EP2977125B1 - Sand casting method - Google Patents

Sand casting method Download PDF

Info

Publication number
EP2977125B1
EP2977125B1 EP14769379.0A EP14769379A EP2977125B1 EP 2977125 B1 EP2977125 B1 EP 2977125B1 EP 14769379 A EP14769379 A EP 14769379A EP 2977125 B1 EP2977125 B1 EP 2977125B1
Authority
EP
European Patent Office
Prior art keywords
sand mold
mold
approximately
temperature
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP14769379.0A
Other languages
German (de)
French (fr)
Other versions
EP2977125A4 (en
EP2977125A1 (en
Inventor
Tetsuo Miura
Tsutomu Honda
Yoshimitsu Watanabe
Kenichi Watanabe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Techno Metal Co Ltd
Original Assignee
Techno Metal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Techno Metal Co Ltd filed Critical Techno Metal Co Ltd
Publication of EP2977125A1 publication Critical patent/EP2977125A1/en
Publication of EP2977125A4 publication Critical patent/EP2977125A4/en
Application granted granted Critical
Publication of EP2977125B1 publication Critical patent/EP2977125B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/02Sand moulds or like moulds for shaped castings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22CFOUNDRY MOULDING
    • B22C9/00Moulds or cores; Moulding processes
    • B22C9/10Cores; Manufacture or installation of cores
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D27/00Treating the metal in the mould while it is molten or ductile ; Pressure or vacuum casting
    • B22D27/04Influencing the temperature of the metal, e.g. by heating or cooling the mould

