EP3502598B1 - Method and apparatus for defrosting a refrigeration apparatus - Google Patents
Method and apparatus for defrosting a refrigeration apparatus Download PDFInfo
- Publication number
- EP3502598B1 EP3502598B1 EP17208636.5A EP17208636A EP3502598B1 EP 3502598 B1 EP3502598 B1 EP 3502598B1 EP 17208636 A EP17208636 A EP 17208636A EP 3502598 B1 EP3502598 B1 EP 3502598B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- flow rate
- fill level
- refrigeration apparatus
- defrost process
- vaporisation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 70
- 238000005057 refrigeration Methods 0.000 title claims description 53
- 238000010257 thawing Methods 0.000 title claims description 10
- 238000009834 vaporization Methods 0.000 claims description 35
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 24
- 239000007788 liquid Substances 0.000 claims description 13
- 230000003213 activating effect Effects 0.000 claims description 2
- 238000007664 blowing Methods 0.000 claims description 2
- 230000000977 initiatory effect Effects 0.000 claims description 2
- 239000003570 air Substances 0.000 description 44
- 239000003507 refrigerant Substances 0.000 description 11
- 238000001816 cooling Methods 0.000 description 7
- 238000010438 heat treatment Methods 0.000 description 6
- 238000013500 data storage Methods 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 4
- 230000001960 triggered effect Effects 0.000 description 4
- 238000007906 compression Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 2
- 239000012080 ambient air Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001704 evaporation Methods 0.000 description 1
- 230000008020 evaporation Effects 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 238000010309 melting process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000011144 upstream manufacturing Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25D—REFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
- F25D21/00—Defrosting; Preventing frosting; Removing condensed or defrost water
- F25D21/02—Detecting the presence of frost or condensate
- F25D21/025—Detecting the presence of frost or condensate using air pressure differential detectors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25D—REFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
- F25D21/00—Defrosting; Preventing frosting; Removing condensed or defrost water
- F25D21/14—Collecting or removing condensed and defrost water; Drip trays
Definitions
- the present disclosure relates to methods and apparatus for defrosting a refrigeration apparatus.
- So-called frost-free refrigeration apparatus such as freezers and refrigerators and the like, employ various complex methods for preventing a build-up of ice.
- One example of such a method is periodically heating the freezer or refrigerator to melt any ice that may have formed inside. This process can be wasteful and inefficient.
- JPH0979710A discloses a system comprising means for measuring the number of rotations of a ran at a blower and a defrosting control means for sending a fact that a desired amount of frosting is produced at a cooling device when the number of rotations of the fan is decreased by a value lower than a predetermined number of rotations.
- DE102010039573A1 discloses a household cooling device having an evaporator including a refrigerant cycle for cooling a coolable interior.
- a container is designed as a defrost water shell and collects defrost water coming from the evaporator.
- a level-indicator determines a filling level of the container.
- a defrost device is designed as a defrost heater, which is thermally coupled with the evaporator.
- a control device operates the defrost device based on the determined filling level.
- JP2002340451A discloses an outdoor unit of an air conditioner which is equipped with a heat exchanged and an axial blower driven by a DC motor.
- a revolution detection means detects the number of revolutions of the DC motor, and the number of defrosting start revolutions and the number of defrosting finish revolutions are determined in advance.
- a method of controlling of defrosting of a refrigeration apparatus comprising: detecting a flow rate of air through an item of the refrigeration apparatus that is susceptible to frosting; initiating a defrost process in response to the detected air flow through the item being less than a start threshold flow rate; during the defrost process, detecting a flow rate of air through the item that is susceptible to frosting and detecting a fill level of a vaporisation tank storing liquid water resulting from the defrost process; and stopping the defrost process in response to either: (i) the detected fill level reaching a predetermined threshold fill level; or (ii) the detected air flow rate being greater than an end threshold flow rate; wherein the start threshold flow rate is lowered in response to the detected fill level reaching the predetermined threshold fill level.
- the fill level of the vaporisation tank is determined based on measuring a flow rate during the defrost process.
- the fill level of the vaporisation tank is determined based on receiving data from a fill level sensor of the vaporisation tank.
- the end threshold is equal to the start threshold.
- measuring the air flow rate comprises activating a fan arranged to blow air through the item.
- the air flow rate is measured periodically.
- a refrigeration apparatus comprising: a flow rate sensor for detecting a flow rate of air through an item of the refrigeration apparatus that is susceptible to frosting; and a fill level sensor for detecting a fill level of a vaporisation tank for storing liquid water resulting from the defrost process; the refrigeration apparatus being configured to: initiate a defrost process in response to the detected air flow rate being less than a start threshold flow rate; and stop a defrost process being carried out by the refrigeration apparatus in response to either: (i) the detected fill level reaching a predetermined threshold fill level; or (ii) the detected air flow rate being greater than an end threshold flow rate; wherein the start threshold flow rate is lowered in response to the detected fill level reaching the predetermined threshold fill level.
- the refrigeration apparatus comprises a fan for blowing air through the item that is susceptible to frosting.
- the refrigeration apparatus is configured to determine the fill level of the vaporisation tank based on measuring a flow rate during the defrost process.
- refrigeration apparatus such as for example frost-free freezers and refrigerators and the like, prevent a build-up of ice, using relatively complex or inefficient methods.
