EP3445916B1 - Foundation element - Google Patents
Foundation element Download PDFInfo
- Publication number
- EP3445916B1 EP3445916B1 EP17721878.1A EP17721878A EP3445916B1 EP 3445916 B1 EP3445916 B1 EP 3445916B1 EP 17721878 A EP17721878 A EP 17721878A EP 3445916 B1 EP3445916 B1 EP 3445916B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- foundation element
- closing means
- pressure chamber
- ground
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 claims description 19
- 238000003780 insertion Methods 0.000 claims description 18
- 230000037431 insertion Effects 0.000 claims description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 6
- 239000007788 liquid Substances 0.000 description 10
- 238000012360 testing method Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 5
- 239000012530 fluid Substances 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 239000003921 oil Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/04—Pneumatic caissons
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/44—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with enlarged footing or enlargements at the bottom of the pile
Definitions
- the invention relates to a vibrating device for inserting a foundation element, such as a foundation pile or sheet pile profile or tube, into the ground.
- a foundation element such as a foundation pile or sheet pile profile or tube
- Such foundation elements can be inserted into the ground on land or at sea.
- a problem with existing vibrating systems is that due to the ground resistance great power is usually required to insert the foundation element into the ground.
- the great resistance entails the danger of overloading of the hydraulic system and/or makes it necessary for great power to be provided for the vibrating system. This increases the insertion time of the foundation element and/or entails higher costs.
- An object of the present invention is to obviate or reduce the above stated problems and to provide an effective vibrating system for inserting a foundation element into the ground.
- the vibrating system for inserting a foundation element into the ground, wherein the vibrating system comprises:
- the vibrating device also referred to as vibrator block, with a number of eccentrics in particular enables a vibration to be exerted on a foundation element, such as a foundation pile, a foundation tube, a tube and a sheet pile profile.
- the drive of the vibrating device is formed by the motor, in a currently preferred embodiment comprising a hydraulic motor.
- This is preferably provided in combination with a pump, in a currently preferred embodiment comprising a hydraulic pump.
- This produces a quantity of hydraulic fluid which determines the frequency of the vibrating device.
- the effective frequency of the vibrating device is determined in practice by the relation between the quantity of hydraulic fluid and the so-called stroke volume of the hydraulic motor, together with the transmission ratio inside the vibrating device.
- the frequency of the vibrating device together with the eccentric moment of the vibrating device determine the impact force, i.e. the power produced by the vibrating device.
- the maximum available power of the drive for the vibrating system is determined by the (hydraulic) pump, which is operatively connected to the (hydraulic) motor, together with the drive unit for the (hydraulic) pump.
- a drive unit is preferably a diesel engine, although an electrically driven hydraulic pump is also possible.
- the hydraulic pressure determines the drive force which can be realized with the vibrating system.
- the drive force of the vibrating device is substantially used to overcome the resistance which is encountered during insertion into the ground of the foundation element, and some losses.
- Providing the drive with an adjusting device which is configured to set the drive force of the system achieves an optimal use of the available power, while the power which can be supplied by the vibrating device to the foundation element remains substantially constant.
- a closing means comprising one, two or more plugs or closing means
- a pressure chamber is provided in the interior of the foundation element.
- An overpressure can be provided in the pressure chamber during insertion into the ground of the foundation element. This achieves that the stability of the foundation element, particularly a tube, is increased. Providing an underpressure in the pressure chamber during the vibration process achieves that the foundation element will penetrate further into the ground than in a similar situation without pressure chamber. This significantly increases the effectiveness of the process, and enables a number of foundation elements to be inserted into the ground in less time. Besides installation being accelerated, an additional advantage is that a sound-reducing effect is achieved whereby the total amount of sound produced can remain limited. The risk that the foundation element may or may not reach its destination depth can in addition also be limited further. If desired, in a possible embodiment according to the invention it is also possible to provide a type of spring action with the pressure chamber during installation of the foundation element.
- the pressure chamber is preferably brought to an overpressure, whereby an upward force is achieved.
- This removal of a foundation element from the ground is also referred to as decommissioning.
- One of the advantages herein is that the crane used has to lift the foundation element and possible vibrator block, but need not overcome the full resistance of the ground. This is because the upward force contributes to the decommissioning of the foundation element. Decommissioning of the foundation element is for instance applicable during removal of the foundation element after use and/or testing of the load-bearing capacity of the foundation element.
