EP3264009B1 - Control device, control method, and computer program - Google Patents

Control device, control method, and computer program Download PDF

Info

Publication number
EP3264009B1
EP3264009B1 EP16779897.4A EP16779897A EP3264009B1 EP 3264009 B1 EP3264009 B1 EP 3264009B1 EP 16779897 A EP16779897 A EP 16779897A EP 3264009 B1 EP3264009 B1 EP 3264009B1
Authority
EP
European Patent Office
Prior art keywords
heat pump
variation amount
temperature
pump device
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP16779897.4A
Other languages
German (de)
French (fr)
Other versions
EP3264009A1 (en
EP3264009A4 (en
Inventor
Masahiro Teraoka
Takuya Okada
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Heavy Industries Thermal Systems Ltd
Original Assignee
Mitsubishi Heavy Industries Thermal Systems Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Heavy Industries Thermal Systems Ltd filed Critical Mitsubishi Heavy Industries Thermal Systems Ltd
Publication of EP3264009A1 publication Critical patent/EP3264009A1/en
Publication of EP3264009A4 publication Critical patent/EP3264009A4/en
Application granted granted Critical
Publication of EP3264009B1 publication Critical patent/EP3264009B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1051Arrangement or mounting of control or safety devices for water heating systems for domestic hot water
    • F24D19/1054Arrangement or mounting of control or safety devices for water heating systems for domestic hot water the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D17/00Domestic hot-water supply systems
    • F24D17/02Domestic hot-water supply systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B30/00Heat pumps
    • F25B30/02Heat pumps of the compression type
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/12Heat pump
    • F24D2200/123Compression type heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/04Sensors
    • F24D2220/042Temperature sensors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/003Indoor unit with water as a heat sink or heat source
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/031Sensor arrangements
    • F25B2313/0314Temperature sensors near the indoor heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2339/00Details of evaporators; Details of condensers
    • F25B2339/04Details of condensers
    • F25B2339/047Water-cooled condensers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/06Several compression cycles arranged in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/21Temperatures
    • F25B2700/2116Temperatures of a condenser
    • F25B2700/21161Temperatures of a condenser of the fluid heated by the condenser

