EP3375989B1 - Waste heat recovery apparatus and method for controlling waste heat recovery apparatus - Google Patents

Waste heat recovery apparatus and method for controlling waste heat recovery apparatus Download PDF

Info

Publication number
EP3375989B1
EP3375989B1 EP18162265.5A EP18162265A EP3375989B1 EP 3375989 B1 EP3375989 B1 EP 3375989B1 EP 18162265 A EP18162265 A EP 18162265A EP 3375989 B1 EP3375989 B1 EP 3375989B1
Authority
EP
European Patent Office
Prior art keywords
phase refrigerant
liquid
evaporator
heat recovery
refrigerant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP18162265.5A
Other languages
German (de)
French (fr)
Other versions
EP3375989A1 (en
Inventor
Manabu Tateno
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Publication of EP3375989A1 publication Critical patent/EP3375989A1/en
Application granted granted Critical
Publication of EP3375989B1 publication Critical patent/EP3375989B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/065Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle the combustion taking place in an internal combustion piston engine, e.g. a diesel engine
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02GHOT GAS OR COMBUSTION-PRODUCT POSITIVE-DISPLACEMENT ENGINE PLANTS; USE OF WASTE HEAT OF COMBUSTION ENGINES; NOT OTHERWISE PROVIDED FOR
    • F02G5/00Profiting from waste heat of combustion engines, not otherwise provided for
    • F02G5/02Profiting from waste heat of exhaust gases
    • F02G5/04Profiting from waste heat of exhaust gases in combination with other waste heat from combustion engines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D15/00Adaptations of machines or engines for special use; Combinations of engines with devices driven thereby
    • F01D15/08Adaptations for driving, or combinations with, pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/101Regulating means specially adapted therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K25/00Plants or engines characterised by use of special working fluids, not otherwise provided for; Plants operating in closed cycles and not otherwise provided for
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01NGAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR MACHINES OR ENGINES IN GENERAL; GAS-FLOW SILENCERS OR EXHAUST APPARATUS FOR INTERNAL COMBUSTION ENGINES
    • F01N5/00Exhaust or silencing apparatus combined or associated with devices profiting by exhaust energy
    • F01N5/02Exhaust or silencing apparatus combined or associated with devices profiting by exhaust energy the devices using heat
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P7/00Controlling of coolant flow
    • F01P7/14Controlling of coolant flow the coolant being liquid
    • F01P7/16Controlling of coolant flow the coolant being liquid by thermostatic control
    • F01P7/162Controlling of coolant flow the coolant being liquid by thermostatic control by cutting in and out of pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01PCOOLING OF MACHINES OR ENGINES IN GENERAL; COOLING OF INTERNAL-COMBUSTION ENGINES
    • F01P2050/00Applications
    • F01P2050/24Hybrid vehicles
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F02COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
    • F02GHOT GAS OR COMBUSTION-PRODUCT POSITIVE-DISPLACEMENT ENGINE PLANTS; USE OF WASTE HEAT OF COMBUSTION ENGINES; NOT OTHERWISE PROVIDED FOR
    • F02G2260/00Recuperating heat from exhaust gases of combustion engines and heat from cooling circuits

