EP3203150A1 - Kraftwerk und verfahren zur erhöhung des wirkungsgrades des kraftwerks - Google Patents

Kraftwerk und verfahren zur erhöhung des wirkungsgrades des kraftwerks Download PDF

Info

Publication number
EP3203150A1
EP3203150A1 EP16153861.6A EP16153861A EP3203150A1 EP 3203150 A1 EP3203150 A1 EP 3203150A1 EP 16153861 A EP16153861 A EP 16153861A EP 3203150 A1 EP3203150 A1 EP 3203150A1
Authority
EP
European Patent Office
Prior art keywords
ash
boiler
heat
bed
power plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16153861.6A
Other languages
English (en)
French (fr)
Other versions
EP3203150B1 (de
Inventor
Tino-Martin Marling
Frank Michael Kluger
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
General Electric Technology GmbH
Original Assignee
General Electric Technology GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by General Electric Technology GmbH filed Critical General Electric Technology GmbH
Priority to EP16153861.6A priority Critical patent/EP3203150B1/de
Priority to PL16153861T priority patent/PL3203150T3/pl
Priority to PCT/EP2017/051950 priority patent/WO2017134016A1/en
Publication of EP3203150A1 publication Critical patent/EP3203150A1/de
Application granted granted Critical
Publication of EP3203150B1 publication Critical patent/EP3203150B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C10/00Fluidised bed combustion apparatus
    • F23C10/002Fluidised bed combustion apparatus for pulverulent solid fuel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J3/00Removing solid residues from passages or chambers beyond the fire, e.g. from flues by soot blowers
    • F23J3/06Systems for accumulating residues from different parts of furnace plant
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23CMETHODS OR APPARATUS FOR COMBUSTION USING FLUID FUEL OR SOLID FUEL SUSPENDED IN  A CARRIER GAS OR AIR 
    • F23C2206/00Fluidised bed combustion
    • F23C2206/10Circulating fluidised bed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23JREMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES; FLUES 
    • F23J2900/00Special arrangements for conducting or purifying combustion fumes; Treatment of fumes or ashes
    • F23J2900/01002Cooling of ashes from the combustion chamber by indirect heat exchangers