- the pressure chamber in addition increases the buoyancy of the foundation element. This is particularly advantageous when the foundation element is transported over water, which element can hereby be displaced in floating manner. This simplifies transport of the foundation element.
- the closing means is positioned between two outer ends of the foundation element.
- the closing means is provided with one or more expanders for moving the closing means between an insertion configuration and a closing configuration in which the closing means is expanded.
- Expanders enables the closing means to be placed in the foundation element in relatively simple manner.
- the closing means is inserted and carried to the desired position while having a relatively small diameter.
- the closing means is brought to a relatively large diameter with the expanders such that the closing means is fixed against the internal surface of the pile or tube, preferably water and/or air-tightly.
- Expanders can be formed in diverse ways, for instance using an element extendable with a cylinder, and/or an inflatable element.
- the closing means is preferably removable. This allows the closing means to be reused.
- the closing means can be provided with a valve for for instance carrying air or water (passively) out of or into the pressure chamber.
- a medium such as air or water can additionally or alternatively be carried into the pressure chamber or removed therefrom in a more active manner using a pump or compressor.
- the vibrating system further comprises a control system for modifying the pressure in the pressure chamber.
- control system for modifying the pressure in the pressure chamber the pressure in this pressure chamber can be monitored and preferably controlled. Use is preferably made here of one or more pressure sensors. By making use of a control system according to the invention the desired effects to be achieved with the pressure chamber can be provided in effective manner.
- the control system is preferably suitable for controlling the above described passive and/or active manner of introducing or removing a medium, such as water or air, into or from the pressure chamber.
- the foundation element further comprises a cutting tool configured to cut off the foundation element.
- Providing a cutting tool is particularly advantageous during decommissioning of a foundation element. If a foundation element cannot be wholly removed from the ground, a part can be cut off so that at least a part of the foundation element can be removed.
- optimal use is made of the available power, and the power which can be transmitted by the vibrating device to the foundation element is kept substantially constant herein during use.
- the insertion time required and the overall amount of energy required to insert the foundation element into the ground is hereby minimized.
- the power taken up by the foundation element is determined here by the frequency and the drive force of the vibrating device.
- a foundation element By optimizing the taken-up power with an adjusting device in such a preferred embodiment a foundation element can be inserted into the ground in effective manner. It is here possible in practice to dispense with a conventional safety valve, or at least with the practical use thereof, whereby in conventional systems the maximum operating pressure is limited. Hydraulic fluid is carried via such a safety valve back to the reservoir, while the drive force of the vibrating device remains the same. This results in loss of power.
- the adjusting device according to the invention increases the drive force, while the frequency is reduced. No power is hereby lost, and an effective process is achieved.
- the invention further relates to a method for inserting a foundation element into the ground or decommissioning it, comprising the steps of:
- the method provides the same advantages and effects as described for the vibrating system.
- this closing means is preferably arranged in the interior of the foundation element between the two outer ends thereof. Use is preferably made here of expanders for varying the diameter of the closing means.
- the method also preferably comprises the step of removing the closing means.
- the method comprises the step of transporting the foundation element over water, wherein the pressure chamber created by the closing means provides buoyancy. This enables efficient transport.
- the pressure chamber is preferably placed under an overpressure such that the stability of the foundation element is increased. This preferably improves the stability such that the foundation element can stand independently. This simplifies the insertion process.
- Increasing the stability prior to insertion into the ground is in a possible embodiment also possible when the foundation element is not yet positioned on the ground or ground layer by making use of two closing means.
- the pressure chamber is then situated therebetween. For insertion into the ground one of the closing means can then be opened or removed, so that the ground will once again function as second closing means and an underpressure in the pressure chamber allows the vibration process to run more efficiently, as already described above.
- the pressure chamber is here preferably filled with a gas or liquid which is lighter than water, for instance air, for the purpose of increasing the stability.
- the pressure chamber is placed under an underpressure for the purpose of insertion, such that the power of insertion into the ground is increased during insertion of the foundation element into the ground.
- a smaller vibrating device can hereby suffice and/or the foundation element can be inserted into the ground more quickly.
- the pressure chamber is placed under an overpressure such that an outward pressing or outward driving force is achieved during decommissioning of the foundation element.
- a smaller vibrating device can hereby suffice and/or the foundation element can be decommissioned more quickly.
- a cutting tool is preferably provided in this application. In the case that not the whole foundation element need or can be removed from the ground, the foundation element is cut off with a cutting tool during decommissioning of the foundation element.