- One such method is periodically restricting a cooling system or heating parts of the refrigeration apparatus to allow or cause any ice that may have formed to melt. Such methods have no regard for how much ice has actually formed.
- an air flow rate on a downstream side of an item can be used to control a defrost process.
- a defrost process is stopped in response to a detected air flow rate rising above a threshold level.
- the defrost process is initiated in response to a detected flow rate dropping below a (potentially different) threshold level.
- the ice on an item which is susceptible to frosting, such as an evaporator or other component of the refrigeration apparatus will slowly build over time. If the item is placed in the path of an air flow, then the air flow will encounter increased resistance as the ice builds up. This means that the "output" flow rate of air (on the downstream side of the item) decreases with increasing frost on the item.
- FIG. 1 shows schematically an example of a known refrigeration apparatus 100 for implementing a vapour-compression refrigeration cycle to cool a space 110.
- the vapour-compression refrigeration cycle (described in more detail below) is implemented to cool a freezer portion 111 of the space 110 to below 0°C. Other portions of the space 110 will be cooled too depending on the temperature of the freezer portion 111 and the layout of the refrigeration apparatus 100.
- the freezer portion 111 represents a subsection of the space 110 in which substances such as foodstuffs may be placed to freeze them.
- the vapour-compression refrigeration cycle may be used to cool a space 110 of a refrigeration apparatus 100 even if the refrigeration apparatus 100 does not have a freezer portion as such.
- the refrigeration apparatus 100 comprises a closed circuit of tubing 120 containing a selected refrigerant for cooling the interior of a space 110 (e.g. a foodstuff-storing portion of a refrigeration apparatus).
- a space 110 e.g. a foodstuff-storing portion of a refrigeration apparatus.
- the circuit of tubing 120 includes an internal section 122 located within the freezer portion 111 and an external section 124 located outside the space 110.
- the refrigerant is selected having a temperature of vaporisation such that it will vaporise in the internal section 122 as it absorbs heat from the interior of the freezer portion 111.
- the internal section 122 may also be referred to as an evaporator 122.
- a compressor 123 is provided to compress the vaporised refrigerant and so raise its temperature significantly.
- the high pressure, high temperature refrigerant vapour passes from the compressor 123 through the "hot" external section 124 of the circuit 120.
- the external section 124 acts as a condenser in the refrigeration cycle, transferring heat to the environment (e.g. the room in which the refrigeration apparatus 100 is located).
- a heat sink or fan may be provided to improve the transfer of heat. The transfer of heat causes at least some of the refrigerant vapour in the external section 124 to condense back to a liquid form.
- the high pressure refrigerant now cooled and at least partially in liquid form, passes to an expansion valve 121 which reduces the pressure of the refrigerant, causing it to expand and cool.
- the low pressure low temperature refrigerant then passes through the evaporator 122 within the freezer portion 111, acting as an evaporator in the refrigeration cycle, to absorb heat from the interior of the freezer portion 111.
- the cool refrigerant liquid passing through the evaporator 122 vaporises before passing on to the compressor 123 to complete the refrigeration cycle.
- the compressor 123 may be driven by a low power DC motor, selected according to the refrigerant vapour pressure and temperature required in the external section 124 of the circuit and the rate of cooling required by the evaporator 122 of the circuit.
- the ice build-up also called "frost"
- a user of the refrigeration apparatus may "defrost" the refrigeration apparatus 100 periodically by allowing the freezer portion 111 to heat up to a point at which the ice melts, and then removing the resulting liquid water.
- Some known refrigeration apparatus have a mechanism, such as a heating resistor or other heating element, for heating up the freezer portion 111 briefly in order to melt the ice layer and thereby defrost the freezer portion 111.
- a “defrost process” may be performed automatically and periodically on a cycle, irrespective of how much frost has actually built up on the evaporator 122.
- FIG 2 shows schematically a refrigeration apparatus 200 in accordance with examples described herein.
- the refrigeration apparatus 200 has a space 210 in which a freezer portion 211 is cooled by an evaporator 222 so as to be below 0°C, in the same manner described above in relation to the space 110, freezer portion 111 and evaporator 122 of Figure 1 .
- the principles discussed herein may also be applied to a refrigeration apparatus 200 that does not have a freezer portion as such and the interior of which is (only) cooled to temperatures above freezing.
- the refrigeration apparatus 200 comprises a fan 201 which is arranged to blow air through the evaporator 222.
- the fan 201 is, in the example of Figure 2 , located above the evaporator 222. In this arrangement, the fan 201 is configured to blow air downwards through the evaporator 222.
- the fan 201 is therefore located on an "upstream" side of the evaporator 222 and air leaves the evaporator 222 (when not completely blocked by frost build-up) on the "downstream" side of the evaporator 222.
- Melted frost will drip from the evaporator 222 in the form of liquid water on the downstream side.
- a pipe 204 is provided for directing this liquid water into a vaporisation tank 203. Water in the vaporisation tank 204 will slowly evaporate into the environment.
- the vaporisation tank 204 may be removable such that a user can manually empty the vaporisation tank 204.
