EP2976465A1 - Procede de consolidation d'un sol encaissant un tunnel - Google Patents
Procede de consolidation d'un sol encaissant un tunnelInfo
- Publication number
- EP2976465A1 EP2976465A1 EP14716899.1A EP14716899A EP2976465A1 EP 2976465 A1 EP2976465 A1 EP 2976465A1 EP 14716899 A EP14716899 A EP 14716899A EP 2976465 A1 EP2976465 A1 EP 2976465A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tube
- soil
- section
- injection
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
Definitions
- the present invention relates to the realization of buried structures and in particular tunnels.
- the invention relates, in particular, the improvement by consolidation of the soil located in the vicinity of such a buried work. Even more especially, the invention relates to a method for consolidating the soil during the construction of the structure, as and when slaughter (process also called "progress").
- pre-retaining systems intended to reinforce the soil in front of and behind the face of the face, before the installation of the retaining wall and the final coating of the tunnel.
- pre-retaining systems consist of reinforcing the soil by inclusions including steel set up in boreholes and linked to the surrounding soil by a grout.
- presutment vaults better known under the name of "umbrella vaults” (or “pipe umbrella” or “piperoof”), which consists in introducing into the ground a plurality of hollow tubes arranged in parallel and relatively tight to each other, usually metal, and inject into these tubes a sealing grout to seal them to the surrounding soil.
- the assembly of these tubes forms an arch below which the ground can be excavated without risk of collapse, before the realization of the walls of the tunnel.
- pre-support inclusions occurs at different levels.
- the soil resistance to traction and shear can be improved, as well as the stiffness of the surrounding soil mass, but the known pre-retaining methods do not sufficiently prevent damage to the massif, especially the soil decompression problems and subsidence on the surface.
- the object of the invention is to provide a method for easily consolidating the soil located in the vicinity of a tunnel and, in particular, to avoid the phenomenon of settlements related to the excavation work.
- This object is achieved with a method of consolidating a soil encasing a tunnel excavated in sections, wherein each section of said tunnel is surmounted by a pre-retaining vault consisting of a plurality of tubes sealed to the ground with a grout. sealing, and comprising the following steps:
- a) a plurality of tubes are introduced into the ground so as to form the pre-supporting profile vault corresponding to that desired for the tunnel, each tube having an open proximal end and at least a first outlet orifice on its distal portion; buried in the ground, and
- a consolidation grout is injected into the soil through said first outlet of said tube or by at least a second outlet formed on its distal portion.
- the method according to the invention makes it possible to improve the mechanical characteristics of the soil located in the vicinity of the tunnel, quickly and simply.
- the consolidation grout is injected directly by the tubes constituting the pre-retaining vault (or umbrella vault), so that it is not necessary to perform additional drilling specific to the injection.
- the injection treated soil is hardened.
- the structure of the injected soil is modified to increase its apparent rigidity, which will be mobilized during the subsequent excavation phases.
- the soil located at the right of an excavated zone is weakened. In these places, the soil has undergone settlements. Such settlements also occur in front of the excavated area, on a short portion of soil indirectly undergoing the effects of adjacent excavation.
- the tubes of the pre-retaining vault extend from the excavated zone but their distal end opens into a soil zone located in front of the face, ie in a zone not yet excavated.
- the drilling reaches a zone of non-embrittled ground and the injection is thus carried out in a potentially intact soil zone of any settlement.
- the consolidation method thus makes it possible to anticipate future settlements, by modifying the characteristics of the ground in the right of a future section of tunnel, before said section is excavated.
- the injection of the consolidation slurry is intended, at least to a certain extent, to prestress the soil, that is to say to modify the state of stress before it undergoes the disorders (settlements , especially decompression) related to the excavation of the tunnel.
- front and rear are used with reference to the axis of the tunnel, the excavated area being located behind the face of the face and the unexcavated area being located in front of the face of size.
- Sealing grout should be understood as a hardenable product. Generally used for cementing the tubes, a grout of cement.
