EP3633142B1 - Novel process for controlling downhole gas in abandoned mine - Google Patents
Novel process for controlling downhole gas in abandoned mine Download PDFInfo
- Publication number
- EP3633142B1 EP3633142B1 EP18805598.2A EP18805598A EP3633142B1 EP 3633142 B1 EP3633142 B1 EP 3633142B1 EP 18805598 A EP18805598 A EP 18805598A EP 3633142 B1 EP3633142 B1 EP 3633142B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- water
- gas
- downhole
- drift
- mine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 14
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 126
- 238000005086 pumping Methods 0.000 claims description 42
- 230000000903 blocking effect Effects 0.000 claims description 30
- 239000004575 stone Substances 0.000 claims description 26
- 239000011150 reinforced concrete Substances 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 239000004576 sand Substances 0.000 claims description 8
- 239000004568 cement Substances 0.000 claims description 7
- 239000004927 clay Substances 0.000 claims description 4
- 239000003657 drainage water Substances 0.000 claims description 4
- 239000007789 gas Substances 0.000 description 82
- 239000003245 coal Substances 0.000 description 7
- 238000004519 manufacturing process Methods 0.000 description 6
- 239000004567 concrete Substances 0.000 description 4
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 4
- 238000009825 accumulation Methods 0.000 description 3
- 239000011083 cement mortar Substances 0.000 description 3
- 238000005070 sampling Methods 0.000 description 3
- 239000011449 brick Substances 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 241000894006 Bacteria Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 239000003344 environmental pollutant Substances 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 231100000719 pollutant Toxicity 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F7/00—Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F16/00—Drainage
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
- E21F17/103—Dams, e.g. for ventilation
Definitions
- Gas in abandoned mines means methane, which is in an adsorbed or free state, residual in remaining coal seams, surrounding rocks and downhole confined spaces in mines that are closed according to relevant provisions of the state due to the depletion of coal resources or other reasons such as inconformity to requirements and policies on safe production.
- the utilization of gas in abandoned mines means that gas is extracted and utilized by the existing gas pumping system on the ground, by taking certain blocking measures, before the mines are closed. In China, no successful experience and projects can be found in the field of control of abandoned mines, in spite of some theoretical studies. Although the pumping of gas by ground drilling has already been done in some mines, the real comprehensive control and utilization of gas in abandoned mines is blank yet.
- the air inlet pipe is connected into the closed roadway and is hung and fixed through hanging hooks, the air inlet pipe is built and grounded in the closed roadway, the situation that gas accumulated in the closed roadway is denoted by discharge sparks generated by static electricity on the air inlet pipe after the roadway is closed is avoided, and the head-on distance between of a pipe opening, on one side of the closed roadway, of the air inlet pipe and the closed roadway is smaller than the effective range of input air flow of the air inlet pipe and is generally smaller than 5 m.
- the closed roadway is unsealed, the high-concentration gas accumulated in the closed roadway is replaced with fresh air flow in advance and is pumped out by connecting the gas drainage pipe and a coal mine extraction system. While, a GB application No.
- an objective of the present invention is to provide a novel process for controlling downhole gas in abandoned mines, by blocking downhole drifts in an abandoned mine, forming holes, connecting and reconstructing the gas pumping pipe system, reconstructing the water drainage system, pumping downhole gas by a pumping device on the ground, in order to achieve the purposes of comprehensive control and utilization of gas in an abandoned mine.
- the technical solution comprises the following steps.
- the present invention has the following beneficial effects.
- compressive gas control measures such as blocking downhole drifts in an abandoned mines, reconstructing the downhole gas pipe, reconstructing the pumping of inflowing downhole water, and closing the entrance of the abandoned mine.
- disasters caused by the accumulation and escape of downhole gas in the abandoned mine and the accumulation of downhole water are avoided.
- the gas in the abandoned mine can be reused.
- Great economic, environmental and social benefits can be realized.
- one embedded pipe 5 that is DN100-DN200 thick is embedded in the blocking walls at a position 0.2-0.3m from the top of the adit.
- the branched drifts are communicated with the main drift 8.
- a pipe flange 6 is used outside the embedded pipe to close it. If gas reaches a concentration that can be utilized, the pipe can be directly connected to a downhole gas pumping main pipe 7 by the flange, and then the downhole gas is pumped and utilized by the existing gas pumping device on the ground.