- the pressure in the pressure chamber is preferably monitored and preferably controlled with a control system.
- Foundation element 2 ( Figure 1 ) is held on the upper side by clamping system 4 using one or more clamps 6.
- vibrator block 8 Arranged above clamping system 4 is vibrator block 8 which in the shown embodiment is provided with hydraulic motor 10. Further arranged above vibrator block 8 is a so-called suppressor 12 which ensures inter alia that vibrations are not transmitted via connection 14 to for instance the boom of a lifting device.
- vibrating system 16 comprises in addition to vibrator block 8 with hydraulic motor 10 a power pack 18, wherein hydraulic hoses 20 carry hydraulic fluid, for instance an oil, to connections to suppressor 12 and back via hoses 22, wherein via suppressor 12 hydraulic fluid is carried via hydraulic hoses 24 to hydraulic motor 10 and back via hydraulic hoses 26.
- hydraulic hoses 20, 22, 24, 26 A different configuration of hydraulic hoses 20, 22, 24, 26 is of course likewise possible.
- power pack 18 comprises diesel engine 28 and hydraulic pump 30, which are mutually coupled using connection 32.
- foundation pile 2 is situated partially in air 38, under water 40 and in ground 42.
- a pile cutter 44 is further optionally provided.
- Pressure sensor 46 whereby pressure signal 48 is sent to controller 50, is shown schematically.
- instruction 52 can hereby be sent to actuator 54, for instance a pump, which modifies the pressure in pressure chamber 36, if required, with control action 56.
- an underpressure is preferably applied in chamber 36 during transport and upending.
- an overpressure is preferably applied in chamber 36 for the purpose of stable positioning.
- an underpressure is preferably applied in chamber 36 using controller 50.
- pile 2 When pile 2 is decommissioned from ground 42 an overpressure is preferably applied in chamber 36. If desired, a part of pile 2 can be cut off using pile cutter 44.
- Vibrator block 8 is hereby driven and operated at a determined frequency and drive force. In the case of an increase of the resistance to a foundation element 2 being inserted into the ground, the drive force is increased according to the invention, while the frequency of vibrator block 8 decreases.
- closing means according to the invention can be both placed in the foundation element as separate component or can be integrated therein.
- the pressure chamber can optionally be filled with both liquid which cannot be compressed in practice, or hardly so, and/or gas which can be compressed in practice.
- use is for instance made of water or air.
- the choice can be made on the basis of for instance the specific application, such as insertion of the foundation element into the ground, decommissioning of the foundation element, increasing the pile stability and/or testing the load-bearing capacity.
- the closing means can also be used to test the load-bearing force of the pile.
- the downward load-bearing capacity of the pile can be tested by creating underpressure.
- the upward load-bearing capacity can be tested by creating overpressure. This testing is for instance possible immediately after installation with the vibrating system. It is also possible to perform the tests at a later time, for instance in order to map the change in load-bearing capacity in the course of time.
- Increasing the stability and/or testing the load-bearing capacity with the closing means in a possible embodiment can be done in combination with the vibrating system, but also by using only the closing means.
- the stability is increased using in particular two closing means, wherein the pressure chamber is filled with a gas or liquid lighter than the surrounding liquid, optionally in combination with an above described vibrating device.
- the stability is increased using one closing means, wherein the pressure chamber is filled with a gas or liquid lighter than the surrounding liquid, optionally in combination with an above described vibrating device.
- a foundation element is inserted into the ground more efficiently by applying underpressure in the pressure chamber, in combination with vibration, wherein the pressure chamber is filled with liquid, gas or a combination of the two.
- a foundation element is decommissioned more efficiently, in combination with vibration, wherein the pressure chamber is filled with air, water or a combination of the two.
- the upward load-bearing capacity is tested by means of applying an overpressure, wherein the pressure chamber is filled with liquid, gas or a combination of the two, optionally in combination with a vibrating device.
- the downward load-bearing capacity is tested by applying an underpressure, wherein the pressure chamber is filled with liquid, gas or a combination of the two, optionally in combination with a vibrating device.
- an optional so-called pile run during installation of the pile is prevented or avoided, wherein the closing means can be closed in the case of such a pile run, wherein the pressure chamber is filled with liquid.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
- The invention relates to a vibrating device for inserting a foundation element, such as a foundation pile or sheet pile profile or tube, into the ground. Such foundation elements can be inserted into the ground on land or at sea.