Definitions

  • the present invention relates to a sand casting method.
  • Patent Literature 1 proposes an austenitic heat resistant cast steel instead of ferritic heat resistant cast steels commonly adopted as materials for automotive exhaust system components such as an exhaust manifold and turbocharger.
  • the austenitic heat resistant cast steel has excellent hot strength and provides good fluidity during casting.
  • the austenitic heat resistant cast steel can meet requirements for high heat resistance while reducing casting defects.
  • a sand casting process is a metalworking method for making a product by pouring molten metal into a sand mold created by binding sand as aggregate using a binder.
  • the sands used as aggregate can be classified into natural sand and artificial sand, and these sands as well as reclamation sand thereof are used appropriately according to the intended use.
  • Known binders include organic (furan resin, phenol resin, urethane resin, gas curable binder, etc.), inorganic (e.g., water glass), and hybrid binders.
  • Patent Literatures 2 to 5 disclose hybrid binders and hybrid casting processes which use the hybrid binders.
  • the hybrid binders secure strength (strength at room temperature) of a created sand mold (including a core) using an organic binder and secure strength (hot strength) of the sand mold during casting using ceramic.
  • the hybrid binder which is called an XP alcoholic solution, is a solution composed principally of an alcoholic solution containing one or more alcohol-soluble metallic alkoxides and an alcohol-soluble alkali compound of an alkali metal or alkaline earth metal, both in a less advanced stage of hydrolysis, where the alcohol-soluble metallic alkoxides are selected from among alkoxides of the metals in the 4A group or 4B group (excluding carbon) and the metals in the 3A group or 3B group of the periodic table and partial hydrolysates of the alkoxides.
  • Patent Literatures 2 to 5 Patent Literature 6 describes a method for casting an aluminum alloy member.
  • the casting material of an Al-Si system is molten at a prescribed temperature.
  • a heater is kept heated so as to maintain the heater temperature at a prescribed temperature; and the point of a central part in the bottom of the mold in contact with the heater is the part to solidify last.
  • the mold is removed upon lapse of some time after the de-energization to obtain the Al alloy piece.
  • the hybrid binder secures strength (strength at room temperature) of a created sand mold (including a core) using an organic binder component of the hybrid binder and secures strength (hot strength) of the sand mold during casting using a ceramic component of the hybrid binder.
  • the hybrid casting process using the hybrid binder allows high-temperature molten metal to be poured into the sand mold, making it possible to cast metal with poor fluidity or cast a thin-walled product of which fluidity is required strictly.
  • An object of the present invention is to provide a sand casting method which can limit the risk that molten metal will not spread to an entire area of a product portion of a sand mold while minimizing cost increases.
  • Another object of the present invention is to provide a sand casting method which can reduce casting defects of a metal which has relatively poor fluidity and casting defects of a thin-walled product of which fluidity is required strictly.
  • Still another object of the present invention is to provide a sand casting method which can produce a relatively thin-walled casting by a gravity casting process using a metal which has relatively poor fluidity.
  • the technical problems described above can be solved by providing a sand casting method according to claim 1.
  • RCS resin coated sand
  • Figure 1 shows deflection strength (Kg/cm 2 ), i.e., resistance of the test pieces to bending at room temperature, 200°C, and 300°C.
  • Figure 2 shows strength degradation rate (%) of the test pieces with heating at 200°C, 300°C, 400°C, and 500°C. The strength degradation rate (%) was calculated based on room temperature.
  • the organic binder had appropriate strength (a deflection strength of approximately 40kg/cm 2 at 200°C and a deflection strength of approximately 24kg/cm 2 at 300°C).
  • the organic binder is applicable to the present invention practically at approximately 200°C to approximately 350°C, and preferably at approximately 200°C to approximately 300°C.
  • HiSiMo ductile (spherical graphite) cast iron and austenitic spherical graphite cast iron (Ni-resist D5S) have excellent fluidity.
  • cast iron ( FC : Ferrum Casting) and heat resistant steel ( SCH ) have relatively poor fluidity and that the heat resistant steel ( SCH ) has poorer fluidity than cast iron ( FC ).
  • Figures 3 to 5 show a sand mold used to cast a tabular test piece (2 mm in thickness) rectangular in planar view.
  • Figure 3 shows a cavity in the sand mold used to cast the test piece.
  • Figure 4 is a side view of the sand mold.
  • Figure 5 is a plan view of the sand mold.
  • the illustrated sand mold 10 for the test piece was made of RCS.
  • RCS stands for resin coated sand, which contains Cerabeads as aggregate, and a resin as a binder.
  • the sand mold 10 for the test piece is made up of an upper mold 12 and a lower mold 14 ( Figure 4 ).
  • the cavity 16 in the sand mold 10 is made up of a product portion 18 and a runner 20. Molten metal poured into a down sprue 22 flows into the runner 20 through a gate stick portion 24.
  • An overflow channel 26 is connected to a downstream end portion of the product portion 18 , opening in a top surface of the upper mold 12.
  • the product portion 18 measures 300.0 mm in length, 95.0 mm in width, and 2.0 mm in thickness.
  • the lower mold 14 of the sand mold 10 for test pieces has a first recess 30 , which faces an upstream end portion of the product portion 18 and the runner 20 , as indicated by imaginary lines in Figures 6 and 7 .
  • the first recess 30 is open upward.
  • the lower mold 14 of the sand mold 10 has a second recess 32 which extends from an upstream end to a downstream end on a lateral portion (lateral portion on the side further from the gate stick portion 24 ) of the product portion 18 as indicated by imaginary lines in Figures 8 and 9 .
  • the second recess 32 is open upward.
  • the lower mold 14 of the sand mold 10 has a third recess 34 which faces an entire area of the downstream end portion of the product portion 18 as indicated by indicated by imaginary lines in Figures 10 and 11 .
  • the third recess 34 is open upward.
  • Figures 12 to 14 show partial sand molds 40 , 42 , and 44 which are detachably attached, respectively, to the first to third recesses 30 , 32 , and 34 described above.
  • the first partial sand mold 40 in Figure 12 has a tabular rectangular shape, which is complementary to the contour of the first recess 30 described above ( Figures 6 and 7 ).
  • the first partial sand mold 40 When the first partial sand mold 40 is assembled onto the first recess 30, the first partial sand mold 40 forms a cavity wall surface in the upstream end portion of the product portion 18 and a cavity wall surface of the runner 20 by being integrated with the lower mold 14.
  • the second partial sand mold 42 in Figure 13 has the shape of a rectangular parallelepiped, which is complementary to the contour of the second recess 32 described above ( Figures 8 and 9 ).
  • the second partial sand mold 42 forms a cavity wall surface in the lateral portion (lateral portion on the side further from the gate stick portion 24 ) of the product portion 18 by being integrated with the lower mold 14.
  • the third partial sand mold 44 in Figure 14 has a tabular rectangular shape, which is complementary to the contour of the third recess 34 described above ( Figures 10 and 11 ).
  • the third partial sand mold 44 forms a cavity wall surface in the downstream end portion of the product portion 18 by being integrated with the lower mold 14.
  • Figure 15 shows an example in which test pieces Tp were cast from cast iron (FC) in the sand mold 10 made of RCS. Casting conditions of the first to third test pieces Tp (1) to Tp (3) shown in ( I ) to ( III ) of Figure 15 were as following.
  • FIG 16 shows an example in which cast iron ( FC ) was cast in the sand mold 10 ( Figures 6 and 7 ) equipped with the first recess 30 and incorporated with the heated first partial sand mold 40 ( Figure 12 ).
  • the partial sand mold 40 was made of RCS.
  • the RCS was prepared from Cerabeads #650 and an organic binder (resin).
  • Figure 17 shows an example in which test pieces Tp were cast from heat resistant steel ( SCH22 ) using the first partial sand mold 40 ( Figure 12 ) described above.
  • the first partial sand mold 40 was made using the hybrid binder ( XP alcoholic solution).
  • the aggregate used was Cerabeads #650.
  • Figure 18 shows an example in which seventh and eighth test pieces Tp (7) and Tp (8) were cast from heat resistant steel ( SCH22 ) using the second partial sand mold 42 ( Figure 13 ) described above.
  • the second partial sand mold 42 was made using the hybrid binder ( XP alcoholic solution).
  • the aggregate used was Cerabeads #650.
  • the casting conditions of ( VIII ) which provided the completed eighth test piece Tp (8) differ from the casting conditions of ( VII ) in that (a) the melting temperature was approximately 10°C higher and that (b) the heated sand mold 10 was used.
  • the fluidity can be improved if the melting temperature of the heat resistant steel is increased and the sand mold 10 is heated.
  • Figure 19 shows an example in which ninth and tenth test pieces Tp (9) and Tp (10) were cast from heat resistant steel ( SCH22 ) using the third partial sand mold 44 (installed in the downstream portion of the product portion 18: Figure 19 ) described above.
  • the third partial sand mold 44 was made using the hybrid binder ( XP alcoholic solution).
  • the aggregate used was Cerabeads #650.
  • the solid line in Figures 20 to 26 indicates temperatures in various places inside the sand mold 10 when molten metal at a typical temperature is poured into the sand mold 10. If these temperatures are taken as reference temperatures, the temperature of the molten metal falls while the molten metal is flowing inside the sand mold 10.
  • Figure 20 shows falls (chain double-dashed line) in the once raised temperature of molten metal poured into the sand mold 10. By raising the temperature of the molten metal, it is possible to maintain the temperature in various places of the sand mold 10 at levels higher than the reference temperatures. Figure 20 teaches that the possibility of occurrence of casting defects can be reduced by raising the temperature of the molten metal.
  • Figure 21 shows temperature falls in the molten metal flowing in the sand mold 10 heated for use in casting, where the temperature is indicated by a chain double-dashed line.
  • the chain double-dashed line in Figure 21 corresponds to casting under the casting conditions of (III) in Figure 15 .
  • the use of the heated sand mold 10 for casting can reduce the slope of the temperature fall. That is, the temperature falls in the molten metal flowing in the sand mold 10 can be reduced in magnitude.
  • Figure 21 teaches that the possibility of occurrence of casting defects can be reduced by using the heated sand mold 10 for casting.
  • Figure 22 shows temperature falls in the molten metal flowing in the sand mold 10 when casting is carried out by installing a heat source (first partial sand mold 40 ) in a downstream portion of the runner 20 and upstream portion of the product portion 18 , where the temperature is indicated by a chain double-dashed line.
  • the molten metal introduced into the sand mold 10 enters the runner 20 while falling in temperature.
  • the temperature falls in the molten metal in the downstream portion of the runner 20 and upstream portion of the product portion 18 are retarded by the heat source (first partial sand mold 40 ) placed in the downstream portion of the runner 18 and upstream portion of the product portion 18.
  • the temperature of the molten metal in the entire area of the product portion 18 including the downstream portion of the product portion 18 can be maintained at a relatively high level.
  • Figure 22 teaches that the possibility of occurrence of casting defects can be reduced by placing the heat source in the upstream portion of the product portion 18 and the runner 20 located upstream of the product portion 18.
  • Figure 23 shows temperature falls in the molten metal flowing in the sand mold 10 (especially in the lateral portion where a heat source is placed) when casting is carried out by installing the heat source (second partial sand mold 42 ( Figure 13 )) in the lateral portion of the product portion 18 prone to cause casting defects, where the temperature is indicated by a chain double-dashed line.
  • the temperature falls in the molten metal introduced into the sand mold 10 and flowing in the lateral portion of the product portion 18 are retarded by the heat source (second partial sand mold 42 ) placed in the lateral portion.
  • the flow of the molten metal can be improved by maintaining the temperature of the molten metal in the lateral portion of the product portion 18 prone to cause casting defects at a relatively high level.
  • Figure 23 teaches that the possibility of occurrence of casting defects can be reduced by placing the heat source in that part of the product portion 18 which is prone to cause casting defects.
  • Figure 24 shows temperature falls in the molten metal flowing in the sand mold 10 (especially in the lateral portion where a heat source is placed) when casting is carried out by installing the heat source (third partial sand mold 44 ( Figure 14 )) in a recess in the downstream portion of the product portion 18 , where the temperature is indicated by a chain double-dashed line.
  • the temperature falls in the molten metal introduced into the sand mold 10 and flowing in the downstream portion of the product portion 18 are retarded by the heat source (third partial sand mold 44 ) placed in the recess in the downstream portion of the product portion 18. This corresponds to the casting conditions of ( IX ) and ( X ) in Figure 19 .
  • Figure 25 shows temperature falls in the molten metal flowing in the sand mold 10 (especially in the lateral portion where a heat source is placed) when casting is carried out by installing the heat source in a recess in the downstream portion of the runner 20 , where the temperature is indicated by a chain double-dashed line.
  • the temperature falls in the molten metal introduced into the sand mold 10 and flowing in the downstream portion of the runner 20 are retarded by the heat source placed in the downstream portion of the runner 20. This makes it possible to maintain the temperatures of the molten metal in various parts of the product portion 18 at relatively high levels.
  • Figure 25 teaches that the flow of molten metal in the entire area of the product portion 18 can be improved by placing the heat source (heated partial sand mold) in the downstream portion of the runner 20.
  • a heat source hereinated partial sand mold
  • a heat source may be placed in the entire area of the runner 20 in a flow direction or a heat source (heated partial sand mold) may be placed in an upstream portion or intermediate portion of the runner 20 in the flow direction.
  • Figure 26 shows temperature falls in the molten metal flowing in the sand mold 10 when casting is carried out by installing a heat source (heated partial sand mold) in a recess in the upstream portion of the product portion 18, where the temperature is indicated by a chain double-dashed line.
  • the temperature falls in the molten metal flowing into the product portion 18 are retarded by the heat source (heated partial sand mold) placed in the upstream portion of the product portion 18.
  • the temperature of the molten metal in the entire area of the product portion 18 can be maintained at a relatively high level.
  • Figure 26 teaches that the possibility of occurrence of casting defects can be reduced by placing the heat source (heated partial sand mold) in the upstream portion of the product portion 18.
  • Figure 27 shows a reference example.
  • a sand mold 100 is made up of a main mold 102 and a core 104 while the main mold 102 in turn is made up of an upper mold 106 and a lower mold 108.
  • Aggregate for the main mold 102 and core 104 may be natural sand, artificial sand, or synthetic sand obtained by mixing the natural sand and artificial sand.
  • the aggregate which can be adopted at least one type of casting sand selected from the group consisting of silica sand, mullite, synthetic mullite, alumina, quartz, zircon, fused silica, silica flour, chamotte, and synthetic chamotte can be adopted.
  • the binder to be added to the aggregate may be either an organic binder or inorganic binder.
  • Figure 27 shows an example in which casting is carried out using a heated main mold 102.
  • the main mold 102 is made using an organic binder.
  • casting is carried out in the main mold 102 heated to a temperature of approximately 200°C to approximately 300°C.
  • the main mold 102 may be heated either in a heating furnace or by blowing hot air into the main mold 102.
  • Figure 27 shows an example in which casting is carried out using a heated core 104.
  • the binder for the core 104 may be an organic binder, an inorganic binder, or the hybrid binder ( XP alcoholic solution) described above. Since the hybrid binder can maintain strength at temperatures of up to 1000°C or above, casting may be carried out using the core 104 , for example, at approximately 350°C to approximately 1100°C, preferably at approximately 350°C to approximately 1000°C, and more preferably at approximately 350°C to approximately 800°C.
  • the temperatures of the core 104 are only exemplary. The temperatures which can prevent casting defects may be determined experimentally according to the metal and product geometry to be used.
  • casting may be carried out by heating the core 104 , for example, to approximately 200°C, approximately 250°C, approximately 300°C, or approximately 350°C.
  • the temperatures of core 104 are only exemplary. The temperatures which can prevent casting defects may be determined experimentally according to the metal and product geometry to be used. The temperatures at which a predetermined strength can be maintained may be determined experimentally by taking into consideration the type of aggregate and binder used to form the core 104.
  • the temperatures at which the strength of the core 104 can be maintained by the inorganic binder when the core 104 is heated may be determined experimentally.
  • Figure 28 shows an example in which a heated partial sand mold 120 is installed in the upper mold 106 in an embodiment of the present invention.
  • the runner 20 is illustrated as an installation location of the partial sand mold 120 by way of example, but the number and installation locations of partial sand molds 120 are arbitrary, and locations effective in making molten metal spread smoothly to the entire area of the product portion 18 may be determined experimentally.
  • Figure 29 shows an example in which a heated partial sand mold 120 is installed in a recess in that portion of the lower mold 108 which faces the runner 20.
  • the partial sand mold 120 installed in the lower mold 108 is exposed to the runner 20 , forming a cavity surface which defines the runner 20.
  • Figure 29 also shows an example in which a heated partial sand mold 120 is installed in a recess in the upstream portion of the product portion 18.
  • the partial sand mold 120 is exposed to the product portion 18 , forming a cavity surface which defines the product portion 18.
  • Figure 30 shows an example in which heated partial sand molds 120 are installed in the upper mold 106 and lower mold 108.
  • a recess facing the runner 20 is illustrated as an installation location of the partial sand mold 120 by way of example, but the installation location is arbitrary, and the locations effective in making molten metal spread smoothly to the entire area of the product portion 18 may be determined experimentally.
  • the partial sand molds 120 installed in the upper mold 106 and lower mold 108 are exposed to the runner 20 , forming cavity surfaces which defines the runner 20.
  • Figure 30 also shows an example in which a partial sand mold 120 is installed in the core 104.
  • the partial sand mold 120 installed in the core 104 is in a state of being exposed to the product portion 18.
  • Either a single partial sand mold 120 or plural partial sand molds 120 may be installed in the core 104.
  • Figure 31 shows an example in which heated partial sand molds 120 are installed in a recess in the upstream portion of the product portion 18 and a recess in the core 104.
  • Figure 32 shows an example in which a heated partial sand mold 120 extending from the upstream portion to the downstream portion of the product portion 18 is installed in a recess in the lower mold 108. Besides, Figure 32 also shows an example in which a heated partial sand mold 120 is installed in a recess in the core 104.
  • the number and installation locations of partial sand molds 120 are not limited to those in the examples of Figures 28 to 32 .
  • the locations effective in making molten metal spread smoothly to the entire area of the product portion 18 may be determined experimentally.
  • the aggregate and binder of the partial sand mold 120 may be selected arbitrarily.
  • the partial sand mold 120 may be made using coated sand prepared by mixing aggregate and a binder or may be made before coating the aggregate with the binder.
  • the binder may be an organic binder, inorganic binder, or hybrid binder ( XP alcoholic solution) which is capable of maintaining sand mold strength even at ultra-high temperatures.
  • the partial sand molds 120 may be equal in both material and temperature, may be equal in material and differ in temperature, or may differ in both material and temperature.
  • Examples of combinations of a heated main mold 102 , heated core 104 , and heated partial sand mold 120 include the following.
  • the material (aggregate and binder) and temperature of the main mold, the material and temperature of the core, the material and temperature of the partial sand mold incorporated into the main mold, and the material and temperature of the partial sand mold incorporated into the core as well as combinations thereof are arbitrary.
  • the material and temperature of the main mold, the material and temperature of the partial sand mold, and the like may be selected such that the flow of metal in the product portion can be facilitated and that the occurrence of casting defects can be reduced.
  • the temperatures of the main mold, core, and partial sand mold may be determined to the extent that a predetermined strength can be maintained, by actually examining the aggregate and binder adopted. Also, if a simple geometry is selected for the partial sand mold, the required strength (deflection strength) can be limited to a relatively small value.
  • the present invention is widely applicable to metal casting.
  • the application of the present invention allows the occurrence of casting defects to be reduced even if molten metal is at a relatively low temperature. This makes it possible to reduce the amount of thermal energy used to heat metal.
  • the present invention is effective in reducing casting defects of metal which has poor fluidity in molten state.
  • the present invention enables mass production of thin-walled products 2 mm or less in wall thickness.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mold Materials And Core Materials (AREA)
  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Description