- the refrigeration apparatus 200 also comprises a flow sensor 202 for measuring a flow rate through the pipe 204. That is, the flow sensor 202 is located on the downstream side of the evaporator 222 for measuring air flow through the pipe 204. As mentioned above, the flow rate changes depending on the amount of ice build-up on the evaporator 222 and therefore can be used to control the timing of a defrost process.
- An example of a suitable type of flow sensor is a paddle wheel, though other types of flow sensor may be used.
- the flow sensor 202 may also measure a water flow rate through the pipe 204, as will be discussed further below.
- Measurements of the air flow rate during normal operation can be used to determine when too much frost has built up on the evaporator, and so a defrost process should be started. This may be performed in response to the air flow rate dropping below a threshold value.
- Measurements of the flow rate during a defrost process can be used to determine when enough frost has been melted, and so the defrost process should be ended. This may be performed in response to the flow rate returning to a base line level (e.g. if all the frost is to be melted), or other threshold value, depending on how much frost is intended to be melted.
- FIG 3 shows schematically a control system for controlling the refrigeration apparatus 200 described above in relation to Figure 2 .
- the control system comprises at least a controller 300, which may be a processor or the like, the flow rate sensor 202 and fan 201 described above, and a heating resistor 302 or other defrost mechanism as mentioned above in relation to Figure 1 .
- the control system also comprises a fill level sensor 301 for measuring a fill level of the vaporisation tank 204.
- the controller 300 is operably coupled to each of the flow rate sensor 202, fill level sensor 301, the fan 201, and the resistor 301 (or other defrost mechanism).
- the controller 300 is configured to activate the fan 201 to blow air through the evaporator 222 as described above, and simultaneously receive flow rate data from flow rate sensor 202 indicative of a flow rate through the pipe 204. This may be carried out periodically, of the order of for example every few hours, such as once a day or every 6 hours or so. When there is no frost present on the evaporator 222, the measured flow rate will be at a maximum.
- the controller 300 may be preconfigured with the value of this maximum (or "baseline”) flow rate stored in an internal data storage (not shown in Figure 3 ).
- the controller 3000 may be configured to perform a commissioning step in which the baseline flow rate is measured, e.g. upon installation, and stored to the internal data storage.
- a start threshold flow rate value at which a defrost process is triggered may be stored in an internal data storage accessible by the controller 300.
- the controller 300 is configured to compare the measured flow rate with the start threshold flow rate, and to trigger a defrost process in response to the detected flow rate being less than the start threshold flow rate.
- Triggering the defrost process may comprise controlling the resistor 302 to heat up the evaporator 222 sufficiently to cause the frost to begin to melt.
- Other mechanisms for enacting a defrost process are possible.
- the controller 300 may periodically turn on the fan 201 and measure the flow rate at the flow rate sensor 301.This may be carried out relatively frequently, of the order of for example every few minutes, such as every 5 minutes or so.
- An end threshold flow rate value at which a defrost process is ended may be stored in an internal storage device accessible by the controller 300. The controller 300 is configured to compare the measured flow rate with the end threshold flow rate, and to stop the defrost process in response to the detected flow rate being greater than the end threshold flow rate.
- the end threshold flow rate and start threshold flow rate may be (substantially) equal. In such cases, the defrost process is begun when the flow rate drops below the threshold and is stopped when the flow rate returns to above the (same) threshold. There may nevertheless be a small difference between the start and end threshold air flow rates to prevent the defrost process repeatedly starting and stopping.
- the controller 300 may be configured to determine, from this flow data, a volume of water which has been defrosted so far. Hence, the controller 300 is able to determine a fill level of the vaporisation tank 203 based on liquid flow rate.
- a fill level sensor 301 is provided at the vaporisation tank 301 in order to directly determine the fill level of the vaporisation tank 203.
- the controller 300 may store (e.g. on the internal data storage) a maximum capacity of the vaporisation tank 203. Therefore, the controller 300 is able to determine how full the vaporisation tank is, and in particular when the vaporisation tank 203 is full.
- the controller 300 is configured to stop the defrost process in response to the determined fill level reaching a threshold fill level.
- the controller 300 is configured with two conditions for stopping the defrost process: a first condition being that, when the fan is operated to blow air during the defrost process, the detected air flow rate exceeds the end threshold; and a second condition being that the determined fill level of the vaporisation tank 203 exceeds the threshold fill level.
- the controller 300 is configured to stop the defrost process upon either condition being met (i.e. whichever condition is met first).
- the controller 300 lowers the start threshold in response to determining that the vaporisation tank 203 is full. This means that the (current) defrost process will stop, as the threshold is not yet met. It also means that more frost will have to form on the evaporator 222 (reducing the flow rate) before the next defrost process is triggered. This gives time for water in the vaporisation tank 203 to evaporate, creating space for more water.
- the controller 300 lowers the start threshold based on the current fill level of the vaporisation tank 203, not just when the vaporisation tank 203 is full.
- the initial air flow rate may be 0.2m 3 /min and controller 300 measures air flow every 6 hours.
- the controller 300 determines that the air flow rate reduces to 0.1 m 3 /min (the threshold), it starts a defrost process (e.g. using resistor 302).
- the water flow rate may be 80 cl/min (liquid water resulting from the defrosting of ice). This will be the value measured by the flow rate sensor 202 when the fan 201 is not active. Note that this is typically much less than the air flow rate generated by the fan 201.
