JP4450541B2 - Energy saving evaluation method and energy saving evaluation method - Google Patents

Energy saving evaluation method and energy saving evaluation method Download PDF

Info

Publication number
JP4450541B2
JP4450541B2 JP2002167389A JP2002167389A JP4450541B2 JP 4450541 B2 JP4450541 B2 JP 4450541B2 JP 2002167389 A JP2002167389 A JP 2002167389A JP 2002167389 A JP2002167389 A JP 2002167389A JP 4450541 B2 JP4450541 B2 JP 4450541B2
Authority
JP
Japan
Prior art keywords
data
energy
operation data
standard
energy consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002167389A
Other languages
Japanese (ja)
Other versions
JP2004012342A (en
Inventor
正文 寺脇
勇 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanki Engineering Co Ltd
Original Assignee
Sanki Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanki Engineering Co Ltd filed Critical Sanki Engineering Co Ltd
Priority to JP2002167389A priority Critical patent/JP4450541B2/en
Publication of JP2004012342A publication Critical patent/JP2004012342A/en
Application granted granted Critical
Publication of JP4450541B2 publication Critical patent/JP4450541B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Description

【0001】
【発明の属する技術分野】
本発明は省エネルギー評価方法及び省エネルギー評価手段に関するものである。
【0002】
【従来の技術】
ESCO事業やPFI事業では、所轄官庁に省エネルギー実績報告書を提出することが義務付けられている。一方、ESCO事業やPFI事業で省エネルギー機器(ECM)を設置するに際しては、季節や月日、時刻により変動する標準の気象データに基いて省エネルギー機器を設置する前の消費エネルギーの量を算出し、又、熱源機器の標準の運転時間、運転方法を想定して省エネルギー機器を設置する前の消費エネルギーの量を算出し、これらの消費エネルギーを基として、省エネルギー機器を設置した場合にどの程度の省エネルギーが可能となるかというベースラインを算出してユーザに提示したうえ事業契約を締結する。
【0003】
しかるに、省エネルギー機器の設置後にベースラインの想定時には予期しなかった異常気象や、例えば室温の設定値を勝手に変更する等、ユーザの恣意的な運転等によりエネルギー消費量が増加し、当初の省エネルギーの目標を達成できない場合には、事業収益が悪化するという事態を招来する虞がある。
【0004】
又、省エネルギー機器の設置後には、どの程度エネルギーを消費しているかを知ることが必要であり、このため、従来はエネルギー監視システムが用いられている。このエネルギー監視システムでは、予め想定したベースラインと比較してどの程度の省エネルギーを達成しているかの評価は、エネルギー監視システムで得たデータを抽出してエネルギー監視システムとは別に設けたパソコンにデータを用い行っていた。
【0005】
而して、従来の省エネルギー監視システムの適用される電力やエネルギーを消費する設備の例は図10に示され、この設備に使用するエネルギー監視システムは図11に示されている。
【0006】
図10中、1はパソコン、2は図11に示すエネルギー監視システムが内臓されたハードウエア、3はビル、工場、病院等の施設に設けられた計測システムである。計測システム3は分(配)電盤電力検出手段4、熱源設備エネルギー検出手段5、空調設備エネルギー検出手段6、ポンプ等の搬送設備電力検出手段7、照明設備電力検出手段8、パソコン等の機器のケーブルが接続されるコンセントのコンセント電力検出手段9、外気条件検出手段10、日射条件検出手段11、空調条件検出手段12を備えている。
【0007】
而して、分(配)電盤電力検出手段4からは電力W1を、熱源設備エネルギー検出手段5からはエネルギーE1を、空調設備エネルギー検出手段6からはエネルギーE2を、搬送設備電力検出手段7からは電力W2を、照明設備電力検出手段8からは電力W3を、コンセント電力検出手段9からは電力W4を、外気条件検出手段10からは外気温度T1や外気湿度H1を、日射条件検出手段11からは日射量Iを、空調条件検出手段12からは温度T2や湿度H2を、夫々パソコン1からハードウエア2に与え得るようになっている。
【0008】
13は冷房設備、暖房設備等の空調設備で、空調設備13が暖房設備の場合は温水循環ライン14を備えている。温水循環ライン14には、温水循環方向へ向かって、例えば一次ポンプ15、熱源設備16、二次ポンプ17、コイル18を備えていると共に、温水循環ライン14における熱源設備16の入側及び出口側には、熱源入口温度計19及び熱源出口温度計20、熱源水流量計21が、又、温水循環ライン14におけるコイル18の入口側及び出口側には、温水コイル入口温度計22及び温水コイル出口温度計23、温水流量計24が夫々設けられている。
【0009】
コイル18は空調機25に設置されており、空調機25には、コイル18により加熱された空気を吸引して送出するブロワ26、混合気温度計27、混合気湿度計28、還気温度計29が設置されている。
【0010】
空調機25に設置されたブロワ26から吐出された温空気は、中途部に給気温度計30を備えたダクト31を通って暖房を行う室32へ送給されるようになっており、室32から還気された空気はダクト33から空調機25へ戻り得るようになっている。室32内には、室内温度計34、室内湿度計35が設置されている。
【0011】
戸外には外気温度検出計36及び外気湿度検出計37が設置されていると共に日射計38が設置されている。
【0012】
而して、熱源入口温度計19及び熱源出口温度計20で検出した温度並びに熱源水流量計21で検出した温水流量は、熱源設備エネルギー検出手段5に与え得るようになっている。又、温水コイル入口温度計22で検出した温水温度及び温水コイル出口温度計23で検出した温水温度並びに温水流量計24で検出した温水流量は、空調設備エネルギー検出手段6に与え得るようになっている。
【0013】
更に、一次ポンプ15運転時の動力及び二次ポンプ17運転時の動力は搬送設備電力検出手段7へ与え得るようになっており、外気温度検出計36で検出した外気温度及び外気湿度検出計37で検出した外気湿度は外気条件検出手段10へ与え得るようになっている。又、日射計38で検出した日射量は日射条件検出手段11へ与え得るようになっており、混合気温度計27で検出した温度、混合気湿度計28で検出した湿度、還気温度計29で検出した温度、給気温度計30で検出した湿度、室内温度計34で検出した温度、室内湿度計35で検出した湿度は、夫々空調条件検出手段12へ与え得るようになっている。
【0014】
又、図示してないが、熱源設備16、ブロワ26、一次ポンプ15、二次ポンプ17といったポンプ、照明設備、コンセントの運転時間は、図示してないハードウエア2に内蔵した運転時間検出器により検出して後述のエネルギー監視システム39における通信インターフェース40、データ収集部41を介してエネルギー監視システム39のデータ記録部42に与え得るようになっている。
【0015】
ハードウエア2に設定されたエネルギー監視システム39は、図11に示すように、図10における計測システム3の分(配)電盤電力検出手段4、熱源設備エネルギー検出手段5、空調設備エネルギー検出手段6、搬送設備電力検出手段7、照明設備電力検出手段8、コンセント電力検出手段9、外気条件検出手段10、日射条件検出手段11、空調条件検出手段12から伝送された各データを仲介する通信インターフェース40、通信インターフェース40からのデータを収集するデータ収集部41、データ収集部41からのデータを記録するデータ記録部42、データ記録部42からのデータを基として実績運転データを演算する実績運転演算部43、実績運転演算部43で演算した実績運転データを表示する表示部44を備えている。
【0016】
上記設備の稼動時においては、熱源入口温度計19及び熱源出口温度計20で検出した温度並びに熱源水流量計21で検出した温水流量は、熱源設備エネルギー検出手段5に与えられ、温水コイル入口温度計22で検出した温水温度及び温水コイル出口温度計23で検出した温水温度並びに温水流量計24で検出した温水流量は、空調設備エネルギー検出手段6に与えられる。
【0017】
又、一次ポンプ15運転時の動力及び二次ポンプ17運転時の動力は搬送設備電力検出手段7へ与えられ、外気温度検出計36で検出した外気温度及び外気湿度検出計37で検出した外気湿度は外気条件検出手段10へ与えられ、日射計38で検出した日射量は日射条件検出手段11へ与えられ、混合気温度計27で検出した温度、混合気湿度計28で検出した湿度、還気温度計29で検出した温度、給気温度計30で検出した湿度、室内温度計34で検出した温度、室内湿度計35で検出した湿度は空調条件検出手段12へ与えられる。
【0018】
而して、分(配)電盤電力検出手段4からは分(配)電盤の電力W1が、熱源設備エネルギー検出手段5からは上述の与えられた検出データから求められたエネルギーE1が、空調設備エネルギー検出手段6からは上述の与えられた検出データから求められたエネルギーE2が、搬送設備電力検出手段7からは上述の与えられた検出データから求められた電力W2が、照明設備電力検出手段8からは上述の与えられた検出データから求められた電力W3が、コンセント電力検出手段9からはパソコン等の電力W4が、外気条件検出手段10からは上述の与えられた検出データから求められた外気温度T1、外気湿度H1が、日射条件検出手段11からは日射量Iが、空調条件検出手段12からは上述の与えられた検出データから求められた温度T2、湿度H2が、夫々パソコン1を介してハードウエア2のエネルギー監視システム39に与えられる。各電力W1、W2、W3、W4及びエネルギーE1、E2、外気温度T1、温度T2、外気湿度H1、湿度H2、日射量Iは一定時間間隔(例えば10分間隔)でハードウエア2のエネルギー監視システム39に与えられる。
【0019】
熱源設備、空調設備、搬送設備、照明設備、コンセントのエネルギー、電力と外気条件、日射条件、空調条件の温度と湿度、日射量は、パソコン1を介してハードウエア2に設定されているエネルギー監視システム39の通信インターフェース40、データ収集部41を介してデータ記録部42に与えられ、データ記録部42からは、必要なデータが実績運転演算部43に取出され、所定の演算が行われる。運転時間は例えば計測システム3の各検出手段から一定時間間隔で与えられた信号を実績運転演算部43に内臓された運転時間検出器によりカウントすることにより求められる。熱源設備、空調設備、搬送設備、照明設備、コンセントが運転されていることは、一定時間間隔でデータが送られていることにより判断される。
【0020】
例えば、X月Y日〜X月Z日の間における期間の熱源設備、空調設備、搬送設備、照明設備、コンセントの運転時間数は、運転時間検出器により検出された運転時間のデータを加算することにより演算されて実績運転データが得られ、又、熱源設備、空調設備、搬送設備、照明設備、コンセントの運転時間数を加算することによりX月Y日〜X月Z日の間におけるトータルの実績運転データが得られる。
【0021】
而して、得られた運転時間数の実績運転データは、図12に示すように個々の機器の運転時間数及び各機器のトータルの運転時間数として適宜、表示部44に表示される。図12において、横棒線グラフは各熱源設備、空調設備、搬送設備、照明設備、コンセントの夫々の運転時間数を表わし、縦棒線グラフは熱源設備、空調設備、搬送設備、照明設備、コンセントのトータルの運転時間数を表わしている。
【0022】
例えば、X月Y日〜X月Z日の間において外気条件に対応した熱源設備、空調設備、搬送設備、照明設備、コンセントの消費エネルギーの実績運転データのトータルΣEは、実績運転演算部43において個々のデータを基に求められる。すなわち、分(配)電盤電力検出手段4からの電力W1、搬送設備電力検出手段7からの電力W2、照明設備電力検出手段8からの電力W3、コンセント電力検出手段9からの電力W4といった各電力に運転時間数並びに係数が掛けられると共に、熱源設備エネルギー検出手段5からのエネルギーE1、空調設備エネルギー検出手段6からのエネルギーE2が加算されて求められる。消費エネルギーのトータルΣEの実績運転データを求める式は[数1]に示されている。
【数1】
ΣE=(ΣW1×h1+ΣW2×h2+ΣW3×h3+ΣW4×h4)・α+E1+E2
【0023】
ここで、h1、h2、h3、h4は対応した各機器の運転時間、αは電力をエネルギーに換算するための係数である。而して、[数1]によりX月Y日〜X月Z日の間における消費エネルギーのトータルの実績運転データが得られる。
【0024】
得られた消費エネルギーの個々の設備の実績運転データやトータルの実績運転データは図13に示すように適宜表示部44に表示される。図13において、横棒線グラフは各熱源設備、空調設備、搬送設備、照明設備、コンセントの夫々の消費エネルギーを表わし、縦棒線グラフは熱源設備、空調設備、搬送設備、照明設備、コンセントのトータルの消費エネルギーを表わしている。
