EP3546842A1 - Air conditioner power consumption estimation method and device - Google Patents

Air conditioner power consumption estimation method and device Download PDF

Info

Publication number
EP3546842A1
EP3546842A1 EP18794528.2A EP18794528A EP3546842A1 EP 3546842 A1 EP3546842 A1 EP 3546842A1 EP 18794528 A EP18794528 A EP 18794528A EP 3546842 A1 EP3546842 A1 EP 3546842A1
Authority
EP
European Patent Office
Prior art keywords
air conditioner
air conditioners
time period
power consumption
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP18794528.2A
Other languages
German (de)
French (fr)
Other versions
EP3546842A4 (en
EP3546842B1 (en
Inventor
Li Guo
Shifang SONG
Yongfu CHENG
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Air Conditioner Gen Corp Ltd
Original Assignee
Qingdao Haier Air Conditioner Gen Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Air Conditioner Gen Corp Ltd filed Critical Qingdao Haier Air Conditioner Gen Corp Ltd
Publication of EP3546842A1 publication Critical patent/EP3546842A1/en
Publication of EP3546842A4 publication Critical patent/EP3546842A4/en
Application granted granted Critical
Publication of EP3546842B1 publication Critical patent/EP3546842B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/60Energy consumption

Definitions

  • the present invention relates to the technical field of air conditioners, and particularly relates to a method and a device for estimating power consumption of an air conditioner.
  • Embodiments of the present invention provide a method and a device for estimating power consumption of an air conditioner, so as to solve a problem of relatively large error since the power consumption of the air conditioner is estimated by using laboratory data in the prior art.
  • a brief summary is given below. The summary is not a general comment, nor tends to determine key/critical constituent elements or describe a protection scope of these embodiments, and only aims to present some concepts in a simplified form as an introduction of the following detailed description.
  • a method for estimating power consumption of an air conditioner is provided according to a first aspect of the embodiments of the present invention.
  • the method for estimating the power consumption of the air conditioner includes:
  • the calculating the estimated power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient ⁇ i of each of the n first air conditioners includes:
  • the calculating the power consumption of the second air conditioner within the time period T includes:
  • the determining the power correction coefficients ⁇ i of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner includes:
  • the method further includes:
  • the calculating the actual power consumption W2 of the second air conditioner within the time period T includes:
  • the power consumption of the second air conditioner within the time period T when the set temperature is the first temperature is estimated according to the types of the n first air conditioners and the operating parameters of each of the first air conditioners within the time period T.
  • the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the power consumption of the second air conditioner within the time period is estimated according to the parameters.
  • the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners.
  • the estimated power consumption of the second air conditioner also corresponds to the time period.
  • the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • a device for estimating power consumption of an air conditioner is provided according to a second aspect of the embodiments of the present invention.
  • the device for estimating the power consumption of the air conditioner includes a signal receiver and a processor.
  • the processor is further configured to calculate a correction power P i of each of the n first air conditioners, calculate an average correction power P of the n first air conditioners according to the correction power P i of each of the n first air conditioners, and calculate the estimated power consumption W1 of the second air conditioner within the time period T according to the average correction power P of the n first air conditioners.
  • the power consumption of the second air conditioner within the time period T when the set temperature is the first temperature is estimated according to the types of the n first air conditioners and the operating parameters of each of the first air conditioners within the time period T.
  • the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the power consumption of the second air conditioner within the time period is estimated according to the parameters.
  • the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners.
  • the estimated power consumption of the second air conditioner also corresponds to the time period.
  • the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • the quantity of saved electricity of an air conditioner needs to be calculated after the air conditioner is subjected to electricity-saving control in the prior art.
  • the quantity of saved electricity is determined according to a difference between an estimated power consumption of the air conditioner and an actual power consumption of the air conditioner in a period of regulating a first state to a second state of the air conditioner, i.e., a time period T after the air conditioner is subjected to electricity-saving control.
  • the actual power consumption of the air conditioner can be calculated according to a power and a time fed back by the air conditioner.
  • An overall concept of the present invention is to acquire types and operating parameters of a plurality of air conditioners in the first state within the time period T, and calculate the estimated power consumption within the time period T when calculating that the air conditioner is in the first state according to the above parameters.
  • the first state refers to a state of the air conditioner before electricity-saving control
  • the second state refers to a state of the air conditioner after electricity-saving control
  • the first state and the second state may be regulation for a set temperature of the air conditioner, e.g., a first temperature is adjusted to a second temperature, and may also be regulation for a fan speed of the air conditioner, e.g., a first fan speed is adjusted to a second fan speed.
  • First air conditioners are a type of air conditioners of which the types and the operating parameters are taken from a database when calculating the estimated power consumption of the second air conditioner.
  • Operating states of the first air conditioners within the time period T are the same as an operating state of a second air conditioner before electricity-saving control, i.e., the first air conditioners are in the first state.
  • the first air conditioners and the second air conditioner are located in the same region, such as the same city or the same region; and the outdoor environments are basically the same.
  • the second air conditioner is an air conditioner which is subjected to electricity-saving control and requires calculation of the estimated power consumption.
  • the second air conditioner is in the first state as the first air conditioners before electricity-saving control.
  • the second air conditioner is adjusted from the first state to the second state after performing electricity-saving control on the second air conditioner.
  • the types of the first air conditioners or the second air conditioner refer to a type of parameters capable of reflecting a horsepower and an energy consumption level of the air conditioner, such as a machine type and a machine code.
  • the energy consumption level can be represented by an energy rating label and can be classified into five levels according to national standards.
  • a level 1 indicates that an electricity-saving effect of the product has reached an international advanced level and the energy consumption is the lowest;
  • a level 2 indicates that the product is relatively electricity-saving;
  • a level 3 indicates that an energy efficiency of the product is at an average level of the Chinese market;
  • a level 4 indicates that the energy efficiency of the product is lower than the average level of the market;
  • a level 5 is a market access indicator of the product, in which the products that fail to meet the requirements of the level are not allowed to be produced and sold; and the energy consumption level can also be classified according to industry standards or enterprise standards.
  • a power correction coefficient is determined according to the types of the first air conditioners and the type of the second air conditioner, and is used for correcting powers of the first air conditioners and further calculating correction powers of the first air conditioners.
  • the estimated power consumption corresponds to the power consumption of the second air conditioner within the time period T before electricity-saving control, i.e., in the first state.
  • the actual power consumption corresponds to the power consumption of the second air conditioner within the time period T after electricity-saving control, i.e., in the second state.
  • FIG. 1 is a flow chart of an embodiment of the present invention. As shown in the FIG. 1 :
  • the method for estimating the power consumption of the air conditioner includes:
  • the estimated power consumption of the second air conditioner within the time period T is calculated according to the types of the n first air conditioners and the operating parameters of each first air conditioner within the time period T.
  • the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the estimated power consumption W1 of the second air conditioner is calculated according to the parameters.
  • the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners.
  • the estimated power consumption W1 of the second air conditioner also corresponds to the time period.
  • the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • the set temperature of a second home appliance before the electricity-saving control is a first temperature; and the set temperature after the electricity-saving control is set to a second temperature.
  • the set temperature of the n first air conditioners taken in the above embodiment is the first temperature; and the calculated estimated power consumption is a power consumption of the second home appliance within the operating time period T when the set temperature is the first temperature.
  • the second home appliance achieves a purpose of saving electricity by adjusting the set temperature. Therefore, in the present embodiment, the first state of the n first home appliances means that the set temperature is the first temperature.
  • the second state of the second home appliance after the electricity-saving control means that the set temperature is the second temperature.
  • the types and operating parameters of the n first air conditioners may be acquired from a cloud server or other devices in the step S101.
  • the cloud server or other devices are configured to monitor the operating states of the air conditioners in the same region, such as the first state and the second state; when the power of the air conditioner changes, the air conditioner may actively report the change to the cloud server or other devices and inform them of a current power; and therefore, the cloud server or other devices also record the power of each air conditioner and the operating time corresponding to the power.
  • the power correction coefficients ⁇ i of the n first air conditioners may be queried from a local or cloud server or other devices in the step S102.
  • the power correction coefficients ⁇ i of the air conditioners of different types are recorded in a database; and the power correction coefficients ⁇ i of the first air conditioners can be directly queried according to the types of the first air conditioners and the type of the second air conditioner.
