CN104977461B - The computational methods and electronic equipment of air conditioning electricity consumption - Google Patents
The computational methods and electronic equipment of air conditioning electricity consumption Download PDFInfo
- Publication number
- CN104977461B CN104977461B CN201510039702.5A CN201510039702A CN104977461B CN 104977461 B CN104977461 B CN 104977461B CN 201510039702 A CN201510039702 A CN 201510039702A CN 104977461 B CN104977461 B CN 104977461B
- Authority
- CN
- China
- Prior art keywords
- power
- time period
- special time
- air
- temperature
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
The present invention is applied to field of air conditioning, and there is provided the computational methods of air conditioning electricity consumption and electronic equipment.The computational methods of the air conditioning electricity consumption include:Obtain the power parameter matched with the model of the air-conditioning;Obtain the air conditioning operating mode of user's setting;Real time temperature is obtained, and calculates the temperature difference of the real time temperature and preset temperature, the real time temperature is the indoor temperature that temperature detecting module is detected;In the operation of air conditioner, the change moment of the power of the air-conditioning is counted;The power consumption computations of user's triggering is received, the special time period that the power consumption computations is specified is determined;At the change moment based on the power parameter, the air conditioning operating mode, the temperature difference and statistics, calculate the power consumption of the special time period.
Description
Technical field
The invention belongs to the computational methods and electronic equipment of field of air conditioning, more particularly to air conditioning electricity consumption.
Background technology
Air-conditioning is as a kind of high-power household electrical appliance, and it, which consumes energy, is particularly subject to the concern of user, and energy-conservation is air-conditioning research and development people
Member it must be considered that major issue.Therefore, the convenient and low air conditioning electricity consumption monitoring tools of cost are developed to be developed into
Air-conditioning researches and develops a Research Emphasis in field.
Therefore, existing air conditioning system maker proposes a variety of monitoring, detection air conditioning electricity consumption method, and accordingly develop each
The air conditioning electricity consumption monitoring tools of formula various kinds, but there is many following shortcomings in existing air conditioning electricity consumption monitoring tools:
Most of air conditioning electricity consumption monitoring tools need to increase voltage sensor, current sensor constant power detecting element, greatly
The big cost for adding complete machine;
Each air conditioning electricity consumption monitoring tools record air-conditioning power consumption is, it is necessary to which user manually performs button after air-conditioning is started
Operation is extremely not humane to record the time.
In addition, most of power consumption monitoring tools are opened to test, maintenance as independently of the attachment device outside air-conditioning
Personnel to air conditioning condition to test and analyze, therefore user's palpus one expense of extraneous expense monitors to buy the power consumption
Instrument, this undoubtedly hinders the promotion and popularization of power consumption monitoring tools.
The content of the invention
It is an object of the invention to provide the computational methods of air conditioning electricity consumption and electronic equipment, during air-conditioning use in real time
According to the indoor temperature change generated in case of some period, the air conditioning electricity consumption of this section of period is calculated.
In a first aspect, the present invention provides the computational methods of air conditioning electricity consumption, the computational methods of the air conditioning electricity consumption include:
Obtain the power parameter matched with the model of the air-conditioning;
Obtain the air conditioning operating mode of user's setting;
Real time temperature is obtained, and calculates the temperature difference of the real time temperature and preset temperature, the real time temperature is temperature
The indoor temperature that detection module is detected;
In the operation of air conditioner, the change moment of the power of the air-conditioning is counted;
The power consumption computations of user's triggering is received, the special time period that the power consumption computations is specified is determined;
At the change moment based on the power parameter, the air conditioning operating mode, the temperature difference and statistics, calculate
The power consumption of the special time period.
Second aspect, the present invention provides a kind of electronic equipment, and the electronic equipment includes power consumption computing module, timing mould
Block and communication module;
The communication module is used for:The power parameter matched with the model of the air-conditioning is obtained, the power parameter is sent out
Deliver to the power consumption computing module;
The communication module is additionally operable to:The air conditioning operating mode of user's setting is obtained, the air conditioning operating mode is sent
To the power consumption computing module;
The communication module is additionally operable to:Real time temperature is obtained, the real time temperature is sent to the power consumption and calculates mould
Block, the real time temperature is the indoor temperature that temperature detecting module is detected;
The timing module is used for:In the operation of air conditioner, the change moment of the power of the air-conditioning is counted;
The timing module is additionally operable to:The power consumption computations of user's triggering is received, determines that the power consumption is calculated and refers to
Make the special time period specified;
The power consumption computing module is used for:The temperature difference of the real time temperature and preset temperature is calculated, based on the work(
Rate parameter, the air conditioning operating mode, the change moment of the temperature difference and statistics calculate the use of the special time period
Electricity.
Beneficial effects of the present invention:The power parameter matched with the model of the air-conditioning is obtained in advance;Obtain user's setting
Air conditioning operating mode, also obtains real time temperature, and calculate the temperature of the real time temperature and preset temperature from temperature detecting module
Difference;Based on changing the air-conditioning in the power parameter, the air conditioning operating mode, the temperature difference and the special time period
At the change moment of power, calculate the power consumption for the special time period that user specifies.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
In required for the accompanying drawing that uses be briefly described, it should be apparent that, drawings in the following description are only some of the present invention
Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these
Accompanying drawing obtains other accompanying drawings.
