EP3179099B1 - Method of assembling wind turbine tower and oval adjustment device - Google Patents
Method of assembling wind turbine tower and oval adjustment device Download PDFInfo
- Publication number
- EP3179099B1 EP3179099B1 EP16199695.4A EP16199695A EP3179099B1 EP 3179099 B1 EP3179099 B1 EP 3179099B1 EP 16199695 A EP16199695 A EP 16199695A EP 3179099 B1 EP3179099 B1 EP 3179099B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- end portion
- section
- points
- lower section
- application
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 238000000034 method Methods 0.000 title claims description 48
- 238000005259 measurement Methods 0.000 claims description 60
- 230000002093 peripheral effect Effects 0.000 claims description 45
- 238000003466 welding Methods 0.000 claims description 21
- 230000008878 coupling Effects 0.000 claims description 11
- 238000010168 coupling process Methods 0.000 claims description 11
- 238000005859 coupling reaction Methods 0.000 claims description 11
- 238000010586 diagram Methods 0.000 description 9
- 239000000463 material Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 230000007423 decrease Effects 0.000 description 2
- 239000000470 constituent Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/344—Arrangements for lifting tower sections for placing additional sections under them
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Definitions
- the present disclosure relates to a method of assembling a wind turbine tower and an oval adjustment device.
- a wind-turbine tower of a wind turbine power generating apparatus or the like may be assembled by coupling a plurality of tower sections that constitute a wind-turbine tower.
- Patent Document 1 discloses a wind turbine power generating apparatus including a tower having a structure combining a plurality of sections.
- the tower is divided into two sections, an upper section and a lower section, at an intermediate part in the height direction.
- the upper section and the lower section of the tower are coupled via a flange structure.
- the tower is assembled by fastening a flange formed protruding inward and outward in the radial direction from a lower end portion of the upper section of the tower and a flange formed protruding inward and outward in the radial direction from an upper end portion of the lower section of the tower with bolts and nuts.
- Patent Document EP2754783 discloses a method and device of assembling a wind turbine tower by applying a force in a radial direction of the tower. A tool is used to align a pair of adjacent flanges of adjacent segments of the tower.
- Patent Document 1 JP2013-19207A
- Tower sections that constitute a wind-turbine tower may deform after being manufactured into a predetermined shape and before being assembled (e.g. during transportation).
- a tower section of a large wind-turbine tower has a large diameter, and thus is more likely to deform in the radial direction due to the weight of the tower section.
- a tower section that has no flange on the edge portion has a smaller rigidity than a tower section with a flange on the edge portion, and thus is more likely to deform.
- an object of at least one embodiment of the present invention is to provide a method of assembling a wind-turbine tower whereby it is possible to connect tower sections appropriately.
- bolt fastening amounts can be adjusted individually for the pair of bolt tensioners disposed on either side of the coupling section coupling the other point of application and the reaction-force receiving plate, and it is possible to apply a tension force in an appropriate direction to the pair of points of application while maintaining the parallelism of the second bracket with respect to the third bracket.
- a method of assembling a wind-turbine tower whereby it is possible to connect tower sections appropriately.
- FIG. 1 is a schematic diagram of a configuration example of a wind turbine provided with a wind-turbine tower assembled by a method of assembling a wind-turbine tower according to an embodiment.
- a wind turbine 1 includes a rotor 3 including at least one blade 2 and a hub 4, a nacelle 5 supporting the rotor 3, and a wind-turbine tower 6 supporting the nacelle 5.
- the wind-turbine tower 6 may be disposed on a base structure 7 disposed on water or on land.
- the base structure 7 may be a foundation structure disposed on water or on land, or a floating structure disposed on water.
- the wind turbine 1 may constitute a wind turbine power generating apparatus.
- the nacelle 5 may house a generator driven by rotational energy of the rotor 3, a drive train for transmitting rotational energy of the rotor 3 to the generator, or the like.
- the wind-turbine tower 6 includes a plurality of tower sections.
- the wind-turbine tower 6 includes four tower sections 6a to 6d.
- the tower sections 6a to 6d are disposed along an upward-and-downward direction (i.e., the vertical direction), and in each pair of sections disposed adjacently in the upward-and-downward direction, a lower end portion 11 of an upper section 10 disposed above and an upper end portion 13 of a lower section 12 disposed below are connected to each other to form the single wind-turbine tower 6.
- FIG. 2 is a flowchart schematically showing a method of assembling a wind-turbine tower according to an embodiment.
- the diameter D L of the upper end portion 13 of the lower section 12 and the diameter D U of the lower end portion 11 of the upper section 10 are measured (S102). Furthermore, the temperature T L of the lower section 12 and the temperature T U of the upper section 10 are measured individually (S104), and the measurement results of the respective diameters D L , D U of the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 are corrected on the basis of the measurement results of the temperatures T L , T U , respectively (S106).
- the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 are positioned to face each other (S110), and then the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 are connected (S112).
- step S104 of measuring each of the temperature T L of the lower section 12 and the temperature T U of the upper section 10, and step S106 of correcting the measurement results of the diameters D L , D U respectively on the basis of the measurement results of the temperatures T L , T U are optional steps and performed if needed.
- the method according to the present embodiment can be applied to connection of at least one pair of tower sections disposed adjacent to each other in the upward-and-downward direction from among the four tower sections 6a to 6d constituting the wind-turbine tower 6 (i.e., the tower sections 6a and 6b, 6b and 6c, or 6c and 6d).
- step S108 of performing oval adjustment to reduce the difference between the diameter D L and the diameter D U maybe performed after step S110 of positioning the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 to face each other and before step S112 of connecting the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10.
- Described in detail below with reference to FIGs. 3 to 7 are steps in the method of assembling a wind-turbine tower shown in the flowchart of FIG. 2 .
- the tower section 6b is referred to as the upper section 10
- the tower section 6a is referred to as the lower section 12.
- FIGs. 3 to 7 are each a diagram for describing a method of assembling a wind-turbine tower according to an embodiment.
- step S102 the diameter D L of the upper end portion 13 of the lower section 12 (tower section 6a) and the diameter D U of the lower end portion 11 of the upper section 10 (tower section 6b) are measured.
- the positions in the circumferential direction i.e. positions in the circumferential direction of the wind-turbine tower 6) for measuring the diameter D L and the diameter D U at the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 are not particularly limited.
- the diameter D L of the upper end portion 13 of the lower section 12 and the diameter D U of the lower end portion 11 of the upper section 10 are measured at positions in the circumferential direction that correspond to (face) each other in the upward-and-downward direction (i.e. vertical direction) of the wind-turbine tower 6.
- FIG. 3A is a bottom view of the upper section 10 according to an embodiment
- FIG. 3B is a top view of the lower section 12 according to an embodiment.
- measurement points U 1 to U 8 may be disposed on the lower end portion 11 of the upper section 10 as depicted in FIG. 3A
- measurement points L 1 to L 8 corresponding to the measurement points U 1 to U 8 may be disposed on the upper end portion 13 of the lower section 12 as depicted in FIG. 3B
- U 1 to U 8 and L 1 to L 8 are measurement points to be disposed on respective positions in the circumferential direction that form opposing pairs in the upward-and-downward direction (i.e. vertical direction) of the wind-turbine tower 6, when the upper section 10 and the lower section 12 are connected in the following step S112.
- step S112 the upper section 10 and the lower section 12 are connected while the measurement point U 1 at the lower end portion 11 of the upper section 10 and the measurement point L 1 at the upper end portion 13 of the lower section 12 face each other in the upward-and-downward direction.
- the diameter D U of the lower end portion 11 of the upper section 10 may be measured at at least one of the measurement points U 1 to U 8 disposed on the lower end portion 11 of the upper section 10, and the diameter D L may be measured at the measurement point corresponding to the measurement point at which the diameter D U of the upper section 10 is measured, from among the measurement points L 1 to L 8 on the upper end portion 13 of the lower section 12.
- the measurement points U 1 to U 8 are disposed at intervals of 45° in the circumferential direction about the center axis P of the upper section 10, while the measurement points L 1 to L 8 are disposed at intervals of 45° in the circumferential direction about the center axis Q of the lower section 12.