  • coefficients of the air conditioners corresponding to different horsepower and different energy consumption levels are recorded in the database, as shown in a Table 1.
  • Table 1 Horsepower Level-1 energy consumption Level-2 energy consumption Level-3 energy consumption 1P A11 A12 A13 1.5P A21 A22 A23 2P A31 A32 A33 3P A41 A42 A43
  • the type of the air conditioner corresponds to the horsepower and the energy consumption level of the air conditioner.
  • the horsepower and the energy consumption level of the air conditioner can be determined by identifying the type of the air conditioner.
  • step S102 specifically includes:
  • the coefficients ⁇ i of the n first air conditioners i.e., ⁇ 1 , ⁇ 2 , ..., ⁇ n , can be calculated.
  • the step S103 includes:
  • W 1 P ⁇ ⁇ T
  • the correction power P i of each first air conditioner is calculated after the types and state parameters of the n first air conditioners are acquired; then, the calculated correction powers P i are averaged to calculate the average correction power P of the n first air conditioners, i.e., the estimated power consumption of the second air conditioner within the time period T in the first state before electricity-saving control; and then, P calculated in the above step is multiplied by T to calculate the estimated power consumption W1 of the second air conditioner within the time period T.
  • the method further includes the quantity of saved electricity of the second air conditioner after electricity-saving control is calculated.
  • the actual power consumption W2 of the second air conditioner within the time period T is calculated when the set temperature is adjusted from the first temperature to the second temperature after the second air conditioner is subjected to electricity-saving control; and then the quantity of saved electricity, i.e., a power consumption saving value ⁇ W of the second air conditioner within the time period T is calculated according to W1 and W2.
  • ⁇ W W 1 ⁇ W 2
  • the calculating the actual power consumption W2 specifically includes:
  • the actual power consumption W2 is calculated according to the operating parameter of the second air conditioner within the time period T; and the second air conditioner reports a current power when the power changes during operation, so that at least one operating power within the time period T and the corresponding operating time are acquired.
  • the operating parameters of the second air conditioner within the time period T may be recorded in a local database, or acquired from the cloud server or other devices.
  • the first air conditioners having the same type as the type of the second air conditioner are preferentially acquired from the database to ensure that the operating environment of the extracted first air conditioners is the most similar to the operating environment of the second air conditioner, thereby improving the accuracy of the estimated power consumption.
  • FIG. 2 is a flow chart of the method for estimating the power consumption of the air conditioner according to an embodiment of the present invention. As shown in FIG. 2 , the method includes:
  • Step S203 operating data of a plurality of air conditioners using T11 as the set temperature in the same region are collected to calculate the estimated power consumption W1.
  • the number of air conditioners having the same type in a certain region may be different, we require collecting 100 air conditioners in the same region to estimate the power consumption at the temperature T11.
  • the air conditioners having the same type are preferred.
  • the air conditioners are randomly selected to make up 100.
  • the power consumption W1 at the temperature T11 is estimated according to a weighted average of the power consumptions of the 100 devices.
  • a method for calculating W1 is specifically as follows: The method for calculating the power consumption of each first air conditioner is the same as the formula 6.
  • Step S204 the quantity of saved electricity within 10:00-11:00 is calculated according to the estimated power consumption W1 and the actual power consumption W2 of the air conditioner of the user.
  • Table 1 records the average unit energy consumption of devices with the same horsepower and the same energy consumption level in the past year.
  • FIG. 3 shows a device for estimating the power consumption of the air conditioner according to an embodiment of the present invention.
  • the device for estimating the power consumption of the air conditioner includes a signal receiver 301 and a processor 302.
  • the signal receiver 301 is configured to acquire types of the n first air conditioners and operating parameters of each first air conditioner within the time period T.
  • the processor 302 is configured to determine the power correction coefficients ⁇ i of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner, and calculate the estimated power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient ⁇ i of each of the n first air conditioners.
  • the estimated power consumption of the second air conditioner within the time period T is calculated according to the types of the n first air conditioners and the operating parameters of each of the first air conditioners within the time period T.
  • the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the estimated power consumption W1 of the second air conditioner is calculated according to the parameters.
  • the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners.
  • the estimated power consumption W1 of the second air conditioner also corresponds to the time period.
  • the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • the set temperature of a second home appliance before the electricity-saving control is the first temperature; and the set temperature after the electricity-saving control is set to the second temperature.
  • the set temperature of the n first air conditioners taken in the above embodiment is the first temperature; and the estimated power consumption calculated by the processor 302 is a power consumption of the second home appliance within the operating time period T when the set temperature is the first temperature.
  • the second home appliance achieves a purpose of saving electricity by adjusting the set temperature. Therefore, in the present embodiment, the first state of the n first home appliances means that the set temperature is the first temperature.
  • the second state of the second home appliance after the electricity-saving control means that the set temperature is the second temperature.
  • the signal receiver 301 can also be configured to acquire the types and the operating parameters of the n first air conditioners from a cloud server or other devices.
  • the cloud server or other devices are configured to monitor the operating states of the air conditioners in the same region, such as the first state and the second state.
  • the air conditioner may actively report the change to the server or other devices and inform them of a current power. Therefore, the cloud server or other devices also record the power of each air conditioner and the operating time corresponding to the power.
  • the processor 302 can query the power correction coefficients ⁇ i of the n first air conditioners from a local or cloud server or other devices.
  • the power correction coefficients ⁇ i of the air conditioners of different types are recorded in a database of the local or cloud server or other devices; and the power correction coefficients ⁇ i of the first air conditioners can be directly queried according to the types of the first air conditioners and the type of the second air conditioner.
  • coefficients of the air conditioners corresponding to different horsepower and different energy consumption levels are recorded in the database, as shown in Table 1.
  • the type of the air conditioner corresponds to the horsepower and the energy consumption level of the air conditioner.
  • the horsepower and the energy consumption level of the air conditioner can be determined by identifying the type of the air conditioner.
  • the horsepower corresponding to the type of the second air conditioner is IP
  • the energy consumption level is the level-1 energy consumption
  • a 0 is A11.
  • the coefficients ⁇ i of the n first air conditioners i.e., ⁇ 1 , ⁇ 2 , ..., ⁇ n , can be calculated.
  • the processor 302 is further configured to calculate the correction power P i of each of the n first air conditioners, calculate the average correction power P of the n first air conditioners according to the correction power P i of each of the n first air conditioners, and calculate the estimated power consumption W1 of the second air conditioner within the time period T according to the average correction power P of the n first air conditioners.
  • the processor 302 calculates the correction power P i of each first air conditioner after the signal receiver 301 acquires the types and state parameters of the n first air conditioners, then averages the calculated correction powers P i to calculate the average correction power P of the n first air conditioners, i.e., the estimated power consumption of the second air conditioner within the time period T in the first state before electricity-saving control, and then multiplies P calculated in the above step by T to calculate the estimated power consumption W1 of the second air conditioner within the time period T.
  • the processor 302 is further configured to calculate the quantity of saved electricity of the second air conditioner after electricity-saving control.
  • the processor 302 is configured to calculate the actual power consumption W2 of the second air conditioner within the time period T when the set temperature is adjusted from the first temperature to the second temperature after the second air conditioner is subjected to electricity-saving control, and then calculate the quantity of saved electricity, i.e., a power consumption saving value ⁇ W of the second air conditioner within the time period T according to W1 and W2.
  • the processor 302 is further configured to acquire the operating parameters of the second air conditioner within the time period T, including m times of powers P y reported by the second air conditioner within the time period T and an operating time t y corresponding to each power P y .
  • the actual power consumption W2 is calculated by the processor 302 according to the operating parameter of the second air conditioner within the time period T; and the second air conditioner reports a current power when the power changes during operation, so that at least one operating power within the time period T and the corresponding operating time are acquired.
  • the operating parameters of the second air conditioner within the time period T may be recorded in a local database, or acquired from the cloud server or other devices by the signal receiver 301.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The present invention discloses a method for estimating power consumption of an air conditioner, and belongs to the technical field of air conditioners. The method includes: acquiring types of n first air conditioners which are located in the same region with a second air conditioner, and operating parameters of each of the first air conditioners within a time period T (S101), wherein the operating parameters include s times of powers Preported by each of the first air conditioners within the time period T and an operating time tcorresponding to each power P; determining power correction coefficients αof the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner (S102); and calculating estimated power consumption W1 of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αof each of the n first air conditioners (S103). The present invention also discloses a device for estimating power consumption of an air conditioner.

