EP3222783A1 - Structure marine flottante à pieux à succion - Google Patents

Structure marine flottante à pieux à succion Download PDF

Info

Publication number
EP3222783A1
EP3222783A1 EP17162940.5A EP17162940A EP3222783A1 EP 3222783 A1 EP3222783 A1 EP 3222783A1 EP 17162940 A EP17162940 A EP 17162940A EP 3222783 A1 EP3222783 A1 EP 3222783A1
Authority
EP
European Patent Office
Prior art keywords
suction
suction pile
pile
plug
grout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP17162940.5A
Other languages
German (de)
English (en)
Other versions
EP3222783C0 (fr
EP3222783B1 (fr
Inventor
Mark Riemers
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SPT Equipment BV
Original Assignee
SPT Equipment BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SPT Equipment BV filed Critical SPT Equipment BV
Publication of EP3222783A1 publication Critical patent/EP3222783A1/fr
Application granted granted Critical
Publication of EP3222783C0 publication Critical patent/EP3222783C0/fr
Publication of EP3222783B1 publication Critical patent/EP3222783B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0078Suction piles, suction cans

Definitions

  • the invention relates to re-floating (also called recovering or retrieving or decommissioning) of a suction pile (hereafter also called "pile") and a marine structure provided with one or more suction piles as its foundation or part of it.
  • a suction pile hereafter also called "pile”
  • a marine structure provided with one or more suction piles as its foundation or part of it.
  • a suction pile is a thin walled steel sleeve or pipe or cylinder, which cylinder is closed at its longitudinal top end by a bulkhead or different sealing means and which cylinder is sealingly located on the subsea bottom with the open end opposite the bulkhead since this open end penetrates the subsea bottom due to the weight of the suction pile.
  • the cavity also called suction space
  • suction space delimited by the cylinder and the bulkhead is sealed by the subsea floor such that vacuum or suction can be generated by removing water from within the suction space such that a resulting force tends to force the suction pile deeper into the subsea floor.
  • the creation of the suction can be with the aid of a suction source, such as a pump, being on, or close to or at a distance from the suction pile and connected to the suction space.
  • the applied level of the suction can be e.g. at least substantially constant, smoothly increase or decrease or else pulsate, for which there are convenient means.
  • the suction pile can easily be removed by creating an overpressure within the suction space, e.g. by pumping in (sea) water.
  • a self installing marine structure e.g. platform applying suction piles is known from e.g. WO99/51821 (SIP1) or EP-A-1 101 872 (SIP2) of the present inventor.
  • WO 02/088.475 discloses a tower carrying a wind turbine at the top and suction piles as foundation.
  • US8025463 discloses an offshore foundation system having an assembly of spaced suction piles and a reaction base connecting the suction piles.
  • the closed suction pile top projects a distance above the bottom face of the reaction base such that, in use, a gap remains between the top of a soil plug inside the suction space and the closed suction pile top.
  • WO 03/099646 discloses a suction pile seabed anchor having within its suction space a seabed soil retainer embodied by a top down oriented cone with sharp angled apex.
  • N2011860 discloses a pre-installed load bearing surface at small distance below the top bulkhead.
  • EP1881113 discloses a straight tube extending downwards from the top bulkhead to inject water for dredging purposes.
  • suction piles One of the benefits of suction piles is that a marine structure can be designed to be self foundating or self installing by providing it with one or more suction piles. So the hoisting device and the plant for installing the foundation, e.g. hammering device, can be eliminated.
  • the structure is provided with one or more suction piles, removal after use is made easier in that by pressing out the suction pile, the anchoring of the structure to the underwater bottom can be removed.
  • each suction pile has one or more of: a diameter of at least 5 meters; a height of at least 5 meters; a wall thickness of at least 1 centimeter; the longitudinal axis of the suction pile and the relevant supporting leg (of the upper structure to be supported by the suction pile) are substantially in line or eccentric.
  • a gap can remain between the top of a soil plug inside the suction space and the closed suction pile top.
  • Such gap can be filled, e.g. with grout or cement concrete or a different, preferably form free, fill material (hereafter called "grout plug") which preferably cures or hardens or becomes rigid after it has entered the gap.
  • This grout plug inside the suction space obstructs the development of an overpressure within the suction space during decommissioning. In stead of "plug”, one could also name this rigid object "slab”.
  • this slab is provided after the suction pile is sunk to the water bottom and penetrated the water soil to its final depth, by pouring or casting the at that time flowable material of the slab into the fluid filled space between the top bulkhead and the top face of the soil plug within the suction pile.