- the diameter D U1 passing through the center axis P of the upper section 10 and the measurement point U 1 (and the measurement point U 5 disposed opposite to U 1 across the center axis P in the radial direction) may be measured for the lower end portion 11 of the upper section 10, and the diameter D L1 passing through the center axis Q of the lower section 12 and the measurement point L 1 (and the measurement point L 5 disposed opposite from L 1 across the center axis Q in the radial direction) may be measured for the upper end portion 13 of the lower section 12.
- the diameter D U and the diameter D L may be measured at different multiple positions in the circumferential direction. For instance, diameters D U1 , D U2 , D U3 , and D U4 passing through the center axis P of the upper section 10 and the measurement points U 1 , U 2 , U 3 , and U 4 (and the measurement points U 5 to U 8 disposed opposite from U 1 to U 4 across the center axis P in the radial direction), respectively, may be measured for the lower end portion 11 of the upper section 10, and diameters D L1 , D L2 , D L3 , and D L4 passing through the center axis Q of the lower section 12 and the measurement points L 1 , L 2 , L 3 , and L 4 (and the measurement points L 5 to L 8 disposed opposite from L 1 to L 4 across the center axis Q in the radial direction), respectively, may be measured for the upper end portion 13 of the lower section 12.
- step S104 the temperature T L of the lower section 12 and the temperature T U of the upper section 10 are measured individually.
- step S102 the temperature T L of the lower section 12 and the temperature T U of the upper section 10 may be measured at the measurement points at which the diameters of the lower section 12 and the upper section 10 are measured in S102.
- temperatures T U1 and T U5 may be measured at the measurement points U 1 and U 5 , respectively. Furthermore, the temperature is measured similarly at other measurement points of the upper section 10 and measurement points of the lower section 12.
- step S106 the measurement results of the respective diameters D L , D U of the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 are corrected on the basis of the respective measurement results of temperature obtained in step S104.
- the measurement result of the diameter D U1 is corrected on the basis of the measurement results of the temperatures T U1 and T U5 measured at the measurement points U 1 and U 5 , respectively.
- step S106 the measurement results of the diameter are corrected on the basis of the measurement results of the temperature, and thereby it is possible to reduce the influence of the temperature on the measurement results of the diameter of the upper section 10 and the lower section 12.
- step S108 on the basis of the measurement results of the diameter D L and the diameter D U obtained in steps S102 to S106, oval adjustment is performed so as to reduce the difference between the diameter D L and the diameter D U , by applying a force in the radial direction of the wind-turbine tower 6 to at least one of the upper end portion 13 of the lower section 12 or the lower end portion 11 of the upper section 10.
- step S108 an outward or inward force in the radial direction of the wind-turbine tower 6 is applied to a pair of points of application on the inner peripheral wall surface of at least one of the lower end portion 11 of the upper section 10 or the upper end portion 13 of the lower section 12.
- an inward force in the radial direction of the wind-turbine tower 6 is applied to a pair of points of application on the inner peripheral wall surface 8 of the lower end portion 11 of the upper section 10 to reduce the diameter D L1
- an outward force in the radial direction of the wind-turbine tower 6 is applied to a pair of points of application on the inner peripheral wall surface 9 of the upper end portion 1 3 of the lower section 12 to increase the diameter D U1 .
- the pair of points of application may be disposed on positions that face each other across the center of the wind-turbine tower 6 on the inner peripheral wall surface of at least one of the lower end portion 11 of the upper section 10 or the upper end portion 13 of the lower section 12.
- the pair of points of application on the inner peripheral wall surface 8 of the lower end portion 11 of the upper section 10 may be points of application A U1 , A U5 on the inner peripheral wall surface 8 corresponding to the measurement points U 1 and U 5 (see FIG. 3A ).
- the pair of points of application on the inner peripheral wall surface 9 of the upper end portion 13 of the lower section 12 may be points of application A L1 , A L5 on the inner peripheral wall surface 8 corresponding to the measurement points L 1 and L 5 (see FIG. 3B ).
- FIGs. 4 and 6 are each a diagram of an oval adjustment device according to an embodiment.
- step S108 for instance, forces F 1 , F 1 ' directed inward in the radial direction of the wind-turbine tower 6 may be applied to a pair of points of application A 1 , A 2 on the inner peripheral wall surface 8 of the lower end portion 11 of the upper section 10 or the inner peripheral wall surface 9 of the upper end portion 13 of the lower section 12, by using the oval adjustment device 20 depicted in FIG. 4 .
- step S108 forces F 2 , F 2 ' directed outward in the radial direction of the wind-turbine tower 6 may be applied to a pair of points of application A 3 , A 4 on the inner peripheral wall surface 8 of the lower end portion 11 of the upper section 10 or the inner peripheral wall surface 9 of the upper end portion 13 of the lower section 12, by using the oval adjustment device 40 depicted in FIG. 6 .
- step S110 while the lower section 12 is disposed upright, the upper section 10 is suspended above the lower section 12 by using a crane or the like so that the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 face each other.
- step S112 the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 are connected.
- the upper section 10 may be rotated in the circumferential direction relative to the lower section 12 so that the position of the upper section 10 coincides with the position of the lower section 12 in the circumferential direction.
- the upper section 10 may be provided with a chain block, and revolved with respect to the lower section 12 by using the chain block.
- the step of rotating the upper section 10 relative to the lower section 12 in the circumferential direction may be performed if the protruding portions 14 are not in the same positions as the corresponding receiving portions 16 in the circumferential direction when the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10 are positioned so as to face each other in step S102.
- step S112 the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 are joined by welding.
- the method further includes a step of, before joining the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 by welding, moving the upper section 10 in the upward-and-downward direction relative to the lower section 12, and adjusting the clearance between the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 to be within a predetermined range.
- the clearance between the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 is a root gap for welding the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12.
- the clearance may be adjusted by moving the upper section 10 in the upward-and-downward direction by using a crane suspending the upper section 10, or a hydraulic jack disposed on the upper section 10 or the lower section 12, for instance.
- step S112 the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 are joined by automatic welding.
- an automatic welding machine is used to move an electrode automatically along a welding line between the upper end portion 13 of the lower section 12 and the lower end portion 11 of the upper section 10.
- step S112 the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 may be joined by manual welding by manpower.
- the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 may be joined partly by automatic welding, and partly by manual welding.
- the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12 may be connected by fastening a flange (not depicted) disposed on the lower end portion 11 of the upper section 10 and a flange (not depicted) disposed on the upper end portion 13 of the lower section 12 with bolts and nuts.
- a force in the radial direction of the wind-turbine tower 6 is applied to at least one of the lower end portion 11 of the upper section 10 or the upper end portion 13 of the lower section 12 so that a difference between the diameter of the lower end portion 11 of the upper section 10 and the diameter of the upper end portion 13 of the lower section 12 decreases, on the basis of the measurement results of the diameters thereof.
- an oval adjustment device according to some embodiments will be described with reference to FIGs. 4 to 7 .
- an outward or inward force in the radial direction of the wind-turbine tower 6 can be applied to a pair of points of application on the inner peripheral wall surface of at least one of the lower end portion 11 of the upper section 10 or the upper end portion 13 of the lower section 12.
- FIGs. 5 and 7 are configuration diagrams of the oval adjustment devices depicted in FIGs. 4 and 6 , respectively.
- the oval adjustment devices 20, 40 are for applying a tension force to a pair of points of application disposed opposite to each other across the center of a tower section of the wind turbine 1, on the inner peripheral wall surface of the tower section.
- oval adjustment devices 20, 40 can be used for both of the lower end portion 11 of the upper section 10 and the upper end portion 13 of the lower section 12, the following example describes the oval adjustment device 20 being applied to the lower end portion 11 of the upper section 10.
- the oval adjustment device 20 depicted in FIG. 4 is for applying a tension force to a pair of points of application disposed opposite to each other across the center (center axis P) of the upper section 10 on the inner peripheral wall surface 8 at the lower end portion 11 of the upper section 10. If a tension force is to be applied to a pair of points of application A 1 , A 2 on the inner peripheral wall surface 8 by using the oval adjustment device 20, the oval adjustment device 20 is disposed along a line connecting the pair of points of application A 1 , A 2 , as depicted in FIG. 4 .