    Technical Field
  • The present invention relates to a sand casting method.
  • Background Art
  • In response to global demand in relation to recent environmental problems, it has become imperative for the automobile and aircraft industries, for example, to further reduce fuel consumption. An indication thereof can be found in Patent Literature 1. Patent Literature 1 proposes an austenitic heat resistant cast steel instead of ferritic heat resistant cast steels commonly adopted as materials for automotive exhaust system components such as an exhaust manifold and turbocharger. The austenitic heat resistant cast steel has excellent hot strength and provides good fluidity during casting. The austenitic heat resistant cast steel can meet requirements for high heat resistance while reducing casting defects.
  • A sand casting process is a metalworking method for making a product by pouring molten metal into a sand mold created by binding sand as aggregate using a binder. The sands used as aggregate can be classified into natural sand and artificial sand, and these sands as well as reclamation sand thereof are used appropriately according to the intended use. Known binders include organic (furan resin, phenol resin, urethane resin, gas curable binder, etc.), inorganic (e.g., water glass), and hybrid binders.
  • Patent Literatures 2 to 5 disclose hybrid binders and hybrid casting processes which use the hybrid binders. The hybrid binders secure strength (strength at room temperature) of a created sand mold (including a core) using an organic binder and secure strength (hot strength) of the sand mold during casting using ceramic.
  • The hybrid binder, which is called an XP alcoholic solution, is a solution composed principally of an alcoholic solution containing one or more alcohol-soluble metallic alkoxides and an alcohol-soluble alkali compound of an alkali metal or alkaline earth metal, both in a less advanced stage of hydrolysis, where the alcohol-soluble metallic alkoxides are selected from among alkoxides of the metals in the 4A group or 4B group (excluding carbon) and the metals in the 3A group or 3B group of the periodic table and partial hydrolysates of the alkoxides. For details of the XP alcoholic solution, refer to Patent Literatures 2 to 5.
    Patent Literature 6 describes a method for casting an aluminum alloy member. Therein, the casting material of an Al-Si system is molten at a prescribed temperature. A heater is kept heated so as to maintain the heater temperature at a prescribed temperature; and the point of a central part in the bottom of the mold in contact with the heater is the part to solidify last. The mold is removed upon lapse of some time after the de-energization to obtain the Al alloy piece.
  • The hybrid binder secures strength (strength at room temperature) of a created sand mold (including a core) using an organic binder component of the hybrid binder and secures strength (hot strength) of the sand mold during casting using a ceramic component of the hybrid binder. The hybrid casting process using the hybrid binder allows high-temperature molten metal to be poured into the sand mold, making it possible to cast metal with poor fluidity or cast a thin-walled product of which fluidity is required strictly.
    • Patent Literature 1: Japanese Patent Laid-Open No. 7-90502
    • Patent Literature 2: Japanese Patent No. 3139918
    • Patent Literature 3: Japanese Patent Laid-Open No. 2010-42985
    • Patent Literature 4: Japanese Patent Laid-Open No. 2012-35269
    • Patent Literature 5: Japanese Patent Laid-Open No. 2002-143983
    • Patent Literature 6: Japanese Patent Laid-Open No. 2-160163
    Summary of Invention Technical Problem
  • In aiming to reduce the thickness of a casting, there is a high risk that molten metal will not spread to an entire product portion of the sand mold, i.e., a casting defect will occur. Since the hybrid casting process described above can maintain sand mold strength even under high temperature conditions of, for example, 1000°C or above, if hot casting process is adopted, which involves carrying out casting by heating the molten metal to a higher temperature and/or using a sand mold heated to a high temperature, the risk described above can be reduced greatly.
  • However, increases in a casting temperature at which the molten metal is poured into the sand mold will become a contributing factor to cost increases because thermal energy is required in order to heat the metal to a higher temperature. Also, heating the sand mold to a high temperature in a preliminary stage (adoption of a hot casting process), requires capital investment for that, thermal energy, and time and effort, which also becomes a contributing factor to cost increases. For example, it is practically difficult to apply a hot casting process to mass-produced products such as exhaust system components or a cylinder block of an automobile engine.
  • An object of the present invention is to provide a sand casting method which can limit the risk that molten metal will not spread to an entire area of a product portion of a sand mold while minimizing cost increases.
  • Another object of the present invention is to provide a sand casting method which can reduce casting defects of a metal which has relatively poor fluidity and casting defects of a thin-walled product of which fluidity is required strictly.
  • Still another object of the present invention is to provide a sand casting method which can produce a relatively thin-walled casting by a gravity casting process using a metal which has relatively poor fluidity.
  • Solution to Problem
  • According to one aspect of the present invention, the technical problems described above can be solved by providing a sand casting method according to claim 1.
  • Further objects and operation and effects of the present invention will become clearer from the following detailed description of the present invention.
  • Brief Description of Drawings
    • [Figure 1] Figure 1 is a graph showing strength of a test piece molded from resin coated sand (RCS) as measured by heating the test piece.
    • [Figure 2] Figure 2 is a graph showing strength degradation of a test piece molded from resin coated sand (RCS) as measured by heating the test piece.
    • [Figure 3] Figure 3 is a diagram for describing a cavity of a sand mold used to cast a thin-walled test piece of 2mm in wall thickness.
    • [Figure 4] Figure 4 is a side view of the sand mold used to cast the thin-walled test piece of 2mm in wall thickness.
    • [Figure 5] Figure 5 is a plan view of the sand mold illustrated in Figure 4 .
    • [Figure 6] Figure 6 is a side view of a sand mold which is used to cast a thin-walled test piece of 2mm in wall thickness and in which a first partial sand mold is incorporated into a runner and an upstream portion of a product portion.
    • [Figure 7] Figure 7 is a plan view of the sand mold illustrated in Figure 6 .
    • [Figure 8] Figure 8 is a side view of a sand mold which is used to cast a thin-walled test piece of 2mm in wall thickness and in which a second partial sand mold is incorporated into a lateral portion of the product portion.
    • [Figure 9] Figure 9 is a plan view of the sand mold illustrated in Figure 8 .
    • [Figure 10] Figure 10 is a side view of a sand mold which is used to cast a thin-walled test piece of 2mm in wall thickness and in which a third partial sand mold is incorporated into a downstream portion of the product portion.
    • [Figure 11] Figure 11 is a plan view of the sand mold illustrated in Figure 10 .
    • [Figure 12] Figure 12 is a perspective view of the first partial sand mold.
    • [Figure 13] Figure 13 is a perspective view of the second partial sand mold.
    • [Figure 14] Figure 14 is a perspective view of the third partial sand mold.
    • [Figure 15] Figure 15 is a diagram showing test pieces of cast iron (FC) cast in a sand mold at room temperature and in a sand mold at 300°C.
    • [Figure 16] Figure 16 is a diagram showing test pieces of cast iron (FC) cast with the heated first partial sand mold installed in the runner and the upstream portion of the product portion.
    • [Figure 17] Figure 17 is a diagram showing test pieces of heat resistant steel (SCH) cast with the heated first partial sand mold installed in the runner and the upstream portion of the product portion.
    • [Figure 18] Figure 18 is a diagram showing test pieces of heat resistant steel (SCH) cast with the heated second partial sand mold installed in the lateral portion of the product portion which is prone to cause casting defects.
    • [Figure 19] Figure 19 is a diagram showing test pieces of heat resistant steel (SCH) cast with the heated third partial sand mold installed in the downstream portion of the product portion.
    • [Figure 20] Figure 20 is a diagram for qualitatively describing how the temperature of molten metal in a sand mold falls when the molten metal at a higher temperature is poured into the sand mold.
    • [Figure 21] Figure 21 is a diagram for qualitatively describing how the temperature of molten metal in a sand mold falls when casting is carried out using a heated sand mold.
    • [Figure 22] Figure 22 is a diagram for qualitatively describing how the temperature of molten metal in a sand mold falls when casting is carried out with the heated first partial sand mold installed in the runner and the upstream portion of the product portion.
    • [Figure 23] Figure 23 is a diagram for qualitatively describing how the temperature of molten metal in a sand mold falls when casting is carried out with the heated second partial sand mold installed in the lateral portion of the product portion which is prone to cause casting defects.
    • [Figure 24] Figure 24 is a diagram for qualitatively describing how the temperature of molten metal in a sand mold falls when casting is carried out with the heated third partial sand mold installed in the downstream portion of the product portion.
    • [Figure 25] Figure 25 is a diagram for qualitatively describing how the temperature of molten metal in a sand mold falls when casting is carried out with a heated partial sand mold installed in a runner portion.
    • [Figure 26] Figure 26 is a diagram for qualitatively describing how the temperature of molten metal in a sand mold falls when casting is carried out with a heated partial sand mold installed in the upstream portion of the product portion.
    • [Figure 27] Figure 27 is a schematic diagram of a sand mold for carrying out casting using a heated main mold and/or heated core.
    • [Figure 28] Figure 28 is a schematic diagram of a sand mold in which a heated partial sand mold is installed in the runner portion of the main mold.
    • [Figure 29] Figure 29 is a schematic diagram of a sand mold in which heated partial sand molds are installed in the runner portion and product portion of the main mold, respectively.
    • [Figure 30] Figure 30 is a schematic diagram of a sand mold in which heated partial sand molds are installed in the runner portion of the main mold and in the core, respectively.
    • [Figure 31] Figure 31 is a schematic diagram of a sand mold in which heated partial sand molds are installed in the upstream portion of the product portion of the main mold and in the core, respectively.
    • [Figure 32] Figure 32 is a schematic diagram of a sand mold in which heated partial sand molds are installed in the runner portion and the product portion of the main mold and core, respectively.
    Description of Embodiment
  • A basic concept of the present invention will be described below before describing an embodiment of the present invention in detail. First, to solve the problem of reducing the wall thickness of castings, the present inventors conducted the following tests.
