EP2931976B1 - Foundation system for bridges and other structures - Google Patents

Foundation system for bridges and other structures Download PDF

Info

Publication number
EP2931976B1
EP2931976B1 EP13862489.5A EP13862489A EP2931976B1 EP 2931976 B1 EP2931976 B1 EP 2931976B1 EP 13862489 A EP13862489 A EP 13862489A EP 2931976 B1 EP2931976 B1 EP 2931976B1
Authority
EP
European Patent Office
Prior art keywords
metal reinforcement
elongated
elongated metal
lengthwise
recess
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP13862489.5A
Other languages
German (de)
English (en)
French (fr)
Other versions
EP2931976A1 (en
EP2931976A4 (en
Inventor
Scott D. Aston
Michael G. Carfagno
Philip A. Creamer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Contech Engineered Solutions LLC
Original Assignee
Contech Engineered Solutions LLC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US14/098,615 external-priority patent/US8925282B2/en
Application filed by Contech Engineered Solutions LLC filed Critical Contech Engineered Solutions LLC
Publication of EP2931976A1 publication Critical patent/EP2931976A1/en
Publication of EP2931976A4 publication Critical patent/EP2931976A4/en
Application granted granted Critical
Publication of EP2931976B1 publication Critical patent/EP2931976B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125Grating or flooring for bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Definitions

  • the present application relates to the general art of structural, bridge and geotechnical engineering, and to the particular field of foundations for overfilled arches and other bridge structures, such as generally known from the disclosure of document US 6,640,505 or US 2013/0008108 A1 .
  • Overfilled bridge structures are frequently formed of precast or cast-in-place reinforced concrete and are used in the case of bridges to support a first pathway over a second pathway, which can be a waterway, a traffic route, or in the case of other structures, a storage space or the like.
  • the term "overfilled bridge” will be understood from the teaching of the present disclosure, and in general as used herein, an overfilled bridge is a bridge formed of bridge elements or units that rest on a foundation and has soil or the like resting thereon and thereabout to support and stabilize the structure and in the case of a bridge provide the surface of the first pathway.
  • a foundation structure, system and method with advantages as to manufacturability, installation and ability to effectively receive and support bridge structures would be desirable.
  • precast or "precast concrete” as used in reference to a structure or portion of a structure means that the concrete of the structure or portion of the structure was poured and cured to create the structure or portion of the structure prior to delivery of the structure or portion of the structure to a construction site or other installation/use location where the structure or portion of the structure will be installed for use.
  • the term "cast-in-place” or “cast-in place concrete” as used in reference to a structure or portion of a structure means that the concrete of the structure or portion of the structure was poured and cured at the installation/use location of the structure or portion of the structure.
  • concrete means traditional concrete as well as variations such as concrete formulas with plastics/polymers or resins incorporated therein or with fibers or other materials incorporated therein.
  • a method of constructing a combination precast and cast-in-place concrete foundation structure involves: utilizing a precast concrete foundation unit having a first elongated upright wall member and a second elongated upright wall member spaced apart from the first elongated upright wall member to define a channel therebetween, and at least one upright support extending laterally across the channel and interconnecting the first elongated upright wall member and the second elongated upright wall member, wherein an inner side of the first elongated upright wall member includes a first lengthwise recess facing the channel and an inner side of the second upright wall member includes a second lengthwise recess facing the channel in opposed and aligned relationship with the first lengthwise recess, wherein the upright support includes a plurality of through openings; subsequent to casting of the precast concrete foundation unit, inserting a first plurality of elongated metal reinforcement members into the channel such that each elongated metal reinforcement member extends laterally between the first lengthwise recess and the second lengthwise reces
  • the inserting steps are performed at the construction site.
  • the inserting steps are performed prior to delivery of the precast concrete foundation unit to the construction site.
  • each elongated metal reinforcement member of the first plurality is tied to at least one elongated metal reinforcement member of the second plurality to maintain a desired position of each elongated metal reinforcement member of the first plurality within the channel.
  • the inner side of the first elongated upright wall member includes a third lengthwise recess facing the channel and positioned below the first lengthwise recess
  • the inner side of the second upright wall member includes a fourth lengthwise recess facing the channel and positioned below the second lengthwise recess, the fourth lengthwise recess in opposed and aligned relationship with the third lengthwise recess, and subsequent to casting of the precast concrete foundation unit, inserting a third plurality of elongated metal reinforcement members into the channel such that each elongated metal reinforcement member of the third plurality extends laterally between the third lengthwise recess and the fourth lengthwise recess with a first end of the elongated metal reinforcement member of the third plurality positioned in the third lengthwise recess and a second end of the elongated metal reinforcement member of the third plurality positioned in the fourth lengthwise recess.