- Diverse vibrating systems are known in practice which make use of a vibrating device and more particularly of a vibrator block provided with a number of eccentrics. Such a vibrator block exerts vibrations on the foundation element, whereby this element is vibrated into the ground. Such vibrator blocks are usually arranged on the upper side of the foundation element during insertion thereof. These vibrating systems known in practice are usually driven hydraulically, wherein use is made of a so-called power pack comprising a diesel engine and a hydraulic pump. This hydraulic pump drives the hydraulic motor of the vibrating device.
- The document
US 6 672 805 B1 discloses a vibrating system sporting a foundation element according to the preamble of claim 1. It further teaches a method of installing or decommissioning a foundation element. - A problem with existing vibrating systems is that due to the ground resistance great power is usually required to insert the foundation element into the ground. The great resistance entails the danger of overloading of the hydraulic system and/or makes it necessary for great power to be provided for the vibrating system. This increases the insertion time of the foundation element and/or entails higher costs.
- An object of the present invention is to obviate or reduce the above stated problems and to provide an effective vibrating system for inserting a foundation element into the ground.
- This object is achieved with the vibrating system according to the present invention for inserting a foundation element into the ground, wherein the vibrating system comprises:
- a vibrating device;
- a drive operatively connected to the vibrating device and comprising a motor; and
- a foundation element to be inserted into the ground or removed from the ground, comprising a closing means arranged in the interior of the foundation element for realizing a pressure chamber in the interior of the foundation element. In a currently preferred embodiment the pressure chamber is created between the closing means and the ground into which or on which the foundation element is inserted or is situated.
- Providing the vibrating device, also referred to as vibrator block, with a number of eccentrics in particular enables a vibration to be exerted on a foundation element, such as a foundation pile, a foundation tube, a tube and a sheet pile profile.
The drive of the vibrating device is formed by the motor, in a currently preferred embodiment comprising a hydraulic motor. This is preferably provided in combination with a pump, in a currently preferred embodiment comprising a hydraulic pump. This produces a quantity of hydraulic fluid which determines the frequency of the vibrating device. The effective frequency of the vibrating device is determined in practice by the relation between the quantity of hydraulic fluid and the so-called stroke volume of the hydraulic motor, together with the transmission ratio inside the vibrating device. The frequency of the vibrating device together with the eccentric moment of the vibrating device determine the impact force, i.e. the power produced by the vibrating device. - The maximum available power of the drive for the vibrating system is determined by the (hydraulic) pump, which is operatively connected to the (hydraulic) motor, together with the drive unit for the (hydraulic) pump. Such a drive unit is preferably a diesel engine, although an electrically driven hydraulic pump is also possible.
- The hydraulic pressure determines the drive force which can be realized with the vibrating system. The drive force of the vibrating device is substantially used to overcome the resistance which is encountered during insertion into the ground of the foundation element, and some losses. Providing the drive with an adjusting device which is configured to set the drive force of the system achieves an optimal use of the available power, while the power which can be supplied by the vibrating device to the foundation element remains substantially constant.
- By providing according to the invention a closing means, comprising one, two or more plugs or closing means, a pressure chamber is provided in the interior of the foundation element.
- An overpressure can be provided in the pressure chamber during insertion into the ground of the foundation element. This achieves that the stability of the foundation element, particularly a tube, is increased. Providing an underpressure in the pressure chamber during the vibration process achieves that the foundation element will penetrate further into the ground than in a similar situation without pressure chamber. This significantly increases the effectiveness of the process, and enables a number of foundation elements to be inserted into the ground in less time. Besides installation being accelerated, an additional advantage is that a sound-reducing effect is achieved whereby the total amount of sound produced can remain limited. The risk that the foundation element may or may not reach its destination depth can in addition also be limited further. If desired, in a possible embodiment according to the invention it is also possible to provide a type of spring action with the pressure chamber during installation of the foundation element.
- During removal of the foundation element from the ground the pressure chamber is preferably brought to an overpressure, whereby an upward force is achieved. This removal of a foundation element from the ground is also referred to as decommissioning. One of the advantages herein is that the crane used has to lift the foundation element and possible vibrator block, but need not overcome the full resistance of the ground. This is because the upward force contributes to the decommissioning of the foundation element. Decommissioning of the foundation element is for instance applicable during removal of the foundation element after use and/or testing of the load-bearing capacity of the foundation element.
- The pressure chamber in addition increases the buoyancy of the foundation element. This is particularly advantageous when the foundation element is transported over water, which element can hereby be displaced in floating manner. This simplifies transport of the foundation element.