Description

  • The present application is proposed based on China patent application No. 201710302173.2, filed on May 2, 2017 , and claims priority to the China patent application, the entire contents of which are hereby incorporated by reference.
  • Technical Field
  • The present invention relates to the technical field of air conditioners, and particularly relates to a method and a device for estimating power consumption of an air conditioner.
  • Background
  • With the progress of science and technology and the development of culture, industrial development and economic activities require a large amount of energy. Energy is not inexhaustible; in addition, the consumption of non-clean energy will bring environmental pollution. In view of greenhouse effect, high-price trend of the energy, exhaustion of traditional energy and other problems, how to save energy and correctly evaluate an energy-saving effect becomes the most concerned issue in the world. In the prior art, such as in the technical field of air conditioners, many energy-saving control methods have appeared. The power consumption of the air conditioners is generally estimated by relying on laboratory data when the quantity of saved electricity is measured. However, the method has a relatively large error since the power consumption of the air conditioners is affected by many factors such as geographical location, outdoor environment, indoor environment, house type and machine type.
  • Summary
  • Embodiments of the present invention provide a method and a device for estimating power consumption of an air conditioner, so as to solve a problem of relatively large error since the power consumption of the air conditioner is estimated by using laboratory data in the prior art. In order to basically understand some aspects of the disclosed embodiments, a brief summary is given below. The summary is not a general comment, nor tends to determine key/critical constituent elements or describe a protection scope of these embodiments, and only aims to present some concepts in a simplified form as an introduction of the following detailed description.
  • A method for estimating power consumption of an air conditioner is provided according to a first aspect of the embodiments of the present invention.
  • In some exemplary embodiments, the method for estimating the power consumption of the air conditioner includes:
    • acquiring types of n first air conditioners which are located in the same region with a second air conditioner, and operating parameters of each of the first air conditioners within a time period T, where the operating parameters include s times of powers Pix reported by each of the first air conditioners within the time period T and an operating time tix corresponding to each power Pix; i = 1, 2, ..., n; the n is a positive integer not less than 1; x = 1, 2, ..., s; and the s is a positive integer not less than 1;
    • determining power correction coefficients αi of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner; and
    • calculating an power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners.
  • In some illustrative embodiments, the calculating the estimated power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners includes:
    • calculating a correction power Pi of each of the n first air conditioners;
    • calculating an average correction power P of the n first air conditioners according to the correction power Pi of each of the n first air conditioners; and
    • calculating the estimated power consumption W1 of the second air conditioner within the time period T according to the average correction power P of the n first air conditioners.
  • In some illustrative embodiments, the calculating the power consumption of the second air conditioner within the time period T according to the following formula includes:
    • calculating the correction power Pi of each of the n first air conditioners according to a formula 1: P i = x = 1 s P ix t ix x = 1 s t ix α i
      Figure imgb0001
  • In some illustrative embodiments, the determining the power correction coefficients αi of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner includes:
    • determining a coefficient a0 of the second air conditioner according to the type of the second air conditioner;
    • determining coefficients ai of the n first air conditioners according to the types of the n first air conditioners; and
    • calculating the power correction coefficients αi of the n first air conditioners according to a formula 4: α i = a i a o
      Figure imgb0002
  • In some illustrative embodiments, after calculating the power consumption of the second air conditioner within the time period T, the method further includes:
    • calculating an actual power consumption W2 of the second air conditioner within the time period T, where a set temperature of the second air conditioner within the time period T is a second temperature, and the second temperature is different from the first temperature; and
    • calculating a power consumption saving value Δ W of the second air conditioner within the time period T according to the following formula: Δ W = W 1 W 2 .
      Figure imgb0003
  • In some illustrative embodiments, the calculating the actual power consumption W2 of the second air conditioner within the time period T includes:
    • acquiring the operating parameters of the second air conditioner within the time period T, where the operating parameters include m times of powers Py reported by the air conditioner within the time period T and an operating time ty corresponding to each power Py; and
    • calculating the actual power consumption W2 according to the following formula: W 2 = y = 1 m P y t y
      Figure imgb0004
      where y = 1, 2, ... , m, and the m is a positive integer not less than 1.
  • In the above embodiments, the power consumption of the second air conditioner within the time period T when the set temperature is the first temperature is estimated according to the types of the n first air conditioners and the operating parameters of each of the first air conditioners within the time period T. In the present embodiment, when the power consumption of the air conditioner is estimated, the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the power consumption of the second air conditioner within the time period is estimated according to the parameters. In the present embodiment, the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners. In addition, the estimated power consumption of the second air conditioner also corresponds to the time period. Thus, the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • A device for estimating power consumption of an air conditioner is provided according to a second aspect of the embodiments of the present invention.
  • In some exemplary embodiments, the device for estimating the power consumption of the air conditioner includes a signal receiver and a processor.
  • The signal receiver is configured to acquire types of n first air conditioners which are located in a same region with a second air conditioner, and operating parameters of each of the first air conditioners within a time period T; where the operating parameters include s times of powers Pix reported by each of the first air conditioners within the time period T and an operating time tix corresponding to each power Pix, where the x = 1, 2, ..., s; the s is a positive integer not less than 1; i = 1, 2, ..., n; the n is a positive integer not less than 1; and
    the processor is configured to determine power correction coefficients αi of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner, and calculate the power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners.
  • In some illustrative embodiments,
    the processor is further configured to calculate a correction power Pi of each of the n first air conditioners, calculate an average correction power P of the n first air conditioners according to the correction power Pi of each of the n first air conditioners, and calculate the estimated power consumption W1 of the second air conditioner within the time period T according to the average correction power P of the n first air conditioners.
  • In some illustrative embodiments,
    the processor is further configured to calculate the correction power Pi of each of the n first air conditioners according to the following formula: P i = x = 1 s P ix t ix x = 1 s t ix α i
    Figure imgb0005
  • In some illustrative embodiments,
    the processor is further configured to determine a coefficient a0 of the second air conditioner according to the type of the second air conditioner,
    determine coefficients a; of the n first air conditioners according to the types of the n first air conditioners, and
    calculate the power correction coefficients αi of the n first air conditioners according to the following formula: α i = a i a o
    Figure imgb0006
  • In some illustrative embodiments,
    the processor is further configured to acquire the operating parameters of the second air conditioner within the time period T, where the operating parameters include m times of powers Py reported by the second air conditioner within the time period T and an operating time ty corresponding to each power Py,
    calculate the actual power consumption W2 according to the following formula: W 2 = y = 1 m P y t y ,
    Figure imgb0007
    where y = 1, 2, ... , m, and m is a positive integer not less than 1, and
    calculate a power consumption saving value Δ W of the second air conditioner within the time period T according to the following formula: Δ W = W 1 W 2 .
    Figure imgb0008
  • Technical solutions provided by the embodiments of the present invention may include beneficial effects below.
  • In the above embodiments, the power consumption of the second air conditioner within the time period T when the set temperature is the first temperature is estimated according to the types of the n first air conditioners and the operating parameters of each of the first air conditioners within the time period T. In the present embodiment, when the power consumption of the air conditioner is estimated, the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the power consumption of the second air conditioner within the time period is estimated according to the parameters. In the present embodiment, the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners. In addition, the estimated power consumption of the second air conditioner also corresponds to the time period. Thus, the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • It should be understood that the above general description and the following detailed description are merely exemplary and illustrative, and not restrictive to the present invention.
  • Brief Description of the Drawings
