EP3459602A1 - Wall bar - Google Patents

Wall bar Download PDF

Info

Publication number
EP3459602A1
EP3459602A1 EP18000742.9A EP18000742A EP3459602A1 EP 3459602 A1 EP3459602 A1 EP 3459602A1 EP 18000742 A EP18000742 A EP 18000742A EP 3459602 A1 EP3459602 A1 EP 3459602A1
Authority
EP
European Patent Office
Prior art keywords
rungs
rung
wall
bars
wall bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP18000742.9A
Other languages
German (de)
French (fr)
Other versions
EP3459602B1 (en
Inventor
Kurt Schindler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP3459602A1 publication Critical patent/EP3459602A1/en
Application granted granted Critical
Publication of EP3459602B1 publication Critical patent/EP3459602B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/00047Exercising devices not moving during use
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B9/00Climbing poles, frames, or stages
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B1/00Horizontal bars
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B17/00Exercising apparatus combining several parts such as ladders, rods, beams, slides
    • A63B17/04Exercising apparatus combining several parts such as ladders, rods, beams, slides separable
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/06User-manipulated weights
    • A63B21/068User-manipulated weights using user's body weight
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B21/00Exercising apparatus for developing or strengthening the muscles or joints of the body by working against a counterforce, with or without measuring devices
    • A63B21/16Supports for anchoring force-resisters
    • A63B21/169Supports for anchoring force-resisters for anchoring on or against a wall
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B23/00Exercising apparatus specially adapted for particular parts of the body
    • A63B23/035Exercising apparatus specially adapted for particular parts of the body for limbs, i.e. upper or lower limbs, e.g. simultaneously
    • A63B23/12Exercising apparatus specially adapted for particular parts of the body for limbs, i.e. upper or lower limbs, e.g. simultaneously for upper limbs or related muscles, e.g. chest, upper back or shoulder muscles
    • A63B23/1209Involving a bending of elbow and shoulder joints simultaneously
    • A63B23/1218Chinning, pull-up, i.e. concentric movement
    • AHUMAN NECESSITIES
    • A63SPORTS; GAMES; AMUSEMENTS
    • A63BAPPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
    • A63B2210/00Space saving
    • A63B2210/50Size reducing arrangements for stowing or transport

Abstract

Die Erfindung betrifft eine Sprossenwand (1), welche zwei vertikale Holme (2) und mehrere daran befestigte, horizontal ausgerichtete, die beiden Holme (2) verbindende Sprossen (3) aufweist. Eine temporär an einer oder mehreren Sprossen (3) anbringbare Versteifungsvorrichtung liegt an einem seitlichen Mantelflächenbereich einer Sprosse (3) an, und ist an dem an der Sprosse anliegenden Bereich gegen Bewegung in jener horizontalen, normal zur Sprosse (3) verlaufenden Richtung, welche von der Sprosse (3) zu dem anliegenden Bereich der Versteifungsvorrichtung gerichtet ist, abgestützt.The invention relates to a wall bar (1), which has two vertical spars (2) and a plurality of horizontally aligned, the two spars (2) connected thereto rungs (3) attached thereto. A stiffening device which can be attached temporarily to one or more rungs (3) rests against a lateral lateral surface area of a rung (3) and is against the region abutting against the rung against movement in that horizontal direction normal to the rung (3) the rung (3) is directed to the adjacent region of the stiffening device, supported.

Description

Die Erfindung betrifft eine Sprossenwand.The invention relates to a wall bars.

Eine Sprossenwand im Sinne dieses Dokumentes ist ein leiterartiges Turnmöbel, welches typischerweise ortsfest an einer Wand angebracht ist, zwei zumindest annähernd vertikal und zueinander parallel verlaufende Holme aufweist, und eine Reihe von Sprossen, welche horizontal und parallel zueinander ausgerichtet sind und vertikal übereinander in einem Abstand zueinander die beiden Holme verbinden.A wall bars in the sense of this document is a ladder-like gymnastics furniture, which is typically fixedly mounted on a wall, two at least approximately vertically and mutually parallel spars, and a series of rungs, which are aligned horizontally and parallel to each other and vertically above each other at a distance connect the two spars to each other.