【0025】
又、上述の各検出データは例えば10分に1回エネルギー監視システム39に伝送されるが、実績運転演算部43では例えば検出された温度や湿度は毎正時毎に10分毎のデータを6回加算して6で除し、1時間当たりの温度や湿度に換算し、これから実際の毎正時のデータを求めて空気線図上にプロットした状態で表示部44に表示させられる。図14にはX月Y日〜X月Z日の間における毎正時毎の実際の気象データ及びその間の空調設備処理エネルギーが実績運転データとして表示されている。図14中、イは比エンタルピー線、ロは飽和水蒸気曲線、ハは毎正時の温度と湿度を表わす気象データである。図14によれば、X月Y日〜X月Z日の間における実際の気象状態と空調設備処理エネルギーの関係が分る。
【0026】
更に、実績運転演算部43においては、外気条件検出手段10からの外気温度T1、外気湿度H2、空調条件検出手段12からの温度T2、湿度H2からX月Y日〜X月Z日の間における特定の時間における外気、空調機25の混合器25a、室32内、ブロワ26の給気部の空気の温度Tや湿度Hを[数2]、[数3]により毎正時のデータとして求めることもできる。
【数2】
T=(T10+T20+T30+T40+T50+T60)×1/6
【数3】
H=(H10+H20+H30+H40+H50+H60)×1/6
【0027】
[数2]においてT10〜T60は10分間隔で測定した所定場所の温度、[数3]においてH10〜H60は10分間隔で測定した所定場所の湿度である。
【0028】
[数2]、[数3]で求めたデータも表示部44に表示される。図15に特定の時間の外気、空調機25の混合器25aにおける空気、室内、給気部の空気の関係及びそのときの空調設備処理エネルギーが示されている。
【0029】
図15中、ニは外気、ホは混合器25aの部分の空気、へは室32内の空気、トはブロワ26における給気部の空気の温度及び湿度の状態を示す。従って、図14によれば、X月Y日〜X月Z日の間の特定の日時における気象状態と空調設備処理エネルギーの関係が分り、図15によればX月Y日〜X月Z日の間の特定の日時における特定の場所の気象状態と空調設備処理エネルギーの関係が分る。
【0030】
【発明が解決しようとする課題】
上述の設備では、省エネルギー機器の設置後にベースラインの想定時には予期しなかった異常気象や、例えば室温の設定値を勝手に変更する等、ユーザの恣意的な運転等によりエネルギー消費量が増加し、当初の省エネルギーの目標を達成できない場合には、事業収益が悪化するという事態を招来する虞がある。
【0031】
しかるに、上記設備では実績運転データは把握することができるが、予め定められたベースラインから求められる設備としての標準運転データと実績運転データにどの程度の差異があるかの解析、ベースラインの算定、省エネルギーの解析、評価は別のパソコンを使用して演算する必要があるため、前記差異をオンタイムでは知ることができず、その結果、オンタイムで不測の事態に対応することができず、問題が起きた後でしかその事実を把握することができなかった。
【0032】
又、省エネルギー評価は実績運転データを印刷して出力し、その出力結果を人が見て判断しているため、省エネルギー評価に多大な労力、コスト、時間を要し、更に設備の運用が不適切に行われていても発見に時間が掛かり、省エネルギー機器の性能を十分に発揮させることができなかった。
【0033】
本発明は、斯かる実情に鑑み、省エネルギーの評価をオンタイムで行い得るようにすることにより、迅速に不測の事態に対応することができるようにし、以って事業収益の悪化のリスクを回避できるようにし、しかも省エネルギーの評価に労力、コスト、時間を要さず、省エネルギー機器の性能を十分に発揮させることのできるようにした省エネルギー評価方法及び省エネルギー評価手段を提供することを目的としてなしたものである。
【0034】
【課題を解決するための手段】
請求項1の省エネルギー評価方法は、熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーと、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーからなる標準気象データとを基に、前記建物に係わる設備に使用する各機器の所定の期間の消費エネルギーの標準運転データを求め、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求め、前記標準運転データ及び実績運転データに基き補正係数を求め、該補正係数を基に消費エネルギーの実績運転データの予測値を再計算するものである。
請求項2の省エネルギー評価方法においては、前記消費エネルギーの実績運転データの予測値を用いる年間のトータルの消費エネルギーの実績運転データの予測値の再計算は、請求項1で行った消費エネルギーの再計算に加えて、1月からX月までの消費エネルギーの実績運転データを加算すると共に、(X+1)月から12月までの消費エネルギーの標準運転データに補正係数を掛けて(X+1)月から12月までの消費エネルギーの実績運転データの予測値を求め、1月からX月までの消費エネルギーの実績運転データと(X+1)月から12月までの消費エネルギーの実績運転データの予測値とを加算して年間のトータルの消費エネルギーの実績運転データの予測値を求めるものである。
【0035】
請求項3の省エネルギー評価方法は、前記標準運転データ、実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、標準運転データ、再計算した消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行うものである。
請求項4の省エネルギー評価方法は、熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーと、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーからなる標準気象データを基に、前記建物が係わる設備に使用する各機器の所定の期間の消費エネルギーの標準運転データを求め、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求め、前記標準運転データ、前記消費エネルギーの実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、前記標準運転データ、前記消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行うものである。
【0036】
請求項5の省エネルギー評価手段は、熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーが設定されているベースライン記録部と、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーが気象データとして設定された標準気象データ記録部と、前記ベースライン記録部及び標準気象データ記録部からのデータを基に各機器の所定の期間の消費エネルギーの標準運転データを求めるようにした標準運転演算部と、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求める実績運転演算部と、前記標準運転演算部及び実績運転演算部からのデータに基き補正係数を求める補正係数演算部と、該補正係数演算部からの補正係数を基に消費エネルギーの実績運転データの予測値を求める消費エネルギー再計算部とを備えたものである。
請求項6の省エネルギー評価手段は消費エネルギー再計算部は、請求項5の消費エネルギー再計算部に加えて、1月からX月までの消費エネルギーの実績運転データを加算すると共に、(X+1)月から12月までの消費エネルギーの標準運転データに補正係数を掛けて(X+1)月から12月までの消費エネルギーの実績運転データの予測値を求め、1月からX月までの消費エネルギーの実績運転データと(X+1)月から12月までの消費エネルギーの実績運転データの予測値とを加算して年間の消費エネルギーのトータルを求めるよう構成したものである。
【0037】
請求項7の省エネルギー評価手段は、前記標準運転演算部及び実績運転演算部からの標準運転データ、実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、標準運転演算部及び消費エネルギー再計算部からの標準運転データ、消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行い得るようにした表示部を備えたものである。
請求項8の省エネルギー評価手段は、熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーが設定されているベースライン記録部と、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーが気象データとして設定された標準気象データ記録部と、前記ベースライン記録部及び標準気象データ記録部からのデータを基に各機器の所定の期間の消費エネルギーの標準運転データを求めるようにした標準運転演算部と、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求める実績運転演算部と、前記標準運転演算部及び実績運転演算部からの標準運転データ、実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、標準運転演算部及び消費エネルギー再計算部からの標準運転データ、消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行い得るようにした表示部を備えたものである。
【0039】
本発明によれば、予め定められたベースラインから求められる設備としての標準運転データと実績運転データにどの程度の差異があるかの解析、ベースラインの算定、省エネルギーの解析、評価をオンラインで行うことができるため、オンタイムで不測の事態に対処でき、しかも、事業収益の悪化のリスクを回避することができ、又、即時に省エネルギー評価ができるため、省エネルギー評価の労力、コスト、時間の削減を行うことができ、運用が良くない場合には直ちにそれが分り、運用方法を改善することで設備性能をフルに発揮することができる。
【0040】
【発明の実施の形態】
以下、本発明の実施の形態を図示例と共に説明する。
図1〜図9は本発明の実施の形態の一例を示す。本実施の形態例においては、省エネルギー評価システムの適用される電力やエネルギーを消費する設備は図10に示す従来の例と同じであり、パソコン1のハードウエア2に設定されるのは、従来のエネルギー監視システムではなく、省エネルギー評価システムである点が図11に示す従来のものとは異なっている。
【0041】
すなわち、図1は本発明を実施する省エネルギー評価システムの実施の形態の一例であって、図中、図11と同一の符号を付した部分は同一のものを表わしている。而して、本図示例の特徴とするところは、図11に示す実績運転を演算表示する系統を備えたエネルギー監視システム39に、予め想定したベースラインや標準気象データを基として標準運転状態を演算する系統を設けてハードウエア2に内蔵された省エネルギー評価システム45(図1参照)を形成し、オンタイムで標準運転データと実績運転データを比較して各種の補正係数を求め得るようにした点、及び消費エネルギーを予測し得るようにした点にある。
【0042】
図1中、46はベースライン記録部であり、ベースライン記録部46には、一年間の各月日における各機器の運転時間、運転時の消費エネルギーが想定されたベースラインとして入力されるようになっている。すなわち、365日×24時間(8,760時間)の間における想定される機器の運転時間の標準運転データ、想定される機器の運転時間から定まる消費エネルギーの標準運転データがベースラインのデータとして設定されるようになっている。
【0043】
47は標準気象データ記録部であり、標準気象データ記録部47には、一年間の各月日における各正時ごとの想定された外気温度、外気湿度、外気エンタルピーが標準気象データとして入力されるようになっている。標準気象データ記録部47には標準気象データとしてトータル8,760×3個のデータが設定されるようになっている。
【0044】
48は標準運転演算部であり、標準運転演算部48では、ベースライン記録部46から与えられた各機器のある月日における想定された運転時間及び消費エネルギーの標準運転データ、標準気象データ記録部47から与えられたある月日における毎正時の温度及び湿度の標準気象データから各機器のある期間X月Y日〜X月Z日の間の標準運転データを求め得るようになっている。
【0045】
例えば各機器の運転時間は、ベースライン記録部46から与えられた所定の機器の運転時間を加算すれば、X月Y日〜X月Z日の間の所定の機器の運転時間の標準運転データが分る。又各機器の消費エネルギーの標準運転データは、標準気象データから定まる対応する機器の単位時間当たりの消費エネルギーにX月Y日〜X月Z日の間の運転時間の標準運転データを掛けることにより求められ、各機器のトータルの消費エネルギーの標準運転データは[数1]に順じて演算され、演算された機器の運転時間、消費エネルギーの標準運転データ、気象データは表示部44及び補正係数演算部49に与え得るようになっている。又、運転時間、消費エネルギーの標準運転データの他に標準気象データ記録部47からの温度及び湿度並びにエンタルピーの標準気象データを補正係数演算部49に与え得るようになっている。
【0046】
補正係数演算部49には、標準運転演算部48からのベースラインとなる消費エネルギーのトータルの標準運転データ、気象データの他に実績運転演算部43から[数1]により演算したトータルの消費エネルギーΣEの実績運転データやトータルの運転時間、気象データの実績運転データを与え得るようになっている。なお、エンタルピーは計測できないので、実績運転演算部43からの外気エンタルピーは計測された外気温度及び外気湿度から所定の関数により演算したデータである。
【0047】
補正係数演算部49ではある期間X月Y日〜X月Z日の間の消費エネルギーの補正係数、運転時間の補正係数、外気温度の補正係数、エンタルピーの補正係数を演算し得るようになっている。各補正係数は[数4]により求められる。
【数4】