- the fan 201 Periodically, e.g. every few minutes, such as every 5 or 10 minutes or so, the fan 201 is turned on for e.g. a few seconds, such as 5 seconds or so, and the controller 300 determines the air flow rate using the flow rate sensor 202. Note that this time the measured flow rate will be contributed to by both the air and the water. However, the fan 201 can be configured to generate a sufficiently high air flow rate that the water flow rate (which will be small due to resulting from a slow melting process) will be negligible compared to the air flow rate. Hence, it can be assumed that the measured flow rate during this time is substantially due to air alone.
- the initial air flow rate (0.2m 3 /min in this example) may be set as a "target" flow rate at which the defrost process is to be ended.
- the defrost process can only be 2.5 minutes with 80cl/min flow before the vaporisation tank 203 is completely full. When this happens (i.e. after the 2.5 minutes has elapsed) the defrost process is paused by lowering the threshold flow rate at which defrosting is triggered.
- the ambient temperature, relative humidity (RH), and other atmospheric conditions such as ambient air velocity may be used to determine when a next defrost process can be started.
- the ambient temperature, RH, and air speed may be measured by sensors not shown in the figures but well-known in the art. A combination of these values may be used to determine (an estimate of) the speed at which water will evaporate from the vaporisation tank 203. For example, vaporisation speed with 1km/h air flow (still weather) and 50C evaporation is around 0.5 kg/m 2 /h for 5C melted ice.
- the previous defrost process introduced 1.8L of water into the vaporisation tank 203, and 0.02L evaporates each hour. After 80h, the air flow reaches the defrost process trigger threshold, and a new defrost process starts with the remaining 0.2L of water present. The maximum allowed defrosted water, air flow and next threshold will be adjusted accordingly.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Defrosting Systems (AREA)
Description
- The present disclosure relates to methods and apparatus for defrosting a refrigeration apparatus.
- So-called frost-free refrigeration apparatus, such as freezers and refrigerators and the like, employ various complex methods for preventing a build-up of ice. One example of such a method is periodically heating the freezer or refrigerator to melt any ice that may have formed inside. This process can be wasteful and inefficient.
- JPH0979710A discloses a system comprising means for measuring the number of rotations of a ran at a blower and a defrosting control means for sending a fact that a desired amount of frosting is produced at a cooling device when the number of rotations of the fan is decreased by a value lower than a predetermined number of rotations.
-
DE102010039573A1 discloses a household cooling device having an evaporator including a refrigerant cycle for cooling a coolable interior. A container is designed as a defrost water shell and collects defrost water coming from the evaporator. A level-indicator determines a filling level of the container. A defrost device is designed as a defrost heater, which is thermally coupled with the evaporator. A control device operates the defrost device based on the determined filling level. -
JP2002340451A - According to the invention, there is provided a method of controlling of defrosting of a refrigeration apparatus, the method comprising: detecting a flow rate of air through an item of the refrigeration apparatus that is susceptible to frosting; initiating a defrost process in response to the detected air flow through the item being less than a start threshold flow rate; during the defrost process, detecting a flow rate of air through the item that is susceptible to frosting and detecting a fill level of a vaporisation tank storing liquid water resulting from the defrost process; and stopping the defrost process in response to either: (i) the detected fill level reaching a predetermined threshold fill level; or (ii) the detected air flow rate being greater than an end threshold flow rate; wherein the start threshold flow rate is lowered in response to the detected fill level reaching the predetermined threshold fill level.
- In a preferred embodiment of the invention, the fill level of the vaporisation tank is determined based on measuring a flow rate during the defrost process.
- In a preferred embodiment of the invention, the fill level of the vaporisation tank is determined based on receiving data from a fill level sensor of the vaporisation tank.
- In a preferred embodiment of the invention, the end threshold is equal to the start threshold.
- In a preferred embodiment of the invention, measuring the air flow rate comprises activating a fan arranged to blow air through the item.
- In a preferred embodiment of the invention, the air flow rate is measured periodically.
- According to the invention, there is provided a refrigeration apparatus comprising: a flow rate sensor for detecting a flow rate of air through an item of the refrigeration apparatus that is susceptible to frosting; and a fill level sensor for detecting a fill level of a vaporisation tank for storing liquid water resulting from the defrost process; the refrigeration apparatus being configured to: initiate a defrost process in response to the detected air flow rate being less than a start threshold flow rate; and stop a defrost process being carried out by the refrigeration apparatus in response to either: (i) the detected fill level reaching a predetermined threshold fill level; or (ii) the detected air flow rate being greater than an end threshold flow rate; wherein the start threshold flow rate is lowered in response to the detected fill level reaching the predetermined threshold fill level.
- In a preferred embodiment of the invention, the refrigeration apparatus comprises a fan for blowing air through the item that is susceptible to frosting.
- In a preferred embodiment of the invention, the refrigeration apparatus is configured to determine the fill level of the vaporisation tank based on measuring a flow rate during the defrost process.