Beispielsweise die DE 1678249 zeigt ein oftmals als "Klimmzugbügel" bezeichnetes Turngerät, welches an einer Sprossenwand mittels Haken die Sprossen umgreifen lösbar befestigbar ist und in befestigtem Zustand normal zu deren Ebene von der Sprossenwand weg kragt. Das Turngerät erstreckt sich in vertikaler Richtung über mindestens zwei Sprossen der Sprossenwand. Wenn das Turngerät - welches beispielsweise eine Art Reckstange sein kann - bei Turnübungen in einem Abstand zur Ebene der Sprossenwand durch das Gewicht eines Menschen belastet wird, werden die Sprossen der Sprossenwand, an welchen das Turngerät anliegt, mit hohen Kräften belastet, die überwiegend horizontal normal zur Längsrichtung der jeweiligen Sprosse ausgerichteten sind. Sofern der jeweilige Angriffspunkt einer dieser Kräfte an einer Sprosse nicht sehr nahe an einem vertikalen Holm der Sprossenwand liegt, wird die Sprosse dadurch stark auf Biegung belastet. Diese Biegebelastung ist ein entscheidender, störend begrenzender Faktor für die Auslegung und Benutzbarkeit des Turngerätes an der Sprossenwand.For example, the DE 1678249 shows a frequently referred to as "pull-up bar" gymnastic apparatus which engage on a wall bars by means of hooks the sprouts is releasably attachable and cantilevered in the attached state normal to the plane of the wall bars. The gymnastics apparatus extends vertically over at least two rungs of the wall bars. If the gymnastic apparatus - which may be a kind of stretching bar, for example - is loaded by the weight of a person during gymnastic exercises at a distance from the level of the wall of the shoot, the rungs of the wall on which the gymnastic apparatus rests are loaded with high forces, which are predominantly horizontal normal are aligned to the longitudinal direction of the respective rung. If the respective point of attack of one of these forces on a rung is not very close to a vertical spar of the wall bars, the rung is thereby heavily loaded on bending. This bending load is a decisive, disturbing limiting factor for the design and usability of the gymnastics device on the wall bar.

Kurz sei erklärt, warum zwei naheliegende Lösungsansätze nicht zu befriedigenden Ergebnissen führen:
Das einzuhängenden Turngerät in vertikaler Richtung größer auszuführen und damit in vertikaler Richtung einen größeren Abstand zwischen den Abstützungspunkten zu erreichen, würde zwar zu kleineren Abstützungskräften an den Sprossen führen, brächte aber den Nachteil, dass der Höhenbereich in welchem das Turngerät angeordnet werden kann, störend verkleinert wird.
Briefly explain why two obvious solutions do not lead to satisfactory results:
To carry out the gymnastic equipment to be hooked in the vertical direction larger and thus to achieve a greater distance between the support points in the vertical direction, would lead to smaller support forces on the rungs, but would bring the Disadvantage that the height range in which the gymnastic apparatus can be arranged is reduced in a disturbing way.

Die Sprossen generell besser biegefest auszuführen, brächte den Nachteil, dass Holz als alleiniges Material für Sprossen nicht mehr ausreicht. Es müssten Sprossen aus Metall oder aus Metall-Holz-Verbund verwendet werden, welche teurer herzustellen und schwieriger zu verarbeiten wären, und bei vielen Turnübungen auch bezüglich der Haptik problematisch wären.The sprouts generally perform better bending resistant, would bring the disadvantage that wood is no longer sufficient as the sole material for sprouts. It would need to use rungs made of metal or metal-wood composite, which would be more expensive to produce and difficult to work with, and would be problematic in many gymnastics exercises also in terms of haptics.

Die der Erfindung zu Grunde liegende Aufgabe besteht darin, unter Umgehung der oben beschriebenen Nachteile eine Sprossenwand derart auszubilden, dass sie sowohl wie eine übliche Sprossenwand ohne zusätzlichem Turngerät verwendbar ist, als auch für die wahlweise Belastung mit einem Turngerät verwendbar ist, durch welches hohe Kräfte in horizontaler, normal zu den Sprossen ausgerichteten Richtungen in die Sprossen eingeleitet werden.The object of the invention is based, bypassing the disadvantages described above, a rung wall in such a way that it can be used as an ordinary wall bars without additional gym equipment, as well as for the optional load with a gymnastics device is used by which high forces be introduced into the rungs in horizontal, normal to the sprouts aligned directions.

Für das Lösen der Aufgabe wird vorgeschlagen, die Sprossenwand mit einer temporär an einer oder mehreren Sprossen anzubringenden Versteifungsvorrichtung auszustatten, welche an mindestens einer Sprosse seitlich an eine Mantelfläche anliegt und diese gegen Bewegung zu jener Seite hin an der die Versteifungsvorrichtung seitlich anliegt, abstützt.For solving the problem, it is proposed to equip the wall bars with a temporarily to be attached to one or more rungs stiffening device, which rests on at least one rung laterally against a lateral surface and this is against movement to that side on which the stiffening device bears laterally supported.

