EP3578385A1 - Method for refining a large format building panel - Google Patents
Method for refining a large format building panel Download PDFInfo
- Publication number
- EP3578385A1 EP3578385A1 EP18176816.9A EP18176816A EP3578385A1 EP 3578385 A1 EP3578385 A1 EP 3578385A1 EP 18176816 A EP18176816 A EP 18176816A EP 3578385 A1 EP3578385 A1 EP 3578385A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- building board
- embossing
- recess
- decor
- embossed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
- B44C5/00—Processes for producing special ornamental bodies
- B44C5/04—Ornamental plaques, e.g. decorative panels, decorative veneers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
- B44C1/00—Processes, not specifically provided for elsewhere, for producing decorative surface effects
- B44C1/24—Pressing or stamping ornamental designs on surfaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B44—DECORATIVE ARTS
- B44C—PRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
- B44C5/00—Processes for producing special ornamental bodies
- B44C5/04—Ornamental plaques, e.g. decorative panels, decorative veneers
- B44C5/043—Ornamental plaques, e.g. decorative panels, decorative veneers containing wooden elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/02005—Construction of joints, e.g. dividing strips
- E04F15/02033—Joints with beveled or recessed upper edges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F15/00—Flooring
- E04F15/02—Flooring or floor layers composed of a number of similar elements
- E04F15/10—Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials
- E04F15/102—Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials of fibrous or chipped materials, e.g. bonded with synthetic resins
Definitions
- the invention relates to a method for finishing a large-scale provided building board, in particular MDF or HDF, with a top and bottom, wherein at least in the top of a relief is imprinted, and then printed on the embossed top of the building board a decor and the decor then by Applying an abrasion resistant layer is sealed.
- Such a method is for example from the EP 1 820 640 B1 known.
- Such structural panels are divided after finishing in individual panels and used for example as a floor or as wall and ceiling panels and are often provided with a wood, stone or fantasy decoration with superimposed, three-dimensional surface.
- the split panels have connecting means (tongue and groove) and are usually equipped with locking means for locking adjacent plates in the horizontal and vertical directions (so-called click panels).
- the superimposition of decor and three-dimensional surface creates a realistic visual and haptic impression of the imitated material.
- a structure adapted to the decor is referred to as a decore-synchronous structure (embossed register).
- the decor is present either as a paper layer laminated onto the carrier plate or as a color layer printed directly onto the carrier plate.
- the decor is also provided with a wear-resistant layer.
- abrasion-resistant paper layers, so-called overlays, or after curing abrasion resistant paint or resin layers are used.
- the decorsynchronous structure lies as a three-dimensional surface structure and is impressed by means of a correspondingly three-dimensionally structured press plate into the plate surface.
- the thermal and pressure-activatable constituents of the coating melt and run out and fill the three-dimensional structure embossing with hardening.
- the structure usually has a height of up to 500 ⁇ m.
- the number and the depth of the structures are limited on the one hand by the available amount of activatable components and on the other by the pressing force.
- a generic method according to the invention provides that the relief is embossed in a first embossing step as at least one strip-shaped recess with two opposite side walls, a bottom wall connecting them and a depth. Preferably, a plurality of mutually parallel recesses is impressed.
- At least one further recess extending at an angle transversely to the at least one depression is embossed.
- a plurality of transverse depressions are preferably impressed, along which the division of the panels can then take place in the transverse direction.
- a MDF or HDF board is used as a building board, it is provided that their density profile (density profile over the cross-section of the plate) compared to a conventional density profile, as for example from the EP 3 023 261 B1 is known, is lowered.
- a pressing skin forms at the top and the bottom, which is also called "rotting layer”.
- the plate when pressed with a maximum apparent density in the cover layers of 950-1000 kg / m 3 , can be provided press-finished, that is, the press-skin is not removed. However, it is also possible to at least partially abrade the press skin to reduce the density at the top.
- a tempering agent may be applied to the top, which is preferably an aqueous melamine resin.
- the tempering agent it is achieved that the previously reduced bulk density at the upper side (in the cover layer) is increased again in order to achieve sufficient strength properties on the later panels.
- the building board is heated to 40 to 80 ° C, preferably 60 ° C and when embossing the at least one depression, a surface temperature of up to 220 ° C is established.
- the heating of the building board can be done by means of water vapor.
- the top of the building panel can be primed with a white paint before embossing the recess.
- At least the recess can be printed by means of a digital printer with a monochrome or multi-colored decor.
- a white color for the primer any other color may be used as well.
- the first embossing step may be carried out by means of at least one calendering roll. This has the advantage that the embossing step can be integrated into the production line. The embossing can then be followed directly by the pressing of the wood-based panel in a Kontipresse, in which the previously scattered fiber cake was pressed into a plate of desired thickness, connect, or upstream of the printing of the top in a printing system. The production is thereby optimized.
- the building board After completion of the construction, which consists of at least a primer, the decor and an abrasion-resistant layer, the building board is laminated in a short-cycle press under high pressure and high temperature and is characterized in a second embossing step again in the at least one strip-shaped depression to the Forming the side walls to achieve without changing the position of the bottom wall in depth.
- the side walls formed in the first embossing step are "rounded", so that these roundings are converted again into a plane surface by the second embossing step.
- the melamine resin already hardens during the first embossing step and increases the bulk density. If the tempering agent is applied after the first embossing step, it hardens in the short-cycle press. The same applies in the case when in the first embossing step, a sufficiently high temperature is not achieved.
- the depth of the at least one depression is preferably up to 0.7 mm and may in particular be stepped so that the bottom wall is step-shaped. In such a case, several first pressing steps are carried out with different pressing depths.
- marks may be printed on the bottom walls of the at least one depression, which may consist of lines, circles, points, crosses or other graphic characters. Preferably, lines are used.
- the re-embossing in the recess in the second embossing step is preferably carried out in a short-cycle press, in which strip-shaped elevations are applied to the press plate.