- Multiple effects are achieved in the above stated manner with the pressure chamber according to the invention, which can be advantageously combined in the whole process of insertion of the foundation element into the ground or decommissioning thereof. This can hereby be performed in more effective manner, preferably using a lighter vibrating device.
- In an advantageous preferred embodiment according to the invention the closing means is positioned between two outer ends of the foundation element.
- By providing the closing means in the interior of the foundation element instead of at the outer end thereof in a possible embodiment an interior pressure chamber is provided inside the foundation element. The above stated effects are hereby better guaranteed.
- In an advantageous preferred embodiment according to the invention the closing means is provided with one or more expanders for moving the closing means between an insertion configuration and a closing configuration in which the closing means is expanded.
- Applying expanders enables the closing means to be placed in the foundation element in relatively simple manner. In the case that round foundation piles or tubes are applied, the closing means is inserted and carried to the desired position while having a relatively small diameter. At the desired position the closing means is brought to a relatively large diameter with the expanders such that the closing means is fixed against the internal surface of the pile or tube, preferably water and/or air-tightly. Expanders can be formed in diverse ways, for instance using an element extendable with a cylinder, and/or an inflatable element.
- The closing means is preferably removable. This allows the closing means to be reused.
- In a further embodiment according to the invention the closing means can be provided with a valve for for instance carrying air or water (passively) out of or into the pressure chamber. If desired, a medium such as air or water can additionally or alternatively be carried into the pressure chamber or removed therefrom in a more active manner using a pump or compressor.
- In an advantageous preferred embodiment according to the invention the vibrating system further comprises a control system for modifying the pressure in the pressure chamber.
- By providing a control system for modifying the pressure in the pressure chamber the pressure in this pressure chamber can be monitored and preferably controlled. Use is preferably made here of one or more pressure sensors. By making use of a control system according to the invention the desired effects to be achieved with the pressure chamber can be provided in effective manner. The control system is preferably suitable for controlling the above described passive and/or active manner of introducing or removing a medium, such as water or air, into or from the pressure chamber.
- In an advantageous preferred embodiment according to the invention the foundation element further comprises a cutting tool configured to cut off the foundation element.
- Providing a cutting tool is particularly advantageous during decommissioning of a foundation element. If a foundation element cannot be wholly removed from the ground, a part can be cut off so that at least a part of the foundation element can be removed.
- In a currently preferred embodiment optimal use is made of the available power, and the power which can be transmitted by the vibrating device to the foundation element is kept substantially constant herein during use. The insertion time required and the overall amount of energy required to insert the foundation element into the ground is hereby minimized. The power taken up by the foundation element is determined here by the frequency and the drive force of the vibrating device.
- By optimizing the taken-up power with an adjusting device in such a preferred embodiment a foundation element can be inserted into the ground in effective manner. It is here possible in practice to dispense with a conventional safety valve, or at least with the practical use thereof, whereby in conventional systems the maximum operating pressure is limited. Hydraulic fluid is carried via such a safety valve back to the reservoir, while the drive force of the vibrating device remains the same. This results in loss of power. The adjusting device according to the invention increases the drive force, while the frequency is reduced. No power is hereby lost, and an effective process is achieved.
- The invention further relates to a method for inserting a foundation element into the ground or decommissioning it, comprising the steps of:
- providing a foundation element to be inserted into the ground or decommissioned;
- providing a closing means in the foundation element for the purpose of providing a pressure chamber;
- providing a vibrating device at or on the foundation element; and
- inserting or removing the foundation element.
- The method provides the same advantages and effects as described for the vibrating system.
- During providing of the closing means, this closing means is preferably arranged in the interior of the foundation element between the two outer ends thereof. Use is preferably made here of expanders for varying the diameter of the closing means. The method also preferably comprises the step of removing the closing means.
- In a possible application the method comprises the step of transporting the foundation element over water, wherein the pressure chamber created by the closing means provides buoyancy. This enables efficient transport.
- During or prior to insertion into the ground the pressure chamber is preferably placed under an overpressure such that the stability of the foundation element is increased. This preferably improves the stability such that the foundation element can stand independently. This simplifies the insertion process. Increasing the stability prior to insertion into the ground is in a possible embodiment also possible when the foundation element is not yet positioned on the ground or ground layer by making use of two closing means. The pressure chamber is then situated therebetween. For insertion into the ground one of the closing means can then be opened or removed, so that the ground will once again function as second closing means and an underpressure in the pressure chamber allows the vibration process to run more efficiently, as already described above. The pressure chamber is here preferably filled with a gas or liquid which is lighter than water, for instance air, for the purpose of increasing the stability.