In einer besonders bevorzugten Ausführung der Erfindung besteht die Versteifungsvorrichtung in einem Zusatzholm, welcher zwischen zwei vertikalen Holmen der Sprossenwand, an den horizontal ausgerichteten, die beiden Holme durch eine starre Befestigung verbindenden Sprossen, platziert wird. Dieser Zusatzholm erstreckt sich in der zur Richtung der Sprossen normalen Richtung in der Ebene der Sprossenwand über mehrere Sprossen hinweg. Er ist an den einzelnen Sprossen gegen Relativbewegung normal zur Ebene der Sprossenwand fixiert und entlang der Sprossen verschiebbar.In a particularly preferred embodiment of the invention, the stiffening device in an additional spar, which is placed between two vertical bars of the rung wall, on the horizontally oriented, the two spars connecting by a rigid attachment rungs. This additional spar extends in the direction normal to the direction of the sprouts in the plane of the wall bars over several sprouts. It is fixed to the individual rungs against relative movement normal to the plane of the wall bars and slid along the rungs.

Wenn der Zusatzholm etwa in den mittleren Bereich zwischen zwei starr mit den Sprossen verbundenen Holmen verschoben ist, bewirkt er eine zwischen den Holmen der Sprossenwand liegende Abstützung gegen das Ausbiegen von einzelnen Sprossen zufolge horizontal ausgerichteter, an die Sprossen angreifender Kräfte, womit die Belastbarkeit der Sprossen gegenüber derartigen Kräften vielfach steigt. Wenn die Zusatzabstützung nicht erforderlich ist, kann der Zusatzholm an einen starren Holm herangeschoben werden und ist somit so verstaut, dass er kaum auffällt und übliche Benutzungsweisen der Sprossenwand nicht behindert.If the additional spar is moved approximately in the middle region between two rigidly connected to the rungs spars, causes he a lying between the spars of the wall bars support against the bending of individual sprouts according to horizontally oriented, attacking the rungs forces, whereby the resilience of the sprouts against such forces increases many times. If the additional support is not required, the additional spar can be pushed to a rigid spar and is thus stowed so that it hardly noticeable and does not hinder the usual ways of using the wall bar.

Gemäß einer besonders einfachen Ausführung des Erfindungsgedankens besteht die Versteifungsvorrichtung aus mehreren Versteifungsschienen, wobei jeweils eine Schiene an jeweils einer Sprosse anzubringen ist und dann entlang dieser Sprosse parallel verläuft. Um die Anbringung einfach zu machen, weist die Versteifungsschiene zumindest einen Längsabschnitt auf, in welchem sie U-Profilform aufweist, sodass sie auf eine Sprossen durch eine Bewegung normal zur Längsrichtung der Sprosse aufschiebbar ist.According to a particularly simple embodiment of the inventive idea, the stiffening device consists of a plurality of stiffening rails, wherein in each case one rail is to be attached to a respective rung and then runs parallel along this rung. To make the attachment easy, the stiffening rail has at least one longitudinal portion in which it has a U-profile shape, so that it can be pushed onto a rung by a movement normal to the longitudinal direction of the rung.

Gemäß einer weiteren Ausführung des Erfindungsgedankens besteht die Versteifungsvorrichtung aus normal zur Sprossenrichtung verlaufenden starren Klemmen, welche mindestens drei übereinanderliegende Sprossen verbinden und an den Sprossen gegen Relativbewegung zu diesen in horizontaler, quer zur Sprossenrichtung liegender Richtung, blockiert sind.According to a further embodiment of the inventive concept, the stiffening device consists of rigidly extending to the rung direction rigid clamps, which connect at least three superimposed rungs and are blocked on the rungs against relative movement to them in a horizontal, transversely to the rung direction.

Die Erfindung wird an Hand von Zeichnungen zu beispielhaften Ausführungen veranschaulicht:

Fig. 1:
zeigt eine erste erfindungsgemäße Sprossenwand allein in Frontalansicht.
Fig. 2:
zeigt mit Blickrichtung von oben her die Sprossenwand von Fig. 1 mit daran auf der obersten Sprosse angebrachtem Turngerät.
Fig. 3:
zeigt in seitlicher Teilschnittansicht die Sprossenwand von Fig. 1 und Fig. 2 mit daran in mittlere Höhe angebrachtem dem Turngerät von Fig. 2.
Fig. 4:
zeigt eine Schnittansicht durch eine Sprosse einer zweiten erfindungsgemäßen Sprossenwand.
Fig. 5:
zeigt eine Schnittansicht durch mehrere Sprossen einer dritten erfindungsgemäßen Sprossenwand.
The invention will be illustrated with reference to drawings of exemplary embodiments:
Fig. 1:
shows a first rung wall according to the invention alone in a frontal view.
Fig. 2:
shows the view from above the wall of Fig. 1 with gymnastic apparatus attached to it on the top rung.
3:
shows a side partial sectional view of the wall bars of Fig. 1 and Fig. 2 with the gymnastic apparatus attached to it in middle height Fig. 2 ,
4:
shows a sectional view through a rung of a second rung wall according to the invention.
Fig. 5:
shows a sectional view through several rungs of a third rung wall according to the invention.

Die Sprossenwand 1 von Fig. 1 bis 3 weist zwei seitliche Holme 2, Sprossen 3 und einen Zusatzholm 4 auf. Die Holme 2 und der Zusatzholm 4 sind typischerweise Rechteckprofile aus einem viellagigen Sperrholz. Die Sprossen 3 sind typischerweise Vollholzstäbe, beispielsweise Eschenholz. Üblicherweise sind die beiden Holme 2 an einer Wand eines Gebäudes starr fixiert. Die Sprossen 3 verlaufen horizontal zwischen den beiden Holmen 2 und sind mit ihren Enden in jeweils einem Holm 2 starr fixiert.The wall 1 of Fig. 1 to 3 has two lateral spars 2, 3 rungs and an additional spar 4. The spars 2 and the additional spar 4 are typically rectangular profiles of a multi-ply plywood. The rungs 3 are typically solid wood rods, for example ash wood. Usually, the two spars 2 are rigidly fixed to a wall of a building. The rungs 3 extend horizontally between the two bars 2 and are rigidly fixed with their ends in each case a spar 2.

Die erfindungsgemäße Versteifungsvorrichtung wird durch den Zusatzholm 4 gebildet. Er verläuft zwischen den beiden Holmen 2 etwa parallel zu diesen, und er ist durch die einzelnen Sprossen 3 durchdrungen. Das heißt, die Sprossen 3 verlaufen durch jeweils eine Bohrung durch den Zusatzholm 4 hindurch. Dabei bildet die Bohrung im Zusatzholm mit der jeweiligen Sprosse 3 eine Spielpassung, d.h. die Querschnittsabmessungen der Bohrung im Zusatzholm 4 sind geringfügig größer als die Querschnittsabmessungen der Sprosse. Da die Sprossen 3 parallel zueinander sind, ist damit der Zusatzholm 4 entlang der Längsrichtung der Sprossen 3 gegenüber diesen verschiebbar und damit im Bereich zwischen den beiden Holmen 2 einstellbar positionierbar. Relativbewegung zwischen Sprossen 3 und Zusatzholm 4, in zur Ebene der Sprossenwand 1 normalen Richtung, ist formschlüssig unterbunden.The stiffening device according to the invention is formed by the additional spar 4. It runs between the two bars 2 approximately parallel to these, and it is penetrated by the individual rungs 3. That is, the rungs 3 pass through a respective hole through the additional spar 4 therethrough. The hole in the additional spar with the respective rung 3 forms a clearance fit, i. the cross-sectional dimensions of the hole in the additional spar 4 are slightly larger than the cross-sectional dimensions of the rung. Since the rungs are 3 parallel to each other, so that the additional spar 4 along the longitudinal direction of the rungs 3 relative to these slidably and thus adjustable in the area between the two bars 2 positionable. Relative movement between sprouts 3 and additional spar 4, in the plane of the wall bar 1 normal direction is positively prevented.

Anstatt die Sprossen 3 durch Bohrungen im Zusatzholm durchzuführen, könnte man beispielsweise auch einen schmäleren Zusatzholm verwenden, welcher mit einer Reihe von Bügeln ausgestattet ist, welche jeweils eine Sprosse 3 umfassen.Instead of performing the rungs 3 through holes in the additional spar, one could for example also use a narrower additional spar, which is equipped with a series of brackets, each comprising a rung 3.

Fig. 2 und Fig. 3 zeigen wie ein Turngerät 5, welches man unter anderem auch als Klimmzugbügel nutzen kann, an der Sprossenwand 1 verankert ist. Fig. 2 and Fig. 3 show how a gymnastic apparatus 5, which can be used, inter alia, as a chin-up bar, anchored to the wall bars 1.