Definitions

  • the present invention relates to a control device, a control method, and a computer program.
  • each of a plurality of heat pump devices heats water circulating through water piping.
  • the related art is disclosed in PTL 1.
  • the device disclosed in PTL 1 attempts to attain efficient operation and improvement in reliability in the heat pump system in which each of the plurality of heat pump devices heats water circulating through water piping.
  • the circulating water becomes higher in pressure at a high temperature as the heat pump device in the heat pump system is located further downstream in a water circulation path.
  • Each of the heat pump devices needs to raise the temperature of water by performing heat exchange while the water passes through the inside of the device itself.
  • downsizing is considered in order to reduce a material cost.
  • the capacity (volume) of a heat exchanger through which a refrigerant passes is reduced. For this reason, the pressure of the refrigerant in the heat exchanger becomes higher as the heat pump device is located further downstream in the water circulation path and as the heat pump device becomes smaller.
  • the present invention has an object to provide a control device, a control method, and a computer program which can solve the above problem.
  • control device According to a first aspect of the present invention, there is provided a control device according to claim 1.
  • the variation amount allocation determining unit may determine a variation amount allocated to the plurality of heat pump devices other than the most downstream heat pump device such that a variation amount allocated to the most downstream heat pump device at a timing when the temperature of the water at the output of the most downstream heat pump device exceeds a second set temperature is smaller than the variation amount at the normal time, in a case where the target temperature of the water at the output of the most downstream heat pump device exceeds the first set temperature.
  • control device may further include: a variation amount allocation setting unit that sets the allocated variation amounts which are allocated to the most downstream heat pump device and the plurality of heat pump devices other than the most downstream heat pump device, on the basis of the allocated variation amount determined by the variation amount allocation determining unit.
  • control device the control method and the computer program described above, it is possible to use inexpensive parts in a heat exchanger of the heat pump device located furthest downstream, among a plurality of heat pump devices connected in series in a heat pump system, and it is possible to perform downsizing of the heat pump system and a reduction in the manufacturing cost of the heat pump system.
  • a heat pump system 1 is provided with a facility 10, a first heat pump device 20a1, a second heat pump device 20a2, ..., a (n-1)-th heat pump device 20a(n-1), an n-th heat pump device 20an, a control device 30, and water piping 40, as shown in Fig. 1 .
  • the facility 10 changes the temperature of water by ⁇ T.
  • the facility 10 is an office, a factory, or the like, and in the facility 10, the temperature of water is changed by ⁇ T by using an air conditioner, boiler equipment, a freezer, or the like.
  • lowering the temperature of water by ⁇ T it means cooling of water.
  • raising the temperature of water by ⁇ T it means heating of water.
  • the facility 10 outputs, for example, water with the temperature lowered by ⁇ T to the first heat pump device 20a1 through the water piping 40. Further, water is input from the n-th heat pump device 20an to the facility 10 through the water piping 40. For example, the water heated to a water temperature which is required for the facility 10 is supplied from the n-th heat pump device 20an to the facility 10 through the water piping 40.
  • the first heat pump device 20a1 heats the water input from the facility 10 by heat exchange.
  • the first heat pump device 20a1 outputs the heated water to the second heat pump device 20a2 through the water piping 40.
  • the second heat pump device 20a2 heats the water input from the first heat pump device 20a1 by heat exchange.
  • the second heat pump device 20a2 outputs the heated water to a third heat pump device 20a3 through the water piping 40.
  • the third heat pump device 20a3 heats the water input from the second heat pump device 20a2 by heat exchange.
  • the third heat pump device 20a3 outputs the heated water to a fourth heat pump device 20a4 through the water piping 40.
  • the (n-1)-th heat pump device 20a(n-1) heats the water input from the (n-2)-th heat pump device 20a(n-2) by heat exchange.
  • the (n-1)-th heat pump device 20a(n-1) outputs the heated water to the n-th heat pump device 20an through the water piping 40.
  • the n-th heat pump device 20an is the most downstream heat pump device disposed furthest downstream in a water circulation path.
  • the n-th heat pump device 20an heats the water input from the (n-1)-th heat pump device 20a(n-1) by heat exchange.
  • the n-th heat pump device 20an outputs the heated water to the facility 10 through the water piping 40.
  • the first heat pump device 20a1, the second heat pump device 20a2, ..., the (n-1)-th heat pump device 20a(n-1), and the n-th heat pump device 20an are collectively referred to as a heat pump device 20.
  • an arrow in the water piping 40 indicates a flow direction of water in the water circulation path.
  • the control device 30 controls each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an. Specifically, the control device 30 determines a target outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), that is, allocation of a variation amount in each heat pump device, on the basis of a temperature decrease ⁇ T of water in the facility 10, equipment capacity indicating the capacity of varying a water temperature, of each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an, an input water temperature of the first heat pump device 20a1 disposed furthest upstream, and a target outlet water temperature of the n-th heat pump device 20an disposed furthest downstream.
  • the allocation of the variation amount is an amount indicating the variation amount of a water temperature in which the variation amount ⁇ T of the water temperature in the facility 10 (in this case, the temperature decrease ⁇ T of water in the facility 10) is allocated to each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and is a variation amount which is shown by a difference between the target outlet water temperature and the inlet water temperature in each heat pump device.
  • the control device 30 generates a control command for the allocation of the variation amount in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) on the basis of each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1).
  • the control device 30 transmits the generated control command to the corresponding heat pump device 20.
  • a broken line indicates a communication path between each of the heat pump devices 20 and the control device 30.
  • the control device 30 transmits and receives information to and from the facility 10 through the communication path.
  • the control device 30 transmits a control signal for the target outlet water temperature or the like to the heat pump device 20 through this communication path.
  • the communication path may be wired or wireless.
  • Each of the heat pump devices 20 is provided with a compressor 201, a four-way valve 202, a water heat exchanger 203, an expansion valve 204, an air heat exchanger 205, an accumulator 206, a refrigerant pipe 207, a first temperature sensor 208, and a second temperature sensor 209, as shown in Fig. 2 .
  • the compressor 201, the four-way valve 202, the water heat exchanger 203, the expansion valve 204, the air heat exchanger 205, and the accumulator 206 are connected by the refrigerant pipe 207 to configure a refrigerant circuit.
  • the compressor 201 is provided between the four-way valve 202 and the accumulator 206.
  • a motor is driven by an inverter.
  • the rotational speed of the motor that is, the discharge amount of the refrigerant is adjusted by the output frequency of the inverter.
  • the water heat exchanger 203 performs heat exchange between the water in the water piping 40 through which water flows from the heat pump device 20 on the upstream side to the heat pump device 20 on the downstream side, and the refrigerant in the refrigerant pipe 207 between the four-way valve 202 and the expansion valve 204.
  • the expansion valve 204 is provided between the water heat exchanger 203 and the air heat exchanger 205.
  • the expansion valve 204 converts a liquid refrigerant having a pressure P, which is input at a certain temperature T, to a refrigerant having a pressure lower than the pressure P at a temperature lower than the temperature T.
  • the air heat exchanger 205 is provided between the four-way valve 202 and the expansion valve 204.
  • the air heat exchanger 205 performs heat exchange between the outside air and the refrigerant.
  • the accumulator 206 is provided between the compressor 201 and the four-way valve 202.
  • the accumulator 206 prevents the refrigerant that has not been completely gasified in an evaporator (the water heat exchanger 203 or the air heat exchanger 205) from being drawn into the compressor 201 in a liquid state.
  • the first temperature sensor 208 is provided at the inlet of the water piping 40 in the water heat exchanger 203 through which water flows from the heat pump device 20 on the upstream side (in the case of the first heat pump device 20a1, from the facility 10).
  • the water temperature detected by the first temperature sensor 208 is transmitted to the control device 30 as the actually measured value of the inlet water temperature in the water piping 40.
  • the second temperature sensor 209 is provided at the outlet of the water piping 40 in the water heat exchanger 203 through which water flows to the heat pump device 20 on the downstream side (in the case of the n-th heat pump device 20an, to the facility 10).
  • the water temperature detected by the second temperature sensor 209 is transmitted to the control device 30 as the actually measured value of the output water temperature in the water piping 40.
  • a heating operation and a cooling (or defrosting) operation are switched by switching the four-way valve 202 to change the flow direction of the refrigerant.
  • the refrigerant discharged from the compressor 201 flows through the water heat exchanger 203, the expansion valve 204, the air heat exchanger 205, and the accumulator 206 in this order.
  • the water heat exchanger 203 acts as a condenser and the air heat exchanger 205 acts as an evaporator. Then, the water heated in the water heat exchanger 203 is output to the next heat pump device 20 on the downstream side in the water circulation path or the facility 10 through the water piping 40.
  • control device 30 The configuration of the control device 30 according to this embodiment will be described.
  • the control device 30 is provided with a communication unit 301, a storage unit 302, a communication control unit 303, a temperature variation control unit 304, a variation amount allocation determining unit 305, a variation amount reading unit 306, and a variation amount allocation setting unit 307, as shown in Fig. 3 .
  • the communication unit 301 transmits and receives information necessary for the control device 30 to control each of the heat pump devices 20 to and from each of the heat pump devices 20. For example, the communication unit 301 receives the actually measured value of the inlet water temperature detected by the first temperature sensor 208 in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and the actually measured values of the outlet water temperature detected by the second temperature sensor 209 in each heat pump device. Further, the communication unit 301 transmits the control command to each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1).
  • the storage unit 302 stores various kinds of information necessary for the processing to be performed by the control device 30.
  • a data table TBL1 showing the variation amount of the water temperature to be varied in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an is stored in the storage unit 302 in advance.
  • the variation amount of the water temperature to be varied in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an is, for example, the variation amount ⁇ T of the water temperature to be cooled in the facility 10.
  • the communication control unit 303 controls communication which is performed by the control device 30 through the communication unit 301. Even in a case where the fact that the communication control unit 303 controls the communication which is performed through the communication unit 301 of the control device 30 is not specifically described in the following description, the communication control unit 303 controls the communication which is performed by the control device 30 through the communication unit 301.
  • the temperature variation control unit 304 determines the target outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the input water temperature of the first heat pump device 20a1 disposed furthest upstream, and the target outlet water temperature of the n-th heat pump device 20an disposed furthest downstream.
  • the temperature variation control unit 304 generate a control command for each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ⁇ T of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1).
  • the control device 30 transmits the generated control command to the corresponding heat pump device 20 and controls the heat pump device 20.
  • the temperature variation control unit 304 generates a control command for varying the temperature of water on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ⁇ T of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) and performs control.
  • temperature variation control unit 304 generates a control command for varying the temperature of the water by the allocation of the variation amount which is set to each of the heat pump devices 20 by the variation amount allocation setting unit 307, and controls each of the heat pump devices 20.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • the variation amount allocation determining unit 305 equally divides the variation amount read from the storage unit 302 by the variation amount reading unit 306 by the number n of the heat pump devices 20, at the normal time, and determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, at a predetermined timing.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, at the predetermined timing.
  • the variation amount allocation determining unit 305 may determine the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, at a timing when the actually measured value of the temperature of water at the output of the n-th heat pump device 20an exceeds a second set temperature.
  • the variation amount reading unit 306 reads the variation amount for varying the temperature of water in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an, from the storage unit 302. For example, the variation amount reading unit 306 reads the data table TBL1 from the storage unit 302.
  • the variation amount allocation setting unit 307 sets the allocation of the variation amounts to be allocated to the n-th heat pump device 20an and the heat pump devices 20 other than the n-th heat pump device 20an on the basis of the allocation of the variation amount determined by the variation amount allocation determining unit 305.