- Consolidation grout should be understood as a curable product, suitable for being pumped into the soil.
- the consolidation grout may be the same or different from the grout.
- a liquid slurry mixture of water and a binder, in particular cement, possibly with added bentonite
- a more rigid mortar grout added with aggregates, in particular sand.
- the setting parameters of the consolidation grout are controlled so as to cause a displacement of the ground, in particular a compression or a deformation of said ground, in the purpose of modifying its state of stress so that its apparent rigidity is increased.
- the consolidation grout is injected at a low pressure and a low flow rate.
- the total volume is optionally injected in several steps separated by a rest period.
- the total injected volume is chosen so that the apparent stiffness of the soil located around the point (s) of injection is increased.
- the injection of the consolidation slurry is a fracturing injection (also called "breakdown" injection) in which the grouting injection pressure is chosen. greater than the soil confining pressure resulting from the state of the constraints existing in the field.
- the consolidation grout used is usually a fluid slurry, and the objective is to create a fracture in the soil that may contain a grout lens.
- the injection of the consolidation slurry is a solid injection in which the grout (for example a mortar) is viscous, and in which said grout remains immediate proximity to the borehole and generates compressive stress on the surrounding soil.
- the grout for example a mortar
- the injection can be done in all the tubes of the vault of pre-support, or in only some of these tubes.
- consolidation grout may be injected into only one out of every two or three tubes, or only into the tubes at the upper end of the vault or at its lateral ends.
- a consolidation injection will be performed in at least 50%, preferably at least 75% of the tubes of the pre-retaining vault.
- the tubes forming the pre-retaining vault can serve both as a drilling member and as a drilling fluid injection tube, as a sealing slurry and, where appropriate, as consolidation grout.
- the umbrella vault comprises a single layer of tubes arranged next to each other.
- the tubes will be arranged in two superimposed layers.
- the tubes of a pre-retaining vault are substantially parallel to each other and to the axis of the tunnel.
- the tubes of a pre-retaining vault have a slight inclination with respect to the axis of the tunnel, allowing the tubes of an umbrella vault of a section of rank N to overlap partially, that is to say over a certain length, the tubes of the vaults at least Nl and N + 1 tunnel sections of tunnel. It is said that the successive vaults of the tunnel are partially nested within each other.
- step c) the interior of the at least one tube of the pre-support vault in which it is desired to perform the injection of the consolidation grout is cleaned.
- Each tube of a pre-retaining vault has at least one opening at each of its ends.
- the cleaning step consists in disengaging the tube from the sealing grout contained therein, for example with water, so as to make the two openings of the tube communicate and allow the reuse of said tube for the injection of the consolidation grout.
- the method according to the invention further comprises the following steps:
- the tubes constitute, on the length excavated, a temporary protection structure, which prevents the landslide behind the face of the face.
- the realization of the wall of the tunnel section may include the laying of temporary or permanent hangers and / or the realization of the final coating of the section, for example but not exclusively by the technique of shotcrete.
- steps a) to e) are repeated until the tunnel is excavated along its length. If the steps a) to e) correspond to the realization of a section of the tunnel of rank N, these same steps are repeated for the realization of at least one section of rank N + 1, and possibly a plurality of rows of rank N + n, n varying according to the length of the tunnel.
- an injection step is carried out in the tubes of the vault of a N-rank tunnel section, before the excavation of said section of rank N.
- the step d) of excavation can be carried out once the injection of consolidation grout has been stopped.
- the step of injection of consolidation slurry can continue during step d) of excavation and, possibly, during subsequent steps of tunneling.
- the zone injected by the tubes of the vault of the section of rank N, before the beginning of the excavation of said section is advantageously a zone of ground which theoretically would not have been damaged because of the excavation work sections of rank N, N-1, etc., in particular by decompression phenomena, settlements, etc.
- the soil can be treated before disturbances occur due to excavation.
- the injection made in the ground located at the right of a section of rank N + 2 comes to prevent settlements which would have been generated, otherwise, by the excavation of the section of rank N.