Definitions

  • the present disclosure relates to a power plant, and more specifically, to a coal fired power plant where hot ash is stored and utilized for heat recovery and a method for recovering heat of the ash and utilize the recovered heat to increase the efficiency of the power plant.
  • flue gas passes the rotary air preheater where the flue gas heat transfer to access air takes place.
  • the flue gas is loaded with fly ash which will be separated downstream in the electrostatic precipitator. After electrostatic precipitator the ash is discharged to a fly ash silo for further utilization or back to the mine.
  • fly ash silo for further utilization or back to the mine.
  • circulating fluidized bed boiler hot bed ash is also cooled down and discharged to the mine.
  • the present disclosure relates to a power plant and more specifically, to a coal fired power plant where hot ash is stored and utilized for heat recovery and a method for recovering heat of the ash and utilize the recovered heat to increase the efficiency of the power plant.
  • the recovered heat of the hot ash improves cycle efficiency replacing the steam extraction from steam turbine.
  • the solution of the present disclosure can be used as "retrofit" within existing power plants.
  • a power plant comprising a boiler including a combustion chamber configured to carry out combustion of fuel to form ash and flue gas.
  • An energy recovery system connected to the boiler to recover heat of the ash and utilize the recovered heat to increase the efficiency of the power plant and save steam extraction from the steam turbine for feedwater heating.
  • the energy recovery system comprising ash storage to receive and store the ash, a heat exchanger fluidically connected to the ash storage and the ash which is stored in the ash storage is passed through the heat exchanger to extract the heat of the ash.
  • the energy recovery system further comprising an ash discharge system connected to the heat exchanger to discharge the ash.
  • the ash is a fly ash from a pulverized coal fired boiler or a bed ash or a mixture of the fly ash and the bed ash in CFB arrangement.
  • the recovered heat of the ash is provided to heat a working fluid being fed to the boiler.
  • the boiler is a pulverized coal boiler and in that the energy recovery system is connected to the pulverized coal boiler through a separator.
  • the recovered heat of the fly ash is provided to heat the working fluid, the heated working fluid being fed at startup to the pulverized coal boiler.
  • the recovered heat of the fly ash is used to heat a plurality of tubes of the combustion chamber of the pulverized coal boiler in case of a part load change of the pulverized coal boiler.
  • the boiler is a circulating fluidized bed boiler and in that the energy recovery system is connected to the circulating fluidized bed boiler through an ash discharge screw.
  • stored bed ash in the ash storage is provided to fluidize circulating bed at startup of the circulating fluidized bed boiler.
  • a method for increasing efficiency of a power plant comprising providing a boiler including a combustion chamber , the boiler being in connection with an energy recovery system and configured so that ash and flue gas are produced during combustion of fuel inside the combustion chamber , recovering heat of the ash through the energy recovery system and utilizing the recovered heat to increase the efficiency of the power plant.
  • the energy recovery system comprises an ash storage and a heat exchanger which are fluidically connected with each other and recovery of heat of the ash comprising the steps of receiving and storing the ash in the ash storage , passing the ash through the heat exchanger recovering the heat of the ash.
  • the recovery of heat of the ash by the energy recovery system further comprising discharging the ash through an ash discharge system.
  • the ash is a fly ash or a bed ash or a mixture of the fly ash and the bed ash.
  • the method further including step of providing the recovered heat of the ash to heat a working fluid being fed to the boiler.
  • the method further including step of providing the recovered heat of the fly ash to heat a plurality of tubes of the combustion chamber of a pulverized coal boiler during a load change of the pulverized coal boiler.
  • the method further including step of providing the recovered heat of the fly ash to heat the working fluid and feeding the heated working fluid at startup of the pulverized coal boiler.
  • the method further including step of providing stored bed ash of the ash storage to fluidize circulating bed of a circulating fluidized bed boiler at startup of the circulating fluidized bed boiler.
  • the present disclosure offers a technical solution for power plants which are hard coal fired units with pulverized coal fired boiler as well as lignite fired units and circulating fludized bed boiler.
  • the technical solution is achieved by providing intermediate hot ash storage to store hot ash and utilize inherent heat on demand in the power plant particularly for feed water heating during startup of the boiler.
  • the inherent heat is also used to heat saturated steam in tubes of combustion chamber of the pulverized coal fired boiler in case of a load change.
  • the inherent heat is also used to heat fluidized bed at the starting time.
  • the hot ash is a fly ash or a bed ash or a mixture of the fly ash and the bed ash.
  • the ash is the fly ash from the pulverized coal fired boiler or a bed ash or a mixture of the fly ash and the bed ash in circulating fluidized bed boiler.
