EP3524743A1 - Prefabricated bathroom - Google Patents
Prefabricated bathroom Download PDFInfo
- Publication number
- EP3524743A1 EP3524743A1 EP19156402.0A EP19156402A EP3524743A1 EP 3524743 A1 EP3524743 A1 EP 3524743A1 EP 19156402 A EP19156402 A EP 19156402A EP 3524743 A1 EP3524743 A1 EP 3524743A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- bathroom
- floor
- bottom frame
- prefabricated
- walls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910052602 gypsum Inorganic materials 0.000 claims abstract description 51
- 239000010440 gypsum Substances 0.000 claims abstract description 51
- 238000004519 manufacturing process Methods 0.000 claims abstract description 14
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000009434 installation Methods 0.000 claims description 31
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 20
- 238000004026 adhesive bonding Methods 0.000 claims description 11
- 239000000835 fiber Substances 0.000 claims description 10
- 239000003292 glue Substances 0.000 claims description 7
- 238000010422 painting Methods 0.000 claims description 7
- 238000005520 cutting process Methods 0.000 claims description 5
- 239000002131 composite material Substances 0.000 claims description 4
- 239000004744 fabric Substances 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 description 22
- 239000010959 steel Substances 0.000 description 22
- 238000010276 construction Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 229910001335 Galvanized steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 239000008397 galvanized steel Substances 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000003670 easy-to-clean Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000012447 hatching Effects 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 125000000391 vinyl group Chemical group [H]C([*])=C([H])[H] 0.000 description 1
- 229920002554 vinyl polymer Polymers 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34869—Elements for special technical purposes, e.g. with a sanitary equipment
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
Definitions
- the present invention relates to a prefabricated bathroom which has been manufactured by means of box-shaped wall elements, and a method for the manufacture of such a bathroom.
- the prefabricated bathroom according to the invention is suitable for being manufactured at a production site, whereafter the bathroom in almost a completely assembled state can be transported to a building into which the bathroom easily can be arranged. Subsequently, at the site of the building, only sanitary installations and electricity need be coupled to the bathroom.
- the present invention relates to a prefabricated bathroom wherein the walls and the ceiling has been manufactured by means of box-shaped elements, which are closed on the side facing the bathroom and which are open on the side facing away from the bathroom, wherein the elements on the side facing the bathroom are being covered with gypsum boards.
- gypsum boards By applying gypsum boards to the inner surfaces of the bathroom is achieved that these surfaces may be applied with paint. Accordingly, expenses to mounting of tiles can be saved and the weight of the cabin may at the same time be reduced.
- box-shaped elements ensures that all or at least a major part of the installations, inter alia in the form of wires and pipes, may be hidden in walls and ceiling.
- the prefabricated bathroom is being provided with a floor, such as a concrete floor.
- the floor of the prefabricated bathroom is being covered with a covering, such as tiles or clinker tiles or a covering in the form of a polymer or a composite material, such as vinyl.
- the prefabricated bathroom comprises a primary bottom frame, wherein the primary bottom frame is configured for supporting the box-shaped elements and optionally also the floor.
- the floor may suitable be manufactured by arranging, within the primary bottom frame, an armament, of e.g. steel, whereafter the inner of the primary bottom frame including this armament, is filled with concrete. After the curing of the concrete a sturdy floor is obtained.
- an armament of e.g. steel
- the prefabricated bathroom comprises one or more lifting brackets, such as 2 or more lifting brackets, for example 3 or more lifting brackets, for example 4 or more lifting brackets, such as 5 or more lifting brackets, such as 6 or more lifting brackets.
- the prefabricated bathroom is provided with sanitary installations in the form of one or more of the following types: sink, shower, bathtub, toilet, drain.
- the prefabricated bathroom further comprises, in respect of one or more specific types of sanitary installations, a water supply conduit and/or a water drain conduit to/from that specific type of sanitary installation, wherein that water supply conduit and/or water drain conduit extend(s) between that specific type of sanitary installation and that side of one of the box-shaped elements facing away from the interior of the bathroom.
- the gypsum boards comprise fiber gypsum, such as fiber gypsum comprising a compressed composite of gypsum and paper fibers.
- the gypsum boards of fiber gypsum comprises a compressed composite of gypsum and paper fibers, wherein the content of paper fibers is 0.5 - 50 % or more, such as 1 - 45 %, for example 2 - 40 %, such as 5 - 35 % for example 10 - 30 %, such as 12 - 25 % or 15 - 20 %.
- the bathroom additionally comprises a secondary bottom frame, wherein said secondary bottom frame extends from one of the box-shaped elements, at a lower part thereof and from the side thereof facing away from the interior of the bathroom, said secondary bottom frame thereby defines a shaft area.
- the secondary bottom frame extends from the primary bottom frame of the prefabricated bathroom at the level thereof.
- the secondary bottom frame may comprise one or more lifting brackets.
- primary bottom frame may be construed to mean a bottom frame which essentially is being arranged under the interior of the prefabricated bathroom.
- secondary bottom frame may be construed to mean a bottom frame which in a horizontal plane is arranged in a displaced position in relation to the interior of the prefabricated bathroom.
- the prefabricated bathroom solely comprises a bottom frame having an extension corresponding to the interior of the bathroom this bottom frame may merely be denoted "bottom frame” without the prefix "primary”.