- the injection carried out in the ground located at the right a section of rank N + 3 comes to prevent settlements which would have been generated by the excavation of the section of rank N + 1. And so on.
- each tube of the pre-retaining vault has a length at least 2.5 times greater than this excavated length.
- the method may comprise a step of predictive modeling of settlements of the soil at the progress of the excavation.
- This predictive modeling can to be obtained either by finite element numerical models or by empirical models (in particular, the Peck model -
- these models can be regularly updated according to the observations made on them. previous phases of work.
- the injection pressure and / or the volume of consolidation grout injected are determined according to the predicted settlements.
- the unit settlement of the ground situated in line with an N + 2 section generated by the excavation of the N-rank tunnel section is evaluated, and the parameters of the injection (pressure, volume of grout, phasing of the injection operations) carried out by at least one tube of the retaining vault of the rank N segment in the ground zone located at the right of the N + 2 rank section so that the consolidation grout is applied to the injected soil constraints for neutralizing said unitary settlement.
- the movements of the soil are continuously monitored during the injection.
- the control can for example be done at the level of the ground surface (i.e. the upper surface of the excavated massif), for example by means of a laser level. It can also be done by means of an extensometer inserted directly into the soil volume by means of a borehole, for example executed from the face of size.
- Detecting an amplitude of displacement of the ground greater than a predetermined value can for example determine the moment of the stop of the injection.
- the control of the movements of the ground makes it possible, for example, to avoid damage, because of the uprisings, the dwellings founded on the mass of excavated ground.
- a consolidation grout may be injected into one or several tubes of a N-shaped pre-support vault at any moment during tunneling, in order to correct excessive deformations in front of or behind the face of size. surface. In this case, care must be taken to maintain access to the open ends of the injection tubes, even after bending and / or laying of coating operations on the tunnel walls.
- the tubes used for the realization of the vault and for the injection can be perforated tubes.
- a perforated tube makes it possible to accurately produce localized injections in several zones to be treated which are distant from each other.
- perforated tube means a tube provided with openings of any shape, for example a sleeve tube, well known elsewhere.
- openings are closed by rubber sleeves which open when the pressure in the sleeve tube is greater than the pressure outside the tube.
- the perforated tube is a sleeve tube and, for the injection of consolidation grout in particular, is introduced into the sleeve tube a shutter tube, preferably a double shutter tube, to perform the injection through some of openings.
- a consolidation grout injection can also be performed in the face of size.
- At least one borehole is drilled into the face of the borehole, an injection tube is placed in said borehole and sealed to the ground with a grout. sealing, said injection tube having an open proximal end and at least one outlet orifice on its distal portion sunk into the ground, and a consolidation slurry is injected into the soil through said tube.
- the injection tube is sealed to the ground with a sealing slurry before the consolidation slurry is injected.
- the length of the injection tube introduced into the cutting face of a section of rank N is chosen so that the soil zone injected by said tube is situated axially in front of the tunnel segment of rank N + 2. .
- the nailing of the forehead is completed by a treatment of the soil by injection.
- the drilling carried out for the nailing can be used also for the realization of the injection operations.
- an armature in particular a fiberglass bolt, is introduced into the borehole drilled into the face and intended to receive the injection tube, and the armature is sealed to the ground at using a grout.
- the reinforcement is inserted inside the injection tube, it is removed. the tube, and the reinforcement is sealed to the ground by means of a grout.
- the injection tube and the reinforcement are introduced into the borehole, side by side in the radial direction of the borehole, a sealing grout is injected into the ground for sealing said injection tube and the frame on the ground, and the consolidation grout is injected into the ground through the injection tube.
- Figure 1 is a transverse view of a tunnel being excavated, just before the beginning of the realization of the rank N segment;
- FIGS 2 to 7 illustrate the steps of making the N-rank tunnel section and the soil consolidation method according to an embodiment of the invention
- Figures 8 to 12 illustrate a variant of the consolidation method according to the invention
- Figure 13 shows the face of Figure 12
- FIG. 14 shows the soil zone consolidated by the process according to the invention and the predicted curve of settlements after excavation of the rank section N-1, in the absence of consolidation of the soil;
- FIG. 15 illustrates a second variant of implementation of the consolidation method according to the invention.