Fig. 1 is the flow chart of the computational methods of air conditioning electricity consumption provided in an embodiment of the present invention;
Fig. 2 is a kind of Optimizing Flow figure of the computational methods of air conditioning electricity consumption provided in an embodiment of the present invention;
Fig. 3 is another Optimizing Flow figure of the computational methods of air conditioning electricity consumption provided in an embodiment of the present invention;
Fig. 4 is a kind of flow chart of step C1 in Fig. 3;
Fig. 5 is the composition structure chart of electronic equipment provided in an embodiment of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Electronic equipment described in the embodiment of the present invention, is made up of electronic components such as integrated circuit, transistor, electron tubes,
Application electric technology and/or software engineering are to realize concrete function;The electronic equipment includes electronic computer, calculated by electronics
Robot, numerical control or stored program controlled of machine control etc.;It is mobile eventually that the electronic equipment also includes tablet personal computer, smart mobile phone etc.
End.
In embodiments of the present invention, it is the computational methods of execution air conditioning electricity consumption, the electronic equipment need to be provided with communication mould
Block and power consumption computing module.Wherein, the communication module is used to set up wired connection or wireless connection;For example, the electricity
Sub- equipment is connected by the communication module with the controller of server and/or air-conditioning, so, and the electronic equipment can be with server
Data interaction is carried out, for example, electronic equipment obtains the power parameter matched with the model of the air-conditioning, electronic equipment from server
Data interaction can be carried out with the controller of air-conditioning, for example, electronic equipment obtains the model with the air-conditioning from the controller of air-conditioning
The power parameter of matching.In embodiments of the present invention, wired company is set up using which kind of mode or interface for the communication module
Connect and do not limit, also do not limited for the communication module sets up wireless connection using which kind of communication protocol.
It is another it should be noted that, the electronic equipment external temperature detection module, the temperature detecting module is used for detection temperature;
In the embodiment of the present invention, the temperature detecting module is used for the environment temperature for detecting interior, wherein, the sky described in the embodiment of the present invention
Tune is placed on the interior.
According to indoor environment temperature, to calculate the air conditioning electricity consumption in preset time, the embodiments of the invention provide sky
The computational methods of electricity are called, the computational methods of the air conditioning electricity consumption are applied to the electronic equipment.Fig. 1 shows implementation of the present invention
The flow of the computational methods for the air conditioning electricity consumption that example is provided, for the ease of description, illustrate only related to the embodiment of the present invention
Part.
The computational methods of air conditioning electricity consumption provided in an embodiment of the present invention, referring to Fig. 1, the calculating side of the air conditioning electricity consumption
Method includes step A11, step A12, step A13, step A14, step A15 and step A16.
Step A11, obtains the power parameter matched with the model of the air-conditioning.
As a step A11 embodiment, electronic equipment is successfully established communication connection by communication module and server
Afterwards, the model of the air-conditioning of interior if electronic equipment is stored with, the request for obtaining power parameter can will be sent to server, should
The model of the air-conditioning is carried in request;When server responds the request, the power parameter of the air-conditioning is fed back to electronic equipment;Electricity
Sub- equipment can receive the power parameter by communication module, and the power parameter is stored.
For example, client is installed on electronic equipment (tablet personal computer, smart mobile phone) in advance, it is real by the client
Existing man-machine interaction, realizes the computational methods that air conditioning electricity consumption is performed under man-machine interaction.Pass through installation sweeping on an electronic device
Code functionality scan air-conditioning model, client account and the air-conditioning model is matched, user end to server sends and is loaded with the air-conditioning
The request for being used to obtain power parameter of model, server inquires about the air-conditioning model pair when receiving the request from database
The power parameter (including power, the power of outer blower fan, the power of electric-controlled plate of inner blower etc.) answered, electronic equipment passes through the mould that communicates
Block receives the power parameter and the power parameter is transferred into client.
As a step A11 embodiment, electronic equipment is successfully established logical by the controller of communication module and air-conditioning
After letter connection, the model of the air-conditioning of interior if electronic equipment is stored with can obtain work(by being sent to the controller of the air-conditioning
The request of rate parameter, carries the model of the air-conditioning in the request;When the controller of the air-conditioning responds the request, to electronic equipment
Feed back the power parameter of the air-conditioning;Electronic equipment can receive the power parameter by communication module, and the power parameter is stored.
Step A12, obtains the air conditioning operating mode of user's setting.
The air conditioning operating mode, refers to the various mode of operations of air-conditioning, including refrigeration mode, heating mode, dehumidifying mould
Formula, air vent mode etc..
The different air conditioning operating modes of correspondence, one or more power parameters of air-conditioning are different.As an embodiment,
The power parameter that step A11 is obtained marks record using power parameter;The power parameter table has not only recorded multiple power parameters, also
Corresponding power parameter is recorded respectively for different air conditioning operating modes.
In addition, the air conditioning operating mode also includes the mode of operation, electric auxiliary hot mode of operation, wind guide strip of inner blower
Operational module.
Wherein, the mode of operation of inner blower includes:Low wind pattern, apoplexy pattern and high wind pattern;Under the low wind pattern
The rotating speed of inner blower be less than the rotating speed of the inner blower under the apoplexy pattern, the rotating speed of the inner blower under the apoplexy pattern is low
In the rotating speed of the inner blower under the high wind pattern.