- the length, width and depth of the water reservoir depend upon the size of the downhole drift, the capacity of the pumping system, and the amount of inflowing water.
- the water reservoir consists of two water reservoirs connected in series, which are 20m long, 3m wide and 3m deep.
- a water drainage wellbore 13 is formed on the ground right above the water reservoir, so that the water reservoir is communicated with the ground by the water drainage wellbore 13.
- a water drainage pump 12 is mounted in the water drainage wellbore. An outlet of the water drainage pump 12 is connected to a water treatment device on the ground. By the water drainage pump, the inflowing downhole water accumulated in the water reservoir is drained, to ensure an enough downhole space to release the stored gas. In this way, the purposes of comprehensive control and utilization of downhole gas in abandoned mines are achieved.
- a steel-reinforced concrete cover plate 15 is arranged to block the entrance.
- the distance from the upper surface of the cover plate to the ground, the thickness of the steel-reinforced concrete cover plate, the size of the used steel, the grade of concrete, and the proportion of steel and concrete depend upon the size of the entrance, and will be designed by professional structure design organizations.
- one or two steel pipes 3 having a diameter of DN300-500mm are embedded in the steel-reinforced concrete cover plate.
- One end of the embedded pipe extends into the entrance by a length of greater than 15m, and the pipe orifice inside the entrance is open.
- the other end of the embedded pipe remains on the steel-reinforced concrete cover plate.
- a pipe flange is welded at 0.5m to 1m from the ground, and the blind flange and the flange are connected by bolts to block the pipe orifice.
- a sampling device is put into the pipe to sample and analyze the concentration of downhole gas. If gas reaches a concentration that can be utilized, the pipe is connected to the gas pumping system pipe on the ground to pump and utilize the accumulated downhole gas. In this way, the purpose of comprehensively controlling gas in abandoned mines is achieved.
- a squared stone sealing wall 3 having a thickness of not less than 1m is built with squared stones, cement and sand; then, loess or clay is filled in the loess or clay filling section 20 having a thickness of greater than 20m, up to the adit entrance of the inclined shaft; and then, a squared stone blocking wall 19 having a thickness of not less than 1m is built with squared stones, cement and sand.
- one or two steel pipes 2 having a diameter of DN300-500mm are embedded in the upper portion of the adit entrance.
- One end of the embedded pipe 18 extends into the entrance 1 by a length of greater than 20m and is supported by a rack, and the pipe orifice inside the entrance is open.
- the other end of the embedded pipe remains outside the squared stone blocking wall 19 at the entrance of the inclined shaft.
- a pipe flange is welded at 0.5m to 1m from the blocking wall, and the blind flange and the flange are connected by bolts to block the pipe orifice.
- a sampling device is put into the pipe to sample and analyze the concentration of downhole gas. If gas reaches a concentration that can be utilized, the pipe is connected to the existing gas pumping main pipe 22 on the ground to pump and utilize the accumulated downhole gas. In this way, the purpose of comprehensively controlling gas in abandoned mines is achieved.
Description
- The present invention belongs to the field of control of gas in mines, and particularly relates to a novel process for controlling gas in an abandoned mine.