Definitions

  • the present invention relates to a waste heat recovery apparatus and a method for controlling a waste heat recovery apparatus, and particularly, to a waste heat recovery apparatus and a method for controlling a waste heat recovery apparatus that recovers the waste heat of an internal combustion engine by using a Rankine cycle system.
  • JP 2013-119831 A discloses a technique regarding a power recovery apparatus including a Rankine cycle device constituted of a pump, a boiler, an expander, and a condenser.
  • the pump pumps a refrigerant to the boiler side.
  • the boiler causes the refrigerant pumped by the pump to perform heat exchange with exhaust gas flowing through an exhaust pipe of an engine so as to heat the refrigerant.
  • the refrigerant turned into steam by being heated by the boiler flows into the expander.
  • the expander takes out the expansion energy of the refrigerant turned into steam by the boiler as power to rotate a drive shaft.
  • the pumping speed of the refrigerant by the pump is controlled in accordance with the rotating speed of the engine. Specifically, when the rotating speed of the engine exceeds a predetermined rotating speed, the rotating speed of the pump is controlled such that the pumping speed of the refrigerant by the pump decreases. Accordingly, the expander is restrained from overspeeding.
  • Other waste heat recovery systems are disclosed in JP2014-134174 , US2011/0167818 A1 and US2006/0225421 A1 .
  • the amount of the refrigerant to be pumped by the evaporator is controlled for the purpose of restraining the overspeed of the expander.
  • the supply of the refrigerant to the evaporator also influences the temperature of the refrigerant within the evaporator. That is, a boiling refrigerant is stored in the evaporator under heating. For this reason, when the refrigerant that does not reach a boiling temperature is frequently pumped to the evaporator, a refrigerant temperature within the evaporator may drop and boiling may subside temporarily. In this case, since the amount of a gas-phase refrigerant turned into steam decreases, there is a problem in that that the waste heat recovery efficiency of the Rankine cycle will incline.
  • the present invention provides a waste heat recovery apparatus and a method for controlling a waste heat recovery apparatus that can continue boiling of a refrigerant stored in an evaporator as long as possible to enhance waste heat recovery efficiency.
  • a first aspect of the invention relates to a waste heat recovery apparatus including an evaporator configured to turn a liquid-phase refrigerant into steam through heat exchange with exhaust gas of an internal combustion engine, an expander configured to expand a gas-phase refrigerant passed through the evaporator to recover heat energy, a condenser configured to condense the gas-phase refrigerant passed through the expander such that the gas-phase refrigerant returns to the liquid-phase refrigerant, a liquid-phase refrigerant supply device configured to supply the liquid-phase refrigerant delivered from the condenser, to the evaporator, and a control device configured to control the liquid-phase refrigerant supply device so as to adjust an amount of the liquid-phase refrigerant to be supplied to the evaporator.
  • the control device is configured to control the liquid-phase refrigerant supply device so as to bring the supply of the liquid-phase refrigerant by the liquid-phase refrigerant supply device into a stopped state at least until an amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than a predetermined low refrigerant amount, during operation of the internal combustion engine.
  • the liquid-phase refrigerant supply device may be a pump that pumps the liquid-phase refrigerant delivered from the condenser to the evaporator, and the control device may be configured to stop operation of the pump when the supply of the liquid-phase refrigerant is brought into a stopped state.
  • control device may be configured to continue a state where the operation of the pump is stopped, during the operation of the internal combustion engine and even after the amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the low refrigerant amount.
  • control device may be configured to operate the pump during the operation of the internal combustion engine and in a case where the amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the low refrigerant amount.
  • control device may be configured to operate the pump during stop of the internal combustion engine and in a case where a temperature of the liquid-phase refrigerant stored in the evaporator reaches a boiling temperature; and the control device may be configured to bring the pump into a stopped state during the stop of the internal combustion engine and when the temperature of the liquid-phase refrigerant stored in the evaporator does not reach the boiling temperature.
  • control device may be configured to calculate an amount of a refrigerant needed to bring the amount of the liquid-phase refrigerant stored in the evaporator into a full amount as a target refrigerant amount, and the control device may be configured to control the operation of the pump with the target refrigerant amount as an upper limit.
  • the waste heat recovery apparatus of the first aspect of the invention may further include a heat recovery device that performs heat exchange between the liquid-phase refrigerant passed through the pump, and an engine coolant passed through the internal combustion engine, and a pumping device that pumps the engine coolant to the heat recovery device.
  • the control device may be configured to operate the pumping device in a case where the pump is operated and in a case where a temperature of the engine coolant passed through the pump is higher than a temperature of the liquid-phase refrigerant.
  • the evaporator may include a flue tube through which the exhaust gas of the internal combustion engine flows and a refrigerant passage which is formed around the flue tube and in which the liquid-phase refrigerant is stored, a first end of the flue tube may be constituted as a fixed end; and a second end of the flue tube may include a bellows tube for absorbing a change in tube length resulting from thermal expansion of the flue tube.
  • a second aspect of the invention related to a method for controlling a waste heat recovery apparatus.
  • the waste heat recovery apparatus includes an evaporator, an expander, a condenser, and a liquid-phase refrigerant supply device.
  • the evaporator is configured to turn a liquid-phase refrigerant into steam through heat exchange with exhaust gas of an internal combustion engine.
  • the expander is configured to expand a gas-phase refrigerant passed through the evaporator to recover heat energy.
  • the condenser is configured to condense the gas-phase refrigerant passed through the expander to return the condensed gas-phase refrigerant to the liquid-phase refrigerant.
  • the liquid-phase refrigerant supply device is configured to supply the liquid-phase refrigerant delivered from the condenser, to the evaporator.
  • the method includes adjusting an amount of the liquid-phase refrigerant to be supplied to the evaporator by controlling the liquid-phase refrigerant supply device; receiving operation of the internal combustion engine to bring the supply of the liquid-phase refrigerant by the liquid-phase refrigerant supply device into a stopped state; and continuing the stopped state until an amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than a predetermined low refrigerant amount during the operation of the internal combustion engine.
  • the liquid-phase refrigerant stored in the evaporator is heated and boils through the heat exchange between the exhaust gas of the internal combustion engine and the liquid-phase refrigerant.
  • the liquid-phase refrigerant is not supplied to the evaporator until the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the predetermined low refrigerant amount. Accordingly, since the boiling of the liquid-phase refrigerant stored in the evaporator can be restrained from subsiding during the operation of the internal combustion engine, the waste heat recovery efficiency can be enhanced.
  • the first aspect of the invention it is possible to bring the supply of the liquid-phase refrigerant into a stopped state by stopping the operation of the pump that pumps the liquid-phase refrigerant delivered from the condenser, to the evaporator.
  • the stopped state is continued even after the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the predetermined low refrigerant amount during the operation of the internal combustion engine. Accordingly, it is possible to continue the boiling state of the refrigerant until the liquid-phase refrigerant stored in the evaporator runs out.
  • the liquid-phase refrigerant is pumped to the evaporator in a case where the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the predetermined low refrigerant amount during the operation of an internal combustion engine. Accordingly, a decline in the waste heat recovery efficiency that can occur due to the fact that the liquid-phase refrigerant stored in the evaporator has the low refrigerant amount can be suppressed.
  • the pump is operated when the temperature of the liquid-phase refrigerant stored in the evaporator reaches the boiling temperature during the stop of the internal combustion engine, and the pump is brought into a stopped state when the temperature of the liquid-phase refrigerant does not reach the boiling temperature. Accordingly, since the temperature can be restrained from further dropping from a state where the liquid-phase refrigerant stored in the evaporator does not boil, the time needed until the refrigerant boils after the next operation of the internal combustion engine can be prolonged to restrain the waste heat recovery efficiency from declining.
  • the liquid-phase refrigerant in a case where the conditions for operating the pump are satisfied, it is possible to pump the liquid-phase refrigerant to the evaporator with the full amount as the upper limit.
  • the liquid-phase refrigerant pumped to the evaporator can be heated through the heat exchange with the engine coolant. Therefore, a higher-temperature liquid-phase refrigerant can be pumped to the evaporator. Accordingly, since the time until the liquid-phase refrigerant of the evaporator boils can be shortened, the waste heat recovery efficiency can be enhanced.
  • the evaporator includes a structure for absorbing a change in tube length resulting from the thermal expansion of the flue tube. Accordingly, since the heat resistance of the evaporator can be enhanced, occurrence of a problem caused by the amount of the liquid-phase refrigerant decreasing and the evaporator being excessively superheated can be restrained.
  • FIG. 1 is a view illustrating the configuration of a waste heat recovery apparatus 1 of Embodiment 1.
  • the waste heat recovery apparatus 1 is configured by being assembled into an internal combustion engine (hereinafter, also referred to as an "engine") 2 mounted on a vehicle.
  • the vehicle is a hybrid vehicle using the power from the engine 2 and the power from a motor (not illustrated).
  • the vehicle that is applicable to the waste heat recovery apparatus 1 of Embodiment 1 is not limited to the hybrid vehicle and may be applied to various vehicles, such as a start-stop vehicle having a start-stop function, on the premise that the engine 2 is frequently operated and stopped.
  • the waste heat recovery apparatus 1 includes a refrigerant circulation circuit in which a plurality of refrigerant pipes 31, 32, 33, 34, 35, 36, 37 is provided such that the refrigerant pipes are annularly connected together.
  • the waste heat recovery apparatus 1 performs heat exchange between exhaust gas flowing through an exhaust passage 4 of the engine 2, and the refrigerant circulating through the refrigerant circulation circuit, and thereby the waste heat of the exhaust gas is transferred to the refrigerant.
  • the refrigerant is liquid at normal temperature, and may be anything that boils or evaporates due to the heat of the engine 2 and turns into a gas-phase refrigerant. In the present embodiment, the refrigerant is water.
  • An evaporator 10, which is a heat exchanger, an exhaust gas control catalyst 12, and a superheater 14 are attached to the exhaust passage 4 sequentially from a downstream side in a flow direction of the exhaust gas.
  • An outlet of the pump 24 is connected to an engine cooling heat recovery device 8 by the refrigerant pipe 31.
  • the engine cooling heat recovery device 8 performs heat exchange between an engine coolant passed through the engine 2, and the refrigerant circulating through the refrigerant circulation circuit, and thereby the waste heat of the engine coolant is transferred to the refrigerant.
  • the engine cooling heat recovery device 8 is connected to the evaporator 10 by the refrigerant pipe 32.
  • the evaporator 10 is connected to the superheater 14 by the refrigerant pipe 33.
  • the water delivered from the pump 24 absorbs heat from the engine coolant in the engine cooling heat recovery device 8, and turns into high-temperature hot water.
  • the hot water absorbs heat from high-temperature exhaust gas in the evaporator 10, evaporates or boils, and turns into steam.
  • the steam further absorbs heat from high-temperature exhaust gas in the superheater 14, and turns into superheated steam.
  • the superheater 14 is connected to a turbine 18 by the refrigerant pipe 34.
  • the turbine 18 functions as an expander that expands the steam delivered from the superheater 14 to take out work.
  • a turbine nozzle 16 is provided at a connecting part between the refrigerant pipe 34 and the turbine 18.
  • the steam is jetted to the turbine 18 from the turbine nozzle 16 to rotate the turbine 18.
  • the rotation of the turbine 18 is transmitted to an output shaft of the engine 2 via a speed reducer (not illustrated). That is, the work taken out in the turbine 18 is used for assisting in the engine 2. It is to be noted, however, that it is possible to adopt a configuration in which a generator is driven by the turbine 18 and generated electricity is stored in a storage battery.
  • the turbine 18 is connected to a condenser 20 by the refrigerant pipe 35.
  • the steam expanded in the turbine 18 is cooled and condensed by the condenser 20, and is returned to liquid-phase water.
  • a catch tank 22 in which water is stored is disposed below the condenser 20 in a vertical direction.
  • the condenser 20 is connected to the catch tank 22 by the refrigerant pipe 36.
  • the water produced due to the condensation of the steam in the condenser 20 is temporarily stored in the catch tank 22.
  • the catch tank 22 is connected to an inlet of the pump 24 by the refrigerant pipe 37.
  • the water in the catch tank 22 is again delivered to the evaporator 10 by the pump 24.
  • the pump 24 is a positive-displacement pump, such as a vane pump.
  • the waste heat recovery apparatus 1 includes a turbine control valve 40 provided in the refrigerant pipe 34. Additionally, the waste heat recovery apparatus 1 includes a bypass circuit that bypasses the turbine 18, and a bypass valve 41 provided in the bypass circuit.
  • the bypass circuit is constituted of a refrigerant pipe 42 that branches from an upstream side of the turbine control valve 40 in the refrigerant pipe 34 and is connected to the bypass valve 41, and a refrigerant pipe 43 that connects the bypass valve 41 and the refrigerant pipe 35 together.
  • the turbine control valve 40 and the bypass valve 41 are control valves that are operated depending on signals from a control device 70 to be described below. Additionally, the waste heat recovery apparatus 1 includes a bypass nozzle 44 in the refrigerant pipe 43.
  • the waste heat recovery apparatus 1 includes an engine coolant circulation circuit in which a plurality of fluid pipes 51, 52, 53 is provided such that the fluid pipes are annularly connected together.
  • An engine cooling pump 60 which delivers the engine coolant from the fluid pipe 53 to the fluid pipe 51, is disposed in the engine coolant circulation circuit.
  • An outlet of the engine cooling pump 60 is connected to an engine coolant inlet of the engine 2 by the fluid pipe 51.
  • An engine coolant outlet of the engine 2 is connected to an inlet of a radiator 61 by the fluid pipe 52.
  • the high-temperature engine coolant delivered from the engine 2 is cooled by the radiator 61.
  • An outlet of the radiator 61 is connected to an inlet of the engine cooling pump 60 by the fluid pipe 53.
  • the engine cooling pump 60 is an electric pump that is operated depending on a signal from the control device 70 to be described below.
  • the radiator 61 is disposed on a vehicle rear side with respect to the condenser 20. According to such an arrangement, a traveling wind is introduced into the radiator 61 after being first introduced into the condenser 20 to absorb the heat of the condenser. Thus, excessive cooling of the radiator 61 is suppressed in a case where the engine 2 is stopped and the vehicle travels.
  • the waste heat recovery apparatus 1 includes a radiator bypass circuit that bypasses the radiator 61 to circulate the engine coolant.
  • a radiator bypass circuit is configured to include a fluid pipe 54 that branches from the fluid pipe 52 and is connected to the engine cooling heat recovery device 8, and a fluid pipe 55 that connects the engine cooling heat recovery device 8 and the fluid pipe 53 together.
  • a three-way valve 62 is disposed at a connecting part between the fluid pipe 52 and the fluid pipe 54. The three-way valve 62 is a valve that switches a flow destination for the engine coolant, which flows through the fluid pipe 52, between the fluid pipe 53 and the fluid pipe 54, and is operated depending on a signal from the control device 70 to be described below.
  • a plurality of sensors is disposed in the middle of the refrigerant circulation circuit and the engine coolant circulation circuit.
  • a pressure sensor 71 for detecting a pre-pressure (hereinafter, a nozzle pre-pressure) P of the turbine nozzle 16, and a temperature sensor 72 for detecting a pre-temperature (a nozzle pre-temperature) T of the turbine nozzle 16 are disposed in the refrigerant pipe 34.
  • a temperature sensor 73 which detects a refrigerant temperature (hereinafter, a pump inlet coolant temperature) on the inlet side of the pump 24, is disposed in the refrigerant pipe 37.
  • a temperature sensor 74 which detects the temperature (hereinafter, engine outlet coolant temperature) of the engine coolant passed through the engine 2, is disposed in the fluid pipe 52.
  • a temperature sensor 75 which detects the temperature of the liquid-phase water that is stored inside, is disposed in the evaporator 10.
  • a pressure sensor 76 for detecting a post-pressure (hereinafter, nozzle post-pressure) of the turbine nozzle 16, and a temperature sensor 77 for detecting a post-temperature (a nozzle post-temperature) of the turbine nozzle 16 are disposed in the refrigerant pipe 35.
  • the waste heat recovery apparatus 1 includes the control device 70.
  • the control device 70 is a control device that totally controls the overall waste heat recovery apparatus 1.
  • the control device 70 includes at least an input/output interface, a memory, and a CPU.
  • the input/output interface is provided to fetch sensor signals from sensors attached to the waste heat recovery apparatus 1 and to output operation signals to various actuators provided in the waste heat recovery apparatus 1.
  • the temperature sensors 72, 73, 74, 75, 77 and the pressure sensors 71 and 76 are included in the sensors from which the control device 70 fetches the signals.
  • the pump 24, the engine cooling pump 60, the turbine control valve 40, the bypass valve 41, and the three-way valve 62 are included in the actuators from which the control device 70 issues the operation signals.
  • control programs, maps, and the like for controlling the waste heat recovery apparatus 1 are stored in the memory.
  • the CPU reads and executes the control programs or the like from the memory, and generates the operation signals based on the fetched sensor signals.
  • FIG. 2 is a view illustrating an internal configuration of the evaporator 10 provided in the waste heat recovery apparatus 1 of Embodiment 1.
  • the evaporator 10 includes a tubular housing 101, a flue tube 102 through which the exhaust gas flows, a refrigerant passage 103 in which the refrigerant is stored, and a bellows tube 104.
  • the flue tube 102 is constituted of a plurality of tubes disposed in parallel within the housing 101, and is configured such that the exhaust gas flowing from the exhaust passage 4 passes through the tube.
  • a space around the flue tube 102 inside the housing 101 is constituted as the refrigerant passage 103.
  • the water pumped from the refrigerant pipe 32 is stored in the refrigerant passage 103.
  • a first end 105 of the flue tube 102 is a fixed end fixed to the housing 101.
  • a second end 106 of the flue tube 102 is fixed to the housing 101 via the bellows tube 104.
  • the bellows tube 104 is configured to be extendable in a longitudinal direction of the flue tube 102 in accordance with a change in tube length resulting from the thermal expansion of the flue tube 102.
  • the evaporator 10 is made of a high heat-resistant material, such as stainless steel. In the waste heat recovery apparatus 1 of Embodiment 1, a control (to be described below) assuming a situation in which the evaporator 10 undergoes the no-water burning is realized by including the evaporator 10 configured as described above.
  • FIG. 3 is a view for describing the flow of the refrigerant flowing through the refrigerant circulation circuit during the operation of the engine.
  • paths along which the refrigerant is flowing are represented by thick solid lines, and paths along which the refrigerant is not flowing are represented by thick broken lines.
  • the waste heat recovery apparatus 1 of Embodiment 1 recovers the waste heat during the operation of the engine 2 as the rotational energy of the turbine 18 using the Rankine cycle.
  • the waste heat recovery control of the waste heat recovery apparatus 1 is performed by opening the turbine control valve 40 during the operation of the engine 2.
  • Water serving as the liquid-phase refrigerant is stored in the evaporator 10.