- a structure can be embossed in the first and / or second embossing step, which structure runs at least partially synchronously with the decoration, which is called “embossed register” in the technical language.
- the starting point is a large-format HDF board with a length of 2,800 or 1,860 mm, a width of 2,070 mm and a thickness of 7 to 14 mm.
- the bulk density is lowered compared to a conventional HDF board as a comparison of FIG. 7 with the FIGS. 8 and 9 shows.
- the cover layer tips were lowered compared to the standard by at least 40 kg / m 3 .
- Good results were achieved with a reduction of up to 60 kg / m 3 .
- the apparent density is in the range of 950 to 1000 kg / m 3 .
- An example of the density profile of a conventional HDF board is in FIG. 7 shown.
- FIGS. 8 and 9 show examples of gross density profiles of structural panels used in the invention.
- aqueous melamine resin In order to impress depressions 5, 6 in the top 2 of the building board 1, it is first heated to a temperature between 30 and 50 ° C by means of steam. Then, as a tempering agent, 10 to 50 g / m 3 , preferably 30 g / m 3 of aqueous melamine resin is applied. It may be a standard impregnating resin having a solids content of 50 to 65 wt.%, Preferably 60 wt.% Act. In addition to water, other additives, such as hardeners, wetting agents and the like may be present in the solution. Alternatively, it is also possible to use UF resin as the bonding agent or UF and melamine resins in mixtures.
- flexibilizing agents eg, 1,4-butanediol, caprolactam, polyglycol, etc.
- a subsequent addition of the elastification agent should be on the order of about 3 to 7 wt.%.
- the thus pre-treated building board 1 is passed under one or more calender rolls 20 arranged one behind the other with embossing rings 21 arranged parallel to one another.
- embossing rings 21 arranged parallel to one another.
- 6 are impressed with a depth T of up to 0.7 mm.
- the line pressure of the embossing rings 21 is up to 300 N / mm and the surface temperature is up to 220 ° C.
- the tempering agent on the upper side 2 is at least partially reacted, so it hardens at least partially, thereby increasing the bulk density.
- the recesses 5, 6 can be formed graduated, for example by several calender rolls 20 are used with different stamping rings 21 and, for example, first 0.3 mm and then a further depth T of up to 0.7 mm is embossed. Between the embossing rings 21, a structure can be engraved in the jacket 22 of the calendering roll 20, which is then embossed in the upper side 3 next to the depressions 5, 6 in the first embossing step.
- the top 2 is primed with a white base color.
- a decoration 3 is printed on the primer 11 by means of digital printing, wherein the color dots of the digital printer not only on the flat top 2, but also on the side walls 5.1, 5.2 and the bottom wall 5.3 of the strip-shaped recesses 5, 6 are shown, so that the recesses 5, 6 are completely decorated.
- the decor 3 may be monochrome or multi-colored and is applied so that it runs at least partially synchronous with the structure previously embossed. Simultaneously with the decor 3 marks 7 are printed on the bottom wall 5.3.
- the marks 7 may be circles 7.1, crosses 7.2, lines 7.3 and lines 7.4 or other geometric figures. By means of these markings 7, the building board 2 can be aligned via a camera system for carrying out further processing steps.
- a return 8 and on the decor 3 an overlay paper 4.
- an overlay paper 4 a liquid overlay can also be applied in the roll application, into which corundum is mixed or scattered.
- the return 8 can be applied liquid.
- This structure is then fed to a short-cycle press 30, the upper press plate 31 is provided with strip-shaped elevations 32.
- the building board 1 is aligned, so that the ridges 32 in the subsequent compression of the structure again in the embossed recesses 5, 6 dive and the coated during the coating of the top 2 side walls 5.1, 5.2 of the wells 5, 6 again to adjust parallel and planar side walls 5.1, 5.2 in a second embossing step without changing the depth T of the recesses 5, 6 or the position of the bottom walls 5.3.
- FIG. 4 shows, the elevations 32 in the transition region from the side walls 5.1, 5.2 to the bottom wall 5.3 formed larger than the width of the recesses 5, 6, to safely form the lower edges of the recesses 5, 6.
- the pressing time in the second embossing step is between 10 and 30 seconds, preferably 12 to 15 seconds, in which the resins melt and connect to the building board 1.
- the temperature of the press plates 31, 33 is increased during the pressing, so that a surface temperature of 120 ° to 180 ° C increases in the course of pressing on the compact.
- the pressure curve is carried out starting from a pressure build-up phase in a holding phase and a pressure reduction phase.
- the embossing depth T will be carried out in the sense of a path control.
- the at least one calender roll 20 is integrated into the printing system, or this immediately upstream. For a meaningful design must in the first Embossing step at least two in the longitudinal direction L and two in the transverse direction Q depressions 5, 6 are embossed, so that the side edges of the split panels are all lowered.
Abstract
Die Erfindung betrifft ein Verfahren zur Veredelung einer großformatig bereitgestellten Bauplatte (1) aus einem Holzwerkstoff, insbesondere MDF oder HDF, mit einer Oberseite (2) und einer Unterseite (9), wobei mindestens in die Oberseite (2) ein Relief eingeprägt wird, und anschließend auf die geprägte Oberseite (2) der Bauplatte (1) ein Dekor (3) aufgedruckt und das Dekor (3) anschließend durch Aufbringen einer abriebfesten Schicht (4) versiegelt wird. Erfindungsgemäß ist vorgesehen, dass das Relief in einem ersten Prägeschritt als mindestens eine streifenförmig ausgebildete Vertiefung (5) mit zwei gegenüberliegenden Seitenwandungen (5.1, 5.2), einer diese verbindenden Bodenwandung (5.3) und einer Tiefe (T) geprägt wird.The invention relates to a method for finishing a building board (1) made of a wooden material, in particular MDF or HDF, provided with a large format, with a top (2) and a bottom (9), a relief being embossed at least into the top (2), and then a decor (3) is printed on the embossed top (2) of the building board (1) and the decor (3) is then sealed by applying an abrasion-resistant layer (4). According to the invention, the relief is embossed in a first embossing step as at least one strip-shaped depression (5) with two opposite side walls (5.1, 5.2), a bottom wall (5.3) connecting them and a depth (T).