  • the technical solution provides several advantages like application of a smaller electrostatic precipitator in power plants as ash is dealt with earlier. Recovered heat utilization leads to less power consumption of steam and electric power in the power plants as well as savings on start-up fuels. A reduction in CO2 emission as the ash is separated and captured efficiently at a very early stage and a constant feed water temperature is provided during the operation of the boiler.
  • the power plant 10 includes a boiler 20 having a combustion chamber 30 to carry out combustion of fuel 40 to generate heat, ash 50 and flue gas 60 in the combustion chamber 30.
  • the coal is stored in a silo 104.
  • the boiler 20 is connected to an energy recovery system 70.
  • the energy recovery systems 70 recovers heat of the ash 50 and utilize the recovered heat to increase the efficiency of the power plant 10.
  • the recovered heat is transferred to a working fluid 130 for example feed water 132 and steam 135 which is fed to the boiler 20.
  • the working fluid 130 is further heated in the boiler 20 from the heat generated during the combustion and used to drive a steam turbine or a series of steam turbines 100.
  • the boiler 20 is connected to the energy recovery system 70 through a separator 110.
  • the energy recovery system 70 may include an ash storage 80 and a heat exchanger 90 fluidically connected to the ash storage 80.
  • the ash storage 80 may receive and store the ash 50 generated in the boiler 20.
  • the ash 50 may be passed through the heat exchanger 90 to extract the heat of the ash 50.
  • the energy recovery system 70 further includes an ash discharge system 95 which is connected to the heat exchanger 90 to discharge the ash 50 in to ash silo 105.
  • the boiler 20 of the power plant 10 may be a pulverized coal boiler, such as pulverized coal boiler 200, herein after 'boiler 200'.
  • the boiler 200 may include a combustion chamber 202 to carry out combustion of fuel to generate heat, ash and flue gas in the combustion chamber 202.
  • the boiler 200 includes a silo 204 that stores coal to be burned to produce heat, ash 50 and flue gas 60 in the combustion chamber 202.
  • the coal from the silo 204 may be sent to a pulverizer (not shown) to be crushed in to a powder form.
  • the coal powder is mixed with air that is induced by a fan 205 to produce fuel 206.
  • the fuel 206 may be supplied in to the combustion chamber 202 through burners 207. During combustion of the fuel 206 heat, ash 50 and flue gas 60 are produced.
  • the ash 50 may be a fly ash 52 or a bed ash 55 or a mixture of the fly ash 52 and the bed ash 55.
  • the boiler 200 may be connected to an energy recovery system 270 through a separator 210.
  • the energy recovery system 270 may include an ash storage 280 and a heat exchanger 290 fluidically connected to the ash storage 280.
  • the ash storage 280 may receive and store the ash 50 generated in the boiler 200.
  • the ash 50 may be passed through the heat exchanger 290 to extract the heat of the ash 50.
  • One part of the ash 50, which is heavy, may be settled in bottom of the combustion chamber 202, and the other part which is lighter may be moved up in the combustion chamber 202.
  • heavy ash may be the bed ash 55 and the lighter ash may be the fly ash 52.
  • the separator 210 which is connected to the combustion chamber 202 receives the fly ash 52 and the flue gas 60 and separates fly ash 52 from the flue gas 60.
  • the fly ash 52 leaves the separator 210 with a temperature range of 410 °C to 450 °C, and more particularly at 430 °C, is stored in the ash storage 80 and for example lignite coal with a temperature range of 280 °C - 320 °C and more particularly at 300 °C is stored in an ash storage 80.
  • the stored fly ash 52 is discharged through the heat exchanger 290 where inherent heat of the fly ash 52 is utilized to heat the working fluid 130 for example feed water 132 or steam 135 which is supplied to the boiler 200.
  • the energy recovery system 270 further includes an ash discharge system 295 which is connected to the heat exchanger 290 to discharge the fly ash 52 in to ash silo 237. As the fly ash 52 is very much fluid, the energy recovery system 270 is arranged in such a way that a gravimetric flow is realized.
  • the recovered heat of the fly ash 52 is further utilized to heat the working fluid 130 for example steam 135 being fed at startup to the boiler 200. Also the recovered heat of the fly ash 52 is utilized to heat a plurality of tubes 230 forming walls of the combustion chamber 202 of the boiler 200 in case of a part load change of the boiler 200 so that the working fluid 130 is flowing though the plurality of tubes 230 is also heated and converted to steam with high temperature to be supplied immediately to the steam turbine 100.
  • the bed ash 55 may also be supplied through a conduit 240 or any other suitable means to the ash storage 80.
  • the fly ash 52 or the bed ash 55 or the mixture of the fly ash 52 and the bed ash 55 may also be discharged directly through the heat exchanger 90 to recover the heat of the ash 50.
  • the ash storage 280 may be covered by an insulated layer to stop the loss of the heat during storage.
  • a controlled valve 260 is provided to control flow of the fly ash 52 to the heat exchanger 290.
  • a series of heat transfer surfaces 250 are also provide in the combustion chamber 202 in form of super heater, reheater and economizer which are arranged as per the requirements of the boiler 200.
  • the heat transfer surfaces 250 further heated the working fluid 130 into super-heated steam, reheated steam.
  • the boiler 20 of the power plant 10 may be a circulating fluidized bed boiler, such as circulating fluidized bed boiler 300, herein after 'boiler 300'.