Figure 0004450541
【0048】
ここで、Ci−jはある期間i−j(例えばX月Y日〜X月Z日)の消費エネルギー、運転時間、外気温度、外気エンタルピーの補正係数、REALpは消費エネルギー、運転時間、外気温度、外気エンタルピーの実績運転データのある時間pのある値、STDpは消費エネルギー、運転時間、外気温度、外気エンタルピーの標準運転データのある時間pのある値、Ni−jは消費エネルギー、運転時間、外気温度、外気エンタルピーのデータの個数である。
【0049】
50は消費エネルギー再計算部であり、消費エネルギー再計算部50では例えば、1月〜X月の消費エネルギーの実績運転データを加算すると共に(X+1)月〜12月までの標準運転データに補正係数を掛けて得たデータを加算して1年間の消費エネルギーの再計算を行い得るようになっている。又、標準運転データ、実績運転データの予測値は消費エネルギー再計算部50から表示部44に与えて比較表示し得るようになっている。
【0050】
次に、上記図示例の作動を図10をも参照しつつ説明する。
設備の稼動に際しては、ベースライン記録部46には予め、一年間における各月日における各機器の運転時間、運転時の消費エネルギーの標準運転データが想定されたベースラインとして入力されている。すなわち、365日×24時間(8,760時間)の間における想定される機器の運転時間の標準運転データ、想定される機器の運転時間から定まる消費エネルギーの標準運転データがベースラインのデータとして設定されている。
【0051】
又、標準気象データ記録部47には予め、一年間における各月日における各正時ごとの想定された外気温度、外気湿度、外気エンタルピーが気象データとして入力されている。標準気象データ記録部47には標準気象データとしてトータル8,760×3個のデータが設定されている。
【0052】
而して、ベースライン記録部46に設定されている各機器の所定期間X月Y日〜X月Z日の運転時間、運転時の消費エネルギーの標準運転データ、標準気象データ記録部47に設定されている外気気温、外気湿度、外気エンタルピーといった標準気象データは標準運転演算部48に与えられて上記期間における熱源設備、空調設備、搬送設備、照明設備、コンセントの標準の運転時間数、標準の消費エネルギー([数1]参照)が演算され、演算されたた標準の運転時間数、標準の消費エネルギーは標準運転データとして表示部44及び補正係数演算部49に与えられる。又、標準運転データを演算した場合の標準気象データも表示部44及び補正係数演算部49に与えられる。
【0053】
一方、計測システム3により従来の場合と同様にして分(配)電盤電力検出手段4により検出された分(配)電盤の電力W1、熱源設備エネルギー検出手段5により検出された熱源設備のエネルギーE1、空調設備エネルギー検出手段6により検出された空調設備のエネルギーE2、搬送設備電力検出手段7により検出された搬送設備の消費エネルギーW2、照明設備電力検出手段8により検出された照明設備の電力W3、コンセント電力検出手段9により検出されたコンセントの電力W4、外気条件検出手段10により検出された外気温度T1、外気湿度H1、日射条件検出手段11により検出された日射量I、空調条件検出手段12により検出された空調温度T2及び空調湿度H2は通信インターフェース40、データ収集部41、データ記録部42を経て実績運転演算部43に与えられる。
【0054】
実績運転演算部43では従来と同様にしてX月Y日〜X月Z日間の熱源設備、空調設備、搬送設備、照明設備、コンセントの運転時間数の実績運転データ、消費エネルギーの実績運転データ、空調設備処理エネルギーの実績運転データが演算されて表示部44及び補正係数演算部49に与えられる。又、実績運転データを演算した際の外気温度、外気湿度、外気エンタルピーも表示部44及び補正係数演算部49に与えられる。外気エンタルピーは外気温度、外気湿度から関数により演算される。
【0055】
補正係数演算部49では、[数4]を基として補正係数が演算される。補正係数として求めるのは、消費エネルギーの補正係数(=消費エネルギーの実績運転データ/消費エネルギーの標準運転データ)、空調設備処理エネルギーの補正係数(=空調設備処理エネルギーの実績運転データ/空調処理エネルギーの標準運転データ)、運転時間の補正係数(=運転時間数の実績運転データ/運転時間数の標準運転データ)、外気温度の補正係数(=外気温度の実績運転データ/外気温度の標準運転データ)、外気エンタルピーの補正係数(=外気エンタルピーの実績運転データ/外気エンタルピーの標準運転データ)である。
【0056】
補正係数演算部49で求められた各補正係数は消費エネルギー再計算部50へ与えられ、例えば消費エネルギーの実績運転データがない月の消費エネルギーの実績運転データの予測値が求められる。又、年間のトータルの消費エネルギーの実績運転データの予測値の再計算が行われる。すなわち、例えば(X+1)月から12月までの各月の標準運転データに補正係数を掛けて(X+1)月〜12月までの実績運転データの予測値を演算し、1月〜X月までの各月の実績運転データと、(X+1)月から12月までの各月の実績運転データの予測値を加算して1月から12月までの消費エネルギーの予測値を求める(図2参照)。予測値は具体的には[数5]により演算される。
【数5】
E1y=E01+E02+E03+・・・Ex+Es(x+1)×K+Es(x+2)×K+Es(x+3)×K+・・・Es(12)×K
【0057】
ここで、E1yは標準運転データ及び実績運転データから求められる一年間のトータルの消費エネルギーの予測値、E01、E02、E03・・・Exは、1月、2月、3月・・・X月の消費エネルギーの実績運転データ、Es(x+1)、Es(x+2)、Es(x+3)・・・Es(12)は、(x+1)月、(x+2)月、(x+3)月・・・12月における消費エネルギーの標準運転データ、KはX月に求めた消費エネルギーの補正係数である。なお、(x+1)月まで設備の稼動が行われた場合においては[数5]においては、消費エネルギーの標準運転データEs(x+1)は消費エネルギーの実績運転データE(x+1)となり、補正係数は(x+1)月に計算された新たな補正係数となる。
【0058】
この計算により、予め定められたベースラインから求められる設備としての標準運転データと実績運転データにどの程度の差異があるかの解析、ベースラインの算定、省エネルギーの解析、評価をオンラインで行うことができ、このため、オンタイムで不測の事態に対処でき、又、事業収益の悪化のリスクを回避することができる。
【0059】
上述の1月から12月までの消費エネルギーと同様の計算は、空調設備処理エネルギー、運転時間数、外気温度、外気湿度、外気エンタルピーについても行われる。
【0060】
表示部44では図2〜図9に示すようなグラフが比較表示或は並列表示若しくは重ね合わせ表示が行われる。例えば、図2に示すように、1月〜X月までは、消費エネルギーの標準運転データと実績運転データとがグラフとして比較表示され、(X+1)月から12月までは、消費エネルギーの標準運転データと実績運転データの予測値とがグラフとして比較表示される。又、図3に示すように熱源設備、空調設備、搬送設備、照明設備、コンセントといった各機器のX月Y日〜X月Z日における運転時間数の標準運転データ、運転時間数の実績運転データ、トータルの運転時間数の標準運転データ、トータルの運転時間数の実績運転データがグラフとして並列表示される。
【0061】
更に、表示部44では、図4に示すようにX月Y日〜X月Z日における標準気象データと空調設備処理エネルギーの標準運転データ、実績気象データと空調設備処理エネルギーの実績運転データが並列表示される。図4中、白丸52はベースラインを計算する際に用いる毎正時の外気温度と絶対湿度の関係を、又、黒角53は実際に測定された毎正時の外気温度と絶対湿度の関係を示し、イは比エンタルピー線、ロは飽和水蒸気曲線を示す。
【0062】
更に又、表示部44では、図5に示すようにX月Y日〜X月Z日における熱源設備、空調設備、搬送設備、照明設備、コンセントといった各機器の消費エネルギーの標準運転データ、トータルの消費エネルギーの標準運転データ、熱源設備、空調設備、搬送設備、照明設備、コンセントといった各機器の消費エネルギーの実績運転データ、トータルの消費エネルギーの実績運転データが並列表示される。
【0063】
更に又、表示部44では、図6に示すように、X月Y日〜X月Z日における空調設備処理エネルギーの標準運転データ、空調設備処理エネルギーの実績運転データが並列表示されると共に絶対湿度と外気温度の標準気象データと実績気象データが重ね合わせ比較表示され、図7に示すように、標準気象データと実績気象データの絶対湿度と外気温度との関係が外気条件予測表示として表示され、図8に示すように空調設備処理エネルギーの標準運転データと実績運転データ、ある時間のある場所における絶対湿度と外気温度の関係の標準運転データ、ある時間のある場所における絶対湿度と外気温度の関係の実績運転データが並列表示される。図8中、’のついたものは、標準運転データで、ニ’は外気、ホ’は混合器25aの部分の空気、へ’は室32内の空気、ト’はブロワ26における給気部の空気の夫々空気温度及び絶対湿度の状態を示し、’がついていないものは、実績運転データで、ニは外気、ホは混合器25aの部分の空気、へは室32内の空気、トはブロワ26における給気部の空気の夫々空気温度及び絶対湿度の状態を示す。
【0064】
又更に、表示部44では、図9に示すように空調設備処理エネルギーの標準運転データと実績運転データとが並列表示され、絶対湿度と外気温度との関係の標準運転データと実績運転データとが重ね合わせ比較表示される。
【0065】
なお、図3、図5、図12に示す棒グラフ中、同一の模様で表わすものは同一の機器の運転時間数、消費エネルギーの状態を表わしており、図4、図6、図8、図9、図14、図15に示す棒グラフ中、同一の模様で表わすものは同一の状態の負荷処理エネルギーを表わしている。
【0066】
図2に示すように表示部44に標準運転データ、実績運転データ、実績運転データの予測値を比較表示し、図3〜図9に示すように表示部44に標準運転データと実績運転データを並列表示し或は重ね合わせ表示することにより、即時に省エネルギー評価ができるため、省エネルギー評価の労力、コスト、時間の削減を行うことができ、運用が良くない場合には直ちにそれが分り、運用方法を改善することで設備性能をフルに発揮することができる。
【0067】
なお、本発明の省エネルギー評価方法及び省エネルギー評価手段は、上述の図示例にのみ限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々変更を加えることは勿論である。
【0068】
【発明の効果】
以上、説明したように本発明の請求項1〜に記載の省エネルギー評価方法及び省エネルギー評価手段によれば、予め定められたベースラインから求められる設備としての標準運転データと実績運転データにどの程度の差異があるかの解析、ベースラインの算定、省エネルギーの解析、評価をオンラインで行うことができるため、オンタイムで不測の事態に対処でき、しかも、事業収益の悪化のリスクを回避することができ、又、即時に省エネルギー評価ができるため、省エネルギー評価の労力、コスト、時間の削減を行うことができ、運用が良くない場合には直ちにそれが分り、設備性能をフルに発揮することができる、という優れた効果を奏し得る。
【図面の簡単な説明】
【図1】 本発明の省エネルギー評価方法及び省エネルギー評価手段の実施の形態の一例を表わすブロック図である。
【図2】 図1に示す消費エネルギー再計算部で計算して得られた一定期間の消費エネルギーの標準運転データ、実績運転データ、実績運転データの予測値を表わすグラフであり、図1に示す表示部に表示される予測グラフである。
【図3】 図1に示す表示部に表示される各機器の一定期間における運転時間数及びトータルの運転時間数の標準運転データ及び実績運転データを表わすグラフである。
【図4】 一定期間の毎正時における絶対湿度と外気温度との関係を示す標準気象データとそのときのある空調設備の空調処理エネルギーを表わす標準運転データ、及び一定期間の毎正時における絶対湿度と外気温度との関係を示す実績気象データとそのときのある空調設備の空調設備処理エネルギーを表わす実績運転データとを図1に示す表示部に並列表示された状態を示すグラフである。
【図5】 各機器の消費エネルギー及びトータルの消費エネルギーの標準運転データ及び実績運転データを図1に示す表示部に並列表示された状態を示すグラフである。
【図6】 一定期間の絶対湿度と外気温度の標準気象データ及び実績気象データを図1の表示部に重ね合わせ表示すると共に、ある空調設備における空調設備処理エネルギーの標準運転データと実績運転データを図1の表示部に並列表示した状態を示すグラフである。
【図7】 ある特定の月の絶対湿度と外気温度の標準気象データ及び実績気象データを図1に示す表示部に重ね合わせ表示した状態を示すグラフである。
【図8】 ある特定の日における各場所の絶対湿度と気温及びそのときの空調設備処理エネルギーの標準運転データ、ある特定の日における各場所の絶対湿度と気温及びそのときの空調設備処理エネルギーの実績運転データを図1の表示部に並列表示した状態を示すグラフである。
【図9】 ある特定の日における各場所の絶対湿度と気温の標準気象データ及び実績気象データとを図1の表示部に重ね合わせ表示すると共に、そのときの空調設備処理エネルギーの標準運転データ及び実績運転データを図1の表示部に並列表示した状態を示すグラフである。
【図10】 図1の省エネルギー評価方法及び省エネルギー評価手段、若しくは図11のエネルギー監視手段が適用される設備の概要図である。
【図11】 図10の空調設備に適用されるエネルギー監視手段のブロック図である。
【図12】 図11の表示部に表示される一定期間の各機器の運転時間数及びトータルの運転時間数の実績運転データを示すグラフである。
【図13】 図11の表示部に表示される一定期間における各機器の消費エネルギーの実績運転データ及び一定期間における各機器のトータルの消費エネルギーの実績運転データを示すグラフである。
【図14】 図11の表示部に表示される一定期間における毎正時の絶対湿度と外気温度との関係を示す実績気象データ及びそのときの空調設備処理エネルギーの実績運転データを示すグラフである。
【図15】 図11の表示部に表示されるある特定の日における各場所の絶対湿度と外気温度の関係を示す実績気象データと、そのときの空調設備処理エネルギーの実績運転データを示すグラフである。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an energy saving evaluation method and an energy saving evaluation method. In steps It is related.
[0002]
[Prior art]
In ESCO business and PFI business, it is obliged to submit an energy conservation performance report to the competent authority. On the other hand, when installing energy-saving equipment (ECM) in the ESCO business or PFI business, calculate the amount of energy consumed before installing the energy-saving equipment based on the standard weather data that changes according to the season, month, day, and time. Also, calculate the amount of energy consumption before installing the energy-saving device assuming the standard operating time and operation method of the heat source device, and how much energy saving is possible when the energy-saving device is installed based on these energy consumptions Calculate the baseline of whether or not it will be possible, present it to the user, and conclude a business contract.
[0003]
However, after the installation of energy-saving equipment, energy consumption increased due to abnormal weather that was not expected when the baseline was assumed, or arbitrary operation of the user, such as changing the set value of room temperature on its own, etc. If this goal cannot be achieved, there is a risk that business profits will deteriorate.
[0004]
In addition, it is necessary to know how much energy is consumed after the installation of the energy saving device, and for this reason, an energy monitoring system is conventionally used. In this energy monitoring system, the degree of energy saving achieved compared to the baseline assumed in advance is evaluated by extracting the data obtained from the energy monitoring system and storing it on a personal computer provided separately from the energy monitoring system. It was done using.
[0005]
Thus, FIG. 10 shows an example of equipment that consumes electric power and energy to which the conventional energy saving monitoring system is applied, and FIG. 11 shows the energy monitoring system used for this equipment.
[0006]
In FIG. 10, 1 is a personal computer, 2 is hardware incorporating the energy monitoring system shown in FIG. 11, and 3 is a measurement system provided in a facility such as a building, factory, or hospital. The measuring system 3 includes distribution board power detection means 4, heat source equipment energy detection means 5, air conditioning equipment energy detection means 6, transportation equipment power detection means 7 such as a pump, lighting equipment power detection means 8, and equipment such as a personal computer. Outlet power detection means 9, an outside air condition detection means 10, a solar radiation condition detection means 11, and an air conditioning condition detection means 12 are provided.
[0007]
Thus, the electric power W1 from the distribution board power detection means 4, the energy E1 from the heat source equipment energy detection means 5, the energy E2 from the air conditioning equipment energy detection means 6, and the transport equipment power detection means 7 Power W2 from the lighting equipment power detection means 8, power W4 from the outlet power detection means 9, air temperature T1 and air humidity H1 from the outside air condition detection means 10, and solar radiation condition detection means 11 From the personal computer 1, the solar radiation amount I can be given to the hardware 2 and the temperature T2 and the humidity H2 can be given from the personal computer 1 to the hardware 2, respectively.
[0008]
Reference numeral 13 denotes an air conditioning facility such as a cooling facility or a heating facility. When the air conditioning facility 13 is a heating facility, a warm water circulation line 14 is provided. The hot water circulation line 14 includes, for example, a primary pump 15, a heat source facility 16, a secondary pump 17, and a coil 18 in the warm water circulation direction, and an inlet side and an outlet side of the heat source facility 16 in the warm water circulation line 14. Includes a heat source inlet thermometer 19, a heat source outlet thermometer 20, and a heat source water flow meter 21, and a hot water coil inlet thermometer 22 and a hot water coil outlet on the inlet side and outlet side of the coil 18 in the hot water circulation line 14. A thermometer 23 and a hot water flow meter 24 are provided respectively.
[0009]
The coil 18 is installed in an air conditioner 25, and the air conditioner 25 includes a blower 26 that sucks and sends air heated by the coil 18, an air-fuel mixture thermometer 27, an air-fuel mixture hygrometer 28, and a return air thermometer. 29 is installed.
[0010]
The warm air discharged from the blower 26 installed in the air conditioner 25 is supplied to a room 32 for heating through a duct 31 having a supply air thermometer 30 in the middle. The air returned from the air 32 can return to the air conditioner 25 from the duct 33. In the chamber 32, an indoor thermometer 34 and an indoor hygrometer 35 are installed.
[0011]
An outdoor air temperature detector 36 and an outdoor air humidity detector 37 are installed outside and an insolation meter 38 is installed.
[0012]
Thus, the temperature detected by the heat source inlet thermometer 19 and the heat source outlet thermometer 20 and the hot water flow rate detected by the heat source water flow meter 21 can be given to the heat source facility energy detection means 5. Further, the hot water temperature detected by the hot water coil inlet thermometer 22, the hot water temperature detected by the hot water coil outlet thermometer 23, and the hot water flow rate detected by the hot water flow meter 24 can be supplied to the air conditioner energy detection means 6. Yes.
[0013]
Further, the power during the operation of the primary pump 15 and the power during the operation of the secondary pump 17 can be applied to the transfer facility power detection means 7, and the outside air temperature and outside air humidity detector 37 detected by the outside air temperature detector 36. The outside air humidity detected in step 1 can be given to the outside air condition detecting means 10. Further, the amount of solar radiation detected by the solar radiation meter 38 can be given to the solar radiation condition detecting means 11, the temperature detected by the mixture temperature meter 27, the humidity detected by the mixture temperature meter 28, and the return temperature thermometer 29. , The humidity detected by the air supply thermometer 30, the temperature detected by the indoor thermometer 34, and the humidity detected by the indoor hygrometer 35 can be supplied to the air conditioning condition detection means 12, respectively.
[0014]
Although not shown, the operation time of the heat source equipment 16, the blower 26, the primary pump 15 and the secondary pump 17 such as the pump, the lighting equipment, and the outlet is determined by an operation time detector built in the hardware 2 (not shown). The data can be detected and provided to the data recording unit 42 of the energy monitoring system 39 via the communication interface 40 and the data collecting unit 41 in the energy monitoring system 39 described later.
[0015]
As shown in FIG. 11, the energy monitoring system 39 set in the hardware 2 includes a distribution board power detection unit 4, a heat source facility energy detection unit 5, and an air conditioning facility energy detection unit of the measurement system 3 in FIG. 10. 6. Transportation facility power detection means 7, lighting equipment power detection means 8, outlet power detection means 9, outside air condition detection means 10, solar radiation condition detection means 11, and air conditioning condition detection means 12 40, a data collection unit 41 that collects data from the communication interface 40, a data recording unit 42 that records data from the data collection unit 41, and an actual operation calculation that calculates actual operation data based on the data from the data recording unit 42 43, and a display unit 44 for displaying the actual operation data calculated by the actual operation calculation unit 43.
[0016]