  • the gap to be filled with the grout plug typically has a height between 10 or 20 or 30 and 50 or 100 or 150 centimeters.
  • the object of the invention is versatile. In an aspect removal of the foundation is facilitated.
  • the object is obtained by providing the grout plug (provided after the suction pile penetrated the seafloor to its end depth) such that it is fluid (i.e. gas and/or liquid) permeable such that a fluid flow from the bottom to the top, or vice versa, of the grout plug is allowed, such that a fluid from a fluid source (e.g. pump) above the grout plug can flow through the grout plug to below the grout plug and e.g. into the soil plug below it and/or a fluid from below the grout plug, e.g. from the soil plug below it, can flow through the grout plug to a fluid drain (e.g. pump) above it.
  • the grout plug is provided with one or more fluid channels.
  • the permeability or porosity can be provided prior to, during or after application of the grout plug.
  • Providing the fluid permeability is possible in different ways, e.g. by providing the grout plug more or less like a foam with open cells or pores distributed through its thickness such that the permeability is provided by the mutually connected cells or pores. In this manner the permeability of the grout plug is substantially equally distributed across its top and bottom surface.
  • a fluid channel is provided by a mechanical operation, e.g. drilling, through the rigid grout plug, preferably through its complete thickness such that the fluid channel debouches both at its top face and bottom face. This procedure is most likely adopted at the time when it is desired to decommission it, thus at the end of the service life of the suction pile. Subsequently, a pump is connected to the top end of this drilled fluid channel to pump a fluid from this pump through the fluid channel into the area below the grout plug to press out the suction pile.
  • a mechanical operation e.g. drilling
  • a fluid channel is provided by locating near the top bulkhead a downward extending tube like element (hereafter called "tube") within the suction space at such a location that at least a length part of it becomes embedded within the grout plug.
  • tube downward extending tube like element
  • the suction pile is provided with such tube before the suction pile sinks to the sea bottom, e.g. on shore where the pile is manufactured.
  • a pump is connected to the tube to pump fluid into the area below the grout plug to press out the pile.
  • the tube is provided, e.g. sealed to the top bulkhead and sufficient long to project below the top face of the soil plug, such that it is avoided that it becomes filled with grout coming from filling with grout of the cavity below the top bulkhead and the top face of the soil plug.
  • the tube preferably has one or more of: is eccentrically located relative to the longitudinal axis of the suction pile, e.g. at a distance of at least 50 centimeter or 1 meter; is located at a distance from the side wall of the suction pile, e.g. at a distance of at least 50 centimeter or 1 meter; is cantilevered mounted, e.g.
  • top bulkhead such that it is rigid mounted at its one end (proximal end) and unsupported along its length from the mounted proximal end to the opposite distal end located within the suction space below the top bulkhead; is straight along its complete length; extends parallel to the longitudinal axis of the suction pile; is of thin walled steel; has a wall thickness of at least 0.5 or 1 or 2 or 3 or 4 or 5 millimeters, preferably over at least 50 or 60 or 70 or 80 or 90 or 95% of its length; has a cross section that is constant for at least 80 or 90 or 95% of its length; terminates at least 0.5 or 1 or 1.5 meters above the bottom end of the suction pile; is designed to be pressed or driven or urged into the seafloor soil by lengthwise downward movement of the suction pile, preferably for at least 10 or 25 of 50 centimeters deep, e.g.
  • a connector e.g. quick connector, for temporary coupling with a suction and/or pressure pump, which connector is preferably outside the suction pile, e.g.
  • top bulkhead (such connector is preferably designed for coupling and uncoupling of the pump by a ROV); has a fixed length; is rigid; is associated with a valve to selectively prevent and allow fluid flow through it; has an extension terminating at a distance above the top bulkhead, e.g. carrying the connector.
  • the circumferential wall of the tube is at least along a part of its length, preferably close to the top bulkhead, e.g. the length part adjacent the bulkhead, perforated or fluid permeable such that sea water can pass the tube wall in said part, while grout preferably not.
  • the grout plug is provided by supplying grout to the gap. While the gap fills with grout, the tube stays free from grout since the grout can not pass the tube wall, thus the tube stays available for future use to refloat the pile.