- Figure 1 illustrates a tunnel 10 during excavation.
- several sections of the tunnel of the same length L T , have already been excavated and coated.
- each section R of the tunnel is designated according to its rank, the first excavated section being of rank one, the second, of rank two, and the Nth, of rank N, and so on.
- the realization of a tunnel segment R N of rank N will be described in detail with reference to FIGS. 2 to 7. This method being reiterated for each section of the tunnel in a systematic way, it is only described once.
- each tunnel section Ri,... Fn 10 is surmounted by a portion of an umbrella vault Vi,..., N of conventional type, consisting of an assembly of tubes 12 introduced into the ground from the previous section, the assembly having, in section, an arcuate profile of main axis A, corresponding to the desired profile for the tunnel.
- the general profile of the umbrella vault is visible in particular in Figure 13.
- an axial direction is a direction parallel to the main axis A of the tunnel 10.
- a radial direction is a direction perpendicular to the axis A.
- an axial plane is a plane parallel to the axis of the tunnel and a radial plane is a plane perpendicular to this axis.
- the umbrella vault V N of rank N is constituted by the tubes located at the periphery of the N-rank tunnel section being the closest to the axis A of the tunnel 10 in the radial direction.
- the face of size F N of the segment of rank N designates the slice of ground marking the end of the excavation of the section of rank N.
- the face of size F N forms a defined terrain wall. in a substantially radial plane, and marking the limit with the following section R N + i.
- the soil is drilled and the tubes 12 are introduced into the soil, one after the other, so as to form the vault V N of section R N of rank N.
- each tube 12 comprises an open proximal end 14 and an open distal end 16 having an annular peripheral edge which is provided with cutting teeth 24.
- teeth cutting means drilling tools in general, such as pimples, knobs, tungsten carbide pellets, etc. to excavate the soil S during the drilling.
- the cutting teeth 24 are sized to excavate the ground, so that the tube 12 is also used as a drilling tool, before being left in place in the ground. The steps of drilling and introduction of the tube into the soil are therefore carried out concomitantly (it is commonly spoken cased bore tool lost).
- the soil is first drilled with an independent drilling tool, not intended to remain in place in the soil (in this case it is referred to as uncased drilling), and then, after the Drill tool was removed, the tube is introduced into the well drilled borehole.
- the tubes 12 are, more particularly, cuffed tubes.
- a sleeve tube 12 is provided with openings 20 which are formed at different heights of the tube, as well as flexible sleeves 22 which surround the sleeve tube 12 so as to seal the openings 20 when the pressure at inside of the sleeve tube is less than or equal to the pressure outside the sleeve tube.
- These flexible sleeves 22 are arranged to deform outwardly to allow flow through the openings 20 when the pressure inside the sleeve tube is substantially greater than the pressure outside the sleeve tube.
- the openings 20 covered with flexible sleeves 22 are distributed over the distal portion of the tube, in particular on the last third of the tube 12.
- each tube 12 is connected, by its proximal end 14, to means 18 for driving in rotation, which here comprise a hydraulic motor 19.
- each tube 12 is introduced into the ground via its distal end 16, being rotated by the drive means 18.
- Each tube 12 is inserted on the crown (ie at the periphery) of the forehead of size of the section R N-1 of rank Nl, substantially skirting the upper part of this section R N- i.
- the tube 12 extends in a direction defined in a substantially axial plane and slightly inclined relative to the main axis A, for example an angle ⁇ between 5 ° and 10 °.
- the inclination of the tubes 12 relative to the axis A of the tunnel 10 allows the overlap of the V umbrella vaults successive tunnel.
- each new umbrella vault V N formed is, as it were, embedded or partially fitted into the umbrella vault V N- i of the preceding section.