Das Turngerät 5 besteht aus zwei spiegelbildlich zueinander ausgebildete Modulen 6, 7 und einer diese Module 6, 7 verbindenden Verbindungsstange 8. Die Spiegelebene zwischen den beiden Modulen 6, 7 liegt dabei vertikal, normal zur Ebene der Sprossenwand 1.The gymnastics device 5 consists of two mirror-inverted modules 6, 7 and a connecting rod 8 connecting these modules 6, 7. The mirror plane between the two modules 6, 7 is vertical, normal to the plane of the wall bars. 1

Das Modul 6, 7 weist ein vertikal verlaufendes Zentralrohr 9 auf. Im an der Sprossenwand montiertem Zustand erstreckt sich das Zentralrohr 9 von einer mittleren Sprosse 3 aus zur nächstoberen und zur nächstunteren Sprosse 3. Am oberen Ende des Zentralrohres 9 ist ein nach unten offener Haken 10 befestigt, mit dem das Modul 6, 7 bestimmungsgemäß an der oberen der genannten Sprossen 3 von oben her einhängbar ist. Vom unteren Ende des Zentralrohres 9 aus ragt ein Fortsatz 11 unter die unterste der genannten Sprossen 3 und blockiert so unkontrolliertes Anheben des Moduls 6, 7.The module 6, 7 has a vertically extending central tube 9. In the mounted on the wall bars state, the central tube 9 extends from a central rung 3 from the next upper and the next lower rung 3. At the upper end of the central tube 9 a downwardly open hook 10 is fixed, with which the module 6, 7 as intended on the upper of said rungs 3 can be suspended from above. From the lower end of the central tube 9 protrudes an extension 11 below the bottom of said rungs 3 and blocks so uncontrolled lifting of the module 6, 7th

Von der den Sprossen 3 abgewandten Seite des Zentralrohres 9 ragt eine Reckstange 12 normal zur Ebene der Sprossenwand 1 von dieser horizontal weg. Bei der hier dargestellten vorteilhaften Ausführung ist der von der Sprossenwand 1 abgewandt liegende Endbereich der Reckstange 12 in eine zu den Sprossen 3 parallel liegende Richtung gebogen. Gegen Biegung nach unten ist die Reckstange 12 durch eine diagonal zwischen Zentralrohr 9 und Reckstange 12 verlaufende Diagonalstrebe 13 gehalten.From the side facing away from the rungs 3 of the central tube 9, a stretch rod 12 protrudes normal to the plane of the wall bars 1 of this horizontally away. In the advantageous embodiment shown here, the end region of the stretch rod 12 facing away from the bulkhead wall 1 is bent in a direction parallel to the rungs 3. Against bending down the stretch rod 12 is held by a diagonal brace 13 extending between the central tube 9 and stretch rod 12 diagonal strut.

Wenn die Reckstange 12 in einem von der Sprossenwand 1 entfernt liegenden Bereich mit Gewichtskraft, also nach unten gerichteter Kraft belastet wird, so bewirkt das, dass jene Sprosse 3 an welcher sich der Haken 10 befindet, mit einer horizontal zur Reckstange 12 hin ausgerichteten Kraft belastet wird, und jene Sprosse 3, an welcher sich der Fortsatz 11 befindet, mit einer horizontal von der Reckstange 12 weg ausgerichteten Kraft. Diese Kräfte könnten bei einer herkömmlichen Sprossenwand die besagten Sprossen 3 störend und gefährlich ausbiegen. Bei der dargestellten erfindungsgemäßen Bauweise jedoch ist das nicht der Fall, weil eine Ausbiegung dieser Sprossen durch den Zusatzholm 4 blockiert wird. Der Zusatzholm 4 selbst wird durch die zuvor genannten Sprossen 3, welche nicht unmittelbar durch die Module 6, 7 belastet sind, gegen Ausbiegung gehalten. Er bewirkt also, dass die Belastungen jener beiden Sprossen 3, an welchen die Module 6, 7 direkt anliegen, auf die weiteren benachbarten Sprossen aufgeteilt wird.When the stretch rod 12 is loaded in a region remote from the bulkhead wall 1 with weight force, ie downwardly directed force, this causes that rung 3 on which the hook 10 is loaded with a horizontally directed to the stretch rod 12 towards force is, and those rung 3, on which the extension 11 is located, with a horizontally oriented away from the stretch rod 12 force. These forces could deflect the said sprouts 3 disturbing and dangerous in a conventional wall bars. In the illustrated construction according to the invention, however, this is not the case because a deflection of these rungs is blocked by the additional spar 4. The additional spar 4 itself is characterized by the aforementioned Sprouts 3, which are not directly loaded by the modules 6, 7, held against deflection. It thus causes the loads of those two rungs 3, to which the modules 6, 7 lie directly, is divided on the other adjacent rungs.