- the secondary bottom frame may have an essentially rectangular shape with an outer width and an outer length, wherein the outer width and the outer length, respectively, independently are having dimensions selected from the range of 40 - 400 cm, such as 50 - 375 cm, for example 75 - 350 cm, such as 100 - 325 cm, for example 125 - 300 cm, such as 150 - 275 cm, such as 175 - 250 cm or 200 - 225 cm.
- a shaft area may serve the purpose of making room for the installations for water and sanitary installations which are necessary in order to couple the bathroom to water and sanitary facility installations of a building.
- the secondary bottom frame of the prefabricated bathroom is being integrated with the primary bottom frame; or the secondary bottom frame is mounted on the primary bottom frame; or the primary bottom frame is mounted on the secondary bottom frame.
- the secondary bottom frame of the prefabricated bathroom additionally comprises one or more walls, such as 1, 2 or 3 walls, wherein each of these one or more walls comprises a box-shaped element and wherein each wall is a wall, which is not adjoining the interior of the bathroom.
- one or more of the walls of the secondary bottom frame, on the side facing away from the shaft area may be provided with gypsum boards.
- the wall or the walls, which is/are being arranged on the secondary bottom frame may make up a wall or walls in the building into which the bathroom is to be installed, in such a way that this wall thereby adjoins another room in the relevant building.
- the shaft area of the prefabricated bathroom is not being provided with floor or ceiling.
- the shaft area of the bathroom is being provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering the whole horizontal area corresponding to the shaft area.
- the shaft area of the bathroom may also be provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering only a part of the horizontal area corresponding to the shaft area.
- one or more supply conduits and/or drain conduits for water to/from one or more types of sanitary installations is/are being terminated with a termination on that side of that wall of the bathroom facing the shaft area.
- the elements are made up of steel cassettes.
- the steel cassettes are being made from galvanized steel plates, preferably hot-dip galvanized steel plates.
- the material thickness of the steel cassettes is between 0.6 mm and 3 mm, preferably between 1 mm and 2 mm.
- Such steel cassettes are beneficial due to a very suitable combination of low weight and high strength, especially after mounting of the gypsum boards.
- the height of the steel cassettes is between 1.8 m and 2.5 meter, preferably between 2.1 m and 2.3 m.
- the width of the steel cassettes is between 0.1 m and 0.8 m, preferably between 0.16 m and 0.6 m.
- the thickness of the steel cassettes is between 3 cm and 7 cm, preferably between 5.5 cm and 6 cm.
- the steel cassettes may beneficially be assembled by the so-called clinching technique in which a point on the plates are squeezed out at a pressure of 30 kilonewton (kN) or more and thereby creates a permanent joint.
- the gypsum boards are being fully glued to the elements.
- fully gluing may be interpreted in the way where a gypsum board on the entirety of one of its surfaces is applied with glue, whereafter the elements via this applied glue are glued to the gypsum boards.
- the thickness of the gypsum boards is between 10 mm and 20 mm.
- the gypsum boards have been cut in such a way that a single gypsum board will cover the whole of an internal surface in the bathroom, such as a whole side wall or a ceiling.
- the invention relates to a method for the manufacture of a bathroom as described above, wherein said method comprises the steps of:
- the painting of the inner walls are performed without prior filling/fairing, however, optionally with prior mounting of felt cloth on the wall(s).
- the manufactured bathroom comprises a secondary bottom frame
- the method furthermore comprises, regarding this secondary bottom frame, the following steps:
- the invention additionally relates to the use of a prefabricated bathroom according to the present invention as a construction element in the construction of a building.
- Fig. 1 show a view into a prefabricated bathroom 1 according to an embodiment of the invention.
- the bathroom 1 has been assembled by arranging the four walls 4,5 on the previously manufactured tile covered floor 2 having a floor drain 10, whereafter the ceiling 3 has been mounted.
- the manufacture of the bathroom has been finished by painting and mounting of wall tiles 12 and sanitary installations in the form of for example toilet 7, sink 8 and shower 9. As seen, it is only the shower compartment which has tiles mounted on the wall 4. In the rest of the bathroom the walls 5 have been painted, which is considerably faster end less demanding in terms of material consumption, compared to mounting of tiles.
- Fig. 2 shows the same bathroom 1 as viewed from the outside.
- the box-shaped steel cassettes 6, from which the wall 4,5 of the bathroom 1 are made up are clearly seen.
- the floor 2 is surrounded by a bottom frame in the form of a primary bottom frame 16 having a door opening 14 and lifting brackets 15, and that transportation legs 18, onto which the bottom frame 16 of the bathroom 1 is supported, have been arranged under each corner of the bathroom 1.
- Fig. 3 is a schematic drawing of the bathroom 1 as view from above and without ceiling 3.
- the steel cassettes 6 on the inner side are covered with gypsum boards 11 on top of which, tiles 12 have been mounted at certain places.
- the toilet 7 has been partly hidden in the void in that steel cassette into which it is installed.
- Fig. 4a is a schematic drawing of a finished floor 2 to the bathroom 1 as viewed form above.
- the floor 2 is covered with tiles 12 and the hatching of the floor 2 in the shower compartment denotes that the floor in this area may be sunk in relation to the remainder of the floor 2.
- Fig. 4c illustrating a cross-section of the floor 2 and the underlying concrete support 19.
- Fig. 4b and 4c illustrate the bottom frame 16 around the floor 2 as viewed from two different sides.
- Fig. 5 og 6 show how installations such as for example a shower connection 17 and the flush tank of the toilet 7 and supply conduits and drain conduits can be fully or partly hidden to a user in the voids in the steel cassettes 6 of the bathroom 1.