  • The accompanying drawings herein, which are incorporated in the description and constitute a part of the description, illustrate embodiments consistent with the present invention and serve to explain principles of the present invention together with the description.
    • FIG. 1 is a flow chart of a method for estimating power consumption of an air conditioner according to an exemplary embodiment;
    • FIG. 2 is a flow chart of a method for estimating power consumption of an air conditioner according to an exemplary embodiment; and
    • FIG. 3 is a block diagram of a device for estimating power consumption of an air conditioner according to an exemplary embodiment.
    Detailed Description
  • The following description and accompanying drawings fully illustrate specific embodiments of the present invention so that those skilled in the art can practice the specific embodiments. The embodiments only represent possible variations. Individual components and functions are optional unless explicitly required, and a sequence of operations is variable. Parts and features of some embodiments may be included in or substituted for parts and features of other embodiments. A scope of the embodiments of the present invention includes a full scope of claims and available equivalents of the claims. In this description, various embodiments may be individually or generally represented by a term "invention" for convenience only. If more than one invention is actually disclosed, the scope of the application is not automatically limited to any individual invention or inventive concept. In this description, relational terms such as first, second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not require or imply any actual relationship or order among these entities or operations. Moreover, the terms such as "include", "contain" or any other variation thereof are intended to cover non-exclusive inclusions, such that a process, method or apparatus including a series of elements not only includes those elements, but also includes other elements not explicitly listed. Each embodiment herein is described in a progressive manner, and focuses on illustrating differences from other embodiments. Same and similar parts of the various embodiments can be referred to each other. Structures, products and the like disclosed in the embodiments correspond to the parts disclosed in the embodiments, and thus are described relatively simply; and the relevant parts refer to the descriptions of the method.
  • The quantity of saved electricity of an air conditioner needs to be calculated after the air conditioner is subjected to electricity-saving control in the prior art. The quantity of saved electricity is determined according to a difference between an estimated power consumption of the air conditioner and an actual power consumption of the air conditioner in a period of regulating a first state to a second state of the air conditioner, i.e., a time period T after the air conditioner is subjected to electricity-saving control. In the above process, the actual power consumption of the air conditioner can be calculated according to a power and a time fed back by the air conditioner.
  • However, the estimated power consumption of the air conditioner needs to be calculated according to the laboratory data. However, since the power consumption of the air conditioner may be affected by geographical location, outdoor environment, indoor environment, house type, machine type and other factors of the air conditioner, the laboratory data cannot reflect an actual operating state of the air conditioner; and the calculated estimated power consumption is relatively large in error. An overall concept of the present invention is to acquire types and operating parameters of a plurality of air conditioners in the first state within the time period T, and calculate the estimated power consumption within the time period T when calculating that the air conditioner is in the first state according to the above parameters.
  • In the present invention, the first state refers to a state of the air conditioner before electricity-saving control; the second state refers to a state of the air conditioner after electricity-saving control; and the first state and the second state may be regulation for a set temperature of the air conditioner, e.g., a first temperature is adjusted to a second temperature, and may also be regulation for a fan speed of the air conditioner, e.g., a first fan speed is adjusted to a second fan speed.
  • First air conditioners are a type of air conditioners of which the types and the operating parameters are taken from a database when calculating the estimated power consumption of the second air conditioner. Operating states of the first air conditioners within the time period T are the same as an operating state of a second air conditioner before electricity-saving control, i.e., the first air conditioners are in the first state. The first air conditioners and the second air conditioner are located in the same region, such as the same city or the same region; and the outdoor environments are basically the same.
  • The second air conditioner is an air conditioner which is subjected to electricity-saving control and requires calculation of the estimated power consumption. The second air conditioner is in the first state as the first air conditioners before electricity-saving control. The second air conditioner is adjusted from the first state to the second state after performing electricity-saving control on the second air conditioner.
  • The types of the first air conditioners or the second air conditioner refer to a type of parameters capable of reflecting a horsepower and an energy consumption level of the air conditioner, such as a machine type and a machine code.
  • The energy consumption level can be represented by an energy rating label and can be classified into five levels according to national standards. A level 1 indicates that an electricity-saving effect of the product has reached an international advanced level and the energy consumption is the lowest; a level 2 indicates that the product is relatively electricity-saving; a level 3 indicates that an energy efficiency of the product is at an average level of the Chinese market; a level 4 indicates that the energy efficiency of the product is lower than the average level of the market; a level 5 is a market access indicator of the product, in which the products that fail to meet the requirements of the level are not allowed to be produced and sold; and the energy consumption level can also be classified according to industry standards or enterprise standards.
  • A power correction coefficient is determined according to the types of the first air conditioners and the type of the second air conditioner, and is used for correcting powers of the first air conditioners and further calculating correction powers of the first air conditioners.
  • The estimated power consumption corresponds to the power consumption of the second air conditioner within the time period T before electricity-saving control, i.e., in the first state.
  • The actual power consumption corresponds to the power consumption of the second air conditioner within the time period T after electricity-saving control, i.e., in the second state.
  • FIG. 1 is a flow chart of an embodiment of the present invention. As shown in the FIG. 1:
    In some exemplary embodiments, the method for estimating the power consumption of the air conditioner includes:
    • step S101, types of n first air conditioners located in the same region and operating parameters of each of the first air conditioners within the time period T are acquired, where the operating parameters include s times of powers Pix reported by each of the first air conditioners within the time period T and an operating time tix corresponding to each power Pix; i = 1, 2, ..., n; n is a positive integer not less than 1; x = 1, 2, ..., s; and s is a positive integer not less than 1;
    • step S102, the power correction coefficients αi of the n first air conditioners are determined according to the types of the n first air conditioners and the type of the second air conditioner; and step S103, the estimated power consumption W1 of the second air conditioner within the time period T is calculated according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners.
  • In the above embodiments, the estimated power consumption of the second air conditioner within the time period T is calculated according to the types of the n first air conditioners and the operating parameters of each first air conditioner within the time period T. In the present embodiment, when the power consumption of the air conditioner is estimated, the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the estimated power consumption W1 of the second air conditioner is calculated according to the parameters. In the present embodiment, the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners. In addition, the estimated power consumption W1 of the second air conditioner also corresponds to the time period. Thus, the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • In some optional embodiments, the set temperature of a second home appliance before the electricity-saving control is a first temperature; and the set temperature after the electricity-saving control is set to a second temperature. The set temperature of the n first air conditioners taken in the above embodiment is the first temperature; and the calculated estimated power consumption is a power consumption of the second home appliance within the operating time period T when the set temperature is the first temperature. In the present embodiment, the second home appliance achieves a purpose of saving electricity by adjusting the set temperature. Therefore, in the present embodiment, the first state of the n first home appliances means that the set temperature is the first temperature. The second state of the second home appliance after the electricity-saving control means that the set temperature is the second temperature.
  • In some optional embodiments, the types and operating parameters of the n first air conditioners may be acquired from a cloud server or other devices in the step S101. The cloud server or other devices are configured to monitor the operating states of the air conditioners in the same region, such as the first state and the second state; when the power of the air conditioner changes, the air conditioner may actively report the change to the cloud server or other devices and inform them of a current power; and therefore, the cloud server or other devices also record the power of each air conditioner and the operating time corresponding to the power.