- Gas in abandoned mines means methane, which is in an adsorbed or free state, residual in remaining coal seams, surrounding rocks and downhole confined spaces in mines that are closed according to relevant provisions of the state due to the depletion of coal resources or other reasons such as inconformity to requirements and policies on safe production. The utilization of gas in abandoned mines means that gas is extracted and utilized by the existing gas pumping system on the ground, by taking certain blocking measures, before the mines are closed. In China, no successful experience and projects can be found in the field of control of abandoned mines, in spite of some theoretical studies. Although the pumping of gas by ground drilling has already been done in some mines, the real comprehensive control and utilization of gas in abandoned mines is blank yet. With the development of structural reform of the coal industry and elimination of backward production capacity in China, the number of the closed mines is increasing year by year. The hazards of gas escape, mine collapse, contamination of dirt and accumulated downhole water in abandoned mines are increasingly obvious. The ecological environment will be seriously threatened without scientific control. Meanwhile, these closed mines are rich in gas. It was reported that there may be a trillion cubic feet of gas resources in these abandoned mines in China. The popularization and industrial application of the process of the present invention all over the country will facilitate the development and utilization of unconventional natural gas resources during the China's "13th Five-Year Plan", and also the transformation of coal enterprises, the creation of new jobs and the reuse of abandoned resources, and more importantly, will solve the safety and environmental protection problems of abandoned mines and protect the ecological environment. It is of great social significance. A
PCT application No. WO 2016/019427 discloses a well system comprising at least one gas well extending from a ground surface into the ground, a water production well extending from a surface into the ground and a water drainage well fluidly connecting the at least one gas well to the water production well. Whereas, aCN application No. 104196558A discloses a fast and safe gas emission method of a coal mine closed roadway. When a roadway building of a coal mine is closed and sealed, a gas drainage pipe for the gas emission and an air inlet pipe are reserved on a closed wall. The air inlet pipe is connected into the closed roadway and is hung and fixed through hanging hooks, the air inlet pipe is built and grounded in the closed roadway, the situation that gas accumulated in the closed roadway is denoted by discharge sparks generated by static electricity on the air inlet pipe after the roadway is closed is avoided, and the head-on distance between of a pipe opening, on one side of the closed roadway, of the air inlet pipe and the closed roadway is smaller than the effective range of input air flow of the air inlet pipe and is generally smaller than 5 m. When the closed roadway is unsealed, the high-concentration gas accumulated in the closed roadway is replaced with fresh air flow in advance and is pumped out by connecting the gas drainage pipe and a coal mine extraction system. While, aGB application No. 2278379A - In view of existing shortcomings in controlling downhole gas in abandoned mines, an objective of the present invention is to provide a novel process for controlling downhole gas in abandoned mines, by blocking downhole drifts in an abandoned mine, forming holes, connecting and reconstructing the gas pumping pipe system, reconstructing the water drainage system, pumping downhole gas by a pumping device on the ground, in order to achieve the purposes of comprehensive control and utilization of gas in an abandoned mine.
- For this purpose, the technical solution comprises the following steps.
- 1) Before closing an abandoned mine, branched drifts with high downhole gas overflow are blocked at their joints with a main drift by squared stone walls, and pipes are embedded to extract gas and to pump inflowing water:
- a: Blockage of downhole drifts: before closing an abandoned mine, at joints of branched downhole drifts in the mining area and goaf with a main drift, an internal wall with a thickness of 0.8m to 1m and an external wall with a thickness of 0.8m to 1m are built with squared stones, with loess filled between the walls. During the whole building process of the blocking walls, a pipe is embedded to enable the interior of the drift to communicate with the exterior. A removable enclosure is formed outside the communication pipe, so that a gas detector can be put into the enclosed drifts for detection. If a drift with high gas content is detected, this pipe is directly connected to the downhole gas main pipe. Also, water drainage holes are to be formed in lower portions of the blocking walls, to drain inflowing water from the drifts. The existing gas pumping pipe system is, after being reconstructed, kept in connection to the pumping system on the ground, to realize the pumping of downhole gas in the abandoned mine.
- b: Pumping of inflowing downhole water: normally, downhole water always inflows to the goaf, and during the normal production of mines, the pumping of inflowing downhole water is also an important one of routine tasks in production of mines. However, after a mine is shut down and closed, if the inflowing downhole water is not drained in time, the accumulated inflowing downhole water will flood drifts in the goaf in the mine. Consequently, there is no space for the downhole gas to escape out, and as a result, it is unable to extract and utilize the downhole gas. In the present invention, after a mine is shut down and closed, an inflowing downhole water control and pumping system is redesigned, by which, by operating on the ground, the inflowing downhole water can be pumped to the ground without any operator in the mine. In this way, a space is reserved for the downhole gas to escape out and the accumulation of water in the mine is avoided. Meanwhile, the purpose of controlling gas in abandoned mines is realized.