- a drilling fluid for example water
- annular space a narrow space, usually a few millimeters thick, defined all around the tube
- the drilling is carried out so as to bring the distal end 16 of each tube 12 to a predetermined depth at which the soil zone to be consolidated Z is located.
- a sealing grout in particular a grout, referred to herein as CS
- CS a sealing grout
- the sealing grout CS impregnates the soil around the tube 12, fill the annular space, and thus seal the tube 12 on the ground and adjacent tubes 12.
- each tube 12 is cleaned in a second step (not shown), for example with water, so that at least some of the openings 20 to the periphery of the tube 12 and at its distal end 16 communicate with the opening of the tube at its proximal end 14.
- the tubes 12 of the umbrella vault V N form, once cleaned, injection tubes through which a consolidation grout, referenced here CC, will be injected into the soil zone to be activated (hereinafter consolidation injection).
- the aim of the consolidation injection according to the invention is to bring the soil of the zone to be activated into a state of constraints different from its initial state.
- the injection is intended to prestress this area of soil before it undergoes the disorders (settlements, decompression in particular) related to the excavation of previous sections.
- FIG. 14 for example, the predicted soil settlement curve has been illustrated at the surface of the massif at the end of the excavation of the sections up to the row N1 and in the absence of any consolidation of the soil.
- the largest settlements T are measured at the right of the excavated areas and that the settlement amplitude decreases progressively until becoming almost zero at a distance D from the face of size F N- i, in front of the latter.
- the length L A of the tubes 12 is chosen so that at least one injection orifice of each tube 12, provided on its distal portion, is located in the zone to be activated Z in which the settlements related to the excavation work of the section N are theoretically evaluated as being less than a limit value (low value characterizing a quasi-absence of settlements) in the absence of prior consolidation of the soil.
- the distance D is approximately twice the length L T of a section.
- the length L A of the tubes is therefore greater than two and a half times the length L T of a section, here about three times this length.
- a maximum volume loss coefficient is usually set by contract globally, for the tunnel or for a tunnel area. This coefficient of volume loss, which corresponds to the ratio between the volume of the settlement basin on the surface of the massif and the theoretical volume of ground excavated for the tunnel, characterizes the maximum of settlement admissible over the length of the tunnel or the zone. considered.
- the objective of the injection is to compensate, as and when tunneling, the settlements induced by the excavation of each section.
- Injection treatment is all the more effective when applied to the source of settlements, and includes a preventive component (soil prestressing). From the volume loss coefficient corresponding to a section of the tunnel, it is possible to deduce an injection program at this section, and especially a volume and pressure set point, for the injection around this section.
- Each injection pass can be modeled by a lift. It is thus possible to determine, generally automatically, an optimum distribution of injection points and amounts of substance to be injected so that the theoretical uprisings related to the injection neutralize the theoretical settlements related to the excavation.
- the injection set point for a section of rank N + 2, especially in volume, is reached in a single injection phase in the tubes of the vault of a section of rank N, upstream of the excavation of said rank section N.
- the setpoint is reached in several successive injection phases, carried out in the tubes of the row vault N, at different times during excavation of the tunnel.
- the consolidation grout CC is thus injected into each tube 12 via a double obturator tube 26 which is introduced into the tube 12 in order to isolate one or more openings 20.
- the difference between the actual settlement of the mass of land to the excavated section and the tolerance imposed by the technical specifications of the project is generally measured and the volume loss coefficient of the section is adjusted. those of the following sections to take account of this difference in the determination injection instructions. If necessary, the injection is completed on the section concerned.
- hangers 60 are placed on the side walls of the tunnel section and the section is coated with concrete 62, for example by the shotcrete technique.
- FIGS. 8 to 12 A first mode of implementation according to the invention, allowing such a reinforcement, is illustrated in FIGS. 8 to 12.
- tubes for example cuff tubes 42, of the same type as those described above are introduced into the face-piece F N and then sealed to the ground by means of a CS grout (grout seal filling the annular space surrounding the injection tube).