  • the data table TBL1 shows the variation amount ⁇ T for varying the temperature of water in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an.
  • the data table TBL1 shows the correspondence relationship between the respective facilities (the facility 10, a facility 300, ...) and the variation amount ⁇ T of the temperature of water in each facility, as shown in Fig. 4 .
  • a processing flow of Fig. 5 showing the processing of the control device 30 which heats water by controlling each of the heat pump devices 20 in a case where in the heat pump system 1 according to this embodiment, the facility 10 cools water and the temperature of the water is lowered by ⁇ T will be described. It is known in advance that the facility 10 cools water which is input from the n-th heat pump device 20an through the water piping 40 and lowers the temperature of the water by ⁇ T, and the storage unit 302 stores the variation amount ⁇ T in the data table TBL1.
  • the variation amount ⁇ T recorded in the data table TBL1 of the storage unit 302 by the facility 10 is the variation amount for varying the temperature of water in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an.
  • the variation amount reading unit 306 reads the variation amount ⁇ T corresponding to the facility 10 from the data table TBL1 of the storage unit 302 (step S1). For example, in the case of the data table TBL1 shown in Fig. 4 , the variation amount reading unit 306 searches the facility 10 in order from the top of the facilities in the data table TBL1 to specify it and specifies and reads a variation amount ⁇ T1 corresponding to the specified facility 10 as the variation amount ⁇ T of the facility 10.
  • the variation amount reading unit 306 outputs the read variation amount ⁇ T to the variation amount allocation determining unit 305.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amount of each of the heat pump devices 20 at the normal time on the basis of the input variation amount ⁇ T, the equipment capacity of each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an, the input water temperature of the first heat pump device 20a1 disposed furthest upstream, and the target outlet water temperature of the n-th heat pump device 20an disposed furthest downstream (step S2).
  • the variation amount allocation determining unit 305 determines, at the normal time, allocation ⁇ T ⁇ n of the variation amount obtained by equally dividing the variation amount ⁇ T by the number n of the heat pump devices 20 as the allocation of the variation amount of each of the heat pump devices 20.
  • the variation amount allocation determining unit 305 outputs the allocation of the variation amount of each of the heat pump devices 20 determined at the normal time to the variation amount allocation setting unit 307.
  • the variation amount allocation setting unit 307 sets the input allocation of the variation amount of each of the heat pump devices 20 to each of the heat pump devices 20 (step S3). For example, in a case where the variation amount allocation determining unit 305 determines the allocation of the variation amount of each of the heat pump devices 20 to be ⁇ T ⁇ n, the variation amount allocation setting unit 307 sets the allocation of the variation amount of each of the heat pump devices 20 at the normal time to be ⁇ T ⁇ n.
  • the temperature variation control unit 304 If the variation amount allocation setting unit 307 sets the allocation of the variation amount of each of the heat pump devices 20 at the normal time, the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ⁇ T of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20 (step S4).
  • each of the heat pump devices 20 outputs water heated and having increased pressure to the heat pump device 20 on the downstream side in the water circulation path or the facility 10.
  • the variation amount allocation determining unit 305 determines whether or not the predetermined timing has been reached when each of the heat pump devices 20 heats water and outputs the increased pressure at the normal time (step S5). Specifically, for example, the variation amount allocation determining unit 305 determines whether or not a timing at which the target temperature of water at the output of the n-th heat pump device 20an exceeds the first set temperature and the actually measured value of the temperature of water at the output of the n-th heat pump device 20an exceeds the second set temperature has been reached.
  • the variation amount allocation determining unit 305 determines whether or not a timing at which the target temperature of water at the output of the n-th heat pump device 20an exceeds the first set temperature, 55 degrees, (for example, the target temperature of water is 60 degrees) and the actually measured value of the temperature of water at the output of the n-th heat pump device 20an exceeds the second set temperature, 50 degrees, has been reached.
  • step S5 the variation amount allocation determining unit 305 returns to the processing of step S5.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time (step S6).
  • the variation amount allocation determining unit 305 determines the allocation of the variation amount of the n-th heat pump device 20an to be lower than ⁇ T ⁇ n and performs a determination such that the allocation of the variation amounts of one or more heat pump devices 20 other than the n-th heat pump device 20an is increased by an amount corresponding to the decrease in the allocation of the variation amount of the n-th heat pump device 20an.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amount which is lower than the allocation of the variation amount of the n-th heat pump device 20an at the normal time and can be easily realized per unit time even in the high-temperature and high-pressure state in the n-th heat pump device 20an.
  • the variation amount allocation determining unit 305 outputs the determined allocation of the variation amount of each of the heat pump device 20 to the variation amount allocation setting unit 307.
  • the variation amount allocation setting unit 307 sets the input allocation of the variation amount of each of the heat pump devices 20 to each of the heat pump devices 20 (step S7).
  • the temperature variation control unit 304 If the variation amount allocation setting unit 307 sets the allocation of the variation amount of each of the heat pump devices 20 determined at the predetermined timing, the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ⁇ T of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20 (step S8).
  • the number n of the heat pump devices 20 may be any number as long as it is two or more.
  • the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ⁇ T of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amount of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • the heat pump system 1 is provided with the facility 10, the first heat pump device 20a1, the second heat pump device 20a2, ..., the (n-1)-th heat pump device 20a(n-1), the n-th heat pump device 20an, the control device 30, and the water piping 40, as shown in Fig. 6 , similar to the heat pump system 1 according to the first embodiment.
  • the facility 10 in this embodiment is provided with a temperature sensor 101, a temperature sensor 102, a temperature difference calculation unit 103, and a temperature difference transmitter 104, in addition to the facility 10 in the first embodiment.
  • the temperature sensor 101 is installed at an input portion of the water piping 40 from the n-th heat pump device 20an and detects the temperature of the water in the water piping 40.
  • the temperature sensor 102 is installed at an output portion of the water piping 40 to the first heat pump device 20a1 and detects the temperature of the water in the water piping 40.
  • the temperature difference calculation unit 103 calculates the decrease temperature ⁇ T of the water in the facility 10 by subtracting the temperature of the water detected by the temperature sensor 102 from the temperature detected by the temperature sensor 101.
  • the temperature difference transmitter 104 transmits the decrease temperature ⁇ T of the water in the facility 10 calculated by the temperature difference calculation unit 103 to the control device 30.
  • Each of the communication unit 301, the communication control unit 303, the temperature variation control unit 304, the variation amount allocation determining unit 305, the variation amount reading unit 306, and the variation amount allocation setting unit 307 provided in the control device 30 performs processing in real time by using the decrease temperature ⁇ T of the water in the facility 10, which is transmitted in real time by the temperature difference transmitter 104 through the communication unit 301, instead of the water temperature ⁇ T lowered by the facility 10, shown in the data table TBL1 stored in the storage unit 302.
  • Others are the same as those in the control device 30 according to the first embodiment, and the processing flow of the control device 30 according to this embodiment is also the same as the processing flow of the control device 30 according to the first embodiment.
  • the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ⁇ T of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amount of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • the temperature sensor 101 is installed at the input portion of the water piping 40 from the n-th heat pump device 20an and detects the temperature of the water in the water piping 40.
  • the temperature sensor 102 is installed at the output portion of the water piping 40 to the first heat pump device 20a1 and detects the temperature of the water in the water piping 40.
  • the temperature difference calculation unit 103 calculates the variation amount ⁇ T (the decrease temperature ⁇ T of the water) in the facility 10 by subtracting the temperature of the water detected by the temperature sensor 102 from the temperature detected by the temperature sensor 101.
  • the temperature difference transmitter 104 transmits the variation amount ⁇ T in the facility 10 calculated by the temperature difference calculation unit 103 to the control device 30.
  • Each of the communication unit 301, the communication control unit 303, the temperature variation control unit 304, the variation amount allocation determining unit 305, the variation amount reading unit 306, and the variation amount allocation setting unit 307 provided in the control device 30 performs processing in real time by using the variation amount ⁇ T in the facility 10, which is transmitted in real time by the temperature difference transmitter 104 through the communication unit 301, instead of the variation amount ⁇ T in the facility 10, shown in the data table TBL1 stored in the storage unit 302.
  • the heat pump system 1 is provided with the facility 10, the first heat pump device 20a1, the second heat pump device 20a2, ..., the (n-1)-th heat pump device 20a(n-1), the n-th heat pump device 20an, the control device 30, and the water piping 40, as shown in Fig. 1 , similar to the heat pump system 1 according to the first embodiment.
  • control device 30 according to this embodiment is provided with an outside air temperature measuring unit 308 in addition to the control device 30 according to the first embodiment, as shown in Fig. 7 .
  • the outside air temperature measuring unit 308 detects the outside air temperature of the heat pump device 20 provided with the outside air temperature measuring unit 308.
  • the variation amount allocation determining unit 305 provided in the control device 30 acquires the outside air temperature detected by the outside air temperature measuring unit 308 provided in each of the heat pump devices 20. Then, the variation amount allocation determining unit 305 corrects the influence of the acquired outside air temperature on a temperature change of the water in each of the heat pump devices 20 and determines the allocation of the variation amount of each of the heat pump devices 20. Others are the same as those in the control device 30 according to the first embodiment, and the processing flow of the control device 30 according to this embodiment is also the same as the processing flow of the control device 30 according to the first embodiment.
  • the temperature variation control unit 304 generates a control command for varying the temperature of water on the basis of the variation amount ⁇ T of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ⁇ T of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20.
  • the variation amount allocation determining unit 305 determines the allocation of the variation amount of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • control device 30 is provided with the outside air temperature measuring unit 308 in addition to the control device 30 according to the first embodiment.
  • the outside air temperature measuring unit 308 detects the outside air temperature of the heat pump device 20 provided with the outside air temperature measuring unit 308.
  • the variation amount allocation determining unit 305 provided in the control device 30 acquires the outside air temperature detected by the outside air temperature measuring unit 308 provided in each of the heat pump devices 20. Then, the variation amount allocation determining unit 305 corrects the influence of the acquired outside air temperature on a temperature change of the water in each of the heat pump devices 20 and determines the allocation of the variation amount of each of the heat pump devices 20.
  • the storage unit 302 in the embodiments of the present invention may be provided anywhere within a range where appropriate transmission and reception of information are performed. Further, a plurality of storage units 302 may be present in a range where appropriate transmission and reception of information are performed, and store data in a dispersed manner.
  • the order of processing may be changed within a range where appropriate processing is performed.
  • each of the speed control units 104 and 104a, the automatic train operation devices 102, 102a, and 102b, and the ATP device 20 described above has a computer system inside thereof.
  • the process of the processing described above is stored in a computer readable recording medium in the form of a program, and a computer reads and executes the program, whereby the above processing is performed.
  • the computer readable recording medium refers to a magnetic disk, a magnetooptical disc, a CD-ROM, a DVD-ROM, a semiconductor memory, or the like.
  • a configuration may be made such that the computer program is delivered to a computer through a communication line and the computer which has received the delivery executes the program.
  • the computer program may be a so-called differential file (differential program) which is a file capable of realizing the above-described functions by a combination with a program already recorded in a computer system.
  • differential file differential program
  • control device the control method and the computer program described above, it is possible to use inexpensive parts in the heat exchanger of the heat pump device located furthest downstream, among the plurality of heat pump devices connected in series in the heat pump system, and it is possible to perform downsizing of the heat pump system and a reduction in the manufacturing cost of the heat pump system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Air Conditioning Control Device (AREA)
  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Other Air-Conditioning Systems (AREA)