During the operation of the above equipment, the temperature detected by the heat source inlet thermometer 19 and the heat source outlet thermometer 20 and the hot water flow rate detected by the heat source water flow meter 21 are given to the heat source equipment energy detection means 5 and the hot water coil inlet temperature is detected. The hot water temperature detected by the meter 22, the hot water temperature detected by the hot water coil outlet thermometer 23, and the hot water flow rate detected by the hot water flow meter 24 are given to the air conditioning equipment energy detection means 6.
[0017]
The power during the operation of the primary pump 15 and the power during the operation of the secondary pump 17 are given to the transfer facility power detection means 7, and the outside air temperature detected by the outside air temperature detector 36 and the outside air humidity detected by the outside air humidity detector 37. Is given to the outside air condition detecting means 10 and the amount of solar radiation detected by the solar radiation meter 38 is given to the solar radiation condition detecting means 11, the temperature detected by the air-fuel mixture thermometer 27, the humidity detected by the air-fuel mixture hygrometer 28, and the return air The temperature detected by the thermometer 29, the humidity detected by the air supply thermometer 30, the temperature detected by the indoor thermometer 34, and the humidity detected by the indoor hygrometer 35 are given to the air conditioning condition detection means 12.
[0018]
Thus, the power W1 of the distribution board is obtained from the distribution board power detection means 4, and the energy E1 obtained from the given detection data is received from the heat source facility energy detection means 5, The energy E2 obtained from the above-mentioned given detection data from the air conditioning equipment energy detection means 6 and the power W2 obtained from the above given detection data from the transportation equipment power detection means 7 are detected as the lighting equipment power. From the means 8, the power W3 obtained from the given detection data is obtained, from the outlet power detection means 9, the power W4 of a personal computer or the like is obtained from the outside air condition detection means 10 from the given detection data. The outside air temperature T1, the outside air humidity H1, the solar radiation amount I from the solar radiation condition detection means 11, and the temperature obtained from the above-mentioned given detection data from the air conditioning condition detection means 12. T2, humidity H2 is given to energy monitoring system 39 hardware 2 via a respective personal computer 1. Each power W1, W2, W3, W4 and energy E1, E2, outside air temperature T1, temperature T2, outside air humidity H1, humidity H2, and solar radiation amount I are energy monitoring system of hardware 2 at regular time intervals (for example, every 10 minutes) 39.
[0019]
Heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, outlet energy, power and outside air conditions, solar radiation conditions, temperature and humidity of air conditioning conditions, and solar radiation amount are set in hardware 2 via PC 1 The data is provided to the data recording unit 42 via the communication interface 40 and the data collecting unit 41 of the system 39, and necessary data is extracted from the data recording unit 42 to the actual operation calculating unit 43, and a predetermined calculation is performed. The operation time is obtained, for example, by counting signals given from the respective detection means of the measurement system 3 at regular time intervals using an operation time detector incorporated in the actual operation calculation unit 43. The operation of the heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlet is determined by data being sent at regular time intervals.
[0020]
For example, the operation time data detected by the operation time detector is added to the heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, and outlet operation hours during the period from X month Y day to X month Z day. The actual operation data is obtained by calculation, and the total number of hours between X month Y and X month Z is obtained by adding the operating hours of heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlets. Actual driving data can be obtained.
[0021]
Thus, the obtained actual operation data of the number of operation hours is appropriately displayed on the display unit 44 as the operation time number of each device and the total operation time number of each device as shown in FIG. In FIG. 12, the horizontal bar graph represents the number of operating hours of each heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlet, and the vertical bar graph represents heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlet. Represents the total number of operating hours.
[0022]
For example, the total ΣE of the actual operation data of the energy consumption of heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlets corresponding to the outside air condition between X month Y and X month Z is It is calculated based on individual data. That is, each of the power W1 from the distribution (distribution) panel board power detection means 4, the power W2 from the transport equipment power detection means 7, the power W3 from the lighting equipment power detection means 8, and the power W4 from the outlet power detection means 9 The electric power is multiplied by the number of operating hours and a coefficient, and the energy E1 from the heat source equipment energy detection means 5 and the energy E2 from the air conditioning equipment energy detection means 6 are added and obtained. The formula for obtaining the actual operation data of the total energy consumption ΣE is shown in [Equation 1].
[Expression 1]
ΣE = (ΣW1 × h1 + ΣW2 × h2 + ΣW3 × h3 + ΣW4 × h4) · α + E1 + E2
[0023]
Here, h1, h2, h3, and h4 are operating times of the corresponding devices, and α is a coefficient for converting electric power into energy. Thus, the total actual operation data of the energy consumption between X month Y day and X month Z day is obtained by [Equation 1].
[0024]
The obtained actual operation data and total actual operation data of each facility of the consumed energy are appropriately displayed on the display unit 44 as shown in FIG. In FIG. 13, horizontal bar graphs represent the energy consumption of each heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlets, and vertical bar graphs represent heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlets. It represents the total energy consumption.
[0025]
Each detection data described above is transmitted to the energy monitoring system 39 once every 10 minutes, for example. In the actual operation calculation unit 43, for example, the detected temperature and humidity are set to 6 data every 10 minutes every hour. The number of times is added and divided by 6, converted into temperature and humidity per hour, and actual hourly data is obtained from this and displayed on the display 44 in a state plotted on the air diagram. In FIG. 14, actual meteorological data every hour on the hour between X month Y and X month Z, and the air conditioning facility processing energy between them are displayed as actual operation data. In FIG. 14, a is a specific enthalpy line, B is a saturated water vapor curve, and C is meteorological data representing the hourly temperature and humidity. According to FIG. 14, the relationship between the actual weather condition and the air conditioning equipment processing energy between X month Y day and X month Z day is known.
[0026]
Further, in the actual operation calculation unit 43, the outside air temperature T1 and the outside air humidity H2 from the outside air condition detecting means 10 and the temperature T2 and the humidity H2 from the air conditioning condition detecting means 12 are between X month Y day to X month Z day. The temperature T and humidity H of the outside air at a specific time, the mixer 25a of the air conditioner 25, the air in the chamber 32, and the air supply part of the blower 26 are obtained as data on the hour by [Equation 2] and [Equation 3]. You can also.
[Expression 2]
T = (T10 + T20 + T30 + T40 + T50 + T60) × 1/6
[Equation 3]
H = (H10 + H20 + H30 + H40 + H50 + H60) × 1/6
[0027]
In [Equation 2], T10 to T60 are temperatures at predetermined locations measured at intervals of 10 minutes, and in [Equation 3], H10 to H60 are humidity at predetermined locations measured at intervals of 10 minutes.
[0028]
The data obtained from [Equation 2] and [Equation 3] are also displayed on the display unit 44. FIG. 15 shows the relationship between the outside air for a specific time, the air in the mixer 25a of the air conditioner 25, the air in the room and the air supply unit, and the energy of the air conditioning equipment at that time.
[0029]
In FIG. 15, d indicates the outside air, ho indicates the air in the portion of the mixer 25 a, h indicates the air in the chamber 32, and g indicates the temperature and humidity of the air supply section in the blower 26. Therefore, according to FIG. 14, the relationship between the weather condition and the air conditioning equipment processing energy at a specific date and time between X month Y day and X month Z day is known, and according to FIG. 15, X month Y day to X month Z day. The relationship between the weather condition of a specific place and the energy of air conditioning equipment at a specific date and time during the period is known.
[0030]
[Problems to be solved by the invention]
In the above-mentioned facilities, energy consumption increases due to abnormal weather that was unexpected when the baseline was assumed after installation of energy-saving equipment, arbitrary operation of the user, such as changing the set value of room temperature on its own, etc. If the initial energy saving target cannot be achieved, there is a risk that business profits will deteriorate.
[0031]
However, the actual operation data can be grasped with the above equipment, but the difference between the standard operation data and the actual operation data as the equipment obtained from the predetermined baseline is calculated, and the baseline is calculated. , Because energy saving analysis and evaluation must be performed using a separate computer, the difference cannot be known on-time, and as a result, it cannot respond to unforeseen circumstances on-time. I was able to grasp the fact only after the problem occurred.
[0032]
In addition, the energy saving evaluation prints and outputs the actual operation data, and the output result is judged by humans. Therefore, the energy saving evaluation requires a lot of labor, cost, and time, and the operation of the equipment is inappropriate. However, it took a long time to find out, and the performance of energy-saving equipment could not be fully demonstrated.
[0033]
In view of such circumstances, the present invention makes it possible to respond to unforeseen circumstances quickly by enabling energy-saving evaluations on-time, thereby avoiding the risk of business profit deterioration. Energy-saving evaluation method and energy-saving evaluation method that can perform the energy-saving device performance sufficiently without requiring labor, cost and time for energy-saving evaluation. Step It was made for the purpose of providing.
[0034]
[Means for Solving the Problems]
The energy saving evaluation method according to claim 1 includes a heat energy source, an air conditioning facility, a transportation facility, a lighting facility, a distribution board, a power consumption, which is a baseline of each device used for equipment related to a building, and a predetermined amount. Assumed outside air temperature, outside air humidity, outside air enthalpy at a given time on each month and day in the period Consist of Based on the standard weather data, the standard operation data of the energy consumption for a predetermined period of each device used for the equipment related to the building is obtained, and the detection data of the power detected by the predetermined power detection means and the predetermined energy detection means In addition, the actual operation data of the consumed energy is obtained from the detected data of energy, the correction coefficient is obtained based on the standard operation data and the actual operation data, and the predicted value of the actual operation data of the consumed energy is recalculated based on the correction coefficient. It is.
In the energy saving evaluation method according to claim 2, the recalculation of the predicted value of the actual operation data of the total annual energy consumption using the predicted value of the actual operation data of the consumed energy is performed by the re-consumption of the energy consumption performed in claim 1. In addition to the calculation, the actual operation data of energy consumption from January to X month is added, and the standard operation data of energy consumption from (X + 1) month to December is multiplied by a correction coefficient, and (X + 1) month to 12 Calculate the predicted value of the actual operating data of energy consumption from the month and add the actual operating data of the energy consumption from January to X and the predicted value of the actual operating data of energy consumption from (X + 1) month to December Thus, the predicted value of the actual operation data of the total energy consumption for the year is obtained.
[0035]
The energy saving evaluation method according to claim 3 is characterized in that the standard operation data, the parallel display of the actual operation data, or the standard weather data, the superimposed display or the parallel display of the actual weather data, or the standard operation data, the recalculated energy consumption. The comparison display of the predicted value of the actual operation data is performed individually or in any combination.
The energy saving evaluation method according to claim 4 comprises: a heat source facility, an air conditioning facility, a transport facility, a lighting facility, a distribution board, a power consumption, which is a baseline of each device used for facilities related to a building, and a predetermined amount. Assumed outside air temperature, outside air humidity, outside air enthalpy at a given time on each month and day in the period Consist of Based on the standard weather data, the standard operation data of the energy consumption for a predetermined period of each device used for the equipment related to the building is obtained, and the detection data of the power detected by the predetermined power detection means and the predetermined energy detection means, and Obtain actual operation data of energy consumption from the detection data of energy, the standard operation data, the parallel display of the actual operation data of energy consumption, or the standard weather data, the superimposed display or parallel display of the actual weather data, or the The comparison display of the predicted values of the standard operation data and the actual operation data of the consumed energy is performed individually or in any combination.