    1. (A) Heating strength test (Figures 1 and 2 ) of a sand mold using an organic binder:
      1. (i) Cerabeads #650 was used as aggregate.
      2. (ii) A resin was used as an organic binder (1.8 mass%).
      3. (iii) Hexamine was used as a curing agent. Calcium stearate was used as a lubricant.
  • RCS (resin coated sand) was produced by mixing the aforementioned materials. Then, test pieces were molded using RCS, and strength and strength degradation were measured by heating the test pieces.
  • Figure 1 shows deflection strength (Kg/cm2), i.e., resistance of the test pieces to bending at room temperature, 200°C, and 300°C. Figure 2 shows strength degradation rate (%) of the test pieces with heating at 200°C, 300°C, 400°C, and 500°C. The strength degradation rate (%) was calculated based on room temperature.
  • The results of the above test revealed the following. That is, although approximately 40% strength degradation was observed at 200°C to 300°C, it was confirmed that the organic binder had appropriate strength (a deflection strength of approximately 40kg/cm2 at 200°C and a deflection strength of approximately 24kg/cm2 at 300°C). When measurement errors are allowed for, the organic binder is applicable to the present invention practically at approximately 200°C to approximately 350°C, and preferably at approximately 200°C to approximately 300°C.
    • (B) The hybrid binder (XP alcoholic solution) described above has the property of being able to maintain sand mold strength at temperatures of up to approximately 1000°C or above. As described above, the XP alcoholic solution is a solution composed principally of an alcoholic solution containing one or more alcohol-soluble metallic alkoxides and an alcohol-soluble alkali compound of an alkali metal or alkaline earth metal, both in a less advanced stage of hydrolysis, where the alcohol-soluble metallic alkoxides are selected from among alkoxides of the metals in the 4A group or 4B group (excluding carbon) and the metals in the 3A group or 3B group of the periodic table and partial hydrolysates of the alkoxides. XP alcoholic solutions and sand molds using the same are described in detail in Japanese Patent No. 3139918 (Patent Literature 2) and Patent Literatures 3 to 5 cited above, and thus Patent Literatures 2 to 5 are incorporated herein by reference in their entirety by citing these related Patent Literatures.
  • Next, regarding metal materials with excellent heat resistance, it is known that HiSiMo ductile (spherical graphite) cast iron and austenitic spherical graphite cast iron (Ni-resist D5S) have excellent fluidity. On the other hand, it is known that cast iron (FC: Ferrum Casting) and heat resistant steel (SCH) have relatively poor fluidity and that the heat resistant steel (SCH) has poorer fluidity than cast iron (FC).
  • There is the barrier of the "2-mm wall thickness" in the casting industry and it is said that mass production technology of castings 2 mm or less in wall thickness is a dream technology. For example, it is said that the use of HiSiMo ductile cast iron enables mass production of an automotive exhaust manifold of 2.5 mm in wall thickness, but it is still considered that the barrier of the "2-mm wall thickness" is difficult to overcome.
  • Figures 3 to 5 show a sand mold used to cast a tabular test piece (2 mm in thickness) rectangular in planar view. Figure 3 shows a cavity in the sand mold used to cast the test piece. Figure 4 is a side view of the sand mold. Figure 5 is a plan view of the sand mold. The illustrated sand mold 10 for the test piece was made of RCS. As described above, RCS stands for resin coated sand, which contains Cerabeads as aggregate, and a resin as a binder.
  • The sand mold 10 for the test piece is made up of an upper mold 12 and a lower mold 14 (Figure 4 ). Referring especially to Figure 3 , the cavity 16 in the sand mold 10 is made up of a product portion 18 and a runner 20. Molten metal poured into a down sprue 22 flows into the runner 20 through a gate stick portion 24. An overflow channel 26 is connected to a downstream end portion of the product portion 18, opening in a top surface of the upper mold 12. The product portion 18 measures 300.0 mm in length, 95.0 mm in width, and 2.0 mm in thickness.
  • According to one embodiment, the lower mold 14 of the sand mold 10 for test pieces has a first recess 30, which faces an upstream end portion of the product portion 18 and the runner 20, as indicated by imaginary lines in Figures 6 and 7 . The first recess 30 is open upward.
  • Also, according to a second embodiment, the lower mold 14 of the sand mold 10 has a second recess 32 which extends from an upstream end to a downstream end on a lateral portion (lateral portion on the side further from the gate stick portion 24) of the product portion 18 as indicated by imaginary lines in Figures 8 and 9 . The second recess 32 is open upward.
  • Also, according to a third embodiment, the lower mold 14 of the sand mold 10 has a third recess 34 which faces an entire area of the downstream end portion of the product portion 18 as indicated by indicated by imaginary lines in Figures 10 and 11 . The third recess 34 is open upward.
  • Figures 12 to 14 show partial sand molds 40, 42, and 44 which are detachably attached, respectively, to the first to third recesses 30, 32, and 34 described above. The first partial sand mold 40 in Figure 12 has a tabular rectangular shape, which is complementary to the contour of the first recess 30 described above (Figures 6 and 7 ). When the first partial sand mold 40 is assembled onto the first recess 30, the first partial sand mold 40 forms a cavity wall surface in the upstream end portion of the product portion 18 and a cavity wall surface of the runner 20 by being integrated with the lower mold 14.
  • The second partial sand mold 42 in Figure 13 has the shape of a rectangular parallelepiped, which is complementary to the contour of the second recess 32 described above (Figures 8 and 9 ). When the second partial sand mold 42 is assembled onto the second recess 32, the second partial sand mold 42 forms a cavity wall surface in the lateral portion (lateral portion on the side further from the gate stick portion 24) of the product portion 18 by being integrated with the lower mold 14.
  • The third partial sand mold 44 in Figure 14 has a tabular rectangular shape, which is complementary to the contour of the third recess 34 described above (Figures 10 and 11 ). When the third partial sand mold 44 is assembled onto the third recess 34, the third partial sand mold 44 forms a cavity wall surface in the downstream end portion of the product portion 18 by being integrated with the lower mold 14.
  • Figure 15 shows an example in which test pieces Tp were cast from cast iron (FC) in the sand mold 10 made of RCS. Casting conditions of the first to third test pieces Tp(1) to Tp(3) shown in (I) to (III) of Figure 15 were as following.
  • Casting conditions in (I) of Figure 15 and results thereof:
    1. (1) The melting temperature of the cast iron (FC) was 1380°C.
    2. (2) The temperature of the sand mold 10 was room temperature.
    3. (3) The resulting first test piece Tp(1) had a shape in which a portion corresponding to the downstream portion of the product portion 18 of the sand mold 10 was lacking.
  • Casting conditions in (II) of Figure 15 and results thereof:
    1. (1) The melting temperature of the cast iron (FC) was 1465°C.
    2. (2) The temperature of the sand mold 10 was room temperature.
    3. (3) The second test piece Tp(2) cast in the sand mold 10 at room temperature had a shape in which a portion corresponding to the downstream portion of the product portion 18 of the sand mold 10 was lacking, but the lacking portion was smaller than the first test piece Tp(1) in (I) of Figure 15 . It can be seen from these results that the higher the melting temperature, the further the fluidity can be improved.
  • Casting conditions in (III) of Figure 15 and results thereof:
    1. (1) The melting temperature of the cast iron (FC) was 1409°C, which was lower than in (II) described above.
    2. (2) The temperature of the sand mold 10 was 300°C.
    3. (3) The third test piece Tp(3) cast in the sand mold 10 heated to 300°C was a finished product. It was confirmed that molten metal spread to an entire area of the product portion 18 of the sand mold. Thus, it can be seen that the fluidity of molten metal can be improved using a heated sand mold 10.
  • Figure 16 shows an example in which cast iron (FC) was cast in the sand mold 10 (Figures 6 and 7 ) equipped with the first recess 30 and incorporated with the heated first partial sand mold 40 (Figure 12 ). The partial sand mold 40 was made of RCS. The RCS was prepared from Cerabeads #650 and an organic binder (resin).
  • Casting conditions in ( IV) of Figure 16 and results thereof:
    1. (1) The melting temperature of the cast iron (FC) was 1380°C.
    2. (2) The temperature of the sand mold 10 was room temperature.
    3. (3) The heated first partial sand mold 40 was incorporated into the first recess 30 of the sand mold 10 (lower mold 14) (Figures 6 and 7 ). The temperature of the first partial sand mold 40 (Figure 12 ) was 300°C.
    4. (4) The cast fourth test piece Tp(4) had a shape in which a portion corresponding to the downstream portion of the product portion 18 of the sand mold 10 was lacking as can be seen from (IV) of Figure 16 . Note that the casting conditions are the same as the first test piece Tp(1) in (I) of Figure 15 except that the heated first partial sand mold 40 was incorporated, but the lacking portion was smaller than cof the first test piece Tp(1) in (I) of Figure 15 . It was found from these results that the fluidity in the product portion 18 can be improved if the heated first partial sand mold 40 is installed on an upstream portion of the product portion 18 and the runner 20.
  • Casting conditions in (V) of Figure 16 and results thereof:
    1. (1) The melting temperature of the cast iron (FC) was 1398°C.
    2. (2) The temperature of the sand mold 10 was room temperature.
    3. (3) The heated first partial sand mold 40 (Figure 12 ) was incorporated into the first recess 30 of the sand mold 10 (lower mold 14) (Figures 6 and 7 ). The temperature of the first partial sand mold 40 was 300°C.
    4. (4) The fifth test piece Tp(5) which was cast had almost a complete shape although there was a slight lack at the downstream end of the product portion 18 of the sand mold 10.
  • When the casting conditions of (IV) and casting conditions of (V) in Figure 16 are compared, the difference is only in the temperature of the molten metal poured into the sand mold 10, and the temperature is approximately 20°C higher under the casting conditions of (V) than that under the casting conditions of (IV). Again it can be seen that the fluidity in the product portion 18 can be improved as the temperature of the molten metal gets higher.
  • Figure 17 shows an example in which test pieces Tp were cast from heat resistant steel (SCH22) using the first partial sand mold 40 (Figure 12 ) described above. The first partial sand mold 40 was made using the hybrid binder (XP alcoholic solution). The aggregate used was Cerabeads #650.
  • Casting conditions in (VI) of Figure 17 and results thereof:
    1. (1) The melting temperature of the heat resistant steel (SCH22) was 1514°C.
    2. (2) The temperature of the sand mold 10 was room temperature.
    3. (3) The first partial sand mold 40 was incorporated into the first recess 30 of the sand mold 10 immediately after being heated in a furnace at 1100°C for 60 minutes.
    4. (4) The sixth test piece Tp(6) which was cast was a finished product without any lacking portion.
