EP3381858A1 - Kit for a temporary hoist - Google Patents
Kit for a temporary hoist Download PDFInfo
- Publication number
- EP3381858A1 EP3381858A1 EP18161232.6A EP18161232A EP3381858A1 EP 3381858 A1 EP3381858 A1 EP 3381858A1 EP 18161232 A EP18161232 A EP 18161232A EP 3381858 A1 EP3381858 A1 EP 3381858A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tower
- basket
- kit according
- platform
- winch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000000903 blocking effect Effects 0.000 claims description 6
- 239000002184 metal Substances 0.000 abstract description 3
- 229910052751 metal Inorganic materials 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 13
- 238000000926 separation method Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 239000002131 composite material Substances 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 239000006228 supernatant Substances 0.000 description 4
- 230000006835 compression Effects 0.000 description 3
- 238000007906 compression Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000011265 semifinished product Substances 0.000 description 2
- 235000004443 Ricinus communis Nutrition 0.000 description 1
- 240000000528 Ricinus communis Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000001404 mediated effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 210000002445 nipple Anatomy 0.000 description 1
- 239000000047 product Substances 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000035484 reaction time Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/16—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
- B66B9/187—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure with a liftway specially adapted for temporary connection to a building or other structure
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
- B66B9/16—Mobile or transportable lifts specially adapted to be shifted from one part of a building or other structure to another part or to another building or structure
Definitions
- the invention relates to a kit for producing a temporary elevator.
- Freight lifts are used for material transport.
- a temporary elevator is an elevator which is not permanently operated at a specific site.
- mobile goods lifts which are mounted on bogies and are known, for example, as a roofer lift or the like
- a temporary goods lift elevator which is built for a certain period of time in place and then not like a mobile freight elevator is moved to another location, but rather is dismantled so that then this kit to be re-installed at another site can and where the goods lift can be used again for a certain period of operation.
- the invention has for its object to provide a kit for a temporary elevator, and to provide an elevator created therefrom, on the one hand allows the construction or disassembly of a temporary elevator within a short time and allows the transport of the individual components of the elevator with a small footprint ,
- the proposed elevator is often referred to as freight lift below.
- it can also be used as a passenger elevator, especially if it is technically developed in accordance with appropriate regulations and provided with a suitable safety equipment.
- the invention proposes designing the kit as a plug-in system with metallic tubes.
- a platform is provided which can be set up on a correspondingly load-bearing base and from which a tower extends upwards. Both the platform and the tower are dismantled by the platform has at least two separable frame parts and the tower has a plurality of supports, which in turn each have a plurality of superposed, plug-in support members. Due to the dismantling of these basic components of the goods lift can be reduced to such a small extent that they can be loaded, for example, on a pallet and thus, for example, in relatively small transport vehicles can be brought to their intended location.
- the supports of the tower are placed at a distance from each other and between the supports a cargo basket is provided vertically movable.
- guide rails are respectively provided on the support parts of the supports, which are designed as profiled strips with a longitudinal groove. In this groove each extending a boom of the cargo basket, so that in this way the cargo basket is guided in the horizontal direction, while it is movable in the upright direction.
- a motor-driven winch In order to move the cargo basket in the upright direction, a motor-driven winch is provided so that it can be dispensed with hydraulic punch or the like and a special reliable, robust design of the goods lift is ensured.
- This may advantageously be an electric motor driven winch, because the electrical power is guaranteed at all usual and typical locations of the goods lift, and can otherwise be easily ensured by a mobile generator.
- connection of the individual frame parts of the platform or the individual support parts of the tower supports with each other takes place in the form of a plug connection in that the frame parts or support parts are designed as metallic tubes.
- the mentioned metallic tubes are designed as square tubes.
- Securing elements such as cotter pins, locking screws or the like, which extend through the connectors, can be mounted in this way particularly simple and in a short time, as opposed to For example, circular tubes, the shape of the square tubes represents an anti-rotation, so that aligned holes in the assembly of the pipes reliably accurately aligned with each other.
- the connector can be advantageously effected by the fact that the square tubes have at the junctions inner tubes which extend partially into the one tube.
- tubes for example as the mentioned square tubes, commercially available semi-finished products can be used, so that an economical, low-cost production of the goods lift is possible.
- the mentioned inner tubes and if the connector is secured by a screw frame elements or support parts of the goods lift can be inexpensively created from commercially available semi-finished products.
- the connector can be advantageously secured by a screw which extends transversely through the nested tubes.
- a screw which extends transversely through the nested tubes.
- Such a deflection fitting may advantageously have a so-called center bar, which extends over the center of the tower cross section, and carries two pulleys:
- a first pulley is referred to as outer roller, because it is located outside the cross-sectional area of the tower, where the cargo basket on - and moves down.
- the cable extends to this first guide roller, namely the outer roller of the deflection fitting substantially perpendicular.
- the cable then runs substantially horizontally up to a second deflection roller, which is referred to as inner roller, since it is located centrally within the tower cross section, namely centrally above the cargo basket. From there, the rope runs to the cargo basket, so that it attacks the center of the base of the cargo basket.
- the present proposal uses the construction of the tower of columns and cross bars:
- the fall protection has a spring-loaded locking latch, which is held against the spring action in a driving position in which it allows the mobility of the cargo basket of the elevator.
- the cargo basket moves within a clearance gauge in the tower. For example, if the rope breaks, on which hangs the cargo basket, eliminates the effect with which the locking bar is held by the rope against the spring action in its driving position.
- Spring-loaded the locking bolt is now moved from its driving position into a blocking position, in which the locking bolt projects beyond the clearance profile to the outside.
- the cargo basket can now fall downwards over a certain distance, it is collected at the next crossbars, since the locking bar comes into abutment against these crossbars.
- the drop height of the goods lift is thus limited due to the construction of the tower, where obstacles for the locking bar limit the clearance space.
- the crossbar used so that it requires no additional elements in the construction of the elevator, which would be provided specifically as stops for the locking bolt.
- the locking bar is designed as an inner part of the telescopic linkage and an outer part of the telescopic linkage is designed as a tube which receives the locking bar, so that in its driving position of the locking bolt at least partially and possibly completely dips into this tube.
- the tube causes excellent protection for the locking bolt, for example, against contamination, which could otherwise affect the free movement of the locking bolt in use.
- the tube allows safe guidance and a secure hold for the locking bolt when it is in its locked position, the tube in turn can be reliably attached to the cargo basket of the elevator, for example, can be welded to other components of the cargo basket.
- the tension element is designed as a safety rope.
- a lever arrangement or similar rigid elements can be created by means of a rope, a particularly space-saving, easy and inexpensive way to operate the locking bar.
- this rope is designated as safety rope, it is also expressed that this rope as a tension element serving rope can be configured differently than the rope, which runs from the winch to the cargo basket and is used for the up and down movement of the cargo basket.
- the tubes 6 consist of square steel tubes with an outer edge length of 60 mm and a wall thickness of 2 mm.
- the tubes 6 are connected to each other by inner tubes 7, which are also configured as steel tubes, with a square cross-section, an edge length of 55 mm and a wall thickness of 2 mm.
- the inner tubes 7 can be screwed to both frame parts 3 and 4 be. In favor of a faster work progress, however, it is provided that they are permanently mounted in one of the two frame parts 3 and 4, and that they are inserted only in the respective other frame part 4 or 3 in the local pipe 6 and secured by a screw, the extends transversely through the respective tube 6 and the inner tube 7.
- each foot plates 8 are arranged, with which the platform 2 is supported on the ground.
- a leveling screw 9 is provided in each foot plate 8, so that by means of the leveling screws 9, the entire platform 2 can be aligned horizontally.
- Fig. 2 shows that the leveling screws 9 are each provided at its lower end with a bottom plate 10.
- the cargo basket 17 is placed in the middle of the platform 2.
- the cargo basket 17 is not finally mounted at this time by the upper half of the support bracket 18 is not yet connected by means of the aforementioned connectors with the lower half.
- the winch 21 is installed on the center bar 28 and the cable 27 is connected to the eyelet 42 at the bottom of the cargo basket 17.
- the cargo basket 17 can be pulled up and used as a work platform.
- the cargo basket 17 is raised so far that its bottom profiles 40 are located above crossbars 24.
- the boom are inserted into the bottom profiles 40 and the cargo basket 17 is lowered again, so that the arms put on the crossbar 24.
- the tower can be built 23 floor by floor up to the desired tower height.
- the rope 27 is guided by the winch 21, which is located on the support frame 22, via the outer roller 29 and the inner roller 30 to the cargo basket 17 and struck there.
- the mounting bracket 18 is configured so resilient that the cable 27 is posted on the support bracket 18.
- the four supports 12 each consist of a plurality of superposed support members 14. Where two support members 14 adjoin each other, a cross bar 24 extends from a support 12 to an adjacent support 12, so that through this plurality of cross bar 24 more floors of the tower 23rd arise and accordingly the height of the tower 23 in the construction of the temporary elevator 1 to the respective circumstances, eg. As a construction site, can be adjusted.
- Fig. 6 is also apparent that the cable 27 connects exactly in the middle of the bracket 18 to this support bracket 18, said middle region is referred to as a connection fitting 107 of the cargo basket 17.
- FIG. 6 It can be seen that where two superimposed support members 14 adjoin one another, the crossbars 24 extend, which are each fastened with screws 25 to the supports 12, so that by means of these screws 25, both the adjacent support members 14 and the cross bar 24 connected become.
- the crossbars 24 are designed as L-shaped angle profiles made of steel, while the support members 14 are designed as steel hollow sections of a steel tube with a square cross-section.
- Fig. 7 shows the right half of in Fig. 6 shown fall protection. It can be seen that the safety cable 103 is formed of two separate sections, each connecting to a fitting 115 which is fixed to the cable 27.
- the telescopic arrangement has an outer tube 108, in which the likewise designed as a tube locking bar 105 is guided longitudinally movable.
- a guide tube 109 extends axially through the tube 108 and the locking bar 105.
- This guide tube 109 serves to guide the safety cable 103.
- the compression spring 106 configured as a helical spring runs around this guide tube 109 and is supported against two tubesheets 110, which are respectively provided on the end of the tube 108 and the locking bar 105 facing the deflection roller 104.
- Another tube plate 110 is disposed within the locking bar 105, near the opposite free end, so that a comparatively short projection of the tube of the locking bar 105 relative to this tube plate 110 remains up to the free end of the locking bolt 105.
- the end of the safety cable 103 is received, this end with a nipple, clamping fitting o. The like. Is secured.
- the free end of this locking bar 105 is covered by a cap 111, which consists of plastic and is held by a press fit in the tube of the locking bolt 105.
- the cable 27 With tensile forces acting on the cable 27, the cable 27 is tightened, as shown in the drawings, so that the fitting 115 is held at a distance above the mounting bracket 18 and the connection fitting 107. Accordingly, the safety cable 103 is tightened, so that a cable clamp 116, which is provided at the end of the safety cable 103, compressive forces on the local tube sheet 110 transmits, so that the locking bar 105 against the action of the spring 106 as deeply as possible drawn into the tube 108.