- the open side of the steel cassettes will be closed off, using gypsum boards 11 or otherwise, so that these installations will be fully hidden.
- Fig. 7 which illustrates a joint between the floor 2 and a painted wall 5 in a bathroom 1 according to an embodiment of the invention, it is seen how the steel cassettes 6 with the glued-on gypsum board 11 is arranged on top of the bottom frame 16. Moreover, it is illustrated how the transition between the bottom frame 16 and the gypsum board 11 in areas of the bathroom 1, in respect of which the wall is not covered with tiles 4, but has been painted 5, may be covered with a low tile cover along the floor.
- Fig. 8 illustrates a joint between two tile covered walls 4 in a bathroom 1 according to an embodiment of the invention.
- the tile cover 12 has been mounted on top of the gypsum board 11, which in turn has been mounted on the steel cassettes 6.
- Fig. 9 illustrates in a perspective view an embodiment of a prefabricated bathroom according to the invention comprising a primary bottom frame along with a secondary bottom frame which defines a shaft area, wherein the bathroom is viewed from the outside.
- Fig. 9 It is seen in Fig. 9 that the inner of the bathroom 1 is surrounded by ceiling 3 and walls 5,6.
- the walls 5,6 are supported by a primary bottom frame 16, which also supports a floor (not seen in Fig. 9 ).
- a secondary bottom frame 19 extends from the primary bottom frame 16. This secondary bottom frame defines a shaft area 20.
- FIG. 9 accordingly represents a bathroom which has been almost optimally prefabricated in the sense that this bathroom is ready for being transported to a construction site, where it by means of the lifting brackets 15 in the bottom frames 16 and 19 may be lifted into the interior of a building, into which the bathroom is to be functional.
- the bathroom 1 can be easily connected to the supply pipes and drain pipes being present in the building
- the shaft area 20 accordingly may function as an installation room for the bathroom. Moreover, it can be assured that the respective shaft areas 20 in respect of different bathrooms 1 being arranged on top of each other in different floors in a building will define a shaft in the building in such a way that even when the construction of the building has been finished, it is possible to access the water installations, that is the water supply conduits 22 and the water drain conduits 22 belonging to the bathroom of each floor.
- the shaft area 20 of each bathroom may either be provided without floor and ceiling; or the shaft area 20 of each bathroom may be provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering the whole horizontal area corresponding to the shaft area; or the shaft area 20 of each bathroom may be provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of this shaft area is covering only a part of the horizontal area corresponding to the shaft area 20.
- a wall 24 comprising a box-shaped element is arranged on the secondary bottom frame 19.
- This wall 24 is, on that side facing away from the shaft area 20, covered with one or more gypsum boards 11 and hence may function as a wall in the finished building so that this wall will be facing another room in the building.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Epidemiology (AREA)
- Public Health (AREA)
- Residential Or Office Buildings (AREA)
- Bathtubs, Showers, And Their Attachments (AREA)
Abstract
Description
- The present invention relates to a prefabricated bathroom which has been manufactured by means of box-shaped wall elements, and a method for the manufacture of such a bathroom.
- In the field of manufacture of prefabricated bathrooms/bath cabins it has been a customary manufacturing method to build walls made of steel cassettes which afterwards are being provided with gypsum boards on the outside and tiles on the inside. The gypsum boards on the outside serves the purpose of stiffening the construction as well as of insulating the bathroom. A bathroom which has been designed in this way is however relatively heavy and the mounting of the inner tile covering is very labor heavy and accordingly expensive to carry out.
- It is an objective of the present invention to provide a bathroom and a method for the manufacture of such a bathroom which overcomes the above-mentioned disadvantages of the prior art within this technical field.
- The prefabricated bathroom according to the invention is suitable for being manufactured at a production site, whereafter the bathroom in almost a completely assembled state can be transported to a building into which the bathroom easily can be arranged. Subsequently, at the site of the building, only sanitary installations and electricity need be coupled to the bathroom.
- The present invention relates to a prefabricated bathroom wherein the walls and the ceiling has been manufactured by means of box-shaped elements, which are closed on the side facing the bathroom and which are open on the side facing away from the bathroom, wherein the elements on the side facing the bathroom are being covered with gypsum boards.
- By applying gypsum boards to the inner surfaces of the bathroom is achieved that these surfaces may be applied with paint. Accordingly, expenses to mounting of tiles can be saved and the weight of the cabin may at the same time be reduced. Using box-shaped elements ensures that all or at least a major part of the installations, inter alia in the form of wires and pipes, may be hidden in walls and ceiling.
- In an embodiment of the invention, the prefabricated bathroom is being provided with a floor, such as a concrete floor.
- In an embodiment of the invention, the floor of the prefabricated bathroom is being covered with a covering, such as tiles or clinker tiles or a covering in the form of a polymer or a composite material, such as vinyl.
- Hereby is achieved a surface of the floor which has an aesthetic appearance, and which moreover is durable and easy to clean.
- In an embodiment of the invention, the prefabricated bathroom comprises a primary bottom frame, wherein the primary bottom frame is configured for supporting the box-shaped elements and optionally also the floor.
- The floor may suitable be manufactured by arranging, within the primary bottom frame, an armament, of e.g. steel, whereafter the inner of the primary bottom frame including this armament, is filled with concrete. After the curing of the concrete a sturdy floor is obtained.