- the oval adjustment device 20 includes a wire 22, the first bracket 24, the second bracket 26, the third bracket 28, bolts 30a, 30b, and bolt tensioners 32a, 32b, extending along the line connecting the pair of points of application A 1 , A 2 .
- the first bracket 24 is fixed to a mounting portion 18a disposed on the inner peripheral wall surface 8 of the upper section 10 with bolts 19a, and thereby an end 23a of the wire 22 is connected to the point of application A 1 on the inner peripheral wall surface 8.
- the second bracket 26 is connected to the other end 32b of the wire 22.
- the third bracket 28 is fixed to a mounting portion 18b disposed on the inner peripheral wall surface 8 with bolts 19b and thereby attached to the other point of application A 2 , and includes a reaction-force receiving plate 29 extending along a plane that is orthogonal to the extending direction of the wire 22.
- the bolts 30a, 30b extend along the wire 22 between the second bracket 26 and the third bracket 28, are fixed to the second bracket 26 with nuts 31a, 31b, and are inserted through the reaction-force receiving plate 29 of the third bracket 28.
- the bolt tensioners 32a, 32b are for applying a tension force to the bolts 30a, 30b, and are disposed on the side of the point of application A 2 opposite from the bolts 30a, 30b across the reaction-force receiving plate 29.
- the third bracket 28 further includes a coupling section 27 disposed on an extension line of the wire 22 and coupling the point of application A 2 and the reaction-force receiving plate 29.
- the pair of bolt tensioners 32a, 32b is disposed on either side of the coupling section 27.
- the bolt fastening amounts can be adjusted individually for the pair of bolt tensioners 32a, 32b disposed on either side of the coupling section 27, and it is possible to apply a tension force in an appropriate direction to the pair of points of application A 1 , A 2 while maintaining the parallelism of the second bracket 26 with respect to the third bracket 28.
- the oval adjustment device 40 depicted in FIG. 6 is for applying a tension force to a pair of points of application disposed opposite to each other across the center (center axis P) of the upper section 10 on the inner peripheral wall surface 8 at the lower end portion 11 of the upper section 10. If a tension force is to be applied to a pair of points of application A 3 , A 4 on the inner peripheral wall surface 8 by using the oval adjustment device 40, the oval adjustment device 40 is disposed along a line connecting the pair of points of application A 3 , A 4 , as depicted in FIG. 6 .
- the oval adjustment device 40 includes an intermediate rod 42 and a hydraulic jack 44 mounted to at least one of the end portions of the intermediate rod 42, as depicted in FIG. 6 .
- hydraulic jacks 44a, 44b are mounted to both of the end portions of the intermediate rod 42.
- the intermediate rod 42 is oriented in the radial direction in which a force is to be applied, at the lower end portion 11 of the upper section 10, and the hydraulic jacks 44a, 44b are disposed between the intermediate rod 42 and a pair of respective points of application on the inner peripheral wall surface 8 on which the force is to be applied.
- the intermediate rod 42 is oriented along the line connecting the pair of points of application A 3 , A 4 , and the hydraulic jack 44a is disposed between the point of application A 3 and the intermediate rod 42 while the hydraulic jack 44b is disposed between the point of application A 4 and the intermediate rod 42.
- outward forces in the radial direction can be applied to the pair of points of application A 3 , A 4 on the inner peripheral wall surface 8 by using the hydraulic jacks 44a, 44b.
- the intermediate rod 42 may be rotated in the circumferential direction while being suspended from above as depicted in FIG. 7 , to orient the intermediate rod 42 along the line connecting the pair of points of application A 3 , A 4 .
- a chain block may be used to rotate the intermediate rod 42 in the circumferential direction.
- the intermediate rod 42 is rotated while being suspended from above, and thereby it is possible to change the direction of the intermediate rod 42 readily, and thus to orient the intermediate rod 42 along the line connecting the pair of points of application in a desired radial direction.
- the intermediate rod 42 may be moved in the upward-and-downward direction to adjust the position of the intermediate rod 42 in the upward-and-downward direction.
- a chain block may be used to move the intermediate rod 42 in the upward-and-downward direction.
- the intermediate rod 42 is moved in the upward-and-downward direction while being suspended from above, and thereby it is possible to change the position of the intermediate rod 42 readily in the upward-and-downward direction, and thus to set the intermediate rod 42 in an initial position in the upward and downward direction.
- an expression of relative or absolute arrangement such as “in a direction”, “along a direction”, “parallel”, “orthogonal”, “centered”, “concentric” and “coaxial” shall not be construed as indicating only the arrangement in a strict literal sense, but also includes a state where the arrangement is relatively displaced by a tolerance, or by an angle or a distance whereby it is possible to achieve the same function.
- an expression of an equal state such as “same” “equal” and “uniform” shall not be construed as indicating only the state in which the feature is strictly equal, but also includes a state in which there is a tolerance or a difference that can still achieve the same function.
- an expression of a shape such as a rectangular shape or a cylindrical shape shall not be construed as only the geometrically strict shape, but also includes a shape with unevenness or chamfered corners within the range in which the same effect can be achieved.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Wind Motors (AREA)
Description
- The present disclosure relates to a method of assembling a wind turbine tower and an oval adjustment device.
- A wind-turbine tower of a wind turbine power generating apparatus or the like may be assembled by coupling a plurality of tower sections that constitute a wind-turbine tower.
- For instance,
Patent Document 1 discloses a wind turbine power generating apparatus including a tower having a structure combining a plurality of sections. The tower is divided into two sections, an upper section and a lower section, at an intermediate part in the height direction. The upper section and the lower section of the tower are coupled via a flange structure. Specifically, the tower is assembled by fastening a flange formed protruding inward and outward in the radial direction from a lower end portion of the upper section of the tower and a flange formed protruding inward and outward in the radial direction from an upper end portion of the lower section of the tower with bolts and nuts. Patent DocumentEP2754783 discloses a method and device of assembling a wind turbine tower by applying a force in a radial direction of the tower. A tool is used to align a pair of adjacent flanges of adjacent segments of the tower. - Patent Document 1:
JP2013-19207A - Tower sections that constitute a wind-turbine tower may deform after being manufactured into a predetermined shape and before being assembled (e.g. during transportation).
- For instance, a tower section of a large wind-turbine tower has a large diameter, and thus is more likely to deform in the radial direction due to the weight of the tower section. Furthermore, for instance, a tower section that has no flange on the edge portion has a smaller rigidity than a tower section with a flange on the edge portion, and thus is more likely to deform.
- Depending on the degree of such deformation of tower sections, it may be difficult to match positions of end portions of tower sections during assembly of a wind-turbine tower, which raises a risk of inappropriate connection of tower sections.
- In view of the above, an object of at least one embodiment of the present invention is to provide a method of assembling a wind-turbine tower whereby it is possible to connect tower sections appropriately.
- (1) A method of assembling a wind-turbine tower which comprises a plurality of tower sections including a lower section and an upper section to be connected to the lower section, according to at least one of the present invention, comprises: a step of measuring a diameter of an upper end portion of the lower section and a diameter of a lower end portion of the upper section; a step of applying a force in a radial direction of the wind-turbine tower to at least one of the upper end portion of the lower section or the lower end portion of the upper section so as to reduce a difference between the diameter of the upper end portion of the lower section and the diameter of the lower end portion of the upper section, on the basis of a measurement result of each of the diameter of the upper end portion of the lower section and the diameter of the lower end portion of the upper section; a step of suspending the upper section above the lower section while the lower section is disposed upright so that the upper end portion of the lower section and the lower end portion of the upper section face each other; and a step of connecting the lower end portion of the upper section and the upper end portion of the lower section.