- the portion of the cable 27 which is located between the connection fitting 107 and the fitting 115 of the safety arrangement can become slack. Even if this portion of the rope 27 ruptures or if the safety cable 103 breaks, the consequence is in any case that the spring 106 can relax and push the locking bar 105 out of the tube 108 as far as possible.
- the locking bolt 105 thus gets beyond the clearance of the tower 23 out to the outside, so that in a lowering movement of the cargo basket 17th the two locking bolts 105 from above on the next lower crossbar 24 meet and thereby further downward movement of the cargo basket 17 is prevented.
- the safety cable 103 extends as a single piece of rope from a locking bar 105 on the fitting 115 to the opposite locking bar 105, especially if the safety cable 103 is not clamped in the region of the fitting 115, but only is guided by the fitting 115, it can be ensured that both locking bolt 105 is triggered and moved into its blocking position when the safety cable 103 should tear at any point between its two ends.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Transportation (AREA)
- Automation & Control Theory (AREA)
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Die Erfindung schlägt einen Bausatz für einen temporären Aufzug (1) sowie einen daraus gebildeten Aufzug (1) vor, mit ¢ einer als Rahmen ausgestalteten Plattform (2), wobei die Plattform (2) wenigstens zwei lösbar miteinander verbundene Rahmenteile (3, 4) aufweist, ¢ mehreren Stützen (12) zur Schaffung eines Turms (23), wobei jede Stütze (12) aus übereinander angeordneten, steckbaren Stützenteilen (14) aufgebaut ist, und die Stützenteile (14) mit Führungsschienen (15) versehen sind, die als Profilleisten mit einer längs verlaufenden Nut (16) ausgestaltet sind, ¢ einer motorisch angetriebenen Seilwinde (21), ¢ einem Lastenkorb (17), der zwischen den Stützen (12) des Turms (23) höhenbeweglich anordbar ist, einen mit dem Seil (27) der Seilwinde (21) verbindbaren Anschlussbeschlag (107) aufweist, und Ausleger (19) aufweist, welche in die Nuten (16) der Führungsschienen (15) einführbar sind, derart, dass der Lastenkorb (17) in horizontaler Richtung in den Führungsschienen (15) geführt und in vertikaler Richtung verfahrbar ist, und wobei die Rahmenteile (3, 4) der Plattform (2) sowie die Stützenteile (14) des Turms (23) als metallische Rohre (6) ausgestaltet sind und mittels einer Steckverbindung wahlweise miteinander verbindbar oder voneinander lösbar sind.The invention proposes a kit for a temporary elevator (1) and an elevator (1) formed therefrom, with €¢ a platform designed as a frame (2), the platform (2) having at least two frame parts (3, 4) which are detachably connected to one another, €¢ several supports (12) to create a tower (23), each support (12) being made up of pluggable support parts (14) arranged one above the other, and the support parts (14) are provided with guide rails (15) which are designed as profile strips with a longitudinal groove (16), €¢ a motor-driven cable winch (21), €¢ a load basket (17), which can be arranged in a height-adjustable manner between the supports (12) of the tower (23), has a connection fitting (107) that can be connected to the cable (27) of the cable winch (21), and cantilevers (19) which can be inserted into the grooves (16) of the guide rails (15), such that the load basket (17) is guided in the horizontal direction in the guide rails (15) and can be moved in the vertical direction, and wherein the frame parts (3, 4) of the platform (2) and the support parts (14) of the tower (23) are designed as metal tubes (6) and can be connected to one another or detached from one another by means of a plug-in connection.
Description
Die Erfindung betrifft einen Bausatz zur Herstellung eines temporären Aufzugs.The invention relates to a kit for producing a temporary elevator.
Lastenaufzüge dienen zum Materialtransport. Als temporärer Aufzug wird im Rahmen des vorliegenden Vorschlags ein Aufzug bezeichnet, der nicht dauerhaft an einem bestimmten Einsatzort betrieben wird. Im Unterschied zu beispielsweise mobilen Lastenaufzügen, die auf Fahrgestellen montiert sind und beispielsweise als Dachdeckeraufzug oder dergleichen bekannt sind, wird im Rahmen des vorliegenden Vorschlags als temporärer Lastenaufzug ein Aufzug bezeichnet, der für eine bestimmte Zeitdauer an Ort und Stelle errichtet wird und anschließend nicht wie ein mobiler Lastenaufzug an einen anderen Einsatzort verbracht wird, sondern vielmehr demontiert wird, so dass dann dieser Bausatz an einem anderen Einsatzort wieder montiert werden kann und dort der Lastenaufzug erneut für eine bestimmte Betriebsdauer genutzt werden kann.Freight lifts are used for material transport. In the context of the present proposal, a temporary elevator is an elevator which is not permanently operated at a specific site. In contrast to, for example, mobile goods lifts, which are mounted on bogies and are known, for example, as a roofer lift or the like, is referred to in the context of the present proposal as a temporary goods lift elevator, which is built for a certain period of time in place and then not like a mobile freight elevator is moved to another location, but rather is dismantled so that then this kit to be re-installed at another site can and where the goods lift can be used again for a certain period of operation.
Der Erfindung liegt die Aufgabe zugrunde, einen Bausatz für einen temporären Aufzug anzugeben, sowie einen daraus geschaffenen Aufzug anzugeben, der einerseits die Errichtung oder auch die Demontage eines temporären Aufzugs innerhalb kurzer Zeit ermöglicht und den Transport der einzelnen Bauelemente des Aufzugs mit einem geringen Platzbedarf ermöglicht.The invention has for its object to provide a kit for a temporary elevator, and to provide an elevator created therefrom, on the one hand allows the construction or disassembly of a temporary elevator within a short time and allows the transport of the individual components of the elevator with a small footprint ,
Diese Aufgabe wird durch einen Bausatz nach Anspruch 1 und durch einen Aufzug nach Anspruch 16 gelöst. Vorteilhafte Ausgestaltungen sind in den Unteransprüchen beschrieben.This object is achieved by a kit according to
Aufgrund der auf eine begrenzte Zeit angelegten, aber vielfach wiederholbaren Nutzungsdauer, wie dies z. B. für die Verwendung auf mehreren Baustellen vorteilhaft ist, wird nachfolgend der vorschlagsgemäße Aufzug vielfach als Lastenaufzug bezeichnet. Er kann jedoch auch als Personenaufzug verwendet werden, insbesondere wenn er in Anpassung an entsprechende Vorschriften technisch weiterentwickelt und mit einer geeigneten Sicherheitsausstattung versehen ist.Due to the limited time, but repeatable useful life, as z. B. is advantageous for use on several construction sites, the proposed elevator is often referred to as freight lift below. However, it can also be used as a passenger elevator, especially if it is technically developed in accordance with appropriate regulations and provided with a suitable safety equipment.
Die Erfindung schlägt mit anderen Worten vor, den Bausatz als Stecksystem mit metallischen Rohren auszugestalten. Dabei ist einerseits eine Plattform vorgesehen, die auf einem entsprechend tragfähigen Untergrund aufgestellt werden kann und von der aus sich ein Turm in die Höhe erstreckt. Sowohl die Plattform als auch der Turm sind zerlegbar, indem die Plattform wenigstens zwei voneinander trennbare Rahmenteile aufweist und der Turm mehrere Stützen aufweist, die jeweils wiederum mehrere übereinander angeordnete, steckbare Stützenteile aufweisen. Durch die Zerlegbarkeit können diese Grundbestandteile des Lastenaufzugs auf so kleine Maße reduziert werden, dass sie beispielsweise auf einer Palette verladen werden können und somit beispielsweise auch in vergleichsweise kleinen Transportfahrzeugen zu ihrem jeweils vorgesehenen Einsatzort verbracht werden können.In other words, the invention proposes designing the kit as a plug-in system with metallic tubes. In this case, on the one hand, a platform is provided which can be set up on a correspondingly load-bearing base and from which a tower extends upwards. Both the platform and the tower are dismantled by the platform has at least two separable frame parts and the tower has a plurality of supports, which in turn each have a plurality of superposed, plug-in support members. Due to the dismantling of these basic components of the goods lift can be reduced to such a small extent that they can be loaded, for example, on a pallet and thus, for example, in relatively small transport vehicles can be brought to their intended location.
Die Stützen des Turms sind im Abstand voneinander aufgestellt und zwischen den Stützen ist ein Lastenkorb höhenbeweglich vorgesehen. Um diesen zuverlässig zu führen, sind an den Stützenteilen der Stützen jeweils Führungsschienen vorgesehen, die als Profilleisten mit einer längs verlaufenden Nut ausgestaltet sind. In diese Nut erstreckt sich jeweils ein Ausleger des Lastenkorbs, so dass auf diese Weise der Lastenkorb in horizontaler Richtung geführt ist, während er in aufrechter Richtung verfahrbar ist.The supports of the tower are placed at a distance from each other and between the supports a cargo basket is provided vertically movable. To guide them reliably, guide rails are respectively provided on the support parts of the supports, which are designed as profiled strips with a longitudinal groove. In this groove each extending a boom of the cargo basket, so that in this way the cargo basket is guided in the horizontal direction, while it is movable in the upright direction.
Um den Lastenkorb in aufrechter Richtung zu verfahren, ist eine motorisch angetriebene Seilwinde vorgesehen, so dass auf hydraulische Stempel oder dergleichen verzichtet werden kann und eine besondere betriebssichere, robuste Ausgestaltung des Lastenaufzugs sichergestellt ist. Dabei kann es sich vorteilhaft um eine elektromotorisch angetriebene Seilwinde handeln, denn die elektrische Stromversorgung ist an allen üblichen und typischen Einsatzorten des Lastenaufzugs gewährleistet, und kann andernfalls problemlos durch einen mobilen Generator gewährleistet werden.In order to move the cargo basket in the upright direction, a motor-driven winch is provided so that it can be dispensed with hydraulic punch or the like and a special reliable, robust design of the goods lift is ensured. This may advantageously be an electric motor driven winch, because the electrical power is guaranteed at all usual and typical locations of the goods lift, and can otherwise be easily ensured by a mobile generator.
Die Verbindung der einzelnen Rahmenteile der Plattform bzw. der einzelnen Stützenteile der Turmstützen untereinander erfolgt in Form einer Steckverbindung, indem die Rahmenteile bzw. Stützenteile als metallische Rohre ausgestaltet sind.The connection of the individual frame parts of the platform or the individual support parts of the tower supports with each other takes place in the form of a plug connection in that the frame parts or support parts are designed as metallic tubes.