  • the third plurality of elongated reinforcement members is inserted prior to insertion of the first plurality of elongated reinforcement members.
  • the plurality of through openings include a first set of laterally spaced apart through openings at a first height that is proximate a height of both the first lengthwise recess and the second lengthwise recess, and a second set of laterally spaced apart through openings at a second height that is proximate a height of both the third lengthwise recess and the fourth lengthwise recess.
  • the step of inserting a second plurality of elongated metal reinforcement members involves inserting a first multiplicity of elongated metal reinforcement members through the first set of laterally spaced apart through openings and inserting a second multiplicity of elongated metal reinforcement members through the second set of laterally spaced apart through openings.
  • each elongated metal reinforcement member of the first plurality is tied to at least one elongated metal reinforcement member of the first multiplicity and each elongated metal reinforcement member of the third plurality is tied to at least one elongated metal reinforcement member of the second multiplicity.
  • the inserting steps are performed prior to delivery of the precast concrete foundation unit to the construction site.
  • the step of inserting the first plurality of elongated metal reinforcement members involves orienting each of the first plurality of elongated metal reinforcement members at an angle that is offset from perpendicular to a lengthwise axis of the precast concrete foundation unit, moving the elongated metal reinforcement member into the cell to a depth aligned with the first lengthwise recess and the second lengthwise recess and rotating the elongated metal reinforcement such that the first end moves in the first lengthwise recess and the second end moves into the second lengthwise recess.
  • a first vertical recess intersects with the first lengthwise recess and a second vertical recess intersects with the second lengthwise recess
  • the step of inserting the first plurality of elongated metal reinforcement members involves orienting each of the first plurality of elongated metal reinforcement members such that the first end is aligned with the first vertical recess and the second end is aligned with the second vertical recess, and moving the elongated metal reinforcement member depthwise along the first and second vertical recesses until the first end and the second end are positioned in the first lengthwise recess and second lengthwise recesses respectively.
  • a distance between the first and second elongate upright wall members is at least as great as a span of a bridge unit to be placed thereon.
  • a precast concrete foundation unit assembly comprises a precast concrete foundation unit having a first elongated upright wall member and a second elongated upright wall member spaced apart from the first elongated upright wall member to define a channel therebetween, and multiple upright supports located within and extending laterally across the channel and interconnecting the first elongated upright wall member and the second elongated upright wall member to define at least one open cell within the channel, wherein an inner side of the first elongated upright wall member includes a first lengthwise recess facing the open cell and an inner side of the second upright wall member includes a second lengthwise recess facing the open cell in opposed and aligned relationship with the first lengthwise recess, wherein at least some of the multiple upright supports each includes a plurality of lengthwise extending through openings; a first plurality of elongated metal reinforcement members each extending laterally between the first lengthwise recess and the second lengthwise recess with a first end of the elongated metal reinforcement member positioned in the
  • a bridge structure 10 is shown atop spaced apart foundation structures 12 that, when completed, are made up of both precast and cast-in-place concrete.
  • bridge structure 10 is formed by a plurality of side-by-side three sided precast bridge units 14.
  • Each foundation structure 12 is formed by a number of precast concrete foundation units 16 laid end to end (e.g., ends abutting each other).
  • a length L of each precast foundation unit 16 accommodates three bridge units 14, but many variations are possible.
  • Each foundation unit includes a lower base portion 18 (e.g., as a bottom wall of the unit) with respective upright walls 20 extending upwardly at each side to define a generally U-shaped channel 22.
  • a central region of the channel 22 includes a series of upwardly extending, spaced apart supports 24 upon which the bottom ends of the side walls of the bridge units 14 are supported, either directly or indirectly.
  • the bottom ends may sit on the surface of the support, in other implementations the bottom ends may sit on shims or a bracket or other channel member that is mounted on the support.
  • the spacing between the supports 24 may vary, but should be no greater than the depth D B of the bridge units to be supported thereon.
  • Supports may be located at each end of the foundation unit 16 so that end supports 24 of abutted units 16 will abut with each other as shown, but variations are possible.
  • Figs. 3 and 4 show exemplary end elevation views of alternative embodiments of the foundation units 16.
  • the end elevation profile is generally an E-shape with the legs of the E extending upward.
  • the base 18, walls 20 and supports 24 are formed as a unitary casting with suitable steel reinforcement 26 embedded therein.
  • supports 24 could be cast as separate pieces and then attached to the base 18 either after the base 18 and walls 20 have been cast together, or during the casting process for the base 18 and walls 20 (e.g., by placement of the support 24 within the form in which the base 18 and walls are cast).