According to the above method (1), before the upper end portion of the lower section and the lower end portion of the upper section are connected, a force in the radial direction of the wind-turbine tower is applied to at least one of the lower end portion of the upper section or the upper end portion of the lower section so that a difference between the diameter of the lower end portion of the upper section and the diameter of the upper end portion of the lower section decreases, on the basis of the measurement results of the diameters thereof. Accordingly, it is possible to reduce a difference between the diameter of the upper end portion of the lower section and the diameter of the lower end portion of the upper section, and thus the positions of the tower sections can be matched more readily. Thus, even if the lower section and/or the upper section deforms in the radial direction during transportation, for instance, it is possible to connect the upper section and the lower section appropriately. - (2) In some embodiments, in the above method (1), the method further comprises: a step of measuring each of a temperature of the lower section and a temperature of the upper section; and a step of correcting the measurement result of each of the diameter of the upper end portion of the lower section and the diameter of the lower end portion of the upper section, on the basis of measurement results of the temperatures.
Measurement results of the diameters of the upper end portion of the lower section and the lower end portion of the upper section are affected by thermal expansion or the like of the constituent material, for instance, depending on the temperature. In this regard, according to the above method (2), the measurement results of the diameters of the upper end portion of the lower section and the lower end portion of the upper section are temperature-corrected on the basis of the measurement results of the temperatures of the upper end portion of the lower section and the lower end portion of the upper section, and thus it is possible to reduce the difference between the diameters of the upper end portion of the lower section and the lower end portion of the upper section effectively. Thus, it is possible to set the end portions of the tower sections in matching positions more reliably, and to connect the upper section and the lower section appropriately. - (3) In some embodiments, in the above method (1) or (2), the method further comprises a step of moving the upper section in an upward-and-downward direction relative to the lower section to adjust a clearance between the lower end portion of the upper section and the upper end portion of the lower section to be within a predetermined range. The step of connecting includes joining the lower end portion of the upper section and the upper end portion of the lower section by welding.
According to the above method (3), the upper section is moved in the upward-and-downward direction relative to the lower section, and the clearance between the lower end portion of the upper section and the upper end portion of the lower section is adjusted to be within a predetermined range, and thereby it is possible to perform welding reliably between the lower end portion of the upper section and the upper end portion of the lower section. - (4) In some embodiments, in any one of the above methods (1) to (3), the connecting step includes performing automatic welding along a welding line between the upper end portion and the lower end portion by using an automatic welding machine.
According to the above method (4), an automatic welding machine is used to move an electrode automatically along a welding line between the upper end portion and the lower end portion, and thereby it is possible to perform high-quality welding effectively, and to connect the lower end portion of the upper section and the upper end portion of the lower section. - (5) In some embodiments, in any one of the above methods (1) to (4), the step of applying a force in the radial direction includes applying an outward or inward force in the radial direction to a pair of points of application on an inner peripheral wall surface of at least one of the lower end portion of the upper section or the upper end portion of the lower section.
According to the above method (5), an outward or inward force in the radial direction is applied to a pair of points of application on the inner peripheral wall surface of at least one of the lower end portion of the upper section or the upper end portion of the lower section, and thereby it is possible to reduce the difference between the diameters of the upper end portion of the lower section and the lower end portion of the upper section effectively. - (6) In some embodiments, in the above method (5), the pair of points of application is disposed on positions facing each other across a center of the wind-turbine tower, on the inner peripheral wall surface.
According to the above method (6), an outward or inward force in the radial direction is applied to a pair of points of application at positions opposite from each other across the center of the wind-turbine tower, on the inner peripheral wall surface, and thereby it is possible to reduce the difference between the diameters of the upper end portion of the lower section and the lower end portion of the upper section effectively. - (7) In some embodiments, in the above method (5) or (6), the step of applying a force in the radial direction includes: connecting a first end of a wire to one of the points of application on the inner peripheral wall surface via a first bracket; connecting a second end of the wire to a second bracket; attaching a third bracket to the other one of the points of application on the inner peripheral wall surface; disposing at least one bolt so that the at least one bolt is inserted through a reaction-force receiving plate of the third bracket, the reaction-force receiving plate extending along a plane orthogonal to an extending direction of the wire, and fixing the at least one bolt to the second bracket; and applying a tension force to the at least one bolt with at least one bolt tensioner disposed on the side of the other one of the points of application across the reaction-force receiving plate.
According to the above method (7), a bolt tensioner is used to generate a tension force in the bolt and the wire to apply an inward force in the radial direction to a pair of points of application on the inner peripheral wall surface of at least one of the lower end portion of the upper section or the upper end portion of the lower section. Accordingly, it is possible to further reduce a difference between the diameter of the upper end portion of the lower section and the diameter of the lower end portion of the upper section, and thus the positions of the end portions of the tower sections can be matched more readily and the upper section and the lower section can be connected appropriately. - (8) In some embodiments, in the above method (5) or (6), the step of applying a force in the radial direction includes: orienting an intermediate rod along a line connecting the pair of points of application; and applying an outward force in the radial direction to each of the points of application via the intermediate rod by using at least one hydraulic jack disposed between at least one end of the intermediate rod and at least one of the points of application on the inner peripheral wall surface.
According to the above method (8), a hydraulic jack is used to apply an outward force in the radial direction to a pair of points of application on the inner peripheral wall surface of at least one of the lower end portion of the upper section or the upper end portion of the lower section. Accordingly, it is possible to further reduce a difference between the diameter of the upper end portion of the lower section and the diameter of the lower end portion of the upper section, and thus the positions of the end portions of the tower sections can be matched more readily and the upper section and the lower section can be connected appropriately. - (9) In some embodiments, in the above method (8), the intermediate rod is oriented along the line connecting the pair of points of application by rotating the intermediate rod while the intermediate rod is suspended from above.
According to the above method (9), the intermediate rod is rotated while being suspended from above, and thereby it is possible to change the direction of the intermediate rod readily. Thus, it is possible to orient the intermediate rod along a line connecting a pair of points of application in a radial direction, and thereby an outward force in the radial direction can be easily applied to at least one of the upper end portion of the lower section or the lower end portion of the upper section in a radial direction, and to match the positions of the end portions of the tower sections more readily. - (10) An oval adjustment device for applying a tension force to a pair of points of application disposed on an inner peripheral wall surface of a tower section of a wind turbine facing each other across a center of the tower section, according to at least one embodiment of the present invention, comprises: a wire to extend along a line connecting the pair of points of application; a first bracket for connecting a first end of the wire to one of the points of application on the inner peripheral wall surface; a second bracket to be connected to a second end of the wire; a third bracket to be mounted to the other one of the points of application on the inner peripheral wall surface and including a reaction-force receiving plate to extend along a plane orthogonal to an extending direction of the wire; at least one bolt to extend along the wire between the second bracket and the third bracket, to be fixed to the second bracket, and to be inserted through the reaction-force receiving plate of the third bracket; and at least one bolt tensioner to be disposed on the side of the other one of the points of application across the reaction-force receiving plate, for applying a tension force to the at least one bolt.
With the above configuration (10), a bolt tensioner is used to generate a tension force in the bolt and the wire to apply an inward force in the radial direction to a pair of points of application on the inner peripheral wall surface of at least one of the lower end portion of the upper section or the upper end portion of the lower section. Accordingly, it is possible to further reduce a difference between the diameter of the upper end portion of the lower section and the diameter of the lower end portion of the upper section, and thus the positions of the end portions of the tower sections can be matched more readily and the upper section and the lower section can be connected appropriately. - (11) In some embodiments, in the above configuration (10), the third bracket further includes a coupling portion to be disposed on an extension line of the wire and to couple the other one of the points of application and the reaction-force receiving plate. The at least one bolt tensioner comprises a pair of bolt tensioners disposed on opposite sides of the coupling portion.
- With the above configuration (11), bolt fastening amounts can be adjusted individually for the pair of bolt tensioners disposed on either side of the coupling section coupling the other point of application and the reaction-force receiving plate, and it is possible to apply a tension force in an appropriate direction to the pair of points of application while maintaining the parallelism of the second bracket with respect to the third bracket.
- According to at least one embodiment of the present invention, provided is a method of assembling a wind-turbine tower whereby it is possible to connect tower sections appropriately.