- To assist understanding of the present invention and to show how embodiments may be put into effect, reference is made by way of example to the accompanying drawings in which:
-
Figure 1 shows schematically a refrigeration apparatus implementing a refrigeration cycle for cooling a space; -
Figure 2 shows schematically a refrigeration apparatus in accordance with examples described herein; and -
Figure 3 shows schematically an example control system for controlling the refrigeration apparatus. - As mentioned previously, refrigeration apparatus, such as for example frost-free freezers and refrigerators and the like, prevent a build-up of ice, using relatively complex or inefficient methods. One such method is periodically restricting a cooling system or heating parts of the refrigeration apparatus to allow or cause any ice that may have formed to melt. Such methods have no regard for how much ice has actually formed.
- According to examples disclosed herein, an air flow rate on a downstream side of an item, such as for example an evaporator, can be used to control a defrost process. Specifically, a defrost process is stopped in response to a detected air flow rate rising above a threshold level. The defrost process is initiated in response to a detected flow rate dropping below a (potentially different) threshold level. The ice on an item which is susceptible to frosting, such as an evaporator or other component of the refrigeration apparatus, will slowly build over time. If the item is placed in the path of an air flow, then the air flow will encounter increased resistance as the ice builds up. This means that the "output" flow rate of air (on the downstream side of the item) decreases with increasing frost on the item.
-
Figure 1 shows schematically an example of a knownrefrigeration apparatus 100 for implementing a vapour-compression refrigeration cycle to cool aspace 110. Specifically, in this example the vapour-compression refrigeration cycle (described in more detail below) is implemented to cool afreezer portion 111 of thespace 110 to below 0°C. Other portions of thespace 110 will be cooled too depending on the temperature of thefreezer portion 111 and the layout of therefrigeration apparatus 100. In any case, thefreezer portion 111 represents a subsection of thespace 110 in which substances such as foodstuffs may be placed to freeze them. More generally, the vapour-compression refrigeration cycle may be used to cool aspace 110 of arefrigeration apparatus 100 even if therefrigeration apparatus 100 does not have a freezer portion as such. - The
refrigeration apparatus 100 comprises a closed circuit oftubing 120 containing a selected refrigerant for cooling the interior of a space 110 (e.g. a foodstuff-storing portion of a refrigeration apparatus). Specifically, the circuit oftubing 120 includes aninternal section 122 located within thefreezer portion 111 and anexternal section 124 located outside thespace 110. - The refrigerant is selected having a temperature of vaporisation such that it will vaporise in the
internal section 122 as it absorbs heat from the interior of thefreezer portion 111. For this reason, theinternal section 122 may also be referred to as anevaporator 122. - A
compressor 123 is provided to compress the vaporised refrigerant and so raise its temperature significantly. The high pressure, high temperature refrigerant vapour passes from thecompressor 123 through the "hot"external section 124 of thecircuit 120. Theexternal section 124 acts as a condenser in the refrigeration cycle, transferring heat to the environment (e.g. the room in which therefrigeration apparatus 100 is located). A heat sink or fan may be provided to improve the transfer of heat. The transfer of heat causes at least some of the refrigerant vapour in theexternal section 124 to condense back to a liquid form. - The high pressure refrigerant, now cooled and at least partially in liquid form, passes to an
expansion valve 121 which reduces the pressure of the refrigerant, causing it to expand and cool. The low pressure low temperature refrigerant then passes through theevaporator 122 within thefreezer portion 111, acting as an evaporator in the refrigeration cycle, to absorb heat from the interior of thefreezer portion 111. As a result, the cool refrigerant liquid passing through theevaporator 122 vaporises before passing on to thecompressor 123 to complete the refrigeration cycle. - The
compressor 123 may be driven by a low power DC motor, selected according to the refrigerant vapour pressure and temperature required in theexternal section 124 of the circuit and the rate of cooling required by theevaporator 122 of the circuit. - Because of the low temperatures generated within the
freezer portion 111 by theevaporator 122 of thetubing 120, humidity from the air may freeze to theevaporator 122, causing an ice layer to build up over time. The ice build-up (also called "frost") on theevaporator 122 and/or in other parts of therefrigeration apparatus 100 is undesirable because it occupies space within thefreezer portion 111 or other parts of therefrigeration apparatus 100, which could otherwise be used for storage (e.g. of foodstuffs) and reduces the efficiency of therefrigeration apparatus 100. A user of the refrigeration apparatus may "defrost" therefrigeration apparatus 100 periodically by allowing thefreezer portion 111 to heat up to a point at which the ice melts, and then removing the resulting liquid water. Some known refrigeration apparatus have a mechanism, such as a heating resistor or other heating element, for heating up thefreezer portion 111 briefly in order to melt the ice layer and thereby defrost thefreezer portion 111. Such a "defrost process" may be performed automatically and periodically on a cycle, irrespective of how much frost has actually built up on theevaporator 122. -
Figure 2 shows schematically arefrigeration apparatus 200 in accordance with examples described herein. Therefrigeration apparatus 200 has aspace 210 in which afreezer portion 211 is cooled by anevaporator 222 so as to be below 0°C, in the same manner described above in relation to thespace 110,freezer portion 111 andevaporator 122 ofFigure 1 . The principles discussed herein may also be applied to arefrigeration apparatus 200 that does not have a freezer portion as such and the interior of which is (only) cooled to temperatures above freezing. - The
refrigeration apparatus 200 comprises afan 201 which is arranged to blow air through theevaporator 222. This arrangement is such that the air flow will be increasingly blocked as frost builds up on theevaporator 222. Thefan 201 is, in the example ofFigure 2 , located above theevaporator 222. In this arrangement, thefan 201 is configured to blow air downwards through theevaporator 222. Thefan 201 is therefore located on an "upstream" side of theevaporator 222 and air leaves the evaporator 222 (when not completely blocked by frost build-up) on the "downstream" side of theevaporator 222. - Melted frost will drip from the
evaporator 222 in the form of liquid water on the downstream side. Apipe 204 is provided for directing this liquid water into avaporisation tank 203. Water in thevaporisation tank 204 will slowly evaporate into the environment. In some examples, thevaporisation tank 204 may be removable such that a user can manually empty thevaporisation tank 204. - The
refrigeration apparatus 200 also comprises aflow sensor 202 for measuring a flow rate through thepipe 204. That is, theflow sensor 202 is located on the downstream side of theevaporator 222 for measuring air flow through thepipe 204. As mentioned above, the flow rate changes depending on the amount of ice build-up on theevaporator 222 and therefore can be used to control the timing of a defrost process. An example of a suitable type of flow sensor is a paddle wheel, though other types of flow sensor may be used. (In one specific example, theflow sensor 202 may also measure a water flow rate through thepipe 204, as will be discussed further below.) - Measurements of the air flow rate during normal operation (not during a defrost process) can be used to determine when too much frost has built up on the evaporator, and so a defrost process should be started. This may be performed in response to the air flow rate dropping below a threshold value.