- In an embodiment of the invention, the prefabricated bathroom comprises one or more lifting brackets, such as 2 or more lifting brackets, for example 3 or more lifting brackets, for example 4 or more lifting brackets, such as 5 or more lifting brackets, such as 6 or more lifting brackets.
- Hereby easy transport from the manufacturing site of the bathroom to the site of installation in a building is assured.
- In an embodiment of the invention, the prefabricated bathroom is provided with sanitary installations in the form of one or more of the following types: sink, shower, bathtub, toilet, drain.
- In an embodiment of the invention, the prefabricated bathroom further comprises, in respect of one or more specific types of sanitary installations, a water supply conduit and/or a water drain conduit to/from that specific type of sanitary installation, wherein that water supply conduit and/or water drain conduit extend(s) between that specific type of sanitary installation and that side of one of the box-shaped elements facing away from the interior of the bathroom.
- In these two embodiments it is assured that the prefabricated bathroom will be prefabricated to an optimum degree, which implies that a minimum of installation is required, once the bathroom has been arranged in the desired building.
- In an embodiment of the prefabricated bathroom the gypsum boards comprise fiber gypsum, such as fiber gypsum comprising a compressed composite of gypsum and paper fibers.
- In an embodiment of the prefabricated bathroom according to the invention, the gypsum boards of fiber gypsum comprises a compressed composite of gypsum and paper fibers, wherein the content of paper fibers is 0.5 - 50 % or more, such as 1 - 45 %, for example 2 - 40 %, such as 5 - 35 % for example 10 - 30 %, such as 12 - 25 % or 15 - 20 %.
- These materials have proven beneficial in that these materials can be used as an inner wall of the bathroom without the necessity for doing any filling/fairing prior to painting of these gypsum boards. As the gypsum boards only require painting, optionally including a prior application of felt cloth, a fast and cost-efficient production of a prefabricated bathroom is assured.
- In an embodiment of the invention the bathroom additionally comprises a secondary bottom frame, wherein said secondary bottom frame extends from one of the box-shaped elements, at a lower part thereof and from the side thereof facing away from the interior of the bathroom, said secondary bottom frame thereby defines a shaft area.
- In this embodiment the secondary bottom frame extends from the primary bottom frame of the prefabricated bathroom at the level thereof.
- As with the primary bottom frame, also the secondary bottom frame may comprise one or more lifting brackets.
- Within the scope of the present invention the term "primary bottom frame" may be construed to mean a bottom frame which essentially is being arranged under the interior of the prefabricated bathroom. Within the scope of the present invention the term "secondary bottom frame" may be construed to mean a bottom frame which in a horizontal plane is arranged in a displaced position in relation to the interior of the prefabricated bathroom.
- In the event that the prefabricated bathroom solely comprises a bottom frame having an extension corresponding to the interior of the bathroom this bottom frame may merely be denoted "bottom frame" without the prefix "primary".
- In an embodiment the secondary bottom frame may have an essentially rectangular shape with an outer width and an outer length, wherein the outer width and the outer length, respectively, independently are having dimensions selected from the range of 40 - 400 cm, such as 50 - 375 cm, for example 75 - 350 cm, such as 100 - 325 cm, for example 125 - 300 cm, such as 150 - 275 cm, such as 175 - 250 cm or 200 - 225 cm.
- Providing the prefabricated bathroom with a secondary bottom frame means that one may define a shaft area immediately on the other side of one of the walls delimiting the interior of the bathroom from its surroundings. Such a shaft area may serve the purpose of making room for the installations for water and sanitary installations which are necessary in order to couple the bathroom to water and sanitary facility installations of a building.
- In an embodiment of the invention the secondary bottom frame of the prefabricated bathroom is being integrated with the primary bottom frame; or the secondary bottom frame is mounted on the primary bottom frame; or the primary bottom frame is mounted on the secondary bottom frame.
- These embodiments represent alternatives of designs of the bottom frame when this comprises a primary bottom frame as well as a secondary bottom frame.
- In an embodiment of the invention the secondary bottom frame of the prefabricated bathroom additionally comprises one or more walls, such as 1, 2 or 3 walls, wherein each of these one or more walls comprises a box-shaped element and wherein each wall is a wall, which is not adjoining the interior of the bathroom.
- In such an embodiment one or more of the walls of the secondary bottom frame, on the side facing away from the shaft area, may be provided with gypsum boards.
- In these two embodiments the wall or the walls, which is/are being arranged on the secondary bottom frame may make up a wall or walls in the building into which the bathroom is to be installed, in such a way that this wall thereby adjoins another room in the relevant building.
- In an embodiment of the invention the shaft area of the prefabricated bathroom is not being provided with floor or ceiling. Alternatively, the shaft area of the bathroom is being provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering the whole horizontal area corresponding to the shaft area. The shaft area of the bathroom may also be provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering only a part of the horizontal area corresponding to the shaft area.
- In an embodiment of the prefabricated bathroom of the invention one or more supply conduits and/or drain conduits for water to/from one or more types of sanitary installations is/are being terminated with a termination on that side of that wall of the bathroom facing the shaft area.
- Hereby is assured an easy and fast coupling of the bathroom to the existing water installations in a building, in a situation where the bathroom has been installed in a building.
- In an embodiment of the invention the elements are made up of steel cassettes.
- In an embodiment of the invention the steel cassettes are being made from galvanized steel plates, preferably hot-dip galvanized steel plates.
- In an embodiment of the invention the material thickness of the steel cassettes is between 0.6 mm and 3 mm, preferably between 1 mm and 2 mm.