Wherein, the auxiliary hot operational module of electricity includes:On-mode and pass pattern;The on-mode is the electric auxiliary heat for opening air-conditioning
This pattern of function;The pass pattern can this pattern to close the electric auxiliary hot merit of air-conditioning.It is used as the auxiliary hot implementation of realization electricity
Mode, is realized using the auxiliary thermal technology of PTC electricity;Specifically, PTC is a kind of semiconductor heating ceramics, when ambient temperature reduction, PTC
Resistance value reduce therewith, caloric value can accordingly increase on the contrary, according to this principle, employ the air-conditioning of the auxiliary thermal technology of PTC electricity, energy
It is enough to change caloric value automatically according to the change of room temperature and the size of inner blower air quantity, so that rightly regulation room
Interior temperature, reaches rapid, the powerful purpose heated.
Wherein, the mode of operation of wind guide strip includes:Put wind pattern and dead beat wind pattern.Pendulum wind pattern the leading for air-conditioning
Wind bar swing work;The dead beat wind pattern starts building to make for the wind guide strip dead beat of air-conditioning.
Step A13, obtains real time temperature, and calculate the temperature difference of the real time temperature and preset temperature, the real-time temperature
Spend the indoor temperature detected for temperature detecting module.
Specifically, temperature detecting module detects the environment temperature (indoor temperature) of interior in real time, and should by what is detected
Indoor temperature is sent to electronic equipment;Alternatively, electronic equipment receives what the temperature detecting module was sent by its communication module
The indoor temperature.
It should be noted that, it is determined that while air conditioning operating mode or afterwards, the controllable air-conditioning of user carries out the default temperature
The setting of degree.After the preset temperature is set, air-conditioning is in the air conditioning operating mode continuous service;If the air conditioning operating mode
For refrigeration mode, indoor temperature is reduced to the preset temperature;If the air conditioning operating mode is heating mode, by indoor temperature
It is increased to the preset temperature.
It should be noted that, air-conditioning can will be located in the temperature detecting module, the temperature detecting module can also be set
In some indoor position, the embodiment of the present invention is not limited for the placement location of the temperature detecting module.In addition, for adopting
The temperature detecting module is realized with which kind of electronic device or temperature sensor, is not also limited.
As the optional embodiment of the embodiment of the present invention one, the temperature detecting module not directly with electronic equipment communication link
Connect, the temperature detecting module is connected with server communication, the temperature detecting module in real time uploads the indoor temperature detected
To server, the indoor temperature is forwarded to electronic equipment by server, electronic equipment is by its communication module to the Indoor Temperature
Degree is received and stored.
In step A14, the operation of air conditioner, the change moment of the power of the air-conditioning is counted.
In the present embodiment, after power-on of air conditioner work, timing module starts timing;Especially, when air-conditioning changes power
During operation, at the time of record changes power (i.e. described change moment).Air-conditioning changes Power operation:Air-conditioning is from a certain
Power parameter operation is switched to other power parameter operation.
For example, when the air conditioning operating mode changes, (such as electric auxiliary hot mode of operation is switched to pass from on-mode
Pattern), the power of operation of air conditioner changes, and the change moment will be used as at the time of changing.To be pushed away in this, air-conditioning fortune
Capable power changes every time, as the change moment at the time of all changing every time.
Step A15, receives the power consumption computations of user's triggering, determines that the power consumption computations is specified specific
Period.
Specifically, each equipment in air-conditioning is obtained according to step A11 (including the mechanical, electrical auxiliary heat of compressor, inner blower, exogenous wind, to lead
Wind bar and electric-controlled plate) all possible power parameter, can be further after determining air conditioning operating mode further according to step A12
Determine possible power parameter under the air conditioning operating mode;And then according to step A13 further determine that the real time temperature with
After the temperature difference of preset temperature, the work(that the real time temperature is adjusted to the air-conditioning during preset temperature can determine
The change moment of rate, step A14 counts the change moment of the power of the air-conditioning.So as to which user can trigger electricity consumption according to demand
Computations is measured, the period (i.e. special time period) for needing to calculate power consumption is formulated by the power consumption computations;So as to,
Determine whether air conditioning operating mode changes in the special time period, when also determining the change that the special time period includes
Carve (including at the time of air conditioning operating mode change), and then the special time period is determined according to the step A11 power parameters obtained
One or more power of interior operation of air conditioner.
Step A16, the change based on the power parameter, the air conditioning operating mode, the temperature difference and statistics
At the moment, calculate the power consumption of the special time period.
Specifically, the power consumption computing module of electronic equipment be based on the power parameter, it is the air conditioning operating mode, described
At the change moment of the power of operation of air conditioner, the special time is calculated using ad hoc algorithm in temperature difference and the special time period
The power consumption of section;But the embodiment of the present invention is not limited the specific algorithm of the ad hoc algorithm.Specifically in implementation process, may be used also
To introduce other known air-conditioning parameter or measurable air-conditioning parameter, to improve the essence for the power consumption for calculating the special time period
Degree.
Fig. 2 shows a kind of Optimizing Flow of the computational methods of air conditioning electricity consumption provided in an embodiment of the present invention, in order to just
In description, the part related to the embodiment of the present invention illustrate only.
As the optional embodiment of the embodiment of the present invention one, referring to Fig. 2, the power consumption of the calculating special time period
The step for before, the computational methods of the air conditioning electricity consumption also include step B1.
Step B1, it is determined that the power of inner blower described in the air conditioning operating mode in special time period, electric auxiliary heat
Power and wind guide strip power, to determine to change in the special time period during change of the air conditioning operating mode
Carve.