- In a possible advantageous embodiment the pressure chamber is placed under an underpressure for the purpose of insertion, such that the power of insertion into the ground is increased during insertion of the foundation element into the ground. A smaller vibrating device can hereby suffice and/or the foundation element can be inserted into the ground more quickly.
- In a further advantageous preferred embodiment the pressure chamber is placed under an overpressure such that an outward pressing or outward driving force is achieved during decommissioning of the foundation element. A smaller vibrating device can hereby suffice and/or the foundation element can be decommissioned more quickly. A cutting tool is preferably provided in this application. In the case that not the whole foundation element need or can be removed from the ground, the foundation element is cut off with a cutting tool during decommissioning of the foundation element.
- In the discussed applications the pressure in the pressure chamber is preferably monitored and preferably controlled with a control system.
- Further advantages, features and details of the invention are elucidated on the basis of a preferred embodiment thereof, wherein reference is made to the accompanying figures in which:
-
Figure 1 shows a view of a vibrating system according to the invention. - Foundation element 2 (
Figure 1 ) is held on the upper side by clamping system 4 using one or more clamps 6. Arranged above clamping system 4 is vibrator block 8 which in the shown embodiment is provided withhydraulic motor 10. Further arranged above vibrator block 8 is a so-calledsuppressor 12 which ensures inter alia that vibrations are not transmitted viaconnection 14 to for instance the boom of a lifting device. - In the shown
embodiment vibrating system 16 comprises in addition to vibrator block 8 with hydraulic motor 10 apower pack 18, whereinhydraulic hoses 20 carry hydraulic fluid, for instance an oil, to connections tosuppressor 12 and back viahoses 22, wherein viasuppressor 12 hydraulic fluid is carried viahydraulic hoses 24 tohydraulic motor 10 and back viahydraulic hoses 26. A different configuration ofhydraulic hoses - In the shown
embodiment power pack 18 comprisesdiesel engine 28 andhydraulic pump 30, which are mutually coupled usingconnection 32. - Provided in
foundation element 2 is closing means or plug 34 wherebypressure chamber 36 is provided. In the shownembodiment foundation pile 2 is situated partially inair 38, underwater 40 and inground 42. Apile cutter 44 is further optionally provided. -
Pressure sensor 46, wherebypressure signal 48 is sent tocontroller 50, is shown schematically. On the basis of the operation to be performed onfoundation element 2,instruction 52 can hereby be sent toactuator 54, for instance a pump, which modifies the pressure inpressure chamber 36, if required, withcontrol action 56. - When foundation pile 2 is installed in
ground 42 an underpressure is preferably applied inchamber 36 during transport and upending. Whenpile 2 is positioned upright an overpressure is preferably applied inchamber 36 for the purpose of stable positioning. During vibration for the purpose of installation an underpressure is preferably applied inchamber 36 usingcontroller 50. - When
pile 2 is decommissioned fromground 42 an overpressure is preferably applied inchamber 36. If desired, a part ofpile 2 can be cut off usingpile cutter 44. - During insertion of
foundation element 2power pack 18 is set into operation to supply available power. Hydraulic oil is carried tomotor 10 with a set stroke volume. Vibrator block 8 is hereby driven and operated at a determined frequency and drive force. In the case of an increase of the resistance to afoundation element 2 being inserted into the ground, the drive force is increased according to the invention, while the frequency of vibrator block 8 decreases. - It is noted for the sake of completeness that the closing means according to the invention can be both placed in the foundation element as separate component or can be integrated therein.
- According to the invention, the pressure chamber can optionally be filled with both liquid which cannot be compressed in practice, or hardly so, and/or gas which can be compressed in practice. In an advantageous embodiment use is for instance made of water or air. The choice can be made on the basis of for instance the specific application, such as insertion of the foundation element into the ground, decommissioning of the foundation element, increasing the pile stability and/or testing the load-bearing capacity.
- In a possible embodiment the closing means can also be used to test the load-bearing force of the pile. The downward load-bearing capacity of the pile can be tested by creating underpressure. The upward load-bearing capacity can be tested by creating overpressure. This testing is for instance possible immediately after installation with the vibrating system. It is also possible to perform the tests at a later time, for instance in order to map the change in load-bearing capacity in the course of time.