In der in Fig. 2 und Fig. 3 dargestellten, sehr vorteilhaften Ausführung, liegt die Verbindungsstange 8 direkt am Zusatzholm 4 an, und zwar in jenem Höhenbereich, welcher mittig zwischen der oberen und der unteren direkt durch die Module 6, 7 belasteten Sprossen 3 liegt. Dadurch stützt die Verbindungsstange 8 den Zusatzholm 4 zusätzlich gegen Ausbiegung zur Reckstange 12 hin.In the in Fig. 2 and Fig. 3 shown, very advantageous embodiment, the connecting rod 8 is located directly on the additional spar 4, in that height range, which is located centrally between the upper and lower directly loaded by the modules 6, 7 rungs 3. As a result, the connecting rod 8 additionally supports the additional spar 4 against deflection toward the stretching rod 12.

Die Versteifungsvorrichtung gemäß Fig. 4 ist besonders einfach. Es ist eine - typischerweise aus Stahl bestehende - Versteifungsschiene 15, welche sich in montiertem Zustand parallel zu dieser entlang einer Sprosse 3 erstreckt und an dieser anliegt. Zumindest ein Längsabschnitt der Versteifungsschiene 15 ist als Klammer 16 mit U-Profilform ausgebildet, welche die Sprosse 3 teilweise umfasst und somit die Versteifungsschiene 15 an der Sprosse 3 hält. Wenn sich nur eine Klammer 16 in der Längsmitte der Versteifungsschien 15 befindet, ist die Versteifungsschiene 15 so an der Sprosse anzubringen, dass sich ihr durchgehender Längsteil an der Innenseite (Druckseite) der Biegekurve befindet. Wenn sich Klammern 16 nur an den Längsenden der Versteifungsschien 15 befinden, ist die Versteifungsschiene 15 so an der Sprosse anzubringen, dass sich ihr durchgehender Längsteil an der Außenseite (Zugseite) der Biegekurve befindet.The stiffening device according to Fig. 4 is very easy. It is a - typically made of steel - stiffening rail 15 which extends in the assembled state parallel to this along a rung 3 and rests against this. At least one longitudinal section of the stiffening rail 15 is designed as a clip 16 with a U-profile shape, which partially surrounds the rung 3 and thus holds the stiffening rail 15 on the rung 3. If only one clamp 16 is located in the longitudinal center of the stiffening rails 15, the stiffening rail 15 is to be attached to the rung such that its continuous longitudinal part is located on the inside (pressure side) of the bending curve. If brackets 16 are only at the longitudinal ends of the stiffening rails 15, the stiffening rail 15 is to be attached to the rung so that its continuous longitudinal part is located on the outside (tension side) of the bending curve.

Gemäß Fig. 5 ist die Versteifungsvorrichtung durch eine U-förmige Klemme 17 gebildet, welche typischerweise aus Stahl besteht und deren Schenkel sich in vertikaler Richtung über mindestens drei Sprossen 3 erstrecken und zueinander um genau eine Sprossenstärke beabstandet sind. Die freien Enden der Klemme 17 sind durch eine Schraubverbindung 18 (oder eine andere auf Zug haltende Verbindung) gegen Bewegung voneinander weg, gehalten. Bezüglich der Sprossen 3 wirkt die Klemme 17 etwa gleich wie der weiter oben an Hand Fig. 1 bis Fig. 3 besprochen Zusatzholm 4.According to Fig. 5 the stiffening device is formed by a U-shaped clamp 17, which is typically made of steel and whose legs extend in the vertical direction over at least three rungs 3 and are spaced from each other by exactly one rung thickness. The free ends of the clamp 17 are held away from each other by a screw connection 18 (or other connection holding a pull). Regarding the Sprouts 3, the clamp 17 is about the same as the above on hand Fig. 1 to Fig. 3 discussed additional spar 4.