  • the boiler 300 may include a combustion chamber 302 to carry out combustion of fuel to generate heat, ash and flue gas in the combustion chamber 302.
  • the boiler 300 includes a silo 304 that stores crushed coal to be burned to produce heat, ash 50 and flue gas 60 in the combustion chamber 302.
  • the crushed coal as a fuel 306 from the silo 304 may be supplied in to the combustion chamber 302 at its bottom.
  • a bed 307 of inert material for example sand is formed at the bottom of the combustion chamber 302.
  • the bed 307 is where the crushed coal or fuel 306 spreads.
  • Preheated primary air 309 supply is from under the bed 307 at high pressure through primary air fans (not shown). This lifts the bed 307 material and fuel particles 308 and keeps the fuel particles 308 in suspension. The combustion of the fuel particles 308 takes place in this suspended condition.
  • the lifted bed 307 and suspended fuel particles 308 forms a fluidized circulating bed which is maintained at range of 850 °C - 900 °C.
  • Secondary air 314 provides pre-heated combustion air. Nozzles 341 in the combustion chamber 302 walls at various levels distribute the preheated combustion air in the combustion chamber 302.
  • the ash 50 may be a fly ash 52 or a bed ash 55 or a mixture of the fly ash 52 and the bed ash 55.
  • the bed ash 55 is produced in the range of 35% to 45% of the ash 50 and settled in a lower portion of the combustion chamber 302.
  • Fine particles of partly burned fuel particles 308, fly ash 52 and bed material 307 are carried along with the flue gas 60 to upper areas of the combustion chamber 302 and then into a separator 310 which is connected the combustion chamber 302.
  • the separator 310 fine particles of partly burned fuel particles 308, the fly ash 52 and the bed material 307 is captured and separated from the flue gas 60 and falls to a seal pot 312.
  • the heavy particle of partly burned fuel particles 308, the fly ash 52 and the bed material 307 returns to the combustion chamber 302 for recirculation either directly through arm 316 or through another arm 317 after passing through a fluidized bed heat exchanger 318. These heavy particles keep on recirculating till they captured in the separator 310.
  • the fly ash 52 keeps on adding with bed ash 55 in the lower portion of the combustion chamber 302.
  • the flue gas 60 gases from the separator 310 pass to a series of heat transfer surfaces 350 and move out of the boiler 300.
  • the boiler 300 may be connected to an energy recovery system 370 through ash discharge screw 410.
  • the energy recovery system 370 may include an ash storage 380 and a heat exchanger 390 fluidically connected to the ash storage 380.
  • the ash storage 380 may receive and store the bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 generated in the boiler 300.
  • the bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 may be passed through the heat exchanger 390 to extract the heat of the bed ash 55.
  • the bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 leaves the boiler on a temperature range of 750 °C - 850 °C . Due to design constraints the bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 is supplied pneumatically through a conduit 375 to the ash storage 380 leads to a heat loss of in temperature range of 100 °C - 200 °C resulting in a final storage temperature of 600°C in the ash storage 380.
  • the stored bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 is discharged through the heat exchanger 390 where inherent heat of the bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 is utilized to heat the working fluid 130 for example feed water 132 or steam 135 which is supplied to the boiler 300.
  • the energy recovery system 370 further includes an ash discharge system 395 which is connected to the heat exchanger 390 to discharge the bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 in to a ash silo 420.
  • the energy recovery system 370 is arranged in such a way that a gravimetric flow is realized.
  • the fly ash 52 or the bed ash 55 or the mixture of the fly ash 52 and the bed ash 55 may also be discharged directly through the heat exchanger 390 to recover the heat of the ash 50.
  • the ash storage 380 may be covered by an insulated layer to stop the loss of the heat during storage.
  • a controlled valve 430 is provided to control flow of the ash 50 particularly the mixture the fly ash 52 and the bed ash 55 to the heat exchanger 390.
  • the stored bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 in the ash storage 380 is provided to fluidize bed 307 at startup of the boiler 300 through a conduit 450 .
  • a controlled valve 440 is provided to control the flow of the stored bed ash 55 particularly the mixture the fly ash 52 and the bed ash 55 to the combustion chamber 302.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Fluidized-Bed Combustion And Resonant Combustion (AREA)
EP16153861.6A 2016-02-02 2016-02-02 Kraftwerk und verfahren zur erhöhung des wirkungsgrades des kraftwerks Active EP3203150B1 (de)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP16153861.6A EP3203150B1 (de) 2016-02-02 2016-02-02 Kraftwerk und verfahren zur erhöhung des wirkungsgrades des kraftwerks
PL16153861T PL3203150T3 (pl) 2016-02-02 2016-02-02 Elektrownia i sposób zwiększenia wydajności elektrowni
PCT/EP2017/051950 WO2017134016A1 (en) 2016-02-02 2017-01-30 A power plant and method for increasing the efficiency of the power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP16153861.6A EP3203150B1 (de) 2016-02-02 2016-02-02 Kraftwerk und verfahren zur erhöhung des wirkungsgrades des kraftwerks