[0036]
The energy saving evaluation means of claim 5 includes heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, distribution board, outlet Composed by, The baseline recording unit that sets the baseline energy consumption of each device used in the equipment related to the building, and the estimated outside air temperature, outside air humidity, and outside air enthalpy at each predetermined time on each month and day in a predetermined period. Standard operation in which standard operation data of energy consumption for a predetermined period of each device is obtained based on data from a standard weather data recording unit set as weather data and the baseline recording unit and the standard weather data recording unit An operation unit, an actual operation calculation unit for obtaining actual operation data of energy consumption from the detection data of the electric power detected by the predetermined electric power detection means and the predetermined energy detection unit, and the detection data of the energy, the standard operation calculation unit and the actual operation A correction coefficient calculation unit for obtaining a correction coefficient based on data from the calculation unit, and a correction coefficient calculation unit A positive factor is that a consumption energy recalculating unit for obtaining the predicted value of the actual operating data of the energy consumption based.
In addition to the consumption energy recalculation unit of claim 5, the energy saving evaluation means of claim 6 adds the actual operation data of consumption energy from January to X month, and (X + 1) months. Multiply the standard operation data of energy consumption from January to December by (X + 1) to obtain the predicted value of actual operation data of energy consumption from January to December Actual operation of energy consumption from January to X The total energy consumption of the year is obtained by adding the data and the predicted value of actual operation data of energy consumption from (X + 1) month to December.
[0037]
The energy saving evaluation means according to claim 7 includes: standard operation data from the standard operation calculation unit and actual operation calculation unit, parallel display of actual operation data, or standard weather data, superimposed display or parallel display of actual weather data, or The standard operation data from the standard operation calculation unit and the energy consumption recalculation unit, and the display unit that can compare and display the predicted values of the actual operation data of the energy consumption can be used alone or in any combination. Is.
The energy saving evaluation means of claim 8 includes heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, distribution board, outlet Composed by, The baseline recording unit that sets the baseline energy consumption of each device used in the equipment related to the building, and the estimated outside air temperature, outside air humidity, and outside air enthalpy at each predetermined time on each month and day in a predetermined period. Standard operation in which standard operation data of energy consumption for a predetermined period of each device is obtained based on data from a standard weather data recording unit set as weather data and the baseline recording unit and the standard weather data recording unit An operation unit, an actual operation calculation unit for obtaining actual operation data of energy consumption from the detection data of the electric power detected by the predetermined electric power detection means and the predetermined energy detection unit, and the detection data of the energy, the standard operation calculation unit and the actual operation Standard operation data from the calculation unit, parallel display of actual operation data, or standard weather data, actual Overlap display or parallel display of meteorological data, standard operation data from the standard operation calculation unit and energy consumption recalculation unit, and comparison display of predicted values of actual operation data of energy consumption are independent or arbitrary It is provided with a display unit that can be combined.
[0039]
According to the present invention, an analysis is performed on the basis of a difference between the standard operation data and the actual operation data as equipment obtained from a predetermined baseline, the calculation of the baseline, the energy saving analysis, and the evaluation are performed online. Therefore, it is possible to cope with unforeseen situations on-time, avoid the risk of deterioration of business profits, and perform an immediate energy saving evaluation, thereby reducing labor, cost and time for energy saving evaluation. If the operation is not good, it is immediately known, and the equipment performance can be fully exhibited by improving the operation method.
[0040]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
1 to 9 show an example of an embodiment of the present invention. In this embodiment, the power consumption and the energy consuming equipment to which the energy saving evaluation system is applied are the same as those in the conventional example shown in FIG. It is different from the conventional one shown in FIG. 11 in that it is not an energy monitoring system but an energy saving evaluation system.
[0041]
That is, FIG. 1 is an example of an embodiment of an energy saving evaluation system for carrying out the present invention. In the figure, the same reference numerals as those in FIG. 11 denote the same parts. Thus, the feature of the illustrated example is that the energy monitoring system 39 provided with a system for calculating and displaying the actual operation shown in FIG. 11 has the standard operation state based on the assumed baseline and standard weather data. An energy saving evaluation system 45 (see FIG. 1) built in the hardware 2 is formed by providing a calculation system so that various correction factors can be obtained by comparing the standard operation data and the actual operation data on time. The point is that the energy consumption can be predicted.
[0042]
In FIG. 1, reference numeral 46 denotes a baseline recording unit. The baseline recording unit 46 inputs the operation time and the energy consumption during operation of each device on each day of the year as an assumed baseline. It has become. That is, the standard operation data of the expected operation time of 365 days × 24 hours (8,760 hours) and the standard operation data of the energy consumption determined from the assumed operation time of the device are set as the baseline data. It has come to be.
[0043]
Reference numeral 47 denotes a standard weather data recording unit. The standard weather data recording unit 47 receives the assumed outside air temperature, outside air humidity, and outside air enthalpy for each hour on each day of the year as standard weather data. It is like that. In the standard weather data recording unit 47, a total of 8,760 × 3 pieces of data are set as standard weather data.
[0044]
Reference numeral 48 denotes a standard operation calculation unit. In the standard operation calculation unit 48, standard operation data and standard weather data recording unit of the assumed operation time and energy consumption for a certain date of each device given from the baseline recording unit 46 47, standard operation data for a certain period X month Y day to X month Z day of each device can be obtained from the standard weather data of the hourly hourly temperature and humidity given from 47.
[0045]
For example, the operation time of each device can be obtained by adding the operation time of the predetermined device given from the baseline recording unit 46 to the standard operation data of the operation time of the predetermined device between X month Y and X month Z. I understand. The standard operation data of energy consumption of each device is obtained by multiplying the energy consumption per unit time of the corresponding device determined from the standard weather data by the standard operation data of the operation time between X month Y day and X month Z day. The calculated standard operation data of the total energy consumption of each device is calculated in accordance with [Equation 1], and the calculated operation time of the device, the standard operation data of the energy consumption, and the weather data are the display unit 44 and the correction coefficient. The calculation unit 49 can be given. In addition to the standard operating data of operating time and energy consumption, temperature and humidity from the standard weather data recording unit 47 and standard weather data of enthalpy can be given to the correction coefficient calculating unit 49.
[0046]
In the correction coefficient calculation unit 49, the total energy consumption calculated by [Equation 1] from the actual operation calculation unit 43 in addition to the total standard operation data of the consumption energy serving as the baseline from the standard operation calculation unit 48 and the weather data. Actual operation data of ΣE, total operation time, and actual operation data of weather data can be provided. In addition, since enthalpy cannot be measured, the outside air enthalpy from the actual operation calculation unit 43 is data calculated by a predetermined function from the measured outside air temperature and outside air humidity.
[0047]
The correction coefficient calculation unit 49 can calculate a correction coefficient for energy consumption, an operation time correction coefficient, an outside air temperature correction coefficient, and an enthalpy correction coefficient during a certain period of X month Y day to X month Z day. Yes. Each correction coefficient is obtained by [Equation 4].
[Expression 4]
Figure 0004450541
[0048]
Where C ij Is the energy consumption, operation time, outside air temperature, outside air enthalpy correction factor for a certain period ij (for example, X month Y day to X month Z day), REALp is the actual operation of energy consumption, operation time, outside air temperature, outside air enthalpy A certain value of time p with data, STDp is a certain value of time p with standard operation data of energy consumption, operation time, outside air temperature, outside air enthalpy, N ij Is the number of data of energy consumption, operation time, outside air temperature, outside air enthalpy.
[0049]
Reference numeral 50 denotes a consumption energy recalculation unit. The consumption energy recalculation unit 50 adds actual operation data of consumption energy from January to X month, for example, and (X + 1) a correction coefficient to standard operation data from month to December. It is possible to recalculate energy consumption for one year by adding the data obtained by multiplying. The predicted values of the standard operation data and the actual operation data can be given from the energy consumption recalculation unit 50 to the display unit 44 for comparison display.
[0050]
Next, the operation of the illustrated example will be described with reference to FIG.
At the time of operation of the facility, the baseline recording unit 46 is preliminarily input with the operation time of each device in each month and day and the standard operation data of energy consumption during operation as an assumed baseline. That is, the standard operation data of the expected operation time of 365 days × 24 hours (8,760 hours) and the standard operation data of the energy consumption determined from the assumed operation time of the device are set as the baseline data. Has been.
[0051]
In addition, the standard weather data recording unit 47 is preliminarily inputted with the assumed outside air temperature, outside air humidity, and outside air enthalpy for each hour on each month and day in the year as weather data. In the standard weather data recording unit 47, a total of 8,760 × 3 pieces of data are set as standard weather data.
[0052]
Thus, the operation time of each device set in the baseline recording unit 46 for the predetermined period X month Y day to X month Z, the standard operation data of energy consumption during operation, and the standard weather data recording unit 47 are set. Standard weather data such as outside air temperature, outside air humidity, outside air enthalpy, etc. are given to the standard operation calculation unit 48, and the standard operating hours of the heat source equipment, air conditioning equipment, transport equipment, lighting equipment, outlets, standard The consumed energy (see [Equation 1]) is calculated, and the calculated standard operation time number and standard consumed energy are given to the display unit 44 and the correction coefficient calculating unit 49 as standard operation data. Further, standard weather data when the standard operation data is calculated is also given to the display unit 44 and the correction coefficient calculation unit 49.
[0053]
On the other hand, in the same manner as in the conventional case, the measurement system 3 uses the distribution (distribution) panel power detection means 4 to detect the power W1 of the distribution (distribution) panel, and the heat source facility energy detection means 5 detects the heat source facility. Energy E1, energy E2 of the air conditioning equipment detected by the air conditioning equipment energy detection means 6, energy consumption W2 of the transportation equipment detected by the transportation equipment power detection means 7, power of the lighting equipment detected by the lighting equipment power detection means 8 W3, outlet power W4 detected by the outlet power detection means 9, the outside air temperature T1 detected by the outside air condition detection means 10, the outside air humidity H1, the solar radiation amount I detected by the solar radiation condition detection means 11, the air conditioning condition detection means The air conditioning temperature T2 and the air conditioning humidity H2 detected by the communication interface 40, the data collection unit 41, the data It is given to actual driving operation unit 43 through the recording unit 42.