Eine besonders einfache Handhabung bei der Montage bzw. Demontage des Lastenaufzugs kann dadurch ermöglicht werden, dass die erwähnten metallischen Rohre als Vierkantrohre ausgestaltet sind. Sicherungselemente, wie Splinte, Sicherungsschrauben oder dergleichen, welche sich durch die Steckverbindungen hindurch erstrecken, können auf diese Weise besonders einfach und in kurzer Zeit montiert werden, da im Unterschied zu beispielsweise kreisrunden Rohren die Formgebung der Vierkantrohre eine Verdrehsicherung darstellt, so dass miteinander fluchtende Bohrungen bei der Montage der Rohre zuverlässig passgenau miteinander fluchten. Die Steckverbindung kann dabei vorteilhaft dadurch bewirkt werden, dass die Vierkantrohre an den Verbindungsstellen Innenrohre aufweisen, die sich teilweise in das eine Rohr erstrecken. Die Innenrohre können als separat handhabbares Bauteile vorliegen, oder einen besonders schnellen Baufortschritt dadurch ermöglichen, dass sie jeweils an einem Ende in einem äußeren Rohr durch Verschraubung oder Verschweißung oder dergleichen festgelegt sind, wobei ein Überstand des Innenrohrs aus dem betreffenden Rohr herausragt, so dass ein benachbartes metallisches Rohr auf diesen Überstand aufgesteckt werden kann und der Überstand des Innenrohrs im inneren Hohlraum des zweiten metallischen Rohrs aufgenommen wird.A particularly simple handling during assembly or disassembly of the goods lift can be made possible in that the mentioned metallic tubes are designed as square tubes. Securing elements, such as cotter pins, locking screws or the like, which extend through the connectors, can be mounted in this way particularly simple and in a short time, as opposed to For example, circular tubes, the shape of the square tubes represents an anti-rotation, so that aligned holes in the assembly of the pipes reliably accurately aligned with each other. The connector can be advantageously effected by the fact that the square tubes have at the junctions inner tubes which extend partially into the one tube. The inner tubes may be present as separately manageable components, or allow a particularly rapid construction progress, that they are each fixed at one end in an outer tube by screwing or welding or the like, wherein a supernatant of the inner tube protrudes from the respective tube, so that a adjacent metallic tube can be plugged onto this supernatant and the supernatant of the inner tube is received in the inner cavity of the second metallic tube.
Als Rohre, beispielsweise als die erwähnten Vierkantrohre, können handelsübliche Halbzeuge verwendet werden, so dass eine wirtschaftliche, preisgünstige Herstellung des Lastenaufzugs möglich ist. Insbesondere wenn für die Schaffung der Steckverbindung keine speziellen, am Ende verformten Rohre verwendet werden, sondern die erwähnten Innenrohre, und wenn die Steckverbindung durch eine Verschraubung gesichert wird, können Rahmenelemente bzw. Stützenteile des Lastenaufzugs preisgünstig aus handelsüblichen Halbzeugen geschaffen werden.As tubes, for example as the mentioned square tubes, commercially available semi-finished products can be used, so that an economical, low-cost production of the goods lift is possible. In particular, if no special, deformed at the end pipes are used for the creation of the connector, but the mentioned inner tubes, and if the connector is secured by a screw frame elements or support parts of the goods lift can be inexpensively created from commercially available semi-finished products.
Die Steckverbindung kann vorteilhaft durch eine Verschraubung gesichert werden, welche sich quer durch die ineinander gesteckten Rohre erstreckt. Dadurch, dass zum Lösen der Verschraubung ein Werkzeug erforderlich ist, wird die Sicherung der Steckverbindung gegen ein unbeabsichtigtes Lösen geschützt, wie dies ansonsten bei werkzeuglos zu betätigenden Sicherungen nicht ausgeschlossen werden könnte, beispielsweise bei federnden Splinten, bei federnden Schnappverschlüssen oder dergleichen.The connector can be advantageously secured by a screw which extends transversely through the nested tubes. The fact that a tool is required to release the screw, the fuse of the connector is protected against unintentional loosening, as otherwise could not be excluded with tool-operated fuses, for example, in resilient Splints, with resilient snap closures or the like.
Vorteilhaft kann die Plattform einen viereckigen Rahmen aufweisen, der auf den Untergrund aufgelegt wird. An wenigstens einer der vier Ecken ist dabei eine Nivellierschraube angeordnet, so dass der Rahmen spielfrei auf den Untergrund aufgelegt werden kann und gegen Wackeln geschützt ist. Besonders vorteilhaft jedoch können an sämtlichen vier Ecken Nivellierschrauben vorgesehen sein, so dass der Rahmen nicht nur wackelsicher auf dem Untergrund abgelegt werden kann, sondern auch zuverlässig exakt in die Waage gebracht werden kann, also nivelliert werden kann. Die Nivellierschraube ist am unteren Ende mit einer Bodenplatte versehen, so dass die Gewichtslast bzw. Stützlast, mit welcher sich die Nivellierschraube auf dem Untergrund abstützt auf eine größere Fläche verteilt wird, verglichen mit der Querschnittsfläche der Nivellierschraube selbst, beispielsweise verglichen mit dem Schaft der Nivellierschraube. Auch später noch, wenn der Lastenaufzug in Betrieb genommen worden ist, können mit den Nivellierschrauben Korrekturen vorgenommen werden, falls der Untergrund sich z. B. setzen sollte.Advantageously, the platform may have a quadrangular frame which is placed on the ground. At least one of the four corners while a leveling screw is arranged so that the frame can be placed without play on the ground and is protected against wobbling. However, it is particularly advantageous for leveling screws to be provided at all four corners, so that the frame can not only be stored on the ground in a wobbly manner, but can also be reliably accurately leveled, that is, leveled. The leveling screw is provided at the lower end with a bottom plate, so that the weight load or support load, with which the leveling screw is supported on the ground is distributed over a larger area compared to the cross-sectional area of the leveling screw itself, for example, compared to the shaft of the leveling screw , Even later, when the goods lift has been put into operation, can be made with the leveling screws corrections, if the ground is z. B. should set.
Eine Aussteifung des Turms kann vorteilhaft mit Hilfe von Querriegeln erfolgen, wobei sich ein solcher Querriegel von einer ersten zu einer benachbarten zweiten Stütze des Turms erstreckt. Dabei ist die Aussteifung des Turms mittels des Querriegels dadurch besonderes wirkungsvoll erreichbar, dass der Querriegel nicht nur an einen Stützenteil einer Stütze anschließt, sondern bei beiden Stützen, die der Querriegel verbindet, jeweils mit den beiden aneinander grenzenden Stützenteilen verbunden ist, so dass ein möglichst spielarmer Verbund dieser vier Stützenteile mittels des Querriegels geschaffen wird.A stiffening of the tower can be carried out advantageously by means of cross bars, with such a crossbar extending from a first to an adjacent second support of the tower. In this case, the stiffening of the tower by means of the crossbar is particularly effective reachable that the cross bar not only connects to a support part of a support, but is connected to both supports, which connects the crossbar, each with the two adjacent support members, so that as possible low-play composite of these four support members is created by means of the cross bar.
Vorteilhaft kann die Seilwinde im unteren Bereich des Lastenaufzugs angeordnet sein, so dass die Montage des Lastenaufzugs erleichtert wird, da die Seilwinde und der Antriebsmotor nicht in eine große Höhe angehoben werden müssen. Vielmehr ist ein Umlenkbeschlag oben am Turm angeordnet, so dass das Seil von unten, nämlich von der Seilwinde nach oben zu dem Umlenkbeschlag geführt ist und vom Umlenkbeschlag zum Lastenkorb verläuft.Advantageously, the winch can be arranged in the lower region of the goods lift, so that the assembly of the goods lift is facilitated, since the winch and the drive motor do not need to be raised to a high altitude. Rather, a deflection fitting is arranged at the top of the tower, so that the rope is guided from below, namely from the winch up to the deflection fitting and runs from the deflection fitting to the cargo basket.
Ein solcher Umlenkbeschlag kann vorteilhaft einen so genannten Mittelriegel aufweisen, der sich nämlich über die Mitte des Turmquerschnitts hinweg erstreckt, und der zwei Umlenkrollen trägt: Eine erste Umlenkrolle ist als Außenrolle bezeichnet, weil sie sich außerhalb der Querschnittsfläche des Turms befindet, wo der Lastenkorb auf- und abwärts verfährt. Von der Seilwinde aus verläuft das Seil zu dieser ersten Umlenkrolle, nämlich der Außenrolle des Umlenkbeschlags im Wesentlichen senkrecht. Von der Außenrolle verläuft das Seil anschließend im Wesentlichen horizontal bis zu einer zweiten Umlenkrolle, die als Innenrolle bezeichnet ist, da sie sich mittig innerhalb des Turmquerschnitts befindet, nämlich mittig oberhalb des Lastenkorbs. Von dort verläuft das Seil bis zum Lastenkorb, so dass es mittig über der Grundfläche des Lastenkorbs angreift.Such a deflection fitting may advantageously have a so-called center bar, which extends over the center of the tower cross section, and carries two pulleys: A first pulley is referred to as outer roller, because it is located outside the cross-sectional area of the tower, where the cargo basket on - and moves down. From the cable winch, the cable extends to this first guide roller, namely the outer roller of the deflection fitting substantially perpendicular. From the outer roller, the cable then runs substantially horizontally up to a second deflection roller, which is referred to as inner roller, since it is located centrally within the tower cross section, namely centrally above the cargo basket. From there, the rope runs to the cargo basket, so that it attacks the center of the base of the cargo basket.
Vorteilhaft können die Führungsschienen, die für den Lastenkorb an den Stützen bzw. den einzelnen Stützenteilen vorgesehen sind, Nuten aufweisen, die eine Hinterschneidung in ihrem Nutquerschnitt aufweisen, wobei damit zusammenwirkend die Ausleger des Lastenkorbs zunächst einen vergleichsweise schmalen so genannten Hals aufweisen und anschließend, an ihrem äußeren Ende, jeweils einen Kopf aufweisen, der in der Hinterschneidung der Nut aufgenommen wird.Advantageously, the guide rails, which are provided for the cargo basket on the supports or the individual support parts, have grooves which have an undercut in their groove cross-section, cooperating with the boom of the cargo basket initially having a comparatively narrow so-called neck and then, on their outer end, each having a head which is received in the undercut of the groove.
Vorteilhaft können die Führungsschienen ein Kunststoffprofil aufweisen, welches mit der Nut versehen ist und welches einen reibungsarmen Lauf der Ausleger in den Führungsschienen gewährleistet. Zur Aussteifung des Kunststoffprofils und als mechanischen Schutz kann ein solches Kunststoffprofil in einer metallischen Profilschiene angeordnet sein, beispielsweise in einem U-förmigen Metallprofil.Advantageously, the guide rails may have a plastic profile, which is provided with the groove and which ensures a low-friction running of the boom in the guide rails. To stiffen the plastic profile and as mechanical protection, such a plastic profile in a metallic Rail be arranged, for example in a U-shaped metal profile.
Die Seilwinde kann vorteilhaft an einem Tragrahmen montiert sein, der seinerseits mit den Stützen bzw. der Plattform des Lastenaufzugs verschraubbar ist. Dieser Tragrahmen stellt in Art einer Konsole die korrekte Positionierung der Seilwinde sicher, so dass diese außerhalb des Bewegungsraumes des Lastenkorbs angeordnet ist.The winch can be advantageously mounted on a support frame, which in turn can be screwed to the supports or the platform of the goods lift. This support frame ensures the correct positioning of the winch in the manner of a console, so that it is located outside the movement space of the cargo basket.