  • the pressurized water supplied to the tube for pressing out the pile can not escape through the permeable part, and thus can be supplied to the soil plug below the grout plug. Passage of grout can e.g. be avoided by making the perforations small enough or by providing a small water flow from inside the tube through the permeable wall during grouting, or by providing a releasable sealing means, e.g. a sleeve sliding along the tube, to selectively seal and/or cover the permeable wall part, which sealing means is preferably provided with an actuating means, e.g. projection, e.g. flange, designed to become engaged with the soil plug, to generate the sliding movement between the released and covering position.
  • an actuating means e.g. projection, e.g. flange
  • the grout has a specific weight substantially higher then sea water such that during grouting the grout deposits on the top face of the soil plug and the grout plug develops from below while urging the water to escape through one or more vents in the top bulkhead. This continues until the growing grout plug has reached the top bulkhead and starts escaping though the same vents.
  • the tube can have a length sufficient to extend beyond the top and/or bottom face of the grout plug.
  • the tube terminates within the grout plug remote from the top and/or bottom face of the grout plug such that one or both of its ends is sealed by material of the grout plug, which seal is broken prior to pressing out the pile, e.g. by drilling or by pressurized fluid supplied by the pump.
  • the fluid channel preferably provides a flow cross section equal to a circular cross section having a diameter of at least 10 or 20 or 30 centimeters and/or a length at least 10 or 20 or 30 and/or at most 80 or 100 or 150 or 200 centimeters.
  • the fluid channel of the invention differs from tubes of the suction pile provided for different functions and extending downward from the top bulkhead.
  • grout injection pipes which are angled and project only a small distance from the top bulkhead.
  • water injection pipes having an internal diameter of only 5 centimeters and extend the complete height of the suction pile (adjacent the circumferential suction pile wall to be supported by it along their complete length) to debouch at the lower edge of the suction pile to fluidise the soil during penetration of the soil by the pile.
  • a pipe for dredging purposes e.g. EP1881113
  • These kind of pipes become damaged if forced to penetrate the seafloor soil since they are not designed for such loads.
  • a single fluid port with associated coupling at the bulkhead is sufficient for temporarily coupling of first the suction pump and later the pressure pump.
  • the bulkhead is associated with two or more fluid ports with associated coupling, the one for temporary coupling of the suction pump, the other for temporary coupling of the pressure pump.
  • Extraction from the seabed of the suction pile according to the invention is easier compared to the prior art suction pile, in case an overpressure within the suction space is applied to force the suction pile from the seabed opposite the way in which the suction pile penetrated the seabed by creation of suction within the suction space. Without to be bound by theory it is believed that the invention ensures equal distribution of the overpressure within the suction space, which makes extraction more reliable.
  • the invention is preferably directed to suction piles for foundations, in other words designed to carry the weight of an upper structure, e.g. wind turbine or platform, placed on top, to avoid that such upper structure sinks into the subsea bottom.
  • an upper structure e.g. wind turbine or platform
  • a foundation suction pile bears loads from the associated upper structure which tend to force the suction pile further into the ground.
  • the grout plug below the top bulkhead is designed to prevent that the suction pile moves deeper into the subsea bottom due to the pushing loads generated by the weight of the upper structure.
  • a foundation suction pile is by the nature of its loading different from a suction pile for anchoring, which anchoring suction pile must withstand pulling forces from the anchored object which tries to leave its desires location by trying to pull the anchoring suction pile out of the subsea bottom.
  • the suction required to penetrate the suction pile into the subsea bottom during installation and/or the overpressure to extract the suction pile from the sea bed is generated within the suction pile above the grout plug or above the top bulkhead of the suction pile, preferably since the suction side of a suction pump means or the pressure side of a pressure pump means is connected to the suction pile at a location above the grout plug, e.g.
  • the top bulkhead is provided with a nozzle or different sealable port for fluid connection of the suction space with a suction or pressure pump means;
  • the diameter of the suction pile is constant over its height (the height is the direction from the top bulkhead towards the opposite open end); from the top bulkhead the cylinder walls of the suction pile extend parallel;
  • the open end of the suction pile, designed to be located on the sea floor first is completely open, in other words, its aperture is merely bordered by the cylinder walls;