  • the evaporator 10 receives the waste heat of the exhaust gas of the engine 2, and boils the water. When the water boils, a part of the boiled water turns into a gas-phase refrigerant (steam).
  • the steam generated in the evaporator 10 is introduced into the superheater 14 via the refrigerant pipe 33.
  • the steam that undergoes the phase transition in the evaporator 10 becomes high-temperature and high-pressure superheated steam.
  • the superheated steam passed through the superheater 14 is introduced into the turbine 18 via the refrigerant pipe 34 in a state where the turbine control valve 40 is opened.
  • the introduced superheated steam is decompressed and expanded by the turbine nozzle 16, and then jetted to turbine blades. Accordingly, the heat energy of the superheated steam is taken out as the rotational motion of the turbine 18.
  • Low-pressure steam passed through the turbine 18 is introduced into the condenser 20 via the refrigerant pipe 35.
  • the bypass valve 41 is opened. Accordingly, the superheated steam of the refrigerant pipe 34 bypasses the turbine 18, and is decompressed by the bypass nozzle 44, and then escaped to the condenser 20.
  • the steam introduced into the condenser 20 is cooled, turns into water, and is temporarily stored in the catch tank 22 via the refrigerant pipe 36. As such a waste heat recovery operation continues, the waste heat of the engine 2 continues and is recovered.
  • FIG. 4 is a view for describing the flow of the refrigerant flowing through the refrigerant circulation circuit during the stop of the engine.
  • paths along which the refrigerant is flowing are represented by thick solid lines, and paths along which the refrigerant is not flowing are represented by thick broken lines.
  • the water injection control is performed by controlling the operation of the pump 24.
  • the pump 24 pumps an amount of water according to its rotating speed from the refrigerant pipe 37 side to the refrigerant pipe 31 side.
  • the pump 24 is operated during the stop of the engine 2
  • the water stored in the catch tank 22 is pumped to the engine cooling heat recovery device 8 via the refrigerant pipes 37 and 31.
  • the engine cooling heat recovery control of heating water through the heat exchange with engine coolant is performed.
  • the engine cooling heat recovery control will be described below in detail.
  • the heated high-temperature water is injected into the evaporator 10 via the refrigerant pipe 32.
  • the engine cooling heat recovery control to be performed in the engine cooling heat recovery device 8 will be described.
  • the three-way valve 62 and the engine cooling pump 60 function as a pumping device that pumps the engine coolant to the evaporator 10.
  • the waste heat recovery apparatus 1 of Embodiment 1 heats the water injected into the evaporator 10 by using the heat of the high-temperature engine coolant pumped to the evaporator 10 with the heat of the engine coolant, and restrains the engine coolant from boiling during the stop of the engine 2.
  • FIG. 5 is a view for describing the flow of the engine coolant during the operation of the engine 2.
  • FIG. 6 is a view for describing the flow of the engine coolant during the stop of the engine 2.
  • paths along which the engine coolant is flowing are represented by thick solid lines, and paths along which the refrigerant is not flowing are represented by thick broken lines.
  • FIG. 7 is a flowchart illustrating a control routine for engine cooling heat recovery control to be executed in the waste heat recovery apparatus 1 of Embodiment 1.
  • the control routine illustrated in FIG. 7 is repeatedly executed in each predetermined control cycle by the control device 70.
  • Step S12 whether or not the engine 2 is stopping is determined.
  • Step S14 the process proceeds to the next step in which a communication destination of the three-way valve 62 is switched to the fluid pipe 52 of the radiator 61 side. Accordingly, as illustrated in FIG.
  • the engine coolant circulation circuit is formed which returns from the engine 2 to the fluid pipe 52, the three-way valve 62, the fluid pipe 52, the radiator 61, the fluid pipe 53, the engine cooling pump 60, and the fluid pipe 51, and subsequently to the engine 2.
  • Step S16 the normal operation of the pump 24 is executed (Step S16).
  • the operation of the pump 24 is controlled in accordance with the engine outlet coolant temperature detected by the temperature sensor 74. Accordingly, the waste heat carried out from the engine body during the operation of the engine 2 is carried to the radiator 61 by the engine coolant, and radiates heat through the heat exchange with external air.
  • Step S12 the process proceeds to the next step in which whether or not the engine outlet coolant temperature detected by the temperature sensor 74 is higher than the pump inlet coolant temperature detected by the temperature sensor 73 is determined (Step S18).
  • Engine outlet coolant temperature > Pump inlet coolant temperature is not satisfied, the water passing through the engine cooling heat recovery device 8 is determined as being incapable of being heated through the heat exchange with engine coolant, and the process returns to the processing of Step S12 again.
  • Step S18 in a case where Engine outlet coolant temperature > Pump inlet coolant temperature is satisfied, the water passing through the engine cooling heat recovery device 8 is determined as being capable of being heated through the heat exchange with the engine coolant, and the engine coolant is determined as having a possibility of boiling.
  • the process proceeds to the next step in which the communication destination of the three-way valve 62 is switched to the fluid pipe 54 on the engine cooling heat recovery device 8 side (Step S20). Accordingly, as illustrated in FIG.
  • the circulation circuit is formed which returns from the engine 2 to the fluid pipe 52, the three-way valve 62, the fluid pipe 54, the engine cooling heat recovery device 8, the fluid pipe 55, the fluid pipe 53, the engine cooling pump 60, and the fluid pipe 51, and subsequently to the engine 2.
  • the engine cooling pump 60 is operated (Step S22). Accordingly, the waste heat carried out from the engine body during the stop of the engine 2 is carried to the engine cooling heat recovery device 8 by the engine coolant.
  • the pump 24 is operated, and thereby the water that is the refrigerant is carried to the evaporator 10 via the engine cooling heat recovery device 8.
  • the waste heat of the engine coolant is transferred to the water.
  • the water of which the temperature rises due to the absorption of the heat is injected into the evaporator 10 via the refrigerant pipe 32.
  • the engine coolant of the temperature drops due to heat dissipation is returned to the body of the engine 2 through the fluid pipe 55, the fluid pipe 53, and the fluid pipe 51.
  • the engine coolant can be restrained from boiling during the stop of the engine 2. Since the waste heat of the engine coolant is transferred to the water that is the refrigerant, it is possible to further enhance the waste heat recovery efficiency.
  • a configuration in which a small amount of engine coolant is made to flow to the engine cooling heat recovery device 8 side during the operation of the engine 2 may be adopted.
  • Such a control can be realized, for example, by the control of intermittently switching the three-way valve 62 to the engine cooling heat recovery device 8 side during the operation of the engine 2, the control of adjusting an opening degree on the radiator 61 side and an opening degree on the engine cooling heat recovery device 8 side by using a control valve capable of adjusting the opening degree. Accordingly, since the temperature of the engine cooling heat recovery device 8 is restrained from dropping markedly during the operation of the engine 2, it is possible to enhance the waste heat recovery efficiency during the stop of the engine 2.
  • FIG. 8 is a flowchart illustrating a control routine for the water injection control to be executed in the waste heat recovery apparatus 1 of Embodiment 1.
  • the control routine illustrated in FIG. 8 is repeatedly executed in each predetermined control cycle by the control device 70.
  • Step S2 whether or not the engine 2 is stopping is determined.
  • the water injection into the evaporator 10 is determined as being suppressed, and the process proceeds to Step S8 to be described below.
  • the water injection into the evaporator 10 is determined as being permitted, and the process proceeds to the next step in which the pump 24 is operated, and the integrated time (hereinafter, pump operating time) after the pump is operated is calculated (Step S4).
  • Step S6 Whether or not the pump operating time calculated in Step S4 reaches target operating time is determined (Step S6).
  • the target operating time is the operating time of the pump 24 needed to inject water with the next target injection water amount calculated in Step S10 of the previous control routine.
  • Step S6 the injection of the target injection water amount is determined as being completed, and the process proceeds to the next step in which the operation of the pump 24 is stopped and the pump operating time (hereinafter, stop time) until the operation is stopped is stored (Step S8).
  • the target injection water amount at the time of the next water injection is calculated (Step S10).
  • the injection water residual amount in the current control routine is calculated using the following Equation (1).
  • the pump operation injection water amount of the following Equation (1) is the amount of water into injected in the current control routine, and can be calculated by multiplying injection water amount per unit time calculated from the rotating speed of the pump 24 by the stop time stored in Step S8.
  • a pressure difference between the nozzle pre-pressure detected in the pressure sensor 71 and the nozzle post-pressure detected by the pressure sensor 76 is equivalent to a difference between pressures in front of and behind the pump 24.
  • Injection water residual amount target injection water amount ⁇ Pump operation injection water amount
  • the current amount of the water stored in the evaporator 10 is calculated using the following Equation (2).
  • full water amount represents water maximum amount capable of being stored in the evaporator 10.
  • the current amount is the current amount of the water stored in the evaporator 10.
  • Current amount Full water amount ⁇ Turbine nozzle steam passage amount Q + Injection water residual amount
  • the turbine nozzle stream passage amount Q of the above Equation (2) can be calculated using the following Equation (3) using the nozzle pre-pressure P and the nozzle pre-temperature T.
  • A represents the opening area of the nozzle
  • R represents a steam gas constant
  • represents the specific heat ratio of steam.
  • the target injection water amount at the time of the next water injection is calculated using the following Equation (4).
  • the main control routine is ended.
  • Q A ⁇ 2 ⁇ + 1 ⁇ p RT
  • Next target injection water amount Full amount ⁇ Current amount
  • FIG. 9 is a time chart illustrating various state quantities during the traveling of the vehicle on which the waste heat recovery apparatus is mounted. Since the engine 2 is stopping in a period from time t0 to time t1 illustrated on the chart of FIG. 9 , the injection of the water, which is the refrigerant, into the evaporator 10 is permitted. For this reason, in the example illustrated on the chart of FIG. 9 , the water injection into the evaporator 10 from time t0 is performed.
  • the recovery of waste heat is performed by the Rankine cycle upon receiving a rise in the exhaust gas temperature. Since the water injection is suppressed in a period from time t1 to time t2 during which the engine 2 is stopped, the pump 24 is maintained in a stopped state.
  • the water injection is permitted again.
  • the pump 24 is operated again in this period.
  • the water injection is suppressed in a period from time t3 to time t4 during which the engine 2 is operated, the water injection is permitted in a period from time t4 to time t5 during which the engine is stopped, and then, the water injection is permitted again when the engine 2 is operated again at time t5.
  • the water injection into the evaporator 10 is not performed during the operation of the engine 2, and the water injection is performed using the period during which the engine 2 stops. Accordingly, it is possible to continue the boiling of the evaporator 10 during the operation of the engine 2 to enhance the waste heat recovery efficiency.
  • the evaporator 10 including the bellows tube 104 is used.
  • the configuration of an available evaporator 10 is not limited to this. That is, as long as the evaporator 10 can withstand the temperature (for example, 400°C) of the exhaust gas introduced thereinto, other well-known structures may be adopted.
  • the amount of the water stored in the evaporator 10 is not detected or estimated.
  • the water injection into the evaporator 10 is not performed even when the actual amount of the water within the evaporator 10 becomes equal to or lower than a predetermined low refrigerant amount (for example, zero).
  • a predetermined low refrigerant amount for example, zero.
  • the waste heat recovery apparatus 1 of above-described Embodiment 1 includes the superheater 14, the above configuration is not indispensable.
  • the waste heat recovery apparatus 1 of the above-described Embodiment 1 includes the engine cooling heat recovery device 8 that performs the heat exchange with the engine coolant, the above configuration is not indispensable.
  • the engine cooling heat recovery device 8 for example, a heat recovery device that performs the heat exchange with the exhaust gas may be adopted as the heat recovery device using the waste heat of the engine 2.
  • the waste heat recovery apparatus 1 of the above-described Embodiment 1 has a configuration in which the water injection into the evaporator 10 is stopped by controlling the pump 24 into a stopped state.
  • means for stopping the water injection into the evaporator 10 is not limited to this.
  • the waste heat recovery apparatus 1 further including a bypass pipe that branches from the refrigerant pipe 31 and is connected to the catch tank 22, and a switching valve provided in a branching part between the refrigerant pipe 31 and the bypass pipe, the switching valve may be controlled to open the bypass pipe side in a state where the pump 24 is operated. According to such control, it is also possible to stop the water injection into the evaporator 10 in a state where the pump 24 is operated.
  • a waste heat recovery apparatus of Embodiment 2 will be described.
  • the waste heat recovery apparatus 1 of Embodiment 2 can be realized by causing the control device 70 to execute a control routine illustrated in FIG. 10 (to be described below) using the hardware configuration illustrated in FIG. 1 .
  • the water injection control during the operation of the engine 2 is uniformly suppressed, and the pump 24 is brought into a stopped state.
  • the water injection control of Embodiment 1 is assumed that the water stored in the evaporator 10 runs out in a case where the operation of the engine 2 is continued for a long time.
  • the waste heat recovery apparatus 1 of Embodiment 2 has a feature in the control of executing the water injection control, in a case where all the water stored in the evaporator 10 during the operation of the engine 2 is turned into steam.
  • specific processing of the water injection control to be executed by Embodiment 2 will be described in accordance with a flowchart.
  • FIG. 10 is a flowchart illustrating a control routine for the water injection control to be executed in the waste heat recovery apparatus 1 of Embodiment 1.
  • the control routine illustrated in FIG. 10 is repeatedly executed in each predetermined control cycle by the control device 70.
  • Steps S2 to S10 in the control routine illustrated in FIG. 10 the same processing as the processing of Steps S2 to S10 of the above-described control routine of FIG. 8 is basically performed.
  • the process proceeds to a separate step in which an integrated value (hereinafter, integrated steam amount) in the current control routine for the amount of the steam that undergoes the phase transition in the evaporator 10 is calculated (Step S26).
  • integrated steam amount is calculated using Equation (3).
  • the integrated steam amount is calculated by integrating the turbine nozzle stream passage amount Q calculated in the current control routine.
  • Step S28 Whether or not the integrated steam amount is larger than the current amount calculated in the previous control routine is determined.
  • Step S4 the total amount of water stored in the evaporator 10 can be determined as having undergone phase transition into steam.
  • Step S28 in a case where Current amount ⁇ Integrated steam amount is not satisfied, residual water can be determined as being present in the evaporator 10.
  • the process proceeds to Step S8 in which the pump 24 is brought into a stopped state.
  • the water injection is performed in a case where the water stored in the evaporator 10 runs out during the operation of the engine 2. Accordingly, since the water injection can be performed without waiting for the next stop of the engine 2, the waste heat recovery efficiency can be enhanced. Since the evaporator 10 can be restrained from undergoing the no-water burning, it is possible to protect the evaporator 10 from heat. In the waste heat recovery apparatus 1 of Embodiment 2, during the operation of the engine 2, the water injection is not performed until the water stored in the evaporator 10 runs out. Accordingly, since the boiling state of the water of the evaporator 10 can be continued and the water can be run out, it is possible to enhance the waste heat recovery efficiency as compared to a case where the water injection is performed on the way and the boiling subsides.
  • the control in which the water injection is performed in a case where the total amount of water stored in the evaporator 10 undergoes phase transition into steam during the operation of the engine 2 is adopted.
  • the timing at which the water injection is performed is not limited to the above timing. That is, when the water stored in the evaporator 10 decreases, the contact area between the water and a heat exchanger decreases. Therefore, heat exchange capacity declines.
  • the amount of the refrigerant in which the heat exchanger is exposed and the heat exchange capacity declines significantly may be set in advance as the low refrigerant amount, and the water injection may be performed in a case where the amount of the water stored in the evaporator 10 decreases to the low refrigerant amount.
  • satisfaction of Current amount - Low refrigerant amount ⁇ Integrated steam amount may be determined, for example, in Step S26 of the control routine illustrated in the FIG. 10 . Accordingly, it is possible to enhance efficiency quickly in a case where the waste heat recovery efficiency declines.
  • a waste heat recovery apparatus of Embodiment 3 will be described.
  • the waste heat recovery apparatus 1 of Embodiment 3 can be realized by causing the control device 70 to execute a control routine illustrated in FIG. 11 (to be described below) using the hardware configuration illustrated in FIG. 1 .
  • the waste heat recovery apparatus 1 of Embodiment 3 has a feature in the control of prohibiting the execution of the water injection control, in a case where the temperature of the water stored in the evaporator 10 does not reach a boiling temperature.
  • specific processing of the water injection control to be executed by Embodiment 3 will be described in accordance with a flowchart.
  • FIG. 11 is a flowchart illustrating a control routine for the water injection control to be executed in the waste heat recovery apparatus 3 of Embodiment 1.
  • the control routine illustrated in FIG. 11 is repeatedly executed in each predetermined control cycle by the control device 70.
  • Step S30 whether or not the water injection is permitted is determined.
  • a coolant temperature detected by the temperature sensor 75 provided in the evaporator 10 is equal to or higher than the boiling temperature (for example, 100°C) is determined.
  • the boiling temperature for example, 100°C
  • Step S30 in a case where Coolant temperature ⁇ Boiling temperature is satisfied, the water within the evaporator 10 is already in a boiling state.
  • the process proceeds to the processing after the next Step S2 in which the same processing as the processing in the control routine illustrated in FIG. 10 is performed.
  • the waste heat recovery apparatus 1 of Embodiment 3 the water injection in a case where the water stored in the evaporator 10 does not reach the boiling temperature is suppressed. Accordingly, the waste heat recovery efficiency can be enhanced by restraining the time needed for the water stored in the evaporator 10 to re-boil from being excessively prolonged.
  • the waste heat recovery apparatus 1 of the above-described embodiment 3 has a configuration in which whether or not the water injection is possible depending on whether or not the temperature of the water stored in the evaporator 10 is equal to or higher than the boiling temperature is determined.
  • the boiling temperature is a value that varies depending on pressure
  • the pressure inside the evaporator 10 may be detected to correct the boiling temperature. Accordingly, it is possible to accurately determine whether or not the water stored in the evaporator 10 boils.
  • the method of determining the temperature state of the water stored in the evaporator 10 is not limited to the above. That is, for example, when the difference between temperatures in front of and behind the evaporator 10 and intake air amount is detected, the quantity of heat received by the water in the evaporator 10 can be estimated. Thus, the temperature state of the water stored in the evaporator 10 may be estimated with the quantity of heat as an index. The temperature state of the water stored in the evaporator 10 may be estimated with the active state of the exhaust gas control catalyst 12 as an index.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Description