- the injection tubes 42 have a length advantageously greater than 2.5 times the length of a section. In this way, the tubes 42 make it possible to consolidate the face of size but also, to a certain extent, the zone of soil to be activated Z located at the right of the tunnel section of rank N + 2.
- the inside of the tubes 42 is then cleaned, for example by means of a water injection lance 41, and then, as illustrated in FIG. 9, a consolidation grout CC is injected into the ground by the tubes 42, possibly by means of a double shutter tube 26.
- the tubes 42 are cleaned again and a fiberglass reinforcement 44 is introduced into each of them.
- FIG. 1 A second mode of implementation according to the invention, allowing the reinforcement of the front of size F N -i of the section of rank Nl, is illustrated in FIG.
- a borehole 50 is firstly made in the face of size F N , said borehole being sufficiently wide to receive one next to the other, an armature 44 such as A fiberglass bolt and an injection tube 70.
- the borehole 50 is a cased bore to the lost tool.
- the drill member is a drill pipe 52 which is kept in the ground when, during a second step, the frame 44 and, next to it, the injection tube 70 are introduced into the borehole 50.
- the diameter of the injection tube 42 is obviously smaller than the diameter of the borehole 50 and the drill pipe 52 and the length of the injection tube 70 is Moreover, in this embodiment, the injection tube 70 is advantageously made of a plastic material, allowing its easy destruction during the excavation of the section of rank N.
- the drill pipe 52 is withdrawn from the borehole 50.
- a sealing grout CS is injected through the injection tube 70 to seal said injection tube 70 and the frame 44 to the ground.
- the injection tube 70 is then cleaned in a fifth step.
- a consolidation grout CS is injected into the ground, through the injection tube 70.
- the borehole 50 is made using a drill bit removed before the introduction, into the borehole 50, of the reinforcement. 44 and the injection tube 70. Because it is consistent, the soil is held without casing.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR1352551A FR3003583B1 (fr) | 2013-03-21 | 2013-03-21 | Procede de consolidation d'un sol encaissant un tunnel |
| PCT/FR2014/050649 WO2014147349A1 (fr) | 2013-03-21 | 2014-03-20 | Procede de consolidation d'un sol encaissant un tunnel |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP2976465A1 true EP2976465A1 (fr) | 2016-01-27 |
| EP2976465B1 EP2976465B1 (fr) | 2017-05-03 |
Family
ID=48570352
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP14716899.1A Active EP2976465B1 (fr) | 2013-03-21 | 2014-03-20 | Procede de consolidation d'un sol encaissant un tunnel |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP2976465B1 (fr) |
| FR (1) | FR3003583B1 (fr) |
| WO (1) | WO2014147349A1 (fr) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107060841B (zh) * | 2017-05-31 | 2023-04-07 | 天津大学 | 一种用于快速治理隧道渗漏水问题的分节式环形挡水装置 |
| CN109469050A (zh) * | 2018-12-25 | 2019-03-15 | 高永光 | 灌注桩桩底安装中空(孔)环形钢板胶囊(腔)后注浆技术 |
| CN111382473A (zh) * | 2020-02-13 | 2020-07-07 | 浙江大学城市学院 | 一种由浅埋隧道横穿引起的地下管线沉降预测方法 |
| CN115316169B (zh) * | 2022-07-11 | 2024-01-09 | 北京市政路桥股份有限公司 | 利用隧道锚杆同步施工的盆式古树保护结构及施工方法 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102006044733C5 (de) * | 2006-09-20 | 2013-03-28 | Gta Maschinensysteme Gmbh | Mobile Einhausung mit Vortriebsaggregaten |
-
2013
- 2013-03-21 FR FR1352551A patent/FR3003583B1/fr not_active Expired - Fee Related
-
2014
- 2014-03-20 EP EP14716899.1A patent/EP2976465B1/fr active Active
- 2014-03-20 WO PCT/FR2014/050649 patent/WO2014147349A1/fr not_active Ceased
Non-Patent Citations (1)
| Title |
|---|
| See references of WO2014147349A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| FR3003583B1 (fr) | 2015-04-17 |
| WO2014147349A1 (fr) | 2014-09-25 |
| EP2976465B1 (fr) | 2017-05-03 |
| FR3003583A1 (fr) | 2014-09-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0240493B1 (fr) | Procede de compactage-armature-injection ou de decompactage-drainage et de construction d'ouvrages lineaires et d'ouvrages plans dans les sols | |