  • the water depth is such that the suction pile is completely below the water surface when its lower end contacts the sea floor, in other words when its lower end has not penetrated the sea floor yet;
  • the foundation comprises one, two, three, four or more mutually spaced suction piles;
  • the grout plug obtains, by application of the invention, an increase of permeability of at least 10% or 20%, in other words at least 10% or 20% of the cross sectional surface area of the suction space at the level of the grout plug allows free passage of fluid between above and below the
  • a valve, selectively closable port in the top bulkhead to allow water entering and/or exiting the suction pile is provided with a coupling means designed for temporary engagement of a suction and/or pressure pump at the time of installing and removing, respectively, of the suction pile into and from, respectively, the seafloor soil, which port is associated with the fluid flow channel.
  • the design of the suction pile is such that fluid from a source, e.g. pressure pump, flows from the source through a sealed channel, comprising the permeable part of the grout plug (e.g. provided by the tube), terminating below the grout plug.
  • the pump typically is designed to be temporary connected to the internal space (also called suction space) of the suction pile to generate an over pressure or under pressure within the suction space, preferably wherein the pressure difference generated relative to the surrounding water pressure (e.g. approximately 10 bar at 100 meter water depth or 100 bar at 1000 meter water depth) is at least 0.5 or 1 or 2 or 3 or 5 bar.
  • the pump system is designed to generate within the suction space an over or under pressure between 5 and 10 bar.
  • the suction pile is also preferably provided with known as such valves and/or hatches adjacent or at its top bulkhead for selectively allowing water and air to enter or exit the suction space through the top side of the suction pile.
  • the quick connector or quick release coupling can comprise one or more of: a flanged coupling in that the to be coupled longitudinal ends of two tubes each have a flange which mutually bear in the coupled state; a releasable locking means, e.g. comprising a retractable locking member, e.g. pivoting claw or finger, to positively keep the mutually coupled tubes together, e.g. a retractable pivoting finger or claw at the one tube engaging behind a hooking edge, e.g. part of a flange, at the other tube, retractable snapping hooks engaging a recess; drive means associated with the locking means, e.g. to move a locking member between a releasing retracted position and a locking extended position.
  • the tube associated with the suction pile comprises the passive part of the locking means, e.g. hooking edge
  • the tube associated with the pump comprises the active part, e.g. pivoting or differently moving retractable locking member.
  • the invention is directed, in an embodiment, to an offshore foundation system or a suction pile of said system, the suction pile preferably provided by an open bottom and closed top, advantageously cylindrical, elongate shell providing a suction compartment or suction space, said closed top having an externally facing upper face and an opposite, toward the suction space facing lower face and preferably provided with one or more valves selectively allowing fluid communication between the suction space and the environment, the suction space being provided, near its top end, with a fixedly located plug, e.g.
  • the grout plug provided after the suction pile reached the seafloor, and wherein, in use, the grout plug bottom bears onto a top of a soil plug inside the suction space, the top bulkhead of the suction pile bears onto the grout plug and a fluid flow channel extends upwardly through the grout plug to bring fluid pressure from high to low level of the grout plug, or vice versa.
  • Fig. 1 shows three stages during penetration of the suction pile into the sea floor by suction within the suction space.
  • the left hand stage is the initial stage in which the open bottom of the suction pile has penetrated the seabed by gravity, such that the suction space is sealed.
  • the central stage is obtained by removing water from the suction space by pumping, such that suction is created within the suction space such that the suction pile penetrates deeper into the seabed, thus its top comes closer to the seabed.
  • the right hand stage is the final stage in which the suction pile is penetrated to its final depth, providing its design load bearing capacity for a weight resting on top of it.
  • the load bearing surface 4 spaced below the top bulkhead is shown and is provided by the lower side of a grout plug.
  • the top bulkhead 6 is spaced from the sea floor 11. Within the suction space internal from the side wall 7, the surface 12 of the sea floor material rises due to penetration of the suction pile. Such seabed part captive within the suction space is also called soil plug.
  • Fig. 2-4 show the suction pile of fig. 1 in the completely installed stage (right hand stage of fig. 1 ) more in detail.
  • the rigid grout plug 9 provides a load bearing surface 4 within the suction space 7 and spaced below the top bulkhead 6.
  • a pipe stud 5 penetrates the top bulkhead to connect the suction space with a suction source.