  • Figure 18 shows an example in which seventh and eighth test pieces Tp(7) and Tp(8) were cast from heat resistant steel (SCH22) using the second partial sand mold 42 (Figure 13 ) described above. The second partial sand mold 42 was made using the hybrid binder (XP alcoholic solution). The aggregate used was Cerabeads #650.
  • Casting conditions in (VII) of Figure 18 and results thereof:
    1. (1) The melting temperature of the heat resistant steel (SCH22) was 1528°C.
    2. (2) The temperature of the sand mold 10 was room temperature.
    3. (3) The second partial sand mold 42 was incorporated into the second recess 32 of the sand mold 10 immediately after being heated in a furnace at 1100°C for 60 minutes.
    4. (4) The seventh test piece Tp(7) which was cast contained a lacking portion. The lacking portion was in the lateral portion on the side further from the gate stick portion 24 (Figure 3 ).
  • Casting conditions in (VIII) of Figure 18 and results thereof:
    1. (1) The melting temperature of the heat resistant steel (SCH22) was 1536°C.
    2. (2) The temperature of the sand mold 10 was approximately 300°C.
    3. (3) The second partial sand mold 42 was incorporated into the second recess 32 of the sand mold 10 immediately after being heated in a furnace at 1100°C for 60 minutes.
    4. (4) The eighth test piece Tp(8) which was cast had a complete shape without any lacking portion.
  • When the casting conditions of (VII) and casting conditions of (VIII) in Figure 18 are compared, the casting conditions of (VIII) which provided the completed eighth test piece Tp(8) differ from the casting conditions of (VII) in that (a) the melting temperature was approximately 10°C higher and that (b) the heated sand mold 10 was used. Thus, it can be seen that the fluidity can be improved if the melting temperature of the heat resistant steel is increased and the sand mold 10 is heated.
  • Also, when the seventh test piece Tp(7) cast under casting conditions (VII) in Figure 18 is checked for any portion containing a casting defect by referring to Figures 8, 9 , and 18 , a casting defect is observed in a portion corresponding to the lateral portion of the product portion 18 on the side further from the gate stick portion 24. Thus, it can be seen that this region has poor fluidity. The eighth test piece Tp(8) was cast under the casting conditions (VIII) by installing a heat source (heated partial sand mold 42) in the region with poor fluidity, and produced good casting results. From this fact, it was found that if not only the sand mold 10 is heated, but also a heat source (heated partial sand mold 42) is installed in a region prone to cause casting defects or in a portion upstream of this region, this is effective in reducing the occurrence of casting defects in the region with poor fluidity.
  • Figure 19 shows an example in which ninth and tenth test pieces Tp(9) and Tp(10) were cast from heat resistant steel (SCH22) using the third partial sand mold 44 (installed in the downstream portion of the product portion 18: Figure 19 ) described above. The third partial sand mold 44 was made using the hybrid binder (XP alcoholic solution). The aggregate used was Cerabeads #650.
  • Casting conditions in (IX) of Figure 19 and results thereof:
    1. (1) The melting temperature of the heat resistant steel (SCH22) was 1530°C.
    2. (2) The temperature of the sand mold 10 was room temperature.
    3. (3) The third partial sand mold 44 was used for casting by being installed in the sand mold 10 immediately after being heated in a furnace at 1100°C for 60 minutes.
    4. (4) The ninth test piece Tp(9) which was cast contained a lacking portion.
  • Casting conditions in (X) of Figure 19 and results thereof:
    1. (1) The melting temperature of the heat resistant steel (SCH22) was 1530°C (the same as under the casting conditions in (IX) above).
    2. (2) The temperature of the sand mold 10 was approximately 300°C.
    3. (3) The third partial sand mold 44 was used for casting by being installed in the sand mold 10 immediately after being heated in a furnace at 1100°C for 60 minutes.
    4. (4) The test piece Tp(10) which was cast contained a lacking portion.
  • Even though the third partial sand mold 44 heated to a high temperature was installed downstream of the product portion 18, good effects were not obtained.
  • The following can be said in a qualitative sense from the test results described above. The solid line in Figures 20 to 26 indicates temperatures in various places inside the sand mold 10 when molten metal at a typical temperature is poured into the sand mold 10. If these temperatures are taken as reference temperatures, the temperature of the molten metal falls while the molten metal is flowing inside the sand mold 10.
  • Figure 20 shows falls (chain double-dashed line) in the once raised temperature of molten metal poured into the sand mold 10. By raising the temperature of the molten metal, it is possible to maintain the temperature in various places of the sand mold 10 at levels higher than the reference temperatures. Figure 20 teaches that the possibility of occurrence of casting defects can be reduced by raising the temperature of the molten metal.
  • Figure 21 shows temperature falls in the molten metal flowing in the sand mold 10 heated for use in casting, where the temperature is indicated by a chain double-dashed line. The chain double-dashed line in Figure 21 corresponds to casting under the casting conditions of (III) in Figure 15 . The use of the heated sand mold 10 for casting can reduce the slope of the temperature fall. That is, the temperature falls in the molten metal flowing in the sand mold 10 can be reduced in magnitude. Figure 21 teaches that the possibility of occurrence of casting defects can be reduced by using the heated sand mold 10 for casting.
  • Figure 22 shows temperature falls in the molten metal flowing in the sand mold 10 when casting is carried out by installing a heat source (first partial sand mold 40) in a downstream portion of the runner 20 and upstream portion of the product portion 18, where the temperature is indicated by a chain double-dashed line. The molten metal introduced into the sand mold 10 enters the runner 20 while falling in temperature. The temperature falls in the molten metal in the downstream portion of the runner 20 and upstream portion of the product portion 18 are retarded by the heat source (first partial sand mold 40) placed in the downstream portion of the runner 18 and upstream portion of the product portion 18. Thus, the temperature of the molten metal in the entire area of the product portion 18 including the downstream portion of the product portion 18 can be maintained at a relatively high level. Figure 22 teaches that the possibility of occurrence of casting defects can be reduced by placing the heat source in the upstream portion of the product portion 18 and the runner 20 located upstream of the product portion 18.
  • Figure 23 shows temperature falls in the molten metal flowing in the sand mold 10 (especially in the lateral portion where a heat source is placed) when casting is carried out by installing the heat source (second partial sand mold 42 (Figure 13 )) in the lateral portion of the product portion 18 prone to cause casting defects, where the temperature is indicated by a chain double-dashed line. The temperature falls in the molten metal introduced into the sand mold 10 and flowing in the lateral portion of the product portion 18 are retarded by the heat source (second partial sand mold 42) placed in the lateral portion. Thus, the flow of the molten metal can be improved by maintaining the temperature of the molten metal in the lateral portion of the product portion 18 prone to cause casting defects at a relatively high level. Figure 23 teaches that the possibility of occurrence of casting defects can be reduced by placing the heat source in that part of the product portion 18 which is prone to cause casting defects.
  • Figure 24 shows temperature falls in the molten metal flowing in the sand mold 10 (especially in the lateral portion where a heat source is placed) when casting is carried out by installing the heat source (third partial sand mold 44 (Figure 14 )) in a recess in the downstream portion of the product portion 18, where the temperature is indicated by a chain double-dashed line. The temperature falls in the molten metal introduced into the sand mold 10 and flowing in the downstream portion of the product portion 18 are retarded by the heat source (third partial sand mold 44) placed in the recess in the downstream portion of the product portion 18. This corresponds to the casting conditions of (IX) and (X) in Figure 19 . Casting defects were found in the resulting test pieces Tp(9) and Tp(10), meaning that the effect of the heat source (third partial sand mold 44) placed in the recess in the downstream portion of the product portion 18 in reducing casting defects was limited and localized.
  • Figure 25 shows temperature falls in the molten metal flowing in the sand mold 10 (especially in the lateral portion where a heat source is placed) when casting is carried out by installing the heat source in a recess in the downstream portion of the runner 20, where the temperature is indicated by a chain double-dashed line. The temperature falls in the molten metal introduced into the sand mold 10 and flowing in the downstream portion of the runner 20 are retarded by the heat source placed in the downstream portion of the runner 20. This makes it possible to maintain the temperatures of the molten metal in various parts of the product portion 18 at relatively high levels. Figure 25 teaches that the flow of molten metal in the entire area of the product portion 18 can be improved by placing the heat source (heated partial sand mold) in the downstream portion of the runner 20. Of course, a heat source (heated partial sand mold) may be placed in the entire area of the runner 20 in a flow direction or a heat source (heated partial sand mold) may be placed in an upstream portion or intermediate portion of the runner 20 in the flow direction.
  • Figure 26 shows temperature falls in the molten metal flowing in the sand mold 10 when casting is carried out by installing a heat source (heated partial sand mold) in a recess in the upstream portion of the product portion 18, where the temperature is indicated by a chain double-dashed line. The temperature falls in the molten metal flowing into the product portion 18 are retarded by the heat source (heated partial sand mold) placed in the upstream portion of the product portion 18. Thus, the temperature of the molten metal in the entire area of the product portion 18 can be maintained at a relatively high level. Figure 26 teaches that the possibility of occurrence of casting defects can be reduced by placing the heat source (heated partial sand mold) in the upstream portion of the product portion 18.
  • Figure 27 shows a reference example. Referring to Figure 27 , a sand mold 100 is made up of a main mold 102 and a core 104 while the main mold 102 in turn is made up of an upper mold 106 and a lower mold 108.
  • Aggregate for the main mold 102 and core 104 may be natural sand, artificial sand, or synthetic sand obtained by mixing the natural sand and artificial sand. Regarding the aggregate which can be adopted, at least one type of casting sand selected from the group consisting of silica sand, mullite, synthetic mullite, alumina, quartz, zircon, fused silica, silica flour, chamotte, and synthetic chamotte can be adopted. Also, the binder to be added to the aggregate may be either an organic binder or inorganic binder.