Claims (8)

Sprossenwand (1), welche zwei vertikale Holme (2) und mehrere daran befestigte, horizontal ausgerichtete, die beiden Holme (2) verbindende Sprossen (3) aufweist,
dadurch gekennzeichnet, dass
sie eine temporär an einer oder mehreren Sprossen (3) anbringbare Versteifungsvorrichtung aufweist, welche an einem seitlichen Mantelflächenbereich einer Sprosse (3) anliegt und an dem an der Sprosse anliegenden Bereich gegen Bewegung in jener horizontalen, normal zur Sprosse (3) verlaufenden Richtung, welche von der Sprosse (3) zu dem anliegenden Bereich der Versteifungsvorrichtung gerichtet ist, abgestützt ist.
Wall bar (1) having two vertical bars (2) and a plurality of horizontally aligned rungs (3) connecting the two bars (2) attached thereto,
characterized in that
it has a temporarily attached to one or more rungs (3) stiffening device which abuts a lateral lateral surface region of a rung (3) and at the abutting region of the rung against movement in that horizontal, normal to the rung (3) extending direction, which is directed by the rung (3) to the adjacent region of the stiffening device is supported.
Sprossenwand (1), nach Anspruch 1, dadurch gekennzeichnet, dass sich zwischen den beiden Holmen (2) ein Zusatzholm (4) befindet, welcher sich in der zur Richtung der Sprossen (3) normalen Richtung in der Ebene der Sprossenwand (1) über mehrere Sprossen (3) hinweg erstreckt, an den einzelnen Sprossen (3) gegen Relativbewegung normal zur Ebene der Sprossenwand (1) fixiert ist, und parallel zu Sprossen (3) gegenüber diesen verschiebbar ist.Wall bar (1), according to claim 1, characterized in that between the two bars (2) is an additional spar (4), which in the direction of the sprouts (3) normal direction in the plane of the wall bars (1) via extends a plurality of rungs (3) away, is fixed to the individual rungs (3) against relative movement normal to the plane of the wall bars (1), and parallel to rungs (3) relative to these is displaceable. Sprossenwand nach Anspruch 2, dadurch gekennzeichnet, dass die einzelnen Sprossen (3) durch jeweils eine Bohrung durch den Zusatzholm (4) hindurch verlaufen.Wall bars according to claim 2, characterized in that the individual rungs (3) extend through a respective hole through the additional spar (4). Sprossenwand nach Anspruch 2, dadurch gekennzeichnet, dass an dem Zusatzholm (4) Bügel befestigt sind, welche jeweils eine Sprosse (3) umfassen.Wall bar according to claim 2, characterized in that on the additional spar (4) brackets are attached, each comprising a rung (3). Sprossenwand nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass der Zusatzholm (4) aus Sperrholz besteht.Wall bar according to one of claims 1 to 5, characterized in that the additional spar (4) consists of plywood. Sprossenwand nach Anspruch 1, dadurch gekennzeichnet, dass die Versteifungsvorrichtung eine Versteifungsschiene (15) umfasst, welche sich parallel zu dieser entlang einer Sprosse (3) erstreckt, und einen Längsabschnitt aufweist, welcher als Klammer (16) ausgebildet ist, die die Sprosse (3) an ihrer Mantelfläche umfasst.Wall bar according to claim 1, characterized in that the stiffening device comprises a stiffening rail (15), which extends parallel to this along a rung (3), and a longitudinal portion which is formed as a clamp (16) which comprises the rung (3) on its lateral surface. Sprossenwand nach Anspruch 1, dadurch gekennzeichnet, dass die Versteifungsvorrichtung als starre Klemme (17) ausgebildet ist, welche mindestens drei übereinanderliegende Sprossen (3) verbindet.Wall bars according to claim 1, characterized in that the stiffening device is designed as a rigid clamp (17) which connects at least three superimposed rungs (3). Sprossenwand nach Anspruch 7, dadurch gekennzeichnet, dass die Klemme (17) U-förmig ist, wobei sich die Schenkel des U über mindestens drei Sprossen (3) erstrecken und an der Vorderseite und an der Rückseite jeder dieser Sprossen (3) anliegen.Wall bar according to claim 7, characterized in that the clamp (17) is U-shaped, with the legs of the U extending over at least three rungs (3) and abutting the front and the back of each of these rungs (3).
EP18000742.9A 2017-09-21 2018-09-19 Wall bar Active EP3459602B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
ATA377/2017A AT520506A1 (en) 2017-09-21 2017-09-21 Turn system

Publications (2)

Publication Number Publication Date
EP3459602A1 true EP3459602A1 (en) 2019-03-27
EP3459602B1 EP3459602B1 (en) 2021-07-07

Family

ID=63667667

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18000742.9A Active EP3459602B1 (en) 2017-09-21 2018-09-19 Wall bar

Country Status (2)

Country Link
EP (1) EP3459602B1 (en)
AT (1) AT520506A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4017599A4 (en) * 2019-08-20 2023-10-04 Ingenious Moves LLC Crossbar assembly for an exercise ladder and an exercise ladder arrangement incorporating same