  • In some optional embodiments, the power correction coefficients αi of the n first air conditioners may be queried from a local or cloud server or other devices in the step S102.
  • Optionally, the power correction coefficients αi of the air conditioners of different types are recorded in a database; and the power correction coefficients αi of the first air conditioners can be directly queried according to the types of the first air conditioners and the type of the second air conditioner.
  • Optionally, coefficients of the air conditioners corresponding to different horsepower and different energy consumption levels are recorded in the database, as shown in a Table 1. Table 1
    Horsepower Level-1 energy consumption Level-2 energy consumption Level-3 energy consumption
    1P A11 A12 A13
    1.5P A21 A22 A23
    2P A31 A32 A33
    3P A41 A42 A43
  • The type of the air conditioner corresponds to the horsepower and the energy consumption level of the air conditioner. The horsepower and the energy consumption level of the air conditioner can be determined by identifying the type of the air conditioner.
  • Further, the step S102 specifically includes:
    • a coefficient a0 of the second air conditioner is determined according to the type of the second air conditioner;
    • coefficients a; of the n first air conditioners are determined according to the types of the n first air conditioners; and
    • the power correction coefficients αi of the n first air conditioners are calculated according to a formula 4: α i = a i a o
      Figure imgb0009
  • For example, the horsepower corresponding to the type of the second air conditioner is IP, and the energy consumption level is the level-1 energy consumption, and then a0 is A11; a total of n first air conditioners are acquired and numbered from 1 to n, where the horsepower corresponding to the type of the first air conditioner numbered as 3 (i.e., i=3) is 3P, and the energy consumption level is the level-2 energy consumption; and then a3=A42; α3=A42/A11 can be calculated according to the above information and formula 4. Similarly, the coefficients αi of the n first air conditioners, i.e., α1, α2, ..., αn, can be calculated.
  • In some illustrative embodiments, the step S103 includes:
    • the correction power Pi of each of the n first air conditioners is calculated;
    • the average correction power P of the n first air conditioners is calculated according to the correction power Pi of each of the n first air conditioners; and
    • the estimated power consumption W1 of the second air conditioner within the time period T is calculated according to the average correction power P of the n first air conditioners.
  • Further,
    the correction power Pi of each of the n first air conditioners is calculated according to a formula 1: P i = x = 1 s P ix t ix x = 1 s t ix α i
    Figure imgb0010
  • Further,
    the average correction power P of the n first air conditioners is calculated according to a formula 2: P = 1 n i = 1 n P i
    Figure imgb0011
  • Further,
    the estimated power consumption W1 of the second air conditioner within the time period T is calculated according to a formula 3: W 1 = P T
    Figure imgb0012
  • In the above embodiment, a specific calculation method and a corresponding formula for calculating the estimated power consumption W1 are given. The correction power Pi of each first air conditioner is calculated after the types and state parameters of the n first air conditioners are acquired; then, the calculated correction powers Pi are averaged to calculate the average correction power P of the n first air conditioners, i.e., the estimated power consumption of the second air conditioner within the time period T in the first state before electricity-saving control; and then, P calculated in the above step is multiplied by T to calculate the estimated power consumption W1 of the second air conditioner within the time period T.
  • In some optional embodiments, the method further includes the quantity of saved electricity of the second air conditioner after electricity-saving control is calculated. For example, the actual power consumption W2 of the second air conditioner within the time period T is calculated when the set temperature is adjusted from the first temperature to the second temperature after the second air conditioner is subjected to electricity-saving control; and then the quantity of saved electricity, i.e., a power consumption saving value Δ W of the second air conditioner within the time period T is calculated according to W1 and W2.
  • Further, the power consumption saving value Δ W of the second air conditioner within the time period T is calculated according to a formula 5: Δ W = W 1 W 2
    Figure imgb0013
  • Further, the calculating the actual power consumption W2 specifically includes:
    • the operating parameters of the second air conditioner within the time period T are acquired, including m times of powers Py reported by the second air conditioner within the time period T and an operating time ty corresponding to each power Py;
    • the actual power consumption W2 is calculated according to a formula 6: W 2 = y = 1 m P y t y
      Figure imgb0014
    • where y=1, 2, ... , m, and m is a positive integer not less than 1.
  • In the above embodiment, the actual power consumption W2 is calculated according to the operating parameter of the second air conditioner within the time period T; and the second air conditioner reports a current power when the power changes during operation, so that at least one operating power within the time period T and the corresponding operating time are acquired. Optionally, the operating parameters of the second air conditioner within the time period T may be recorded in a local database, or acquired from the cloud server or other devices.
  • In some illustrative embodiments, m first air conditioners having the same type as the type of the second air conditioner are acquired first in the step S101, where the m is a positive integer less than or equal to n. If m is less than n, n-m first air conditioners are randomly acquired. If n is 100, the first air conditioners having the same type as the type of the second air conditioner and using the first temperature as the set temperature are acquired from the database first; and if only 60 first air conditioners meet the condition in a current database, the first air conditioners using the first temperature as the set temperature in the remaining 40 first air conditioners are randomly acquired from the database. Further, the m first air conditioners and the second air conditioner have the same type, and the power correction coefficient αi = 1. In the above embodiment, the first air conditioners having the same type as the type of the second air conditioner are preferentially acquired from the database to ensure that the operating environment of the extracted first air conditioners is the most similar to the operating environment of the second air conditioner, thereby improving the accuracy of the estimated power consumption.
  • In order to give specific descriptions of the above embodiments, FIG. 2 is a flow chart of the method for estimating the power consumption of the air conditioner according to an embodiment of the present invention. As shown in FIG. 2, the method includes:
    • step S201, a set temperature of the air conditioner of a user is adjusted from T11 to T12 according to an electricity-saving control solution;
    • step S202, the actual power consumption W2 of the air conditioner of the user within the time period T, e.g., 10:00-11:00, is calculated according to the reported powers;
    • the data acquired according to the reported powers are as follows:
      Pi=700W, 10 min; P2 = 1000W, 20 min; P3 = 800W, 15 min; and P4 = 600W, 15 min;
  • In the formula 6: W 2 = y = 1 m P y t y ,
    Figure imgb0015
    where m = 4,
    W2 = 48 KW·min = 2880103J.
  • Step S203, operating data of a plurality of air conditioners using T11 as the set temperature in the same region are collected to calculate the estimated power consumption W1.
  • Considering that the number of air conditioners having the same type in a certain region may be different, we require collecting 100 air conditioners in the same region to estimate the power consumption at the temperature T11. The air conditioners having the same type are preferred. When the number of the air conditioners having the same type is less than 100, the air conditioners are randomly selected to make up 100. The power consumption W1 at the temperature T11 is estimated according to a weighted average of the power consumptions of the 100 devices.
  • A method for calculating W1 is specifically as follows:
    The method for calculating the power consumption of each first air conditioner is the same as the formula 6. The number of the first air conditioners within the time T in the same region is n, where n = 100; the respective operating time is tix; n = 1, 2, ..., n; x = 1, 2, ..., s; and t i = x = 1 s t ix .
    Figure imgb0016
  • The correction power of each first air conditioner is P i = x = 1 s P ix t ix x = 1 s t ix α i .
    Figure imgb0017
    αi = 1 when m = n, i.e., m = 100, and the average correction power P of the 100 first air conditioners is calculated as follows: P = 1 n i = 1 n P i .
    Figure imgb0018
  • The coefficient correction is performed according to the corresponding energy consumption level and horsepower when m < 100, and the average correction power P of the 100 first air conditioners is calculated as follows: P = 1 n i = 1 m P i + i = n m n P i .
    Figure imgb0019
  • Finally, the estimated power consumption W1 is calculated according to the calculated P: W 1 = P T
    Figure imgb0020
  • Step S204, the quantity of saved electricity within 10:00-11:00 is calculated according to the estimated power consumption W1 and the actual power consumption W2 of the air conditioner of the user.
  • See Table 1 for the correction factor. Table 1 records the average unit energy consumption of devices with the same horsepower and the same energy consumption level in the past year.
  • For example, the air conditioner of a user in a certain region has 1p and a level-2 energy consumption and is operated for 1 hour when T11 is adjusted to T12; 60 air conditioners with the same type are set at T11 within the 1 hour in the region; the correction coefficients of the 60 air conditioners are α1-60 = 1; the remaining 40 air conditioners are extracted from the air conditioners which have other types and are set at T11 within 1 hour; and if the extracted air conditioners have 1p and a level-1 energy consumption, the correction coefficients of the 40 air conditioners are α61-100=A12/A11.
  • The estimated power consumption W1 of the air conditioner of the user at the set temperature of T11 is: W 1 = 1 100 i = 1 60 P i + i = 61 100 P i 1 .
    Figure imgb0021