    BACKGROUND OF THE INVENTION 1. Field of the Invention
  • The present invention relates to a waste heat recovery apparatus and a method for controlling a waste heat recovery apparatus, and particularly, to a waste heat recovery apparatus and a method for controlling a waste heat recovery apparatus that recovers the waste heat of an internal combustion engine by using a Rankine cycle system.
  • 2. Description of Related Art
  • Japanese Unexamined Patent Application Publication No. 2013-119831 ( JP 2013-119831 A ) discloses a technique regarding a power recovery apparatus including a Rankine cycle device constituted of a pump, a boiler, an expander, and a condenser. The pump pumps a refrigerant to the boiler side. The boiler causes the refrigerant pumped by the pump to perform heat exchange with exhaust gas flowing through an exhaust pipe of an engine so as to heat the refrigerant. The refrigerant turned into steam by being heated by the boiler flows into the expander. The expander takes out the expansion energy of the refrigerant turned into steam by the boiler as power to rotate a drive shaft.
  • In the power recovery apparatus, the pumping speed of the refrigerant by the pump is controlled in accordance with the rotating speed of the engine. Specifically, when the rotating speed of the engine exceeds a predetermined rotating speed, the rotating speed of the pump is controlled such that the pumping speed of the refrigerant by the pump decreases. Accordingly, the expander is restrained from overspeeding. Other waste heat recovery systems are disclosed in JP2014-134174 , US2011/0167818 A1 and US2006/0225421 A1 .
  • SUMMARY OF THE INVENTION
  • In the technique of JP 2013-119831 A , the amount of the refrigerant to be pumped by the evaporator is controlled for the purpose of restraining the overspeed of the expander. However, the supply of the refrigerant to the evaporator also influences the temperature of the refrigerant within the evaporator. That is, a boiling refrigerant is stored in the evaporator under heating. For this reason, when the refrigerant that does not reach a boiling temperature is frequently pumped to the evaporator, a refrigerant temperature within the evaporator may drop and boiling may subside temporarily. In this case, since the amount of a gas-phase refrigerant turned into steam decreases, there is a problem in that that the waste heat recovery efficiency of the Rankine cycle will incline.
  • The present invention provides a waste heat recovery apparatus and a method for controlling a waste heat recovery apparatus that can continue boiling of a refrigerant stored in an evaporator as long as possible to enhance waste heat recovery efficiency.
  • A first aspect of the invention relates to a waste heat recovery apparatus including an evaporator configured to turn a liquid-phase refrigerant into steam through heat exchange with exhaust gas of an internal combustion engine, an expander configured to expand a gas-phase refrigerant passed through the evaporator to recover heat energy, a condenser configured to condense the gas-phase refrigerant passed through the expander such that the gas-phase refrigerant returns to the liquid-phase refrigerant, a liquid-phase refrigerant supply device configured to supply the liquid-phase refrigerant delivered from the condenser, to the evaporator, and a control device configured to control the liquid-phase refrigerant supply device so as to adjust an amount of the liquid-phase refrigerant to be supplied to the evaporator. The control device is configured to control the liquid-phase refrigerant supply device so as to bring the supply of the liquid-phase refrigerant by the liquid-phase refrigerant supply device into a stopped state at least until an amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than a predetermined low refrigerant amount, during operation of the internal combustion engine.
  • In the first aspect of the invention, the liquid-phase refrigerant supply device may be a pump that pumps the liquid-phase refrigerant delivered from the condenser to the evaporator, and the control device may be configured to stop operation of the pump when the supply of the liquid-phase refrigerant is brought into a stopped state.
  • In the first aspect of the invention, the control device may be configured to continue a state where the operation of the pump is stopped, during the operation of the internal combustion engine and even after the amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the low refrigerant amount.
  • In the first aspect of the invention, the control device may be configured to operate the pump during the operation of the internal combustion engine and in a case where the amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the low refrigerant amount.
  • In the first aspect of the invention, the control device may be configured to operate the pump during stop of the internal combustion engine and in a case where a temperature of the liquid-phase refrigerant stored in the evaporator reaches a boiling temperature; and the control device may be configured to bring the pump into a stopped state during the stop of the internal combustion engine and when the temperature of the liquid-phase refrigerant stored in the evaporator does not reach the boiling temperature.
  • In the first aspect of the invention, the control device may be configured to calculate an amount of a refrigerant needed to bring the amount of the liquid-phase refrigerant stored in the evaporator into a full amount as a target refrigerant amount, and the control device may be configured to control the operation of the pump with the target refrigerant amount as an upper limit.
  • The waste heat recovery apparatus of the first aspect of the invention may further include a heat recovery device that performs heat exchange between the liquid-phase refrigerant passed through the pump, and an engine coolant passed through the internal combustion engine, and a pumping device that pumps the engine coolant to the heat recovery device. The control device may be configured to operate the pumping device in a case where the pump is operated and in a case where a temperature of the engine coolant passed through the pump is higher than a temperature of the liquid-phase refrigerant.
  • In the first aspect of the invention, the evaporator may include a flue tube through which the exhaust gas of the internal combustion engine flows and a refrigerant passage which is formed around the flue tube and in which the liquid-phase refrigerant is stored, a first end of the flue tube may be constituted as a fixed end; and a second end of the flue tube may include a bellows tube for absorbing a change in tube length resulting from thermal expansion of the flue tube.
  • A second aspect of the invention related to a method for controlling a waste heat recovery apparatus. The waste heat recovery apparatus includes an evaporator, an expander, a condenser, and a liquid-phase refrigerant supply device. The evaporator is configured to turn a liquid-phase refrigerant into steam through heat exchange with exhaust gas of an internal combustion engine. The expander is configured to expand a gas-phase refrigerant passed through the evaporator to recover heat energy. The condenser is configured to condense the gas-phase refrigerant passed through the expander to return the condensed gas-phase refrigerant to the liquid-phase refrigerant. The liquid-phase refrigerant supply device is configured to supply the liquid-phase refrigerant delivered from the condenser, to the evaporator. The method includes adjusting an amount of the liquid-phase refrigerant to be supplied to the evaporator by controlling the liquid-phase refrigerant supply device; receiving operation of the internal combustion engine to bring the supply of the liquid-phase refrigerant by the liquid-phase refrigerant supply device into a stopped state; and continuing the stopped state until an amount of the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than a predetermined low refrigerant amount during the operation of the internal combustion engine.
  • During the operation of the internal combustion engine, the liquid-phase refrigerant stored in the evaporator is heated and boils through the heat exchange between the exhaust gas of the internal combustion engine and the liquid-phase refrigerant. According to the first and second aspects of the invention, during the operation of the internal combustion engine, the liquid-phase refrigerant is not supplied to the evaporator until the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the predetermined low refrigerant amount. Accordingly, since the boiling of the liquid-phase refrigerant stored in the evaporator can be restrained from subsiding during the operation of the internal combustion engine, the waste heat recovery efficiency can be enhanced.
  • According to the first aspect of the invention, it is possible to bring the supply of the liquid-phase refrigerant into a stopped state by stopping the operation of the pump that pumps the liquid-phase refrigerant delivered from the condenser, to the evaporator.
  • According to the first aspect of the invention, the stopped state is continued even after the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the predetermined low refrigerant amount during the operation of the internal combustion engine. Accordingly, it is possible to continue the boiling state of the refrigerant until the liquid-phase refrigerant stored in the evaporator runs out.
  • According to the first aspect of the invention, the liquid-phase refrigerant is pumped to the evaporator in a case where the liquid-phase refrigerant stored in the evaporator becomes equal to or lower than the predetermined low refrigerant amount during the operation of an internal combustion engine. Accordingly, a decline in the waste heat recovery efficiency that can occur due to the fact that the liquid-phase refrigerant stored in the evaporator has the low refrigerant amount can be suppressed.
  • According to the first aspect of the invention, the pump is operated when the temperature of the liquid-phase refrigerant stored in the evaporator reaches the boiling temperature during the stop of the internal combustion engine, and the pump is brought into a stopped state when the temperature of the liquid-phase refrigerant does not reach the boiling temperature. Accordingly, since the temperature can be restrained from further dropping from a state where the liquid-phase refrigerant stored in the evaporator does not boil, the time needed until the refrigerant boils after the next operation of the internal combustion engine can be prolonged to restrain the waste heat recovery efficiency from declining.
  • According to the first aspect of the invention, in a case where the conditions for operating the pump are satisfied, it is possible to pump the liquid-phase refrigerant to the evaporator with the full amount as the upper limit.
  • According to the first aspect of the invention, the liquid-phase refrigerant pumped to the evaporator can be heated through the heat exchange with the engine coolant. Therefore, a higher-temperature liquid-phase refrigerant can be pumped to the evaporator. Accordingly, since the time until the liquid-phase refrigerant of the evaporator boils can be shortened, the waste heat recovery efficiency can be enhanced.
  • According to the first aspect of the invention, the evaporator includes a structure for absorbing a change in tube length resulting from the thermal expansion of the flue tube. Accordingly, since the heat resistance of the evaporator can be enhanced, occurrence of a problem caused by the amount of the liquid-phase refrigerant decreasing and the evaporator being excessively superheated can be restrained.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • Features, advantages, and technical and industrial significance of exemplary embodiments of the invention will be described below with reference to the accompanying drawings, in which like numerals denote like elements, and wherein:
    • FIG. 1 is a view illustrating the configuration of a waste heat recovery apparatus of Embodiment 1;
    • FIG. 2 is a view illustrating an internal configuration of an evaporator provided in the waste heat recovery apparatus of Embodiment 1;
    • FIG. 3 is a view for describing the flow of a refrigerant flowing through a refrigerant circulation circuit during the operation of an engine;
    • FIG. 4 is a view for describing the flow of the refrigerant flowing through the refrigerant circulation circuit during the stop of the engine;
    • FIG. 5 is a view for describing the flow of engine coolant during the operation of the engine;
    • FIG. 6 is a view for describing the flow of the engine coolant during the stop of the engine;
    • FIG. 7 is a flowchart illustrating a control routine for engine cooling heat recovery control to be executed in the waste heat recovery apparatus of Embodiment 1;
    • FIG. 8 is a flowchart illustrating a control routine for water injection control to be executed in the waste heat recovery apparatus of Embodiment 1;
    • FIG. 9 is a time chart illustrating various state quantities during the traveling of a vehicle on which the waste heat recovery apparatus is mounted;
    • FIG. 10 is a flowchart illustrating a control routine for water injection control to be executed in a waste heat recovery apparatus of Embodiment 2; and
    • FIG. 11 is a flowchart illustrating a control routine for water injection control to be executed in a waste heat recovery apparatus of Embodiment 3.
    DETAILED DESCRIPTION OF EMBODIMENTS
  • Hereinafter, embodiments of the invention will be described with reference to the drawings. It is to be noted, however, that common elements in the respective drawings will be designated by the same reference signs, and the duplicate description thereof will be omitted. However, except for cases where numbers, such as the numbers, quantities, amounts, and ranges of respective elements, are mentioned in the embodiments shown below, and particularly, cases where the numbers, such as the numbers, quantities, amounts, and ranges of respective elements are explicitly stated or are clearly specified in principle, the invention is not limited to the mentioned numbers. The structures and the like to be described in the embodiments shown below are not necessarily indispensable to the invention except for cases where the structures and the like are explicitly stated or are clearly specified in principle.
  • Embodiment 1 1-1. Configuration of Waste Heat Recovery Apparatus
  • FIG. 1 is a view illustrating the configuration of a waste heat recovery apparatus 1 of Embodiment 1. The waste heat recovery apparatus 1 is configured by being assembled into an internal combustion engine (hereinafter, also referred to as an "engine") 2 mounted on a vehicle. The vehicle is a hybrid vehicle using the power from the engine 2 and the power from a motor (not illustrated). The vehicle that is applicable to the waste heat recovery apparatus 1 of Embodiment 1 is not limited to the hybrid vehicle and may be applied to various vehicles, such as a start-stop vehicle having a start-stop function, on the premise that the engine 2 is frequently operated and stopped.
  • The waste heat recovery apparatus 1 includes a refrigerant circulation circuit in which a plurality of refrigerant pipes 31, 32, 33, 34, 35, 36, 37 is provided such that the refrigerant pipes are annularly connected together. A pump 24 serving as a liquid-phase refrigerant supply device, which delivers a liquid-phase refrigerant from the refrigerant pipe 37 to the refrigerant pipe 31, is disposed in the refrigerant circulation circuit. The waste heat recovery apparatus 1 performs heat exchange between exhaust gas flowing through an exhaust passage 4 of the engine 2, and the refrigerant circulating through the refrigerant circulation circuit, and thereby the waste heat of the exhaust gas is transferred to the refrigerant. The refrigerant is liquid at normal temperature, and may be anything that boils or evaporates due to the heat of the engine 2 and turns into a gas-phase refrigerant. In the present embodiment, the refrigerant is water.
  • An evaporator 10, which is a heat exchanger, an exhaust gas control catalyst 12, and a superheater 14 are attached to the exhaust passage 4 sequentially from a downstream side in a flow direction of the exhaust gas. An outlet of the pump 24 is connected to an engine cooling heat recovery device 8 by the refrigerant pipe 31. The engine cooling heat recovery device 8 performs heat exchange between an engine coolant passed through the engine 2, and the refrigerant circulating through the refrigerant circulation circuit, and thereby the waste heat of the engine coolant is transferred to the refrigerant. The engine cooling heat recovery device 8 is connected to the evaporator 10 by the refrigerant pipe 32. The evaporator 10 is connected to the superheater 14 by the refrigerant pipe 33. The water delivered from the pump 24 absorbs heat from the engine coolant in the engine cooling heat recovery device 8, and turns into high-temperature hot water. The hot water absorbs heat from high-temperature exhaust gas in the evaporator 10, evaporates or boils, and turns into steam. The steam further absorbs heat from high-temperature exhaust gas in the superheater 14, and turns into superheated steam.
  • The superheater 14 is connected to a turbine 18 by the refrigerant pipe 34. The turbine 18 functions as an expander that expands the steam delivered from the superheater 14 to take out work. A turbine nozzle 16 is provided at a connecting part between the refrigerant pipe 34 and the turbine 18. The steam is jetted to the turbine 18 from the turbine nozzle 16 to rotate the turbine 18. The rotation of the turbine 18 is transmitted to an output shaft of the engine 2 via a speed reducer (not illustrated). That is, the work taken out in the turbine 18 is used for assisting in the engine 2. It is to be noted, however, that it is possible to adopt a configuration in which a generator is driven by the turbine 18 and generated electricity is stored in a storage battery.
  • The turbine 18 is connected to a condenser 20 by the refrigerant pipe 35. The steam expanded in the turbine 18 is cooled and condensed by the condenser 20, and is returned to liquid-phase water. A catch tank 22 in which water is stored is disposed below the condenser 20 in a vertical direction. The condenser 20 is connected to the catch tank 22 by the refrigerant pipe 36. The water produced due to the condensation of the steam in the condenser 20 is temporarily stored in the catch tank 22. The catch tank 22 is connected to an inlet of the pump 24 by the refrigerant pipe 37. The water in the catch tank 22 is again delivered to the evaporator 10 by the pump 24. The pump 24 is a positive-displacement pump, such as a vane pump.