Publications (2)

Publication Number Publication Date
EP3203150A1 true EP3203150A1 (de) 2017-08-09
EP3203150B1 EP3203150B1 (de) 2021-05-26

Family

ID=55359393

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16153861.6A Active EP3203150B1 (de) 2016-02-02 2016-02-02 Kraftwerk und verfahren zur erhöhung des wirkungsgrades des kraftwerks

Country Status (3)

Country Link
EP (1) EP3203150B1 (de)
PL (1) PL3203150T3 (de)
WO (1) WO2017134016A1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107559816A (zh) * 2017-09-20 2018-01-09 中国神华能源股份有限公司 循环流化床机组的控制方法和装置、存储介质、处理器

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113280359A (zh) * 2021-06-25 2021-08-20 西安热工研究院有限公司 一种减轻π型高钠煤锅炉对流受热面沾污的方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0467913A1 (de) * 1989-04-13 1992-01-29 Ahlstroem Oy Verfahren und vorrichtung zur rückgewinnung von wärme aus feststoffen, welche abgesondert werden bei vergasungs- oder verbrennungsprozessen.
EP0619455A2 (de) * 1993-03-03 1994-10-12 Ebara Corporation Druckwirbelbettkessel mit interner Umwälzung
US20120276492A1 (en) * 2009-12-21 2012-11-01 Foster Wheeler Energia Oy Method of and Arrangement for Recovering Heat From Bottom Ash
US20140093828A1 (en) * 2011-04-20 2014-04-03 Pertti Kinnunen Arrangement and method of drying fuel in a boiler system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0467913A1 (de) * 1989-04-13 1992-01-29 Ahlstroem Oy Verfahren und vorrichtung zur rückgewinnung von wärme aus feststoffen, welche abgesondert werden bei vergasungs- oder verbrennungsprozessen.
EP0619455A2 (de) * 1993-03-03 1994-10-12 Ebara Corporation Druckwirbelbettkessel mit interner Umwälzung
US20120276492A1 (en) * 2009-12-21 2012-11-01 Foster Wheeler Energia Oy Method of and Arrangement for Recovering Heat From Bottom Ash
US20140093828A1 (en) * 2011-04-20 2014-04-03 Pertti Kinnunen Arrangement and method of drying fuel in a boiler system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107559816A (zh) * 2017-09-20 2018-01-09 中国神华能源股份有限公司 循环流化床机组的控制方法和装置、存储介质、处理器
CN107559816B (zh) * 2017-09-20 2019-10-15 中国神华能源股份有限公司 循环流化床机组的控制方法和装置、存储介质、处理器

Also Published As

Publication number Publication date
EP3203150B1 (de) 2021-05-26
PL3203150T3 (pl) 2021-10-25
WO2017134016A1 (en) 2017-08-10

Similar Documents

Publication Publication Date Title
AU2013221967B2 (en) Pressurized oxy-combustion power boiler and power plant and method of operating the same
AU2005295110B2 (en) Method of enhancing the quality of high-moisture materials using system heat sources
US8196532B2 (en) Air-fired CO2 capture ready circulating fluidized bed heat generation with a reactor subsystem
EP0602795B1 (de) Fliessbett-Verbrennungssystem und Fliessbett-Verbrennungsverfahren
US4223529A (en) Combined cycle power plant with pressurized fluidized bed combustor
US9175851B2 (en) Method of and an arrangement for recovering heat from bottom ash
KR910009058B1 (ko) 복합 가스 터빈 발전 시스템 및 그 작동 방법
JP2014148462A (ja) セメントクリンカの製造方法及びセメントクリンカの製造設備
EP3203150A1 (de) Kraftwerk und verfahren zur erhöhung des wirkungsgrades des kraftwerks
JP4690924B2 (ja) 石炭焚きボイラの制御装置
Zhu Update on lignite firing
CN207945695U (zh) 一种生物质循环流化床气化双耦合发电系统
Balasubramanian et al. An insight into advanced technology in circulating fluidised bed combustion steam generators
CN211921416U (zh) 一种火电厂制取活性焦粉的系统
CN112940760A (zh) 一种火电厂制取活性焦粉的系统及工艺、调峰控制方法
KR20150145339A (ko) 저압 과열증기를 이용한 재열방식 석탄 건조장치
CN103438440B (zh) 超临界二次再热循环流化床锅炉
CN103486574A (zh) 大型低一次风功耗超临界循环流化床锅炉
EP3617295A1 (de) System und verfahren zur herstellung von schieferöl aus schiefermaterial
JP6136338B2 (ja) ボイラ装置
Qing et al. APPLICATION OF HIGH-LOW BED CFB COMBUSTION TECHNOLOGY TO OIL SHALE COMBUSTION.
Liu et al. A scheme study of CFB power generation by using pet coke
SANTHANARAJ Different designs of CFBC boilers.
CN107830513A (zh) 一种高效热点可控分布生物质燃烧锅炉
JPH0253094B2 (de)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20180209

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20181018

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20200716

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20201222

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

RAP3 Party data changed (applicant data changed or rights of an application transferred)

Owner name: GENERAL ELECTRIC TECHNOLOGY GMBH

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602016058305

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1396595

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210615

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1396595

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210826

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20210526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210827

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210926

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210927

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210826

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602016058305

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220119

Year of fee payment: 7

26N No opposition filed

Effective date: 20220301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210926

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20220120

Year of fee payment: 7

Ref country code: PL

Payment date: 20220119

Year of fee payment: 7

Ref country code: CZ

Payment date: 20220125

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220228

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220202

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220202

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220228

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220202

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220202

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220228

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220228

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230523

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602016058305

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230202

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20160202

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210526