  • one of the base 18 or walls 20 could be cast first and the other of the base or walls then cast in a manner to form the integrated base and wall unit.
  • the walls 20 of the foundation unit 16 may be formed with inner sides 28 slightly angled (relative to vertical) such that the width W C1 of the channel 22 is greater at the top of the unit than the width W C2 of the channel 22 at the base 18 of the unit.
  • This configuration provides the advantage of more easily removing the unit from the precast formwork and reducing the weight of the unit.
  • the upper surface 30 of the base 18 may be formed with channels 32 to aid in binding with cast-in-place concrete that will be placed in the channel 22 on-site as will be described in further detail below.
  • the vertical walls of the supports 24 may be formed (e.g., during the precasting) with horizontally extending pockets 34 configured to receive reinforcement 36 that will be manually placed in the field prior to pouring concrete. A portion of the reinforcement is received in the pocket 34 and a portion of the reinforcement protrudes from the pocket 34. It is contemplated that the reinforcement 36 will extend lengthwise along substantially the full length of the foundation 12 formed by multiple foundation units 16. It is also recognized that these pockets and longitudinal reinforcement could be incorporated into a surface of the end support 24 or one of the side walls 20.
  • field placed reinforcement 38 is provided on each side of the support members 24.
  • the reinforcement 38 is used to better tie the ends of adjacent foundation units 16 together with cast-in-place concrete and therefore such reinforcement may be limited to the vicinity of such end to end abutments 40 of the foundation units 16 as suggested in Fig. 5 .
  • additional field placed reinforcement could be used in some applications.
  • the width, length and height of the foundation units 16 may vary depending upon various aspects of the bridge installation.
  • a rise of about 6-8' feet and a depth of about 8' the dimensions T 20-1 , T 20 -2, T B , W B and H (see Fig. 3a ) could be on the order of about 4", 5", 6", 48" and 24" respectively;
  • a rise of about 6-8' feet and a depth of about 8' the dimensions T 20-1 , T 20 -2, T B , W B and H (see Fig.
  • the thickness of the supports 24 may typically be the same as or greater than the thickness of the bottom ends of the bridge unit that will rest thereon.
  • the vertical dimension of supports 24 will adjust based on the overall precast foundation dimension.
  • the horizontal location of support 24 may change within the U-shaped channel, such that in some implementations the supports 24 are centered or substantially centered along the width of the U-shaped channel, while in other implementations the support is offset (either toward the outer side wall of the unit or toward the inner side wall of the unit) partially or entirely from the center of the U-shaped channel.
  • Figs. 1 and 2 contemplate a three-sided bridge structure with straight side walls and a curved top wall
  • the foundation system of the present application could be used in combination with other bridge unit configurations, including three-sided units with straight side walls and a straight top wall ( Fig. 6 ) or more traditional arch structures in which substantially the entire bridge unit is curved ( Fig. 7 ).
  • the precast foundation units 16 of the present application facilitate the provision of a foundation with advantageous features.
  • the precast foundation units are shipped to and received at a construction site.
  • a final use/installation site is prepared to receive the precast foundation units by excavating to the desired elevation in a smaller area than traditional methods and preparing a level subsurface which may include additional backfill materials on which to install the units.
  • the units are placed in end to end abutting relationship to form two spaced apart foundation structures 12.
  • the foundation units 16 are simply placed end to end without any structure holding the units adjacent each other.
  • alignable bolt pockets may be formed at the end portions of the foundation units (e.g., in side walls 20, base 18 and/or supports 24) and the bolts manually placed prior to setting of the bridge units.
  • the bridge units 16 may be formed with lengthwise extending ducts could be formed in the foundation units so that tensioning members can be passed through the full length of the series of foundation units to secured them in abutting relationship.
  • there may be other precast components to the foundation structure as well e.g., to support wing walls at the ends of the bridge structure).
  • the reinforcement 36 and 38 can be manually placed and the bridge units placed atop the support structures 24.
  • the upper surface 42 of each support unit 24 may be positioned below the upper surfaces 44 of the side walls 20.
  • the bottom of the bridge unit side walls may rest directly atop the upper surface 42 of the support unit and/or shims 49 may be provided as needed for proper alignment and positioning of the bridge units 14.
  • additional tie in and/or alignment structure may be provided between the supports 24 and the bridge units, such as tie rods 43 ( Fig.
  • the ties rods 43 may be precast into the foundation units 16 or threaded into surface accessible connectors at the end of reinforcement sections that are cast and embedded into the precast foundation unit.