  • Figure 27 shows an example in which casting is carried out using a heated main mold 102. Typically the main mold 102 is made using an organic binder. In this case, casting is carried out in the main mold 102 heated to a temperature of approximately 200°C to approximately 300°C. The main mold 102 may be heated either in a heating furnace or by blowing hot air into the main mold 102.
  • In the sand mold made using the hybrid binder (XP alcoholic solution) described above, conventionally hot casting is carried out by heating the sand mold to temperatures 1000°C or above. In the application of the present invention, after the main mold 102 made using the hybrid binder is heated, casting may be carried out in the main mold 102 at a temperature of approximately 350°C to approximately 800°C.
  • Figure 27 shows an example in which casting is carried out using a heated core 104. The binder for the core 104 may be an organic binder, an inorganic binder, or the hybrid binder (XP alcoholic solution) described above. Since the hybrid binder can maintain strength at temperatures of up to 1000°C or above, casting may be carried out using the core 104, for example, at approximately 350°C to approximately 1100°C, preferably at approximately 350°C to approximately 1000°C, and more preferably at approximately 350°C to approximately 800°C. The temperatures of the core 104 are only exemplary. The temperatures which can prevent casting defects may be determined experimentally according to the metal and product geometry to be used.
  • When the core 104 is formed using an organic binder, casting may be carried out by heating the core 104, for example, to approximately 200°C, approximately 250°C, approximately 300°C, or approximately 350°C. The temperatures of core 104 are only exemplary. The temperatures which can prevent casting defects may be determined experimentally according to the metal and product geometry to be used. The temperatures at which a predetermined strength can be maintained may be determined experimentally by taking into consideration the type of aggregate and binder used to form the core 104. When the core 104 is formed using an inorganic binder, the temperatures at which the strength of the core 104 can be maintained by the inorganic binder when the core 104 is heated may be determined experimentally.
  • Figure 28 shows an example in which a heated partial sand mold 120 is installed in the upper mold 106 in an embodiment of the present invention. The runner 20 is illustrated as an installation location of the partial sand mold 120 by way of example, but the number and installation locations of partial sand molds 120 are arbitrary, and locations effective in making molten metal spread smoothly to the entire area of the product portion 18 may be determined experimentally.
  • Figure 29 shows an example in which a heated partial sand mold 120 is installed in a recess in that portion of the lower mold 108 which faces the runner 20. The partial sand mold 120 installed in the lower mold 108 is exposed to the runner 20, forming a cavity surface which defines the runner 20. Besides, Figure 29 also shows an example in which a heated partial sand mold 120 is installed in a recess in the upstream portion of the product portion 18. The partial sand mold 120 is exposed to the product portion 18, forming a cavity surface which defines the product portion 18.
  • Figure 30 shows an example in which heated partial sand molds 120 are installed in the upper mold 106 and lower mold 108. A recess facing the runner 20 is illustrated as an installation location of the partial sand mold 120 by way of example, but the installation location is arbitrary, and the locations effective in making molten metal spread smoothly to the entire area of the product portion 18 may be determined experimentally. The partial sand molds 120 installed in the upper mold 106 and lower mold 108 are exposed to the runner 20, forming cavity surfaces which defines the runner 20.
  • Besides, Figure 30 also shows an example in which a partial sand mold 120 is installed in the core 104. The partial sand mold 120 installed in the core 104 is in a state of being exposed to the product portion 18. Either a single partial sand mold 120 or plural partial sand molds 120 may be installed in the core 104.
  • Figure 31 shows an example in which heated partial sand molds 120 are installed in a recess in the upstream portion of the product portion 18 and a recess in the core 104.
  • Figure 32 shows an example in which a heated partial sand mold 120 extending from the upstream portion to the downstream portion of the product portion 18 is installed in a recess in the lower mold 108. Besides, Figure 32 also shows an example in which a heated partial sand mold 120 is installed in a recess in the core 104.
  • The number and installation locations of partial sand molds 120 are not limited to those in the examples of Figures 28 to 32 . The locations effective in making molten metal spread smoothly to the entire area of the product portion 18 may be determined experimentally.
  • The aggregate and binder of the partial sand mold 120 may be selected arbitrarily. The partial sand mold 120 may be made using coated sand prepared by mixing aggregate and a binder or may be made before coating the aggregate with the binder. The binder may be an organic binder, inorganic binder, or hybrid binder (XP alcoholic solution) which is capable of maintaining sand mold strength even at ultra-high temperatures. When plural partial sand molds 120 are installed in the sand mold 100, the partial sand molds 120 may be equal in both material and temperature, may be equal in material and differ in temperature, or may differ in both material and temperature.
  • Examples of combinations of a heated main mold 102, heated core 104, and heated partial sand mold 120 include the following.
    1. (1) The main mold 102 is heated. When the main mold 102 is made using an organic binder, typically, the main mold 102 of approximately 200°C to approximately 350°C, and preferably of approximately 200°C to approximately 300°C is used for casting. When the main mold 102 is made using a hybrid binder, the main mold 102 of approximately 350°C to approximately 800°C is used for casting.
    2. (2) When the core 104 is formed using an organic binder, the core 104 of approximately 200°C to approximately 350°C, and preferably of approximately 200°C to approximately 300°C is used for casting. When the core 104 is formed using a hybrid binder, the core 104 of approximately 350°C to approximately 800°C after heating the core 104 is used for casting.
    3. (3) Casting is carried out using the heated main mold 102 and heated core 104. The temperature of the main mold 102 can be selected from temperatures of approximately 200°C to approximately 350°C, and preferably approximately 200°C to approximately 300°C (in the case of an organic binder) or approximately 350°C to approximately 800°C (in the case of a hybrid binder). The temperature of the heated core 104 can be selected from temperatures of approximately 200°C to approximately 350°C and preferably approximately 200°C to approximately 300°C (in the case of an organic binder). In the case of a hybrid binder, the temperature of the heated core 104 can be selected from temperatures of approximately 350°C to approximately 1100°C, preferably approximately 350°C to approximately 1000°C, and more preferably approximately 350°C to approximately 800°C.
    4. (4) Casting is carried out by incorporating the heated partial sand mold 120 into the main mold 102. The main mold 102 may be used by being left at room temperature or by being heated. In a typical example, the temperature of the heated main mold 102 is approximately 200°C to approximately 350°C and preferably approximately 200°C to approximately 300°C. The temperature of the partial sand mold 120 may be approximately 200°C to approximately 350°C and preferably approximately 200°C to approximately 300°C (in the case of an organic binder) or may be higher (e.g., approximately 350°C to approximately 1100°C, and preferably approximately 350°C to approximately 800°C) (in the case of a hybrid binder).
    5. (5) In (4) above, the core 104 of approximately 200°C to approximately 350°C and preferably of 200°C to approximately 300°C, or of approximately 350°C to approximately 1100°C, preferably of approximately 350°C to approximately 1000°C, and more preferably of approximately 350°C to approximately 800°C is incorporated and used for casting.
    6. (6) In (4) above, casting is carried out by incorporating the partial sand mold 120 of approximately 350°C to approximately 1100°C, preferably approximately 350°C to approximately 1000°C, and more preferably approximately 350°C to approximately 800°C into the core of approximately 200°C to approximately 350°C and preferably approximately 200°C to approximately 300°C.
    7. (7) Casting is carried out by incorporating the heated partial sand mold 120 into the main mold 102. The main mold 102 may be used by being left at room temperature or by being heated to approximately 200°C to approximately 350°C, and preferably approximately 200°C to approximately 300°C, or, for example, approximately 350°C to approximately 800°C. The temperature of the partial sand mold 120 may be approximately 200°C to approximately 350°C and preferably approximately 200°C to approximately 300°C (in the case of an organic binder) or may be higher (e.g., approximately 350°C to approximately 800°C) (in the case of a hybrid binder).
    8. (8) In (7) above, the core 104 of approximately 200°C to approximately 350°C, and preferably of approximately 200°C to approximately 300°C or of approximately 350°C to approximately 1100°C (preferably, e.g., of approximately 350°C to approximately 800°C)is incorporated and used for casting.
    9. (9) In (7) above, casting is carried out by incorporating the partial sand mold 120 of approximately 350°C to approximately 1100°C and preferably, for example, approximately 350°C to approximately 800°C into the core of approximately 200°C to approximately 350°C and preferably approximately 200°C to approximately 300°C.
  • Whereas the present invention has been described above, the material (aggregate and binder) and temperature of the main mold, the material and temperature of the core, the material and temperature of the partial sand mold incorporated into the main mold, and the material and temperature of the partial sand mold incorporated into the core as well as combinations thereof are arbitrary. The material and temperature of the main mold, the material and temperature of the partial sand mold, and the like may be selected such that the flow of metal in the product portion can be facilitated and that the occurrence of casting defects can be reduced.
  • The temperatures of the main mold, core, and partial sand mold may be determined to the extent that a predetermined strength can be maintained, by actually examining the aggregate and binder adopted. Also, if a simple geometry is selected for the partial sand mold, the required strength (deflection strength) can be limited to a relatively small value.
  • Industrial Applicability
  • The present invention is widely applicable to metal casting. The application of the present invention allows the occurrence of casting defects to be reduced even if molten metal is at a relatively low temperature. This makes it possible to reduce the amount of thermal energy used to heat metal. Also, the present invention is effective in reducing casting defects of metal which has poor fluidity in molten state. Also, the present invention enables mass production of thin-walled products 2 mm or less in wall thickness.
  • Reference Signs List
  • 100
    Sand mold
    102
    Main mold
    104
    Core
    106
    Upper mold
    108
    Lower mold
    18
    Product portion of sand mold
    20
    Runner of sand mold
    22
    Down sprue of sand mold
    24
    Gate stick portion of sand mold