Description
Die Erfindung betrifft ein Verfahren zur Veredlung einer großformatig bereitgestellten Bauplatte, insbesondere MDF oder HDF, mit einer Oberseite und einer Unterseite, wobei mindestens in die Oberseite ein Relief eingeprägt wird, und anschließend auf die geprägte Oberseite der Bauplatte ein Dekor aufgedruckt und das Dekor anschließend durch Aufbringen einer abriebfesten Schicht versiegelt wird.The invention relates to a method for finishing a large-scale provided building board, in particular MDF or HDF, with a top and bottom, wherein at least in the top of a relief is imprinted, and then printed on the embossed top of the building board a decor and the decor then by Applying an abrasion resistant layer is sealed.
Ein solches Verfahren ist beispielsweise aus der
Derartige Bauplatten werden nach dem Veredeln in einzelne Paneele aufgeteilt und beispielsweise als Fußboden- oder als Wand- und Deckenpaneele verwendet und sind häufig mit einem Holz-, Stein- oder Fantasiedekor mit überlagerter, dreidimensionaler Oberfläche versehen. Die aufgeteilten Paneele weisen Verbindungsmittel (Nut und Feder) auf und sind meist mit Verriegelungsmitteln zum Verriegeln benachbarter Platten in horizontaler und vertikaler Richtung ausgestattet (sogenannte Klickpaneele). Durch die Überlagerung von Dekor und dreidimensionaler Oberfläche entsteht ein realistischer optischer und haptischer Eindruck des imitierten Werkstoffes.Such structural panels are divided after finishing in individual panels and used for example as a floor or as wall and ceiling panels and are often provided with a wood, stone or fantasy decoration with superimposed, three-dimensional surface. The split panels have connecting means (tongue and groove) and are usually equipped with locking means for locking adjacent plates in the horizontal and vertical directions (so-called click panels). The superimposition of decor and three-dimensional surface creates a realistic visual and haptic impression of the imitated material.
Insbesondere bei Fußbodenpaneelen ist bekannt, dass diese mindestens auf der Oberseite beschichtet sind und eine an das Dekor angepasste Struktur aufweisen. Eine solche Struktur wird als dekorsynchrone Struktur (embossed register) bezeichnet. Das Dekor liegt dabei entweder als eine auf die Trägerplatte aufkaschierte Papierlage oder als eine direkt auf die Trägerplatte aufgedruckte Farbschicht vor. Das Dekor ist zudem mit einer verschleißhemmenden Schicht versehen. Dazu werden entweder abriebfeste Papierlagen, sogenannte Overlays, oder nach dem Aushärten abriebfeste Lack- bzw. Harzschichten verwendet. Die dekorsynchrone Struktur liegt als eine dreidimensionale Oberflächenstruktur vor und wird mittels eines entsprechend dreidimensional strukturierten Pressblechs in die Plattenoberfläche eingeprägt. Dabei schmelzen und verlaufen die thermischen und unter Druck aktivierbaren Bestandteile der Beschichtung und füllen die dreidimensionale Strukturprägung unter Aushärtung aus. Die Struktur weist üblicherweise eine Höhe von bis zu 500 µm auf. Die Anzahl und die Tiefe der Strukturen sind zum einen durch die verfügbare Menge an aktivierbaren Bestandteilen und zum anderen durch die Presskraft begrenzt.In particular, in the case of floor panels, it is known that these are coated at least on the upper side and have a structure adapted to the decor. Such a structure is referred to as a decore-synchronous structure (embossed register). The decor is present either as a paper layer laminated onto the carrier plate or as a color layer printed directly onto the carrier plate. The decor is also provided with a wear-resistant layer. For this purpose, either abrasion-resistant paper layers, so-called overlays, or after curing abrasion resistant paint or resin layers are used. The decorsynchronous structure lies as a three-dimensional surface structure and is impressed by means of a correspondingly three-dimensionally structured press plate into the plate surface. The thermal and pressure-activatable constituents of the coating melt and run out and fill the three-dimensional structure embossing with hardening. The structure usually has a height of up to 500 μm. The number and the depth of the structures are limited on the one hand by the available amount of activatable components and on the other by the pressing force.
Bei Laminatfußböden sind die Stoßkanten, an denen benachbarte Fußbodenpaneele aneinanderstoßen problematisch. Je nach Lichteinfall verursachen schon kleinste Höhenunterschiede optisch unschöne Schattenbildungen, die das Gesamtbild eines Fußbodens negativ beeinträchtigen. Durch den Kern aus Holzwerkstoff sind die Paneele außerdem feuchtigkeitsempfindlich. Auf dem Fußboden verschüttete Flüssigkeit muss schnellstmöglich weggewischt werden, um ein Eindringen der Flüssigkeit in die Verbindungsfuge zwischen den Stoßkanten zu vermeiden. Dringt Wasser ein, können sich die Holzfasern in der Trägerplatte ausdehnen und irreversible Quellungen erzeugen, da durch den Quelldruck des Holzes das Gefüge zerstört und/oder der Klebstoff partiell hydrolisiert wird. Aus diesem Grund ist es wichtig, dass schon bei der Herstellung der Paneele den späteren Stoßkanten eine besondere Aufmerksamkeit gewindet wird. Benachbarte Paneele sollen fest aneinander liegen können, es soll sich ein optisch gleichmäßiges Erscheinungsbild zu einem Fußboden verlegter Paneele ergeben und es muss Vorsorge getroffen werden, dass verschüttete Flüssigkeit nicht sofort in die Verbindungsfugen fließen kann.In laminate flooring, the abutting edges adjacent adjacent floor panels encounter are problematic. Depending on the incidence of light, even the smallest differences in height cause visually unsightly shadow formations that adversely affect the overall appearance of a floor. Due to the core of wood-based material, the panels are also sensitive to moisture. Liquid spilled on the floor must be wiped away as quickly as possible to prevent the liquid from penetrating into the joint between the abutting edges. Penetrates water, the wood fibers in the support plate can expand and produce irreversible swelling, as destroyed by the swelling pressure of the wood, the structure and / or the adhesive is partially hydrolyzed. For this reason, it is important that even during the production of the panels, the later edges are given special attention. Adjacent panels should be able to rest against each other, it should give a visually uniform appearance to a floor laid panels and care must be taken that spilled liquid can not flow immediately into the joints.