  • the suction space is bounded by the top bulkhead 6, the cylindrical side wall 7 and the open end 8.
  • the distance between the top bulkhead and the load bearing surface 4 measures 50 centimeter, thus the grout plug is 50 centimeter thick.
  • the pipe studs 5, 10 are located at a distance from the longitudinal axis 14 and the side wall 7 of the suction pile.
  • the pipe stud 5 is used during installing the pile.
  • a similar pipe stud 10 connects to a vertical pipe 15.
  • the lower end of pipe 15 terminates below the lower face 4 of the grout plug 9 and penetrates the soil plug 12.
  • a source of pressurized fluid connected to pipe stud 10 can supply pressurized fluid at a level below grout plug 9, such that an overpressure will be generated within the soil plug 12 within the suction pile, forcing the suction pile upward.
  • fluid flow through pipe stud 10 will be made impossible during installing the pile, and through pipe stud 5 during removing the pile.
  • Fig. 7 shows an alternative based on the provision of dedicated ports 5, 10 for installing and removing, respectively, of the pile.
  • Fig. 5 shows an embodiment without pipe stud 10 and pipe 15.
  • a drill shaft (indicated by the arrow) is inserted in pipe stud 5 to drill a vertical channel through the rigid grout plug and subsequently pressurized fluid is supplied via pipe stud 5 to flow through the drilled channel and into the soil plug 12 to press out the pile.
  • Pipe stud 5 is provided with a coupling above the top bulkhead, designed for temporary engagement of both a suction pump and a pressure pump, which pumps are only present during sucking at the time of installing in and pressing out at the time of recovering of the suction pile, respectively.
  • the vertical pipe 15 is designed as a bypass or branch and connects to pipe stud 5, such that an additional pipe stud 10 is superfluous.
  • Pipe 15 is provided with a valve 16 such that during installation no water is sucked through pipe 15.
  • Pipe stud 10 is in this case a vent to allow air to escape during sinking of the pile.
  • Selectively closable pipe stud 5 is provided with a coupling above the top bulkhead, designed for temporary engagement of both a suction pump and a pressure pump, which pumps are only present during sucking at the time of installing in and pressing out at the time of recovering of the suction pile, respectively.
  • Pipe stud 10 needs not such coupling since it is merely a selectively closable vent.
  • Fig. 7 is similar to fig. 3 .
  • Selectively closable pipe stud 5 and also selectively closable pipe stud 10 are provided with a coupling above the top bulkhead, designed for temporary engagement of a suction pump (in case of pipe stud 5) and a pressure pump (in case of pipe stud 10), which pumps are only present during sucking at the time of installing in and pressing out at the time of recovering of the suction pile, respectively.
  • Fig. 8 shows an embodiment having a water permeable, but grout impermeable, tube 15 such that both a suction pump and a pressure pump can be connected to pipe stud 5 to install and remove, respectively, the suction pile.
  • the permeability is only provided in the circumferential wall part immediately below the top bulkhead.
  • fig. 8 could be provided with increased porosity such that grout could also penetrate the tube wall. Increased porosity is beneficial for increased water through put such that sucking in proceeds quicker.
  • a water impermeable sleeve 17 (shown in phantom in fig. 8 ) is provided around the tube 15 as a selective sealing means. The sleeve is provided with a flange as an actuating means. Initially, the sleeve 17 is at the lower or distal end of the tube and the porous area of the tube 15 is at higher level and thus allows free flow of water through the tube wall.
  • Fig. 9 shows an alternative to the fig. 6 embodiment.
  • selectively closable pipe stud 5 is provided with a coupling above the top bulkhead, designed for temporary engagement of both a suction pump and a pressure pump, which pumps are only present during sucking at the time of installing in and pressing out at the time of recovering of the suction pile, respectively.
  • Fig. 10 and 11 are examples of the upper structures to be supported by the suction piles 1.
  • the top of the upper structures is provided by a platform 2 above water level 3.
  • the marine structure can have a different number of suction piles.
  • the drawing, the specification and claims contain many features in combination. The skilled person will consider these also individually and combine them to further embodiments. Features of different in here disclosed embodiments can in different manners be combined and different aspects of some features are regarded mutually exchangeable. All described or in the drawing disclosed features provide as such or in arbitrary combination the subject matter of the invention, also independent from their arrangement in the claims or their referral.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
EP17162940.5A 2016-03-24 2017-03-24 Structure marine flottante à pieux à succion Active EP3222783B1 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2016485 2016-03-24