It should be noted that, the power of the power parameter including the inner blower, the auxiliary hot power of the electricity and described lead
The power of wind bar.
In the present embodiment, user is controllable or remote control air conditioner, selects the air conditioning operating mode of air-conditioning, including selection institute
State the mode of operation of inner blower and/or the operational module of the auxiliary hot mode of operation of the electricity and/or the wind guide strip.
For the special time period, if the user determine that the mode of operation of the inner blower, also accordingly determines the spy
The power of the inner blower in section of fixing time.If the special time period is divided into one or more sub- special time periods;For every
The individual sub- special time period, if the user determine that the mode of operation of the inner blower, also accordingly determine this it is sub specific when
Between in section the inner blower power.
For the special time period, if the user determine that the electricity auxiliary hot mode of operation, also accordingly determines the spy
The auxiliary hot power of electricity in section of fixing time.If the special time period is divided into one or more sub- special time periods;For every
The individual sub- special time period, if the user determine that the electricity auxiliary hot mode of operation, also accordingly determine this it is sub specific when
Between the auxiliary hot power of electricity in section.
For the special time period, if the user determine that the mode of operation of the wind guide strip, also accordingly determines the spy
The power of the wind guide strip in section of fixing time.If the special time period is divided into one or more sub- special time periods;For every
The individual sub- special time period, if the user determine that the mode of operation of the wind guide strip, also accordingly determine this it is sub specific when
Between in section the wind guide strip power.
It is mentioned above, in the special time period, if it is determined that special time period described in the air conditioning operating mode
The mode of operation of the mode of operation of interior inner blower, electric auxiliary hot mode of operation and wind guide strip, is also just correspondingly determined described
The power of the power of inner blower in special time period, electric auxiliary hot power and wind guide strip.So as to in the special time period
The power of the inner blower be integrated, you can calculate the power consumption of the inner blower in the short time;To described specific
The auxiliary hot power of the electricity in period is integrated, you can calculate the auxiliary hot power consumption of electricity in the short time;It is right
The power of the wind guide strip in the special time period is integrated, you can calculate the use of the wind guide strip in the short time
Electricity.
As the case study on implementation of present embodiment one, electronic equipment has timing module, and the timing module is used for air-conditioning man
The duration timing of operation mode.If for example, the special time period includes many sub- special time periods, if at one or many
In the individual sub- special time period there is difference in the mode of operation of the inner blower, then respectively to every sub- special time period at it
The time timing worked under the mode of operation of the corresponding inner blower, goes back at the time of writing task pattern changes and (belongs to described
Change the moment).Then, the wind guide strip in every sub- special time period included to the special time period power (with
The power of the corresponding wind guide strip of the sub- special time period of difference may be different) it is integrated, you can calculate in the short time
The power consumption of the wind guide strip.
Fig. 3 shows a kind of Optimizing Flow of the computational methods of air conditioning electricity consumption provided in an embodiment of the present invention, in order to just
In description, the part related to the embodiment of the present invention illustrate only.
As the optional embodiment of the embodiment of the present invention one, referring to Fig. 3, the power consumption of the calculating special time period
The step for before, the computational methods of the air conditioning electricity consumption also include step C1.
Step C1, it is determined that the power of compressor corresponding with the temperature difference of every sub- special time period, the special time
Section includes continuous one or more sub- special time periods, and the sub- special time period is the phase in the special time period
Period between the change moment of the power of adjacent two changes compressor, the power parameter includes the compression
The power of machine.
In the present embodiment, in special time period, with temperature difference (indoor real time temperature and the temperature of preset temperature
Degree it is poor) change adjust compressor power;Specifically, because every sub- special time period be between two change moment when
Between section, therefore for certain sub- special time period, the power of the sub- special time period inner compressor is invariable, but for
Two neighboring sub- special time period, the power that compressor is separately operable in two neighboring sub- special time period is different.
Preferably, air-conditioning work is in refrigeration mode, in special time period, with temperature difference (indoor real time temperature with
The temperature difference of preset temperature) the power for tapering into and reducing compressor;But in every sub- special time period, compressor
Power is constant.
Preferably, air-conditioning work is in heating mode, in special time period, with temperature difference (preset temperature and interior
The temperature difference of real time temperature) the power for tapering into and reducing compressor;But in every sub- special time period, compressor
Power is constant.
As the case study on implementation of present embodiment one, multiple temperature differences intervals, each temperature difference interval distribution correspondence are preset
The power of one compressor is set;During air-conditioning works under the air conditioning operating mode, judge that the temperature difference belongs to
Some temperature difference is interval, and control compressor is worked with the power of the compressor matched with this temperature difference interval;Described
When the power of compressor operating changes, timing module will be recorded at the time of change and be used as the change moment.
For example, because the embodiment of the present invention is not specially limited to the power of compressor and the algorithm of temperature difference, therefore
For the power P described in present embodimentmotor, with its function representation with temperature difference Δ T, can be designated as:
Pmotor=U (Δ T);
The U (Δ T) is the power of compressor and the functional expression of temperature difference.With beautiful board model KFR-35GW/DY-X
(E2) exemplified by air-conditioning, the power P of temperature difference Δ T and compressormotorMapping table it is as shown in table 1.