- Measurements of the flow rate during a defrost process (whilst the frost is being melted) can be used to determine when enough frost has been melted, and so the defrost process should be ended. This may be performed in response to the flow rate returning to a base line level (e.g. if all the frost is to be melted), or other threshold value, depending on how much frost is intended to be melted.
-
Figure 3 shows schematically a control system for controlling therefrigeration apparatus 200 described above in relation toFigure 2 . The control system comprises at least acontroller 300, which may be a processor or the like, theflow rate sensor 202 andfan 201 described above, and aheating resistor 302 or other defrost mechanism as mentioned above in relation toFigure 1 . According to the invention, , the control system also comprises afill level sensor 301 for measuring a fill level of thevaporisation tank 204. Thecontroller 300 is operably coupled to each of theflow rate sensor 202, filllevel sensor 301, thefan 201, and the resistor 301 (or other defrost mechanism). - During normal operation of the
refrigeration apparatus 200, thecontroller 300 is configured to activate thefan 201 to blow air through theevaporator 222 as described above, and simultaneously receive flow rate data fromflow rate sensor 202 indicative of a flow rate through thepipe 204. This may be carried out periodically, of the order of for example every few hours, such as once a day or every 6 hours or so. When there is no frost present on theevaporator 222, the measured flow rate will be at a maximum. Thecontroller 300 may be preconfigured with the value of this maximum (or "baseline") flow rate stored in an internal data storage (not shown inFigure 3 ). In another example, the controller 3000 may be configured to perform a commissioning step in which the baseline flow rate is measured, e.g. upon installation, and stored to the internal data storage. - A start threshold flow rate value at which a defrost process is triggered may be stored in an internal data storage accessible by the
controller 300. Thecontroller 300 is configured to compare the measured flow rate with the start threshold flow rate, and to trigger a defrost process in response to the detected flow rate being less than the start threshold flow rate. - Triggering the defrost process may comprise controlling the
resistor 302 to heat up theevaporator 222 sufficiently to cause the frost to begin to melt. Other mechanisms for enacting a defrost process are possible. During the defrost process, thecontroller 300 may periodically turn on thefan 201 and measure the flow rate at the flow rate sensor 301.This may be carried out relatively frequently, of the order of for example every few minutes, such as every 5 minutes or so. An end threshold flow rate value at which a defrost process is ended may be stored in an internal storage device accessible by thecontroller 300. Thecontroller 300 is configured to compare the measured flow rate with the end threshold flow rate, and to stop the defrost process in response to the detected flow rate being greater than the end threshold flow rate. - The end threshold flow rate and start threshold flow rate may be (substantially) equal. In such cases, the defrost process is begun when the flow rate drops below the threshold and is stopped when the flow rate returns to above the (same) threshold. There may nevertheless be a small difference between the start and end threshold air flow rates to prevent the defrost process repeatedly starting and stopping.