  • The waste heat recovery apparatus 1 includes a turbine control valve 40 provided in the refrigerant pipe 34. Additionally, the waste heat recovery apparatus 1 includes a bypass circuit that bypasses the turbine 18, and a bypass valve 41 provided in the bypass circuit. The bypass circuit is constituted of a refrigerant pipe 42 that branches from an upstream side of the turbine control valve 40 in the refrigerant pipe 34 and is connected to the bypass valve 41, and a refrigerant pipe 43 that connects the bypass valve 41 and the refrigerant pipe 35 together. The turbine control valve 40 and the bypass valve 41 are control valves that are operated depending on signals from a control device 70 to be described below. Additionally, the waste heat recovery apparatus 1 includes a bypass nozzle 44 in the refrigerant pipe 43.
  • The waste heat recovery apparatus 1 includes an engine coolant circulation circuit in which a plurality of fluid pipes 51, 52, 53 is provided such that the fluid pipes are annularly connected together. An engine cooling pump 60, which delivers the engine coolant from the fluid pipe 53 to the fluid pipe 51, is disposed in the engine coolant circulation circuit. An outlet of the engine cooling pump 60 is connected to an engine coolant inlet of the engine 2 by the fluid pipe 51. An engine coolant outlet of the engine 2 is connected to an inlet of a radiator 61 by the fluid pipe 52. The high-temperature engine coolant delivered from the engine 2 is cooled by the radiator 61. An outlet of the radiator 61 is connected to an inlet of the engine cooling pump 60 by the fluid pipe 53. The engine cooling pump 60 is an electric pump that is operated depending on a signal from the control device 70 to be described below.
  • The radiator 61 is disposed on a vehicle rear side with respect to the condenser 20. According to such an arrangement, a traveling wind is introduced into the radiator 61 after being first introduced into the condenser 20 to absorb the heat of the condenser. Thus, excessive cooling of the radiator 61 is suppressed in a case where the engine 2 is stopped and the vehicle travels.
  • The waste heat recovery apparatus 1 includes a radiator bypass circuit that bypasses the radiator 61 to circulate the engine coolant. A radiator bypass circuit is configured to include a fluid pipe 54 that branches from the fluid pipe 52 and is connected to the engine cooling heat recovery device 8, and a fluid pipe 55 that connects the engine cooling heat recovery device 8 and the fluid pipe 53 together. A three-way valve 62 is disposed at a connecting part between the fluid pipe 52 and the fluid pipe 54. The three-way valve 62 is a valve that switches a flow destination for the engine coolant, which flows through the fluid pipe 52, between the fluid pipe 53 and the fluid pipe 54, and is operated depending on a signal from the control device 70 to be described below.
  • In the waste heat recovery apparatus 1, a plurality of sensors is disposed in the middle of the refrigerant circulation circuit and the engine coolant circulation circuit. A pressure sensor 71 for detecting a pre-pressure (hereinafter, a nozzle pre-pressure) P of the turbine nozzle 16, and a temperature sensor 72 for detecting a pre-temperature (a nozzle pre-temperature) T of the turbine nozzle 16 are disposed in the refrigerant pipe 34. Additionally, a temperature sensor 73, which detects a refrigerant temperature (hereinafter, a pump inlet coolant temperature) on the inlet side of the pump 24, is disposed in the refrigerant pipe 37. Additionally, a temperature sensor 74, which detects the temperature (hereinafter, engine outlet coolant temperature) of the engine coolant passed through the engine 2, is disposed in the fluid pipe 52. Moreover, a temperature sensor 75, which detects the temperature of the liquid-phase water that is stored inside, is disposed in the evaporator 10. Moreover, a pressure sensor 76 for detecting a post-pressure (hereinafter, nozzle post-pressure) of the turbine nozzle 16, and a temperature sensor 77 for detecting a post-temperature (a nozzle post-temperature) of the turbine nozzle 16 are disposed in the refrigerant pipe 35.
  • The waste heat recovery apparatus 1 includes the control device 70. The control device 70 is a control device that totally controls the overall waste heat recovery apparatus 1. The control device 70 includes at least an input/output interface, a memory, and a CPU. The input/output interface is provided to fetch sensor signals from sensors attached to the waste heat recovery apparatus 1 and to output operation signals to various actuators provided in the waste heat recovery apparatus 1. The temperature sensors 72, 73, 74, 75, 77 and the pressure sensors 71 and 76 are included in the sensors from which the control device 70 fetches the signals. The pump 24, the engine cooling pump 60, the turbine control valve 40, the bypass valve 41, and the three-way valve 62 are included in the actuators from which the control device 70 issues the operation signals. Various control programs, maps, and the like for controlling the waste heat recovery apparatus 1 are stored in the memory. The CPU reads and executes the control programs or the like from the memory, and generates the operation signals based on the fetched sensor signals. Although many other actuators and sensors to be connected to the control device 70 in addition to those illustrated in the drawing are also present, the description thereof is omitted in this specification.
  • 1-2. Configuration of Evaporator
  • When most of the refrigerant stored in the evaporator 10 undergoes a phase transition to the gas-phase refrigerant, the evaporator 10 will be superheated to a temperature equal to or higher than the boiling point of the refrigerant. In the waste heat recovery apparatus 1 of Embodiment 1, the evaporator 10 capable of withstanding such no-water burning is adopted. FIG. 2 is a view illustrating an internal configuration of the evaporator 10 provided in the waste heat recovery apparatus 1 of Embodiment 1. As illustrated in FIG. 2, the evaporator 10 includes a tubular housing 101, a flue tube 102 through which the exhaust gas flows, a refrigerant passage 103 in which the refrigerant is stored, and a bellows tube 104. The flue tube 102 is constituted of a plurality of tubes disposed in parallel within the housing 101, and is configured such that the exhaust gas flowing from the exhaust passage 4 passes through the tube. A space around the flue tube 102 inside the housing 101 is constituted as the refrigerant passage 103. The water pumped from the refrigerant pipe 32 is stored in the refrigerant passage 103.
  • A first end 105 of the flue tube 102 is a fixed end fixed to the housing 101. A second end 106 of the flue tube 102 is fixed to the housing 101 via the bellows tube 104. The bellows tube 104 is configured to be extendable in a longitudinal direction of the flue tube 102 in accordance with a change in tube length resulting from the thermal expansion of the flue tube 102. The evaporator 10 is made of a high heat-resistant material, such as stainless steel. In the waste heat recovery apparatus 1 of Embodiment 1, a control (to be described below) assuming a situation in which the evaporator 10 undergoes the no-water burning is realized by including the evaporator 10 configured as described above.
  • 1-3. Waste Heat Recovery Control of Waste Heat Recovery Apparatus 1
  • A waste heat recovery control to be performed in the waste heat recovery apparatus 1 will be described. FIG. 3 is a view for describing the flow of the refrigerant flowing through the refrigerant circulation circuit during the operation of the engine. In FIG. 3, paths along which the refrigerant is flowing are represented by thick solid lines, and paths along which the refrigerant is not flowing are represented by thick broken lines.
  • The waste heat recovery apparatus 1 of Embodiment 1 recovers the waste heat during the operation of the engine 2 as the rotational energy of the turbine 18 using the Rankine cycle. The waste heat recovery control of the waste heat recovery apparatus 1 is performed by opening the turbine control valve 40 during the operation of the engine 2. Water serving as the liquid-phase refrigerant is stored in the evaporator 10. The evaporator 10 receives the waste heat of the exhaust gas of the engine 2, and boils the water. When the water boils, a part of the boiled water turns into a gas-phase refrigerant (steam). The steam generated in the evaporator 10 is introduced into the superheater 14 via the refrigerant pipe 33.
  • Here, when fresh water is injected into the evaporator 10 in a state where the water boils, the amount of the water of which the boiling subsides temporarily and which undergoes a phase transition to steam decreases. Thus, in the waste heat recovery control to be performed in the waste heat recovery apparatus 1 of Embodiment 1, while the engine 2 is operating, the pump 24 is controlled in a stopped state such that the water injection into the evaporator 10 is suppressed. According to such control, since the boiling of the water stored in the evaporator 10 can be continued as much as possible during the operation of the engine, it is possible to restrain the waste heat recovery efficiency from declining.
  • By further receiving the exhaust heat of the engine 2 in the process of passing through the superheater 14, the steam that undergoes the phase transition in the evaporator 10 becomes high-temperature and high-pressure superheated steam. The superheated steam passed through the superheater 14 is introduced into the turbine 18 via the refrigerant pipe 34 in a state where the turbine control valve 40 is opened. In the turbine 18, the introduced superheated steam is decompressed and expanded by the turbine nozzle 16, and then jetted to turbine blades. Accordingly, the heat energy of the superheated steam is taken out as the rotational motion of the turbine 18. Low-pressure steam passed through the turbine 18 is introduced into the condenser 20 via the refrigerant pipe 35. In a case where the pressure of the superheated steam detected by the pressure sensor 71 reaches an excessively high pressure, the bypass valve 41 is opened. Accordingly, the superheated steam of the refrigerant pipe 34 bypasses the turbine 18, and is decompressed by the bypass nozzle 44, and then escaped to the condenser 20. The steam introduced into the condenser 20 is cooled, turns into water, and is temporarily stored in the catch tank 22 via the refrigerant pipe 36. As such a waste heat recovery operation continues, the waste heat of the engine 2 continues and is recovered.
  • 1-4. Water Injection Control to Evaporator 10
  • In the waste heat recovery apparatus 1 of Embodiment 1, a water injection control of permitting water injection during the stop of the engine 2 in which the water injection into the evaporator 10 is not suppressed and supplying the water stored in the catch tank 22 to the evaporator 10 is executed. FIG. 4 is a view for describing the flow of the refrigerant flowing through the refrigerant circulation circuit during the stop of the engine. In FIG. 4, paths along which the refrigerant is flowing are represented by thick solid lines, and paths along which the refrigerant is not flowing are represented by thick broken lines.
  • The water injection control is performed by controlling the operation of the pump 24. The pump 24 pumps an amount of water according to its rotating speed from the refrigerant pipe 37 side to the refrigerant pipe 31 side. As illustrated in FIG. 4, when the pump 24 is operated during the stop of the engine 2, the water stored in the catch tank 22 is pumped to the engine cooling heat recovery device 8 via the refrigerant pipes 37 and 31. In the engine cooling heat recovery device 8, the engine cooling heat recovery control of heating water through the heat exchange with engine coolant is performed. The engine cooling heat recovery control will be described below in detail. The heated high-temperature water is injected into the evaporator 10 via the refrigerant pipe 32.
  • During the stop of the engine 2, it is desirable to close the turbine control valve 40. Accordingly, since a drop in the pressure of the superheated steam of the superheater 14 can be suppressed, the responsiveness of the waste heat recovery operation at the time of the next operation of the engine 2 can be enhanced. However, when a state where the turbine control valve 40 is closed is continued for a long time during the stop of the engine 2, the pressure of the superheater 14 may rise to an upper limit pressure determined from a viewpoint of durability or the like. Thus, in a case where the pressure of the superheater 14 reaches the upper limit pressure, it is desirable to open the bypass valve 41. Accordingly, it is possible to effectively escape the pressure of the superheater 14 to enhance the reliability of the apparatus.
  • 1-5. Engine Cooling Heat Recovery Control Using Engine Cooling Heat Recovery Device
  • The engine cooling heat recovery control to be performed in the engine cooling heat recovery device 8 will be described. The three-way valve 62 and the engine cooling pump 60 function as a pumping device that pumps the engine coolant to the evaporator 10. The waste heat recovery apparatus 1 of Embodiment 1 heats the water injected into the evaporator 10 by using the heat of the high-temperature engine coolant pumped to the evaporator 10 with the heat of the engine coolant, and restrains the engine coolant from boiling during the stop of the engine 2.
  • FIG. 5 is a view for describing the flow of the engine coolant during the operation of the engine 2. FIG. 6 is a view for describing the flow of the engine coolant during the stop of the engine 2. In FIGS. 5 and 6, paths along which the engine coolant is flowing are represented by thick solid lines, and paths along which the refrigerant is not flowing are represented by thick broken lines. Hereinafter, specific processing of the engine cooling heat recovery control to be executed in the waste heat recovery apparatus of Embodiment 1 will be described, appropriately referring to FIGS. 5 and 6.
  • FIG. 7 is a flowchart illustrating a control routine for engine cooling heat recovery control to be executed in the waste heat recovery apparatus 1 of Embodiment 1. The control routine illustrated in FIG. 7 is repeatedly executed in each predetermined control cycle by the control device 70. In the control routine illustrated in FIG. 7, first, whether or not the engine 2 is stopping is determined (Step S12). As a result, in a case where the engine 2 is determined as being operating, the process proceeds to the next step in which a communication destination of the three-way valve 62 is switched to the fluid pipe 52 of the radiator 61 side (Step S14). Accordingly, as illustrated in FIG. 5, the engine coolant circulation circuit is formed which returns from the engine 2 to the fluid pipe 52, the three-way valve 62, the fluid pipe 52, the radiator 61, the fluid pipe 53, the engine cooling pump 60, and the fluid pipe 51, and subsequently to the engine 2.
  • Next, the normal operation of the pump 24 is executed (Step S16). Here, specifically, the operation of the pump 24 is controlled in accordance with the engine outlet coolant temperature detected by the temperature sensor 74. Accordingly, the waste heat carried out from the engine body during the operation of the engine 2 is carried to the radiator 61 by the engine coolant, and radiates heat through the heat exchange with external air.
  • On the other hand, in a case where the engine 2 is determined as being stopping in Step S12, the process proceeds to the next step in which whether or not the engine outlet coolant temperature detected by the temperature sensor 74 is higher than the pump inlet coolant temperature detected by the temperature sensor 73 is determined (Step S18). As a result, in a case where Engine outlet coolant temperature > Pump inlet coolant temperature is not satisfied, the water passing through the engine cooling heat recovery device 8 is determined as being incapable of being heated through the heat exchange with engine coolant, and the process returns to the processing of Step S12 again.
  • On the other hand, in the processing of Step S18, in a case where Engine outlet coolant temperature > Pump inlet coolant temperature is satisfied, the water passing through the engine cooling heat recovery device 8 is determined as being capable of being heated through the heat exchange with the engine coolant, and the engine coolant is determined as having a possibility of boiling. In this case, the process proceeds to the next step in which the communication destination of the three-way valve 62 is switched to the fluid pipe 54 on the engine cooling heat recovery device 8 side (Step S20). Accordingly, as illustrated in FIG. 6, the circulation circuit is formed which returns from the engine 2 to the fluid pipe 52, the three-way valve 62, the fluid pipe 54, the engine cooling heat recovery device 8, the fluid pipe 55, the fluid pipe 53, the engine cooling pump 60, and the fluid pipe 51, and subsequently to the engine 2.
  • The engine cooling pump 60 is operated (Step S22). Accordingly, the waste heat carried out from the engine body during the stop of the engine 2 is carried to the engine cooling heat recovery device 8 by the engine coolant. During the stop of the engine 2, the pump 24 is operated, and thereby the water that is the refrigerant is carried to the evaporator 10 via the engine cooling heat recovery device 8. In the engine cooling heat recovery device 8, the waste heat of the engine coolant is transferred to the water. The water of which the temperature rises due to the absorption of the heat is injected into the evaporator 10 via the refrigerant pipe 32. The engine coolant of the temperature drops due to heat dissipation is returned to the body of the engine 2 through the fluid pipe 55, the fluid pipe 53, and the fluid pipe 51. When the processing of Step S22 is executed, the process returns to the processing of Step S12 again.
  • According to such an engine cooling heat recovery control, the engine coolant can be restrained from boiling during the stop of the engine 2. Since the waste heat of the engine coolant is transferred to the water that is the refrigerant, it is possible to further enhance the waste heat recovery efficiency.
  • A configuration in which a small amount of engine coolant is made to flow to the engine cooling heat recovery device 8 side during the operation of the engine 2 may be adopted. Such a control can be realized, for example, by the control of intermittently switching the three-way valve 62 to the engine cooling heat recovery device 8 side during the operation of the engine 2, the control of adjusting an opening degree on the radiator 61 side and an opening degree on the engine cooling heat recovery device 8 side by using a control valve capable of adjusting the opening degree. Accordingly, since the temperature of the engine cooling heat recovery device 8 is restrained from dropping markedly during the operation of the engine 2, it is possible to enhance the waste heat recovery efficiency during the stop of the engine 2.
  • 1-6. Specific Processing Executed in Waste Heat Recovery Apparatus
  • Specific processing of the water injection control to be executed in the waste heat recovery apparatus 1 of Embodiment 1 will be described. FIG. 8 is a flowchart illustrating a control routine for the water injection control to be executed in the waste heat recovery apparatus 1 of Embodiment 1. The control routine illustrated in FIG. 8 is repeatedly executed in each predetermined control cycle by the control device 70.