  • the cast-in-place concrete may typically be poured to the top of the channel (as represented by dashed line 46 in Fig. 4 ) or just below the top of the channel, in either case sufficiently high to embed and capture the bottom ends of each bridge unit so as to integrate the bridge units with the foundation. Preferably, at least about 2 to 3 inches of the bottom ends are embedded in the cast-in-place concrete. It is noted that the cast in place concrete can be applied along the outer portion of the U-shaped channel (i.e., the portion that is external of the bridge units) and the spacing between the supports 24 will allow the concrete to freely flow into and fill the other inner portion of the U-shaped channel as well as the portions aligned and between the supports 24.
  • an elongated support with one or more transverse bottom openings or channels could be used, such channels providing the route for concrete to flow from the outer portion of the U-shaped channel to the inner portion of the U-shaped channel during the pour.
  • the concrete may be poured in the U-shaped foundation prior to the spans being set in place.
  • the base 18 of the foundation units may be formed with openings to allow some through passage of concrete which may assist self-leveling.
  • a bridge installation may also include wingwalls 50 at each end of the pathway 52 under the bridge units 14.
  • the foundation structures 12 may be formed with wingwall support portions 54 extending angularly away from the pathway 52.
  • Each wingwall support portion 54 is formed by one or more precast concrete wingwall support units 56 that become integrated with the foundation units 16.
  • each precast wingwall support or foundation unit 56 may be formed in a trapezoidal shape, or other shape that has a bottom surface that is wider than the top surface. The top surface supports the bottom edge of the wingwall 50 and the bottom surface rests upon the prepared site surface.
  • the trapezoidal shape reduces the volume of concrete needed.
  • One end surface 58 of the unit 56 extends generally perpendicular to a longitudinal axis of the unit 56, while the other end surface 60 extends at an non-right angle (substantially offset from 90 degrees) to the longitudinal axis to define the angle at which the unit 56 will extend away from the foundation unit 16 and pathway 52.
  • the wingwall foundation unit 56 which is precast with necessary reinforcement therein, may include pocket 62 at end 60 and into which reinforcement 64 is positioned prior to the on-site concrete pour.
  • Reinforcement sections 64 include a first leg 66 extending axially along the length of the support unit 16 and a second leg 68 extending axially along the length of wingwall support unit 56 into the pocket 62.
  • a laterally spaced series of reinforcement bars may be placed at each side of the end support member 24 of the foundation unit 16.
  • integration of the units 56 with units 16 may be achieved without the pocket by integrating dowel bars or reinforcing bars into the end 60 of unit 56 during precasting such that either the dowel bars or reinforcing bars extend from the end of the unit or a connector (e.g., internally threaded) is presented at the end face of the unit 56 to which the threaded end of a reinforcement bar can be connected.
  • a connector e.g., internally threaded
  • These dowel bars may be pre-bent or subsequently bent, or the reinforcement subsequently connected to the connectors at the end face, to provide extending reinforcement portions in general alignment with the lengthwise axis of the precast foundation unit 16 as shown.
  • the protruding ends of the dowel rods or reinforcement become embedded in the cast-in-place concrete of the U-shaped channel during the on-site pour.
  • the dowel rods or reinforcement could pass through openings in the elongated side walls of the precast unit 16 in order to enter the channel.
  • the wing walls 50 may include anchor members 51 that will become embedded within the surrounding earthen fill material to laterally support the walls.
  • the supports 24 could be cast as separate pieces and then attached to the base 18 of units 16 either after the base 18 and walls 20 have been cast together, or during the casting process for the base 18 and walls 20.
  • the supports 24 are precast separate from base 18 and side walls 20.
  • the supports 24 are precast first with partially embedded tie bolts 70 (or button bars) having heads 72 extending therefrom.
  • the supports are then hung into the form that creates the base 18 and walls 20, such that during casting the bolt heads 72 become embedded in the base 18 to secure the supports 24 to the base.
  • the vertical surfaces of the U-shaped channel may also be formed with V-shaped channels to aid in integration with the cast-in-place concrete that will be poured into the U-shaped channel.
  • Transport cables 76 may also be embedded in the base 18 for lifting and placing the precast concrete foundation units 16.
  • a pedestal type foundation may be desired.
  • the base 18 and side walls 20 are precast as an integrated piece.
  • the pedal structure 24', including end feet 80, is also precast as an integrated piece, with a U-shaped recess 82 in its top surface.
  • the U-shaped member formed by base 18 and side walls 20 and the pedestal 24' are then shipped to the job site as separate precast components.
  • the U-shaped member is placed, then the pedestal 24' is positioned within the channel, and an on-site pour of concrete 84 can be used to integrate the two components together.