ΔT | ΔT>5℃ | 4℃<ΔT<5℃ | 3℃<ΔT<4℃ | 2℃<ΔT<3℃ | 1℃<ΔT<2℃ | 0℃<ΔT<1℃ |
Pmotor | 987W | 814W | 662W | 426W | 315w | 213W |
Table 1
Fig. 4 shows a kind of Optimizing Flow of the computational methods of air conditioning electricity consumption provided in an embodiment of the present invention, in order to just
In description, the part related to the embodiment of the present invention illustrate only.
It is used as the optional embodiment of the embodiment of the present invention one, referring to Fig. 4, the determination and the temperature of every sub- special time period
The step for power of the corresponding compressor of degree difference, specifically include step C11 and step C12.
Step C11, it is determined that electric machine frequency corresponding with the temperature difference in the sub- special time period.
The working frequency (electric machine frequency) of motor is and this in air-conditioning for having determined that model, the compressor of the air-conditioning
Temperature difference is corresponding.
For example, the air-conditioning for having determined that model, electric machine frequency f and temperature difference Δ T (indoor real time temperatures
With the difference of preset temperature) there are ad hoc mapping relations, because the embodiment of the present invention does not do special limit to the ad hoc mapping relations
It is fixed, therefore for the electric machine frequency f described in present embodiment and temperature difference Δ T functional relation, be expressed as follows:
F=G (Δ T);
The G (Δ T) is electric machine frequency f and temperature difference Δ T functional expression.With beautiful board model KFR-35GW/DY-X
(E2) exemplified by air-conditioning, electric machine frequency f and temperature difference Δ T mapping table are as shown in table 2.
ΔT | ΔT>5℃ | 4℃<ΔT<5℃ | 3℃<ΔT<4℃ | 2℃<ΔT<3℃ | 1℃<ΔT<2℃ | 0℃<ΔT<1℃ |
f | F1 | F2 | F3 | F4 | F5 | F6 |
Table 2
Step C12, based on the electric machine frequency of the sub- special time period, calculates the pressure of the sub- special time period
The power of contracting machine.
Specifically, after compressor start, during its stable operation, it with electric machine frequency is to become that the power of compressor, which is,
Change;Therefore, it is determined that in the case of the electric machine frequency of the sub- special time period, the sub- special time period can be calculated
The compressor power.
For example, because of power P of the embodiment of the present invention to compressormotorSpecial limit is not done with electric machine frequency f algorithm
It is fixed, therefore for the power P of the compressor described in present embodimentmotorWith electric machine frequency f functional relation, it is expressed as follows:
Pmotor=V (f),
The V (f) is the power P of the compressormotorWith the functional expression of the electric machine frequency f.With beautiful board model
Exemplified by KFR-35GW/DY-X (E2) air-conditioning, the power P of the compressormotorWith the mapping table such as institute of table 3 of the electric machine frequency f
Show.
f | F1 | F2 | F3 | F4 | F5 | F6 |
Pmotor | 213W | 315w | 426W | 662W | 814W | 987W |
Table 3
As the embodiment of the embodiment of the present invention one, the power parameter also includes power, the work(of outer blower fan of electric-controlled plate
Rate.
In the present embodiment, for having determined that the air-conditioning of model, for the electric-controlled plate in the air-conditioning, after starting of air conditioner
During normal operation, the power P of the electric-controlled platepadIt is constant that can be approximately considered in special time period.
Similarly, for having determined that the air-conditioning of model, for the outer blower fan in the air-conditioning, normally run after starting of air conditioner
During, the power P of the outer blower fanout_fanIt is constant that can be approximately considered in special time period.
Therefore only need to be in power P of the special time period to the electric-controlled platepadIt is integrated, you can determine described automatically controlled
The power consumption that plate is consumed in the special time period;Calculate the power P of the electric-controlled platepadIntegral formula be:
The WpadBe the electric-controlled plate the special time period power consumption, the t1 be the special time period starting
Time point, the t2 is the end time point of the special time period.
Similarly, it is only necessary in power P of the special time period to the outer blower fanout_fanIt is integrated, you can determine institute
State the power consumption that outer blower fan is consumed in the special time period;Calculate the power P of the outer blower fanout_fanIntegral formula be:
The Wout_fanIt is power consumption of the outer blower fan in the special time period, the t1 is of the special time period
Begin time point, the t2 is the end time point of the special time period.
As an embodiment of step A16 in the embodiment of the present invention, the power consumption of air-conditioning is calculated by following integral algorithms
Obtain, the integral algorithm is:
Wherein, W P described in the power consumption in the special time period air-conditioningmotorFor the power of the compressor, institute
State PpadFor the power of the electric-controlled plate, the Pin_fanFor the power of the inner blower, the Pout_fanFor the outer blower fan
Power, the PheaterFor the auxiliary hot power of the electricity, the PlouverFor the power for the wind guide strip, the t1 is that this is specific
The start time point of period, the t2 is the end time point of the special time period.
As the embodiment of the embodiment of the present invention one, electronic equipment has display module;User passes through the electronic equipment control
After starting of air conditioner processed, the client of electronic equipment shows the data such as power parameter, the power consumption of air-conditioning by the display module;
Alternatively, the data such as power parameter, the power consumption of air-conditioning are included on client end interface in real time;In addition, if in the spy
Fix time in section, air conditioning operating mode changes, also need by the display module display pattern switching time point (operation of air conditioner
The time point that pattern changes);After operation of air conditioner terminates, client will operation of air conditioner ginseng corresponding with operation of air conditioner module
Storage of the data such as number, run time point (the especially time point of air conditioning operating mode switching), real time temperature in electronic equipment
Stored in medium;Preferably, by the data storage in the database of electronic equipment, client can be recalled from the database at any time
The data, statistical analysis data simultaneously show the data and analysis result in display module.