- Such steel cassettes are beneficial due to a very suitable combination of low weight and high strength, especially after mounting of the gypsum boards.
- In an embodiment of the invention the height of the steel cassettes is between 1.8 m and 2.5 meter, preferably between 2.1 m and 2.3 m.
- In an embodiment of the invention the width of the steel cassettes is between 0.1 m and 0.8 m, preferably between 0.16 m and 0.6 m.
- In an embodiment of the invention the thickness of the steel cassettes is between 3 cm and 7 cm, preferably between 5.5 cm and 6 cm.
- Use of steel cassettes having these dimensions is suitable for constructing bathrooms having a suitable floor area and height position of the ceiling. The steel cassettes may beneficially be assembled by the so-called clinching technique in which a point on the plates are squeezed out at a pressure of 30 kilonewton (kN) or more and thereby creates a permanent joint.
- In an embodiment of the invention the gypsum boards are being fully glued to the elements.
- Within the scope of the present invention the term fully gluing may be interpreted in the way where a gypsum board on the entirety of one of its surfaces is applied with glue, whereafter the elements via this applied glue are glued to the gypsum boards.
- In an embodiment of the invention the thickness of the gypsum boards is between 10 mm and 20 mm.
- In an embodiment of the invention the gypsum boards have been cut in such a way that a single gypsum board will cover the whole of an internal surface in the bathroom, such as a whole side wall or a ceiling.
- The use of fully glued gypsum boards, each covering the whole of an internal surface in the bathroom means that it is possible to apply paint directly onto the gypsum board without any prior filling/fairing.
- In one aspect the invention relates to a method for the manufacture of a bathroom as described above, wherein said method comprises the steps of:
- manufacture of a tile covered floor
- cutting a gypsum board in such a way that it exactly fits so as to cover the whole of an internal surface of a wall in the desired bathroom
- fully gluing the gypsum board, for example by letting it pass a gluing machine
- arranging box-shaped elements with their closed side into the still wet glue
- mounting the wall manufactured in this way onto the finished floor
- repeating the previous four steps until all four walls have been mounted on the floor
- cutting a gypsum board in such a way that it exactly fits so as to cover the internal ceiling of the desired bathroom
- fully gluing the gypsum board, for example by letting it pass through a gluing machine
- arranging box-shaped elements with their closed side into the still wet glue
- mounting the ceiling manufactured in this way onto the previously manufactured walls
- mounting of tiles on selected parts of the internal walls in the bathroom, for example in a shower compartment
- painting of the rest of the parts of the walls and installing sanitary installations.
- In this way it is possible easily and fast to manufacture a prefabricated bathroom having lower weight and implying lower costs, compared to other prior art bathrooms.
- In an embodiment the painting of the inner walls are performed without prior filling/fairing, however, optionally with prior mounting of felt cloth on the wall(s).
- In an embodiment of the method the manufactured bathroom comprises a secondary bottom frame, and the method furthermore comprises, regarding this secondary bottom frame, the following steps:
- cutting a gypsum board in such a way that it exactly fits so as to cover the whole of a wall in the desired bathroom
- fully gluing the gypsum board, for example by letting it pass through a gluing machine
- arranging box-shaped elements with their closed side into the still wet glue
- mounting the wall manufactured in this way onto the secondary bottom frame
- repeating the previous four steps until the desired number of walls have been mounted on the secondary bottom frame.
- In one aspect the invention additionally relates to the use of a prefabricated bathroom according to the present invention as a construction element in the construction of a building.
- In the following an embodiment of the invention is described in more detail with reference to the drawings, wherein
- Fig. 1
- shows a view into a bathroom according to an embodiment of the invention,
- Fig 2
- shows the same bathroom as seen from the outside,
- Fig. 3
- is a schematic drawing of the bathroom without ceiling as seen from above
- Fig. 4a
- is a schematic drawing of a completed floor to the bathroom, as seen from above,
- Fig. 4b
- is a schematic drawing of the completed floor, as seen from a first side,
- Fig. 4c
- is a schematic drawing of a cross-section of the completed floor,
- Fig. 4d
- is a schematic drawing of the completed floor, as seen from another side,
- Fig. 5
- shows a hidden installation in a steel cassette of a bathroom according to an embodiment of the invention,
- Fig. 6
- shows another, partly hidden installation in a steel cassette of the bathroom,
- Fig. 7
- is a schematic drawing of a joint between floor and wall in a bathroom according to an embodiment of the invention,
- Fig. 8
- is a schematic drawing of a joint between two walls of a bathroom according to an embodiment of the invention, and
- Fig. 9
- shows in a perspective view an embodiment of a bathroom according to the invention, comprising a primary bottom frame and a secondary bottom frame which defines a shaft area.