[0054]
In the actual operation calculation unit 43, the heat source equipment, air conditioning equipment, transport equipment, lighting equipment, actual operation data of the number of hours of operation of the outlet, actual operation data of energy consumption, The actual operation data of the air conditioning facility processing energy is calculated and provided to the display unit 44 and the correction coefficient calculation unit 49. Further, the outside air temperature, the outside air humidity, and the outside air enthalpy when the actual operation data is calculated are also given to the display unit 44 and the correction coefficient calculation unit 49. The outside air enthalpy is calculated by a function from the outside air temperature and the outside air humidity.
[0055]
In the correction coefficient calculation unit 49, the correction coefficient is calculated based on [Equation 4]. As the correction coefficient, the energy consumption correction coefficient (= actual energy consumption operation data / consumption energy standard operation data) and the air conditioning facility processing energy correction coefficient (= air conditioning facility processing energy actual operation data / air conditioning processing energy) Standard operation data), operation time correction coefficient (= actual operation data for operation time / standard operation data for operation time), correction factor for outside temperature (= actual operation data for outside temperature / standard operation data for outside temperature) ), An outside air enthalpy correction coefficient (= actual operation data of outside air enthalpy / standard operation data of outside air enthalpy).
[0056]
Each correction coefficient obtained by the correction coefficient calculation unit 49 is given to the energy consumption recalculation unit 50, and for example, a predicted value of actual operation data of consumed energy for a month without actual operation data of consumed energy is obtained. In addition, the predicted value of the actual operation data of the total energy consumption for the year is recalculated. That is, for example, by multiplying the standard operation data of each month from (X + 1) month to December by a correction coefficient, the predicted value of actual operation data from (X + 1) month to December is calculated, and from January to X month The actual operation data of each month and the predicted value of the actual operation data of each month from (X + 1) month to December are added to obtain the predicted value of energy consumption from January to December (see FIG. 2). Specifically, the predicted value is calculated by [Equation 5].
[Equation 5]
E1y = E01 + E02 + E03 + ... Ex + Es (x + 1) * K + Es (x + 2) * K + Es (x + 3) * K + ... Es (12) * K
[0057]
Here, E1y is a predicted value of total energy consumption for one year obtained from the standard operation data and the actual operation data, and E01, E02, E03... Ex is January, February, March,. Actual operation data of energy consumption, Es (x + 1), Es (x + 2), Es (x + 3) ... Es (12) are (x + 1) month, (x + 2) month, (x + 3) month ... December The standard operation data of energy consumption in K, and K is a correction coefficient for energy consumption obtained in month X. In addition, when the operation of the facility is performed until (x + 1) month, in [Equation 5], the standard operation data Es (x + 1) of the energy consumption becomes the actual operation data E (x + 1) of the energy consumption, and the correction coefficient is (X + 1) New correction coefficient calculated in month.
[0058]
Through this calculation, it is possible to analyze the degree of difference between standard operation data and actual operation data as equipment obtained from a predetermined baseline, calculate the baseline, analyze energy conservation, and evaluate online. Therefore, it is possible to cope with unforeseen situations on time, and to avoid the risk of deterioration in business profits.
[0059]
The same calculation as the above-mentioned energy consumption from January to December is also performed for the air conditioning facility processing energy, the number of operating hours, the outside air temperature, the outside air humidity, and the outside air enthalpy.
[0060]
In the display unit 44, the graphs as shown in FIGS. 2 to 9 are displayed in comparison, parallel display or superimposed display. For example, as shown in FIG. 2, the standard operation data of energy consumption and the actual operation data are compared and displayed as a graph from January to X month, and the standard operation of energy consumption is performed from (X + 1) month to December. The data and the predicted value of the actual operation data are compared and displayed as a graph. In addition, as shown in FIG. 3, the standard operation data of the number of hours of operation from X month Y day to X month Z day of each device such as heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, outlet, etc. The standard operation data for the total operation time and the actual operation data for the total operation time are displayed in parallel as a graph.
[0061]
Further, as shown in FIG. 4, the standard weather data and the standard operation data of the air conditioning equipment processing energy, the actual weather data, and the actual operation data of the air conditioning equipment processing energy are displayed in parallel on the display unit 44 as shown in FIG. 4. Is displayed. In FIG. 4, the white circle 52 indicates the relationship between the outside air temperature and absolute humidity every hour used for calculating the baseline, and the black corner 53 indicates the relationship between the actually measured outside air temperature and absolute humidity every hour. , A is a specific enthalpy line, and B is a saturated water vapor curve.
[0062]
Furthermore, in the display unit 44, as shown in FIG. 5, the standard operation data of the energy consumption of each device such as heat source equipment, air conditioning equipment, transport equipment, lighting equipment, and outlets from X month Y day to X month Z day, total Standard operation data of energy consumption, actual operation data of energy consumption of each device such as heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, and outlet, and actual operation data of total energy consumption are displayed in parallel.
[0063]
Furthermore, as shown in FIG. 6, the display unit 44 displays in parallel the standard operation data of the air conditioning facility processing energy and the actual operation data of the air conditioning facility processing energy from the X month Y day to the X month Z day and the absolute humidity. The standard weather data and the actual weather data of the outside air temperature are superimposed and displayed, and as shown in FIG. 7, the relationship between the absolute humidity and the outside air temperature of the standard weather data and the actual weather data is displayed as an outside air condition prediction display. As shown in FIG. 8, standard operation data and actual operation data of air-conditioning equipment processing energy, standard operation data on the relationship between absolute humidity and outside air temperature at a certain place, relationship between absolute humidity and outside air temperature at a certain place The actual operation data is displayed in parallel. In FIG. 8, those with “” are standard operation data, “d” is outside air, “e” is air in the mixer 25 a, “h” is air in the chamber 32, and “g” is air supply section in the blower 26. The air temperature and the absolute humidity state of each of the air of the above are shown in the actual operation data, where d is the outside air, ho is the air in the mixer 25a, h is the air in the chamber 32, g is The air temperature and absolute humidity states of the air in the air supply section of the blower 26 are shown.
[0064]
Furthermore, as shown in FIG. 9, the display unit 44 displays the standard operation data and the actual operation data of the air conditioning equipment processing energy in parallel, and the standard operation data and the actual operation data regarding the relationship between the absolute humidity and the outside air temperature are displayed. Overlay comparison display.
[0065]
In the bar graphs shown in FIG. 3, FIG. 5, and FIG. 12, the same pattern represents the number of hours of operation and the state of energy consumption of the same device, and FIG. 4, FIG. 6, FIG. In the bar graphs shown in FIGS. 14 and 15, the same pattern represents load processing energy in the same state.
[0066]
As shown in FIG. 2, the standard operation data, the actual operation data, and the predicted values of the actual operation data are compared and displayed on the display unit 44, and the standard operation data and the actual operation data are displayed on the display unit 44 as shown in FIGS. Energy saving evaluation can be performed immediately by displaying in parallel or overlaying, so it is possible to reduce the labor, cost, and time of energy saving evaluation. By improving the system, equipment performance can be fully demonstrated.
[0067]
The energy saving evaluation method and energy saving evaluation method of the present invention The stage is Of course, the present invention is not limited to the illustrated examples described above, and various modifications can be made without departing from the scope of the present invention.
[0068]
【The invention's effect】
As described above, claims 1 to 5 of the present invention. 8 Energy conservation evaluation method and energy conservation evaluation hand described in In steps According to this, it is possible to analyze online how much difference there is between standard operation data and actual operation data as equipment required from a predetermined baseline, calculate baseline, analyze energy conservation, and evaluate online. Therefore, it is possible to deal with unforeseen situations on-time, avoid the risk of business profit deterioration, and immediately perform energy conservation assessments, thus reducing labor, cost and time for energy conservation assessments. If the operation is not good, it can be immediately recognized, and the excellent effect that the equipment performance can be fully exhibited can be obtained.
[Brief description of the drawings]
FIG. 1 shows an energy saving evaluation method and energy saving evaluation method according to the present invention. Stepped It is a block diagram showing an example of an embodiment.
FIG. 2 is a graph showing standard operation data, actual operation data, and predicted values of actual operation data for a certain period of time obtained by calculation by the energy consumption recalculation unit shown in FIG. It is a prediction graph displayed on a display part.
FIG. 3 is a graph showing the standard operation data and the actual operation data of the number of operation hours and the total operation time in a certain period of each device displayed on the display unit shown in FIG.
FIG. 4 shows standard meteorological data indicating the relationship between absolute humidity and outside air temperature every hour on the hour for a certain period, standard operation data representing the air-conditioning processing energy of a certain air conditioner at that time, and absolute on the hour on the hour for a certain period It is a graph which shows the state by which the actual weather data which shows the relationship between humidity and external temperature, and the historical operation data showing the air-conditioning equipment processing energy of an air-conditioning equipment at that time were displayed in parallel on the display part shown in FIG.
FIG. 5 is a graph showing a state in which standard operation data and actual operation data of energy consumption and total energy consumption of each device are displayed in parallel on the display unit shown in FIG. 1;
FIG. 6 shows the standard weather data and actual weather data of absolute humidity and outside air temperature for a certain period superimposed on the display unit of FIG. 1, and the standard operation data and actual operation data of the air conditioning equipment processing energy in a certain air conditioning equipment. It is a graph which shows the state displayed in parallel on the display part of FIG.
7 is a graph showing a state in which standard weather data and actual weather data of absolute humidity and outside air temperature for a specific month are superimposed on the display unit shown in FIG.
FIG. 8 shows the standard operating data of the absolute humidity and temperature of each place on a specific day and the air conditioning equipment processing energy at that time, the absolute humidity and temperature of each place on a specific day, and the air conditioning equipment processing energy at that time It is a graph which shows the state which displayed the actual driving data in parallel on the display part of FIG.
FIG. 9 displays the standard weather data and actual weather data of absolute humidity and temperature at each location on a specific day superimposed on the display unit of FIG. It is a graph which shows the state which displayed the actual driving data in parallel on the display part of FIG.
10 is an energy saving evaluation method and energy saving evaluation means of FIG. 1. FIG. Young Or it is the schematic of the installation with which the energy monitoring means of FIG. 11 is applied.
FIG. 11 is a block diagram of energy monitoring means applied to the air conditioning facility of FIG.
12 is a graph showing the number of hours of operation of each device for a certain period displayed on the display unit of FIG. 11 and the actual operation data of the total number of hours of operation.
13 is a graph showing actual operation data of energy consumption of each device in a certain period displayed on the display unit of FIG. 11 and actual operation data of total energy consumption of each device in a certain period.
14 is a graph showing actual meteorological data showing the relationship between the absolute humidity and the outside air temperature every hour on a regular basis displayed on the display unit of FIG. 11 and the actual operating data of the air conditioning equipment processing energy at that time. .
15 is a graph showing actual meteorological data indicating the relationship between absolute humidity and outside air temperature at each location on a specific day displayed on the display unit of FIG. 11 and actual operating data of air conditioning facility processing energy at that time. is there.