Fig. 5 shows the structure of electronic equipment provided in an embodiment of the present invention, for the ease of description, illustrate only and this hair
The related part of bright embodiment.
Electronic equipment provided in an embodiment of the present invention, referring to Fig. 5, the electronic equipment include power consumption computing module 51,
Communication module 52 and timing module 53;
The communication module 52 is used for:The power parameter matched with the model of the air-conditioning is obtained, by the power parameter
Send to the power consumption computing module 51;
The communication module 52 is additionally operable to:The air conditioning operating mode of user's setting is obtained, the air conditioning operating mode is sent out
Deliver to the power consumption computing module 51;
The communication module 52 is additionally operable to:Real time temperature is obtained, the real time temperature is sent to the power consumption and calculated
Module 51, the real time temperature is the indoor temperature that temperature detecting module is detected;
The timing module 53 is used for:In the operation of air conditioner, the change moment of the power of the air-conditioning is counted;
The timing module 53 is additionally operable to:The power consumption computations of user's triggering is received, determines that the power consumption is calculated
The special time period specified;
The power consumption computing module 51 is used for:The temperature difference of the real time temperature and preset temperature is calculated, based on described
Power parameter, the air conditioning operating mode, the change moment of the temperature difference and statistics calculate the special time period
Power consumption.
As the embodiment of the embodiment of the present invention one, the power consumption computing module 51 is additionally operable to:It is determined that in the air-conditioning
The power of the power of inner blower described in operational mode in special time period, electric auxiliary hot power and wind guide strip, to determine
Change the change moment of the air conditioning operating mode in the special time period;
Wherein, the power parameter includes the power of the power, the auxiliary hot power of the electricity and wind guide strip of the inner blower.
As the embodiment of the embodiment of the present invention one, the power consumption computing module 51 is additionally operable to:It is determined that special with every height
The power of the corresponding compressor of temperature difference for section of fixing time;
Wherein, the special time period includes continuous one or more sub- special time periods, when described sub specific
Between section be the time between the change moment of the two neighboring power for changing the compressor in the special time period
Section, the power parameter includes the power of the compressor.
As the embodiment of the embodiment of the present invention one, the power consumption computing module 51 specifically for:It is determined that with the son
The corresponding electric machine frequency of temperature difference in special time period, the electric machine frequency based on the sub- special time period calculates the son
The power of the compressor of special time period.
As the embodiment of the embodiment of the present invention one, the power parameter also includes power, the work(of outer blower fan of electric-controlled plate
Rate.
As the embodiment of the embodiment of the present invention one, the communication module 52 is used for:Obtained and the air-conditioning from server
Model matching power parameter, and/or obtain the power parameter that is matched with the model of the air-conditioning from the air-conditioning.
It will be appreciated by those skilled in the art that for the modules included by electronic equipment provided in an embodiment of the present invention only
Divided according to function logic, but be not limited to above-mentioned division, as long as corresponding function can be realized;Separately
Outside, the specific name of each functional module is also only to facilitate mutually distinguish, the protection domain being not intended to limit the invention.
Above content is to combine specific preferred embodiment further description made for the present invention, it is impossible to assert
The specific implementation of the present invention is confined to these explanations.For general technical staff of the technical field of the invention,
Some equivalent substitutes or obvious modification are made on the premise of not departing from present inventive concept, and performance or purposes are identical, all should
It is considered as belonging to the scope of patent protection that the present invention is determined by the claims submitted.
Claims (11)
1. a kind of computational methods of air conditioning electricity consumption, it is characterised in that the computational methods of the air conditioning electricity consumption include:
Obtain the power parameter matched with the model of the air-conditioning;
Obtain the air conditioning operating mode of user's setting;
Real time temperature is obtained, and calculates the temperature difference of the real time temperature and preset temperature, the real time temperature is temperature detection
The indoor temperature that module is detected;
In the operation of air conditioner, the change moment of the power of the air-conditioning is counted;
The power consumption computations of user's triggering is received, the special time period that the power consumption computations is specified is determined;
At the change moment based on the power parameter, the air conditioning operating mode, the temperature difference and statistics, calculate described
The power consumption of special time period;
It is not but the change of system monitoring power consumption parameter by the calculating to power consumption, the power consumption parameter includes environment shape
State parameter includes environment temperature with parameter, the ambient condition parameter is manually set, and the parameter that is manually set includes setting temperature
Degree, wind speed, wind-guiding bar state and electric auxiliary Warm status, the change of power consumption parameter described in system detectio, and detect current real-time work(
Rate, when the power consumption parameter changes, system statistics goes out the air conditioning electricity consumption of this period changed, and points out
To user;Further, current power consumption parameter can also be presented to user in real time by system.
2. the computational methods of air conditioning electricity consumption as claimed in claim 1, it is characterised in that the calculating special time period
Power consumption the step for before, the computational methods of the air conditioning electricity consumption also include:
It is determined that power, the electricity auxiliary hot power and wind-guiding of the inner blower described in the air conditioning operating mode in special time period
The power of bar, to determine the change moment for changing the air conditioning operating mode in the special time period;
Wherein, the power parameter includes the power of the power, the auxiliary hot power of the electricity and the wind guide strip of the inner blower.