Von dieser Problemstellung ausgehend soll das eingangsbeschriebene Verfahren entsprechend verbessert werden.Starting from this problem, the method described above should be improved accordingly.
Um die vorgenannten Nachteile zu vermeiden, wird bei einem gattungsgemäßen Verfahren erfindungsgemäß vorgesehen, dass das Relief in einem ersten Prägeschritt als mindestens eine streifenförmig ausgebildete Vertiefung mit zwei gegenüberliegenden Seitenwandungen, einer diese verbindenden Bodenwandung und einer Tiefe geprägt wird. Vorzugsweise wird eine Mehrzahl parallel zueinander beabstandeter Vertiefungen eingeprägt.In order to avoid the aforementioned disadvantages, a generic method according to the invention provides that the relief is embossed in a first embossing step as at least one strip-shaped recess with two opposite side walls, a bottom wall connecting them and a depth. Preferably, a plurality of mutually parallel recesses is impressed.
Entlang der geprägten Vertiefungen erfolgt später die Aufteilung der großformatigen Platte in einzelne Paneele. Durch die geprägten Vertiefungen ist dann die Oberseite an den Seitenkanten abgesenkt. Die Stoßkanten aneinander angrenzender Paneele liegen gegenüber der Oberseite also tiefer. Höhenversatz kann in einem solchen Fall keine Schattenbildung verursachen, die optisch auffällt, weil alle Stoßfugen abgesenkt sind. Durch eine entsprechende Kantenprofilierung kann eine feste Verbindung zwischen benachbarten Paneelen erzielt werden, wodurch das zu schnelle Eindringen von Flüssigkeit in die Stoßfuge wirksam vermieden wird.Along the embossed depressions is later the division of the large format plate into individual panels. Due to the embossed depressions then the top is lowered at the side edges. The abutting edges of adjacent panels are therefore lower in relation to the upper side. Height offset can not cause shadowing in such a case, which attracts attention because all butt joints are lowered. By a corresponding edge profiling a firm connection between adjacent panels can be achieved, whereby the too rapid penetration of liquid is effectively avoided in the butt joint.
Um die Seitenkanten der Paneele umlaufend absenken zu können, wird vorzugsweise mindestens eine weitere in einen Winkel quer zu der mindestens einen Vertiefung verlaufende Vertiefung eingeprägt. Bevorzugt werden auch hier eine Mehrzahl quer laufender Vertiefungen eingeprägt, entlang derer die Aufteilung der Paneele dann in Querrichtung erfolgen kann.In order to be able to lower the side edges of the panels circumferentially, preferably at least one further recess extending at an angle transversely to the at least one depression is embossed. Here, too, a plurality of transverse depressions are preferably impressed, along which the division of the panels can then take place in the transverse direction.
Wenn als Bauplatte eine MDF- oder HDF-Platte verwendet wird, ist vorgesehen, dass deren Rohdichteprofil (Verlauf der Dichte über den Querschnitt der Platte) gegenüber einem üblichen Rohdichteprofil, wie es beispielsweise aus der
Vor oder nach dem Prägen kann auf die Oberseite ein Vergütungsmittel aufgebracht werden, das vorzugsweise ein wässriges Melaminharz ist. Durch das Vergütungsmittel wird erreicht, dass die zuvor reduzierte Rohdichte an der Oberseite (in der Deckschicht) wieder erhöht wird, um ausreichende Festigkeitseigenschaften an den späteren Paneelen zu erzielen.Before or after embossing, a tempering agent may be applied to the top, which is preferably an aqueous melamine resin. By means of the tempering agent it is achieved that the previously reduced bulk density at the upper side (in the cover layer) is increased again in order to achieve sufficient strength properties on the later panels.
Zur Erleichterung des Prägens wird die Bauplatte auf 40 bis 80°C vorzugsweise 60°C erhitzt und beim Prägen der mindestens einen Vertiefung stellt sich eine Oberflächen Temperatur von bis zu 220°C ein. Das Erhitzen der Bauplatte kann mittels Wasserdampfs erfolgen.To facilitate embossing, the building board is heated to 40 to 80 ° C, preferably 60 ° C and when embossing the at least one depression, a surface temperature of up to 220 ° C is established. The heating of the building board can be done by means of water vapor.
Um eine gut bedruckbare Oberfläche zu schaffen, kann die Oberseite der Bauplatte vor dem Prägen der Vertiefung mit einer weißen Farbe grundiert werden. Zumindest die Vertiefung kann mittels eines Digitaldruckers mit einem einfarbigen oder mehrfarbigen Dekor bedruckt werden. Anstatt zur Grundierung eine weiße Farbe zu verwenden, kann ggf. auch jede andere Farbe verwendet werden.To create a good printable surface, the top of the building panel can be primed with a white paint before embossing the recess. At least the recess can be printed by means of a digital printer with a monochrome or multi-colored decor. Instead of using a white color for the primer, any other color may be used as well.
Der erste Prägeschritt kann mittels mindestens einer Kalanderwalze durchgeführt werden. Dies hat den Vorteil, dass der Prägeschritt in die Produktionslinie integriert werden kann. Das Prägen kann sich dann unmittelbar an das Verpressen der Holzwerkstoffplatte in einer Kontipresse, in der der zuvor gestreute Faserkuchen zu einer Platte gewünschter Dicke verpresst wurde, anschließen, bzw. dem Bedrucken der Oberseite in einer Druckanlage vorgeordnet werden. Die Fertigung wird dadurch optimiert.The first embossing step may be carried out by means of at least one calendering roll. This has the advantage that the embossing step can be integrated into the production line. The embossing can then be followed directly by the pressing of the wood-based panel in a Kontipresse, in which the previously scattered fiber cake was pressed into a plate of desired thickness, connect, or upstream of the printing of the top in a printing system. The production is thereby optimized.
Nach Fertigstellung des Aufbaus, der mindestens aus einer Grundierung, dem Dekor und einer abriebfesten Schicht besteht, wird die Bauplatte in einer Kurztaktpresse unter hohem Druck und hoher Temperatur laminiert und dabei wird in einem zweiten Prägeschritt erneut in die mindestens eine streifenförmige Vertiefung geprägt, um die Ausbildung der Seitenwandungen zu erzielen, ohne die Lage der Bodenwandung in der Tiefe zu verändern. Bei der Beschichtung werden die im ersten Prägeschritt ausgebildeten Seitenwandungen "verrundet", sodass durch den zweiten Prägeschritt diese Verrundungen wieder in eine plane Oberfläche überführt werden.After completion of the construction, which consists of at least a primer, the decor and an abrasion-resistant layer, the building board is laminated in a short-cycle press under high pressure and high temperature and is characterized in a second embossing step again in the at least one strip-shaped depression to the Forming the side walls to achieve without changing the position of the bottom wall in depth. During the coating, the side walls formed in the first embossing step are "rounded", so that these roundings are converted again into a plane surface by the second embossing step.
Wenn das Vergütungsmittel vor dem ersten Prägeschritt aufgebracht wurde, und im ersten Prägeschritt eine ausreichend hohe Temperatur erzielt wird, härtet das Melaminharz bereits während des ersten Prägeschrittes aus und erhöht die Rohdichte. Wird das Vergütungsmittel nach dem ersten Prägeschritt aufgetragen, härtet es in der Kurztaktpresse aus. Dasselbe gilt auch in dem Fall, wenn im ersten Prägeschritt keine ausreichend hohe Temperatur erzielt wird.If the tempering agent has been applied before the first embossing step, and a sufficiently high temperature is achieved in the first embossing step, the melamine resin already hardens during the first embossing step and increases the bulk density. If the tempering agent is applied after the first embossing step, it hardens in the short-cycle press. The same applies in the case when in the first embossing step, a sufficiently high temperature is not achieved.
Die Tiefe der mindestens einen Vertiefung beträgt vorzugsweise bis zu 0,7 mm und kann insbesondere abgestuft sein, sodass die Bodenwandung stufenförmig ausgebildet ist. In einem solchen Fall werden mehrere erste Pressschritte mit unterschiedlichen Presstiefen durchgeführt.The depth of the at least one depression is preferably up to 0.7 mm and may in particular be stepped so that the bottom wall is step-shaped. In such a case, several first pressing steps are carried out with different pressing depths.
Um die Bauplatte während der anschließenden weiteren Bearbeitungsschritte ausrichten zu können, können auf die Bodenwandungen der mindestens einen Vertiefung Markierungen aufgedruckt werden, die aus Linien, Kreisen, Punkten, Kreuzen oder sonstigen grafischen Zeichen bestehen können. Bevorzugt werden Linien verwendet. Über diese Markierungen kann mittels eines Kamerasystems die Bauplatte für den zweiten Prägeschritt und weitere nachfolgende Bearbeitungsschritte ausgerichtet werden.In order to align the building board during the subsequent further processing steps, marks may be printed on the bottom walls of the at least one depression, which may consist of lines, circles, points, crosses or other graphic characters. Preferably, lines are used. By means of these markings, the building board for the second embossing step and further subsequent processing steps can be aligned by means of a camera system.
Das nochmalige Prägen in die Vertiefung im zweiten Prägeschritt erfolgt vorzugsweise in einer Kurztaktpresse, bei der auf dem Pressblech leistenförmige Erhöhungen aufgebracht sind.The re-embossing in the recess in the second embossing step is preferably carried out in a short-cycle press, in which strip-shaped elevations are applied to the press plate.
In die Oberseite kann im ersten und/oder im zweiten Prägeschritt eine Struktur eingeprägt werden, die zumindest teilweise synchron zum Dekor verläuft, was in der Fachsprache "embossed register" genannt wird.In the top side, a structure can be embossed in the first and / or second embossing step, which structure runs at least partially synchronously with the decoration, which is called "embossed register" in the technical language.