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE59681C (en) * F. V. HEIKEL in Helsingfors, Finnland Gymnastics scaffolding
GB290629A (en) * 1927-05-18 1928-08-02 Marcel Pierre Daragon
GB946981A (en) * 1961-12-07 1964-01-15 Petros Elia Improvements in and relating to physical training equipment
DE1678249A1 (en) 1968-03-08 1971-12-09 Robert Sander Gymnastics equipment
CN106215395A (en) * 2016-09-14 2016-12-14 安庆师范大学 A kind of combination sport appliances
DE102015012183A1 (en) * 2015-09-17 2017-03-23 Gotthilf Benz Turngerätefabrik GmbH + Co. KG wall bars

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9200821U1 (en) * 1992-01-24 1992-06-25 Sport-Thieme Gmbh, 3332 Grasleben, De
US6217483B1 (en) * 1997-04-03 2001-04-17 Charles Kallassy Exercise apparatus adjustment mechanism
US7309303B1 (en) * 2004-01-14 2007-12-18 Richard Proctor Exercising and physiotherapy system
US9662537B1 (en) * 2016-03-14 2017-05-30 Tony Graves Exercise attachment apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE59681C (en) * F. V. HEIKEL in Helsingfors, Finnland Gymnastics scaffolding
GB290629A (en) * 1927-05-18 1928-08-02 Marcel Pierre Daragon
GB946981A (en) * 1961-12-07 1964-01-15 Petros Elia Improvements in and relating to physical training equipment
DE1678249A1 (en) 1968-03-08 1971-12-09 Robert Sander Gymnastics equipment
DE102015012183A1 (en) * 2015-09-17 2017-03-23 Gotthilf Benz Turngerätefabrik GmbH + Co. KG wall bars
CN106215395A (en) * 2016-09-14 2016-12-14 安庆师范大学 A kind of combination sport appliances

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4017599A4 (en) * 2019-08-20 2023-10-04 Ingenious Moves LLC Crossbar assembly for an exercise ladder and an exercise ladder arrangement incorporating same

Also Published As

Publication number Publication date
EP3459602B1 (en) 2021-07-07
AT520506A1 (en) 2019-04-15

Similar Documents

Publication Publication Date Title
DE202020104196U1 (en) Scaffolding
DE202019004166U1 (en) Attachment element to enlarge the step surface of a ladder rung
DE102010017803A1 (en) Scaffolding support for gabion-bracket scaffold for workers, has angular shaped bearing element arranged at wire mesh of gabion, and receiver provided with connection unit and hook, which are hung into wire of gabion
EP3459602A1 (en) Wall bar
CH657888A5 (en) METAL SCAFFOLDING WITH METAL FRAME USING SECURING WIRE STRING.
DE820963C (en) Scaffolding with stands made of tubes
EP2557252A1 (en) Work platform and method for securely setting up a support frame tower
DE10305158A1 (en) Safety railings for constructing multi-level scaffolding comprise U-shaped bars with support devices at ends of support rods to fit and secure on rail of topmost scaffold stage
EP2792272B1 (en) Foldable frame for bench or table
DE202016001297U1 (en) Collapsible ladder
EP3323931B1 (en) Clothes horse for suspending and drying laundry
DE3824922A1 (en) Wooden ladder scaffolding with ascent devices
DE4114328C2 (en) Device for hanging a bracket frame element
DE10006094C2 (en) Scaffold stairway system
DE202013100469U1 (en) Carrying rack for a plate
DE10322289A1 (en) Side protection for scaffolding, has two connection pieces that are mounted to each pole in such a manner that connection pieces extend transverse to length of pole
DE102006060730B4 (en) Boom for a ladder or work scaffold
DE2236165B2 (en) framework
EP2072655B1 (en) Laundry carrier
DE202015003055U1 (en) Stand element of a cantilever rack
EP4248798A1 (en) Shelf
DE37206C (en) Iron scaffolding with adjustable floor height
DE10304089A1 (en) Side protection device for scaffold, includes single vertical post that attaches side protection rack to scaffolding support via couplings and perforated disks
DE815252C (en) Ladder console frame
DE688695C (en) Support frame for construction work, painting work, etc. like

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20190924

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200422

17Q First examination report despatched

Effective date: 20200619

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20210225

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1407980

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210715

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502018005956

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20210707

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211007

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211007

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211108

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20211008

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502018005956

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20210930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

26N No opposition filed

Effective date: 20220408

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210919

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210919

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210930

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220919

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20180919

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220919

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20230921

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230921

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20231001

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210707