Publications (3)

Publication Number Publication Date
EP3222783A1 true EP3222783A1 (fr) 2017-09-27
EP3222783C0 EP3222783C0 (fr) 2023-06-14
EP3222783B1 EP3222783B1 (fr) 2023-06-14

Family

ID=59969502

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17162940.5A Active EP3222783B1 (fr) 2016-03-24 2017-03-24 Structure marine flottante à pieux à succion

Country Status (3)

Country Link
EP (1) EP3222783B1 (fr)
NL (1) NL2018568B1 (fr)
PL (1) PL3222783T3 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593251A (zh) * 2019-09-20 2019-12-20 天津大学 一种适用于软土海底地基改良的筒型装置及其施工方法
CN110965571A (zh) * 2019-12-31 2020-04-07 中国电建集团华东勘测设计研究院有限公司 负压桶-桩复合基础结构及其施工方法
CN112878353A (zh) * 2021-01-15 2021-06-01 浙江工业大学 应用于海上风机桩桶复合基础的反滤装置及施工方法
US11585064B2 (en) 2019-06-21 2023-02-21 Subsea 7 Norway As Hollow subsea foundations

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114555908A (zh) * 2019-10-03 2022-05-27 Spt设备有限公司 抽吸式洋底井口

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0011894B1 (fr) 1978-12-04 1984-07-04 Shell Internationale Researchmaatschappij B.V. Méthode et appareillage pour l'installation d'un élément tubulaire au fond de l'eau
GB2300661B (en) 1994-01-21 1997-07-30 Johannes Rudolf Hogervorst Method and combination for installing a hollow suction pile in the bottom of a body of water
WO1999051821A1 (fr) 1998-04-02 1999-10-14 Suction Pile Technology B.V. Structure marine
EP1101872A2 (fr) 1999-11-18 2001-05-23 Suction Pile Technology B.V. Structure marine
WO2002088475A1 (fr) 2001-04-26 2002-11-07 Suction Pile Technology B.V. Structure marine
WO2003099646A2 (fr) 2002-05-24 2003-12-04 Stolt Offshore S.A. Ancre de fond de mer
EP1881113A2 (fr) 2006-07-18 2008-01-23 Suction Pile Technology B.V. Arrangement d'aspiration pour un ancrage dans le fond sous-marin et méthode d'opération
US8025463B2 (en) 2008-06-02 2011-09-27 Keppel Offshore & Marine Technology Centre Pte Ltd Offshore foundation system with integral elements for preloading and extracting
WO2014084737A1 (fr) * 2012-11-29 2014-06-05 Suction Pile Technology Bv Pilier à aspiration à double sommet et fondation de pilier à aspiration

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO20085187L (no) * 2008-12-12 2010-06-14 Sclantic Subsea As Anordning ved sugefundament
DE102013004762A1 (de) * 2012-12-12 2014-06-12 Weserwind Gmbh Verfahren zum Verankern einer Gründungsstruktur einer Offshore-Anlage am Meeresboden, Gründungsstruktur und Auflagerelement

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0011894B1 (fr) 1978-12-04 1984-07-04 Shell Internationale Researchmaatschappij B.V. Méthode et appareillage pour l'installation d'un élément tubulaire au fond de l'eau
GB2300661B (en) 1994-01-21 1997-07-30 Johannes Rudolf Hogervorst Method and combination for installing a hollow suction pile in the bottom of a body of water
WO1999051821A1 (fr) 1998-04-02 1999-10-14 Suction Pile Technology B.V. Structure marine
EP1101872A2 (fr) 1999-11-18 2001-05-23 Suction Pile Technology B.V. Structure marine
WO2002088475A1 (fr) 2001-04-26 2002-11-07 Suction Pile Technology B.V. Structure marine
WO2003099646A2 (fr) 2002-05-24 2003-12-04 Stolt Offshore S.A. Ancre de fond de mer
EP1881113A2 (fr) 2006-07-18 2008-01-23 Suction Pile Technology B.V. Arrangement d'aspiration pour un ancrage dans le fond sous-marin et méthode d'opération
US8025463B2 (en) 2008-06-02 2011-09-27 Keppel Offshore & Marine Technology Centre Pte Ltd Offshore foundation system with integral elements for preloading and extracting
WO2014084737A1 (fr) * 2012-11-29 2014-06-05 Suction Pile Technology Bv Pilier à aspiration à double sommet et fondation de pilier à aspiration