Mit Hilfe einer Zeichnung soll ein Ausführungsbeispiel der Erfindung nachfolgend näher beschrieben werden. Es zeigen:
Figur 1- - eine perspektivische Teildarstellung einer großformatigen Bauplatte;
Figur 2- - die Draufsicht auf die Bauplatte nach
;Figur 1 Figur 3- - eine schematische Teildarstellung vor dem zweiten Prägeschritt;
Figur 4- - eine vergrößerte Teildarstellung während des zweiten Prägeschrittes;
Figur 5- - eine schematische Teildarstellung während des ersten Prägeschrittes;
Figur 6- - eine schematische Darstellung der in der Kurztaktpresse befindlichen Bauplatte;
Figur 7- - ein übliches Rohdichteprofil einer HDF-Platte;
Figur 8- - das Rohdichteprofil einer ersten großformatigen Bauplatte;
Figur 9- - das Rohdichteprofil einer zweiten großformatigen Bauplatte;
- FIG. 1
- - A partial perspective view of a large-sized building board;
- FIG. 2
- - The plan view of the building board after
FIG. 1 ; - FIG. 3
- a schematic partial representation before the second embossing step;
- FIG. 4
- - An enlarged partial view during the second embossing step;
- FIG. 5
- a schematic partial representation during the first embossing step;
- FIG. 6
- a schematic representation of the building board in the short-cycle press;
- FIG. 7
- a usual density profile of an HDF board;
- FIG. 8
- the density profile of a first large-format building board;
- FIG. 9
- - The density profile of a second large-sized building board;
Ausgangsbasis ist eine großformatige HDF-Platte mit einer Länge von 2.800 oder 1.860 mm, einer Breite von 2.070 mm und einer Dicke von 7 bis 14 mm. Die Rohdichte ist gegenüber einer üblichen HDF-Platte abgesenkt wie ein Vergleich der
Um Vertiefungen 5, 6 in die Oberseite 2 der Bauplatte 1 einprägen zu können, wird diese zunächst auf eine Temperatur zwischen 30 und 50°C mittels Wasserdampfs erhitzt. Dann werden als ein Vergütungsmittel 10 bis 50 g/m3, vorzugsweise 30 g/m3 wässriges Melaminharz aufgetragen. Dabei kann es sich um ein Standard-Tränkharz mit einem Feststoffanteil von 50 bis 65 Gew.%, vorzugsweise 60 Gew.% handeln. Neben Wasser können weitere Zusätze, wie Härter, Netzmittel und ähnliches in der Lösung vorhanden sein. Alternativ können als Verbindungsmittel auch UF-Harz oder in Mischungen UF- und Melaminharz verwendet werden. Entweder handelt es sich um ein Postforming Harz oder ein Standard Tränkharz, das durch Zugabe von Flexibilisierungsmitteln (z. B. 1,4-Butandiol, Caprolactam, Polyglycol usw.) elastischer eingestellt ist. Eine nachträgliche Zugabe des Elastifizierungsmittels sollte in einer Größenordnung von etwa 3 bis 7 Gew.% erfolgen.In order to impress
Die so vorbehandelte Bauplatte 1 wird unter einer oder mehreren hintereinander angeordneten Kalanderwalzen 20 mit darauf parallel zueinander angeordneten Prägeringen 21 hindurchgeführt. Dabei werden in einem ersten Prägeschritt in die Oberseite 2 über die mindestens zwei Prägeringe 21 in Längsrichtung L und Querrichtung Q verlaufende Vertiefungen 5, 6 mit einer Tiefe T von bis zu 0,7 mm eingeprägt. Der Liniendruck der Prägeringe 21 liegt dabei bei bis zu 300 N/mm und die Oberflächentemperatur liegt bei bis zu 220°C. In diesem ersten Prägeschritt wird das Vergütungsmittel auf der Oberseite 2 zumindest teilweise umgesetzt, härtet also zumindest teilweise aus und erhöht dadurch die Rohdichte. Die Vertiefungen 5, 6 können abgestuft ausgebildet werden, indem beispielsweise mehrere Kalanderwalzen 20 mit unterschiedlichen Prägeringen 21 verwendet werden und beispielsweise zunächst 0,3 mm und anschließend eine weitere Tiefe T von bis zu 0,7 mm geprägt wird. Zwischen den Prägeringen 21 kann in den Mantel 22 der Kalanderwalze 20 eine Struktur eingraviert sein, die im ersten Prägeschritt dann neben den Vertiefungen 5, 6 in die Oberseite 3 eingeprägt wird.The thus
Nach dem ersten Prägeschritt wird die Oberseite 2 mit einer weißen Grundfarbe grundiert. Nach dem Trocknen der Grundfarbe wird mittels Digitaldrucks ein Dekor 3 auf die Grundierung 11 aufgedruckt, wobei die Farbpunkte des Digitaldruckers nicht nur auf der flachen Oberseite 2, sondern auch auf den Seitenwandungen 5.1, 5.2 und der Bodenwandung 5.3 der streifenförmigen Vertiefungen 5, 6 abgebildet werden, sodass die Vertiefungen 5, 6 komplett dekoriert sind. Das Dekor 3 kann einfarbig oder mehrfarbig sein und wird so aufgebracht, dass es zumindest teilweise synchron zu der erst zuvor eingeprägten Struktur verläuft. Gleichzeitig mit dem Dekor 3 werden Markierungen 7 auf die Bodenwandung 5.3 aufgedruckt. Die Markierungen 7 können Kreise 7.1, Kreuze 7.2, Linien 7.3 und Striche 7.4 oder andere geometrische Figuren sein. Über diese Markierungen 7 kann die Bauplatte 2 zur Vornahme weiterer Bearbeitungsschritte über ein Kamerasystem ausgerichtet werden.After the first embossing step, the top 2 is primed with a white base color. After drying the base color, a
Nach dem Dekordruck wird an die Unterseite 9 der Bauplatte 1 ein Gegenzug 8 und auf das Dekor 3 ein Overlaypapier 4 aufgelegt. Anstelle eines Overlaypapiers 4 kann im Walzenauftrag auch ein Flüssigoverlay aufgebracht werden, in das Korund eingemischt oder aufgestreut ist. Auch der Gegenzug 8 kann flüssig aufgetragen werden. Dieser Aufbau wird dann einer Kurztaktpresse 30 zugeführt, deren oberes Pressblech 31 mit leistenförmigen Erhöhungen 32 versehen ist. Über die Markierungen 7 und ein Kamerasystem wird die Bauplatte 1 ausgerichtet, sodass die Erhöhungen 32 beim anschließenden Verpressen des Aufbaus nochmals in die geprägten Vertiefungen 5, 6 eintauchen und die beim Beschichten der Oberseite 2 verrundeten Seitenwandungen 5.1, 5.2 der Vertiefungen 5, 6 nochmals prägen, um parallele und plane Seitenwandungen 5.1, 5.2 in einem zweiten Prägeschritt einzustellen, ohne dabei die Tiefe T der Vertiefungen 5, 6 bzw. die Lage der Bodenwandungen 5.3 zu verändern. Wie