- 2) The pipes embedded in the squared stone walls are connected with a downhole gas pumping pipe to form a downhole gas pumping pipe system, and then the accumulated downhole gas in an abandoned mine is pumped by the existing gas pumping system device on the ground:
A firm steel-reinforced concrete cover plate, which is bigger than the cross section of the wellbore, is cast on the entrance of a vertical shaft. During the casting, two steel pipes are embedded in the steel-reinforced concrete cover plate. An end of the steel pipe running into the inner side of the wellbore is open, to communicate with the downhole space. A blind flange is mounted on the outer side of the wellbore, and connected by blots. For an inclined shaft and an adit inclined shaft, a brick, stone or concrete wall, which has a thickness of not less than 0.6m and must be firm and reliable, should be built at 20m inside the entrance. Then, soil is filled up to the entrance. And then, another brick, stone or concrete wall is built. After the mine is closed, the blind flange outside the embedded pipe is removed, and a gas detector or sampling device is put into the mine to detect the concentration of gas in the mine. If gas in the mine can be utilized, the pipe is connected to the gas pumping pipe on the ground. In this way, the pumping and utilization of accumulated downhole gas is achieved after the mine is closed. - 3) The blocked drift drainage water is communicated with main drift drainage water, a water reservoir is constructed somewhere low on the bottom of the mine, a water drainage wellbore is formed from the ground to the water reservoir, and a water drainage pump and a water pipe are mounted to pump inflowing downhole water to the ground, in order to achieve normal pumping of inflowing downhole water after the mine is closed; an inlet of the water drainage pump is put into 2/3 of a depth of the water reservoir;
a water outlet for the branched drift is formed in a lower side of the squared stone wall; the water outlet is in form of an overflow water seal; a water tank is constructed inside the branched drift close to the squared stone wall; the inflowing water in the branched drift flows into the water tank, when a level of accumulated water reaches an overflow height, the inflowing water flows out of the branched drift from the water tank; while gas in the branched drift will not escape from the water outlet; the inflowing water over flown from each branched drift flows into the water reservoir by a drainage ditch arranged in the main drift. - 4) after finishing the above operations, for an adit inclined shaft, an entrance of the adit inclined shaft is closed by building internal and external walls with squared stones, cement and sand, with loess and clay filled between the walls, and steel pipes that run into the mine are embedded in an upper portion of the entrance of the adit inclined shaft; and for a vertical shaft, the entire entrance of the vertical shaft is blocked with steel-reinforced concrete cover plates, and steel pipes are embedded in the center of the steel-reinforced concrete cover plates to enable the interior to communicate with the exterior; and the connection with the existing gas pumping system device on the ground achieves the pumping, control and utilization of gas in an abandoned mine.
- 5) The existing gas pumping system device on the surface is connected with a downhole gas pumping main pipe to pump gas, thereby achieving the purposes of comprehensive control and utilization of downhole gas in an abandoned mine.
- The present invention has the following beneficial effects. By compressive gas control measures, such as blocking downhole drifts in an abandoned mines, reconstructing the downhole gas pipe, reconstructing the pumping of inflowing downhole water, and closing the entrance of the abandoned mine, disasters caused by the accumulation and escape of downhole gas in the abandoned mine and the accumulation of downhole water are avoided. Meanwhile, the gas in the abandoned mine can be reused. Great economic, environmental and social benefits can be realized.
-
-
Fig. 1 shows a downhole gas pipe system used in the process of the present invention; -
Fig. 2 is an inflowing downhole water drainage system according to the present invention; -
Fig. 3 is a schematic view of closing the entrance of a vertical shaft in an abandoned mine, according to the present invention; and -
Fig. 4 is a schematic view of blocking an inclined shaft in an abandoned mine, and a gas pumping pipe, according to the present invention. - Reference numerals:
1: brancheddownhole drift # 1; 2: branched downhole drift #2; 3: brancheddownhole drift # 3; 4: blocking wall for the branched downhole drift; 5: embedded pipe; 6: pipe flange; 7: downhole gas pumping main pipe; 8: main downhole drift; 9: water outlet fora branched downhole drift; 10: drainage ditch for the main downhole drift; 11: downhole water reservoir; 12: water drainage pump; 13: water drainage wellbore; 14: main entrance of the abandoned mine; 15:cover plate for blocking the entrance; 16: reserved gas pumping pipe; 17: main inclined shaft in the abandoned mine; 18: pipe embedded in the blocking wall; 19: internal squared stone blocking wall; 20: loess or sand filled section; 21: external squared stone blocking wall; and 22: gas pumping main pipe on the ground. - As shown in
Fig. 1 , a novel process for comprehensively controlling downhole gas in an abandoned mine is provided. Before an abandoned mine is closed, a blocking wall 4 is built, respectively, at a position about 8m from the adit entrance of the branched drifts #1, #2 and #3 in the downhole mining area and goaf in the abandoned mine. Specifically, at a position 8m from the entrance of a branched drift, a blocking wall having a thickness of about 0.8m to 1m is built with squared stones, cement and sand to block the branched drift, and an external blocking wall having a thickness of about 0.8m to 1m is built with squared stones, cement and sand, with a layer of loess having a thickness of 5m filled between the walls. During the whole building process of the blocking walls, one embeddedpipe 5 that is DN100-DN200 thick is embedded in the blocking walls at a position 0.2-0.3m from the top of the adit. By this embeddedpipe 5, the branched drifts are communicated with the main drift 8. A pipe flange 6 is used outside the embedded pipe to close it. If gas reaches a concentration that can be utilized, the pipe can be directly connected to a downhole gas pumpingmain pipe 7 by the flange, and then the downhole gas is pumped and utilized by the existing gas pumping device on the ground. - Referring to