- Increasing the stability and/or testing the load-bearing capacity with the closing means in a possible embodiment can be done in combination with the vibrating system, but also by using only the closing means.
- A number of the possible embodiments or possible applications according to the invention is stated below. These can be applied individually or in different combinations, optionally in combination with other aspects.
- In a first embodiment the stability is increased using in particular two closing means, wherein the pressure chamber is filled with a gas or liquid lighter than the surrounding liquid, optionally in combination with an above described vibrating device.
- In a second embodiment the stability is increased using one closing means, wherein the pressure chamber is filled with a gas or liquid lighter than the surrounding liquid, optionally in combination with an above described vibrating device.
- In a third embodiment a foundation element is inserted into the ground more efficiently by applying underpressure in the pressure chamber, in combination with vibration, wherein the pressure chamber is filled with liquid, gas or a combination of the two.
- In a fourth embodiment a foundation element is decommissioned more efficiently, in combination with vibration, wherein the pressure chamber is filled with air, water or a combination of the two.
- In a fifth embodiment the upward load-bearing capacity is tested by means of applying an overpressure, wherein the pressure chamber is filled with liquid, gas or a combination of the two, optionally in combination with a vibrating device.
- In a sixth embodiment the downward load-bearing capacity is tested by applying an underpressure, wherein the pressure chamber is filled with liquid, gas or a combination of the two, optionally in combination with a vibrating device.
- In a seventh embodiment an optional so-called pile run during installation of the pile is prevented or avoided, wherein the closing means can be closed in the case of such a pile run, wherein the pressure chamber is filled with liquid.
Claims (14)
- Vibrating system (16) comprising:- a vibrating device (8);- a drive operatively connected to the vibrating device and comprising a motor; and- a foundation element (2) to be installed in the ground or decommissioned from the ground, characterized in that the foundation element comprises a closing means (34) arranged in the interior of the foundation element for realizing a pressure chamber (36) in the interior of the foundation element.
- Vibrating system as claimed in claim 1, wherein the closing means is positioned on or between two outer ends of the foundation element.
- Vibrating system as claimed in claim 1 or 2, wherein the closing means is provided with one or more expanders configured to move the closing means between an insertion configuration and a closing configuration in which the closing means is expanded.
- Vibrating system as claimed in claim 1, 2 or 3, wherein the closing means is removable.
- Vibrating system as claimed in one or more of the foregoing claims, wherein the foundation element further comprises a pile cutter (44) configured to cut off the foundation element.
- Vibrating system as claimed in one or more of the foregoing claims, further comprising a control system (50) configured to modify the pressure in the pressure chamber.
- Method for installing or decommissioning a foundation element, comprising the steps of:- providing a foundation element (2) to be installed or decommissioned;- providing a closing means (34) in the foundation element for the purpose of providing a pressure chamber (36);- providing a vibrating device (8) at or on the foundation element; and- inserting or removing the foundation element.
- Method as claimed in claim 7, wherein during providing of the closing means, this closing means is arranged in the interior of the foundation element on or between the two outer ends thereof.
- Method as claimed in claim 7 or 8, further comprising the step of removing the closing means.
- Method as claimed in claim 7, 8 or 9, further comprising the step of transporting the foundation element over water (40), wherein the pressure chamber created by the closing means provides buoyancy.
- Method as claimed in one or more of the foregoing claims 7-10, wherein the pressure chamber is placed under an overpressure such that the stability of the foundation element is increased.
- Method as claimed in one or more of the foregoing claims 7-11, wherein the pressure chamber is placed under an underpressure such that the power of insertion into the ground (42) is increased during installation of the foundation element.
- Method as claimed in one or more of the foregoing claims 7-12, wherein the pressure chamber is placed under an overpressure such that an outward pressing force is achieved during decommissioning of the foundation element.