-
-
FIG. 1 is a schematic diagram of a configuration example of a wind turbine provided with a wind-turbine tower assembled by a method of assembling a wind-turbine tower according to an embodiment. -
FIG. 2 is a flowchart schematically showing a method of assembling a wind-turbine tower according to an embodiment. -
FIG. 3A is a bottom view of anupper section 10 according to an embodiment. -
FIG. 3B is a top view of alower section 12 according to an embodiment. -
FIG. 4 is a diagram of an oval adjustment device according to an embodiment. -
FIG. 5 is a diagram of a configuration of the oval adjustment device depicted inFIG. 4 . -
FIG. 6 is a diagram of an oval adjustment device according to an embodiment. -
FIG. 7 is a diagram of a configuration of the oval adjustment device depicted inFIG. 6 . - Embodiments of the present invention will now be described in detail with reference to the accompanying drawings. It is intended, however, that unless particularly specified, dimensions, materials, shapes, relative positions and the like of components described in the embodiments shall be interpreted as illustrative only and not intended to limit the scope of the present invention.
-
FIG. 1 is a schematic diagram of a configuration example of a wind turbine provided with a wind-turbine tower assembled by a method of assembling a wind-turbine tower according to an embodiment. As depicted in the drawing, awind turbine 1 includes arotor 3 including at least oneblade 2 and ahub 4, a nacelle 5 supporting therotor 3, and a wind-turbine tower 6 supporting the nacelle 5. The wind-turbine tower 6 may be disposed on abase structure 7 disposed on water or on land. Thebase structure 7 may be a foundation structure disposed on water or on land, or a floating structure disposed on water. - The
wind turbine 1 may constitute a wind turbine power generating apparatus. In this case, the nacelle 5 may house a generator driven by rotational energy of therotor 3, a drive train for transmitting rotational energy of therotor 3 to the generator, or the like. - The wind-
turbine tower 6 includes a plurality of tower sections. In thewind turbine 1 depicted inFIG. 1 , the wind-turbine tower 6 includes fourtower sections 6a to 6d. Thetower sections 6a to 6d are disposed along an upward-and-downward direction (i.e., the vertical direction), and in each pair of sections disposed adjacently in the upward-and-downward direction, alower end portion 11 of anupper section 10 disposed above and anupper end portion 13 of alower section 12 disposed below are connected to each other to form the single wind-turbine tower 6. -
FIG. 2 is a flowchart schematically showing a method of assembling a wind-turbine tower according to an embodiment. - As shown in the flowchart of
FIG. 2 , in an embodiment, the diameter DL of theupper end portion 13 of thelower section 12 and the diameter DU of thelower end portion 11 of theupper section 10 are measured (S102). Furthermore, the temperature TL of thelower section 12 and the temperature TU of theupper section 10 are measured individually (S104), and the measurement results of the respective diameters DL, DU of theupper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 are corrected on the basis of the measurement results of the temperatures TL, TU, respectively (S106). - Next, on the basis of the measurement results of the diameter DL and the diameter DU obtained in steps S102 to S106, oval adjustment is performed so as to reduce the difference between the diameter DL and the diameter DU (S108).
- The
upper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 are positioned to face each other (S110), and then theupper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 are connected (S112). - It should be noted that step S104 of measuring each of the temperature TL of the
lower section 12 and the temperature TU of theupper section 10, and step S106 of correcting the measurement results of the diameters DL, DU respectively on the basis of the measurement results of the temperatures TL, TU are optional steps and performed if needed. - Furthermore, if the method of assembling a wind-turbine tower according to the present embodiment is to be applied to the
wind turbine 1 depicted inFIG. 1 , the method according to the present embodiment can be applied to connection of at least one pair of tower sections disposed adjacent to each other in the upward-and-downward direction from among the fourtower sections 6a to 6d constituting the wind-turbine tower 6 (i.e., thetower sections - Furthermore, step S108 of performing oval adjustment to reduce the difference between the diameter DL and the diameter DU maybe performed after step S110 of positioning the
upper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 to face each other and before step S112 of connecting theupper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10. - Described in detail below with reference to
FIGs. 3 to 7 are steps in the method of assembling a wind-turbine tower shown in the flowchart ofFIG. 2 . In the example described below, the tower section 6b is referred to as theupper section 10, and thetower section 6a as thelower section 12. -
FIGs. 3 to 7 are each a diagram for describing a method of assembling a wind-turbine tower according to an embodiment. - In step S102, the diameter DL of the
upper end portion 13 of the lower section 12 (tower section 6a) and the diameter DU of thelower end portion 11 of the upper section 10 (tower section 6b) are measured. - The positions in the circumferential direction (i.e. positions in the circumferential direction of the wind-turbine tower 6) for measuring the diameter DL and the diameter DU at the
upper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 are not particularly limited. In some embodiments, when theupper section 10 and thelower section 12 are connected in the following step S112, the diameter DL of theupper end portion 13 of thelower section 12 and the diameter DU of thelower end portion 11 of theupper section 10 are measured at positions in the circumferential direction that correspond to (face) each other in the upward-and-downward direction (i.e. vertical direction) of the wind-turbine tower 6. -
FIG. 3A is a bottom view of theupper section 10 according to an embodiment, andFIG. 3B is a top view of thelower section 12 according to an embodiment. - In an embodiment, eight measurement points U1 to U8 may be disposed on the
lower end portion 11 of theupper section 10 as depicted inFIG. 3A , and measurement points L1 to L8 corresponding to the measurement points U1 to U8 may be disposed on theupper end portion 13 of thelower section 12 as depicted inFIG. 3B . Herein, U1 to U8 and L1 to L8 are measurement points to be disposed on respective positions in the circumferential direction that form opposing pairs in the upward-and-downward direction (i.e. vertical direction) of the wind-turbine tower 6, when theupper section 10 and thelower section 12 are connected in the following step S112. For instance, in step S112, theupper section 10 and thelower section 12 are connected while the measurement point U1 at thelower end portion 11 of theupper section 10 and the measurement point L1 at theupper end portion 13 of thelower section 12 face each other in the upward-and-downward direction. - The diameter DU of the
lower end portion 11 of theupper section 10 may be measured at at least one of the measurement points U1 to U8 disposed on thelower end portion 11 of theupper section 10, and the diameter DL may be measured at the measurement point corresponding to the measurement point at which the diameter DU of theupper section 10 is measured, from among the measurement points L1 to L8 on theupper end portion 13 of thelower section 12. - In the example depicted in
FIGs. 3A and3B , the measurement points U1 to U8 are disposed at intervals of 45° in the circumferential direction about the center axis P of theupper section 10, while the measurement points L1 to L8 are disposed at intervals of 45° in the circumferential direction about the center axis Q of thelower section 12. - For instance, the diameter DU1 passing through the center axis P of the
upper section 10 and the measurement point U1 (and the measurement point U5 disposed opposite to U1 across the center axis P in the radial direction) may be measured for thelower end portion 11 of theupper section 10, and the diameter DL1 passing through the center axis Q of thelower section 12 and the measurement point L1 (and the measurement point L5 disposed opposite from L1 across the center axis Q in the radial direction) may be measured for theupper end portion 13 of thelower section 12. - Furthermore, the diameter DU and the diameter DL may be measured at different multiple positions in the circumferential direction. For instance, diameters DU1, DU2, DU3, and DU4 passing through the center axis P of the
upper section 10 and the measurement points U1, U2, U3, and U4 (and the measurement points U5 to U8 disposed opposite from U1 to U4 across the center axis P in the radial direction), respectively, may be measured for thelower end portion 11 of theupper section 10, and diameters DL1, DL2, DL3, and DL4 passing through the center axis Q of thelower section 12 and the measurement points L1, L2, L3, and L4 (and the measurement points L5 to L8 disposed opposite from L1 to L4 across the center axis Q in the radial direction), respectively, may be measured for theupper end portion 13 of thelower section 12. - In step S104, the temperature TL of the
lower section 12 and the temperature TU of theupper section 10 are measured individually. - At this time, in step S102, the temperature TL of the
lower section 12 and the temperature TU of theupper section 10 may be measured at the measurement points at which the diameters of thelower section 12 and theupper section 10 are measured in S102. - For instance, if the diameter DU1 passing through the center axis P of the