Der vorschlagsgemäße temporäre Aufzug ist in erster Linie als Lastenaufzug auf Baustellen vorgesehen, so dass im Rahmen des vorliegenden Vorschlags der Aufzug stets als Lastenaufzug bezeichnet wird. Er kann jedoch auch als temporärer Personenaufzug genutzt werden, wenn die entsprechenden Sicherheitseinrichtungen vorgesehen sind wie z.B. Geländer oder Schutzplatten in der vorgeschriebenen Höhe. So können beispielsweise Arbeiter zeitsparend die verschiedenen Etagen eines Rohbaus erreichen.The proposed temporary elevator is intended primarily as a goods lift on construction sites, so that in the context of the present proposal, the elevator is always referred to as goods lift. However, it can also be used as a temporary passenger elevator if the corresponding safety devices are provided, such as e.g. Railings or protective plates of the prescribed height. For example, workers can save time to reach the various floors of a shell.
Der vorschlagsgemäße temporäre Lastenaufzug kann auch innerhalb eines Gebäudes errichtet werden. Beispielsweise kann vorgesehen sein, innerhalb eines Rohbaus die einzelnen Geschossdecken mit fluchtend übereinander angeordneten Aussparungen zu versehen. Verbundeisen, die in der umgebenden Geschossdecke verankert sind, werden im Bereich der Aussparungen beispielsweise nach unten gebogen, so dass die Aussparung frei passierbar ist. Der temporäre Lastenaufzug kann nun errichtet werden, wobei sich sein Turm durch diese übereinander angeordneten Aussparungen erstreckt, beispielsweise über einen Teil der Gebäudehöhe, oder über die gesamte Höhe, oder sogar bis über die Gebäudehöhe hinaus nach oben. Wenn der Lastenaufzug nach seiner Nutzung demontiert worden ist, können die Verbundeisen in die Horizontale zurückgebogen werden, die Aussparungen werden dann eingeschalt und mit Beton vergossen, so dass eine monolithische, durchgehende Geschossdecke ohne die zuvor vorhandene Aussparung geschaffen ist.The proposed temporary goods lift can also be built inside a building. For example, it may be provided to provide the individual floor slabs with flush arranged one above the other within a shell. Composite iron, which are anchored in the surrounding floor slab, for example, bent downwards in the region of the recesses, so that the recess is freely passable. The temporary goods lift can now be erected, with its tower extending through these stacked recesses, for example, over part of the building height, or over the entire height, or even up to beyond the building height upwards. If the goods lift has been disassembled after its use, the composite iron can be bent back into the horizontal, the recesses are then shrouded and poured with concrete, so that a monolithic, continuous floor ceiling without the previously existing recess is created.
Der vorschlagsgemäße Aufzug, der bislang in erster Linie als Lastenaufzug vorgesehen war, kann technisch erweitert bzw. verbessert werden, so dass er auch zum Personentransport benutzt werden kann und dabei ein möglichst hohes Maß an Sicherheit aufweist. Hierzu wird vorgeschlagen, eine Absturzsicherung zu schaffen.The proposed elevator, which was previously intended primarily as a freight elevator, can be technically expanded or improved, so that it can also be used for passenger transport and thereby has the highest possible degree of safety. For this purpose, it is proposed to provide a fall protection.
Dabei nutzt der vorliegende Vorschlag die Konstruktion des Turms aus Stützen und Querriegeln: Die Absturzsicherung weist einen federbelasteten Sperrriegel auf, der gegen die Federwirkung in einer Fahrstellung gehalten wird, in welcher er die Verfahrbarkeit des Lastenkorbs des Aufzugs ermöglicht. Der Lastenkorb bewegt sich dabei innerhalb eines Lichtraumprofils im Turm. Wenn beispielsweise das Seil reißt, an welchem der Lastenkorb hängt, entfällt die Wirkung, mit welcher der Sperrriegel durch das Seil gegen die Federwirkung in seiner Fahrstellung gehalten wird. Federbelastet wird nun der Sperrriegel aus seiner Fahrstellung in eine Sperrstellung verbracht, in welcher der Sperrriegel über das Lichtraumprofil hinaus nach außen ragt.The present proposal uses the construction of the tower of columns and cross bars: The fall protection has a spring-loaded locking latch, which is held against the spring action in a driving position in which it allows the mobility of the cargo basket of the elevator. The cargo basket moves within a clearance gauge in the tower. For example, if the rope breaks, on which hangs the cargo basket, eliminates the effect with which the locking bar is held by the rope against the spring action in its driving position. Spring-loaded, the locking bolt is now moved from its driving position into a blocking position, in which the locking bolt projects beyond the clearance profile to the outside.
Der Lastenkorb kann nun zwar über eine gewisse Wegstrecke nach unten fallen, wird allerdings an den nächsten Querriegeln aufgefangen, da der Sperrriegel zur Anlage gegen diese Querriegel gelangt. Die Fallhöhe des Lastenaufzugs ist also aufgrund der Konstruktion des Turms dadurch begrenzt, wo Hindernisse für den Sperrriegel das Lichtraumprofil begrenzen. Im einfachsten Fall sind hierzu, wie bereits erwähnt, die Querriegel verwendet, so dass es bei der Konstruktion des Aufzugs keiner zusätzlichen Elemente bedarf, die eigens als Anschläge für die Sperrriegel vorgesehen wären.Although the cargo basket can now fall downwards over a certain distance, it is collected at the next crossbars, since the locking bar comes into abutment against these crossbars. The drop height of the goods lift is thus limited due to the construction of the tower, where obstacles for the locking bar limit the clearance space. In the simplest case, this, as already mentioned, the crossbar used, so that it requires no additional elements in the construction of the elevator, which would be provided specifically as stops for the locking bolt.
Wenn beispielsweise die vertikalen Stützen des Turms aus einzelnen Stützenteilen zusammengesetzt werden und im Anschlussbereich zweier Stützenteile stets ein Querriegel vorgesehen ist, so bestimmt die Länge der Stützenteile und somit sozusagen die Etagenhöhe des Turms den Abstand, in welchem die einzelnen Querriegel angeordnet sind und somit auch die maximale Fallhöhe des Lastenkorbs. Anhand dieser maximalen Fallhöhe und des maximal zulässigen Gesamtgewichts des Lastenkorbs einschließlich seiner Traglast kann die Konstruktion sowohl der Querriegel als auch der Sperrriegel in der Weise berechnet werden, dass zuverlässig der Lastenkorb nach dieser maximalen Fallhöhe mittels der Sperrriegel abgefangen werden kann und ein weiterer Fall des Lastenkorbs nach unten somit verhindert wird.For example, if the tower's vertical columns are composed of individual posts and in the terminal area two support parts is always provided a cross bar, so determines the length of the support members and thus, so to speak, the floor height of the tower the distance in which the individual crossbar are arranged and thus the maximum drop height of the cargo basket. On the basis of this maximum fall height and the maximum gross weight of the cargo cage including its load, the construction of both the crossbar and the locking bar can be calculated in such a way that reliably the cargo basket can be intercepted by this locking bar after this maximum fall height and another case of the cargo basket is thus prevented downwards.
Der Sperrriegel kann beispielsweise schwenkbar gelagert sein oder auf andere Weise zwischen seiner Fahr- und Sperrstellung beweglich sein. Vorteilhaft kann vorgesehen sein, dass der Sperrriegel als Teil eines Teleskopgestänges ausgestaltet ist und dementsprechend linear verfahrbar ist. Auf diese Weise wird nicht nur eine schnelle Beweglichkeit und somit eine sehr kurze Reaktionszeit des Sperrriegels sichergestellt, sondern auch ein minimaler Freiraum für die Bewegung des Sperrriegels erforderlich, im Vergleich zu beispielsweise einer Schwenkbewegung, so dass aufgrund dieses minimal erforderlichen Bewegungsraumes zusätzlich zu der schnellen Beweglichkeit auch der Vorteil kommt, dass diese Bewegung mit einer hohen Sicherheit ausgeführt werden kann, da die Wahrscheinlichkeit, dass Störelemente in diesem Bewegungsraum hineinragen können, aufgrund des kleinen Bewegungsraumes dementsprechend reduziert ist.The locking bolt, for example, be pivotally mounted or be movable in other ways between its driving and locking position. Advantageously, it can be provided that the locking bolt is designed as part of a telescopic linkage and, accordingly, is linearly movable. In this way, not only a fast mobility and thus a very short reaction time of the locking bar is ensured, but also a minimum clearance for the movement of the locking bar required, compared to, for example, a pivoting movement, so that due to this minimum required space for movement in addition to the fast mobility There is also the advantage that this movement can be carried out with a high degree of safety, since the probability that interfering elements can protrude into this movement space is correspondingly reduced on account of the small movement space.
Vorteilhaft kann bei einer solchen Teleskopgestaltung vorgesehen sein, dass der Sperrriegel als ein innerer Teil des Teleskopgestänges ausgestaltet ist und ein äußerer Teil des Teleskopgestänges als ein Rohr ausgestaltet ist, welches den Sperrriegel aufnimmt, so dass in seiner Fahrstellung der Sperrriegel zumindest teilweise und ggf. gänzlich in dieses Rohr eintaucht. Durch diese Anordnung bewirkt das Rohr einen hervorragenden Schutz für den Sperrriegel, beispielsweise gegen Verschmutzungen, die ansonsten die freie Beweglichkeit des Sperrriegels im Einsatzfall beeinträchtigen könnten. Zudem ermöglicht das Rohr eine sichere Führung und einen sicheren Halt für den Sperrriegel, wenn sich dieser in seiner Sperrstellung befindet, wobei das Rohr seinerseits zuverlässig am Lastenkorb des Aufzugs befestigt werden kann, beispielsweise mit anderen Bestandteilen des Lastenkorbs verschweißt werden kann.Advantageously may be provided in such a telescopic design, that the locking bar is designed as an inner part of the telescopic linkage and an outer part of the telescopic linkage is designed as a tube which receives the locking bar, so that in its driving position of the locking bolt at least partially and possibly completely dips into this tube. By this arrangement, the tube causes excellent protection for the locking bolt, for example, against contamination, which could otherwise affect the free movement of the locking bolt in use. In addition, the tube allows safe guidance and a secure hold for the locking bolt when it is in its locked position, the tube in turn can be reliably attached to the cargo basket of the elevator, for example, can be welded to other components of the cargo basket.