Die Pressdauer im zweiten Prägeschritt beträgt zwischen 10 und 30 Sekunden, vorzugsweise 12 bis 15 Sekunden, in denen die Harze aufschmelzen und sich mit der Bauplatte 1 verbinden. Die Temperatur der Pressbleche 31, 33 wird während des Pressens gesteigert, sodass sich am Pressling eine Oberflächentemperatur von 120° bis zu 180°C im Verlauf der Pressens steigert. Der Druckverlauf erfolgt dabei ausgehend von einer Druckaufbauphase in eine Haltephase und eine Druckabbauphase übergehend. Die Prägetiefe T wird dabei im Sinne einer Wegsteuerung erfolgen. Die mindestens eine Kalanderwalze 20 ist in die Bedruckungsanlage integriert, bzw. dieser unmittelbar vorgelagert. Für eine sinnvolle Ausgestaltung müssen im ersten Prägeschritt mindestens zwei in Längsrichtung L und zwei in Querrichtung Q Vertiefungen 5, 6 geprägt werden, damit die Seitenkanten der aufgeteilten Paneele alle abgesenkt sind.The pressing time in the second embossing step is between 10 and 30 seconds, preferably 12 to 15 seconds, in which the resins melt and connect to the
- 11
- Bauplattebuilding board
- 22
- Oberseitetop
- 33
- Dekordecor
- 44
- abriebfeste Schicht / Overlayabrasion-resistant layer / overlay
- 55
- Vertiefungdeepening
- 5.15.1
- Seitenwandungsidewall
- 5.25.2
- Seitenwandungsidewall
- 5.35.3
- Bodenwandungbottom wall
- 66
- Vertiefungdeepening
- 77
- Markierungmark
- 7.17.1
- Kreisecircles
- 7.27.2
- Kreuzcross
- 7.37.3
- Linieline
- 7.47.4
- Strichstroke
- 88th
- Gegenzugreturn
- 99
-
Unterseite20 Kalanderwalze
Bottom 20 calender roll - 2121
- Prägeringferrule
- 2222
- Mantelcoat
- 3030
- KurztaktpresseShort-cycle press
- 3131
- oberes Pressblechupper press plate
- 3232
- leistenförmige Erhöhungstrip-shaped elevation
- 3333
- unteres Pressblechlower press plate
- αα
- Winkelcorner
- LL
- Längsrichtunglongitudinal direction
- Querrichtungtransversely
- TT
- Tiefedepth
Claims (19)
Priority Applications (10)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES18176816T ES2882709T3 (en) | 2018-06-08 | 2018-06-08 | Procedure for refining a large format build plate |
PT181768169T PT3578385T (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
PL21174458.6T PL3885155T3 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
EP18176816.9A EP3578385B1 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
PL18176816T PL3578385T3 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
EP21174458.6A EP3885155B1 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
CN201980038212.XA CN112423995B (en) | 2018-06-08 | 2019-04-02 | Method for finishing provided building panels |
RU2020141787A RU2757241C1 (en) | 2018-06-08 | 2019-04-02 | Method for finishing the supplied construction panel |
PCT/EP2019/058287 WO2019233652A1 (en) | 2018-06-08 | 2019-04-02 | Method for finishing a supplied building panel |
US16/972,430 US11156004B2 (en) | 2018-06-08 | 2019-04-02 | Method for finishing a supplied building panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP18176816.9A EP3578385B1 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21174458.6A Division EP3885155B1 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3578385A1 true EP3578385A1 (en) | 2019-12-11 |
EP3578385B1 EP3578385B1 (en) | 2021-05-26 |
Family
ID=62712757
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21174458.6A Active EP3885155B1 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
EP18176816.9A Active EP3578385B1 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21174458.6A Active EP3885155B1 (en) | 2018-06-08 | 2018-06-08 | Method for refining a large format building panel |
Country Status (8)
Country | Link |
---|---|
US (1) | US11156004B2 (en) |
EP (2) | EP3885155B1 (en) |
CN (1) | CN112423995B (en) |
ES (1) | ES2882709T3 (en) |
PL (2) | PL3885155T3 (en) |
PT (1) | PT3578385T (en) |
RU (1) | RU2757241C1 (en) |
WO (1) | WO2019233652A1 (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4579767A (en) * | 1983-08-30 | 1986-04-01 | Abitibi-Price Corporation | Simulated ceramic tile |
EP1820640B1 (en) | 2006-02-21 | 2010-05-26 | Flooring Technologies Ltd. | Method for refining a structural panel |
DE102014010747A1 (en) * | 2014-07-23 | 2016-01-28 | Flooring Technologies Ltd. | Process for the production of structural panels, in particular floor panels |
EP3059020A1 (en) * | 2015-02-23 | 2016-08-24 | Flooring Technologies Ltd. | Method for manufacturing a composite wood board, in particular a composite wood board with a decoration layer |
WO2016180643A1 (en) * | 2015-05-11 | 2016-11-17 | Fritz Egger Gmbh & Co. Og | Method for producing panels having recesses |
EP3023261B1 (en) | 2014-11-20 | 2017-03-15 | Flooring Technologies Ltd. | Method for finishing a wooden material panel |
WO2017164806A1 (en) * | 2016-03-24 | 2017-09-28 | Välinge Innovation AB | A method for forming a décor on a substrate |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE516696C2 (en) * | 1999-12-23 | 2002-02-12 | Perstorp Flooring Ab | Process for producing surface elements comprising an upper decorative layer as well as surface elements produced according to the method |
DE10341172B4 (en) * | 2003-09-06 | 2009-07-23 | Kronotec Ag | Method for sealing a building board |
DE102008012220A1 (en) * | 2008-03-03 | 2009-09-17 | Flooring Technologies Ltd. | Method and device for producing a wood-based material board |
CN101998896B (en) * | 2008-04-07 | 2014-12-10 | 瓦林格创新股份有限公司 | Fibre based panels with a wear resistance surface |
EP2730430B1 (en) * | 2012-11-12 | 2014-11-05 | Flooring Technologies Ltd. | Method for treating a composite wood board and structural panel comprising a core of wooden material |
EP2905135A3 (en) * | 2014-02-05 | 2015-12-02 | Dirk Dammers | Method for manufacturing a panel |
CN204435729U (en) * | 2014-12-24 | 2015-07-01 | 上海伊兆实业有限公司 | A kind of decorative panel |
-
2018
- 2018-06-08 PL PL21174458.6T patent/PL3885155T3/en unknown
- 2018-06-08 ES ES18176816T patent/ES2882709T3/en active Active
- 2018-06-08 PL PL18176816T patent/PL3578385T3/en unknown
- 2018-06-08 PT PT181768169T patent/PT3578385T/en unknown
- 2018-06-08 EP EP21174458.6A patent/EP3885155B1/en active Active