Description

    Technical Field
  • The present invention relates to a control device, a control method, and a computer program.
  • Background Art
  • There is a heat pump system in which each of a plurality of heat pump devices heats water circulating through water piping.
  • The related art is disclosed in PTL 1. The device disclosed in PTL 1 attempts to attain efficient operation and improvement in reliability in the heat pump system in which each of the plurality of heat pump devices heats water circulating through water piping.
  • Citation List Patent Literature
    • [PTL 1] Japanese Unexamined Patent Application Publication No. 2013-113556 A discloses a control device according to the preamble of claim 1, a control method according to the preamble of claim 4, and a computer program according to the preamble of claim 5.
    • [PTL 2] Japanese patent application JP 2014 070741 A relates to a heat source system and control method thereof. JP 2014 070741 A discloses a control device according to the preamble of claim 1, a control method according to the preamble of claim 4, and a computer program according to the preamble of claim 5.
    Summary of Invention Technical Problem
  • In a heat pump system in which each of a plurality of heat pump devices connected in series heats circulating water, the circulating water becomes higher in pressure at a high temperature as the heat pump device in the heat pump system is located further downstream in a water circulation path. Each of the heat pump devices needs to raise the temperature of water by performing heat exchange while the water passes through the inside of the device itself. In a case of reducing the manufacturing cost of the heat pump device which is used in this manner, in general, downsizing is considered in order to reduce a material cost. However, in a case where the heat pump device is downsized, the capacity (volume) of a heat exchanger through which a refrigerant passes is reduced. For this reason, the pressure of the refrigerant in the heat exchanger becomes higher as the heat pump device is located further downstream in the water circulation path and as the heat pump device becomes smaller.
  • As a result, in the heat exchanger of the heat pump device which is located furthest downstream, among the plurality of heat pump devices connected in series, expensive parts which can withstand the high pressure of the refrigerant are used, and thus it is difficult to reduce the manufacturing cost of the heat pump system.
  • The present invention has an object to provide a control device, a control method, and a computer program which can solve the above problem.
  • Solution to Problem
  • According to a first aspect of the present invention, there is provided a control device according to claim 1.
  • According to a second aspect of the present invention, in the control device according to the first aspect, the variation amount allocation determining unit may determine a variation amount allocated to the plurality of heat pump devices other than the most downstream heat pump device such that a variation amount allocated to the most downstream heat pump device at a timing when the temperature of the water at the output of the most downstream heat pump device exceeds a second set temperature is smaller than the variation amount at the normal time, in a case where the target temperature of the water at the output of the most downstream heat pump device exceeds the first set temperature.
  • According to a third aspect of the present invention, the control device according to the first or second aspects may further include: a variation amount allocation setting unit that sets the allocated variation amounts which are allocated to the most downstream heat pump device and the plurality of heat pump devices other than the most downstream heat pump device, on the basis of the allocated variation amount determined by the variation amount allocation determining unit.
  • According to a fourth aspect of the present invention, there is provided a control method according to claim 4.
  • According to a fifth aspect of the present invention, there is provided a computer program according to claim 5.
  • Advantageous Effects of Invention
  • According to the control device, the control method and the computer program described above, it is possible to use inexpensive parts in a heat exchanger of the heat pump device located furthest downstream, among a plurality of heat pump devices connected in series in a heat pump system, and it is possible to perform downsizing of the heat pump system and a reduction in the manufacturing cost of the heat pump system.
  • Brief Description of Drawings
    • Fig. 1 is a diagram showing the configuration of a heat pump system according to a first embodiment of the present invention.
    • Fig. 2 is a diagram showing the configuration of a heat pump device according to the first embodiment of the present invention.
    • Fig. 3 is a diagram showing the configuration of a control device according to the first embodiment of the present invention.
    • Fig. 4 is a diagram showing a data table which is stored in a storage unit according to the first embodiment of the present invention.
    • Fig. 5 is a diagram showing a processing flow of the control device according to the first embodiment of the present invention.
    • Fig. 6 is a diagram showing the configuration of a heat pump system according to a second embodiment of the present invention.
    • Fig. 7 is a diagram showing the configuration of a control device according to a third embodiment of the present invention.
    Description of Embodiments <First Embodiment>
  • Hereinafter, embodiments will be described in detail with reference to the drawings.
  • The configuration of a heat pump system which is provided with a control device according to a first embodiment of the present invention will be described.
  • A heat pump system 1 according to the first embodiment of the present invention is provided with a facility 10, a first heat pump device 20a1, a second heat pump device 20a2, ..., a (n-1)-th heat pump device 20a(n-1), an n-th heat pump device 20an, a control device 30, and water piping 40, as shown in Fig. 1.
  • The facility 10 changes the temperature of water by ΔT. For example, the facility 10 is an office, a factory, or the like, and in the facility 10, the temperature of water is changed by ΔT by using an air conditioner, boiler equipment, a freezer, or the like. In a case of lowering the temperature of water by ΔT, it means cooling of water. In a case of raising the temperature of water by ΔT, it means heating of water.
  • The facility 10 outputs, for example, water with the temperature lowered by ΔT to the first heat pump device 20a1 through the water piping 40. Further, water is input from the n-th heat pump device 20an to the facility 10 through the water piping 40. For example, the water heated to a water temperature which is required for the facility 10 is supplied from the n-th heat pump device 20an to the facility 10 through the water piping 40.
  • The first heat pump device 20a1 heats the water input from the facility 10 by heat exchange. The first heat pump device 20a1 outputs the heated water to the second heat pump device 20a2 through the water piping 40.
  • The second heat pump device 20a2 heats the water input from the first heat pump device 20a1 by heat exchange. The second heat pump device 20a2 outputs the heated water to a third heat pump device 20a3 through the water piping 40.
  • Similarly, the third heat pump device 20a3 heats the water input from the second heat pump device 20a2 by heat exchange. The third heat pump device 20a3 outputs the heated water to a fourth heat pump device 20a4 through the water piping 40.
  • Similarly, the (n-1)-th heat pump device 20a(n-1) heats the water input from the (n-2)-th heat pump device 20a(n-2) by heat exchange. The (n-1)-th heat pump device 20a(n-1) outputs the heated water to the n-th heat pump device 20an through the water piping 40. The n-th heat pump device 20an is the most downstream heat pump device disposed furthest downstream in a water circulation path.
  • The n-th heat pump device 20an heats the water input from the (n-1)-th heat pump device 20a(n-1) by heat exchange. The n-th heat pump device 20an outputs the heated water to the facility 10 through the water piping 40. The first heat pump device 20a1, the second heat pump device 20a2, ..., the (n-1)-th heat pump device 20a(n-1), and the n-th heat pump device 20an are collectively referred to as a heat pump device 20.
  • In Fig. 1, an arrow in the water piping 40 indicates a flow direction of water in the water circulation path.
  • The control device 30 controls each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an. Specifically, the control device 30 determines a target outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), that is, allocation of a variation amount in each heat pump device, on the basis of a temperature decrease ΔT of water in the facility 10, equipment capacity indicating the capacity of varying a water temperature, of each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an, an input water temperature of the first heat pump device 20a1 disposed furthest upstream, and a target outlet water temperature of the n-th heat pump device 20an disposed furthest downstream. The allocation of the variation amount is an amount indicating the variation amount of a water temperature in which the variation amount ΔT of the water temperature in the facility 10 (in this case, the temperature decrease ΔT of water in the facility 10) is allocated to each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and is a variation amount which is shown by a difference between the target outlet water temperature and the inlet water temperature in each heat pump device. The control device 30 generates a control command for the allocation of the variation amount in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) on the basis of each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1). The control device 30 transmits the generated control command to the corresponding heat pump device 20.
  • In Fig. 1, a broken line indicates a communication path between each of the heat pump devices 20 and the control device 30. The control device 30 transmits and receives information to and from the facility 10 through the communication path. The control device 30 transmits a control signal for the target outlet water temperature or the like to the heat pump device 20 through this communication path. The communication path may be wired or wireless.
  • The configuration of the heat pump device 20 according to this embodiment will be described.
  • Each of the heat pump devices 20 is provided with a compressor 201, a four-way valve 202, a water heat exchanger 203, an expansion valve 204, an air heat exchanger 205, an accumulator 206, a refrigerant pipe 207, a first temperature sensor 208, and a second temperature sensor 209, as shown in Fig. 2. The compressor 201, the four-way valve 202, the water heat exchanger 203, the expansion valve 204, the air heat exchanger 205, and the accumulator 206 are connected by the refrigerant pipe 207 to configure a refrigerant circuit.
  • The compressor 201 is provided between the four-way valve 202 and the accumulator 206. In the compressor 201, a motor is driven by an inverter. In the compressor 201, the rotational speed of the motor, that is, the discharge amount of the refrigerant is adjusted by the output frequency of the inverter.
  • The water heat exchanger 203 performs heat exchange between the water in the water piping 40 through which water flows from the heat pump device 20 on the upstream side to the heat pump device 20 on the downstream side, and the refrigerant in the refrigerant pipe 207 between the four-way valve 202 and the expansion valve 204.
  • The expansion valve 204 is provided between the water heat exchanger 203 and the air heat exchanger 205. The expansion valve 204 converts a liquid refrigerant having a pressure P, which is input at a certain temperature T, to a refrigerant having a pressure lower than the pressure P at a temperature lower than the temperature T.
  • The air heat exchanger 205 is provided between the four-way valve 202 and the expansion valve 204. The air heat exchanger 205 performs heat exchange between the outside air and the refrigerant.
  • The accumulator 206 is provided between the compressor 201 and the four-way valve 202. The accumulator 206 prevents the refrigerant that has not been completely gasified in an evaporator (the water heat exchanger 203 or the air heat exchanger 205) from being drawn into the compressor 201 in a liquid state.
  • The first temperature sensor 208 is provided at the inlet of the water piping 40 in the water heat exchanger 203 through which water flows from the heat pump device 20 on the upstream side (in the case of the first heat pump device 20a1, from the facility 10). The water temperature detected by the first temperature sensor 208 is transmitted to the control device 30 as the actually measured value of the inlet water temperature in the water piping 40.
  • The second temperature sensor 209 is provided at the outlet of the water piping 40 in the water heat exchanger 203 through which water flows to the heat pump device 20 on the downstream side (in the case of the n-th heat pump device 20an, to the facility 10). The water temperature detected by the second temperature sensor 209 is transmitted to the control device 30 as the actually measured value of the output water temperature in the water piping 40.