Fig. 2 , a system for pumping inflowing downhole water in an abandoned mine is shown. Before an abandoned mine is closed, when building blocking walls for the brancheddownhole drift # 1, a water outlet 9 for a branched downhole drift is formed in the lower side of the blocking walls. The water outlet is in form of an overflow water seal. A water tank, which is plastered with cement mortar, is constructed inside the branched drift close to the blocking walls. The volume of the water tank depends upon the amount of inflowing water in the branched drift. The inflowing water in the branched drift flows into the water tank. When the level of the accumulated water reaches the overflow height, water flows out of the branched drift from the overflow tank in the lower portion of the blocking walls for the branched drift. In this way, the inflowing water in the branched drift can be drained, while gas in the branched drift will not escape from the water outlet 9 which is in form of an overflow water seal. The inflowing water overflown from each branched drift flows into adrainage ditch 10, which is arranged in the main drift and plastered with cement mortar. Awater reservoir 11 is formed somewhere low on the bottom of the mine. The water reservoir is an adit dug somewhere lowest on the bottom of the mine. The water reservoir is plastered with cement mortar. The length, width and depth of the water reservoir depend upon the size of the downhole drift, the capacity of the pumping system, and the amount of inflowing water. Usually, the water reservoir consists of two water reservoirs connected in series, which are 20m long, 3m wide and 3m deep. Awater drainage wellbore 13 is formed on the ground right above the water reservoir, so that the water reservoir is communicated with the ground by thewater drainage wellbore 13. Awater drainage pump 12 is mounted in the water drainage wellbore. An outlet of thewater drainage pump 12 is connected to a water treatment device on the ground. By the water drainage pump, the inflowing downhole water accumulated in the water reservoir is drained, to ensure an enough downhole space to release the stored gas. In this way, the purposes of comprehensive control and utilization of downhole gas in abandoned mines are achieved. - As shown in
Fig. 3 , in the process of the present invention, at themain entrance 14 of the abandoned mine, a steel-reinforcedconcrete cover plate 15 is arranged to block the entrance. The distance from the upper surface of the cover plate to the ground, the thickness of the steel-reinforced concrete cover plate, the size of the used steel, the grade of concrete, and the proportion of steel and concrete depend upon the size of the entrance, and will be designed by professional structure design organizations. During the construction according to the design document, when the steel-reinforced concrete cover plate is prepared, one or twosteel pipes 3 having a diameter of DN300-500mm are embedded in the steel-reinforced concrete cover plate. One end of the embedded pipe extends into the entrance by a length of greater than 15m, and the pipe orifice inside the entrance is open. The other end of the embedded pipe remains on the steel-reinforced concrete cover plate. A pipe flange is welded at 0.5m to 1m from the ground, and the blind flange and the flange are connected by bolts to block the pipe orifice. After removing the blind flange, a sampling device is put into the pipe to sample and analyze the concentration of downhole gas. If gas reaches a concentration that can be utilized, the pipe is connected to the gas pumping system pipe on the ground to pump and utilize the accumulated downhole gas. In this way, the purpose of comprehensively controlling gas in abandoned mines is achieved. - As shown in
Fig. 4 , in the process of the present invention, there is mainly an inclined shaft in an abandoned mine. In this case, when blocking the entrance of the maininclined shaft 17, at a depth more than 25m from the entrance, a squaredstone sealing wall 3 having a thickness of not less than 1m is built with squared stones, cement and sand; then, loess or clay is filled in the loess orclay filling section 20 having a thickness of greater than 20m, up to the adit entrance of the inclined shaft; and then, a squaredstone blocking wall 19 having a thickness of not less than 1m is built with squared stones, cement and sand. During the whole blocking process, one or two steel pipes 2 having a diameter of DN300-500mm are embedded in the upper portion of the adit entrance. One end of the embeddedpipe 18 extends into theentrance 1 by a length of greater than 20m and is supported by a rack, and the pipe orifice inside the entrance is open. The other end of the embedded pipe remains outside the squaredstone blocking wall 19 at the entrance of the inclined shaft. A pipe flange is welded at 0.5m to 1m from the blocking wall, and the blind flange and the flange are connected by bolts to block the pipe orifice. After removing the blind flange, a sampling device is put into the pipe to sample and analyze the concentration of downhole gas. If gas reaches a concentration that can be utilized, the pipe is connected to the existing gas pumpingmain pipe 22 on the ground to pump and utilize the accumulated downhole gas. In this way, the purpose of comprehensively controlling gas in abandoned mines is achieved.
