EP3365121B1 - Method of production of high-pressure seamless cylinder from corrosion-resistant steel - Google Patents

Method of production of high-pressure seamless cylinder from corrosion-resistant steel Download PDF

Info

Publication number
EP3365121B1
EP3365121B1 EP16707614.0A EP16707614A EP3365121B1 EP 3365121 B1 EP3365121 B1 EP 3365121B1 EP 16707614 A EP16707614 A EP 16707614A EP 3365121 B1 EP3365121 B1 EP 3365121B1
Authority
EP
European Patent Office
Prior art keywords
semi
product
cylinder
blank
corrosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16707614.0A
Other languages
German (de)
French (fr)
Other versions
EP3365121A1 (en
Inventor
Pavel Kucera
Petr HOFRIK
Tomas PIJANOWSKI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vitkovice Cylinders AS
Original Assignee
Vitkovice Cylinders AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vitkovice Cylinders AS filed Critical Vitkovice Cylinders AS
Publication of EP3365121A1 publication Critical patent/EP3365121A1/en
Application granted granted Critical
Publication of EP3365121B1 publication Critical patent/EP3365121B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/02Making uncoated products
    • B21C23/20Making uncoated products by backward extrusion
    • B21C23/205Making products of generally elongated shape
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/02Making uncoated products
    • B21C23/20Making uncoated products by backward extrusion
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/21Presses specially adapted for extruding metal
    • B21C23/218Indirect extrusion presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C23/00Extruding metal; Impact extrusion
    • B21C23/32Lubrication of metal being extruded or of dies, or the like, e.g. physical state of lubricant, location where lubricant is applied

Description

    Technical Field
  • The invention relates to the field of material forming, namely the method of production of high-pressure cylinder from corrosion-resistant steel using the method of hot backward extrusion solved completely specifically for the possibility to obtain high-pressure seamless cylinder not showing hydrogen embrittlement and inner surface corrosion.
  • Background Art
  • High-pressure seamless steel cylinders are currently produced using the method of backward extrusion and drawing utilizing the process according to the CZ pat. 243247 .
  • When using the procedure according to the CZ patent 243247 , steel blanks are first cut from billets of square or circular section. The steel blanks are heated in an induction furnace to the output temperature of 1000 to 1250 °C, after which they are robotically transposed into a descaling device where a high-pressure water jetting is performed to remove the scales from the surface of blanks. Then each individual blank is inserted by stacker into an extrusion press, where it is upset and backward extruded. The backward extrusion process is realized in two steps. During the first step, the blank is inserted into a die with a vertically moving ram, cylindrical insert, and piercing mandrel fitted with a piercing head, where a thick-walled hollow semi-product, which is smooth inside without protrusions or bumps, is produced by means of extrusion from the blank. At the end of extrusion in the extrusion press, bottom is pressed in the semi-product basically to the final thickness, however the semi-product has larger diameter than the final product. After completion of the backward extrusion in the extrusion press, the semi-product is robotically removed from the extrusion press, turned by 90°, and seated in this position into the horizontal drawing press, where the second step of forming, which is backward drawing, will take place. During this second step, the semi-product is put on a drawing mandrel with the already final inner diameter of the cylinder, after which it is extruded through a stripper ring and roller cartridges fitted with reduction rollers. The semi-product on the mandrel is rolled, in which process reshaping of the semi-product wall thickness by approximately 25 % to 85 % will take place, and the semi-product will acquire the desired outer and inner diameter. In addition, the rest of scales will fall off. After the semi-product passing through the stripper ring and the roller cartridges, insertion of the semi-product bottom into a sizing die is performed, thus forming the final shape of the cylinder bottom. Then, in the course of backward movement of the drawing mandrel, the semi-product is pulled off from the drawing mandrel with the help of stripping jaws. The stage of the semi-product processing by rolling is mentioned in the Utility model CZ U 20492 . After final forming by rolling, the hollow semi-products are aftercooled with air and subsequently necked, i.e. closed by means of rotary forming to create a steel cylinder of typical geometry.
  • Disadvantage of the existing procedures of production of high-pressure seamless cylinders is the fact that they do not allow production of cylinders from corrosion-resistant steels using the method of backward extrusion and drawing, because the corrosion-resistant material degrades when conventional method of backward extrusion and drawing is used and it is impossible to produce safe high-pressure seamless cylinder from it.
  • Currently there are also procedures that allow producing high-pressure cylinders from corrosion-resistant pipes. These are procedures in which necking of pipe segment is performed on both sides. In a seamless form, however, only double-necked cylinders of a simple shape can be manufactured with these procedures, because they do not allow seamless closure of the bottom. Cylinders of different types of alloys such as chrome-molybdenum can also be produced using these procedures. However, because it is not possible to produce sufficiently thin-walled tubes as the starting semi-product for these procedures, all such pressure bottles made using production methods based on pipes have thick-walled structure, and thus they have considerable disadvantage in a very big mass. Especially in the case of bigger volumes, such big weight of cylinders complicates handling, storage, and transportation. Existing thick-walled cylinders have another disadvantage in low strength.
  • In the steel industry, the use of water glass is known in the field of foundry practice for protection of casting moulds against damage.. In this field, the inner surface of the casting mould is sometimes provided with a coating of water glass so that this coating could prevent direct contact of molten metal with the mould surface and thereby increase the service life of the mould. This coating is resistant to high temperatures used in the foundry practice. Water glass is used in the foundry industry also as a cementing component for the production of foundry moulds of sand.
  • Disclosure of Invention
  • The above-mentioned disadvantages are eliminated by the invention. New method of manufacturing seamless high-pressure cylinder from corrosion-resistant steel is designed allowing the production of thin-walled seamless version of the cylinder from corrosion-resistant steel even for larger and high-volume high-pressure cylinders.
  • The invention starts from the existing method of manufacturing seamless high-pressure cylinders. The starting part in the form of a steel blank is heated in an induction furnace and then inserted into an extrusion press where it is upset and backward extruded in two steps. From this, during the first step, the blank is inserted into a die with a cylindrical insert and a vertically moving piercing tool, and here it is moulded by means of extrusion until a thick-walled hollow semi-product having an inner cavity, walls and bottom is moulded from it. After that, the semi-product is removed from the extrusion press, turned by 90°, and seated in this position into a horizontal drawing press, where the second step of forming, which is backward drawing, takes place. During this second step, the semi-product is put on a drawing mandrel with the diameter corresponding to the desired final inner diameter of the produced cylinder, while in this drawing press, the semi-product is extruded through a stripper ring and roller cartridges fitted with reduction rollers by means of which it is rolled on the mandrel. This rolling is performed so long until the semi-product acquires the desired outer and inner diameter corresponding to the required final dimensions of the produced cylinder. Then the final shape of the cylinder bottom is formed by insertion of the semi-product bottom into a sizing die and subsequently, in the course of the backward movement of the drawing mandrel, the semi-product is pulled off from the drawing mandrel with the help of stripping jaws and is aftercooled. Finally, the semi-product manufactured in this way is necked, by which the shape of the manufactured cylinder is finished. The essence of the new solution according to the invention is that even before heating in the induction furnace, at least 85 % of the blank surface is coated with coating from material based on water glass with thickness of 20 to 150 µm, this coating is cured by drying at the temperature of 15 to 60 °C and only after this curing, the blank is subjected to heating in the induction furnace.
  • The material based on water glass is applied to the blank for example by spraying with nozzles or brushing in the form of water glass suspension. The water glass suspension stands here for suspension containing 20 to 40 % w. w. of sodium silicate or potassium silicate or mixture of these silicates, and 80 to 40 % w. w. of water, while in the case of presence of admixtures such as borosilicates and/or corrosion inhibitors, these admixtures are contained in the amount of maximum 20 % w. w.
  • The blank with coating from material based on water glass is heated in the induction furnace to the temperature of 1180 °C to 1260 °C.
  • Then, when the blank with coating is heated up in the induction furnace, the blank with coating is taken out of here, and during persistence of its temperature of minimum 1110 °C, it is inserted into the extrusion press, preferably without performing water descaling between the removal from the induction furnace and insertion into the extrusion press.
  • During the first step of mechanical working, in the course of piercing, the coating of material based on water glass is broken to pieces by purposeful pushing of the piercing tool to the blank, while it is cracking off during extrusion in the extrusion press until at least its major part is removed, meant as thickness of layer.
  • Then, when the final shape of the cylinder is formed from the semi-product, the leftovers of coating based on water glass are preferably removed from the surface of the semi-product by pressure blasting of its outer as well as inner surface with abrasive.
  • The blank is made preferably from corrosion-resistant steel while the resulting cylinder is made as a seamless cylinder in the volume range from 5 litres up to 260 litres, as a single necked or double-necked cylinder for any volume within the said range.
  • Thin walled seamless high-pressure cylinders of the abovementioned volumes are preferably manufactured with the help of this invention. In the second step of forming, the semi-product wall is pressed to the thickness of 2 to 21.5 mm.
  • The invention is utilizable for manufacturing of seamless high-pressure cylinders. It makes possible to manufacture these cylinders from corrosion-resistant steel and that in the corrosion-resistant version, even for larger and high cylinder volumes from 5 to 260 litres. The invention makes possible to manufacture these cylinders in the thin-walled version from significantly wider range of high-strength corrosion-resistant steels than the existing methods. Using this invention, substantial reduction of the mass of high-pressure cylinders is achieved as compared to the present state of art, and savings of material for their production. The seamless thin-walled version with these volumes was not possible so far. The cylinders according to the invention exhibit high mechanical resistance as well as pressure resistance. They have relatively very low mass, which as compared to the present state of art facilitates manipulation, storage, as well as transport. As compared to cylinders currently manufactured for example for scuba diving, respirators, for calibration gases etc., the cylinders according to the invention are by as much as two thirds lighter. The option to use corrosion-resistant steel for the production makes possible to use these cylinders even for raw natural gas and for gases and mixtures that in the case of existing cylinders from common chrome-molybdenum steel are causing hydrogen embrittlement and accelerated corrosion when reacting with the gas under high pressure.
  • Brief Description of Drawings
  • The invention is illustrated using drawings, where:
    • Fig. 1 shows the blank with applied coating of water glass in cross-section,
    • Fig. 2 shows the phase of curing of the coating on the blank,
    • Fig. 3 shows the phase of relocation of the blank from the induction furnace directly into the extrusion press, and
    • Fig. 4 A, B shows process of pressing of the blank in the extrusion press, from which A shows the phase of extrusion of the future cylinder cavity in the blank and B shows the subsequent phase of breaking and falling off of the coating from the semi-product during pressing.
    Best Mode for Carrying Out the Invention
  • Example of embodiment of the invention is visually demonstrated with the help of Figs. 1 to 4 and the hereinafter-described method of production of corrosion-resistant high-pressure seamless cylinder for storage, transport, and use of natural gas.
  • Parts of the size needed for the manufacture of cylinders of the produced volume are first cut from billets of corrosion-resistant steel having square or circular section. Each individual part, i.e. the starting steel blank 1, is on at least 85 % of its surface coated with coating 2 from material based on water glass. The thickness of applied layer is 20 to 150 µm. Suspension usually called water glass is used as the material based on water glass. For the purposes of the invention, the suspension based on water glass stands for suspension containing 20 to 40 % w. w. of sodium silicate or potassium silicate or their mixture and 80 to 40 % w. w. of water. Admixtures of borosilicates and corrosion inhibitors such as hexamine, fenylethylamine, phosphates, etc. and/or possible other admixtures can be contained provided they do not exceed the amount of 20 % w. w. in the suspension.
  • Examples of materia! composition of the suspension are given below. Suspension I
    Material weight % in the suspension
    Silicates (sodium or potassium silicate or their mixture) 20
    Water 80
    Admixtures 0
    Suspension II
    Material weight % in the suspension
    Silicates (sodium or potassium silicate or their mixture) 40
    Water 60
    Admixtures 0
    Suspension III
    Material weight % in the suspension
    Silicates (sodium or potassium silicate or their mixture) 30
    Water 60
    Admixtures (borosilicates and corrosion inhibitors in quantities 1:1) 10
    Suspension IV
    Material weight % in the suspension
    Silicates (sodium or potassium silicate or their mixture) 40
    Water 40
    Admixtures (borosilicates and unidentified admixtures) 20
  • This coating 2 can be applied by brushing or spraying. After the application, the coating is let to dry at the temperature of 15 to 60 °C until curing. Sufficient curing will not take place in the case of curing below the temperature of 15 °C, so that unwanted cracking and falling-off of the coating 2 layer would take place during subsequent heating in the induction furnace. In the case of curing above 60 °C, unwanted cracking of the coating 2 will take place as soon as during drying. During curing within the said range, creation of homogenous layer acting as a protective jacket on the surface of the blank 1 takes place. For the drying process or after it, the blank 1 is placed into the induction furnace, where it is heated up by gradual heating to the temperature of 1180 °C to 1260 °C. During heating, neither high-temperature oxidation of the surface of blanks 1 contained in the induction furnace nor forge welding of more pieces of blanks 1, imminent in the case of heating without the coating 2, takes place. The heated up blank 1 with the coating 2 is removed from the induction furnace by robotic feeder 3 and immediately after removal from the induction furnace it is inserted into a die 4 of extrusion press without significant cooling down, with continuation of its temperature of at least 1110°C.
  • When compared with the process used until now, the step of descaling by water jetting of scale, which is always performed during the existing process between the removal from the induction furnace and insertion into the extrusion press, is skipped. Skipping of the up to now necessary step of water jetting of scale is very significant, because this is preventing cooling down by more than 80 °C, thus eliminating formation of temperature gradient and temperature fluctuations that are typical during the clearing of high-temperature-heating generated scale by means of high-pressure water jet descaling. In addition, the possibility of precise control of the blank 1 temperature is achieved by skipping the descaling.
  • In the extrusion press, the blank 1, and later the semi-product 5 created from it, is upset and backward extruded in two steps. From this, during the first step, the blank 1 is placed at the bottom 6 of the extrusion press die 4 and here it is pressed by vertically moving ram ended with a piercing mandrel constituting the piercing tool 7. The blank 1 is moulded here by means of extrusion until a thick-walled hollow semi-product 5 having an inner cavity, walls, and bottom is moulded from it, as shown on Figs. 4 A, B. During this first step of mechanical working, in the course of piercing, the coating 2 of material based on water glass is broken to pieces by pushing of the piercing tool 7 to the blank 1 and the semi-product 5 made of it, the coating 2 cracks off, and approximately all this coating 2 is removed during extrusion in the extrusion press. During extrusion, the water glass admixtures will make their way from the coating 2 into the surface layer of the semi-product 5 to the depth of maximum 10 µm, these leftovers are removed later by blasting. The aforementioned extrusion takes place during continuation of the semi-product 5 temperature at 1100 to 1200 °C. Homogenous moulding of the first semi-product 5 does not take place and transversal cracks appear on the semi-product 5 body at a lower temperature. On the contrary, when exceeding the temperature above 1200 °C, oxidation of primary austenitic grains occurs and so called burning out of the material takes place and hence its irreversible degradation. Without using the coating 2, the semi-product 5 could not be extruded and drawn to the required shape, or the corrosion-resistant steel could not be used as the material and/or the result could not lead to the production of the thin-walled seamless high-pressure cylinder of required mechanical and pressure strength.
  • After completion of processing in the extrusion press, the semi-product 5 is removed from the extrusion press, turned by 90°, and seated in this position into a horizontal drawing press, where the second step of forming in terms of backward drawing takes place. During this second step, the semi-product 5 is put on a drawing mandrel having the diameter corresponding to the desired final inner diameter of the produced cylinder, and in this drawing press, the semi-product 5 is extruded through a stripper ring and roller cartridges fitted with reduction rollers by means of which it is rolled on the mandrel. Rolling is performed so long until the semi-product 5 acquires the required outer and inner diameter. Then the final shape of the cylinder bottom is formed by insertion of the semi-product 5 bottom into a sizing die and subsequently, in the course of the backward movement of the drawing mandrel, the semi-product 5 is pulled off from the drawing mandrel with the help of stripping jaws, aftercooled, and subsequently necked by already known method by means of rotary forming or die forging process. The shape of the manufactured cylinder is finished in this way.
  • Leftovers of the water glass based coating 2 are removed from the surface of the semi-product 5 by pressure blasting of its outer as well as inner surface with abrasive for example of steel-shot and cast-iron grit.
  • Corrosion-resistant seamless pressure cylinders in the volume range from 5 litres up to 260 litres can be manufactured using the method according to the invention for any volume within the said range as single necked or double-necked cylinders. In the second step of forming, the invention allows pressing the semi-product 5 wall even to the thickness of a thin-walled cylinder without loss of qualitative properties of the manufactured cylinder. The semi-product 5 wall is pressed even to the thickness of 2 to 21.5 mm. In so doing, the cylinder wall thickness is selected in concrete terms within the above said range depending on the required cylinder volume, pressure for which the cylinder is designated, and requirements for qualitative properties and mechanical strength of the cylinder.
  • Figures Fig. 1 to 4 illustrate only the steps related directly to the new steps of the process of production of the cylinder according to the invention. The other steps and processes that are already known in this field and are described in the Background Art paragraph do not need to be illuminated using figures.

Claims (8)

  1. Method of production of high-pressure seamless cylinder, in which the starting steel blank (1) is heated in an induction furnace and then inserted into an extrusion press where it is upset and backward extruded in two steps, from which during the first step, the blank (1) is inserted into a die (4) with a vertically moving piercing tool (7), and here it is moulded by means of extrusion until a thick-walled hollow semi-product (5) having an inner cavity, walls and bottom is moulded from it, after which this semi-product (5) is removed from the extrusion press, turned by 90°, and seated in this position into a horizontal drawing press, where the second step of forming in terms of backward drawing takes place, when during this second step, the semi-product (5) is put on a drawing mandrel having the diameter corresponding to the required final inner diameter of the produced cylinder, and in this drawing press, the semi-product (5) is extruded through a stripper ring and roller cartridges fitted with reduction rollers by means of which it is rolled on the mandrel, while this rolling is performed so long until the semi-product (5) acquires the required outer and inner diameter, after which the final shape of the cylinder bottom is formed by insertion of the semi-product (5) bottom into a sizing die and subsequently, in the course of the backward movement of the drawing mandrel, the semi-product (5) is pulled off from the drawing mandrel with the help of stripping jaws, aftercooled, and subsequently necked, by which the shape of the manufactured cylinder is finished, characterized by that the starting blank (1) is made from corrosion-resistant steel and even before heating in the induction furnace, the blank (1) is coated on at least 85 % of its surface with coating (2) from material based on water glass with thickness of 20 to 150 µm, this coating (2) is cured by drying at the temperature of 15 to 60 °C and only after this curing, the blank (1) is subjected to heating in the induction furnace.
  2. Method of production of high-pressure seamless cylinder from corrosion-resistant steel according to claim 1, characterized by that the material applied to the blank (1) for example by spraying or by brush consists of suspension containing 20 to 40 % w. w. of sodium silicate or potassium silicate or mixture of these silicates, and 40 to 80 % w. w. of water, while in the case of presence of admixtures such as borosilicates and/or corrosion inhibitors, the admixtures are contained in the amount of maximum 20 % w. w.
  3. Method of production of high-pressure seamless cylinder from corrosion-resistant steel according to claims 1 and 2 characterized by that the blank (1) with the coating (2) from material based on water glass is heated in the induction furnace to the temperature of 1180 °C to 1260 °C.
  4. Method of production of high-pressure seamless cylinder from corrosion-resistant steel according to any of claims 1 to 3, characterized by that after the blank (1) with coating (2) is heated up in the induction furnace, the blank (1) with coating (2) is taken out of here and during persistence of its temperature of minimum 1110 °C, it is inserted into the extrusion press without performing water jetting of scale between the removal from the induction furnace and insertion into the extrusion press.
  5. Method of production of high-pressure seamless cylinder from corrosion-resistant steel according to any of claims 1 to 4, characterized by that during the first step of mechanical working, in the course of piercing, the coating (2) of material based on water glass is broken to pieces by pushing of the piercing tool (7) to the blank (1) and the coating (2) cracks off during extrusion in the extrusion press until at least its predominant part is removed.
  6. Method of production of high-pressure seamless cylinder from corrosion-resistant steel according to claim 5, characterized by that after the final shape of the cylinder is formed from the semi-product (5), the leftovers of coating (2) based on water glass are removed from the surface of the semi-product (5) by pressure blasting of its outer as well as inner surface.
  7. Method of production of high-pressure seamless cylinder from corrosion-resistant steel according to any of claims 1 to 6, characterized by that the blank (1) is made of corrosion-resistant steel while the resulting cylinder is made as a seamless cylinder in the volume range from 5 litres up to 260 litres, as a single necked or double-necked cylinder for any volume within the said range.
  8. Method of production of high-pressure seamless cylinder from corrosion-resistant steel according to claim 7, characterized by that in the second step of forming, the semi-product (5) wall is pressed to the thickness of 2 to 21.5 mm.
EP16707614.0A 2015-12-03 2016-01-08 Method of production of high-pressure seamless cylinder from corrosion-resistant steel Active EP3365121B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CZ2015-855A CZ2015855A3 (en) 2015-12-03 2015-12-03 The method of producing a high-pressure seamless bottle made of stainless steel
PCT/CZ2016/050001 WO2017092721A1 (en) 2015-12-03 2016-01-08 Method of production of high-pressure seamless cylinder from corrosion-resistant steel

Publications (2)

Publication Number Publication Date
EP3365121A1 EP3365121A1 (en) 2018-08-29
EP3365121B1 true EP3365121B1 (en) 2019-04-10

Family

ID=55452969

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16707614.0A Active EP3365121B1 (en) 2015-12-03 2016-01-08 Method of production of high-pressure seamless cylinder from corrosion-resistant steel

Country Status (7)

Country Link
US (1) US20180304330A1 (en)
EP (1) EP3365121B1 (en)
CN (1) CN108348971B (en)
CZ (1) CZ2015855A3 (en)
ES (1) ES2731055T3 (en)
RU (1) RU2710484C1 (en)
WO (1) WO2017092721A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111389944B (en) 2020-03-26 2021-01-29 燕山大学 Extrusion rotary forming method for thick-wall cylinder
CN113817956B (en) * 2021-08-02 2022-09-20 包头钢铁(集团)有限责任公司 700 MPa-level economical seamless gas cylinder steel pipe and manufacturing method thereof
CN116475258B (en) * 2023-06-15 2023-09-01 陕西长羽航空装备股份有限公司 Large titanium alloy deep cylinder back extrusion forging equipment and method for aviation aircraft

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB795989A (en) * 1955-05-31 1958-06-04 Babcock & Wilcox Co Improvements in or relating to the extrusion of metal billets
FR2341384A1 (en) * 1976-02-23 1977-09-16 Little Inc A LUBRICANT AND HOT FORMING METAL PROCESS
SU1219671A1 (en) * 1984-10-23 1986-03-23 Межотраслевой Головной Конструкторско-Технологический Институт Технологической Оснастки Compound for protecting metal from oxidation on heating
CS243247B1 (en) * 1985-01-07 1986-06-12 Roman Barecek Steel sheamless flasks' half-finished products hot making device from dimension stock
JPS62148016A (en) * 1985-12-23 1987-07-02 Kobe Steel Ltd Extrusion method for bottomed cylinder for stainless steel high pressure vessel
ZA963198B (en) * 1995-05-16 1996-10-25 Timcal Ltd Lubricant composition for use on workpieces in the hot forming of metals
JP3558506B2 (en) * 1997-09-16 2004-08-25 住友金属工業株式会社 Glass lubricant for hot extrusion
RU124893U1 (en) * 2012-06-20 2013-02-20 Владимир Николаевич Соколов HIGH PRESSURE STEEL GAS CYLINDER
EP2703454A1 (en) * 2012-08-29 2014-03-05 Pemco Brugge BVBA Coating compositions
RU2560125C2 (en) * 2013-09-10 2015-08-20 Открытое акционерное общество "Российский научно-исследовательский институт трубной промышленности" (ОАО "РосНИТИ") High-pressure cylinder
DE102014101972B4 (en) * 2014-02-17 2018-06-07 Thyssenkrupp Steel Europe Ag Method for producing a seamless pressure vessel for storing hydrogen

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
CN108348971B (en) 2019-08-20
RU2710484C1 (en) 2019-12-26
EP3365121A1 (en) 2018-08-29
CZ306401B6 (en) 2017-01-04
CZ2015855A3 (en) 2017-01-04
US20180304330A1 (en) 2018-10-25
ES2731055T3 (en) 2019-11-13
WO2017092721A1 (en) 2017-06-08
CN108348971A (en) 2018-07-31

Similar Documents

Publication Publication Date Title
CN102873512A (en) Manufacture method of large-caliber medium-and-thick-wall seamless steel tube for nuclear power plant
EP3365121B1 (en) Method of production of high-pressure seamless cylinder from corrosion-resistant steel
CN104043677A (en) Preparation method of carbon steel tube/stainless steel tube composite tube
CN113976789B (en) Hollow reducing extrusion forming process method for titanium alloy thin-wall ultra-large cone angle special-shaped ring forging with inner and outer flange structures
CN106216965B (en) A kind of casting and rolling composite forming method of corronium retainer
CN104174807B (en) The manufacture method of a kind of heavy caliber titanium thick-wall tube
US3391561A (en) Process and apparatus for producing cylindrical tubular bodies from blooms
CN102873126B (en) Manufacturing method of large-aperture thin-walled seamless steel tube for nuclear power plant
CN104551547A (en) Processing process of high-intensity titanium alloy pipe fittings
CN103286153A (en) Manufacture method of ultra-large-diameter pipeline extruded nozzles
CN109822026B (en) Method for manufacturing special-shaped blank and die used in method
JP5180669B2 (en) Mouthpiece shell manufacturing method
CN1393297A (en) Technology for manufacturing seamless Al-alloy pipe
RU2699701C1 (en) High-pressure bottles manufacturing method
US3570582A (en) Process for manufacturing cylindrical tubular metal bodies
CN114247839B (en) Composite production method of large-sized cylinder
US20190040485A1 (en) Stainless steel tubes and method for production thereof
CN102962293A (en) Manufacturing method for pipe die by using steel ingot great-reducing-forming blank
RU2615399C1 (en) Method of producing seamless machined pipes with 530×18-22 mm size from steel of "08х18н10-ш" grade
Nikitin et al. Production of seamless bimetallic pipe for the nuclear industry
RU2288063C1 (en) High pressure vessel forming method
CN112894276B (en) Deep blind hole cylindrical component and manufacturing method thereof
RU2638265C1 (en) METHOD OF PRODUCTION OF SEAMLESS MACHINED PIPES WITH SIZE OF 610×21-27 mm FROM STEEL OF 08Cr18N10T-S GRADE
CN111014329B (en) Gapless extrusion method for aluminum alloy seamless pipe
RU2615918C1 (en) METHOD OF PRODUCING SEAMLESS MACHINED PIPES WITH 530x23-28 mm SIZE FROM THE STEEL GRADE "08Х18Н10-Ш"

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180525

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
INTG Intention to grant announced

Effective date: 20181121

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: VITKOVICE CYLINDERS A.S.

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1117993

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190415

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016012238

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190410

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190910

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190710

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2731055

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20191113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190711

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190710

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190810

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016012238

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

26N No opposition filed

Effective date: 20200113

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200108

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200108

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 1117993

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190410

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20230220

Year of fee payment: 8

Ref country code: AT

Payment date: 20221207

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20221207

Year of fee payment: 8

Ref country code: DE

Payment date: 20221207

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190410

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231113

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20231012

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20240206

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20231113

Year of fee payment: 9