  • In the heat pump device 20, a heating operation and a cooling (or defrosting) operation are switched by switching the four-way valve 202 to change the flow direction of the refrigerant. At the time of the heating operation, the refrigerant discharged from the compressor 201 flows through the water heat exchanger 203, the expansion valve 204, the air heat exchanger 205, and the accumulator 206 in this order. The water heat exchanger 203 acts as a condenser and the air heat exchanger 205 acts as an evaporator. Then, the water heated in the water heat exchanger 203 is output to the next heat pump device 20 on the downstream side in the water circulation path or the facility 10 through the water piping 40.
  • The configuration of the control device 30 according to this embodiment will be described.
  • The control device 30 is provided with a communication unit 301, a storage unit 302, a communication control unit 303, a temperature variation control unit 304, a variation amount allocation determining unit 305, a variation amount reading unit 306, and a variation amount allocation setting unit 307, as shown in Fig. 3.
  • The communication unit 301 transmits and receives information necessary for the control device 30 to control each of the heat pump devices 20 to and from each of the heat pump devices 20. For example, the communication unit 301 receives the actually measured value of the inlet water temperature detected by the first temperature sensor 208 in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and the actually measured values of the outlet water temperature detected by the second temperature sensor 209 in each heat pump device. Further, the communication unit 301 transmits the control command to each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1).
  • The storage unit 302 stores various kinds of information necessary for the processing to be performed by the control device 30. For example, a data table TBL1 showing the variation amount of the water temperature to be varied in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an is stored in the storage unit 302 in advance. The variation amount of the water temperature to be varied in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an is, for example, the variation amount ΔT of the water temperature to be cooled in the facility 10.
  • The communication control unit 303 controls communication which is performed by the control device 30 through the communication unit 301. Even in a case where the fact that the communication control unit 303 controls the communication which is performed through the communication unit 301 of the control device 30 is not specifically described in the following description, the communication control unit 303 controls the communication which is performed by the control device 30 through the communication unit 301.
  • The temperature variation control unit 304 determines the target outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the input water temperature of the first heat pump device 20a1 disposed furthest upstream, and the target outlet water temperature of the n-th heat pump device 20an disposed furthest downstream. The temperature variation control unit 304 generate a control command for each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ΔT of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1). The control device 30 transmits the generated control command to the corresponding heat pump device 20 and controls the heat pump device 20. The temperature variation control unit 304 generates a control command for varying the temperature of water on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ΔT of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1) and performs control. Specifically, temperature variation control unit 304 generates a control command for varying the temperature of the water by the allocation of the variation amount which is set to each of the heat pump devices 20 by the variation amount allocation setting unit 307, and controls each of the heat pump devices 20.
  • The variation amount allocation determining unit 305 determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • For example, the variation amount allocation determining unit 305 equally divides the variation amount read from the storage unit 302 by the variation amount reading unit 306 by the number n of the heat pump devices 20, at the normal time, and determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, at a predetermined timing.
  • Specifically, for example, in a case where the target temperature of water at the output of the n-th heat pump device 20an exceeds a first set temperature and each of the heat pump devices 20 heats the water and outputs the increased pressure, the variation amount allocation determining unit 305 determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, at the predetermined timing. Further, for example, in a case where the target temperature of water at the output of the n-th heat pump device 20an exceeds the first set temperature and each of the heat pump devices 20 heats the water and outputs the increased pressure, the variation amount allocation determining unit 305 may determine the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, at a timing when the actually measured value of the temperature of water at the output of the n-th heat pump device 20an exceeds a second set temperature.
  • The variation amount reading unit 306 reads the variation amount for varying the temperature of water in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an, from the storage unit 302. For example, the variation amount reading unit 306 reads the data table TBL1 from the storage unit 302.
  • The variation amount allocation setting unit 307 sets the allocation of the variation amounts to be allocated to the n-th heat pump device 20an and the heat pump devices 20 other than the n-th heat pump device 20an on the basis of the allocation of the variation amount determined by the variation amount allocation determining unit 305.
  • Next, the data table TBL1 which is stored in the storage unit 302 according to this embodiment will be described.
  • The data table TBL1 shows the variation amount ΔT for varying the temperature of water in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an. For example, the data table TBL1 shows the correspondence relationship between the respective facilities (the facility 10, a facility 300, ...) and the variation amount ΔT of the temperature of water in each facility, as shown in Fig. 4.
  • Next, the processing in the heat pump system 1 according to this embodiment will be described.
  • Here, a processing flow of Fig. 5 showing the processing of the control device 30 which heats water by controlling each of the heat pump devices 20 in a case where in the heat pump system 1 according to this embodiment, the facility 10 cools water and the temperature of the water is lowered by ΔT will be described. It is known in advance that the facility 10 cools water which is input from the n-th heat pump device 20an through the water piping 40 and lowers the temperature of the water by ΔT, and the storage unit 302 stores the variation amount ΔT in the data table TBL1. Here, the variation amount ΔT recorded in the data table TBL1 of the storage unit 302 by the facility 10 is the variation amount for varying the temperature of water in all of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an.
  • The variation amount reading unit 306 reads the variation amount ΔT corresponding to the facility 10 from the data table TBL1 of the storage unit 302 (step S1). For example, in the case of the data table TBL1 shown in Fig. 4, the variation amount reading unit 306 searches the facility 10 in order from the top of the facilities in the data table TBL1 to specify it and specifies and reads a variation amount ΔT1 corresponding to the specified facility 10 as the variation amount ΔT of the facility 10.
  • The variation amount reading unit 306 outputs the read variation amount ΔT to the variation amount allocation determining unit 305.
  • If the variation amount ΔT is input from the variation amount reading unit 306, the variation amount allocation determining unit 305 determines the allocation of the variation amount of each of the heat pump devices 20 at the normal time on the basis of the input variation amount ΔT, the equipment capacity of each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the n-th heat pump device 20an, the input water temperature of the first heat pump device 20a1 disposed furthest upstream, and the target outlet water temperature of the n-th heat pump device 20an disposed furthest downstream (step S2). For example, the variation amount allocation determining unit 305 determines, at the normal time, allocation ΔT÷n of the variation amount obtained by equally dividing the variation amount ΔT by the number n of the heat pump devices 20 as the allocation of the variation amount of each of the heat pump devices 20.
  • The variation amount allocation determining unit 305 outputs the allocation of the variation amount of each of the heat pump devices 20 determined at the normal time to the variation amount allocation setting unit 307.
  • If the allocation of the variation amount of each of the heat pump devices 20 at the normal time is input from the variation amount allocation determining unit 305, the variation amount allocation setting unit 307 sets the input allocation of the variation amount of each of the heat pump devices 20 to each of the heat pump devices 20 (step S3). For example, in a case where the variation amount allocation determining unit 305 determines the allocation of the variation amount of each of the heat pump devices 20 to be ΔT÷n, the variation amount allocation setting unit 307 sets the allocation of the variation amount of each of the heat pump devices 20 at the normal time to be ΔT÷n.
  • If the variation amount allocation setting unit 307 sets the allocation of the variation amount of each of the heat pump devices 20 at the normal time, the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ΔT of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20 (step S4).
  • If the temperature variation control unit 304 generates a control command for varying the temperature of water and controls each of the heat pump devices 20 at the normal time, each of the heat pump devices 20 outputs water heated and having increased pressure to the heat pump device 20 on the downstream side in the water circulation path or the facility 10.
  • The variation amount allocation determining unit 305 determines whether or not the predetermined timing has been reached when each of the heat pump devices 20 heats water and outputs the increased pressure at the normal time (step S5). Specifically, for example, the variation amount allocation determining unit 305 determines whether or not a timing at which the target temperature of water at the output of the n-th heat pump device 20an exceeds the first set temperature and the actually measured value of the temperature of water at the output of the n-th heat pump device 20an exceeds the second set temperature has been reached. More specifically, for example, the variation amount allocation determining unit 305 determines whether or not a timing at which the target temperature of water at the output of the n-th heat pump device 20an exceeds the first set temperature, 55 degrees, (for example, the target temperature of water is 60 degrees) and the actually measured value of the temperature of water at the output of the n-th heat pump device 20an exceeds the second set temperature, 50 degrees, has been reached.
  • At the normal time, in a case where it is determined that the predetermined timing has not been reached (NO in step S5), the variation amount allocation determining unit 305 returns to the processing of step S5.
  • Further, at the normal time, in a case where it is determined that the predetermined timing has been reached when each of the heat pump devices 20 heats water and outputs the increased pressure (YES in step S5), at the determination timing (the predetermined timing), the variation amount allocation determining unit 305 determines the allocation of the variation amounts of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time (step S6). For example, in a case where the variation amount allocation determining unit 305 has determined the allocation of the variation amount of each of the heat pump devices 20 at the normal time to be ΔT÷n, at the predetermined timing, the variation amount allocation determining unit 305 determines the allocation of the variation amount of the n-th heat pump device 20an to be lower than ΔT÷n and performs a determination such that the allocation of the variation amounts of one or more heat pump devices 20 other than the n-th heat pump device 20an is increased by an amount corresponding to the decrease in the allocation of the variation amount of the n-th heat pump device 20an. More specifically, the variation amount allocation determining unit 305 determines the allocation of the variation amount which is lower than the allocation of the variation amount of the n-th heat pump device 20an at the normal time and can be easily realized per unit time even in the high-temperature and high-pressure state in the n-th heat pump device 20an.
  • The variation amount allocation determining unit 305 outputs the determined allocation of the variation amount of each of the heat pump device 20 to the variation amount allocation setting unit 307.
  • If the allocation of the variation amount of each of the heat pump devices 20 determined at the predetermined timing is input from the variation amount allocation determining unit 305, the variation amount allocation setting unit 307 sets the input allocation of the variation amount of each of the heat pump devices 20 to each of the heat pump devices 20 (step S7).