  • The above embodiment provides a specific implementation mode of the method for estimating the power consumption of the air conditioner according to the present invention. In the above embodiment, the estimated power consumption of the second air conditioner, i.e., the air conditioner of the user, within 1 hour from 10:00 to 11:00 is calculated according to the types of the 100 first air conditioners and the operating parameters of each of the first air conditioners within 10:00-11:00. The power consumption of the air conditioner converted in the present invention is more accurate than a mode of calculating with the experimental data in the prior art. FIG. 3 shows a device for estimating the power consumption of the air conditioner according to an embodiment of the present invention. As shown in FIG. 3:
    In some exemplary embodiments, the device for estimating the power consumption of the air conditioner includes a signal receiver 301 and a processor 302.
  • The signal receiver 301 is configured to acquire types of the n first air conditioners and operating parameters of each first air conditioner within the time period T. The operating parameters include s times of powers Pix reported by each of the first air conditioners within the time period T and an operating time tix corresponding to each power Pix; x = 1, 2, ..., s; s is a positive integer not less than 1; i = 1, 2, ..., n; and n is a positive integer not less than 1.
  • The processor 302 is configured to determine the power correction coefficients αi of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner, and calculate the estimated power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners.
  • In the above embodiments, the estimated power consumption of the second air conditioner within the time period T is calculated according to the types of the n first air conditioners and the operating parameters of each of the first air conditioners within the time period T. In the present embodiment, when the power consumption of the air conditioner is estimated, the adopted data are not calculated according to the laboratory data, but are acquired by taking the types and the operating parameters of the n first air conditioners in the same region and within the same operating time period; and the estimated power consumption W1 of the second air conditioner is calculated according to the parameters. In the present embodiment, the operating parameters of the n first air conditioners are collected within the same operating time period; and the parameters are affected by geographic location, outdoor environment, indoor environment, house type, machine type and other factors of each of the first air conditioners. In addition, the estimated power consumption W1 of the second air conditioner also corresponds to the time period. Thus, the power consumption of the air conditioner converted by the present embodiment is more accurate than a mode of calculating with the experimental data in the prior art.
  • In some optional embodiments, the set temperature of a second home appliance before the electricity-saving control is the first temperature; and the set temperature after the electricity-saving control is set to the second temperature. The set temperature of the n first air conditioners taken in the above embodiment is the first temperature; and the estimated power consumption calculated by the processor 302 is a power consumption of the second home appliance within the operating time period T when the set temperature is the first temperature. In the present embodiment, the second home appliance achieves a purpose of saving electricity by adjusting the set temperature. Therefore, in the present embodiment, the first state of the n first home appliances means that the set temperature is the first temperature. The second state of the second home appliance after the electricity-saving control means that the set temperature is the second temperature.
  • In some optional embodiments, the signal receiver 301 can also be configured to acquire the types and the operating parameters of the n first air conditioners from a cloud server or other devices. The cloud server or other devices are configured to monitor the operating states of the air conditioners in the same region, such as the first state and the second state. When the power of the air conditioner changes, the air conditioner may actively report the change to the server or other devices and inform them of a current power. Therefore, the cloud server or other devices also record the power of each air conditioner and the operating time corresponding to the power.
  • In some optional embodiments, the processor 302 can query the power correction coefficients αi of the n first air conditioners from a local or cloud server or other devices.
  • Optionally, the power correction coefficients αi of the air conditioners of different types are recorded in a database of the local or cloud server or other devices; and the power correction coefficients αi of the first air conditioners can be directly queried according to the types of the first air conditioners and the type of the second air conditioner.
  • Optionally, coefficients of the air conditioners corresponding to different horsepower and different energy consumption levels are recorded in the database, as shown in Table 1. The type of the air conditioner corresponds to the horsepower and the energy consumption level of the air conditioner. The horsepower and the energy consumption level of the air conditioner can be determined by identifying the type of the air conditioner.
  • Further, the processor 302 is further configured to determine a coefficient a0 of the second air conditioner according to the type of the second air conditioner, determine coefficients a; of the n first air conditioners according to the types of the n first air conditioners, and calculate the power correction coefficients αi of the n first air conditioners according to a formula 4: α i = a i a o
    Figure imgb0022
  • For example, the horsepower corresponding to the type of the second air conditioner is IP, and the energy consumption level is the level-1 energy consumption, and then a0 is A11. A total of n first air conditioners are acquired and numbered as 1 to n, where the horsepower corresponding to the type of the first air conditioner numbered as 3 is 3P, and the energy consumption level is the level-2 energy consumption, and then a3=A42. α3 = A42/A11 can be calculated according to the above information and formula 4. Similarly, the coefficients αi of the n first air conditioners, i.e., α1, α2, ..., αn, can be calculated.
  • In some optional embodiments,
    the processor 302 is further configured to calculate the correction power Pi of each of the n first air conditioners, calculate the average correction power P of the n first air conditioners according to the correction power Pi of each of the n first air conditioners, and calculate the estimated power consumption W1 of the second air conditioner within the time period T according to the average correction power P of the n first air conditioners.
  • Further, the processor 302 is further configured to calculate the correction power Pi of each of the n first air conditioners according to a formula 1: P i = x = 1 s P ix t ix x = 1 s t ix α i
    Figure imgb0023
  • Further, the processor 302 is further configured to calculate the average correction power P of the n first air conditioners according to a formula 2: P = 1 n i = 1 n P i
    Figure imgb0024
  • Further, the processor 302 is further configured to calculate the estimated power consumption W1 of the second air conditioner within the time period T according to a formula 3: W 1 = P T
    Figure imgb0025
  • In the above embodiment, a specific calculation method and a corresponding formula for calculating the estimated power consumption W1 are given. The processor 302 calculates the correction power Pi of each first air conditioner after the signal receiver 301 acquires the types and state parameters of the n first air conditioners, then averages the calculated correction powers Pi to calculate the average correction power P of the n first air conditioners, i.e., the estimated power consumption of the second air conditioner within the time period T in the first state before electricity-saving control, and then multiplies P calculated in the above step by T to calculate the estimated power consumption W1 of the second air conditioner within the time period T.
  • In some optional embodiments, the processor 302 is further configured to calculate the quantity of saved electricity of the second air conditioner after electricity-saving control. For example, the processor 302 is configured to calculate the actual power consumption W2 of the second air conditioner within the time period T when the set temperature is adjusted from the first temperature to the second temperature after the second air conditioner is subjected to electricity-saving control, and then calculate the quantity of saved electricity, i.e., a power consumption saving value Δ W of the second air conditioner within the time period T according to W1 and W2.
  • In some optional embodiments,
    the processor 302 is further configured to calculate the power consumption saving value Δ W of the second air conditioner within the time period T according to a formula 5: Δ W = W 1 W 2
    Figure imgb0026
  • In some optional embodiments,
    the processor 302 is further configured to acquire the operating parameters of the second air conditioner within the time period T, including m times of powers Py reported by the second air conditioner within the time period T and an operating time ty corresponding to each power Py. The actual power consumption W2 is calculated according to a formula 6: W 2 = y = 1 m P y t y
    Figure imgb0027
    where y=1, 2, ... , m, and m is a positive integer not less than 1.
  • In the above embodiment, the actual power consumption W2 is calculated by the processor 302 according to the operating parameter of the second air conditioner within the time period T; and the second air conditioner reports a current power when the power changes during operation, so that at least one operating power within the time period T and the corresponding operating time are acquired.
  • Optionally, the operating parameters of the second air conditioner within the time period T may be recorded in a local database, or acquired from the cloud server or other devices by the signal receiver 301.
  • It should be understood that the present invention is not limited to processes and structures described above and shown in the accompanying drawings, and can be subjected to various modifications and changes without departing from the scope thereof. The scope of the present invention is only limited by the appended claims.