- During the defrost process, while the
fan 201 is turned off, all flow measured by theflow rate sensor 202 is indicative of liquid water resulting from the melting of the frost. Thecontroller 300 may be configured to determine, from this flow data, a volume of water which has been defrosted so far. Hence, thecontroller 300 is able to determine a fill level of thevaporisation tank 203 based on liquid flow rate. - A
fill level sensor 301 is provided at thevaporisation tank 301 in order to directly determine the fill level of thevaporisation tank 203. Thecontroller 300 may store (e.g. on the internal data storage) a maximum capacity of thevaporisation tank 203. Therefore, thecontroller 300 is able to determine how full the vaporisation tank is, and in particular when thevaporisation tank 203 is full. Thecontroller 300 is configured to stop the defrost process in response to the determined fill level reaching a threshold fill level. That is, according to the invention thecontroller 300 is configured with two conditions for stopping the defrost process: a first condition being that, when the fan is operated to blow air during the defrost process, the detected air flow rate exceeds the end threshold; and a second condition being that the determined fill level of thevaporisation tank 203 exceeds the threshold fill level. Thecontroller 300 is configured to stop the defrost process upon either condition being met (i.e. whichever condition is met first). - The
controller 300 lowers the start threshold in response to determining that thevaporisation tank 203 is full. This means that the (current) defrost process will stop, as the threshold is not yet met. It also means that more frost will have to form on the evaporator 222 (reducing the flow rate) before the next defrost process is triggered. This gives time for water in thevaporisation tank 203 to evaporate, creating space for more water. Thecontroller 300 lowers the start threshold based on the current fill level of thevaporisation tank 203, not just when thevaporisation tank 203 is full. - To illustrate this more explicitly, in a specific example, the initial air flow rate may be 0.2m3/min and
controller 300 measures air flow every 6 hours. When thecontroller 300 determines that the air flow rate reduces to 0.1 m3/min (the threshold), it starts a defrost process (e.g. using resistor 302). - During the defrost process itself, the water flow rate may be 80 cl/min (liquid water resulting from the defrosting of ice). This will be the value measured by the
flow rate sensor 202 when thefan 201 is not active. Note that this is typically much less than the air flow rate generated by thefan 201. - Periodically, e.g. every few minutes, such as every 5 or 10 minutes or so, the
fan 201 is turned on for e.g. a few seconds, such as 5 seconds or so, and thecontroller 300 determines the air flow rate using theflow rate sensor 202. Note that this time the measured flow rate will be contributed to by both the air and the water. However, thefan 201 can be configured to generate a sufficiently high air flow rate that the water flow rate (which will be small due to resulting from a slow melting process) will be negligible compared to the air flow rate. Hence, it can be assumed that the measured flow rate during this time is substantially due to air alone. The initial air flow rate (0.2m3/min in this example) may be set as a "target" flow rate at which the defrost process is to be ended. - Consider an example in which, whilst attempting to reach the target flow rate, e.g. after 20 min of defrosting, 1.6L water reaches the vaporisation tank 203 (e.g. as measured by the fill level sensor 301). If the
vaporisation tank 203 is, for example, 20x20x5cm (0.04m2 surface area and 2L capacity) then the defrost process can only be 2.5 minutes with 80cl/min flow before thevaporisation tank 203 is completely full. When this happens (i.e. after the 2.5 minutes has elapsed) the defrost process is paused by lowering the threshold flow rate at which defrosting is triggered. This means that more frost will have to build up on the evaporator 222 (thus reducing the flow rate) until the new, lower threshold is met. For example, if the final flow rate is 0.17m3/min, the next defrost process may be triggered at 0.13m3/min air flow. - In some examples, the ambient temperature, relative humidity (RH), and other atmospheric conditions such as ambient air velocity may be used to determine when a next defrost process can be started. The ambient temperature, RH, and air speed may be measured by sensors not shown in the figures but well-known in the art. A combination of these values may be used to determine (an estimate of) the speed at which water will evaporate from the
vaporisation tank 203. For example, vaporisation speed with 1km/h air flow (still weather) and 50C evaporation is around 0.5 kg/m2/h for 5C melted ice. - In a specific example, the previous defrost process introduced 1.8L of water into the
vaporisation tank 203, and 0.02L evaporates each hour. After 80h, the air flow reaches the defrost process trigger threshold, and a new defrost process starts with the remaining 0.2L of water present. The maximum allowed defrosted water, air flow and next threshold will be adjusted accordingly. - Modifications not described herein may also be employed within the scope of the invention, which is defined in the claims.
Claims (9)
- A method of controlling of defrosting of a refrigeration apparatus (200), the method comprising:detecting a flow rate of air through an item (222) of the refrigeration apparatus (200) that is susceptible to frosting;initiating a defrost process in response to the detected air flow through the item (222) being less than a start threshold flow rate;during the defrost process, detecting a flow rate of air through the item (222) that is susceptible to frosting and detecting a fill level of a vaporisation tank (203) storing liquid water resulting from the defrost process; andstopping the defrost process in response to either:(i) the detected fill level reaching a predetermined threshold fill level; or(ii) the detected air flow rate being greater than an end threshold flow rate;wherein the start threshold flow rate is lowered in response to the detected fill level reaching the predetermined threshold fill level.
- A method according to claim 1, wherein the fill level of the vaporisation tank (203) is determined based on measuring a flow rate during the defrost process.
- A method according to claim 1 or claim 2, wherein the fill level of the vaporisation tank (203) is determined based on receiving data from a fill level sensor (301) of the vaporisation tank (203).
- A method according to any of claims 1 to 3, wherein the end threshold is equal to the start threshold.
- A method according to any of claims 1 to 4, wherein measuring the air flow rate comprises activating a fan (201) arranged to blow air through the item (222).
- A method according to any of claims 1 to 5, wherein the air flow rate is measured periodically.