  • If the variation amount allocation setting unit 307 sets the allocation of the variation amount of each of the heat pump devices 20 determined at the predetermined timing, the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ΔT of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20 (step S8).
  • The number n of the heat pump devices 20 may be any number as long as it is two or more.
  • The processing of the control device 30 according to the first embodiment of the present invention has been described above. According to the processing of the control device 30 of this embodiment, the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ΔT of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20. The variation amount allocation determining unit 305 determines the allocation of the variation amount of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • In this way, it is possible to use inexpensive parts in the heat exchanger of the heat pump device located furthest downstream, among the plurality of heat pump devices connected in series in the heat pump system, and it is possible to perform downsizing of the heat pump system and a reduction in the manufacturing cost of the heat pump system.
  • <Second Embodiment>
  • The configuration of a heat pump system which is provided with a control device according to a second embodiment of the present invention will be described.
  • The heat pump system 1 according to this embodiment is provided with the facility 10, the first heat pump device 20a1, the second heat pump device 20a2, ..., the (n-1)-th heat pump device 20a(n-1), the n-th heat pump device 20an, the control device 30, and the water piping 40, as shown in Fig. 6, similar to the heat pump system 1 according to the first embodiment.
  • However, the facility 10 in this embodiment is provided with a temperature sensor 101, a temperature sensor 102, a temperature difference calculation unit 103, and a temperature difference transmitter 104, in addition to the facility 10 in the first embodiment.
  • The temperature sensor 101 is installed at an input portion of the water piping 40 from the n-th heat pump device 20an and detects the temperature of the water in the water piping 40.
  • The temperature sensor 102 is installed at an output portion of the water piping 40 to the first heat pump device 20a1 and detects the temperature of the water in the water piping 40.
  • The temperature difference calculation unit 103 calculates the decrease temperature ΔT of the water in the facility 10 by subtracting the temperature of the water detected by the temperature sensor 102 from the temperature detected by the temperature sensor 101.
  • The temperature difference transmitter 104 transmits the decrease temperature ΔT of the water in the facility 10 calculated by the temperature difference calculation unit 103 to the control device 30.
  • Each of the communication unit 301, the communication control unit 303, the temperature variation control unit 304, the variation amount allocation determining unit 305, the variation amount reading unit 306, and the variation amount allocation setting unit 307 provided in the control device 30 performs processing in real time by using the decrease temperature ΔT of the water in the facility 10, which is transmitted in real time by the temperature difference transmitter 104 through the communication unit 301, instead of the water temperature ΔT lowered by the facility 10, shown in the data table TBL1 stored in the storage unit 302. Others are the same as those in the control device 30 according to the first embodiment, and the processing flow of the control device 30 according to this embodiment is also the same as the processing flow of the control device 30 according to the first embodiment.
  • The processing of the control device 30 according to the second embodiment of the present invention has been described above. According to the processing of the control device 30 of this embodiment, the temperature variation control unit 304 generates a control command for varying the temperature of water, on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ΔT of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20. The variation amount allocation determining unit 305 determines the allocation of the variation amount of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • In this way, it is possible to use inexpensive parts in the heat exchanger of the heat pump device located furthest downstream, among the plurality of heat pump devices connected in series in the heat pump system, and it is possible to perform downsizing of the heat pump system and a reduction in the manufacturing cost of the heat pump system.
  • Further, the temperature sensor 101 is installed at the input portion of the water piping 40 from the n-th heat pump device 20an and detects the temperature of the water in the water piping 40. The temperature sensor 102 is installed at the output portion of the water piping 40 to the first heat pump device 20a1 and detects the temperature of the water in the water piping 40.
  • The temperature difference calculation unit 103 calculates the variation amount ΔT (the decrease temperature ΔT of the water) in the facility 10 by subtracting the temperature of the water detected by the temperature sensor 102 from the temperature detected by the temperature sensor 101. The temperature difference transmitter 104 transmits the variation amount ΔT in the facility 10 calculated by the temperature difference calculation unit 103 to the control device 30. Each of the communication unit 301, the communication control unit 303, the temperature variation control unit 304, the variation amount allocation determining unit 305, the variation amount reading unit 306, and the variation amount allocation setting unit 307 provided in the control device 30 performs processing in real time by using the variation amount ΔT in the facility 10, which is transmitted in real time by the temperature difference transmitter 104 through the communication unit 301, instead of the variation amount ΔT in the facility 10, shown in the data table TBL1 stored in the storage unit 302.
  • In this way, it is possible to more accurately determine the allocation of the variation amount.
  • <Third Embodiment>
  • The configuration of a heat pump system which is provided with a control device according to a third embodiment of the present invention will be described.
  • The heat pump system 1 according to this embodiment is provided with the facility 10, the first heat pump device 20a1, the second heat pump device 20a2, ..., the (n-1)-th heat pump device 20a(n-1), the n-th heat pump device 20an, the control device 30, and the water piping 40, as shown in Fig. 1, similar to the heat pump system 1 according to the first embodiment.
  • However, the control device 30 according to this embodiment is provided with an outside air temperature measuring unit 308 in addition to the control device 30 according to the first embodiment, as shown in Fig. 7.
  • The outside air temperature measuring unit 308 detects the outside air temperature of the heat pump device 20 provided with the outside air temperature measuring unit 308.
  • The variation amount allocation determining unit 305 provided in the control device 30 acquires the outside air temperature detected by the outside air temperature measuring unit 308 provided in each of the heat pump devices 20. Then, the variation amount allocation determining unit 305 corrects the influence of the acquired outside air temperature on a temperature change of the water in each of the heat pump devices 20 and determines the allocation of the variation amount of each of the heat pump devices 20. Others are the same as those in the control device 30 according to the first embodiment, and the processing flow of the control device 30 according to this embodiment is also the same as the processing flow of the control device 30 according to the first embodiment.
  • The processing of the control device 30 according to the third embodiment of the present invention has been described above. According to the processing of the control device 30 of this embodiment, the temperature variation control unit 304 generates a control command for varying the temperature of water on the basis of the variation amount ΔT of the water temperature in the facility 10, the equipment capacity of each of the heat pump devices 20, the variation amount ΔT of the water temperature in the facility 10, and each of the target outlet water temperature, the actually measured value of the inlet water temperature, and the actually measured value of the outlet water temperature in each of the first heat pump device 20a1, the second heat pump device 20a2, ..., and the (n-1)-th heat pump device 20a(n-1), and controls each of the heat pump devices 20. The variation amount allocation determining unit 305 determines the allocation of the variation amount of the heat pump devices 20 other than the n-th heat pump device 20an such that the variation amount allocated to the n-th heat pump device 20an is smaller than the variation amount allocated at the normal time, with respect to the allocation of the variation amounts of the n-th heat pump device 20an disposed furthest downstream in the water circulation path, among the heat pump devices 20, and each of the heat pump devices 20 other than the n-th heat pump device 20an.
  • In this way, it is possible to use inexpensive parts in the heat exchanger of the heat pump device located furthest downstream, among the plurality of heat pump devices connected in series in the heat pump system, and it is possible to perform downsizing of the heat pump system and a reduction in the manufacturing cost of the heat pump system.
  • Further, the control device 30 is provided with the outside air temperature measuring unit 308 in addition to the control device 30 according to the first embodiment. The outside air temperature measuring unit 308 detects the outside air temperature of the heat pump device 20 provided with the outside air temperature measuring unit 308. The variation amount allocation determining unit 305 provided in the control device 30 acquires the outside air temperature detected by the outside air temperature measuring unit 308 provided in each of the heat pump devices 20. Then, the variation amount allocation determining unit 305 corrects the influence of the acquired outside air temperature on a temperature change of the water in each of the heat pump devices 20 and determines the allocation of the variation amount of each of the heat pump devices 20.
  • In this way, it is possible to more accurately determine the allocation of the variation amount.
  • The storage unit 302 in the embodiments of the present invention may be provided anywhere within a range where appropriate transmission and reception of information are performed. Further, a plurality of storage units 302 may be present in a range where appropriate transmission and reception of information are performed, and store data in a dispersed manner.
  • In the processing flows in the embodiments of the present invention, the order of processing may be changed within a range where appropriate processing is performed.
  • The embodiments of the present invention have been described. However, each of the speed control units 104 and 104a, the automatic train operation devices 102, 102a, and 102b, and the ATP device 20 described above has a computer system inside thereof. Further, the process of the processing described above is stored in a computer readable recording medium in the form of a program, and a computer reads and executes the program, whereby the above processing is performed. Here, the computer readable recording medium refers to a magnetic disk, a magnetooptical disc, a CD-ROM, a DVD-ROM, a semiconductor memory, or the like. Further, a configuration may be made such that the computer program is delivered to a computer through a communication line and the computer which has received the delivery executes the program.
  • Further, the computer program may be a so-called differential file (differential program) which is a file capable of realizing the above-described functions by a combination with a program already recorded in a computer system.
  • Several embodiments of the present invention have been described. However, these embodiments are examples and do not limit the scope of the invention. In these embodiments, various omissions, substitutions, or changes may be made within a scope of the claims.
  • Industrial Applicability
  • According to the control device, the control method and the computer program described above, it is possible to use inexpensive parts in the heat exchanger of the heat pump device located furthest downstream, among the plurality of heat pump devices connected in series in the heat pump system, and it is possible to perform downsizing of the heat pump system and a reduction in the manufacturing cost of the heat pump system.
  • Reference Signs List
    • 1: heat pump system
    • 10: facility
    • 20: heat pump device
    • 20a1: first heat pump device
    • 20a2: second heat pump device
    • 20a(n-1): (n-1)-th heat pump device
    • 20an: n-th heat pump device
    • 30: control device
    • 40: water piping
    • 102, 208: temperature sensor
    • 103: temperature difference calculation unit
    • 104: temperature difference transmitter
    • 201: compressor
    • 202: four-way valve
    • 203: water heat exchanger
    • 204: expansion valve
    • 205: air heat exchanger
    • 206: accumulator
    • 207: refrigerant pipe
    • 301: communication unit
    • 302: storage unit
    • 303: communication control unit
    • 304: temperature variation control unit
    • 305: variation amount allocation determining unit
    • 306: variation amount reading unit
    • 307: variation amount allocation setting unit
    • 308: outside air temperature measuring unit