Vorteilhaft kann vorgesehen sein, dass das Seil nicht unmittelbar an dem Sperrriegel angreift, sondern vielmehr fest mit dem Aufnahmebeschlag des Lastenkorbs verbunden ist. Vielmehr verläuft vom Seil ein Zugelement zu dem Sperrriegel, so dass mittels dieses Zugelements aufgrund des straff gehaltenen Seils der Sperrriegel in seiner Fahrstellung gehalten wird. Durch das Eigengewicht des Lastenkorbs wird das Seil gestrafft und dementsprechend der Sperrriegel mittels des Zugelements gegen die Wirkung der Feder in seiner Fahrstellung gehalten. Dabei ist vorgesehen, dass das Zugelement im Abstand von dem Anschlussbeschlag des Lastenkorbs an das Seil anschließt. Sollte das Seil reißen, so wird das Seil dementsprechend zwischen dem Anschlussbeschlag und der Stelle, wo das Zugelement an das Seil anschließt, nicht mehr straff gehalten und das Zugelement kann sich dementsprechend unter Verformung des Seils an den Anschlussbeschlag des Lastenkorbs annähern, so dass dementsprechend auf dem Sperrriegel eine größere Beweglichkeit vermittelt wird und dieser dann federkraftunterstützt aus seiner Fahrstellung in die Sperrstellung bewegt wird.Advantageously, it can be provided that the rope does not engage directly on the locking bolt, but rather is firmly connected to the receiving fitting of the cargo basket. Rather, a tension element extends from the rope to the locking bolt, so that is held by means of this tension element due to the tightly held rope of the locking bolt in its driving position. Due to the weight of the cargo basket, the rope is tightened and accordingly held the locking bar by means of the tension element against the action of the spring in its driving position. It is provided that the tension element connects at a distance from the connection fitting of the cargo basket to the rope. Should the rope break, so the rope is accordingly no longer kept taut between the connection fitting and the point where the tension element connects to the rope and the tension element can accordingly approximate under deformation of the rope to the connection fitting of the cargo basket, so that accordingly the locking bolt a greater mobility is mediated and then this spring force assisted from its driving position is moved to the blocking position.
Dabei kann vorteilhaft vorgesehen sein, dass das Zugelement als Sicherungsseil ausgestaltet ist. Statt der Verwendung einer Hebelanordnung oder ähnlich starrer Elemente kann mittels eines Seils eine besonders platzsparende, leichte und preisgünstige Möglichkeit geschaffen werden, um den Sperrriegel zu betätigen. Dadurch, dass dieses Seil als Sicherungsseil bezeichnet ist, kommt auch zum Ausdruck, dass dieses Seil als Zugelement dienende Seil anders ausgestaltet sein kann als das Seil, welches von der Seilwinde bis zum Lastenkorb verläuft und für die Auf- und Abbewegung des Lastenkorbs verwendet wird. Das Sicherungsseil kann beispielsweise schwächer dimensioniert sein, denn einerseits muss es nicht die gesamte Traglast des Lastenkorbes aufnehmen, und andererseits handelt es sich um ein selbstsicherndes System: Sollte das Sicherungsseil versagen und reißen, wird der Sperrriegel nicht mehr gegen die Federkraft in seiner Fahrstellung gehalten, sondern automatisch durch die Federkraft nach außen in seine Sperrstellung verbracht, so dass der Lastenkorb des Aufzugs auf diese Weise einen sicheren Zustand einnimmt.It can be advantageously provided that the tension element is designed as a safety rope. Instead of using a lever arrangement or similar rigid elements can be created by means of a rope, a particularly space-saving, easy and inexpensive way to operate the locking bar. The fact that this rope is designated as safety rope, it is also expressed that this rope as a tension element serving rope can be configured differently than the rope, which runs from the winch to the cargo basket and is used for the up and down movement of the cargo basket. The safety rope can be dimensioned, for example, weaker, because on the one hand it does not absorb the entire load of the goods basket, and on the other hand is a self-locking system: Should the safety rope fail and tear, the locking bolt is no longer held against the spring force in its driving position, but automatically spent by the spring force to the outside in its locked position, so that the cargo basket of the elevator occupies a safe state in this way.
Vorteilhaft kann vorgesehen sein, dass der Aufzug nicht nur einen, sondern mehrere Sperrriegel aufweist, also wenigstens zwei, wobei vorzugsweise vorgesehen ist, dass zwei Sperrriegel einander gegenüberliegend angeordnet sind. Auf diese Weise werden Kippmomente vermieden, wenn der Lastenkorb abwärts fährt und die beiden Sperrriegel gleichzeitig und einander gegenüberliegend gegen entsprechende Hindernisse, wie z. B. die erwähnten Querriegel des Turms anschlagen. Die Vermeidung derartiger Kippkräfte verhindert, dass der Lastenkorb dabei in eine Schräglage gerät, was einerseits für die im Lastenkorb beförderte Ladung, ggf. Personen, vorteilhaft ist, aber auch den Lastenkorb selbst sowie den Turm vor Beschädigungen schützt, die ansonsten durch ein Kippen des Lastenkorbs beim Abbremsen, wenn die Sperrriegel auf ihre Anschläge geraten, hervorgerufen werden könnte.Advantageously, it can be provided that the elevator has not only one but several locking bolts, that is, at least two, wherein it is preferably provided that two locking bolts are arranged opposite one another. In this way, tilting moments are avoided when the cargo basket moves down and the two locking bars simultaneously and opposite each other against corresponding obstacles such. B. strike the mentioned cross bar of the tower. The avoidance of such tilting forces prevents the cargo basket from entering an inclined position, which is beneficial for the cargo carried in the cargo basket, possibly persons, but also protects the cargo cage itself and the tower against damage, which otherwise results from a tilting of the cargo cage when braking, when the locking latch on their attacks, could be caused.
Ausführungsbeispiele der Erfindung werden anhand der rein schematischen Darstellungen nachfolgend näher erläutert. Dabei zeigt
- Fig. 1
- eine Ansicht von oben auf die Plattform und den Lastenkorb eines als temporärer Lastenaufzug ausgestalteten Aufzugs,
- Fig. 2
- eine Seitenansicht, teilweise geschnitten, auf den Aufzug von
Fig.1 , - Fig. 3
- einen Ausschnitt aus
Fig. 2 in einem größeren Maßstab, - Fig. 4
- den oberen Abschluss des Aufzugs während der Montage und nach Fertigstellung,
- Fig. 5
- eine vereinfachte und teilweise weggebrochene Seitenansicht auf einen als Personenaufzug ausgestalteten Aufzug, der mit einer Absturzsicherung versehen ist,
- Fig. 6
- in gegenüber
Fig. 5 vergrößertem Maßstab den Bereich der Absturzsicherung, und - Fig. 7
- in gegenüber
Fig. 6 wiederum vergrößertem Maßstab eine schematische Ansicht, teilweise geschnitten, auf die Absturzsicherung im Bereich eines Sperrriegels.
- Fig. 1
- a view from above of the platform and the cargo basket of a lift designed as a temporary freight elevator,
- Fig. 2
- a side view, partially cut, on the elevator of
Fig.1 . - Fig. 3
- a section from
Fig. 2 on a larger scale, - Fig. 4
- the upper end of the lift during assembly and after completion,
- Fig. 5
- a simplified and partially broken side view of a designed as a lift elevator, which is provided with a fall protection,
- Fig. 6
- in opposite
Fig. 5 enlarged scale the field of fall protection, and - Fig. 7
- in opposite
Fig. 6 again enlarged scale a schematic view, partially cut, on the fall protection in the range of a locking bolt.
In den Zeichnungen ist mit 1 insgesamt ein temporärer Aufzug gekennzeichnet, der aus einem Bausatz zusammengesetzt ist und als Lastenaufzug dient.In the drawings, 1 is a total of a temporary elevator marked, which is composed of a kit and serves as a freight elevator.
Die Rohre 6 bestehen aus quadratischen Stahlrohren mit einer äußeren Kantenlänge von 60 mm und einer Wandstärke von 2 mm. Im Bereich der Trennstellen 5 sind die Rohre 6 durch Innenrohre 7 miteinander verbunden, die ebenfalls als Stahlrohre ausgestaltet sind, mit einem quadratischen Querschnitt, einer Kantenlänge von 55 mm und einer Wandstärke von 2 mm. Die Innenrohre 7 können mit beiden Rahmenteilen 3 und 4 verschraubt sein. Zugunsten eines schnelleren Arbeitsfortschritts ist jedoch vorgesehen, dass sie in einem der beiden Rahmenteile 3 bzw. 4 fest montiert sind, und dass sie lediglich in dem jeweils anderen Rahmenteil 4 bzw. 3 in das dortige Rohr 6 eingesteckt und durch eine Verschraubung gesichert werden, die sich quer durch das betreffende Rohr 6 und das Innenrohr 7 erstreckt.The
Im Bereich der vier Ecken der Plattform 2 sind jeweils Fußplatten 8 angeordnet, mit denen sich die Plattform 2 am Untergrund abstützt. Hierzu ist in jeder Fußplatte 8 eine Nivellierschraube 9 vorgesehen, so dass mittels der Nivellierschrauben 9 die gesamte Plattform 2 waagerecht ausgerichtet werden kann.