upper section 10, the measurement point U1, and the measurement point U5 is measured, temperatures TU1 and TU5 may be measured at the measurement points U1 and U5, respectively. Furthermore, the temperature is measured similarly at other measurement points of theupper section 10 and measurement points of thelower section 12. - In step S106, the measurement results of the respective diameters DL, DU of the
upper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 are corrected on the basis of the respective measurement results of temperature obtained in step S104. - For instance, for the diameter DU1 passing through the center axis P, the measurement point U1, and the measurement point U5 of the
upper section 10, the measurement result of the diameter DU1 is corrected on the basis of the measurement results of the temperatures TU1 and TU5 measured at the measurement points U1 and U5, respectively. - If time, place, or the like for measuring the diameter is different between the
upper section 10 and thelower section 12, the measurement result of each diameter may be affected due to thermal expansion or the like of the material constituting theupper section 10 and thelower section 12 depending on change in the temperature or the sunshine condition. Thus, in step S106, the measurement results of the diameter are corrected on the basis of the measurement results of the temperature, and thereby it is possible to reduce the influence of the temperature on the measurement results of the diameter of theupper section 10 and thelower section 12. - In step S108, on the basis of the measurement results of the diameter DL and the diameter DU obtained in steps S102 to S106, oval adjustment is performed so as to reduce the difference between the diameter DL and the diameter DU, by applying a force in the radial direction of the wind-
turbine tower 6 to at least one of theupper end portion 13 of thelower section 12 or thelower end portion 11 of theupper section 10. - In some embodiments, in step S108, an outward or inward force in the radial direction of the wind-
turbine tower 6 is applied to a pair of points of application on the inner peripheral wall surface of at least one of thelower end portion 11 of theupper section 10 or theupper end portion 13 of thelower section 12. - For instance, in the example depicted in
FIGs. 3A and3B , if an expression DL1>DU1 is satisfied by the relationship between the measurement result of the diameter DL1 passing through the measurement points U1 and U5 at thelower end portion 11 of theupper section 10 and the measurement result of the diameter DL1 passing through the measurement points L1 and L5 at theupper end portion 13 of thelower section 12, an inward force in the radial direction of the wind-turbine tower 6 is applied to a pair of points of application on the innerperipheral wall surface 8 of thelower end portion 11 of theupper section 10 to reduce the diameter DL1, and/or an outward force in the radial direction of the wind-turbine tower 6 is applied to a pair of points of application on the innerperipheral wall surface 9 of theupper end portion 1 3 of thelower section 12 to increase the diameter DU1. - In this case, the pair of points of application may be disposed on positions that face each other across the center of the wind-
turbine tower 6 on the inner peripheral wall surface of at least one of thelower end portion 11 of theupper section 10 or theupper end portion 13 of thelower section 12. - In an embodiment, the pair of points of application on the inner
peripheral wall surface 8 of thelower end portion 11 of theupper section 10 may be points of application AU1, AU5 on the innerperipheral wall surface 8 corresponding to the measurement points U1 and U5 (seeFIG. 3A ). Alternatively, the pair of points of application on the innerperipheral wall surface 9 of theupper end portion 13 of thelower section 12 may be points of application AL1, AL5 on the innerperipheral wall surface 8 corresponding to the measurement points L1 and L5 (seeFIG. 3B ). -
FIGs. 4 and6 are each a diagram of an oval adjustment device according to an embodiment. - In step S108, for instance, forces F1, F1' directed inward in the radial direction of the wind-
turbine tower 6 may be applied to a pair of points of application A1, A2 on the innerperipheral wall surface 8 of thelower end portion 11 of theupper section 10 or the innerperipheral wall surface 9 of theupper end portion 13 of thelower section 12, by using theoval adjustment device 20 depicted inFIG. 4 . - Alternatively, in step S108, for instance, forces F2, F2' directed outward in the radial direction of the wind-
turbine tower 6 may be applied to a pair of points of application A3, A4 on the innerperipheral wall surface 8 of thelower end portion 11 of theupper section 10 or the innerperipheral wall surface 9 of theupper end portion 13 of thelower section 12, by using theoval adjustment device 40 depicted inFIG. 6 . - The configurations of the
oval adjustment device 20 and theoval adjustment device 40 will be described below. - In step S110, while the
lower section 12 is disposed upright, theupper section 10 is suspended above thelower section 12 by using a crane or the like so that theupper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 face each other. - In step S112, the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 are connected. - In some embodiments, before step S112, the
upper section 10 may be rotated in the circumferential direction relative to thelower section 12 so that the position of theupper section 10 coincides with the position of thelower section 12 in the circumferential direction. At this time, theupper section 10 may be provided with a chain block, and revolved with respect to thelower section 12 by using the chain block. - The step of rotating the
upper section 10 relative to thelower section 12 in the circumferential direction may be performed if the protruding portions 14 are not in the same positions as the corresponding receiving portions 16 in the circumferential direction when theupper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 are positioned so as to face each other in step S102. - In some embodiments, in step S112, the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 are joined by welding. - In this case, the method further includes a step of, before joining the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 by welding, moving theupper section 10 in the upward-and-downward direction relative to thelower section 12, and adjusting the clearance between thelower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 to be within a predetermined range. Herein, the clearance between thelower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 is a root gap for welding thelower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12. - By adjusting the clearance to be within a predetermined range as described above, it is possible to weld the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 reliably. - In the step of adjusting the clearance, the clearance may be adjusted by moving the
upper section 10 in the upward-and-downward direction by using a crane suspending theupper section 10, or a hydraulic jack disposed on theupper section 10 or thelower section 12, for instance. - In some embodiments, in step S112, the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 are joined by automatic welding. Specifically, an automatic welding machine is used to move an electrode automatically along a welding line between theupper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10. - In some embodiments, in step S112, the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 may be joined by manual welding by manpower. - Alternatively, in some embodiments, in step S112, the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 may be joined partly by automatic welding, and partly by manual welding. - In some embodiments, in step S112, the
lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12 may be connected by fastening a flange (not depicted) disposed on thelower end portion 11 of theupper section 10 and a flange (not depicted) disposed on theupper end portion 13 of thelower section 12 with bolts and nuts. - According to the above described method of assembling the wind-
turbine tower 6 according to some embodiments, before theupper end portion 13 of thelower section 12 and thelower end portion 11 of theupper section 10 are connected, a force in the radial direction of the wind-turbine tower 6 is applied to at least one of thelower end portion 11 of theupper section 10 or theupper end portion 13 of thelower section 12 so that a difference between the diameter of thelower end portion 11 of theupper section 10 and the diameter of theupper end portion 13 of thelower section 12 decreases, on the basis of the measurement results of the diameters thereof. Accordingly, it is possible to reduce a difference between the diameter of theupper end portion 13 of thelower section 12 and the diameter of thelower end portion 11 of theupper section 10, and thus the positions of theupper end portion 1 3 of thelower section 12 and thelower end portion 11 of theupper section 10 can be matched more readily. Thus, even if thelower section 12 and/or theupper section 10 deforms in the radial direction during transportation, for instance, it is possible to connect theupper section 10 and thelower section 12 appropriately. - Next, an oval adjustment device according to some embodiments will be described with reference to
FIGs. 4 to 7 . In the above described step S108, by using an oval adjustment device according to some embodiments described below, an outward or inward force in the radial direction of the wind-turbine tower 6 can be applied to a pair of points of application on the inner peripheral wall surface of at least one of thelower end portion 11 of theupper section 10 or theupper end portion 13 of thelower section 12. -