Claims (11)

  1. A method for estimating power consumption of an air conditioner, comprising:
    acquiring types of n first air conditioners which are located in a same region with a second air conditioner, and operating parameters of each of the first air conditioners within a time period T, wherein the operating parameters include s times of powers Pix reported by each of the first air conditioners within the time period T and an operating time tix corresponding to each power Pix; i = 1, 2, ..., n; the n is a positive integer not less than 1; x = 1, 2, ..., s; and the s is a positive integer not less than 1;
    determining power correction coefficients αi of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner; and
    calculating an estimated power consumption W1 of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners.
  2. The method according to claim 1, wherein the calculating the estimated power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners comprises:
    calculating a correction power Pi of each of the n first air conditioners;
    calculating an average correction power P of the n first air conditioners according to the correction power Pi of each of the n first air conditioners; and
    calculating the estimated power consumption W1 of the second air conditioner within the time period T according to the average correction power P of the n first air conditioners.
  3. The method according to claim 2, wherein the correction power Pi of each of the n first air conditioners is calculated according to the following formula: P i = x = 1 s P ix t ix x = 1 s t ix α i .
    Figure imgb0028
  4. The method according to any one of claims 1 to 3, wherein the determining the power correction coefficients αi of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner comprises:
    determining a coefficient a0 of the second air conditioner according to the type of the second air conditioner;
    determining coefficients ai of the n first air conditioners according to the types of the n first air conditioners; and
    calculating the power correction coefficients αi of the n first air conditioners according to the following formula: α i = a i a o .
    Figure imgb0029
  5. The method according to claim 4, wherein after calculating the estimated power consumption of the second air conditioner within the time period T, the method further comprises:
    calculating an actual power consumption W2 of the second air conditioner within the time period T; and
    calculating a power consumption saving value Δ W of the second air conditioner within the time period T according to the following formula: Δ W = W 1 W 2 .
    Figure imgb0030
  6. The method according to claim 5, wherein the calculating the actual power consumption W2 of the second air conditioner within the time period T comprises:
    acquiring the operating parameters of the second air conditioner within the time period T, wherein the operating parameters include m times of powers Py reported by the second air conditioner within the time period T, and an operating time ty corresponding to each power Py; and
    calculating the actual power consumption W2 according to the following formula: W 2 = y = 1 m P y t y
    Figure imgb0031
    wherein y = 1, 2, ... , m, and the m is a positive integer not less than 1.
  7. A device for estimating power consumption of an air conditioner, comprising a signal receiver and a processor, wherein
    the signal receiver is configured to acquire types of n first air conditioners which are located in a same region with a second air conditioner, and operating parameters of each of the first air conditioners within a time period T; wherein the operating parameters include s times of powers Pix reported by each of the first air conditioners within the time period T and an operating time tix corresponding to each power Pix, wherein the x = 1, 2, ..., s; the s is a positive integer not less than 1; i = 1, 2, ..., n; the n is a positive integer not less than 1; and
    the processor is configured to determine power correction coefficients αi of the n first air conditioners according to the types of the n first air conditioners and the type of the second air conditioner, and calculate an estimated power consumption of the second air conditioner within the time period T according to the operating parameters within the time period T and the power correction coefficient αi of each of the n first air conditioners.
  8. The device according to claim 7, wherein
    the processor is further configured to calculate a correction power Pi of each of the n first air conditioners, calculate an average correction power P of the n first air conditioners according to the correction power Pi of each of the n first air conditioners, and calculate the estimated power consumption W1 of the second air conditioner within the time period T according to the average correction power P of the n first air conditioners.
  9. The device according to claim 8, wherein
    the processor is further configured to calculate the correction power Pi of each of the n first air conditioners according to the following formula: P i = x = 1 s P ix t ix x = 1 s t ix α i .
    Figure imgb0032
  10. The device according to any one of claims 7 to 9, wherein
    the processor is further configured to determine a coefficient a0 of the second air conditioner according to the type of the second air conditioner,
    determine coefficients ai of the n first air conditioners according to the types of the n first air conditioners, and
    calculate the power correction coefficients αi of the n first air conditioners according to the following formula: α i = a i a o .
    Figure imgb0033
  11. The device according to claim 10, wherein
    the processor is further configured to acquire the operating parameters of the second air conditioner within the time period T, wherein the operating parameters include m times of powers Py reported by the second air conditioner within the time period T and an operating time ty corresponding to each power Py,
    calculate the actual power consumption W2 according to the following formula: W 2 = y = 1 m P y t y ,
    Figure imgb0034
    wherein y = 1, 2, ... , m, and m is a positive integer not less than 1, and
    calculate a power consumption saving value Δ W of the second air conditioner within the time period T according to the following formula: Δ W = W 1 W 2 .
    Figure imgb0035
EP18794528.2A 2017-05-02 2018-04-28 Air conditioner power consumption estimation method and device Active EP3546842B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710302173.2A CN107246705B (en) 2017-05-02 2017-05-02 A kind of air-conditioning power consumption estimation method and device
PCT/CN2018/085032 WO2018201996A1 (en) 2017-05-02 2018-04-28 Air conditioner power consumption estimation method and device