- A refrigeration apparatus (200) comprising:a flow rate sensor (202) for detecting a flow rate of air through an item (222) of the refrigeration apparatus (200) that is susceptible to frosting; anda fill level sensor (301) for detecting a fill level of a vaporisation tank (203) for storing liquid water resulting from a defrost process;the refrigeration apparatus (200) being configured to:initiate a defrost process in response to the detected air flow rate being less than a start threshold flow rate; andstop a defrost process being carried out by the refrigeration apparatus (200) in response to either:i) the detected fill level reaching a predetermined threshold fill level; orii) the detected air flow rate being greater than an end threshold flow rate;wherein the start threshold flow rate is lowered in response to the detected fill level reaching the predetermined threshold fill level.
- A refrigeration apparatus (200) according to claim 7, comprising a fan (201) for blowing air through the item (222) that is susceptible to frosting.
- A refrigeration apparatus (200) according to claim 7 or claim 8, wherein the refrigeration apparatus (200) is configured to determine the fill level of the vaporisation tank (203) based on measuring a flow rate during the defrost process.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP17208636.5A EP3502598B1 (en) | 2017-12-19 | 2017-12-19 | Method and apparatus for defrosting a refrigeration apparatus |
TR2017/22527A TR201722527A2 (en) | 2017-12-19 | 2017-12-28 | Methods and apparatus for defrosting a refrigeration apparatus. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP17208636.5A EP3502598B1 (en) | 2017-12-19 | 2017-12-19 | Method and apparatus for defrosting a refrigeration apparatus |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3502598A1 EP3502598A1 (en) | 2019-06-26 |
EP3502598B1 true EP3502598B1 (en) | 2022-10-19 |
Family
ID=60674049
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17208636.5A Active EP3502598B1 (en) | 2017-12-19 | 2017-12-19 | Method and apparatus for defrosting a refrigeration apparatus |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3502598B1 (en) |
TR (1) | TR201722527A2 (en) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0979710A (en) * | 1995-09-19 | 1997-03-28 | Hitachi Ltd | Defrosting control system of freezer |
JP4548815B2 (en) * | 2001-05-21 | 2010-09-22 | 日立アプライアンス株式会社 | Air conditioner outdoor unit |
DE102010039573A1 (en) * | 2010-08-20 | 2012-02-23 | BSH Bosch und Siemens Hausgeräte GmbH | Cooling device i.e. refrigerator, has evaporator including cycle for cooling interior, container designed as defrost water shell and collecting defrost water coming from evaporator, and level-indicator determining filling level of container |
-
2017
- 2017-12-19 EP EP17208636.5A patent/EP3502598B1/en active Active
- 2017-12-28 TR TR2017/22527A patent/TR201722527A2/en unknown
Also Published As
Publication number | Publication date |
---|---|
TR201722527A2 (en) | 2019-07-22 |
EP3502598A1 (en) | 2019-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2217872B1 (en) | Control method of refrigerator | |
JP5625582B2 (en) | Refrigeration equipment | |
US9772138B2 (en) | Cooling box | |
US20110036105A1 (en) | Method for defrost control of a refrigerator and refrigerator which uses this method | |
JP2018511769A (en) | Method and apparatus for controlling an ice making cycle of an ice making machine using an ice collecting sensor and a temperature sensor | |
CN108885054B (en) | Refrigerator and control method thereof | |
JP5483995B2 (en) | Control of cargo refrigeration | |
EP0816783A2 (en) | Defrost control method and apparatus | |
KR101655802B1 (en) | Refrigerator and Control method of the same | |
US11940200B2 (en) | Refrigerator and control method of refrigerator | |
CN108444185A (en) | A kind of refrigerator and its control method with ducting assembly | |
JP2010164243A (en) | Refrigerating device for vehicle | |
JP6706146B2 (en) | refrigerator | |
JP5105276B2 (en) | refrigerator | |
EP3502598B1 (en) | Method and apparatus for defrosting a refrigeration apparatus | |
CN208139662U (en) | A kind of ducting assembly and its refrigerator of refrigerator | |
US11549740B2 (en) | Refrigerator and controlling method for the same | |
JP2009019808A (en) | Refrigerator and method for preventing dew condensation in refrigerator | |
JP6143458B2 (en) | refrigerator | |
JP4308070B2 (en) | Defrost control device for direct cooling refrigerator | |
JP2001263912A (en) | Refrigerator | |
JP5511735B2 (en) | refrigerator | |
JPH10205980A (en) | Refrigerator | |
US9440839B1 (en) | Preferential distribution of cooling capacity | |
JP6744731B2 (en) | refrigerator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20191218 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20210216 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F25D 21/14 20060101ALN20211222BHEP Ipc: F25D 21/02 20060101AFI20211222BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F25D 21/14 20060101ALN20220317BHEP Ipc: F25D 21/02 20060101AFI20220317BHEP |
|
INTG | Intention to grant announced |
Effective date: 20220404 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTC | Intention to grant announced (deleted) | ||
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F25D 21/14 20060101ALN20220503BHEP Ipc: F25D 21/02 20060101AFI20220503BHEP |
|
INTG | Intention to grant announced |
Effective date: 20220518 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017062737 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1525776 Country of ref document: AT Kind code of ref document: T Effective date: 20221115 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20221019 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1525776 Country of ref document: AT Kind code of ref document: T Effective date: 20221019 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230220 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230119 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230219 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230120 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017062737 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20221231 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221219 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 |
|
26N | No opposition filed |
Effective date: 20230720 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221219 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221219 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20231220 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20231214 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20171219 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20231218 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221019 |