  • In the control routine illustrated in FIG. 8, first, whether or not the engine 2 is stopping is determined (Step S2). As a result, in a case where the engine 2 is determined as being operating, the water injection into the evaporator 10 is determined as being suppressed, and the process proceeds to Step S8 to be described below. On the other hand, in a case where the engine 2 is determined as being stopping, the water injection into the evaporator 10 is determined as being permitted, and the process proceeds to the next step in which the pump 24 is operated, and the integrated time (hereinafter, pump operating time) after the pump is operated is calculated (Step S4).
  • Whether or not the pump operating time calculated in Step S4 reaches target operating time is determined (Step S6). The target operating time is the operating time of the pump 24 needed to inject water with the next target injection water amount calculated in Step S10 of the previous control routine. As a result, in a case where the pump operating time does not reach target operating time, the process returns to the processing of Step S2 again.
  • On the other hand, in a case where the pump operating time reaches the target operating time in Step S6, the injection of the target injection water amount is determined as being completed, and the process proceeds to the next step in which the operation of the pump 24 is stopped and the pump operating time (hereinafter, stop time) until the operation is stopped is stored (Step S8).
  • When the processing of Step S8 is executed, the target injection water amount at the time of the next water injection (target refrigerant amount) is calculated (Step S10). Here, first, the injection water residual amount in the current control routine is calculated using the following Equation (1). The pump operation injection water amount of the following Equation (1) is the amount of water into injected in the current control routine, and can be calculated by multiplying injection water amount per unit time calculated from the rotating speed of the pump 24 by the stop time stored in Step S8. A pressure difference between the nozzle pre-pressure detected in the pressure sensor 71 and the nozzle post-pressure detected by the pressure sensor 76 is equivalent to a difference between pressures in front of and behind the pump 24. Thus, it is preferable to store, on a map or the like, a relationship between the pressure difference and the leak amount of water that leaks from the front of the pump 24 to a position behind the pump in advance, and to specify a water leak amount corresponding to the detected pressure difference to correct the pump operation injection water amount. Injection water residual amount = target injection water amount Pump operation injection water amount
    Figure imgb0001
  • The current amount of the water stored in the evaporator 10 is calculated using the following Equation (2). In the following Equation (2), full water amount represents water maximum amount capable of being stored in the evaporator 10. The current amount is the current amount of the water stored in the evaporator 10. Current amount = Full water amount Turbine nozzle steam passage amount Q + Injection water residual amount
    Figure imgb0002
  • The turbine nozzle stream passage amount Q of the above Equation (2) can be calculated using the following Equation (3) using the nozzle pre-pressure P and the nozzle pre-temperature T. In the following Equation (3), A represents the opening area of the nozzle, R represents a steam gas constant, and κ represents the specific heat ratio of steam. Then, the target injection water amount at the time of the next water injection is calculated using the following Equation (4). When the processing of Step S10 is executed, the main control routine is ended. Q = A κ 2 κ + 1 × p RT
    Figure imgb0003
    Next target injection water amount = Full amount Current amount
    Figure imgb0004
  • 1-7. Specific Example of Water Injection Control
  • An example of the water injection control to be performed in a case where the vehicle on which the waste heat recovery apparatus 1 of Embodiment 1 is mounted is made to actually travel will be described with reference to FIG. 9. FIG. 9 is a time chart illustrating various state quantities during the traveling of the vehicle on which the waste heat recovery apparatus is mounted. Since the engine 2 is stopping in a period from time t0 to time t1 illustrated on the chart of FIG. 9, the injection of the water, which is the refrigerant, into the evaporator 10 is permitted. For this reason, in the example illustrated on the chart of FIG. 9, the water injection into the evaporator 10 from time t0 is performed. When the refrigerant stored in the evaporator 10 in the period during which the injection of the refrigerant is permitted has the full water amount, the pump 24 is stopped. When the water injection is performed on the evaporator 10 and the boiling of the water subsides temporarily, the latent heat for evaporation of the water is no longer used. Therefore, there is also an advantage that a drop in the exhaust gas temperature during the stop of the engine 2 is suppressed.
  • When the engine 2 is operated at time t1, the recovery of waste heat is performed by the Rankine cycle upon receiving a rise in the exhaust gas temperature. Since the water injection is suppressed in a period from time t1 to time t2 during which the engine 2 is stopped, the pump 24 is maintained in a stopped state.
  • When the engine 2 is again stopped at time t2, the water injection is permitted again. In a case where the water stored in the evaporator 10 does not reach the full amount, the pump 24 is operated again in this period. Hereinafter, similarly, the water injection is suppressed in a period from time t3 to time t4 during which the engine 2 is operated, the water injection is permitted in a period from time t4 to time t5 during which the engine is stopped, and then, the water injection is permitted again when the engine 2 is operated again at time t5.
  • In this way, according to the waste heat recovery apparatus 1 of Embodiment 1, the water injection into the evaporator 10 is not performed during the operation of the engine 2, and the water injection is performed using the period during which the engine 2 stops. Accordingly, it is possible to continue the boiling of the evaporator 10 during the operation of the engine 2 to enhance the waste heat recovery efficiency.
  • Meanwhile, in the waste heat recovery apparatus 1 of the above-described Embodiment 1, the evaporator 10 including the bellows tube 104 is used. However, the configuration of an available evaporator 10 is not limited to this. That is, as long as the evaporator 10 can withstand the temperature (for example, 400°C) of the exhaust gas introduced thereinto, other well-known structures may be adopted. In addition, in the waste heat recovery apparatus 1 of Embodiment 1, the amount of the water stored in the evaporator 10 is not detected or estimated. For this reason, during the operation of the engine 2, the water injection into the evaporator 10 is not performed even when the actual amount of the water within the evaporator 10 becomes equal to or lower than a predetermined low refrigerant amount (for example, zero). The configuration of the above-described evaporator 10 is a configuration in which such a no-water burning situation of the evaporator 10 is assumed, and accordingly, it is possible to ensure the long-term reliability of the evaporator 10.
  • Although the waste heat recovery apparatus 1 of above-described Embodiment 1 includes the superheater 14, the above configuration is not indispensable.
  • Although the waste heat recovery apparatus 1 of the above-described Embodiment 1 includes the engine cooling heat recovery device 8 that performs the heat exchange with the engine coolant, the above configuration is not indispensable. In the configuration of the engine cooling heat recovery device 8, for example, a heat recovery device that performs the heat exchange with the exhaust gas may be adopted as the heat recovery device using the waste heat of the engine 2.
  • The waste heat recovery apparatus 1 of the above-described Embodiment 1 has a configuration in which the water injection into the evaporator 10 is stopped by controlling the pump 24 into a stopped state. However, means for stopping the water injection into the evaporator 10 is not limited to this. For example, in the waste heat recovery apparatus 1 further including a bypass pipe that branches from the refrigerant pipe 31 and is connected to the catch tank 22, and a switching valve provided in a branching part between the refrigerant pipe 31 and the bypass pipe, the switching valve may be controlled to open the bypass pipe side in a state where the pump 24 is operated. According to such control, it is also possible to stop the water injection into the evaporator 10 in a state where the pump 24 is operated.
  • Embodiment 2
  • A waste heat recovery apparatus of Embodiment 2 will be described. The waste heat recovery apparatus 1 of Embodiment 2 can be realized by causing the control device 70 to execute a control routine illustrated in FIG. 10 (to be described below) using the hardware configuration illustrated in FIG. 1.
  • 2-1. Feature of Waste Heat Recovery Apparatus of Embodiment 2
  • In the waste heat recovery apparatus 1 of above-described Embodiment 1, the water injection control during the operation of the engine 2 is uniformly suppressed, and the pump 24 is brought into a stopped state. However, in the water injection control of Embodiment 1, is assumed that the water stored in the evaporator 10 runs out in a case where the operation of the engine 2 is continued for a long time.
  • Thus, the waste heat recovery apparatus 1 of Embodiment 2 has a feature in the control of executing the water injection control, in a case where all the water stored in the evaporator 10 during the operation of the engine 2 is turned into steam. Hereinafter, specific processing of the water injection control to be executed by Embodiment 2 will be described in accordance with a flowchart.
  • 2-2. Specific Processing Executed in Waste Heat Recovery Apparatus
  • FIG. 10 is a flowchart illustrating a control routine for the water injection control to be executed in the waste heat recovery apparatus 1 of Embodiment 1. The control routine illustrated in FIG. 10 is repeatedly executed in each predetermined control cycle by the control device 70.
  • In Steps S2 to S10 in the control routine illustrated in FIG. 10, the same processing as the processing of Steps S2 to S10 of the above-described control routine of FIG. 8 is basically performed. However, in the control routine illustrated in FIG. 10, in a case where the engine 2 is determined as being operating as a result of the processing of Step S2, the process proceeds to a separate step in which an integrated value (hereinafter, integrated steam amount) in the current control routine for the amount of the steam that undergoes the phase transition in the evaporator 10 is calculated (Step S26). Here, specifically, the turbine nozzle stream passage amount Q is calculated using Equation (3). Then, the integrated steam amount is calculated by integrating the turbine nozzle stream passage amount Q calculated in the current control routine.
  • Whether or not the integrated steam amount is larger than the current amount calculated in the previous control routine is determined (Step S28). As a result, in a case where Current amount < Integrated steam amount is satisfied, the total amount of water stored in the evaporator 10 can be determined as having undergone phase transition into steam. In this case, the process proceeds to Step S4 in which the water injection into the evaporator 10 is performed. On the other hand, in Step S28, in a case where Current amount < Integrated steam amount is not satisfied, residual water can be determined as being present in the evaporator 10. In this case, the process proceeds to Step S8 in which the pump 24 is brought into a stopped state.
  • In this way, in the waste heat recovery apparatus 1 of Embodiment 2, the water injection is performed in a case where the water stored in the evaporator 10 runs out during the operation of the engine 2. Accordingly, since the water injection can be performed without waiting for the next stop of the engine 2, the waste heat recovery efficiency can be enhanced. Since the evaporator 10 can be restrained from undergoing the no-water burning, it is possible to protect the evaporator 10 from heat. In the waste heat recovery apparatus 1 of Embodiment 2, during the operation of the engine 2, the water injection is not performed until the water stored in the evaporator 10 runs out. Accordingly, since the boiling state of the water of the evaporator 10 can be continued and the water can be run out, it is possible to enhance the waste heat recovery efficiency as compared to a case where the water injection is performed on the way and the boiling subsides.
  • Meanwhile, in the waste heat recovery apparatus 1 of the above-described Embodiment 2, the control in which the water injection is performed in a case where the total amount of water stored in the evaporator 10 undergoes phase transition into steam during the operation of the engine 2 is adopted. However, the timing at which the water injection is performed is not limited to the above timing. That is, when the water stored in the evaporator 10 decreases, the contact area between the water and a heat exchanger decreases. Therefore, heat exchange capacity declines. Thus, the amount of the refrigerant in which the heat exchanger is exposed and the heat exchange capacity declines significantly may be set in advance as the low refrigerant amount, and the water injection may be performed in a case where the amount of the water stored in the evaporator 10 decreases to the low refrigerant amount. In such control, satisfaction of Current amount - Low refrigerant amount < Integrated steam amount may be determined, for example, in Step S26 of the control routine illustrated in the FIG. 10. Accordingly, it is possible to enhance efficiency quickly in a case where the waste heat recovery efficiency declines.
  • Embodiment 3
  • A waste heat recovery apparatus of Embodiment 3 will be described. The waste heat recovery apparatus 1 of Embodiment 3 can be realized by causing the control device 70 to execute a control routine illustrated in FIG. 11 (to be described below) using the hardware configuration illustrated in FIG. 1.
  • 3-1. Feature of Waste Heat Recovery Apparatus of Embodiment 3
  • In the waste heat recovery apparatus 1 of the above-described Embodiment 1, whether or not the water injection is executed is determined depending on whether or not the engine 2 is stopping. However, since the heat energy obtained from the exhaust gas is small depending on the operation conditions of the engine 2, a situation where the temperature of the water stored in the evaporator 10 does not reach the boiling point is also considered. In this case, when the water injection into the evaporator 10 is performed, the temperature of the water stored in the evaporator 10 will drop further, and the time needed for the water to boil will be prolonged. Such a situation is assumed, for example, in a case where the short-time operation of the engine 2 is repeated, in a case where the low-load operation of the engine 2 is continued for a long time, or the like.
  • Thus, the waste heat recovery apparatus 1 of Embodiment 3 has a feature in the control of prohibiting the execution of the water injection control, in a case where the temperature of the water stored in the evaporator 10 does not reach a boiling temperature. Hereinafter, specific processing of the water injection control to be executed by Embodiment 3 will be described in accordance with a flowchart.
  • 3-2. Specific Processing Executed in Waste Heat Recovery Apparatus
  • FIG. 11 is a flowchart illustrating a control routine for the water injection control to be executed in the waste heat recovery apparatus 3 of Embodiment 1. The control routine illustrated in FIG. 11 is repeatedly executed in each predetermined control cycle by the control device 70.
  • In the control routine illustrated in FIG. 11, first, whether or not the water injection is permitted is determined (Step S30). Here, specifically, whether or not a coolant temperature detected by the temperature sensor 75 provided in the evaporator 10 is equal to or higher than the boiling temperature (for example, 100°C) is determined. As a result, in a case where Coolant temperature ≥ Boiling temperature is not satisfied, the time needed up to re-boiling is determined to be prolonged due to the water injection, and the control routine illustrated in FIG. 11 is ended. On the other hand, in Step S30, in a case where Coolant temperature ≥ Boiling temperature is satisfied, the water within the evaporator 10 is already in a boiling state. Therefore, the time needed up to re-boiling is determined not to be excessively prolonged due to the water injection. In this case, the process proceeds to the processing after the next Step S2 in which the same processing as the processing in the control routine illustrated in FIG. 10 is performed.
  • In this way, in the waste heat recovery apparatus 1 of Embodiment 3, the water injection in a case where the water stored in the evaporator 10 does not reach the boiling temperature is suppressed. Accordingly, the waste heat recovery efficiency can be enhanced by restraining the time needed for the water stored in the evaporator 10 to re-boil from being excessively prolonged.
  • Meanwhile, the waste heat recovery apparatus 1 of the above-described embodiment 3 has a configuration in which whether or not the water injection is possible depending on whether or not the temperature of the water stored in the evaporator 10 is equal to or higher than the boiling temperature is determined. However, since the boiling temperature is a value that varies depending on pressure, the pressure inside the evaporator 10 may be detected to correct the boiling temperature. Accordingly, it is possible to accurately determine whether or not the water stored in the evaporator 10 boils.
  • In the waste heat recovery apparatus 1 of the above-described embodiment 3, whether or not the temperature of the water stored in the evaporator 10 is equal to or higher than the boiling temperature is determined using the temperature sensor 75. However, the method of determining the temperature state of the water stored in the evaporator 10 is not limited to the above. That is, for example, when the difference between temperatures in front of and behind the evaporator 10 and intake air amount is detected, the quantity of heat received by the water in the evaporator 10 can be estimated. Thus, the temperature state of the water stored in the evaporator 10 may be estimated with the quantity of heat as an index. The temperature state of the water stored in the evaporator 10 may be estimated with the active state of the exhaust gas control catalyst 12 as an index.