Claims (5)

  1. A sand casting method comprising the steps of:
    preparing a sand mold (10, 100) which includes a) or b):
    a) a recess (30, 32, 34) formed in a main mold (102), opening to a cavity of the main mold (102) and a partial sand mold (40, 42, 44, 120) configured to be detachably attachable to the recess (30, 32, 34),
    b) a main mold (102), a core (104) installed in a product portion (18) of the main mold (102), and a partial sand mold (120) configured to be detachably attachable to a recess (30, 32, 34) which is formed in the core (104), opening to a surface of the core (104);
    setting the partial sand mold (40, 42, 44, 120) to a temperature of 200°C or above, which is higher than a temperature of the main mold (102) in case a), or of the core (104) in case b);
    installing the partial sand mold (40, 42, 44, 120) which has a temperature of 200°C or above in the recess (30, 32, 34) of the main mold (102) in case a), or of the core (104) in case b); and
    carrying out casting by pouring molten metal into the main mold (102), with the main mold (102) in case a) or the core (104) in case b) incorporated with the partial sand mold (40, 42, 44, 120) having a temperature of 200°C or above.
  2. The sand casting method according to claim 1, case a), wherein the partial sand mold (40, 42, 44, 120) is installed in a runner portion (20) of the main mold (102).
  3. The sand casting method according to claim 1, case a), wherein the partial sand mold (40, 42, 44, 120) is installed in an upstream portion of a product portion (18) of the main mold (102).
  4. The sand casting method according to any one of claims 1 to 3, wherein:
    the partial sand mold (40, 42, 44, 120) is made using an organic binder; and
    a temperature of the partial sand mold (40, 42, 44, 120) is 200°C to 350°C.
  5. The sand casting method according to any one of claims 1 to 3, wherein a temperature of the partial sand mold (40, 42, 44, 120) is 350°C to 1100°C.
EP14769379.0A 2013-03-19 2014-03-18 Sand casting method Active EP2977125B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013057386A JP5347077B1 (en) 2013-03-19 2013-03-19 Sand mold casting method
PCT/JP2014/057416 WO2014148516A1 (en) 2013-03-19 2014-03-18 Sand casting method