FIGs. 5 and7 are configuration diagrams of the oval adjustment devices depicted inFIGs. 4 and6 , respectively. - The
oval adjustment devices wind turbine 1, on the inner peripheral wall surface of the tower section. - While the
oval adjustment devices lower end portion 11 of theupper section 10 and theupper end portion 13 of thelower section 12, the following example describes theoval adjustment device 20 being applied to thelower end portion 11 of theupper section 10. - The
oval adjustment device 20 depicted inFIG. 4 is for applying a tension force to a pair of points of application disposed opposite to each other across the center (center axis P) of theupper section 10 on the innerperipheral wall surface 8 at thelower end portion 11 of theupper section 10. If a tension force is to be applied to a pair of points of application A1, A2 on the innerperipheral wall surface 8 by using theoval adjustment device 20, theoval adjustment device 20 is disposed along a line connecting the pair of points of application A1, A2, as depicted inFIG. 4 . - As depicted in
FIG. 5 , theoval adjustment device 20 includes awire 22, thefirst bracket 24, thesecond bracket 26, thethird bracket 28,bolts bolt tensioners - The
first bracket 24 is fixed to a mountingportion 18a disposed on the innerperipheral wall surface 8 of theupper section 10 withbolts 19a, and thereby anend 23a of thewire 22 is connected to the point of application A1 on the innerperipheral wall surface 8. - The
second bracket 26 is connected to theother end 32b of thewire 22. - The
third bracket 28 is fixed to a mountingportion 18b disposed on the innerperipheral wall surface 8 withbolts 19b and thereby attached to the other point of application A2, and includes a reaction-force receiving plate 29 extending along a plane that is orthogonal to the extending direction of thewire 22. - The
bolts wire 22 between thesecond bracket 26 and thethird bracket 28, are fixed to thesecond bracket 26 withnuts force receiving plate 29 of thethird bracket 28. - The
bolt tensioners bolts bolts force receiving plate 29. - In the above described
oval adjustment device 20, if thebolt tensioners bolt tensioners bolts bolts wire 22. Accordingly, forces F1, F1' (seeFIG. 4 ) directed inward in the radial direction can be applied to the pair of points of application A1, A2 on the innerperipheral wall surface 8. - In the
oval adjustment device 20 depicted inFIG. 5 , thethird bracket 28 further includes acoupling section 27 disposed on an extension line of thewire 22 and coupling the point of application A2 and the reaction-force receiving plate 29. The pair ofbolt tensioners coupling section 27. - In this case, the bolt fastening amounts can be adjusted individually for the pair of
bolt tensioners coupling section 27, and it is possible to apply a tension force in an appropriate direction to the pair of points of application A1, A2 while maintaining the parallelism of thesecond bracket 26 with respect to thethird bracket 28. - The
oval adjustment device 40 depicted inFIG. 6 is for applying a tension force to a pair of points of application disposed opposite to each other across the center (center axis P) of theupper section 10 on the innerperipheral wall surface 8 at thelower end portion 11 of theupper section 10. If a tension force is to be applied to a pair of points of application A3, A4 on the innerperipheral wall surface 8 by using theoval adjustment device 40, theoval adjustment device 40 is disposed along a line connecting the pair of points of application A3, A4, as depicted inFIG. 6 . - The
oval adjustment device 40 includes anintermediate rod 42 and a hydraulic jack 44 mounted to at least one of the end portions of theintermediate rod 42, as depicted inFIG. 6 . In theoval adjustment device 40 depicted inFIG. 6 ,hydraulic jacks intermediate rod 42. - To apply an outward force in the radial direction to the
upper section 10, theintermediate rod 42 is oriented in the radial direction in which a force is to be applied, at thelower end portion 11 of theupper section 10, and thehydraulic jacks intermediate rod 42 and a pair of respective points of application on the innerperipheral wall surface 8 on which the force is to be applied. Specifically, theintermediate rod 42 is oriented along the line connecting the pair of points of application A3, A4, and thehydraulic jack 44a is disposed between the point of application A3 and theintermediate rod 42 while thehydraulic jack 44b is disposed between the point of application A4 and theintermediate rod 42. - Then, the
hydraulic jacks intermediate rod 42. - Accordingly, with the
oval adjustment device 40, outward forces in the radial direction can be applied to the pair of points of application A3, A4 on the innerperipheral wall surface 8 by using thehydraulic jacks - In the method of assembling the wind-
turbine tower 6 according to some embodiments, when the above described oval adjustment is performed by using theoval adjustment device 40 depicted inFIG. 6 , theintermediate rod 42 may be rotated in the circumferential direction while being suspended from above as depicted inFIG. 7 , to orient theintermediate rod 42 along the line connecting the pair of points of application A3, A4. In this case, a chain block may be used to rotate theintermediate rod 42 in the circumferential direction. - Accordingly, the
intermediate rod 42 is rotated while being suspended from above, and thereby it is possible to change the direction of theintermediate rod 42 readily, and thus to orient theintermediate rod 42 along the line connecting the pair of points of application in a desired radial direction. - Furthermore, in the method of assembling the wind-
turbine tower 6 according to some embodiments, when the above described oval adjustment is performed by using theoval adjustment device 40 depicted inFIG. 6 , theintermediate rod 42 may be moved in the upward-and-downward direction to adjust the position of theintermediate rod 42 in the upward-and-downward direction. In this case, a chain block may be used to move theintermediate rod 42 in the upward-and-downward direction. - Accordingly, the
intermediate rod 42 is moved in the upward-and-downward direction while being suspended from above, and thereby it is possible to change the position of theintermediate rod 42 readily in the upward-and-downward direction, and thus to set theintermediate rod 42 in an initial position in the upward and downward direction. - Embodiments of the present invention were described in detail above, but the present invention is not limited thereto, and various amendments and modifications may be implemented.
- For instance, an expression of relative or absolute arrangement such as "in a direction", "along a direction", "parallel", "orthogonal", "centered", "concentric" and "coaxial" shall not be construed as indicating only the arrangement in a strict literal sense, but also includes a state where the arrangement is relatively displaced by a tolerance, or by an angle or a distance whereby it is possible to achieve the same function.
- For instance, an expression of an equal state such as "same" "equal" and "uniform" shall not be construed as indicating only the state in which the feature is strictly equal, but also includes a state in which there is a tolerance or a difference that can still achieve the same function.
- Further, for instance, an expression of a shape such as a rectangular shape or a cylindrical shape shall not be construed as only the geometrically strict shape, but also includes a shape with unevenness or chamfered corners within the range in which the same effect can be achieved.
- On the other hand, an expression such as "comprise", "include", "have", "contain" and "constitute" are not intended to be exclusive of other components.
Claims (11)
- A method of assembling a wind-turbine tower (6) which comprises a plurality of tower sections (6a-d,10,12) including a lower section (12) and an upper section (10) to be connected to the lower section (12), the method comprising:a step of measuring a diameter (DL) of an upper end portion (13) of the lower section (12) and a diameter (DU) of a lower end portion (11) of the upper section (10);a step (S108) of applying a force in a radial direction of the wind-turbine tower (6) to at least one of the upper end portion (13) of the lower section (12) or the lower end portion (11) of the upper section (10) so as to reduce a difference between the diameter (DL) of the upper end portion (13) of the lower section (12) and the diameter (DU) of the lower end portion (11) of the upper section (10), on the basis of a measurement result of each of the diameter of the upper end portion (13) of the lower section (12) and the diameter of the lower end portion (11) of the upper section (10) ;a step (S110) of suspending the upper section (10) above the lower section (12) while the lower section (12) is disposed upright so that the upper end portion (13) of the lower section (12) and the lower end portion (11) of the upper section (10) face each other; anda step of connecting the lower end portion (11) of the upper section (10) and the upper end portion (13) of the lower section (12).
- The method of assembling a wind-turbine tower (6) according to claim 1, further comprising:a step (S104) of measuring each of a temperature (TL) of the lower section (12) and a temperature (TU) of the upper section (10); anda step (S106) of correcting the measurement result of each of the diameter (DL) of the upper end portion (13) of the lower section (12) and the diameter (DU) of the lower end portion (11) of the upper section (10), on the basis of measurement results of the temperatures (TR,TL).