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11585064B2 (en) 2019-06-21 2023-02-21 Subsea 7 Norway As Hollow subsea foundations
CN110593251A (zh) * 2019-09-20 2019-12-20 天津大学 一种适用于软土海底地基改良的筒型装置及其施工方法
CN110965571A (zh) * 2019-12-31 2020-04-07 中国电建集团华东勘测设计研究院有限公司 负压桶-桩复合基础结构及其施工方法
CN112878353A (zh) * 2021-01-15 2021-06-01 浙江工业大学 应用于海上风机桩桶复合基础的反滤装置及施工方法

Also Published As

Publication number Publication date
EP3222783C0 (fr) 2023-06-14
EP3222783B1 (fr) 2023-06-14
PL3222783T3 (pl) 2023-11-27
NL2018568A (en) 2017-10-02
NL2018568B1 (en) 2021-10-14

Similar Documents

Publication Publication Date Title
EP3222783B1 (fr) Structure marine flottante à pieux à succion
US4720214A (en) Mudmat design
US11585064B2 (en) Hollow subsea foundations
US8021082B2 (en) Suction pile suitable for shallow depths
EP2925936B1 (fr) Pieux à aspiration à double sommet et fondation de pieux à aspiration
KR102647844B1 (ko) 구조물을 위한 기초
NO315169B1 (no) Fremgangsmåte for anbringelse av dypvannspeler i havbunnen
KR102066144B1 (ko) 내부 격벽을 이용한 석션버켓 및 이를 이용한 해양구조물
EP2216447A1 (fr) Structure marine flottante avec piliers d'aspiration et plateforme reposant sur une barge encastrée entre les piliers d'aspiration et la plateforme
NL2019679B1 (en) Method for installing a pile
EP1598482A1 (fr) Méthode et dispositif d'excavation pour former un puits dans le sol, et ensemble comprenant un dispositif d'excavation et un élément de construction
CN104711975B (zh) 一种长螺旋钻孔灌注桩施工工艺
CA1243494A (fr) Structure oceanique a embase-poids et son mode de stabilisation
EP1881113A2 (fr) Arrangement d'aspiration pour un ancrage dans le fond sous-marin et méthode d'opération
WO2010143966A2 (fr) Base de fondation
KR101630522B1 (ko) 프리로딩을 위한 석션기초 및 그 시공방법
WO2013053936A1 (fr) Système d'ancrage sur le plancher sous-marin et procédé associé
US8888407B2 (en) Method and a device for sealing and/or securing a borehole
WO2014202948A1 (fr) Base gravitaire destinée à une structure marine
JP6586213B2 (ja) ジャケット構造体の構築方法
KR102048564B1 (ko) 고무막을 이용한 석션버켓 및 이를 이용한 해양구조물
JP7389441B1 (ja) 水底試料土採取装置、水底試料土採取方法
IE44972B1 (en) Iprovements in deep water platforms for marine work
NO346296B1 (en) Hollow subsea foundations
JPS60242207A (ja) 水面下に充填物を建造する方法および装置

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180327

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20190415

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: E02B 17/00 20060101ALI20230117BHEP

Ipc: E02D 27/52 20060101AFI20230117BHEP

INTG Intention to grant announced

Effective date: 20230206

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017070141

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1579316

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230715

U01 Request for unitary effect filed

Effective date: 20230714

U07 Unitary effect registered

Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI

Effective date: 20230731

RAP4 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: SPT EQUIPMENT BV

U1H Name or address of the proprietor changed [after the registration of the unitary effect]
REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20230614

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230915

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231014

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231014

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230614

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017070141

Country of ref document: DE

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20240327

Year of fee payment: 8

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240327

Year of fee payment: 8

U20 Renewal fee paid [unitary effect]

Year of fee payment: 8

Effective date: 20240327

26N No opposition filed

Effective date: 20240315

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20240304

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20240327

Year of fee payment: 8