Claims (1)
- A process for controlling downhole gas in an abandoned mine, wherein the process comprises steps of:1) before closing an abandoned mine, blocking branched drifts (1, 2, 3) with high downhole gas overflow at their joints with a main drift by squared stone walls (4) and embedding pipes (5) to extract gas and to pump inflowing water;2) connecting the pipes embedded in the squared stone walls (4) to extract gas with a downhole gas pumping pipe (7) to form a downhole gas pumping pipe system, and then pumping accumulated downhole gas in an abandoned mine by an existing gas pumping system device on the ground;3) communicating the blocked drift drainage water with main drift drainage water, constructing a water reservoir (11) somewhere low on the bottom of the mine, forming a water drainage well bore (13) from the ground to the water reservoir, and mounting a water drainage pump (12) and a water pipe to pump inflowing downhole water to the ground, in order to achieve normal pumping of inflowing downhole water after the mine is closed; an inlet of the water drainage pump is put into 2/3 of a depth of the water reservoir; a water outlet (9) for the branched drift (1, 2, 3) is formed in a lower side of the squared stone wall; the water outlet is in form of an overflow water seal; a water tank is constructed inside the branched drift close to the squared stone wall; the inflowing water in the branched drift flows into the water tank, when a level of accumulated water reaches an overflow height, the inflowing water flows out of the branched drift from the water tank; while gas in the branched drift will not escape from the water outlet; the inflowing water over flown from each branched drift flows into the water reservoir (11) by a drainage ditch (10) arranged in the main drift;4) after finishing the above operations, for an adit inclined shaft, closing an entrance of the adit inclined shaft (17) by building internal and external walls (19,21) with squared stones, cement and sand, with loess and clay (20) filled between the walls, and embedding steel pipes (18) that run into the mine in an upper portion of the entrance of the adit inclined shaft; and for a vertical shaft, blocking an entire entrance of the vertical shaft (14) with steel-reinforced concrete cover plates (15), and embedding steel pipes (16) in the center of the steel-reinforced concrete cover plates to enable the interior to communicate with the exterior; and the connection with the existing gas pumping system device on the ground achieves the pumping, control and utilization of gas in an abandoned mine; and5) connecting the existing gas pumping system device on the ground with a downhole gas pumping main pipe to pump gas, thereby achieving the purposes of comprehensive control and utilization of downhole gas in an abandoned mine.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710383542.5A CN107035401B (en) | 2017-05-26 | 2017-05-26 | A kind of abandoned mine fire damp administers new technology |
PCT/CN2018/082635 WO2018214659A1 (en) | 2017-05-26 | 2018-04-11 | Novel process for controlling downhole gas in abandoned mine |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3633142A1 EP3633142A1 (en) | 2020-04-08 |
EP3633142A4 EP3633142A4 (en) | 2021-03-24 |
EP3633142B1 true EP3633142B1 (en) | 2023-03-22 |
Family
ID=59540530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18805598.2A Active EP3633142B1 (en) | 2017-05-26 | 2018-04-11 | Novel process for controlling downhole gas in abandoned mine |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3633142B1 (en) |
CN (1) | CN107035401B (en) |
WO (1) | WO2018214659A1 (en) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107035401B (en) * | 2017-05-26 | 2018-04-10 | 中节能宁夏新能源股份有限公司 | A kind of abandoned mine fire damp administers new technology |
CN107762554B (en) * | 2017-09-15 | 2019-03-19 | 徐州工程学院 | A kind of system that old abandoned mine places discarded concrete and sequestration of carbon dioxide |
CN108180033B (en) * | 2017-11-30 | 2020-05-15 | 中国矿业大学(北京) | Automatic regulating and controlling equipment for gas release in closed goaf |
CN110939407B (en) * | 2018-09-25 | 2023-03-31 | 山西省煤炭地质勘查研究院 | Double-deck overlapping goaf ground drainage well structure and recovery unit |