-
Fig. 1 show a view into aprefabricated bathroom 1 according to an embodiment of the invention. Thebathroom 1 has been assembled by arranging the fourwalls floor 2 having afloor drain 10, whereafter theceiling 3 has been mounted. - Subsequently, the manufacture of the bathroom has been finished by painting and mounting of
wall tiles 12 and sanitary installations in the form of forexample toilet 7,sink 8 andshower 9. As seen, it is only the shower compartment which has tiles mounted on thewall 4. In the rest of the bathroom thewalls 5 have been painted, which is considerably faster end less demanding in terms of material consumption, compared to mounting of tiles. - As it appears from the right side of the door opening, through which the bathroom is viewed, the walls have been made up of
steel cassettes 6. -
Fig. 2 shows thesame bathroom 1 as viewed from the outside. Here the box-shapedsteel cassettes 6, from which thewall bathroom 1 are made up, are clearly seen. Furthermore, it is seen how thefloor 2 is surrounded by a bottom frame in the form of aprimary bottom frame 16 having adoor opening 14 and liftingbrackets 15, and thattransportation legs 18, onto which thebottom frame 16 of thebathroom 1 is supported, have been arranged under each corner of thebathroom 1. -
Fig. 3 is a schematic drawing of thebathroom 1 as view from above and withoutceiling 3. Here, it is seen how thesteel cassettes 6 on the inner side are covered withgypsum boards 11 on top of which,tiles 12 have been mounted at certain places. Moreover, it is seen how thetoilet 7 has been partly hidden in the void in that steel cassette into which it is installed. -
Fig. 4a is a schematic drawing of afinished floor 2 to thebathroom 1 as viewed form above. Thefloor 2 is covered withtiles 12 and the hatching of thefloor 2 in the shower compartment denotes that the floor in this area may be sunk in relation to the remainder of thefloor 2. This is also shown inFig. 4c illustrating a cross-section of thefloor 2 and the underlyingconcrete support 19.Fig. 4b and 4c illustrate thebottom frame 16 around thefloor 2 as viewed from two different sides. -
Fig. 5 og 6 show how installations such as for example ashower connection 17 and the flush tank of thetoilet 7 and supply conduits and drain conduits can be fully or partly hidden to a user in the voids in thesteel cassettes 6 of thebathroom 1. When the bathroom has been installed in a building, the open side of the steel cassettes will be closed off, usinggypsum boards 11 or otherwise, so that these installations will be fully hidden. - In
Fig. 7 , which illustrates a joint between thefloor 2 and a paintedwall 5 in abathroom 1 according to an embodiment of the invention, it is seen how thesteel cassettes 6 with the glued-ongypsum board 11 is arranged on top of thebottom frame 16. Moreover, it is illustrated how the transition between thebottom frame 16 and thegypsum board 11 in areas of thebathroom 1, in respect of which the wall is not covered withtiles 4, but has been painted 5, may be covered with a low tile cover along the floor. -
Fig. 8 illustrates a joint between two tile coveredwalls 4 in abathroom 1 according to an embodiment of the invention. Here it is clearly seen how thetile cover 12 has been mounted on top of thegypsum board 11, which in turn has been mounted on thesteel cassettes 6. -
Fig. 9 illustrates in a perspective view an embodiment of a prefabricated bathroom according to the invention comprising a primary bottom frame along with a secondary bottom frame which defines a shaft area, wherein the bathroom is viewed from the outside. - It is seen in
Fig. 9 that the inner of thebathroom 1 is surrounded byceiling 3 andwalls walls primary bottom frame 16, which also supports a floor (not seen inFig. 9 ). - At the
nearest wall secondary bottom frame 19 extends from theprimary bottom frame 16. This secondary bottom frame defines ashaft area 20. - It is seen that
supply conduits 22 anddrain conduits 22 for water to and from various types of sanitary installations 21, being present in the interior of the bathroom, have been led to that side of thewall shaft area 20 and that thesesupply conduits 22 anddrain conduits 22 are terminated by atermination 23. - The embodiment illustrated in
Fig. 9 accordingly represents a bathroom which has been almost optimally prefabricated in the sense that this bathroom is ready for being transported to a construction site, where it by means of the liftingbrackets 15 in the bottom frames 16 and 19 may be lifted into the interior of a building, into which the bathroom is to be functional. As all installations in the form ofsupply conduits 22 anddrain conduits 22 for water have been led from the interior of the bathroom to that side of thenearest wall shaft area 20, thebathroom 1 can be easily connected to the supply pipes and drain pipes being present in the building - The
shaft area 20 accordingly may function as an installation room for the bathroom. Moreover, it can be assured that therespective shaft areas 20 in respect ofdifferent bathrooms 1 being arranged on top of each other in different floors in a building will define a shaft in the building in such a way that even when the construction of the building has been finished, it is possible to access the water installations, that is thewater supply conduits 22 and thewater drain conduits 22 belonging to the bathroom of each floor. - The
shaft area 20 of each bathroom may either be provided without floor and ceiling; or theshaft area 20 of each bathroom may be provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering the whole horizontal area corresponding to the shaft area; or theshaft area 20 of each bathroom may be provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of this shaft area is covering only a part of the horizontal area corresponding to theshaft area 20. - Finally, it is seen in
Fig. 9 that awall 24 comprising a box-shaped element is arranged on thesecondary bottom frame 19. Thiswall 24 is, on that side facing away from theshaft area 20, covered with one ormore gypsum boards 11 and hence may function as a wall in the finished building so that this wall will be facing another room in the building. -
- 1. Bathroom
- 2. Floor
- 3. Ceiling
- 4. Wall covered with tiles
- 5. Painted wall
- 6. Steel cassette
- 7. Toilet
- 8. Sink
- 9. Shower
- 10. Floor drain
- 11. Gypsum board
- 12. Covering of tiles
- 13. Sunk tiled floor
- 14. Door opening
- 15. Lifting bracket
- 16. Bottom frame
- 17. Connection for shower
- 18. Transportation leg
- 19. Secondary bottom frame
- 20. Shaft area
- 21. Sanitary installation
- 22. Supply conduit/drain conduit for water
- 23. Termination of supply conduit/ drain conduit for water
- 24. Wall
Claims (16)
- Prefabricated bathroom (1) wherein the walls (4,5) and the ceiling (3) has been manufactured by means of box-shaped elements (6), which are closed on the side facing the bathroom and which are open on the side facing away from the bathroom, wherein the elements on the side facing the bathroom are being covered with gypsum boards (1).