Publications (3)

Publication Number Publication Date
EP2977125A1 EP2977125A1 (en) 2016-01-27
EP2977125A4 EP2977125A4 (en) 2016-09-28
EP2977125B1 true EP2977125B1 (en) 2017-10-18

Family

ID=49764904

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14769379.0A Active EP2977125B1 (en) 2013-03-19 2014-03-18 Sand casting method

Country Status (3)

Country Link
EP (1) EP2977125B1 (en)
JP (1) JP5347077B1 (en)
WO (1) WO2014148516A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6214266B2 (en) * 2013-07-29 2017-10-18 テクノメタル株式会社 Sand mold casting method
CN106563772A (en) * 2016-11-10 2017-04-19 安徽龙氏机械制造有限公司 Complex casting sand mould

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56500681A (en) * 1979-06-14 1981-05-21
JPH02160163A (en) * 1988-12-13 1990-06-20 Toyota Motor Corp Method for casting aluminum alloy member
JPH03133538A (en) * 1989-10-18 1991-06-06 Hitachi Metals Ltd Casting method of thin stainless steel casting
JPH0790502A (en) 1993-09-24 1995-04-04 Toyota Motor Corp Austenitic heat resistant cast steel
JP3139918B2 (en) 1993-12-28 2001-03-05 株式会社キャディック・テクノロジ−・サ−ビス Method for producing refractory molded article and binder for refractory molded article
JPH08332547A (en) * 1995-06-09 1996-12-17 Juki Corp Casting method and mold and its production
JP2000176601A (en) * 1998-12-17 2000-06-27 Nippon Chuzo Kk Production of casting
JP3383881B2 (en) * 2000-06-05 2003-03-10 公朋 細山 Sand mold surface heating device for casting method of thin complex products with sand mold
JP2002143983A (en) 2000-11-10 2002-05-21 Kiyadeitsuku Technol Service:Kk Casting method
JP4776953B2 (en) * 2005-03-16 2011-09-21 花王株式会社 Casting manufacturing method
JP2007030039A (en) * 2005-07-29 2007-02-08 Nobuyoshi Sasaki Method for forming heat-resistant granular cell coating layer
JP5213059B2 (en) * 2008-07-18 2013-06-19 株式会社キャディック Mold composition
EP2581149B1 (en) * 2010-06-08 2018-01-03 Ask Chemicals España, S.A. Method for producing a metal part
JP5553410B2 (en) 2010-08-03 2014-07-16 株式会社キャディック Casting method using high temperature mold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP2977125A4 (en) 2016-09-28
WO2014148516A1 (en) 2014-09-25
EP2977125A1 (en) 2016-01-27
JP5347077B1 (en) 2013-11-20
JP2014180693A (en) 2014-09-29

Similar Documents

Publication Publication Date Title
CA2783978C (en) Foundry mixes containing carbonate salts and their uses
CN104475682A (en) Combined wax pattern-based method of achieving precision investment casting for heat-resistant cast steel thin-wall turbine shell
CN102228956A (en) Precision fire mould casting process of series sliding bed bedplates for turnouts of high-speed railway lines for passenger transport and special die
EP2977125B1 (en) Sand casting method
MX2009007385A (en) Process for casting a metal melt.
US6942007B2 (en) Equipment for molding foundry parts with improved means positioning sand cores, and related positioning method
CN104278193B (en) A kind of Glass Mould of Alloy Cast Iron mouth die material and preparation method thereof
US20050189083A1 (en) Casting mold and method for casting achieving in-mold modification of a casting metal
US20040261969A1 (en) Method for producing castings, molding sand and its use for carrying out said method
JP6214266B2 (en) Sand mold casting method
CN101372033A (en) Self-spreading method for quickly casting armored vehicle aluminium alloy part or blank for emergency in battlefield
Trung Simulation and experimental study on the Fenotec casting method of the engine block RV95
CN106086614A (en) A kind of thick and large casting and manufacture method thereof
JP4754309B2 (en) Die casting core
CN114012036B (en) Casting method of moving coil casting for cabin vibration test
CN212598711U (en) A portable ingate for disappearing mould casting
RU2404879C2 (en) Method of casting and device to this end
RU2661986C1 (en) Method for producing high-manganese steel castings
CN116809865A (en) Exhaust method for precoated sand core sheet for casting
Brieger Optimized feeding systems increase quality and reduce finishing costs
JP2001058252A (en) Production of casting having thin thickness part
Gengel Foundry technologies and their influence on environment
Kruse Ceramic breaks the mold
Kamenskij Manufacturing the housings of electric motors in boxless multisector moulds from coldly hardening sands.
Beeley Some advances in the casting of metals

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20151012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20160831

RIC1 Information provided on ipc code assigned before grant

Ipc: B22C 9/08 20060101ALI20160825BHEP

Ipc: B22C 9/10 20060101ALI20160825BHEP

Ipc: B22C 9/02 20060101AFI20160825BHEP

Ipc: B22D 27/04 20060101ALI20160825BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: B22D 27/04 20060101ALI20170403BHEP

Ipc: B22C 9/02 20060101AFI20170403BHEP

Ipc: B22C 9/10 20060101ALI20170403BHEP

INTG Intention to grant announced

Effective date: 20170509

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 937500

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171115

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014016044

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20171018

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 937500

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180118

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180118

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180119

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180218

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014016044

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

26N No opposition filed

Effective date: 20180719

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20180318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180331

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180318

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180331

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171018

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20140318

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240322

Year of fee payment: 11