Publications (3)

Publication Number Publication Date
EP3546842A1 true EP3546842A1 (en) 2019-10-02
EP3546842A4 EP3546842A4 (en) 2020-01-01
EP3546842B1 EP3546842B1 (en) 2023-02-22

Family

ID=60016870

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18794528.2A Active EP3546842B1 (en) 2017-05-02 2018-04-28 Air conditioner power consumption estimation method and device

Country Status (3)

Country Link
EP (1) EP3546842B1 (en)
CN (1) CN107246705B (en)
WO (1) WO2018201996A1 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107246705B (en) * 2017-05-02 2019-11-05 青岛海尔空调器有限总公司 A kind of air-conditioning power consumption estimation method and device
CN108008184B (en) * 2017-10-31 2021-05-25 青岛海尔空调电子有限公司 A household metering method and system for multi-connected refrigeration operation
CN108833491A (en) * 2018-05-24 2018-11-16 朔联科技(上海)有限公司 The energy consumption statistical method and server of Internet of things system
CN109116775B (en) * 2018-08-07 2021-05-04 珠海格力电器股份有限公司 Energy consumption management method and device for electrical equipment, storage medium and electrical equipment
CN109374963B (en) * 2018-09-30 2021-09-28 四川长虹空调有限公司 Air conditioner electric quantity calculation method
CN112287281B (en) * 2020-10-14 2023-06-30 珠海格力电器股份有限公司 Method and device for determining power consumption and air conditioning unit
CN112781177B (en) * 2021-01-05 2022-05-20 广东美的暖通设备有限公司 Method and device for predicting air conditioner operating power, electronic equipment and storage medium
CN117350438B (en) * 2023-11-13 2024-08-16 国网冀北电力有限公司 Demand response Shen Baoliang evaluation and calculation method and system based on commercial air conditioner parameters
JP2026011013A (en) * 2024-07-10 2026-01-23 ダイキン工業株式会社 Estimation method, estimation device, and program

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0886490A (en) * 1994-09-14 1996-04-02 Toshiba Corp Heat load prediction device
JP3783929B2 (en) * 2001-08-21 2006-06-07 ダイキン工業株式会社 Energy saving effect estimation method and apparatus
JP4450541B2 (en) * 2002-06-07 2010-04-14 三機工業株式会社 Energy saving evaluation method and energy saving evaluation method
JP4147204B2 (en) * 2004-06-01 2008-09-10 北斗電子工業株式会社 Evaluation support method for power consumption reduction, evaluation support device, and power control device
JP4634242B2 (en) * 2005-07-08 2011-02-16 株式会社山武 Energy saving amount estimation apparatus, method, and program
JP2011257073A (en) * 2010-06-09 2011-12-22 Panasonic Electric Works Co Ltd Energy management apparatus
CN101893309B (en) * 2010-07-19 2012-12-05 宁波奥克斯电气有限公司 Control method for energy-saving operation of variable frequency air conditioner
JP6374702B2 (en) * 2014-05-21 2018-08-15 アズビル株式会社 Energy saving effect calculation method and apparatus
CN104318073B (en) * 2014-10-08 2018-01-05 中国建筑设计院有限公司 The method of the electric simulation of energy consumption and energy-conservation of single residential architecture
CN104977461B (en) * 2015-01-26 2017-10-31 广东美的制冷设备有限公司 The computational methods and electronic equipment of air conditioning electricity consumption
CN104990210B (en) * 2015-06-24 2017-12-12 广东美的制冷设备有限公司 Air conditioner, air conditioner indoor set and its power budget control method, device
CN105135592B (en) * 2015-07-06 2019-07-09 Tcl集团股份有限公司 A kind of air-conditioning adaptive regulation method and system
US10564195B2 (en) * 2015-07-13 2020-02-18 Tata Consultancy Services Limited System and method for energy sample forecasting of HVAC-R systems
CN106403207A (en) * 2016-10-24 2017-02-15 珠海格力电器股份有限公司 Control system and control method based on load prediction for heating, ventilation and air conditioning system
CN107246705B (en) * 2017-05-02 2019-11-05 青岛海尔空调器有限总公司 A kind of air-conditioning power consumption estimation method and device

Also Published As

Publication number Publication date
EP3546842A4 (en) 2020-01-01
CN107246705B (en) 2019-11-05
CN107246705A (en) 2017-10-13
WO2018201996A9 (en) 2019-01-03
WO2018201996A1 (en) 2018-11-08
EP3546842B1 (en) 2023-02-22

Similar Documents

Publication Publication Date Title
EP3546842A1 (en) Air conditioner power consumption estimation method and device
CN110264080B (en) Method, device, equipment and storage medium for evaluating running performance of green building
WO2015183242A1 (en) Method and apparatus for distributed control of thermostatic electric loads using high-granularity energy usage data
Duan et al. China’s adaptive response to climate change through air-conditioning
CN107103387B (en) A load prediction method based on the total power of equipment per household and occupancy coefficient
JP6249982B2 (en) Cost prediction apparatus and program
CN103513099A (en) Air conditioner power consumption processing method and device
JP6032486B2 (en) Power management system and power management method
CN109489159A (en) Electric control method and control system for photovoltaic air conditioner
CN103679289B (en) Methods of electric load forecasting based on multiple regression extrapolation
Bertoldi et al. Standby power use: How big is the problem? What policies and technical solutions can address it?
CN109741213A (en) Zero-energy-consumption building energy consumption control method and system
CN120146899B (en) User power accurate calculation system based on artificial intelligence
CN121346426A (en) A Method and System for Monitoring the Operation of Refrigeration Equipment Based on Multidimensional Data Analysis
CN110986108A (en) Cooking control method and device of gas stove
JPH07123589A (en) Demand forecasting device
JP2015187790A (en) Energy saving management device and program
JP2017016206A (en) Energy consumption use decomposition device and energy saving support device
TW201820246A (en) Method for acquiring load operation probability of electric power consumer and method for acquiring load operation probability of electric power consumer group for acquiring load information and total power consumption information of an electric power consumer or an electric power consumer group
KR100979409B1 (en) Method of configuring performance evaluation for energy saving
JP2015201972A (en) Demand prediction device and program
JP2013213635A (en) Air conditioning control method, and air conditioning control system
JPH11264749A (en) Dividing method by purpose of gas use quantity and energy-saving diagnostic system
Maher Measuring the accuracy of engineering models in predicting energy savings from home retrofits: Evidence from monthly billing data
CN112132442A (en) An evaluation method for load identification effect under intermittent start and stop electric heating conditions

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190606

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20191129

RIC1 Information provided on ipc code assigned before grant

Ipc: F24F 11/00 20180101AFI20191125BHEP

Ipc: G01R 22/00 20060101ALI20191125BHEP

Ipc: F24F 11/46 20180101ALI20191125BHEP

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220901

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1549738

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230315

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018046458

Country of ref document: DE

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20230222

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1549738

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230622

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230522

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230622

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230523

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602018046458

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230428

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230522

26N No opposition filed

Effective date: 20231123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20231103

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230428

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230428

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230428

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230522

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20180428

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20180428

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230222