- Prefabricated bathroom according to claim 1, wherein the prefabricated bathroom is being provided with a floor (2), such as a concrete floor.
- Prefabricated bathroom according to claim 1 or 2, wherein the prefabricated bathroom comprises a primary bottom frame (16), wherein the primary bottom frame is configured for supporting the box-shaped elements (6) and optionally also the floor (2).
- Prefabricated bathroom according to claim 3, wherein the primary bottom frame (16) comprises one or more lifting brackets (15), such as 2 or more lifting brackets, for example 3 or more lifting brackets, for example 4 or more lifting brackets, such as 5 or more lifting brackets, such as 6 or more lifting brackets.
- Prefabricated bathroom according to any of the preceding claims, wherein the prefabricated bathroom is provided with sanitary installations (21) in the form of one or more of the following types: sink (8), shower (9), bathtub, toilet (7), drain (10).
- Prefabricated bathroom according to claim 5 further comprising, in respect of one or more specific types of sanitary installations (21), a water supply conduit (22) and/or a water drain conduit (22) to/from that specific type of sanitary installation, wherein that water supply conduit and/or water drain conduit extend(s) between that specific type of sanitary installation (21) and that side of one of the box-shaped elements (6) facing away from the interior of the bathroom.
- Prefabricated bathroom according to any of the preceding claims, wherein the gypsum boards (11) comprises fiber gypsum, such as fiber gypsum comprising a compressed composite of gypsum and paper fibers;
wherein the content of paper fibers optionally is 0.5 - 50 % or more, such as 1 - 45 %, for example 2 - 40 %, such as 5 - 35 % for example 10 - 30 %, such as 12 - 25 % or 15 - 20 %; and/or
wherein the thickness of the gypsum boards is between 10 mm and 20 mm. - Prefabricated bathroom according to any of the preceding claims, wherein the bathroom additionally comprises a secondary bottom frame (19), wherein said secondary bottom frame extends from one of the box-shaped elements (6), at a lower part thereof and from the side thereof facing away from the interior of the bathroom, said secondary bottom frame (19) thereby defines a shaft area (20), wherein said secondary bottom frame (19) extends from the primary bottom frame (16) of the prefabricated bathroom and is being arranged at the level thereof.
- Prefabricated bathroom according to claim 8, wherein said secondary bottom frame additionally comprises one or more walls (24), such as 1, 2 or 3 walls (24), wherein each of these one or more walls comprises a box-shaped element (6) and wherein each wall (24) is a wall, which is not adjoining the interior of the bathroom.
- Prefabricated bathroom according to claim 9, wherein one or more of the walls (24) of the secondary bottom frame, on that side facing away from the shaft area, is being covered with one or more gypsum boards (11).
- Prefabricated bathroom according to any of the claims 8 - 10, wherein the shaft area (20) of the bathroom is not being provided with floor or ceiling; or wherein the shaft area (20) of the bathroom is being provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering the whole horizontal area corresponding to the shaft area; or wherein the shaft area (20) of the bathroom is being provided with a floor and/or a ceiling, wherein the floor and/or the ceiling of the shaft area is covering only a part of the horizontal area corresponding to the shaft area (20).
- Prefabricated bathroom according to any of the claims 8 - 11, wherein one or more supply conduits (22) and/or drain conduits (22) for water to/from one or more types of sanitary installations (21) is/are being terminated with a termination (23) on that side of the walls (4,5) of the bathroom facing the shaft area (20).
- Prefabricated bathroom according to any of the preceding claims, wherein the gypsum boards are fully glued to the elements.
- Prefabricated bathroom according to any of the preceding claims, wherein the gypsum boards have been cut in such a way that a single gypsum board covers the whole of an internal surface in the bathroom, for example the whole of a wall (4,5) or of a ceiling (3).
- A method for the manufacture of a bathroom (1) according to any of the preceding claims, wherein said method comprises the steps of:- manufacture of a tile covered floor (2)- cutting a gypsum board (11) in such a way that it exactly fits so as to cover the whole of an internal surface of a wall (4,5) in the desired bathroom- fully gluing the gypsum board, for example by letting it pass through a gluing machine- arranging box-shaped elements (6) with their closed side into the still wet glue- mounting the wall manufactured in this way onto the finished floor- repeating the previous four steps until all four walls have been mounted on the floor- cutting a gypsum board (11) in such a way that it exactly fits so as to cover the internal ceiling (3) of the desired bathroom- fully gluing the gypsum board, for example by letting it pass through a gluing machine- arranging box-shaped elements with their closed side into the still wet glue- mounting the ceiling manufactured in this way onto the previously manufactured walls- optionally mounting of tiles on selected parts of the internal walls (4) in the bathroom, for example in a shower compartment- painting of the rest of the parts of the walls (5) and installation of sanitary installations (21, 7 - 10).