3. the computational methods of air conditioning electricity consumption as claimed in claim 1, it is characterised in that the calculating special time period
Power consumption the step for before, the computational methods of the air conditioning electricity consumption also include:
It is determined that the power of compressor corresponding with the temperature difference of every sub- special time period, the special time period includes continuous
One or more sub- special time periods, the sub- special time period is the two neighboring change institute in the special time period
Period between the change moment for the power for stating compressor, the power parameter includes the power of the compressor.
4. the computational methods of air conditioning electricity consumption as claimed in claim 3, it is characterised in that when the determination and specific every height
Between section the corresponding compressor of temperature difference power the step for, specifically include:
It is determined that electric machine frequency corresponding with the temperature difference in the sub- special time period;
Based on the electric machine frequency of the sub- special time period, the power of the compressor of the sub- special time period is calculated.
5. the computational methods of the air conditioning electricity consumption as described in any one of Claims 1-4, it is characterised in that the power parameter
Also include power, the power of outer blower fan of electric-controlled plate.
6. a kind of electronic equipment, it is characterised in that the electronic equipment includes power consumption computing module, timing module and communication mould
Block;
The communication module is used for:The power parameter matched with the model of air-conditioning is obtained, the power parameter is sent to described
Power consumption computing module;
The communication module is additionally operable to:The air conditioning operating mode of user's setting is obtained, the air conditioning operating mode is sent to institute
State power consumption computing module;
The communication module is additionally operable to:Real time temperature is obtained, the real time temperature is sent to the power consumption computing module, institute
It is the indoor temperature that temperature detecting module is detected to state real time temperature;
The timing module is used for:In the operation of air conditioner, the change moment of the power of the air-conditioning is counted;
The timing module is additionally operable to:The power consumption computations of user's triggering is received, determines that the power consumption computations refers to
Fixed special time period;
The power consumption computing module is used for:The temperature difference of the real time temperature and preset temperature is calculated, based on power ginseng
The change moment of several, described air conditioning operating mode, the temperature difference and statistics calculates the power consumption of the special time period.
7. electronic equipment as claimed in claim 6, it is characterised in that
The power consumption computing module is additionally operable to:It is determined that the inner blower described in the air conditioning operating mode in special time period
Power, the power of the auxiliary hot power of electricity and wind guide strip, to determine to change in the special time period operation of air conditioner mould
The change moment of formula;
Wherein, the power parameter includes the power of the power, the auxiliary hot power of the electricity and wind guide strip of the inner blower.
8. electronic equipment as claimed in claim 6, it is characterised in that
The power consumption computing module is additionally operable to:It is determined that the work(of compressor corresponding with the temperature difference of every sub- special time period
Rate;
Wherein, the special time period includes continuous one or more sub- special time periods, the sub- special time period
For the period between the change moment of the two neighboring power for changing the compressor in the special time period, institute
Stating power parameter includes the power of the compressor.
9. electronic equipment as claimed in claim 8, it is characterised in that
The power consumption computing module specifically for:It is determined that motor frequency corresponding with the temperature difference in the sub- special time period
Rate, the electric machine frequency based on the sub- special time period calculates the power of the compressor of the sub- special time period.
10. electronic equipment as claimed in claim 6, it is characterised in that the power parameter also power including electric-controlled plate, outer
The power of blower fan.
11. electronic equipment as claimed in claim 6, it is characterised in that
The communication module is used for:The power parameter that is matched with the model of the air-conditioning is obtained from server, and/or from the sky
Adjust the power parameter for obtaining and being matched with the model of the air-conditioning.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510039702.5A CN104977461B (en) | 2015-01-26 | 2015-01-26 | The computational methods and electronic equipment of air conditioning electricity consumption |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510039702.5A CN104977461B (en) | 2015-01-26 | 2015-01-26 | The computational methods and electronic equipment of air conditioning electricity consumption |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104977461A CN104977461A (en) | 2015-10-14 |
CN104977461B true CN104977461B (en) | 2017-10-31 |
Family
ID=54274163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510039702.5A Active CN104977461B (en) | 2015-01-26 | 2015-01-26 | The computational methods and electronic equipment of air conditioning electricity consumption |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104977461B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105976269B (en) * | 2016-05-20 | 2020-10-09 | 广东芬尼克兹节能设备有限公司 | Centralized monitoring method and system for unit electric quantity |