Claims (5)

  1. A control device (30) for controlling a plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1), 20an) which are disposed in order in a circulation path to vary a temperature of circulating water, and which include a most downstream heat pump device (20an) disposed furthest downstream in the circulation path, the control device (30) comprising:
    a temperature variation control unit (304) for performing control for varying the temperature of the water, on the basis of a variation amount of a water temperature in a facility (10), equipment capacity of each of the heat pump devices, a target outlet water temperature in each of the heat pump devices, an actually measured value of an inlet water temperature of each of the heat pump devices, and an actually measured value of an outlet water temperature of each of the heat pump devices;
    a variation amount reading unit (306) for reading the variation amount which varies the temperature of the water in all of the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1), 20an) from a storage unit (302);
    a variation amount allocation determining unit (305) for equally dividing the variation amount read from the storage unit (302) by the variation amount reading unit by the number of the plurality of heat pump devices, at the normal time, and determines a variation amount of water temperature to be allocated to the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device (20an) such that the variation amount to be allocated to the most downstream heat pump device (20an) is smaller than the variation amount at the normal time, at a predetermined timing; and
    characterized in that the variation amount allocation determining unit is configured to determine the variation amount to be allocated to the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device (20an) such that the variation amount to be allocated to the most downstream heat pump device (20an) at a predetermined timing is smaller than the variation amount at the normal time when the variation amount allocation determining unit determines that a target temperature of the water at output of the most downstream heat pump device exceeds a first set temperature.
  2. The control device (30) according to claim 1, wherein the variation amount allocation determining unit (305) is configured to determine the variation amount to be allocated to the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device (20an) such that the variation amount to be allocated to the most downstream heat pump device (20an) at a timing when the temperature of the water at the output of the most downstream heat pump device exceeds a second set temperature is smaller than the variation amount at the normal time, in a case where the target temperature of the water at the output of the most downstream heat pump device exceeds the first set temperature.
  3. The control device according to claims 1 or 2, further comprising:
    a variation amount allocation setting unit (307) for setting the allocated variation amounts which are allocated to the most downstream heat pump device (20an) and the plurality of heat pump devices(20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device, on the basis of the allocated variation amount determined by the variation amount allocation determining unit (305).
  4. A control method of a control device (30) that controls a plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1), 20an) which are disposed in order in a circulation path to vary a temperature of circulating water, and which include a most downstream heat pump device (20an) disposed furthest downstream in the circulation path, the control method comprising the steps of:
    performing control for varying the temperature of the water, on the basis of a variation amount of a water temperature in a facility (10), equipment capacity of each of the heat pump devices, a target outlet water temperature in each of the heat pump devices, an actually measured value of an inlet water temperature of each of the heat pump devices, and an actually measured value of an outlet water temperature of each of the heat pump devices;
    characterized in that the control method comprises the steps of:
    reading, from a storage unit (302), the variation amount by which the temperature of the water in the plurality of heat pump devices is varied;
    equally dividing the variation amount by the number of the plurality of heat pump devices, at the normal time;
    determining the variation amount to be allocated to the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device (20an) such that the variation amount to be allocated to the most downstream heat pump device (20an) is smaller than the variation amount at the normal time, at a predetermined timing; and
    determining the variation amount of water temperature to be allocated to the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device (20an) such that the variation amount to be allocated to the most downstream heat pump device (20an) at a predetermined timing is smaller than the variation amount at the normal time when it is determined that a target temperature of the water at output of the most downstream heat pump device exceeds a first set temperature.
  5. A computer program that causes a computer of a control device (30) that controls a plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1), 20an) which are disposed in order in a circulation path to vary a temperature of circulating water, and which include a most downstream heat pump device (20an) disposed furthest downstream in the circulation path, to execute control for:
    varying the temperature of the water, on the basis of a variation amount of a water temperature in a facility (10), equipment capacity of each of the heat pump devices, a target outlet water temperature in each of the heat pump devices, an actually measured value of an inlet water temperature of each of the heat pump devices, and an actually measured value of an outlet water temperature of each of the heat pump devices;
    characterized in that it causes said computer to execute control for:
    reading, from a storage unit (302), the variation amount by which the temperature of the water in the plurality of heat pump devices is varied;
    equally dividing the variation amount by the number of the plurality of heat pump devices, at the normal time;
    determining the variation amount to be allocated to the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device (20an) such that the variation amount to be allocated to the most downstream heat pump device (20an) is smaller than the variation amount at the normal time, at a predetermined timing; and
    determining the variation amount of water temperature to be allocated to the plurality of heat pump devices (20a1, 20a2, ..., 20a(n-1)) other than the most downstream heat pump device (20an) such that the variation amount to be allocated to the most downstream heat pump device (20an) at a predetermined timing is smaller than the variation amount at the normal time when it is determined that a target temperature of the water at output of the most downstream heat pump device exceeds a first set temperature.
EP16779897.4A 2015-04-14 2016-03-28 Control device, control method, and computer program Active EP3264009B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015082357A JP6592858B2 (en) 2015-04-14 2015-04-14 Control device, control method and program
PCT/JP2016/059821 WO2016167106A1 (en) 2015-04-14 2016-03-28 Control device, control method, and program