Claims (9)

  1. A waste heat recovery apparatus (1) comprising:
    an evaporator (10) configured to turn a liquid-phase refrigerant into steam through heat exchange with exhaust gas of an internal combustion engine;
    an expander (18) configured to expand a gas-phase refrigerant passed through the evaporator (10) to recover heat energy;
    a condenser (20) configured to condense the gas-phase refrigerant passed through the expander (18) such that the gas-phase refrigerant returns to the liquid-phase refrigerant;
    a liquid-phase refrigerant supply device (24) configured to supply the liquid-phase refrigerant delivered from the condenser (20), to the evaporator (10); and
    a control device (70) configured to control the liquid-phase refrigerant supply device (24) so as to adjust an amount of the liquid-phase refrigerant to be supplied to the evaporator (10),
    characterised in that
    the control device (70) is configured to control the liquid-phase refrigerant supply device (24) so as to bring the supply of the liquid-phase refrigerant by the liquid-phase refrigerant supply device (24) into a stopped state at least until an amount of the liquid-phase refrigerant stored in the evaporator (10) becomes equal to or lower than a predetermined low refrigerant amount, during operation of the internal combustion engine.
  2. The waste heat recovery apparatus (1) according to claim 1, wherein:
    the liquid-phase refrigerant supply device (24) is a pump that pumps the liquid-phase refrigerant delivered from the condenser (20) to the evaporator (10); and
    the control device (70) is configured to stop operation of the pump when the supply of the liquid-phase refrigerant is brought into a stopped state.
  3. The waste heat recovery apparatus (1) according to claim 2, wherein the control device (70) is configured to continue a state where the operation of the pump is stopped, during the operation of the internal combustion engine and even after the amount of the liquid-phase refrigerant stored in the evaporator (10) becomes equal to or lower than the low refrigerant amount.
  4. The waste heat recovery apparatus (1) according to claim 2, wherein the control device (70) is configured to operate the pump during the operation of the internal combustion engine and in a case where the amount of the liquid-phase refrigerant stored in the evaporator (10) becomes equal to or lower than the low refrigerant amount.
  5. The waste heat recovery apparatus (1) according to any one of claims 2 to 4, wherein:
    the control device (70) is configured to operate the pump during stop of the internal combustion engine and in a case where a temperature of the liquid-phase refrigerant stored in the evaporator (10) reaches a boiling temperature; and
    the control device (70) is configured to bring the pump into a stopped state during the stop of the internal combustion engine and when the temperature of the liquid-phase refrigerant stored in the evaporator (10) does not reach the boiling temperature.
  6. The waste heat recovery apparatus (1) according to claim 4 or 5, wherein:
    the control device (70) is configured to calculate an amount of a refrigerant needed to bring the amount of the liquid-phase refrigerant stored in the evaporator (10) into a full amount as a target refrigerant amount; and
    the control device (70) is configured to control the operation of the pump with the target refrigerant amount as an upper limit.
  7. The waste heat recovery apparatus (1) according to any one of claims 2 to 6, further comprising:
    a heat recovery device (8) that performs heat exchange between the liquid-phase refrigerant passed through the pump, and an engine coolant passed through the internal combustion engine; and
    a pumping device (60, 62) that pumps the engine coolant to the heat recovery device (8),
    wherein the control device (70) is configured to operate the pumping device (60, 62) in a case where the pump is operated and in a case where a temperature of the engine coolant is higher than a temperature of the liquid-phase refrigerant passed through the pump.
  8. The waste heat recovery apparatus (1) according to any one of claims 1 to 7, wherein:
    the evaporator (10) includes a flue tube through which the exhaust gas of the internal combustion engine flows and a refrigerant passage which is formed around the flue tube and in which the liquid-phase refrigerant is stored;
    a first end of the flue tube is constituted as a fixed end; and
    a second end of the flue tube includes a bellows tube for absorbing a change in tube length resulting from thermal expansion of the flue tube.
  9. A method for controlling a waste heat recovery apparatus (1) including an evaporator (10), an expander (18), a condenser (20), and a liquid-phase refrigerant supply device (24), the evaporator (10) being configured to turn a liquid-phase refrigerant into steam through heat exchange with exhaust gas of an internal combustion engine, the expander (18) being configured to expand a gas-phase refrigerant passed through the evaporator (10) to recover heat energy, the condenser (20) being configured to condense the gas-phase refrigerant passed through the expander (18) to return the condensed gas-phase refrigerant to the liquid-phase refrigerant, and the liquid-phase refrigerant supply device (24) being configured to supply the liquid-phase refrigerant delivered from the condenser (20), to the evaporator (10), the method comprising:
    adjusting an amount of the liquid-phase refrigerant to be supplied to the evaporator (10) by controlling the liquid-phase refrigerant supply device (24); the method being characterised by the steps of
    receiving operation of the internal combustion engine to bring the supply of the liquid-phase refrigerant by the liquid-phase refrigerant supply device (24) into a stopped state; and
    continuing the stopped state until an amount of the liquid-phase refrigerant stored in the evaporator (10) becomes equal to or lower than a predetermined low refrigerant amount during the operation of the internal combustion engine.
EP18162265.5A 2017-03-17 2018-03-16 Waste heat recovery apparatus and method for controlling waste heat recovery apparatus Active EP3375989B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017052938A JP2018155192A (en) 2017-03-17 2017-03-17 Waste heat recovery device and control method for waste heat recovery device

Publications (2)

Publication Number Publication Date
EP3375989A1 EP3375989A1 (en) 2018-09-19
EP3375989B1 true EP3375989B1 (en) 2019-11-06

Family

ID=61691341

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18162265.5A Active EP3375989B1 (en) 2017-03-17 2018-03-16 Waste heat recovery apparatus and method for controlling waste heat recovery apparatus

Country Status (4)

Country Link
US (1) US10641203B2 (en)
EP (1) EP3375989B1 (en)
JP (1) JP2018155192A (en)
CN (1) CN108625912A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4293208A1 (en) 2022-06-13 2023-12-20 Volvo Truck Corporation An internal combustion engine system

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4911353U (en) * 1972-04-27 1974-01-30
US5611673A (en) * 1994-07-19 1997-03-18 Shin-Ei Kabushiki Kaisha Vacuum jet pump for recovering a mixed fluid of gas and liquid condensates from steam-using apparatus
JP2002115505A (en) * 2000-10-11 2002-04-19 Honda Motor Co Ltd Rankine cycle device of internal combustion engine
US7131290B2 (en) * 2003-10-02 2006-11-07 Honda Motor Co., Ltd. Non-condensing gas discharge device of condenser
JP4543920B2 (en) * 2004-12-22 2010-09-15 株式会社デンソー Waste heat utilization equipment for heat engines
JP2006250073A (en) * 2005-03-11 2006-09-21 Honda Motor Co Ltd Rankine cycle device
JP2006250075A (en) 2005-03-11 2006-09-21 Honda Motor Co Ltd Rankine cycle device
JP2007212075A (en) 2006-02-10 2007-08-23 Denso Corp Exhaust heat recovery equipment
JP4983777B2 (en) * 2008-11-26 2012-07-25 トヨタ自動車株式会社 Engine waste heat recovery system
WO2010070786A1 (en) * 2008-12-18 2010-06-24 三菱電機株式会社 Exhaust heat regeneration system
JP5494426B2 (en) * 2010-11-09 2014-05-14 トヨタ自動車株式会社 Rankine cycle system
JP2013119831A (en) 2011-12-08 2013-06-17 Toyota Industries Corp Power recovery device
JP2014134174A (en) * 2013-01-11 2014-07-24 Toyota Industries Corp Rankine cycle device for vehicle
JP2016017487A (en) * 2014-07-09 2016-02-01 トヨタ自動車株式会社 Rankine cycle system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
US10641203B2 (en) 2020-05-05
JP2018155192A (en) 2018-10-04
CN108625912A (en) 2018-10-09
US20180266360A1 (en) 2018-09-20
EP3375989A1 (en) 2018-09-19

Similar Documents

Publication Publication Date Title
US8713939B2 (en) Exhaust heat recovery system
KR102162823B1 (en) Heat recovery device and binary power generation device
US9714581B2 (en) Rankine cycle apparatus
JP2008231981A (en) Waste heat recovery apparatus for internal combustion engine
JP6389794B2 (en) Thermal energy recovery device
JP2011163346A (en) Device for controlling working fluid with low freezing point circulating in closed circuit operating according to rankine cycle and method using the same
US9518480B2 (en) Exhaust heat recovery device
EP3375989B1 (en) Waste heat recovery apparatus and method for controlling waste heat recovery apparatus
JP6328486B2 (en) Engine waste heat utilization device
WO2020189425A1 (en) Rankine cycle system and control method therefor
JP5929974B2 (en) Boiling cooler
EP2926064B1 (en) Pressure control for refrigerant system
JP2017115625A (en) Rankine cycle system
JP4803103B2 (en) Waste heat recovery device
JP7056253B2 (en) Rankine cycle system and control method of Rankine cycle system
JP5967171B2 (en) Boiling cooler
CN110094240B (en) Heat energy recovery device
Wang et al. Experimental investigation on start-up performance of a 315 kw organic rankine cycle system
JP2019044726A (en) Waste heat recovery device
JP2016156327A (en) Rankine cycle system
JP2021004568A (en) Waste heat recovery device
CN111946414A (en) Heat recovery device and method for collecting working medium of heat recovery device
JP2017110581A (en) Rankine cycle system
JP2020029779A (en) Binary power generator and binary power generation method
JP2012193671A (en) Waste heat recovery apparatus

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180416

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: F01K 23/06 20060101AFI20190426BHEP

INTG Intention to grant announced

Effective date: 20190529

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1198989

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191115

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018001071

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20191106

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200207

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200306

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200206

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200206

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20200303

Year of fee payment: 3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200306

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20200214

Year of fee payment: 3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602018001071

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1198989

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20200807

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200316

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200316

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200331

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602018001071

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210331

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211001

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210331

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191106

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220316

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220316