Claims (8)

熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーと、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーからなる標準気象データとを基に、前記建物に係わる設備に使用する各機器の所定の期間の消費エネルギーの標準運転データを求め、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求め、前記標準運転データ及び実績運転データに基き補正係数を求め、該補正係数を基に消費エネルギーの実績運転データの予測値を再計算することを特徴とする省エネルギー評価方法。Energy consumption that is the baseline of each equipment used for building facilities, consisting of heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, distribution boards, and outlets, and every predetermined time in each month in a predetermined period Based on the standard meteorological data consisting of the assumed outside air temperature, outside air humidity, and outside air enthalpy, obtain the standard operating data of the energy consumption of each device used for the equipment related to the building for a specified period and detect the specified power The actual operation data of the consumed energy is obtained from the power detection data and the energy detection data detected by the means and the predetermined energy detection means, the correction coefficient is obtained based on the standard operation data and the actual operation data, and based on the correction coefficient An energy-saving evaluation method characterized by recalculating predicted values of actual operation data of energy consumption. 前記消費エネルギーの実績運転データの予測値を用いる年間のトータルの消費エネルギーの実績運転データの予測値の再計算は、請求項1で行った消費エネルギーの再計算に加えて、1月からX月までの消費エネルギーの実績運転データを加算すると共に、(X+1)月から12月までの消費エネルギーの標準運転データに補正係数を掛けて(X+1)月から12月までの消費エネルギーの実績運転データの予測値を求め、1月からX月までの消費エネルギーの実績運転データと(X+1)月から12月までの消費エネルギーの実績運転データの予測値とを加算して年間のトータルの消費エネルギーの実績運転データの予測値を求める請求項1に記載の省エネルギー評価方法。  In addition to the recalculation of the energy consumption performed in claim 1, the recalculation of the predicted value of the actual operation energy consumption data for the entire year using the predicted value of the actual consumption energy operation data is performed from January to X month. The actual operation data of energy consumption up to (X + 1) is multiplied by the correction coefficient to the standard operation data of energy consumption from (X + 1) month to December, and the actual operation data of energy consumption from month to December is calculated. Obtain the predicted value and add the actual operating data of energy consumption from January to X and the predicted value of the actual operating data of energy consumption from (X + 1) month to December. The energy saving evaluation method according to claim 1, wherein a predicted value of operation data is obtained. 前記標準運転データ、実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、標準運転データ、再計算した消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行う請求項1又は2に記載の省エネルギー評価方法。  Standard operation data, parallel display of actual operation data, or standard weather data, superimposed display or parallel display of actual weather data, or comparison display of predicted values of standard operation data, actual operation data of recalculated energy consumption The energy saving evaluation method according to claim 1 or 2, wherein each of the above is performed alone or in any combination. 熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーと、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーからなる標準気象データを基に、前記建物が係わる設備に使用する各機器の所定の期間の消費エネルギーの標準運転データを求め、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求め、前記標準運転データ、前記消費エネルギーの実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、前記標準運転データ、前記消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行うことを特徴とする省エネルギー評価方法。Energy consumption that is the baseline of each equipment used for building facilities, consisting of heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, distribution boards, and outlets, and every predetermined time in each month in a predetermined period Based on the standard meteorological data consisting of the assumed outside air temperature, outside air humidity, and outside air enthalpy, the standard operating data of the energy consumption for a predetermined period of each device used in the equipment related to the building is obtained, and the predetermined power detection means And the actual operation data of the consumed energy is obtained from the detection data of the electric power detected by the predetermined energy detecting means and the detection data of the energy, the standard operation data, the parallel display of the actual operation data of the consumed energy, or the standard weather data, the actual result Overlap display or parallel display of weather data, or the standard operation data, the consumption energy The comparison display of the predicted value of the actual operating data of Energy, energy conservation evaluation method and performing at each alone or in any combination. 熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーが設定されているベースライン記録部と、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーが気象データとして設定された標準気象データ記録部と、前記ベースライン記録部及び標準気象データ記録部からのデータを基に各機器の所定の期間の消費エネルギーの標準運転データを求めるようにした標準運転演算部と、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求める実績運転演算部と、前記標準運転演算部及び実績運転演算部からのデータに基き補正係数を求める補正係数演算部と、該補正係数演算部からの補正係数を基に消費エネルギーの実績運転データの予測値を求める消費エネルギー再計算部とを備えたことを特徴とする省エネルギー評価手段。  A baseline recording unit that includes the heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, distribution board, outlets, and sets the energy consumption to be used as the baseline of each equipment used for equipment related to the building, and a predetermined amount The standard weather data recording unit in which the assumed outside air temperature, the outside air humidity, and the outside air enthalpy at each predetermined time in each month in the period are set as weather data, and the data from the baseline recording unit and the standard weather data recording unit Based on the standard operation calculation unit that obtains the standard operation data of the energy consumption of each device for a predetermined period based on the predetermined power detection means, the detection data of the power detected by the predetermined energy detection means, and the detection data of the energy Actual operation calculation unit for obtaining actual operation data of energy consumption, standard operation calculation unit and actual operation calculation A correction coefficient calculation unit that obtains a correction coefficient based on data from and a consumption energy recalculation unit that obtains a predicted value of actual operation data of consumption energy based on the correction coefficient from the correction coefficient calculation unit Energy saving evaluation means. 消費エネルギー再計算部は、請求項5の消費エネルギー再計算部に加えて、1月からX月までの消費エネルギーの実績運転データを加算すると共に、(X+1)月から12月までの消費エネルギーの標準運転データに補正係数を掛けて(X+1)月から12月までの消費エネルギーの実績運転データの予測値を求め、1月からX月までの消費エネルギーの実績運転データと(X+1)月から12月までの消費エネルギーの実績運転データの予測値とを加算して年間の消費エネルギーのトータルを求めるよう構成した請求項5に記載の省エネルギー評価手段。  In addition to the energy consumption recalculation unit of claim 5, the energy consumption recalculation unit adds actual operation data of energy consumption from January to X month, and also calculates the energy consumption from (X + 1) month to December. The standard operation data is multiplied by a correction coefficient to obtain a predicted value of actual operation data of energy consumption from (X + 1) months to December, and actual operation data of energy consumption from January to X months and from (X + 1) months to 12 6. The energy saving evaluation means according to claim 5, wherein the energy consumption evaluation means is configured to add a predicted value of actual operation data of energy consumption up to a month to obtain a total of energy consumption for the year. 前記標準運転演算部及び実績運転演算部からの標準運転データ、実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、標準運転演算部及び消費エネルギー再計算部からの標準運転データ、消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行い得るようにした表示部を備えた請求項5又は6に記載の省エネルギー評価手段。  Standard operation data from the standard operation calculation unit and actual operation calculation unit, parallel display of actual operation data, or standard weather data, superimposed display or parallel display of actual weather data, or standard operation calculation unit and energy consumption The energy saving according to claim 5 or 6, further comprising a display unit capable of comparing and displaying the predicted values of the standard operation data from the calculation unit and the actual operation data of the consumed energy, either alone or in any combination. Evaluation means. 熱源設備、空調設備、搬送設備、照明設備、分電盤、コンセントにより構成された、建物に係わる設備に使用する各機器のベースラインとなる消費エネルギーが設定されているベースライン記録部と、所定期間における各月日における所定時刻毎の想定された外気気温、外気湿度、外気エンタルピーが気象データとして設定された標準気象データ記録部と、前記ベースライン記録部及び標準気象データ記録部からのデータを基に各機器の所定の期間の消費エネルギーの標準運転データを求めるようにした標準運転演算部と、所定の電力検出手段及び所定のエネルギー検出手段により検出した電力の検出データ及びエネルギーの検出データから消費エネルギーの実績運転データを求める実績運転演算部と、前記標準運転演算部及び実績運転演算部からの標準運転データ、実績運転データの並列表示、若しくは標準気象データ、実績気象データの重ね合わせ表示或は並列表示、又は、標準運転演算部及び消費エネルギー再計算部からの標準運転データ、消費エネルギーの実績運転データの予測値の比較表示を、夫々単独で或は任意の組合せで行い得るようにした表示部を備えたことを特徴とする省エネルギー評価手段。  A baseline recording unit that includes the heat source equipment, air conditioning equipment, transfer equipment, lighting equipment, distribution board, outlets, and sets the energy consumption to be used as the baseline of each equipment used for equipment related to the building, and a predetermined amount The standard weather data recording unit in which the assumed outside air temperature, the outside air humidity, and the outside air enthalpy at each predetermined time in each month in the period are set as weather data, and the data from the baseline recording unit and the standard weather data recording unit Based on the standard operation calculation unit that obtains the standard operation data of the energy consumption of each device for a predetermined period based on the predetermined power detection means, the detection data of the power detected by the predetermined energy detection means, and the detection data of the energy Actual operation calculation unit for obtaining actual operation data of energy consumption, standard operation calculation unit and actual operation calculation Standard operation data from, parallel display of actual operation data, or standard weather data, superimposed display or parallel display of actual weather data, or standard operation data from standard operation calculation unit and energy consumption recalculation unit, energy consumption An energy-saving evaluation means comprising a display unit that can perform comparison display of predicted values of actual operation data independently or in any combination.
JP2002167389A 2002-06-07 2002-06-07 Energy saving evaluation method and energy saving evaluation method Expired - Lifetime JP4450541B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002167389A JP4450541B2 (en) 2002-06-07 2002-06-07 Energy saving evaluation method and energy saving evaluation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002167389A JP4450541B2 (en) 2002-06-07 2002-06-07 Energy saving evaluation method and energy saving evaluation method