Publications (3)

Publication Number Publication Date
EP3264009A1 EP3264009A1 (en) 2018-01-03
EP3264009A4 EP3264009A4 (en) 2018-02-28
EP3264009B1 true EP3264009B1 (en) 2019-05-01

Family

ID=57127249

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16779897.4A Active EP3264009B1 (en) 2015-04-14 2016-03-28 Control device, control method, and computer program

Country Status (5)

Country Link
EP (1) EP3264009B1 (en)
JP (1) JP6592858B2 (en)
KR (1) KR101987571B1 (en)
CN (1) CN107429951A (en)
WO (1) WO2016167106A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7017406B2 (en) * 2017-12-27 2022-02-08 三菱重工サーマルシステムズ株式会社 Control device, refrigerator system, control method and program
CZ2022492A3 (en) * 2022-11-22 2023-11-15 KovalĂ­k Electrotechnics s.r.o. Connection of heat pumps and the method of controlling the heat pumps of this connection

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3981294A (en) * 1973-11-16 1976-09-21 The Boeing Company All glass composite building panels
JP3477533B2 (en) * 1993-04-26 2003-12-10 株式会社日立製作所 Cold water supply device
CN1226586C (en) * 2003-08-22 2005-11-09 烟台荏原空调设备有限公司 Method and device for controlling running number of connected low temperature water suppliers
JP2008134013A (en) * 2006-11-29 2008-06-12 Toyo Netsu Kogyo Kk Operation control method of cold source machine and cold source system using the same
JP2009168320A (en) * 2008-01-15 2009-07-30 Chugoku Electric Manufacture Co Ltd Heat pump type hot water supply system
JP5283589B2 (en) * 2009-08-31 2013-09-04 三菱電機株式会社 Refrigeration air conditioner
JP5558400B2 (en) * 2011-03-30 2014-07-23 三菱重工業株式会社 Heat source system and number control method for heat source system
JP5777929B2 (en) * 2011-04-22 2015-09-09 株式会社日立製作所 Operation control system for cold source equipment
JP2013002757A (en) * 2011-06-17 2013-01-07 Hitachi Plant Technologies Ltd Heat source system and control method of the same
JP5812829B2 (en) * 2011-11-30 2015-11-17 三菱重工業株式会社 Heat pump position confirmation method and heat pump system in heat pump system
CN104412046B (en) * 2012-06-25 2016-11-23 三菱电机株式会社 Hot water supply system
JP6066648B2 (en) * 2012-09-27 2017-01-25 三菱重工業株式会社 Heat source system and control method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP3264009A1 (en) 2018-01-03
JP6592858B2 (en) 2019-10-23
WO2016167106A1 (en) 2016-10-20
EP3264009A4 (en) 2018-02-28
JP2016200370A (en) 2016-12-01
KR20170125914A (en) 2017-11-15
KR101987571B1 (en) 2019-06-10
CN107429951A (en) 2017-12-01

Similar Documents

Publication Publication Date Title
EP3255352B1 (en) Method and system for optimizing a speed of at least one of a variable speed compressor and a variable speed circulation fan to improve latent capacity
JP5627620B2 (en) Air conditioner
JP6501878B2 (en) Air conditioner and operation control device
US20140374497A1 (en) Heat source system, control device thereof, and control method thereof
EP3228951B1 (en) Refrigeration cycle apparatus
US10976064B2 (en) Method of and system for detecting loss of refrigerant charge
EP3264009B1 (en) Control device, control method, and computer program
EP3236177B1 (en) Air-conditioning device
EP3255353B1 (en) Method and apparatus for optimizing latent capacity of a variable speed compressor system
CN104583684A (en) Air conditioner
JP2011127777A (en) Heat pump device and operation method of the same
JP6422590B2 (en) Heat source system
JP2017053572A (en) Air conditioner
JP7235460B2 (en) Control device, heat source system, method for calculating lower limit of cooling water inlet temperature, control method and program
JP6914451B2 (en) Air conditioner
CN108027189B (en) Freeze protection system and method for a chiller
JP6897736B2 (en) Refrigerator
US11125481B2 (en) Method and system for charge determination
JP7380114B2 (en) Abnormality sign detection device
KR20200071549A (en) Apparatus for controlling air conditioner and method for controlling compressor of air conditioner
JPS6217553A (en) Room temperature control device for air-conditioning device

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170929

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

A4 Supplementary search report drawn up and despatched

Effective date: 20180126

RIC1 Information provided on ipc code assigned before grant

Ipc: F25B 1/00 20060101AFI20180122BHEP

Ipc: F25B 49/02 20060101ALI20180122BHEP

Ipc: F25B 30/02 20060101ALI20180122BHEP

Ipc: F25B 13/00 20060101ALI20180122BHEP

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190103

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1127469

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190515

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016013347

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190501

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190901

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190801

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190801

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190802

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1127469

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016013347

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

26N No opposition filed

Effective date: 20200204

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20200317

Year of fee payment: 5

Ref country code: IT

Payment date: 20200221

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20200214

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200331

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200328

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200331

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20200328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200328

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602016013347

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211001

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210328

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190501