- Method as claimed in one or more of the foregoing claims 7-13, wherein the foundation element is cut off with a pile cutter (44) during decommissioning of the foundation element.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NL2016626 | 2016-04-18 | ||
PCT/NL2017/050232 WO2017183962A1 (en) | 2016-04-18 | 2017-04-13 | Foundation element |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3445916A1 EP3445916A1 (en) | 2019-02-27 |
EP3445916B1 true EP3445916B1 (en) | 2020-05-13 |
Family
ID=58671879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17721878.1A Active EP3445916B1 (en) | 2016-04-18 | 2017-04-13 | Foundation element |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3445916B1 (en) |
DK (1) | DK3445916T3 (en) |
WO (1) | WO2017183962A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20220099804A (en) * | 2021-01-07 | 2022-07-14 | 한국건설기술연구원 | Underwater foundation structure with removal method and pull-out structure of underwater foundation structure |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017183962A1 (en) * | 2016-04-18 | 2017-10-26 | Cape Holland Holding B.V. | Foundation element |
JP6855104B2 (en) * | 2019-03-27 | 2021-04-07 | 大豊建設株式会社 | How to set the air pressure condition of the pneumatic caisson and its work room and man's air pressure room |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016200261A1 (en) * | 2015-06-10 | 2016-12-15 | Vizionz Holding B.V. | Foundation pile |
WO2017183962A1 (en) * | 2016-04-18 | 2017-10-26 | Cape Holland Holding B.V. | Foundation element |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT363044B (en) * | 1977-08-02 | 1981-07-10 | Leffer Stahl & App | DEVICE FOR DEPOSITING A PIPED DEEP HOLE FOR PRODUCING A PIPED FOUNDATION |
-
2017
- 2017-04-13 WO PCT/NL2017/050232 patent/WO2017183962A1/en active Application Filing
- 2017-04-13 DK DK17721878.1T patent/DK3445916T3/en active
- 2017-04-13 EP EP17721878.1A patent/EP3445916B1/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2016200261A1 (en) * | 2015-06-10 | 2016-12-15 | Vizionz Holding B.V. | Foundation pile |
WO2017183962A1 (en) * | 2016-04-18 | 2017-10-26 | Cape Holland Holding B.V. | Foundation element |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20220099804A (en) * | 2021-01-07 | 2022-07-14 | 한국건설기술연구원 | Underwater foundation structure with removal method and pull-out structure of underwater foundation structure |
Also Published As
Publication number | Publication date |
---|---|
DK3445916T3 (en) | 2020-07-20 |
WO2017183962A1 (en) | 2017-10-26 |
EP3445916A1 (en) | 2019-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3445916B1 (en) | Foundation element | |
RU2498016C2 (en) | Deep water pile driver | |
US11333284B2 (en) | Centre system | |
EP0751853B1 (en) | Hydraulic control circuit for pile driver | |
US4257721A (en) | System for placement of piles into the seafloor | |
US10385883B2 (en) | Vibrating ram arrangement, and method for operating the vibrating ram arrangement | |
EP2325397B1 (en) | System for and method of installing foundation elements in a subsea ground formation | |
US20160130777A1 (en) | Method of and driver for installing foundation elements in a ground formation | |
NL2006017C2 (en) | Pile driver system for and method of installing foundation elements in a subsea ground formation. | |
US7861641B2 (en) | Impulse generator and method for impulse generation | |
AU2012240638B2 (en) | Device and method for rock- and concrete machining | |
EP3180478B1 (en) | Hydraulically operated linear driver | |
US5662175A (en) | Sea water pile hammer | |
WO2021075971A1 (en) | Vibrating system and method for inserting a foundation element into the ground using flexible elements | |
FI77724C (en) | Method and apparatus for controlling the cyclic movement of a piston cylinder piston. | |
WO2017164740A1 (en) | Drilling rig | |
US20090123236A1 (en) | Driver for and method of installing foundation elements and a kit of parts for assembling a driver | |
GB2450339A (en) | Removing hollow piles from the ground using fluid pressure | |
JP2000129679A (en) | Vibratory pile driver | |
RU26059U1 (en) | VIBRO-LOADER-PILES | |
JPS5894523A (en) | Driving of both end-opened hollow pile into ground | |
RU2383685C1 (en) | Head of pile driving hammer | |
JPS6024750Y2 (en) | vibrating pile driver | |
JP2022539382A (en) | Pile driver and method | |
JPS6050928B2 (en) | Device to prevent ground vibration caused by impact |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20181119 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20191219 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017016504 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1270441 Country of ref document: AT Kind code of ref document: T Effective date: 20200615 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20200713 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20200513 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200914 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200913 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200814 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200813 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1270441 Country of ref document: AT Kind code of ref document: T Effective date: 20200513 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017016504 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20210216 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210413 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210430 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210413 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230516 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20170413 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240426 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20240321 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240429 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240429 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20240425 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20240429 Year of fee payment: 8 Ref country code: FR Payment date: 20240425 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20240429 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200513 |