Publications (2)

Publication Number Publication Date
JP2004012342A JP2004012342A (en) 2004-01-15
JP4450541B2 true JP4450541B2 (en) 2010-04-14

Family

ID=30434650

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002167389A Expired - Lifetime JP4450541B2 (en) 2002-06-07 2002-06-07 Energy saving evaluation method and energy saving evaluation method

Country Status (1)

Country Link
JP (1) JP4450541B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200034194A (en) * 2018-09-21 2020-03-31 에이치디씨아이콘트롤스 주식회사 Energy Reduction Status Display System, and Method

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4564415B2 (en) * 2005-07-04 2010-10-20 三菱電機ビルテクノサービス株式会社 Equipment operation evaluation information providing device
JP4579137B2 (en) * 2005-11-09 2010-11-10 三菱電機株式会社 Energy variable cost estimation device and energy variable cost estimation program
JP5603730B2 (en) * 2010-10-14 2014-10-08 アズビル株式会社 Total energy management device and method
KR101135985B1 (en) 2012-01-20 2012-04-17 굿어스 주식회사 Power monitoring system
JP5975891B2 (en) * 2013-01-21 2016-08-23 三菱電機ビルテクノサービス株式会社 Energy billing system and program
JP6146126B2 (en) * 2013-05-17 2017-06-14 富士電機機器制御株式会社 Device and program for managing energy consumption
CN104344852B (en) * 2013-08-05 2018-04-06 中国石油化工股份有限公司 The diagnosis of energy saving method and diagnosis of energy saving system of boiler heating system
JP6194246B2 (en) * 2013-12-27 2017-09-06 アズビル株式会社 Refrigerator performance evaluation apparatus and method
CN107246705B (en) * 2017-05-02 2019-11-05 青岛海尔空调器有限总公司 A kind of air-conditioning power consumption estimation method and device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20200034194A (en) * 2018-09-21 2020-03-31 에이치디씨아이콘트롤스 주식회사 Energy Reduction Status Display System, and Method
KR102123950B1 (en) 2018-09-21 2020-06-17 에이치디씨아이콘트롤스주식회사 Energy Reduction Status Display System, and Method

Also Published As

Publication number Publication date
JP2004012342A (en) 2004-01-15

Similar Documents

Publication Publication Date Title
US8977405B2 (en) Continuous optimization energy reduction process in commercial buildings
Wang et al. Monitoring-based HVAC commissioning of an existing office building for energy efficiency
CN104303203B (en) Energy search engine method and system
US11651121B2 (en) System and method for building cooling optimization using periodic building fuel consumption with the aid of a digital computer
US20130060471A1 (en) Estimating energy savings and carbon offsets for buildings in real-time
Claridge et al. Building simulation for practical operational optimization
JP2003216715A (en) Device for evaluating and monitoring building energy saving
JP4450541B2 (en) Energy saving evaluation method and energy saving evaluation method
Zhang et al. An inverse model with uncertainty quantification to estimate the energy performance of an office building
JP2011163710A (en) Unit requirement calculation system, program for executing the same, and recording medium for recording the program
De Keizer et al. Review of long-term fault detection approaches in solar thermal systems
Hitchin et al. Realisable 10-year reductions in European energy consumption for air conditioning
Fine et al. A grouped control strategy for the retrofit of post-war multi-unit residential building hydronic space heating systems
Lee et al. Modeling and simulation of building energy performance for portfolios of public buildings
Touchie et al. Using suite energy-use and interior condition data to improve energy modeling of a 1960s MURB
JP2005149384A (en) Energy evaluation method
JP5395536B2 (en) Energy saving effect amount calculation device and method
US11921478B2 (en) System and method for estimating periodic fuel consumption for cooling of a building with the aid of a digital computer
Chen System dynamics based models for selecting HVAC systems for office buildings: A life cycle assessment from carbon emissions perspective
Calise et al. Dynamic analysis of the heat theft issue for residential buildings
JP2005241161A (en) Consumed energy calculating method in changing variable flow and energy saving diagnosing method
Sheikh Khan et al. Using long-term measurements of airflow, electrical power, indoor temperature, and CO2-concentration for evaluating sizing and performance of an all-air HVAC system in an office building-a case study
Reddy et al. Determination of retrofit savings using a calibrated building energy simulation model
Kerrigan et al. Evaluation of the Performance of Houses with and without Supplemental Dehumidification in a Hot-Humid Climate
Zheng Development of a new methodology for evaluating the thermal performance of residential buildings

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080325

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080526

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20080526

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090428

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090724

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20090804

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091013

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091211

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100112

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100126

R150 Certificate of patent or registration of utility model

Ref document number: 4450541

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130205

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130205

Year of fee payment: 3

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130205

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140205

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term