| EP2976465B1 (fr) | Procede de consolidation d'un sol encaissant un tunnel | |
| WO2010007305A2 (fr) | Procede de construction d'une galerie souterraine ou d'un puits permettant de realiser un bouchon etanche pour un stockage de dechets dangereux et notamment radioactifs | |
| CH642416A5 (fr) | Procede de construction d'ouvrages souterrains a parois verticales, dispositif pour l'execution du procede et ouvrage souterrain. | |
| JP2008274553A (ja) | 斜面の安定化工法 | |
| JP5282541B2 (ja) | 覆工体の浮き上がり防止方法 | |
| EP2900876B1 (fr) | Procédé de réalisation d'une structure armée dans un sol | |
| EP2652205A1 (fr) | Procédé de forage et de chemisage d'un puits | |
| FR2686356A1 (fr) | Perfectionnements aux procedes et dispositifs de reprise des fondations en sous-óoeuvre et aux fondations ainsi obtenues. | |
| FR3012513A1 (fr) | Dispositif et systeme d'amortissement de la convergence d'un terrain, procedes de fabrication de tels dispositif et systeme | |
| EP0509934B1 (fr) | Procédé de guidage de l'outil d'excavation utilisé pour la réalisation d'une paroi moulée dans le sol, et outil d'excavation pour la mise en oeuvre de ce procédé | |
| JP5546000B2 (ja) | 地盤の掘削方法 | |
| FR2482185A1 (fr) | Procede de construction d'un ouvrage souterrain et ouvrage ainsi obtenu | |
| KR102013529B1 (ko) | 지하수 유입밸브와 프리캐스트 콘크리트 바닥판을 갖는 내관이 사용된 연약지반의 소구경 하수관 매설 공법 | |
| EP2900875B1 (fr) | Procédé de réalisation d'un ancrage dans un sol | |
| EP0413676A1 (fr) | Procédé de fixation d'ancrages | |
| JP5282542B2 (ja) | 地盤変状防止方法及び地盤変状防止構造 | |
| FR2574442A1 (fr) | Procede pour le compactage des terrains et la construction d'ouvrages dans le sol enrobes de terrain compacte ou decompacte | |
| JP5726600B2 (ja) | パイプルーフの構築方法 | |
| JP7121955B1 (ja) | マンホールの耐震構造、その構築方法、及び構築方法の実施に供される切削装置 | |
| FR2960573A1 (fr) | Dispositif destine a creer des bassins enterres en vue du stockage de l'eau dans le sol et plus particulierement ceux realises au droit d'un forage, selon un outillage et une demarche specifiques | |
| WO1990001089A1 (fr) | Procede pour reparer une fondation comportant des tetes de pieux deteriorees, notamment de pieux en bois | |
| JP5301316B2 (ja) | 水路管廃棄処理方法 | |
| JP3490351B2 (ja) | 既設埋設管の更新方法 | |
| FR2534611A1 (fr) | Procede et dispositif pour la realisation d'une paroi moulee en terrain dur |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20151014 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| INTG | Intention to grant announced |
Effective date: 20161006 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 890143 Country of ref document: AT Kind code of ref document: T Effective date: 20170515 Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: FRENCH |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602014009349 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20170503 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 890143 Country of ref document: AT Kind code of ref document: T Effective date: 20170503 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170804 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170803 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170803 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170903 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602014009349 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 5 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed |
Effective date: 20180206 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602014009349 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180331 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180320 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180320 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20181002 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180331 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20140320 Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170503 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170503 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230528 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20260220 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20260220 Year of fee payment: 13 |