- The method of assembling a wind-turbine tower (6) according to claim 1 or 2, further comprising
a step of moving the upper section (10) in an upward-and-downward direction relative to the lower section (12) to adjust a clearance between the lower end portion (11) of the upper section (10) and the upper end portion (13) of the lower section (12) to be within a predetermined range,
wherein the step of connecting includes joining the lower end portion (11) of the upper section (10) and the upper end portion (13) of the lower section (12) by welding. - The method of assembling a wind-turbine tower (6) according to any one of claims 1 to 3,
wherein the connecting step includes performing automatic welding along a welding line between the upper end portion (13) and the lower end portion (11) by using an automatic welding machine. - The method of assembling a wind-turbine tower (6) according to any one of claims 1 to 4,
wherein the step of applying a force in the radial direction includes applying an outward or inward force in the radial direction to a pair of points of application on an inner peripheral wall surface (8,9) of at least one of the lower end portion (11) of the upper section (10) or the upper end portion (13) of the lower section (12). - The method of assembling a wind-turbine tower (6) according to claim 5,
wherein the pair of points of application is disposed on positions facing each other across a center of the wind-turbine tower (6), on the inner peripheral wall surface (8,9). - The method of assembling a wind-turbine tower (6) according to claim 5 or 6,
wherein the step of applying a force in the radial direction includes:connecting a first end of a wire (22) to one of the points of application on the inner peripheral wall surface (8) via a first bracket (24);connecting a second end of the wire (22) to a second bracket (26);attaching a third bracket (28) to the other one of the points of application on the inner peripheral wall surface (8);disposing at least one bolt (30a,30b) so that the at least one bolt (30a,30b) is inserted through a reaction-force receiving plate (29) of the third bracket (28), the reaction-force receiving plate (29) extending along a plane orthogonal to an extending direction of the wire (22), and fixing the at least one bolt (30a,30b) to the second bracket (26) ; andapplying a tension force to the at least one bolt with at least one bolt tensioner (32a,32b) disposed on the side of the other one of the points of application across the reaction-force receiving plate (29). - The method of assembling a wind-turbine tower (6) according to claim 5 or 6,
wherein the step of applying a force in the radial direction includes:orienting an intermediate rod (42) along a line connecting the pair of points of application; andapplying an outward force in the radial direction to each of the points of application via the intermediate rod (42) by using at least one hydraulic jack (44a,44b) disposed between at least one end of the intermediate rod (42) and at least one of the points of application on the inner peripheral wall surface (8). - The method of assembling a wind-turbine tower (6) according to claim 8,
wherein the intermediate rod (42) is oriented along the line connecting the pair of points of application by rotating the intermediate rod (42) while the intermediate rod (42) is suspended from above. - An oval adjustment device (20;40) for an application of a method according to any one of claims 1-9, applying a tension force to a pair of points of application disposed on an inner peripheral wall surface (8) of a tower section (10) of a wind turbine (1) facing each other across a center of the tower section (10), the oval adjustment device (20;40) comprising:a wire (22) to extend along a line connecting the pair of points of application;a first bracket (24) for connecting a first end of the wire (22) to one of the points of application on the inner peripheral wall surface (8);a second bracket (26) to be connected to a second end of the wire (22);a third bracket (28) to be mounted to the other one of the points of application on the inner peripheral wall surface (8) and including a reaction-force receiving plate (29) to extend along a plane orthogonal to an extending direction of the wire (22);at least one bolt (30a,30b) to extend along the wire (22) between the second bracket (26) and the third bracket (28), to be fixed to the second bracket (26), and to be inserted through the reaction-force receiving plate (29) of the third bracket (28); andat least one bolt tensioner (32a,32b) to be disposed on the side of the other one of the points of application across the reaction-force receiving plate (29), for applying a tension force to the at least one bolt (30a,30b).
- The oval adjustment device (20;40) according to claim 10,
wherein the third bracket (28) further includes a coupling portion (27) to be disposed on an extension line of the wire (22) and to couple the other one of the points of application and the reaction-force receiving plate (29), and
wherein the at least one bolt tensioner comprises a pair of bolt tensioners (32a,32b) disposed on opposite sides of the coupling portion (29).
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015239226A JP6371272B2 (en) | 2015-12-08 | 2015-12-08 | Wind turbine tower assembling method and oval adjusting device |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3179099A1 EP3179099A1 (en) | 2017-06-14 |
EP3179099B1 true EP3179099B1 (en) | 2018-07-11 |
Family
ID=57348603
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16199695.4A Not-in-force EP3179099B1 (en) | 2015-12-08 | 2016-11-18 | Method of assembling wind turbine tower and oval adjustment device |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP3179099B1 (en) |
JP (1) | JP6371272B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3926164A1 (en) | 2020-06-19 | 2021-12-22 | Vestas Offshore Wind A/S | Device and method for assembling wind turbine |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020253928A1 (en) * | 2019-06-21 | 2020-12-24 | Vestas Wind Systems A/S | Improvements relating to reinforcement of wind turbine towers |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011078016A1 (en) * | 2011-06-22 | 2012-12-27 | Aloys Wobben | tower manufacturing |
DK177198B1 (en) * | 2011-06-24 | 2012-05-29 | Vestas Wind Sys As | METHOD AND APPARATUS FOR CORRECTING OVALITY IN WIND TURBINE TOWERS |
JP5756358B2 (en) | 2011-07-13 | 2015-07-29 | 株式会社日立製作所 | Flange structure and wind power generator |
EP2754783A1 (en) * | 2013-01-11 | 2014-07-16 | Areva Wind GmbH | A tool and a method for aligning a pair of flanges of a supporting structure of a wind generator |
-
2015
- 2015-12-08 JP JP2015239226A patent/JP6371272B2/en not_active Expired - Fee Related
-
2016
- 2016-11-18 EP EP16199695.4A patent/EP3179099B1/en not_active Not-in-force
Non-Patent Citations (1)
Title |
---|
None * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3926164A1 (en) | 2020-06-19 | 2021-12-22 | Vestas Offshore Wind A/S | Device and method for assembling wind turbine |
Also Published As
Publication number | Publication date |
---|---|
EP3179099A1 (en) | 2017-06-14 |
JP6371272B2 (en) | 2018-08-08 |
JP2017106346A (en) | 2017-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8443557B2 (en) | Tower base section of a wind turbine, a wind turbine and a system for mounting a tower | |
EP2444663B1 (en) | Onshore wind turbine with tower support system | |
CA2776020C (en) | Wind turbine with tower support system and associated method of construction | |
EP3134643B1 (en) | Method and tool for assembling tower elements | |
US9845612B2 (en) | System and method for assembling tower sections of a wind turbine lattice tower structure | |
US20100132299A1 (en) | Wind turbine with improved tower and method of assembling same | |
AU2008258174A1 (en) | Wind turbine tower joints | |
US8191316B2 (en) | Off-shore wind turbine and method of erecting a wind turbine tower | |
US20180347547A1 (en) | Wind turbine tower reinforcement system | |
JP5993756B2 (en) | Offshore structure and installation method of offshore structure | |
EP3179099B1 (en) | Method of assembling wind turbine tower and oval adjustment device | |
US9951754B2 (en) | System and method for assembling tower sections of a wind turbine lattice tower structure | |
EP3290692B1 (en) | Wind-turbine tower, wind turbine, and method of assembling wind-turbine tower | |
US20240084781A1 (en) | Wind-turbine tower facility and method of assembling same | |
JP5952600B2 (en) | Connection structure between superstructure and pile | |
EP3179098B1 (en) | Method of assembling wind turbine tower | |
US9777705B2 (en) | Method for re-indexing a pitch bearing of a wind turbine | |
CN113529776A (en) | Three-dimensional position-adjustable photovoltaic module support stand column connection conversion device | |
JP2013060711A (en) | Foundation structure for solar cell module or solar cell array frame | |
KR102563882B1 (en) | Installing device for wind turbine tower and installing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20170609 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20180111 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1017145 Country of ref document: AT Kind code of ref document: T Effective date: 20180715 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602016004026 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20180711 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1017145 Country of ref document: AT Kind code of ref document: T Effective date: 20180711 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181111 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181011 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181012 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20181011 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602016004026 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
26N | No opposition filed |
Effective date: 20190412 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181118 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20181130 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20161118 Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180711 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180711 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191130 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191130 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20210930 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20211018 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20220621 Year of fee payment: 7 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20221118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221118 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221130 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602016004026 Country of ref document: DE |
|