Die Rohre 6 erstrecken sich über die Fußplatten 8 hinaus nach außen, wo aus
Das Verbindungsprinzip des beschriebenen Stecksystems mit äußeren Rohren 6 und Innenrohren 7 wird an mehreren Stellen des temporären Aufzugs 1 angewandt. Unabhängig davon, ob die Rohre 6, die einerseits für die Plattform 2 und andererseits für die Stützen 12 verwendet werden, unterschiedlich ausgestaltet sind oder nicht, werden sie aus Gründen der Vereinfachung in der vorliegenden Beschreibung mit derselben Bezugsziffer 6 gekennzeichnet. Beispielsweise kann vorgesehen sein, dass die Wandstärke der für die Stützen 12 verwendeten Rohre 6 mit 3 mm größer ist als die Wandstärke von 2 mm der für die Plattform 2 verwendeten Rohre 6. In Anpassung daran sind auch die jeweils zur Verbindung verwendeten Innenrohre 7 unterschiedlich ausgestaltet. Dementsprechend werden in der vorliegenden Beschreibung auch die Innenrohre 7 stets mit derselben Bezugsziffer 7 gekennzeichnet, unabhängig davon, ob sie unterschiedlich ausgestaltet sind oder nicht.The connection principle of the described plug-in system with
Zwischen den Stützen 12, also innerhalb der von den vier Stützen 12 umgebenen Fläche, ist ein Lastenkorb 17 angeordnet. Dieser weist einen U-förmigen, zerlegbaren Tragbügel 18 auf, der aus mehreren Rohren 6 und Innenrohren 7 gebildet ist und im oberen Bereich Verstärkungslaschen 39 aufweist. Die obere Hälfte des Tragbügels 18 ist durch eine Steckverbindung mit Innenrohren 7 und Schrauben 25 mit der unteren Hälfte des Tragbügels 18 verbunden, wie insbesondere anhand von
In
Aus
Oben auf dem Turm 23 ist ein Umlenkbeschlag 26 vorgesehen, der ein Seil 27 von der Seiltrommel 21 bis zum Tragbügel 18 des Lastenkorbes 17 führt. Dabei weist dieser Umlenkbeschlag 26 einen Mittelriegel 28 auf, der mit Laschen versehen ist, welche einerseits eine erste Umlenkrolle tragen, die als Außenrolle 29 außerhalb des Turmquerschnitts angeordnet ist und zu welcher das Seil 27 von der Seilwinde 21 nach oben verläuft. Von dieser ersten Außenrolle 29 wird das Seil 27 in die Horizontale umgelenkt und verläuft oberhalb des Mittelriegels 28 bis zu einer zweiten Umlenkrolle, die als Innenrolle 30 bezeichnet ist und das Seil über dem Mittelpunkt des Turmquerschnitts nach unten führt, so dass das Seilende über dem Mittelpunkt des Lastenkorbes 17 an dessen Tragbügel 18 anschließt.On top of the
Der Aufbau des Lastenkorbs 17 ist aus
Bei dem dargestellten Ausführungsbeispiel sind zwei gegenüberliegende Korbwände 31 beweglich ausgestaltet, indem sie am Boden des Lastenkorbs 17 anscharniert sind. In
Unterhalb seines Bodens weist der Lastenkorb 17 Bodenprofile 40 auf, in Form von metallischen Rohren 6, wobei Ausleger in Form von Innenrohren 7 in die Bodenprofile 40 eingesteckt werden können. Diese Ausleger erstrecken sich so weit nach außen, dass sie über den Querschnitt des Turms 23 hinausragen. Wenn die Ausleger nicht montiert sind, kann der Lastenkorb 17 innerhalb des Turms 23 auf und ab verfahren werden und so weit abgesenkt werden, dass er mit seinen Bodenprofilen 40 innerhalb des von der Plattform 2 gebildeten Rahmens auf dem Boden aufsteht. Wenn jedoch der Lastenkorb 17 so weit angehoben ist, dass die Bodenprofile 40 sich oberhalb der Plattform 2 oder innerhalb des Turms 23 oberhalb von Querriegeln 24 befinden, so können die Ausleger in die Bodenprofile 40 eingesteckt und der Lastenkorb 17 anschließend so weit abgesenkt werden, dass sich die Ausleger auf die Plattform 2 bzw. auf die Querriegel 24 auflegen.Below its bottom, the
In
Während die Zeichnungen den fertig montierten temporären Aufzug 1 zeigen, erfolgt dessen Montage entsprechend der nachfolgenden Beschreibung:
Die beiden Rahmenteile 3 und 4 werden im Bereich der Trennstellen 5 ineinander gesteckt und miteinander verbunden. Diese Steckverbindungen werden durchSchrauben 25 gesichert, die sich quer durch dieRohre 6 und dieInnenrohre 7 erstrecken. Die sogeschaffene Plattform 2 istauf den Laufrollen 11 verfahrbar und wird exakt zu dem gewünschten Aufstellungsort des Aufzugs 1 verfahren. An diesem Aufstellungsort wird diePlattform 2 dann mit Hilfe der Nivellierschrauben 9 exakt waagerecht ausgerichtet. Dabei wird diePlattform 2 so weit angehoben, dass dieLaufrollen 11 entlastet sind.
- The two
frame parts 3 and 4 are inserted into each other in the region of the separation points 5 and connected to each other. These connectors are secured byscrews 25 which extend transversely through thetubes 6 and theinner tubes 7. The thus createdplatform 2 is movable on therollers 11 and is moved exactly to the desired site of theelevator 1. At this site, theplatform 2 is then aligned exactly horizontally by means of the leveling screws 9. Theplatform 2 is raised so far that therollers 11 are relieved.
Der Lastenkorb 17 wird in der Mitte der Plattform 2 platziert. Der Lastenkorb 17 wird zu diesem Zeitpunkt noch nicht endgültig montiert, indem die obere Hälfte des Tragbügels 18 noch nicht mithilfe der erwähnten Steckverbindungen mit dessen unterer Hälfte verbunden wird.The
In den vier Ecken der Plattform 2 befinden sich vier aufrecht ragende Rohrstutzen 41 zur Schaffung einer Steckverbindung mit dem weiter oben erläuterten Stecksystem, wobei diese Rohrstutzen 41 fester Bestandteil der Plattform 2 sind und beispielsweise mit den Rohren 6 der beiden Rahmenteile 3 und 4 verschweißt sind. Die Rohrstutzen 41 können entweder als Innenrohr 7 oder als Rohr 6 ausgestaltet sein. Bei dem dargestellten Ausführungsbeispiel sind sie jeweils als ein kurzes Rohr 6 ausgestaltet. Dementsprechend weisen sämtliche Stützenteile 14 an ihren unteren Enden Innenrohre 7 auf, mit welchen sie in die jeweils darunter befindlichen Rohre bzw. in die Rohrstutzen 41 gesteckt werden. Alternativ kann vorgesehen sein, dass die Innenrohre 7 als separate Bauteile vorliegen und beispielsweise zunächst in dem jeweils unteren Rohr 6 bzw. Rohrstutzen 41 befestigt werden, bevor dann ein Rohr 6 von oben auf den nach oben ragenden Überstand des Innenrohrs 7 aufgesteckt wird.In the four corners of the
Bei der Montage der ersten, unteren Stützenteile 14 werden die an diesen Stützenteilen 14 befindlichen Führungsschienen 15 auf die Köpfe 20 der Ausleger 19 des Lastenkorbs 17 aufgefädelt. Die Steckverbindungen zwischen den unteren Enden dieser unteren Stützenteile 14 und den Rohrstutzen 41 werden nun mit Schrauben 25 gesichert.When mounting the first,
Auf die oberen Enden dieser unteren Stützenteile 14 werden vier weitere Stützenteile 14 montiert und anschließend die Querriegel 24 angeschraubt. Schrauben 25 erstrecken sich durch die Laschen 38, die Rohre 6 und die Innenrohre 7, so dass einerseits die übereinander benachbarten Stützenteile 14 ein und derselben Stütze 12 miteinander verbunden werden und dabei auch der Querriegel 24 an den beiden benachbarten Stützen 12 befestigt wird. Durch die Querriegel 24 ergibt sich ein stabiler Verbund. Die Rohre 6 der Stützenteile 14 weisen bei dem dargestellten Ausführungsbeispiel eine Länge von 150 cm auf, so dass der Turm 23 in mehreren Etagen auf die gewünschte Höhe gebracht werden kann und dabei jede Etage eine Höhe von 150 cm aufweist. Nach Montage der ersten, unteren Stützenteile 14 befinden sich deren obere Enden in einer problemlos erreichbaren Arbeitshöhe, so dass die nächsthöheren Stützenteile 14 und auch die Querriegel 24 problemlos noch vom Boden aus montiert werden können.On the upper ends of the
Zur Montage der nächsten Etagen wird der Lastenkorb 17 nach und nach jeweils um eine Etage angehoben, so dass er als Arbeitsplattform für die Montage der nächsten Etage genutzt werden kann. Dadurch, dass der Tragbügel 18 noch nicht vollständig montiert ist, ist dessen obere Hälfte bei der Errichtung des Turms 23 nicht hinderlich im Wege. Um den Lastenkorb 17 auf diese Weise für die Errichtung des Turms 23 nutzen zu können, wird die Seilwinde 21 an dem Mittelriegel 28 installiert und das Seil 27 mit der Öse 42 am Boden des Lastenkorbs 17 verbunden. Nun kann der Lastenkorb 17 nach oben gezogen und als Arbeitsplattform genutzt werden. Hierzu wird der Lastenkorb 17 so weit angehoben, dass seine Bodenprofile 40 sich oberhalb von Querriegeln 24 befinden. Anschließend werden die Ausleger in die Bodenprofile 40 eingesteckt und der Lastenkorb 17 wieder abgesenkt, so dass sich die Ausleger auf die Querriegel 24 legen. Mit der beschriebenen Vorgehensweise kann der Turm 23 Etage für Etage nach oben bis auf die gewünschte Turmhöhe aufgebaut werden.For mounting the next floors of the
Der Tragrahmen 22 wird an der Plattform 2 und den unteren Stützenteilen 14 mithilfe von Schrauben 25 festgelegt.The
Wenn die gewünschte Anzahl von Etagen des Turms 23 montiert worden ist und der Turm 23 seine gewünschte Höhe erreicht hat, werden der Tragbügel 18 und der Umlenkbeschlag 26 komplettiert. Um den Umlenkbeschlag 26 zu bilden, wird von dem Mittelriegel 28 die Seilwinde 21 entfernt und die Innenrolle 30 an denselben, nun frei gewordenen Befestigungspunkten des Mittelriegels 28 befestigt. Zudem wird die Außenrolle 29 am Mittelriegel 28 montiert. Wenn dieselbe Seilwinde 21 zunächst für die Montage des Turms 23 und später für den Betrieb des Aufzugs 1 verwendet werden soll, wird diese nun am Tragrahmen 22 montiert.When the desired number of floors of the
Anschließend wird das Seil 27 von der Seilwinde 21, die sich am Tragrahmen 22 befindet, über die Außenrolle 29 und die Innenrolle 30 bis zum Lastenkorb 17 geführt und dort angeschlagen. Bei dem dargestellten Ausführungsbeispiel ist der Tragbügel 18 so belastbar ausgestaltet, dass das Seil 27 am Tragbügel 18 angeschlagen ist. Hierdurch ist im Lastenkorb 17 der Raum unterhalb des Seils 27 frei nutzbar, ohne dass das Seil 27 bis zur Öse 42, also bis zum Boden des Lastenkorbs 17, verläuft. Falls jedoch wahlweise doch die Öse 42 zum Anschlagen des Seils 27 genutzt werden soll, kann das Seil 27 durch eine Führungsöse am Tragbügel 18 verlaufen, um den Lastenkorb 17 gegen unerwünschte Pendelbewegungen zu stabilisieren.Subsequently, the
Abweichend von dem dargestellten Ausführungsbeispiel kann vorgesehen sein, die beiden Rahmenteile 3 und 4 nicht unmittelbar miteinander zu verbinden, sondern an den Trennstellen 5 Zwischenelemente in Form von Rohren 6 zu montieren. Auf diese Weise weist die Plattform 2 keinen quadratischen Grundriss mehr auf, sondern einen rechteckig länglichen Querschnitt. Zusammen mit entsprechend ausgestalteten Querriegeln 24 kann auf diese Weise die Breite des Aufzugs 1 verändert werden.Notwithstanding the illustrated embodiment can be provided not to connect the two