CN109695476A (en) * | 2019-02-19 | 2019-04-30 | 中节能宁夏新能源股份有限公司 | A kind of abandoned mine gas drainage remote monitoring device based on GPRS data transmission |
CN110043315B (en) * | 2019-05-30 | 2024-03-12 | 西安科技大学 | Rapid sealing device and method for mine disaster area with impact resistance |
CN110159226A (en) * | 2019-06-19 | 2019-08-23 | 贵州盘江精煤股份有限公司 | A kind of gas control provided pipe fast plugging device |
CN110905598B (en) * | 2019-12-05 | 2023-08-29 | 中煤地质集团有限公司 | Column type high-angle inclined roadway drilling grouting plugging equipment and method |
CN111878162B (en) * | 2020-05-27 | 2023-05-09 | 中南大学 | Dredging and pollution discharging method for underground mine leakage filling mortar storage facility |
CN111606451A (en) * | 2020-06-01 | 2020-09-01 | 合肥恒翔电子科技有限公司 | Intelligent water treatment system of mining gas pump station |
CN111720161B (en) * | 2020-07-02 | 2021-12-07 | 杨东方 | Coal mine coal face upper corner gas extraction device |
CN113233525B (en) * | 2021-04-29 | 2023-05-09 | 中国地质调查局武汉地质调查中心 | Method for repairing and treating underground water pollution of pyrite mountain based on underground water flow field |
CN113944497B (en) * | 2021-10-14 | 2023-12-26 | 平安煤矿瓦斯治理国家工程研究中心有限责任公司 | Method for preventing and controlling gas leakage of waste mine shaft |
CN115306480A (en) * | 2022-09-02 | 2022-11-08 | 中国矿业大学 | Method for reforming and utilizing abandoned mine roadway |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU688645A1 (en) * | 1978-05-22 | 1979-09-30 | Восточный научно-исследовательский институт по безопасности работ в горной промышленности | Arrangement for withdrawing explosion-hazardous gas mixture |
SU949207A1 (en) * | 1980-12-11 | 1982-08-07 | Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности | Method for degassing of worked space |
GB2278379A (en) * | 1993-05-05 | 1994-11-30 | Stanley Ball | A mine pollution control unit |
CN101476483A (en) * | 2008-11-24 | 2009-07-08 | 杜志刚 | Gas draining and utilizing method for waste mine |
CN102337906B (en) * | 2011-09-09 | 2014-06-11 | 陕西开拓建筑科技有限公司 | Construction method for pouring airtight partition wall between recovered roadway and reserved roadway |
PL219797B1 (en) * | 2012-01-16 | 2015-07-31 | Politechnika Śląska | Method for direct methane removal and inerting infarct zone in the longwall face |
RU2012150991A (en) * | 2012-11-28 | 2014-06-10 | Юрий Андреевич Иконников | METHOD FOR DEGASING COAL PLASTS |
CN203114329U (en) * | 2013-01-18 | 2013-08-07 | 陕西陕煤黄陵矿业有限公司 | Coal mine long-distance roadway gas discharge device |
CN103670497A (en) * | 2013-12-25 | 2014-03-26 | 大同煤矿集团有限责任公司 | Gas treatment method used when tunneled underground coal mine roadway is communicated with abandoned roadway |
CN203835449U (en) * | 2014-05-16 | 2014-09-17 | 淮南矿业(集团)有限责任公司 | Drainage device for roadway mud region and grouting device |
WO2016019427A1 (en) * | 2014-08-04 | 2016-02-11 | Leap Energy Australia Pty Ltd | A well system |
CN104196558A (en) * | 2014-08-14 | 2014-12-10 | 山西潞安环保能源开发股份有限公司 | Fast and safe gas emission method of coal mine closed roadway |
CN204175336U (en) * | 2014-10-21 | 2015-02-25 | 河南理工大学 | A kind of goaf gas fast plugging device |
CN105715293A (en) * | 2014-12-04 | 2016-06-29 | 西安汇科地质技术服务有限责任公司 | Well hole processing method for abandoned coal mine |
CN204419239U (en) * | 2014-12-26 | 2015-06-24 | 大同煤矿集团有限责任公司 | Ground gas drainage system |
CN205743984U (en) * | 2016-04-24 | 2016-11-30 | 新疆维吾尔自治区煤炭科学研究所 | A kind of stope working surface of coal mines gas at upper corner automatic extraction system |
CN106437632B (en) * | 2016-11-09 | 2018-04-20 | 山西潞安矿业(集团)有限责任公司 | A kind of old goaf gas pumping method in colliery |
CN107035401B (en) * | 2017-05-26 | 2018-04-10 | 中节能宁夏新能源股份有限公司 | A kind of abandoned mine fire damp administers new technology |
-
2017
- 2017-05-26 CN CN201710383542.5A patent/CN107035401B/en active Active
-
2018
- 2018-04-11 EP EP18805598.2A patent/EP3633142B1/en active Active
- 2018-04-11 WO PCT/CN2018/082635 patent/WO2018214659A1/en active Application Filing
Also Published As
Publication number | Publication date |
---|---|
WO2018214659A1 (en) | 2018-11-29 |
EP3633142A4 (en) | 2021-03-24 |
CN107035401B (en) | 2018-04-10 |
EP3633142A1 (en) | 2020-04-08 |