- 2018-06-08 EP EP18176816.9A patent/EP3578385B1/en active Active
-
2019
- 2019-04-02 WO PCT/EP2019/058287 patent/WO2019233652A1/en active Application Filing
- 2019-04-02 CN CN201980038212.XA patent/CN112423995B/en active Active
- 2019-04-02 US US16/972,430 patent/US11156004B2/en active Active
- 2019-04-02 RU RU2020141787A patent/RU2757241C1/en active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4579767A (en) * | 1983-08-30 | 1986-04-01 | Abitibi-Price Corporation | Simulated ceramic tile |
EP1820640B1 (en) | 2006-02-21 | 2010-05-26 | Flooring Technologies Ltd. | Method for refining a structural panel |
DE102014010747A1 (en) * | 2014-07-23 | 2016-01-28 | Flooring Technologies Ltd. | Process for the production of structural panels, in particular floor panels |
EP3023261B1 (en) | 2014-11-20 | 2017-03-15 | Flooring Technologies Ltd. | Method for finishing a wooden material panel |
EP3059020A1 (en) * | 2015-02-23 | 2016-08-24 | Flooring Technologies Ltd. | Method for manufacturing a composite wood board, in particular a composite wood board with a decoration layer |
WO2016180643A1 (en) * | 2015-05-11 | 2016-11-17 | Fritz Egger Gmbh & Co. Og | Method for producing panels having recesses |
WO2017164806A1 (en) * | 2016-03-24 | 2017-09-28 | Välinge Innovation AB | A method for forming a décor on a substrate |
Also Published As
Publication number | Publication date |
---|---|
EP3885155C0 (en) | 2023-11-22 |
PL3885155T3 (en) | 2024-04-15 |
US20210230880A1 (en) | 2021-07-29 |
ES2882709T3 (en) | 2021-12-02 |
EP3578385B1 (en) | 2021-05-26 |
PT3578385T (en) | 2021-08-19 |
EP3885155B1 (en) | 2023-11-22 |
RU2757241C1 (en) | 2021-10-12 |
PL3578385T3 (en) | 2021-12-27 |
CN112423995A (en) | 2021-02-26 |
US11156004B2 (en) | 2021-10-26 |
EP3885155A1 (en) | 2021-09-29 |
CN112423995B (en) | 2021-12-07 |
WO2019233652A1 (en) | 2019-12-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1859912B1 (en) | Process and apparatus for manufacturing a panel | |
DE102006007976B4 (en) | Process for refining a building board | |
EP1559850B1 (en) | Panel, in particular flooring panel | |
DE60015603T2 (en) | METHOD FOR PRODUCING SURFACE ELEMENTS | |
EP2452829B1 (en) | Method for attaching a finish to a wooden material board | |
EP2226201A1 (en) | Method and assembly for producing a wood fibre board | |
DE10310199A1 (en) | Fibreboard, especially floor panel | |
EP2743094A1 (en) | Method for the manufacture of a board provided with a decorative layer | |
EP2762328A1 (en) | Method for producing a decorated wooden board coated on both sides | |
EP0009813A1 (en) | Decorative laminated board with an embossed surface | |
EP3126144B1 (en) | Laminate and method for producing same | |
EP2179863A1 (en) | Method for refining a carrier plate, in particular a wood or composite plate | |
EP3802147B1 (en) | Method for refining a large format building panel | |
DE2357831A1 (en) | PROCESS FOR PRODUCING A MULTICOLORED DECORATIVE RELIEF LAYER | |
EP3578385B1 (en) | Method for refining a large format building panel | |
EP3578383B1 (en) | Method for refining a building panel | |
EP3711970A1 (en) | Method for refining a construction plate | |
DE102018117102A1 (en) | Process for the production of floor panels | |
EP4058289B1 (en) | Method for manufacturing a polyvinyl chloride-free cover layer, polyvinyl chloride-free cover layer, and surfacing element | |
EP4134242A1 (en) | Method and device for applying a decoration and a surface structure to a substrate | |
DE102022125371A1 (en) | Pressing tool for pressing material panels in heating presses | |
EP2179864A1 (en) | Method for finishing a carrier plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190208 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20200417 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20201208 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1395835 Country of ref document: AT Kind code of ref document: T Effective date: 20210615 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502018005387 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Ref document number: 3578385 Country of ref document: PT Date of ref document: 20210819 Kind code of ref document: T Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20210812 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210826 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210826 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210827 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210926 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2882709 Country of ref document: ES Kind code of ref document: T3 Effective date: 20211202 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502018005387 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210608 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210608 |
|
26N | No opposition filed |
Effective date: 20220301 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210926 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20230315 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210526 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20180608 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PT Payment date: 20230530 Year of fee payment: 6 Ref country code: NL Payment date: 20230620 Year of fee payment: 6 Ref country code: FR Payment date: 20230622 Year of fee payment: 6 Ref country code: DE Payment date: 20230531 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20230602 Year of fee payment: 6 Ref country code: PL Payment date: 20230530 Year of fee payment: 6 Ref country code: AT Payment date: 20230616 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20230619 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20230630 Year of fee payment: 6 Ref country code: GB Payment date: 20230622 Year of fee payment: 6 Ref country code: ES Payment date: 20230719 Year of fee payment: 6 Ref country code: CH Payment date: 20230702 Year of fee payment: 6 |