Auch der Lastenkorb 17 weist ein aus Rohren 6 zusammengestecktes Gerüst auf, so dass grundsätzlich das gleiche Stecksystem mit Rohren 6, Innenrohren 7 und Schrauben 25 verwendet wird wie für die Plattform 2 oder den Turm 23, wobei allerdings die Komponenten anders dimensioniert sein können, beispielsweise die Rohre 6 für den Lastenkorb 17 kleinere Querschnittsabmessungen aufweisen können als für die Plattform 2 oder den Turm 23. Aufgrund der Verwendung des Stecksystems können auch die Abmessungen des Lastenkorbs 17 durch Verwendung entsprechender Zwischenelemente verändert werden, in Anpassung an die Abmessungen der Plattform 2.Also, the
Die beiden Rahmenteile 3 und 4 sowie der Tragrahmen 22 mit der gegebenenfalls stets daran verbleibenden Seilwinde 21 stellen die größten einzelnen Komponenten des Bausatzes dar, aus dem der Aufzug 1 aufgebaut wird. Die Plattform 2, der Turm 23 und der Lastenkorb 17 können in mehrere kleine Elemente, insbesondere in ein Bündel von Rohren und Querriegeln, zerlegt werden, wodurch eine platzsparende Lagerung und ein platzsparender Transport des gesamten Aufzugs 1 im zerlegten Zustand ermöglicht ist. Ein praktisches Ausführungsbeispiel bewirkt beispielsweise für einen Aufzug mit 12 Metern Höhe Abmessungen des gesamten Bausatzes in einer Größenordnung von 1,5 m x 1,0 m x 0,6 m, so dass der gesamte Raumbedarf eines solchen Bausatzes weniger als 1m3 beträgt.The two
Der vorschlagsgemäße Aufzug 1 weist außer dem Motor und dem Zugseil, also den Komponenten der einen bzw. der zwei verwendeten Seilwinden 21, praktisch keinen Wartungsbedarf auf und ist dementsprechend preisgünstig im Unterhalt.The proposed
Der Lastenkorb 17 kann auch genutzt werden, um zusammen mit der Plattform 2 ein Fahrgerüst zu bilden. In diesem Fall werden die Nivellierschrauben 9 in die Höhe geschraubt, so dass die Plattform 2 auf ihren Laufrollen 11 verfahrbar ist, die vorzugsweise als Schwerlastrollen ausgestaltet sind. Bei der Nutzung als Fahrgerüst wird vorzugsweise die obere Hälfte des Tragbügels 18 nicht montiert, um nicht hinderlich im Wege zu sein, und die Ausleger 19 können auf die Rohre 6 der Rahmenteile 3 und 4 der Plattform 2 aufgelegt werden, so dass die Bodenprofile 40 des Lastenkorbs 17 vom Untergrund beanstandet und angehoben sind.The
In
Die vier Stützen 12 bestehen jeweils aus mehreren übereinander angeordneten Stützenteilen 14. Dort, wo zwei Stützenteile 14 aneinander anschließen, verläuft jeweils ein Querriegel 24 von einer Stütze 12 zu einer benachbarten Stütze 12, so dass sich durch diese mehreren Querriegel 24 mehrere Etagen des Turms 23 ergeben und dementsprechend die Höhe des Turms 23 beim Aufbau des temporären Aufzugs 1 an die jeweiligen Gegebenheiten, z. B. einer Baustelle, angepasst werden können.The four supports 12 each consist of a plurality of
Wie aus
In
Weiterhin ist in
Weiterhin ist ersichtlich, dass die Teleskopanordnung ein äußeres Rohr 108 aufweist, in welchem der ebenfalls als Rohr ausgestaltete Sperrriegel 105 längs beweglich geführt ist. Zudem erstreckt sich ein Führungsrohr 109 axial durch das Rohr 108 und den Sperrriegel 105. Dieses Führungsrohr 109 dient dazu, das Sicherungsseil 103 zu führen. Die als Wendelfeder ausgestaltete Druckfeder 106 verläuft um dieses Führungsrohr 109 herum und stützt sich gegen zwei Rohrböden 110 ab, die jeweils an dem zur Umlenkrolle 104 gerichteten Ende des Rohrs 108 und des Sperrriegels 105 vorgesehen sind. Ein weiterer Rohrboden 110 ist innerhalb des Sperrriegels 105, nahe dem gegenüber liegenden freien Ende angeordnet, so dass ein vergleichsweise kurzer Überstand des Rohrs des Sperrriegels 105 gegenüber diesem Rohrboden 110 bis zum freien Ende des Sperrriegels 105 verbleibt. Innerhalb dieses Überstandes ist das Ende des Sicherungsseils 103 aufgenommen, wobei dieses Ende mit einem Nippel, Klemmbeschlag o. dgl. gesichert ist. Das freie Ende dieses Sperrriegels 105 ist durch eine Kappe 111 abgedeckt, die aus Kunststoff besteht und durch Klemmsitz im Rohr des Sperrriegels 105 gehalten ist.Furthermore, it can be seen that the telescopic arrangement has an
Bei Zugkräften, die auf das Seil 27 einwirken, wird das Seil 27 gestrafft, wie in den Zeichnungen dargestellt, so dass der Beschlag 115 im Abstand oberhalb von dem Tragbügel 18 und dem Anschlussbeschlag 107 gehalten wird. Dementsprechend wird das Sicherungsseil 103 gestrafft, so dass eine Seilklemme 116, die am Ende des Sicherungsseils 103 vorgesehen ist, Druckkräfte auf den dortigen Rohrboden 110 überträgt, so dass der Sperrriegel 105 gegen die Wirkung der Feder 106 möglichst tief in das Rohr 108 hineingezogen wird.With tensile forces acting on the
Sollte das Zugseil 27 reißen, so kann der Abschnitt des Seils 27, der sich zwischen dem Anschlussbeschlag 107 und dem Beschlag 115 der Sicherungsanordnung befindet, erschlaffen. Auch wenn dieser Abschnitt des Seils 27 reißt oder wenn das Sicherungsseil 103 reißt, ist die Folge in jedem Fall, dass sich die Feder 106 entspannen kann und den Sperrriegel 105 soweit wie möglich aus dem Rohr 108 herausschiebt. Der Sperrriegel 105 gerät somit über das Lichtraumprofil des Turms 23 hinaus nach außen, so dass bei einer Absenkbewegung des Lastenkorbs 17 die beiden Sperrriegel 105 von oben auf die nächst tiefer gelegenen Querriegel 24 treffen und dadurch eine weitere Abwärtsbewegung des Lastenkorbs 17 verhindert wird.Should the pull
Abweichend von dem dargestellten Ausführungsbeispiel kann vorgesehen sein, dass das Sicherungsseil 103 als ein einziges Seilstück von einem Sperrriegel 105 über den Beschlag 115 bis zum gegenüber liegenden Sperrriegel 105 verläuft, insbesondere wenn dabei das Sicherungsseil 103 im Bereich des Beschlags 115 nicht festgeklemmt ist, sondern lediglich mittels des Beschlags 115 geführt ist, kann sichergestellt werden, dass beide Sperrriegel 105 ausgelöst und in ihre Sperrstellung verfahren werden, wenn das Sicherungsseil 103 an einer beliebigen Stelle zwischen seinen beiden Enden reißen sollte.
Claims (17)
und die Stützenteile (14) mit Führungsschienen (15) versehen sind, die als Profilleisten mit einer längs verlaufenden Nut (16) ausgestaltet sind,
der zwischen den Stützen (12) des Turms (23) höhenbeweglich anordbar ist,
einen mit dem Seil (27) der Seilwinde (21) verbindbaren Anschlussbeschlag (107) aufweist,
und Ausleger (19) aufweist, welche in die Nuten (16) der Führungsschienen (15) einführbar sind, derart, dass der Lastenkorb (17) in horizontaler Richtung in den Führungsschienen (15) geführt und in vertikaler Richtung verfahrbar ist,
and the support parts (14) are provided with guide rails (15) which are designed as profiled strips with a longitudinal groove (16),
which is vertically movable between the supports (12) of the tower (23),
a connection fitting (107) which can be connected to the cable (27) of the cable winch (21),
and cantilevers (19) which are insertable into the grooves (16) of the guide rails (15), such that the cargo basket (17) is guided in the horizontal direction in the guide rails (15) and can be moved in the vertical direction,
dadurch gekennzeichnet,
dass die metallische Rohre (6) als Vierkantrohre ausgestaltet sind
und an den Verbindungsstellen Innenrohre (7) angeordnet sind, die sich jeweils teilweise in beide aneinandergrenzenden Rohre (6) erstrecken, während der Hohlraum des anderen metallischen Rohrs (6) einen Aufnahmeraum für den überstehenden Abschnitt des Innenrohrs (7) bildet.Kit according to claim 1,
characterized,
that the metallic tubes (6) are designed as square tubes
and at the junctions inner tubes (7) are arranged, each partially extending into both adjoining tubes (6), while the cavity of the other Metallic tube (6) forms a receiving space for the protruding portion of the inner tube (7).
dadurch gekennzeichnet,
dass die metallischen Rohre (6) im Bereich ihrer jeweiligen Steckverbindung durch eine Verschraubung gesichert sind, welche sich quer durch die ineinander gesteckten Rohre (6, 7) erstreckt.Kit according to claim 1 or 2,
characterized,
that the metallic pipes (6) are secured in the region of their respective plug-in connection by a screw extending transversely through the nested pipes themselves (6, 7).
dadurch gekennzeichnet,
dass die Plattform (2) einen viereckigen Rahmen aufweist und an wenigstens einer der vier Ecken eine Nivellierschraube (9) angeordnet ist,
welche sich senkrecht erstreckt und am unteren Ende mit einer Bodenplatte (10) versehen ist, deren Bodenaufstandsfläche größer ist als die Querschnittsfläche des Schaftes der Nivellierschraube (9).Kit according to one of the preceding claims,
characterized,
that the platform (2) comprises a quadrangular frame and a jack screw (9) is arranged on at least one of the four corners,
which extends vertically and is provided at the lower end with a bottom plate (10), the ground contact surface is greater than the cross-sectional area of the shank of the leveling screw (9).
dadurch gekennzeichnet,
dass dort, wo benachbarte Stützenteile (14) des Turms (23) aneinandergrenzen, ein Querriegel (24) von einer ersten zu einer benachbarten zweite Stütze (12) des Turms (23) verläuft,
wobei der Querriegel (24) an beiden Stützen (12) jeweils mit den beiden aneinandergrenzenden Stützenteilen (14) verbunden ist.Kit according to one of the preceding claims,
characterized,
that where adjacent support parts (14) of the tower (23) adjoin one another, a transverse bar (24) extends from a first to an adjacent second support (12) of the tower (23),
wherein the cross bar (24) is connected at both supports (12) in each case with the two adjoining support parts (14).
dadurch gekennzeichnet,
dass die Seilwinde (21) im unteren Bereich des Aufzugs (1) angeordnet ist,
und ein Umlenkbeschlag (26) oben am Turm (23) angeordnet ist,
wobei das Seil (27) von der Seilwinde (21) nach oben zu dem Umlenkbeschlag (26) und von diesem zu dem Lastenkorb (17) verläuft.Kit according to one of the preceding claims,
characterized,
that the cable winch (21) in the lower region of the lift (1) is arranged,
and a deflection fitting (26) is arranged at the top of the tower (23),
wherein the cable (27) from the winch (21) up to the deflection fitting (26) and from this to the cargo basket (17).