- A method according to claim 15, wherein the painting of the internal walls are taking place without any previous filling/fairing, however optionally with prior mounting of felt cloth on the wall(s).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL19156402T PL3524743T3 (en) | 2018-02-09 | 2019-02-11 | Prefabricated bathroom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DKPA201800061A DK180030B1 (en) | 2018-02-09 | 2018-02-09 | Prefabricated bathtub and method for making such bathtub |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3524743A1 true EP3524743A1 (en) | 2019-08-14 |
EP3524743B1 EP3524743B1 (en) | 2022-02-09 |
Family
ID=66529736
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19156402.0A Active EP3524743B1 (en) | 2018-02-09 | 2019-02-11 | Prefabricated bathroom |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP3524743B1 (en) |
DK (1) | DK180030B1 (en) |
ES (1) | ES2909098T3 (en) |
PL (1) | PL3524743T3 (en) |
PT (1) | PT3524743T (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050108957A1 (en) * | 2003-11-25 | 2005-05-26 | Quesada Jorge D. | Pre-fabricated building modules and method of installation |
US20130086849A1 (en) * | 2011-05-16 | 2013-04-11 | XSite Modular | Bent Metal Panel Prefabricated Bathroom |
JP2018017088A (en) * | 2016-07-29 | 2018-02-01 | パナソニックIpマネジメント株式会社 | Building unit and manufacturing method of building unit |
-
2018
- 2018-02-09 DK DKPA201800061A patent/DK180030B1/en active IP Right Grant
-
2019
- 2019-02-11 EP EP19156402.0A patent/EP3524743B1/en active Active
- 2019-02-11 ES ES19156402T patent/ES2909098T3/en active Active
- 2019-02-11 PL PL19156402T patent/PL3524743T3/en unknown
- 2019-02-11 PT PT191564020T patent/PT3524743T/en unknown
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050108957A1 (en) * | 2003-11-25 | 2005-05-26 | Quesada Jorge D. | Pre-fabricated building modules and method of installation |
US20130086849A1 (en) * | 2011-05-16 | 2013-04-11 | XSite Modular | Bent Metal Panel Prefabricated Bathroom |
JP2018017088A (en) * | 2016-07-29 | 2018-02-01 | パナソニックIpマネジメント株式会社 | Building unit and manufacturing method of building unit |
Also Published As
Publication number | Publication date |
---|---|
ES2909098T3 (en) | 2022-05-05 |
DK201800061A1 (en) | 2019-09-19 |
DK180030B1 (en) | 2020-01-28 |
PL3524743T3 (en) | 2022-04-04 |
PT3524743T (en) | 2022-03-21 |
EP3524743B1 (en) | 2022-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3594422B1 (en) | Modular integrated building and construction method thereof | |
US9631359B2 (en) | Prefabricated module for a building | |
CN101654929B (en) | Combined type house and assembly method thereof | |
US9464436B2 (en) | Prefabricated panel for a building | |
AU2013201852B2 (en) | Modular Building | |
CN101654927B (en) | Main structure of combined type house and assembly method thereof | |
US20070294954A1 (en) | Prefabricated bathroom assembly and methods of its manufacture and installation | |
JP2019504945A (en) | Unit bus and manufacturing method thereof | |
CN205134993U (en) | Prefabricated whole bathroom | |
WO2008004896A2 (en) | Building system | |
CN201276757Y (en) | Combined house | |
EP2907931A2 (en) | Improvements to static home structures | |
EP3524743B1 (en) | Prefabricated bathroom | |
EP2792803B1 (en) | Method for construction of a building | |
CN204645720U (en) | A kind of integral bathroom | |
KR20160068312A (en) | Structure of drid adn raised floor for prefabricated bathroom | |
CN205348844U (en) | Whole bathroom of assembled | |
CN211313514U (en) | Integral prefabricated toilet | |
KR102264712B1 (en) | module type bathroom and building method using the same | |
EP2063041B1 (en) | Prefabricated wall element with a skeleton for fastening boards | |
PL242919B1 (en) | Modular bathroom | |
AU2016102351A4 (en) | Modular Room | |
CN204492244U (en) | A kind of integral bathroom | |
CN114776006A (en) | Method for building assembled toilet in hospital ward | |
HU181162B (en) | Space separating structure serving for increasing the comfort of flats |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20191206 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04B 1/348 20060101AFI20211001BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20211124 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1467593 Country of ref document: AT Kind code of ref document: T Effective date: 20220215 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602019011378 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: RO Ref legal event code: EPE |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: FGE Ref country code: PT Ref legal event code: SC4A Ref document number: 3524743 Country of ref document: PT Date of ref document: 20220321 Kind code of ref document: T Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20220315 |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20220209 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2909098 Country of ref document: ES Kind code of ref document: T3 Effective date: 20220505 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1467593 Country of ref document: AT Kind code of ref document: T Effective date: 20220209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220509 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220510 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220211 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602019011378 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20221110 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220211 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IS Payment date: 20240216 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240216 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: RO Payment date: 20240112 Year of fee payment: 6 Ref country code: FI Payment date: 20240220 Year of fee payment: 6 Ref country code: DE Payment date: 20240219 Year of fee payment: 6 Ref country code: GB Payment date: 20240216 Year of fee payment: 6 Ref country code: CH Payment date: 20240301 Year of fee payment: 6 Ref country code: PT Payment date: 20240129 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20190211 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20240219 Year of fee payment: 6 Ref country code: PL Payment date: 20240112 Year of fee payment: 6 Ref country code: NO Payment date: 20240221 Year of fee payment: 6 Ref country code: IT Payment date: 20240219 Year of fee payment: 6 Ref country code: FR Payment date: 20240215 Year of fee payment: 6 Ref country code: BE Payment date: 20240216 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20240328 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220209 |