprising oxide | |
JP6198649B2 (en) | Raw material charging method for blast furnace | |
US5427604A (en) | Alloy material addition method and apparatus for smelting and melting furnaces | |
JP2018024914A (en) | Method for charging raw material to blast furnace | |
US6235080B1 (en) | Charging device for directly charging reduced fine iron ore into melter-gasifier | |
JP2579785B2 (en) | Pre-reduction device for smelting reduction | |
KR100262486B1 (en) | Reduction process and equipment and smelting reduction equipment of fine iron ore | |
JP2021195621A (en) | Gas distributor | |
JP5966608B2 (en) | Raw material charging method to blast furnace | |
JPS59176584A (en) | Disperser for gas of fluidized bed spare reducing furnace | |
JP4052047B2 (en) | Raw material charging method to blast furnace | |
WO1999032666A1 (en) | Two step twin-single fluidized bed type pre-reduction apparatus for pre-reducing fine iron ore, and method therefor | |
KR20240095265A (en) | Reduced iron manufacturing equipment and reduced iron manufacturing method | |
AU639068B2 (en) | Fluidized bed preliminary reducing furnace for raw material comprising oxide | |
CN118318052A (en) | Reduced iron production facility and reduced iron production method | |
KR20230136640A (en) | How to make pig iron |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20210610 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20211123 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F27B 15/02 20060101ALI20211117BHEP Ipc: C21B 13/00 20060101ALI20211117BHEP Ipc: F27B 15/10 20060101ALI20211117BHEP Ipc: F27B 15/09 20060101ALI20211117BHEP Ipc: F27B 15/08 20060101ALI20211117BHEP Ipc: F27B 15/00 20060101AFI20211117BHEP |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: SHIN, MYOUNG KYUN Inventor name: KO, CHANG KUK |
|
REG | Reference to a national code |
Ref document number: 602019028933 Country of ref document: DE Ref country code: DE Ref legal event code: R079 Free format text: PREVIOUS MAIN CLASS: F27B0015000000 Ipc: F27B0015020000 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: C21B 13/02 20060101ALI20221004BHEP Ipc: F27B 15/10 20060101ALI20221004BHEP Ipc: F27B 15/09 20060101ALI20221004BHEP Ipc: F27B 15/08 20060101ALI20221004BHEP Ipc: C21B 13/00 20060101ALI20221004BHEP Ipc: F27B 15/02 20060101AFI20221004BHEP |
|
RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: POSCO HOLDINGS INC. |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20221208 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: POSCO CO., LTD |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1567045 Country of ref document: AT Kind code of ref document: T Effective date: 20230515 Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602019028933 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20230510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230911 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230810 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230910 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230811 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20231123 Year of fee payment: 5 Ref country code: DE Payment date: 20231129 Year of fee payment: 5 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602019028933 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 1567045 Country of ref document: AT Kind code of ref document: T Effective date: 20230510 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20240213 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230510 |