CN105807107A (en) * | 2016-05-26 | 2016-07-27 | 山东建筑大学 | Electrical equipment power consumption estimating system and method based on internet of things |
CN105812212A (en) * | 2016-05-26 | 2016-07-27 | 山东建筑大学 | Office building electrical device management system and office building electrical device management method based on Internet of Things |
CN106482305A (en) * | 2016-09-22 | 2017-03-08 | 广西中投创新能源科技股份有限公司 | The control method of air-conditioner |
CN106440218B (en) * | 2016-09-30 | 2019-05-07 | 广东美的制冷设备有限公司 | Control method, controller, smart machine and air-conditioning is arranged in electricity |
CN106771429B (en) * | 2016-12-28 | 2019-07-26 | 湖南大学 | Power consumption mode learning method and device and intelligent ammeter |
CN107246705B (en) * | 2017-05-02 | 2019-11-05 | 青岛海尔空调器有限总公司 | A kind of air-conditioning power consumption estimation method and device |
CN109340997A (en) * | 2017-07-31 | 2019-02-15 | 广东美的制冷设备有限公司 | Air conditioner power consumption weight testing method, device and computer readable storage medium |
CN107622105A (en) * | 2017-09-12 | 2018-01-23 | 青岛海尔空调器有限总公司 | The acquisition methods and system of a kind of air conditioning electricity consumption |
CN107806691A (en) * | 2017-10-30 | 2018-03-16 | 中冶集团武汉勘察研究院有限公司 | A kind of tail end of central air conditioner barcode scanning manages intelligence system |
CN113074444A (en) * | 2021-02-24 | 2021-07-06 | 海信(山东)空调有限公司 | Air conditioning system and control method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101408566A (en) * | 2008-11-19 | 2009-04-15 | 深圳创维-Rgb电子有限公司 | Method and system for displaying electric power consumption and electronic apparatus |
CN101981386A (en) * | 2008-03-27 | 2011-02-23 | 东芝开利株式会社 | Air conditioner |
CN102486494A (en) * | 2010-12-01 | 2012-06-06 | 财团法人工业技术研究院 | Thermoelectric power consumption detection device and method |
JP2013200311A (en) * | 2013-04-30 | 2013-10-03 | Toshiba Corp | Electronic apparatus and information output method |
CN203310908U (en) * | 2013-05-24 | 2013-11-27 | 广东美的制冷设备有限公司 | Electric energy detection device for air conditioner |
CN103630739A (en) * | 2012-08-23 | 2014-03-12 | 美的集团股份有限公司 | Method and system for measuring power consumption of air conditioner |
CN104019524A (en) * | 2014-06-23 | 2014-09-03 | 珠海格力电器股份有限公司 | Regulating and controlling method and device for air conditioner |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010097391A (en) * | 2008-10-16 | 2010-04-30 | Ricoh Co Ltd | Information processing apparatus, information processing system, information processing method, information processing program, and recording medium |
-
2015
- 2015-01-26 CN CN201510039702.5A patent/CN104977461B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101981386A (en) * | 2008-03-27 | 2011-02-23 | 东芝开利株式会社 | Air conditioner |
CN101408566A (en) * | 2008-11-19 | 2009-04-15 | 深圳创维-Rgb电子有限公司 | Method and system for displaying electric power consumption and electronic apparatus |
CN102486494A (en) * | 2010-12-01 | 2012-06-06 | 财团法人工业技术研究院 | Thermoelectric power consumption detection device and method |
CN103630739A (en) * | 2012-08-23 | 2014-03-12 | 美的集团股份有限公司 | Method and system for measuring power consumption of air conditioner |
JP2013200311A (en) * | 2013-04-30 | 2013-10-03 | Toshiba Corp | Electronic apparatus and information output method |
CN203310908U (en) * | 2013-05-24 | 2013-11-27 | 广东美的制冷设备有限公司 | Electric energy detection device for air conditioner |
CN104019524A (en) * | 2014-06-23 | 2014-09-03 | 珠海格力电器股份有限公司 | Regulating and controlling method and device for air conditioner |
Also Published As
Publication number | Publication date |
---|---|
CN104977461A (en) | 2015-10-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104977461B (en) | The computational methods and electronic equipment of air conditioning electricity consumption | |
CN102560990B (en) | There is the dryer of environment temperature sensor | |
US20120197445A1 (en) | Air-conditioner operation controlling device and method | |
TWI489068B (en) | Air-conditioning system integrated with app of smart portable device | |
CN105183068B (en) | Household electrical appliance and household appliance controlling system | |
CN104501358A (en) | Air-conditioner control method and system | |
CN107604618A (en) | Airhandling equipment control method, equipment and readable storage medium storing program for executing | |
CN104990222A (en) | Air conditioner control method and device | |
CN107894065A (en) | Air conditioner and its control method, control device and computer-readable recording medium | |
CN107631409A (en) | Air conditioner and its control method, control device and computer-readable recording medium | |
US20180363939A1 (en) | Air quality sensor and data acquisition apparatus | |
CN107894077A (en) | Air conditioner and its control method, control device and computer-readable recording medium | |
CN109323419A (en) | The method and apparatus and air-conditioning system and equipment of peak of power consumption control air-conditioning | |
CN107883540A (en) | Air conditioner and its control method, control device and computer-readable recording medium | |
CN105509235A (en) | Air conditioning system and air conditioning control method based on air conditioning system | |
CN102506529B (en) | Control method of single-stage refrigerant system and optimizer | |
CN103454924B (en) | A kind of online self diagnosis control method of heat pump water-heating machine and control device thereof | |
CN105627519B (en) | The control method and control device of fresh air system | |
CN107700188A (en) | Airhandling equipment control method, equipment and readable storage medium storing program for executing | |
JP2017027433A (en) | Air conditioning apparatus selection assist system | |
CN208750945U (en) | Central Air Conditioning Billing System | |
CN105222476A (en) | A kind of anti-condensation heating system of turnover beam of refrigerator and control method thereof | |
CN104110773A (en) | Energy-saving control method and device for air conditioner | |
CN107270475B (en) | Autonomous dormancy control method and device for outdoor unit of air conditioner | |
US20190302156A1 (en) | Apparatus and cloud server monitoring energy consumption |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |