EP3273451A1 - A lead exit arrangement - Google Patents

A lead exit arrangement Download PDF

Info

Publication number
EP3273451A1
EP3273451A1 EP16180730.0A EP16180730A EP3273451A1 EP 3273451 A1 EP3273451 A1 EP 3273451A1 EP 16180730 A EP16180730 A EP 16180730A EP 3273451 A1 EP3273451 A1 EP 3273451A1
Authority
EP
European Patent Office
Prior art keywords
bushing
transformer
tank
reactor
lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16180730.0A
Other languages
German (de)
French (fr)
Other versions
EP3273451B1 (en
Inventor
David Walter Wright
lleshkumar MAKWANA
William Young
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Technology GmbH
Original Assignee
General Electric Technology GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Technology GmbH filed Critical General Electric Technology GmbH
Priority to EP16180730.0A priority Critical patent/EP3273451B1/en
Publication of EP3273451A1 publication Critical patent/EP3273451A1/en
Application granted granted Critical
Publication of EP3273451B1 publication Critical patent/EP3273451B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F27/00Details of transformers or inductances, in general
    • H01F27/02Casings
    • H01F27/04Leading of conductors or axles through casings, e.g. for tap-changing arrangements
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01FMAGNETS; INDUCTANCES; TRANSFORMERS; SELECTION OF MATERIALS FOR THEIR MAGNETIC PROPERTIES
    • H01F41/00Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties
    • H01F41/02Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets
    • H01F41/04Apparatus or processes specially adapted for manufacturing or assembling magnets, inductances or transformers; Apparatus or processes specially adapted for manufacturing materials characterised by their magnetic properties for manufacturing cores, coils, or magnets for manufacturing coils
    • H01F41/10Connecting leads to windings

Definitions

  • This invention relates to a lead exit arrangement for a high voltage (HV) transformer or reactor.
  • the invention also relates to a transformer or reactor having said lead exit arrangement.
  • the invention also relates to a power distribution network including said transformer or reactor.
  • a transformer or reactor typically comprises an inductive element, such as windings, mounted within a tank or housing.
  • a lead exit arrangement provides an external connection to the internal inductive element of the transformer or reactor.
  • the lead exit arrangement typically includes a bushing and associated electrostatic shielding and insulation.
  • the bushing carries a conductor that at one end connects to the inductive element by way of a winding lead and at the other end provides a terminal of the transformer.
  • the terminal allows, for example, external equipment or a power distribution network to be connected to the transformer.
  • the bushing is typically mounted in a turret, which extends from the external surface of the transformer housing.
  • the turret supports the bushing and houses the connection between the bushing and the winding lead that extends from the windings, through an aperture in the housing and into the turret.
  • Shielding and insulation referred to as a stress shield, surrounds the connection between the bushing and the winding lead in the turret.
  • the turrets and bushings are usually detached for transportation of the transformer after manufacture and testing. Therefore, the transformer must be carefully reassembled on site. Care must be taken to ensure that the apparatus is returned to the same condition in which it was tested in the factory. While replacing the turret and bushing the stress shield must be carefully positioned to ensure its insulating integrity.
  • the turret is also typically filled with an insulating fluid, such as an oil, and the insulation is conditioned accordingly. The need to detach the turret for transportation may prolong exposure of the lead exit arrangement's hygroscopic insulation to the environment, which can increase the risk of contamination.
  • a lead exit arrangement for a high voltage transformer/reactor comprising an elongate bushing having a bushing axis, a stress shield located at a base of the bushing for receiving a winding lead from a transformer/reactor and housing a connection between the winding lead and the base of the bushing, the stress shield configured to receive said winding lead in a direction off-axis with respect to the bushing axis.
  • the stress shield is configured such that the bushing extends out of the stress shield along the bushing axis and the winding lead extends into the stress shield along a second axis or direction, the angle between the bushing axis and the second axis being less than 180°. It has been found that constructing the stress shield in this way, such that it does not have to receive the winding lead along the bushing axis, allows for a more compact design and can obviate the need for a turret and therefore any disassembly of the turret during transportation.
  • the stress shield may be configured such that the angle between the winding lead and the bushing axis at the point of connection between the winding lead and the base of the bushing is less than 180°.
  • the angle may be less than 170° or less than 150° or less than 120°.
  • the angle at which the stress shield accepts the winding lead with respect to the bushing axis and the angle at which the connection between the two parts is formed is important as it allows the lead exit arrangement to be compact.
  • the lead exit arrangement may form part of a transformer or reactor.
  • the transformer/reactor may comprise an ultra high voltage (UHVAC) transformer/reactor.
  • the transformer/reactor may include an inductive element mounted within a tank.
  • the stress shield may be mounted within the tank. This is advantageous as a turret is no longer required because the stress shield, which houses the connection between the bushing and the winding lead, is mounted within the tank rather than external to the tank within the turret structure.
  • a transformer/reactor having an inductive element mounted within a tank wherein a stress shield forming an insulating structure around the connection between a lead of the transformer/reactor and a bushing may form an aspect of the invention.
  • the bushing may be arranged such that it extends through an aperture in the tank.
  • the tank may be configured to support the bushing at the point it projects through the tank.
  • the bushing may include a first end, which is received within the stress shield and a second end, opposite the first end, which forms a terminal of the transformer/reactor, the first end and second end separated by a central section, wherein the tank is configured to engage and support the bushing by its central section.
  • the inductive element may comprise one or two (or more) coils or windings mounted side by side and said stress shield of the lead exit arrangement may be mounted at least partly between said coils.
  • This can lead to a particularly compact design as the stress shield can occupy the space between the sides of the two substantially cylindrical coils and may fit within a linear perimeter extending between the outside edges of the coils.
  • the stress shield may be mounted to and supported by an insulating support structure that extends within the tank.
  • the tank may contain an insulating fluid and said fluid may immerse said stress shield and said inductive element.
  • the stress shield may be configured to receive more than one winding lead.
  • the further winding lead may also be received into the stress shield in a direction other than along the bushing axis.
  • a method of assembling a lead exit arrangement for a HV transformer/reactor said transformer/reactor including a tank configured to house an inductive element of the transformer/reactor, the method comprising;
  • a power distribution network including a transformer/reactor having the lead exit arrangement of the first aspect of the invention.
  • FIGS 1 to 3 show a lead exit arrangement 1 for an ultra high voltage transformer 20. It will be appreciated that the lead exit arrangement is equally applicable to a reactor, although the examples below will refer only to a transformer for brevity.
  • the lead exit arrangement comprises an elongate bushing 2 having a bushing axis B (shown in figure 3 ).
  • the bushing 2 comprises an insulated conductor 4 (shown schematically in Figure 2 ) that provides an electrical connection to the transformer 20.
  • the arrangement 1 further comprises a stress shield 5 located at a base 6 of the bushing 2 for receiving a winding lead 7 from the transformer 20 and housing an electrical connection 8 between the winding lead 7 and the base 6 of the bushing 2.
  • the stress shield 5 is configured to receive said winding lead 7 in a direction off-axis with respect to the bushing axis B.
  • the stress shield 5 provides an insulating function around the junction between the winding lead and the bushing.
  • the winding lead 7 comprises an electrical conductor that extends from an inductive element of the transformer 20, comprising windings 10.
  • the windings 10, in this example, are arranged as two coils 11 and 12.
  • the winding lead 7 thus provides an electrical connection between the coils 11, 12 and the bushing 2.
  • two winding leads 7a and 7b are received by the stress shield 5, one from each of the coils 11, 12. It will be appreciated that the stress shield 5 may be configured to receive only one lead, two leads, or more.
  • the coils 11 and 12 are substantially cylindrical structures having insulation there around and are mounted side by side, as is conventional, with their axes parallel to one another.
  • the stress shield 5 and the connection 8 is mounted in a gap 22 between the two coils 11, 12. This is possible due to the stress shield 5 accepting the winding lead 7 at an angle to the bushing axis.
  • the inductive element 11, 12 of the transformer 20 is mounted with a tank 21, which forms a housing for the coils 11, 12.
  • the stress shield 5 and connection 8 is also mounted within the tank 21.
  • the tank 21 also includes a support structure 23 to which the stress shield 5 is mounted.
  • the stress shield 5 sits within the space defined by the gap 22 and tank 21.
  • the tank 21 also includes an aperture 24 in an upper surface which allows the bushing 2 to extend out of the tank.
  • the bushing 2 comprises a first end 13 at which the connection 8 is made and which is received within the stress shield 5.
  • the bushing also has a second end 14, opposite the first end 13, which includes a terminal 15 which provides the electrical connection to the transformer 20.
  • the terminal 15 comprises the terminal end of the conductor 4 that extends through the bushing 2.
  • the first end 13 comprises the base 6 of the bushing 2.
  • the first end 13 and second end 14 are separated by a central section 16.
  • the arrangement 1 is configured such that the central section 16 of the bushing 2 extends through the aperture 24.
  • the central section 16 may include a flange 17 arranged to be connected to the tank 21.
  • the tank 21 may include an annular ring 25 adapted to engage the flange 17.
  • the tank supports the bushing 2 by its central section as it projects through a wall of the tank 21.
  • the stress shield 5 comprises a substantially spherical or ovoidal conducting body with insulating walls that houses the connection 8.
  • the stress shield 5 is supported by an insulating support structure 18 mounted within the tank 21.
  • Figure 3 shows the angular relationship between the winding lead 7 and the bushing 2.
  • Bushing 2 is received into the stress shield 5 along a bushing axis B.
  • the stress shield 5 includes an aperture 30 for receiving the bushing 2.
  • the stress shield 5 also includes a lead aperture 31 (in this embodiment two lead apertures) which receives the winding leads.
  • One of the winding leads is received along an axis L.
  • the lead axis L does not lie along the axis B and is therefore off-axis with respect to the bushing axis B.
  • the axes L and B are not parallel to one another.
  • An angle C formed between the axis B and the axis L is therefore less than 180°.
  • the angle between the bushing axis and the lead 7 at the connection 8 is also less than 180°.
  • the connection 8 between the lead 7 and the base of the bushing is formed at an obtuse angle rather than end to end.
  • the other winding lead is also received along an axis arranged at a similar angle to the bushing axis B, as viewed in Figure 3 .
  • the other winding lead has a similar angular relationship to the bushing axis B.
  • the axes L substantially perpendicular to the axis of the coils 11, 12.
  • the bushing 2 thus extends at an acute angle away from directly upward and the lead(s) 7 extend at an angle substantially perpendicular to the upward direction (as the coils, in this example, are mounted with their axes parallel to the upward direction).
  • Figure 4 shows a flow chart illustrating the method of mounting a stress shield within said tank shown as step 50.
  • Step 51 shows mounting a base of an elongate bushing in said stress shield, said bushing extending along a bushing axis.
  • Step 52 shows mounting a winding lead from the inductive element to said base of the bushing, said winding lead received into said stress shield in a direction off axis with respect to the bushing axis.
  • Step 53 shows securing a central section of the bushing to the tank, at a point where it extends through an aperture in the tank.
  • Step 54 shows filling the tank with an insulating fluid and thereby immersing the stress shield and inductive element in said fluid.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

A lead exit arrangement (1) for a high voltage transformer/reactor (20) comprising an elongate bushing (2) having a bushing axis (B), a stress shield (5) located at a base (6) of the bushing (2) for receiving a winding lead (7) from a transformer (20) and housing a connection between the winding lead (7) and the base (6) of the bushing (2), the stress shield (5) configured to receive said winding lead (7) in a direction off-axis with respect to the bushing axis (B).

Description

  • This invention relates to a lead exit arrangement for a high voltage (HV) transformer or reactor. The invention also relates to a transformer or reactor having said lead exit arrangement. The invention also relates to a power distribution network including said transformer or reactor.
  • A transformer or reactor typically comprises an inductive element, such as windings, mounted within a tank or housing. A lead exit arrangement provides an external connection to the internal inductive element of the transformer or reactor. The lead exit arrangement typically includes a bushing and associated electrostatic shielding and insulation. The bushing carries a conductor that at one end connects to the inductive element by way of a winding lead and at the other end provides a terminal of the transformer. The terminal allows, for example, external equipment or a power distribution network to be connected to the transformer.
  • At high voltages, the bushing is typically mounted in a turret, which extends from the external surface of the transformer housing. The turret supports the bushing and houses the connection between the bushing and the winding lead that extends from the windings, through an aperture in the housing and into the turret. Shielding and insulation, referred to as a stress shield, surrounds the connection between the bushing and the winding lead in the turret.
  • The turrets and bushings are usually detached for transportation of the transformer after manufacture and testing. Therefore, the transformer must be carefully reassembled on site. Care must be taken to ensure that the apparatus is returned to the same condition in which it was tested in the factory. While replacing the turret and bushing the stress shield must be carefully positioned to ensure its insulating integrity. The turret is also typically filled with an insulating fluid, such as an oil, and the insulation is conditioned accordingly. The need to detach the turret for transportation may prolong exposure of the lead exit arrangement's hygroscopic insulation to the environment, which can increase the risk of contamination.
  • According to a first aspect of the invention, there is provided a lead exit arrangement for a high voltage transformer/reactor comprising an elongate bushing having a bushing axis, a stress shield located at a base of the bushing for receiving a winding lead from a transformer/reactor and housing a connection between the winding lead and the base of the bushing, the stress shield configured to receive said winding lead in a direction off-axis with respect to the bushing axis.
  • Thus the stress shield is configured such that the bushing extends out of the stress shield along the bushing axis and the winding lead extends into the stress shield along a second axis or direction, the angle between the bushing axis and the second axis being less than 180°. It has been found that constructing the stress shield in this way, such that it does not have to receive the winding lead along the bushing axis, allows for a more compact design and can obviate the need for a turret and therefore any disassembly of the turret during transportation.
  • The stress shield may be configured such that the angle between the winding lead and the bushing axis at the point of connection between the winding lead and the base of the bushing is less than 180°. The angle may be less than 170° or less than 150° or less than 120°. The angle at which the stress shield accepts the winding lead with respect to the bushing axis and the angle at which the connection between the two parts is formed is important as it allows the lead exit arrangement to be compact.
  • The lead exit arrangement may form part of a transformer or reactor. The transformer/reactor may comprise an ultra high voltage (UHVAC) transformer/reactor. The transformer/reactor may include an inductive element mounted within a tank. The stress shield may be mounted within the tank. This is advantageous as a turret is no longer required because the stress shield, which houses the connection between the bushing and the winding lead, is mounted within the tank rather than external to the tank within the turret structure. A transformer/reactor having an inductive element mounted within a tank wherein a stress shield forming an insulating structure around the connection between a lead of the transformer/reactor and a bushing may form an aspect of the invention.
  • The bushing may be arranged such that it extends through an aperture in the tank.
  • The tank may be configured to support the bushing at the point it projects through the tank.
  • The bushing may include a first end, which is received within the stress shield and a second end, opposite the first end, which forms a terminal of the transformer/reactor, the first end and second end separated by a central section, wherein the tank is configured to engage and support the bushing by its central section.
  • The inductive element may comprise one or two (or more) coils or windings mounted side by side and said stress shield of the lead exit arrangement may be mounted at least partly between said coils. This can lead to a particularly compact design as the stress shield can occupy the space between the sides of the two substantially cylindrical coils and may fit within a linear perimeter extending between the outside edges of the coils.
  • The stress shield may be mounted to and supported by an insulating support structure that extends within the tank.
  • The tank may contain an insulating fluid and said fluid may immerse said stress shield and said inductive element.
  • The stress shield may be configured to receive more than one winding lead. The further winding lead may also be received into the stress shield in a direction other than along the bushing axis.
  • According to a second aspect of the invention, we provide a method of assembling a lead exit arrangement for a HV transformer/reactor, said transformer/reactor including a tank configured to house an inductive element of the transformer/reactor, the method comprising;
    1. a) mounting a stress shield within said tank;
    2. b) mounting a base of an elongate bushing in said stress shield, said bushing extending along a bushing axis;
    3. c) mounting a winding lead from the inductive element to said base of the bushing, said winding lead received into said stress shield in a direction off axis with respect to the bushing axis.
  • According to a third aspect of the invention, we provide a power distribution network including a transformer/reactor having the lead exit arrangement of the first aspect of the invention.
  • There now follows a brief description of a preferred embodiment of the invention, by way of a non-limiting example, with reference to the following figures in which:
    • Figure 1 shows a plan view of a transformer including the lead exit arrangement in which the bushing is shown with transparency;
    • Figure 2 shows a front view of a transformer shown in Figure 2;
    • Figure 3 shows a side view of the transformer shown in Figures 2 and 3; and
    • Figure 4 shows a flow chart illustrating a method of assembling a lead exit arrangement in a transformer.
  • Figures 1 to 3 show a lead exit arrangement 1 for an ultra high voltage transformer 20. It will be appreciated that the lead exit arrangement is equally applicable to a reactor, although the examples below will refer only to a transformer for brevity. The lead exit arrangement comprises an elongate bushing 2 having a bushing axis B (shown in figure 3). The bushing 2 comprises an insulated conductor 4 (shown schematically in Figure 2) that provides an electrical connection to the transformer 20. The arrangement 1 further comprises a stress shield 5 located at a base 6 of the bushing 2 for receiving a winding lead 7 from the transformer 20 and housing an electrical connection 8 between the winding lead 7 and the base 6 of the bushing 2. The stress shield 5 is configured to receive said winding lead 7 in a direction off-axis with respect to the bushing axis B. The stress shield 5 provides an insulating function around the junction between the winding lead and the bushing.
  • The winding lead 7 comprises an electrical conductor that extends from an inductive element of the transformer 20, comprising windings 10. The windings 10, in this example, are arranged as two coils 11 and 12. The winding lead 7 thus provides an electrical connection between the coils 11, 12 and the bushing 2. In the embodiment shown herein, two winding leads 7a and 7b are received by the stress shield 5, one from each of the coils 11, 12. It will be appreciated that the stress shield 5 may be configured to receive only one lead, two leads, or more.
  • The coils 11 and 12 are substantially cylindrical structures having insulation there around and are mounted side by side, as is conventional, with their axes parallel to one another. The stress shield 5 and the connection 8 is mounted in a gap 22 between the two coils 11, 12. This is possible due to the stress shield 5 accepting the winding lead 7 at an angle to the bushing axis.
  • The inductive element 11, 12 of the transformer 20 is mounted with a tank 21, which forms a housing for the coils 11, 12. The stress shield 5 and connection 8 is also mounted within the tank 21.
  • The tank 21 also includes a support structure 23 to which the stress shield 5 is mounted. The stress shield 5 sits within the space defined by the gap 22 and tank 21. The tank 21 also includes an aperture 24 in an upper surface which allows the bushing 2 to extend out of the tank.
  • The bushing 2 comprises a first end 13 at which the connection 8 is made and which is received within the stress shield 5. The bushing also has a second end 14, opposite the first end 13, which includes a terminal 15 which provides the electrical connection to the transformer 20. The terminal 15 comprises the terminal end of the conductor 4 that extends through the bushing 2. The first end 13 comprises the base 6 of the bushing 2. The first end 13 and second end 14 are separated by a central section 16. The arrangement 1 is configured such that the central section 16 of the bushing 2 extends through the aperture 24. The central section 16 may include a flange 17 arranged to be connected to the tank 21. The tank 21 may include an annular ring 25 adapted to engage the flange 17. Thus, the tank supports the bushing 2 by its central section as it projects through a wall of the tank 21.
  • The stress shield 5 comprises a substantially spherical or ovoidal conducting body with insulating walls that houses the connection 8. The stress shield 5 is supported by an insulating support structure 18 mounted within the tank 21.
  • Figure 3 shows the angular relationship between the winding lead 7 and the bushing 2. Bushing 2 is received into the stress shield 5 along a bushing axis B. Accordingly, the stress shield 5 includes an aperture 30 for receiving the bushing 2. The stress shield 5 also includes a lead aperture 31 (in this embodiment two lead apertures) which receives the winding leads. One of the winding leads is received along an axis L. The lead axis L does not lie along the axis B and is therefore off-axis with respect to the bushing axis B. Further, the axes L and B are not parallel to one another. An angle C formed between the axis B and the axis L is therefore less than 180°. The angle between the bushing axis and the lead 7 at the connection 8 is also less than 180°. Thus, the connection 8 between the lead 7 and the base of the bushing is formed at an obtuse angle rather than end to end. The other winding lead is also received along an axis arranged at a similar angle to the bushing axis B, as viewed in Figure 3. Thus, the other winding lead has a similar angular relationship to the bushing axis B. The axes L substantially perpendicular to the axis of the coils 11, 12. The bushing 2 thus extends at an acute angle away from directly upward and the lead(s) 7 extend at an angle substantially perpendicular to the upward direction (as the coils, in this example, are mounted with their axes parallel to the upward direction).
  • Figure 4 shows a flow chart illustrating the method of mounting a stress shield within said tank shown as step 50. Step 51 shows mounting a base of an elongate bushing in said stress shield, said bushing extending along a bushing axis. Step 52 shows mounting a winding lead from the inductive element to said base of the bushing, said winding lead received into said stress shield in a direction off axis with respect to the bushing axis. Step 53 shows securing a central section of the bushing to the tank, at a point where it extends through an aperture in the tank. Step 54 shows filling the tank with an insulating fluid and thereby immersing the stress shield and inductive element in said fluid.

Claims (12)

  1. A lead exit arrangement (1) for a high voltage transformer/reactor (20) comprising an elongate bushing (2) having a bushing axis (B), a stress shield (15) located at a base (6) of the bushing (2) for receiving a winding lead (7) from a transformer/reactor (20) and housing a connection (8) between the winding lead (7) and the base (6) of the bushing (2), the stress shield (5) configured to receive said winding lead (7) in a direction off-axis with respect to the bushing axis (B).
  2. A lead exit arrangement according to claim 1, in which the stress shield (5) is configured such that the angle between the winding lead (7) and the bushing axis (B) at the point of electrical connection between the winding lead (7) and the base (6) of the bushing (2) is less than 180°.
  3. A transformer/reactor including the lead exit arrangement (1) of claim 1 or claim 2.
  4. A transformer/reactor according to claim 3, in which the transformer/reactor (20) includes an inductive element (11,12) mounted within a tank (21) and the stress shield (5) is mounted within the tank (21) adjacent the inductive element (11,12).
  5. A transformer/reactor according to claim 4, in which the arrangement is configured such that the bushing (2) extends through an aperture (30) in the tank (21).
  6. A transformer/reactor according to claim 5, in which the tank (21) is configured to support the bushing (2) at the point it projects through the tank (21).
  7. A transformer/reactor according to claim 6 in which the bushing (2) includes a first end (13), which is received within the stress shield (5) and a second end (14), opposite the first end (13), which forms a terminal of the transformer/reactor (20), the first end (13) and second end (14) separated by a central section (16), wherein the tank (21) is configured to engage and support the bushing (2) by its central section (16).
  8. A transformer/reactor according to any one of claims 4 to 7, in which the inductive element comprises at least two coils (11,12) mounted side by side and said stress shield (5) of the lead exit arrangement (1) is mounted at least partly between said coils (11,12).
  9. A transformer/reactor according to any one of claims 4 to 8, in which the stress shield (5) is mounted to and supported by an insulating support structure (18) that extends within the tank (21).
  10. A transformer/reactor according to any one of claims 4 to 9, in which the tank (21) contains an insulating fluid and said fluid in said tank (21) immerses said stress shield (5) and said inductive element (11,12).
  11. A method of assembling a lead exit arrangement (1) of a transformer/reactor (20), said transformer/reactor (20) including a tank (21) configured to house an inductive element (11,12) of the transformer/reactor (20), the method comprising;
    a) mounting a stress shield (5) within said tank (21);
    b) mounting a base (6) of an elongate bushing (2) in said stress shield (5), said bushing (2) extending along a bushing axis (B);
    c) mounting a winding lead (7) from the inductive element (11,12) to said base (6) of the bushing (2), said winding lead (7) received into said stress shield (5) in a direction off axis with respect to the bushing axis (B).
  12. A power distribution network including a transformer/reactor (20) as defined in any one of claims 3 to 10.
EP16180730.0A 2016-07-22 2016-07-22 A lead exit arrangement Active EP3273451B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP16180730.0A EP3273451B1 (en) 2016-07-22 2016-07-22 A lead exit arrangement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP16180730.0A EP3273451B1 (en) 2016-07-22 2016-07-22 A lead exit arrangement

Publications (2)

Publication Number Publication Date
EP3273451A1 true EP3273451A1 (en) 2018-01-24
EP3273451B1 EP3273451B1 (en) 2019-11-27

Family

ID=56507513

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16180730.0A Active EP3273451B1 (en) 2016-07-22 2016-07-22 A lead exit arrangement

Country Status (1)

Country Link
EP (1) EP3273451B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108565091A (en) * 2018-03-09 2018-09-21 重庆市开州区宏顺电子厂 A kind of filtering mechanism of miniature transformer
CN115831597A (en) * 2022-12-09 2023-03-21 天威保变(秦皇岛)变压器有限公司 Method for installing and positioning valve side lead of large-scale converter transformer product

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3621426A (en) * 1970-11-12 1971-11-16 Westinghouse Electric Corp Transformer with bushing compartment
US3668584A (en) * 1971-04-13 1972-06-06 Westinghouse Electric Corp Electrical power apparatus
JPS5642313A (en) * 1979-09-14 1981-04-20 Fuji Electric Co Ltd Shielding for high-tension bushing of oil-immersed induction apparatus
JPS6046013A (en) * 1983-08-24 1985-03-12 Hitachi Ltd Electric apparatus
JPH06283347A (en) * 1993-03-25 1994-10-07 Toshiba Corp Split type transformer
US6489782B1 (en) * 2000-12-21 2002-12-03 Eaton Corporation Electrical system with a stand-off insulator-sensor for on-line partial discharge monitoring of the state of high-voltage insulation
US20160148754A1 (en) * 2013-06-25 2016-05-26 General Electric Technology Gmbh Method of assembling a transformer

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3621426A (en) * 1970-11-12 1971-11-16 Westinghouse Electric Corp Transformer with bushing compartment
US3668584A (en) * 1971-04-13 1972-06-06 Westinghouse Electric Corp Electrical power apparatus
JPS5642313A (en) * 1979-09-14 1981-04-20 Fuji Electric Co Ltd Shielding for high-tension bushing of oil-immersed induction apparatus
JPS6046013A (en) * 1983-08-24 1985-03-12 Hitachi Ltd Electric apparatus
JPH06283347A (en) * 1993-03-25 1994-10-07 Toshiba Corp Split type transformer
US6489782B1 (en) * 2000-12-21 2002-12-03 Eaton Corporation Electrical system with a stand-off insulator-sensor for on-line partial discharge monitoring of the state of high-voltage insulation
US20160148754A1 (en) * 2013-06-25 2016-05-26 General Electric Technology Gmbh Method of assembling a transformer

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108565091A (en) * 2018-03-09 2018-09-21 重庆市开州区宏顺电子厂 A kind of filtering mechanism of miniature transformer
CN115831597A (en) * 2022-12-09 2023-03-21 天威保变(秦皇岛)变压器有限公司 Method for installing and positioning valve side lead of large-scale converter transformer product

Also Published As

Publication number Publication date
EP3273451B1 (en) 2019-11-27

Similar Documents

Publication Publication Date Title
EP2654046A2 (en) Sealed inductor connection using litz wire
CN101405819A (en) Connecting element for an electric shielding assembly
RU2419904C2 (en) High-voltage feedthrough insulator
EP3273451B1 (en) A lead exit arrangement
CN106486958A (en) Insulation terminal assembly
EP3018665B1 (en) Low inter-winding capacitance coil form
US8587930B2 (en) Gas-insulated bus
EP2528071A1 (en) High voltage arrangement comprising an insulating structure
WO2019024977A1 (en) A lead exit arrangement
US5142104A (en) High voltage insulator testing system
US9859701B2 (en) Connection of at least four electric conductors
US10074932B2 (en) Secondary transformer bushing with integral sealing legs
EP0109836B1 (en) Bushing
EP2573781B1 (en) High voltage current coil
US4320372A (en) Current transformer for a high-tension installation
JP6974580B2 (en) Coil parts
US12131860B2 (en) Arrangement and method for the gradual shutoff of potential in high-voltage technology
EP4033502A1 (en) Bushing unit and power cable connection structure for a railway vehicle
JP6820893B2 (en) Coil parts
RU2433498C2 (en) Power transformer
US10755845B2 (en) Top head housing
US20230298811A1 (en) Current transformer
EP3196901A1 (en) High voltage assembly
EP2922070A1 (en) Electrical insulation system and high voltage electromagnetic induction device comprising the same
RU2305340C1 (en) Outdoor high-voltage current transformer

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180724

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RIC1 Information provided on ipc code assigned before grant

Ipc: H01F 27/04 20060101AFI20190423BHEP

Ipc: H01F 41/10 20060101ALI20190423BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190607

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1207624

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191215

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016024955

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20191127

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200227

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200228

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200227

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200327

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200419

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016024955

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1207624

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191127

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20200828

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200731

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200722

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200731

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200722

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191127

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20220622

Year of fee payment: 7

Ref country code: GB

Payment date: 20220621

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220621

Year of fee payment: 7

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230522

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602016024955

Country of ref document: DE

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230722

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240201

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230722

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230723