CN107035401A (en) | 2017-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3633142B1 (en) | Novel process for controlling downhole gas in abandoned mine | |
CN108149699B (en) | Recoverable dewatering well device capable of achieving well fast and construction method thereof | |
CN102425421B (en) | Novel water control method suitable for mine shafts | |
CN104060620B (en) | Deep basal pit Karst Fissures water controling method | |
CN205387712U (en) | Quick treatment device of foundation pit piping | |
CN103437339A (en) | Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum | |
CN110067597A (en) | A kind of mine angle of depression negative pressure visits the method for putting old dead zone ponding | |
CN106381405B (en) | A kind of Rare-earth Mine liquor collecting system and method | |
CN103088836A (en) | Sedimentation control method for pumping water and performing reinjection in well casing simultaneously | |
CN102051885A (en) | Process for absorbing and discharging water under deep foundation concrete | |
CN104929135A (en) | Deep foundation pit underground diaphragm wall enclosure structure and chemical churning pile water stop construction method thereof | |
CN103195477A (en) | Gravity drainage system for underground roadway high-pressure water inrush | |
CN104420476A (en) | Method and device using home-made small tube well to lower underground water level | |
CN205187791U (en) | Stifled mechanism of silt is prevented to immersible pump | |
CN110748377B (en) | Gas and water double-extraction device in abandoned mine | |
CN108343470A (en) | A kind of nature moisturizing method of underground water seal cave depot water curtain system | |
CN205591201U (en) | Water treatment system is gushed to interior refuse dump | |
KR100660003B1 (en) | Outflow protection structure of noxious material in closing mine | |
CN214836253U (en) | Well cementation device for large-diameter drilling same-diameter segmented pipe discharging | |
CN206114063U (en) | Underground water level monitoring device | |
CN103669333B (en) | It is easy to the friction pile of vacuum-dewatering | |
CN102966376A (en) | Vacuum negative pressure quick unwatering method for ore body | |
CN203066092U (en) | Pumping and recharging dual-purpose well casing | |
RU2487997C1 (en) | Method to prepare water-logged gas saturated massif of rocks to mining by underground method | |
CN208733656U (en) | A kind of bridge type filter pipe vacuum-dewatering well device suitable for deep pit digging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190918 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20210224 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21F 7/00 20060101AFI20210218BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20221011 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: CHEN, GUANGSHENG Inventor name: MA, YUXIANG Inventor name: DONG, WENJUN Inventor name: WANG, WEI Inventor name: YANG, ZHIBIN Inventor name: BAI, LIANG Inventor name: XIANG, QIZHI Inventor name: QI, MING Inventor name: ZHAO, YAN Inventor name: LIU, SHUANGLIN Inventor name: YU, ZHIJUN |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018047537 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1555400 Country of ref document: AT Kind code of ref document: T Effective date: 20230415 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20230322 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230622 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20230428 Year of fee payment: 6 Ref country code: DE Payment date: 20230524 Year of fee payment: 6 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1555400 Country of ref document: AT Kind code of ref document: T Effective date: 20230322 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230623 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230724 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20230428 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230722 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230411 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602018047537 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20230430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230322 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
26N | No opposition filed |
Effective date: 20240102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230411 |