dadurch gekennzeichnet,
dass der Umlenkbeschlag (26) einen Mittelriegel (28) aufweist, der sich über die Mitte des Turmquerschnitts hinweg erstreckt,
wobei eine erste, als Außenrolle (29) bezeichnete Umlenkrolle aufweist, die oberhalb der Seilwinde (21) anzuordnen ist
sowie eine zweite, als Innenrolle (30) bezeichnete Umlenkrolle aufweist, die mittig oberhalb des Lastenkorbs (17) anzuordnen ist.Kit according to claim 6,
characterized,
that the deflector fitting (26) has a center bolt (28) which extends over the center of the tower cross section of time,
wherein a first, as outer roller (29) designated deflection roller which is to be arranged above the winch (21)
and a second, as inner roller (30) designated deflection roller which is centrally above the cargo basket (17) to be arranged.
dadurch gekennzeichnet,
dass Innenrolle (30) am Mittelriegel (28) lösbar befestigt ist, und dass der Bausatz eine Seilwinde (21) aufweist, die am Mittelriegel (28) montierbar ist.Kit according to claim 7,
characterized,
in that the inner roller (30) is detachably fastened to the middle bar (28), and that the kit has a winch (21) which can be mounted on the center bar (28).
dadurch gekennzeichnet,
dass Innenrolle (30) an bestimmten Montagepunkten am Mittelriegel (28) lösbar befestigt ist demontierbar ist, und dass an diesen Montagepunkten die Seilwinde (21) montierbar ist.Kit according to claim 8,
characterized,
in that the inner roller (30) can be detachably fastened to the center bar (28) at specific mounting points, and that the winch (21) can be mounted on these mounting points.
dass die Führungsschienen (15) der Stützen (12) Nuten (16) aufweisen, welche einen Querschnitt mit Hinterschneidung aufweisen,
und dass die Ausleger (19) des Lastenkorbs (17) jeweils einen Kopf (20) aufweisen, der in der Hinterschneidung aufnehmbar ist.Kit according to one of the preceding claims, characterized
in that the guide rails (15) of the supports (12) have grooves (16) which have a cross-section with an undercut,
and that the boom (19) of the cargo basket (17) respectively a head (20) receivable in the undercut.
dadurch gekennzeichnet,
dass eine Führungsschiene (15) ein Kunststoffprofil aufweist, welches mit der Nut (16) versehen ist.Kit according to one of the preceding claims,
characterized,
that a guide rail (15) comprises a plastic profile which is provided with the groove (16).
dadurch gekennzeichnet,
dass eine Seilwinde (21) an einem Tragrahmen (22) montiert ist, der mit den Stützen (12) und / oder der Plattform (2) verschraubbar ist.Kit according to one of the preceding claims,
characterized,
in that a cable winch (21) is mounted on a supporting frame (22) which can be screwed to the supports (12) and / or the platform (2).
dadurch gekennzeichnet,
dass der Lastenkorb (17) seitlich angeordnete Korbwände (31) aufweist, die sich vom Boden des Lastenkorbs (17) aufrecht erstrecken,
wobei wenigstens eine Korbwand (31) aus ihrer aufrechten Sicherungsstellung in eine liegende Laufbodenstellung beweglich sind.Kit according to one of the preceding claims,
characterized,
that the load basket (17) laterally arranged basket walls (31) extending from the bottom of the load basket (17) extend upright,
wherein at least one basket wall (31) are movable from its upright securing position into a horizontal walking position.
dadurch gekennzeichnet,
dass zwei gegenüberliegende Korbwände (31) beweglich ausgestaltet sind.Kit according to claim 13,
characterized,
that two opposite basket walls (31) are designed to be movable.
dadurch gekennzeichnet,
dass eine bewegliche Korbwand (31) um eine an ihrem unteren Ende angeordnete, liegend verlaufende Scharnierachse schwenkbeweglich gelagert ist.Kit according to claim 13 or 14,
characterized,
that a movable basket wall (31) is pivotally mounted about a lying at its lower end, lying horizontally extending hinge axis.
mit einem mehrere Stützen (12) und Querriegel (24) aufweisenden Turm (23),
wobei die Stützen (12) und Querriegel (24) ein Lichtraumprofil des Turms (23) umgeben,
und mit einem Lastenkorb (17), der zwischen den Stützen (12) des Turms (23) angeordnet und mittels eines von einer Seilwinde (21) zu einem Anschlussbeschlag (107) des Lastenkorbs (17) verlaufenden Seils (27) innerhalb des Lichtraumprofils höhenverfahrbar ist,
dadurch gekennzeichnet,
dass am Lastenkorb (17) ein federbelasteter Sperrriegel (105) angeordnet ist,
welcher beweglich ist zwischen einer Fahrstellung, die der Sperrriegel (105) innerhalb des Lichtraumprofils einnimmt, und einer Sperrstellung, in welcher der Sperrriegel (105) über das Lichtraumprofil hinaus nach außen ragt, und wobei der Sperrriegel (105) durch das Seil (27) gegen die Federwirkung in seiner Fahrstellung gehalten ist.Elevator (1) according to claim 16,
with a tower (23) having a plurality of supports (12) and transverse bars (24),
wherein the supports (12) and transverse bars (24) surround a clearance space of the tower (23),
and with a cargo basket (17) arranged between the supports (12) of the tower (23) and vertically movable by means of a rope (27) extending from a cable winch (21) to a connection fitting (107) of the cargo basket (17) within the clearance space profile is
characterized,
that a spring-loaded locking bolt (105) is arranged on the cargo basket (17),
which is movable between a driving position which the locking bolt (105) occupies within the clearance space, and a blocking position in which the locking bolt (105) projects beyond the clearance profile to the outside, and wherein the locking bolt (105) through the cable (27) held against the spring action in its driving position.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202017101760.5U DE202017101760U1 (en) | 2017-03-27 | 2017-03-27 | Kit for a temporary freight elevator |
DE202017102730.9U DE202017102730U1 (en) | 2017-03-27 | 2017-05-08 | Temporary lift with fall protection |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3381858A1 true EP3381858A1 (en) | 2018-10-03 |
EP3381858B1 EP3381858B1 (en) | 2020-06-03 |
Family
ID=58773901
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18161232.6A Active EP3381858B1 (en) | 2017-03-27 | 2018-03-12 | Temporary elevator designed from a kit |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3381858B1 (en) |
DE (2) | DE202017101760U1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112707267A (en) * | 2020-12-22 | 2021-04-27 | 住友富士电梯有限公司 | Falling-proof safety elevator |
CN114249202A (en) * | 2021-12-21 | 2022-03-29 | 重庆宝铭建设工程有限公司 | From locking-type green building construction elevator anti-falling device |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202017101760U1 (en) | 2017-03-27 | 2017-05-10 | Bernhard Lösing | Kit for a temporary freight elevator |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1398216A (en) * | 1920-03-16 | 1921-11-22 | Jr John S Barnette | Safety device for mine-elevators |
US1853085A (en) * | 1929-03-11 | 1932-04-12 | Albert T Scannell | Tower for elevating construction materials |
US2644545A (en) * | 1950-11-09 | 1953-07-07 | Universal Mfg Co | Elevator tower assembled from prefabricated panels |
US5579865A (en) * | 1994-02-23 | 1996-12-03 | Butler; J. Frank | Scaffold |
DE202016106594U1 (en) * | 2016-08-02 | 2016-12-05 | Bernhard Lösing | Rail system with round bodies |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202017101760U1 (en) | 2017-03-27 | 2017-05-10 | Bernhard Lösing | Kit for a temporary freight elevator |
-
2017
- 2017-03-27 DE DE202017101760.5U patent/DE202017101760U1/en not_active Expired - Lifetime
- 2017-05-08 DE DE202017102730.9U patent/DE202017102730U1/en not_active Expired - Lifetime
-
2018
- 2018-03-12 EP EP18161232.6A patent/EP3381858B1/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1398216A (en) * | 1920-03-16 | 1921-11-22 | Jr John S Barnette | Safety device for mine-elevators |
US1853085A (en) * | 1929-03-11 | 1932-04-12 | Albert T Scannell | Tower for elevating construction materials |
US2644545A (en) * | 1950-11-09 | 1953-07-07 | Universal Mfg Co | Elevator tower assembled from prefabricated panels |
US5579865A (en) * | 1994-02-23 | 1996-12-03 | Butler; J. Frank | Scaffold |
DE202016106594U1 (en) * | 2016-08-02 | 2016-12-05 | Bernhard Lösing | Rail system with round bodies |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112707267A (en) * | 2020-12-22 | 2021-04-27 | 住友富士电梯有限公司 | Falling-proof safety elevator |
CN114249202A (en) * | 2021-12-21 | 2022-03-29 | 重庆宝铭建设工程有限公司 | From locking-type green building construction elevator anti-falling device |
Also Published As
Publication number | Publication date |
---|---|
DE202017101760U1 (en) | 2017-05-10 |
EP3381858B1 (en) | 2020-06-03 |
DE202017102730U1 (en) | 2017-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE69822303T2 (en) | PARTIAL RECORDABLE BUILDING PLATFORM | |
EP2150663B1 (en) | Parking/storage device for motor vehicles | |
EP2253764B1 (en) | Frame-shaped truss | |
EP3827146A1 (en) | Lift drive for a rail-guided climbing system | |
WO2008148379A1 (en) | Girder element for concrete formwork comprising a structure for automatically compensating bending strains | |
EP3381858B1 (en) | Temporary elevator designed from a kit | |
EP3743567B1 (en) | Variable container system | |
EP2823860B1 (en) | Safety system for persons | |
EP2642065B1 (en) | Substructure module for a mobile onshore drilling installation and method for constructing and dismantling such substructure modules | |
DE3420737A1 (en) | Auxiliary apparatus for vertically adjustable scaffolding | |
DE3025017A1 (en) | Hoist | |
DE3742296C2 (en) | ||
WO2006116978A1 (en) | Transport palette for fencing elements | |
DE102020214454A1 (en) | CLIMBING FRAME | |
DE19704967C2 (en) | Gantry crane, in particular for the construction of buildings | |
DE2629253C3 (en) | Device for conveying building material through an opening in a wall into a building | |
DE102020126730B4 (en) | Elevator Device of a Building Scaffolding | |
DE102018104551A1 (en) | Method and device for mounting components, in particular facade elements on very tall buildings | |
WO2024132536A1 (en) | Platform for an elevator system for a building which is under construction | |
DE3911044C2 (en) | ||
DE29607823U1 (en) | Mast | |
DE2360755C2 (en) | Working platform | |
DE102022114668A1 (en) | Reinforcement device | |
DE1481911A1 (en) | Mobile lifting frame | |
WO2011095289A1 (en) | Railing element |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190402 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20191118 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1276815 Country of ref document: AT Kind code of ref document: T Effective date: 20200615 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502018001560 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200904 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200903 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20200603 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200903 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201006 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20201003 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502018001560 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
26N | No opposition filed |
Effective date: 20210304 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20210331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210312 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210312 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210331 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210331 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20220312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20180312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1276815 Country of ref document: AT Kind code of ref document: T Effective date: 20230312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200603 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240917 Year of fee payment: 7 |