  • an on-site pour of concrete 84 can be used to integrate the two components together.
  • the central extent of the pedestal may be formed with a raised, transverse bottom channel 86 to allow poured concrete to flow from one side of the pedestal to the other.
  • the bridge units can then be placed upon the pedestal 24' with bottom ends within the channel 82, and a concrete grout 88 applied within the channel 82 as well to provide a level of integration between the foundation and the bridge units.
  • the pedestal 24' may be centered or substantially centered along the width of the U-shaped channel and in other implementations the pedestal 24' may be offset toward the outer side wall or inner side wall of the precast foundation unit.
  • Figs. 17 and 18 depict a pedestal arrangement used in connection a bridge structure in which two sets of bridge units 14 are utilized in combination with three foundation structures 12 to form two pathways 52.
  • the pedestal 24" of the center foundation structure 12 is formed wider than the pedestals 24' of the outer foundation structures to provide a wider upper channel 82' capable of supporting the bottom ends of two bridge units 14.
  • Figs. 21 and 22 show an implementation in which the foundation supports a structural metal plate arch structure 90.
  • the center supports 24 are raised above an expected pour level 46 of the cast-in-place concrete and include a channel 92 that receives a u-shaped angle iron 94, both of which are angled/offset from vertical so as to be arranged to receive the bottom end portion 96 of the metal plate arch 90.
  • the angle iron 94 may be embedded in the channel 92 during precast.
  • Fig. 23 illustrates an embodiment in which the foundation structures 12 are utilized to support a composite arch.
  • each support 24 receives the lower end of a composite tube 100.
  • an on-site concrete pour is performed to embed the lower ends of the tubes in the concrete of the foundation structure.
  • Corrugated decking can then be set over the composite tubes for support thereby, and the composite tubes filled with concrete (e.g., self-consolidating expansive concrete).
  • a concrete layer could also be placed over the corrugated decking.
  • Figs. 24 and 25 depict an embodiment in which the foundation units 16 are formed unitary with the bridge unit 14 as a single precast unit.
  • the on-site pour and associated reinforcement complete the foundation structure after the combination units have been placed.
  • the precast foundation units 160 are formed with a ladder configuration in which spaced apart side walls 150 are interconnected by a series of cross-member supports 152.
  • the foundation unit 160 lacks any bottom wall, such that open areas 154 extend vertically from the top to bottom of the units in the locations between the cross-members 152.
  • Each cross-member support 152 includes an upper surface with a recess 156 for receiving the bottom end of the bridge units.
  • the recesses 156 may be centered or offset laterally from a center point along the width of the foundation unit as shown. In some cases the recesses 156 will be positioned toward the inward side of the overall structure, but variations are possible.
  • the spacing of the cross-member supports 152 preferably matches the depth of the bridge units, such that adjacent end faces of the side-by-side bridge units abut each other in the vicinity of the recesses 156 as shown in Fig. 29 where the bridge units 14 are shown in transparent wire form.
  • Each cross-member support 152 also includes one or more larger through openings 158 for the purpose of weight reduction and allowing concrete to flow from one open area or cell 154 to the next.
  • Each cross-member also includes multiple, smaller axially extending reinforcement openings 162. In the illustrated embodiment, an upper row 164 and lower row 166 of horizontally spaced apart openings is shown, but variations are possible.
  • Axially extending reinforcement rods may be extended through such openings prior to delivery of the foundation units 160 to the installation site, but could also be installed on-site if desired. These openings 162 are also used to tie foundation units 160 end to end for longer foundation structures, via reinforcement extending from one unit to the next that becomes embedded in cast-in-place concrete.
  • the side walls 150 include reinforcement sections 168 that include a portion 170 extending vertically and a portion 172 extending laterally into the open cell areas 154 in the lower part of the foundation unit 160. At the installation site, or in some cases prior to deliver to the site, opposing portions 172 of the two side walls can then be tied together by a lateral reinforcement section.
  • the subject foundation units 160 can, in one embodiment, be manufactured using a single pour technique to produce both side walls and cross-members.
  • each side wall portion 150 with reinforcement 168 may be formed as separate pieces from respective pours. Once cured, the side wall portions are then arranged with the desired lateral spacing, and suitable formwork added between the side walls (and at the ends of the side walls) to produce the cross-member supports 152 from another pour.
  • the reinforcement portions 172 also extend into and within the cross-members to tie the cross-members to the side walls.
  • upper lateral reinforcement portions 174 can also be provided in the vicinity of the cross-members, as well as lateral reinforcement pieces 176 that tie opposing portions 172 and opposing portions 174 together.
  • the precast foundation units 160 are delivered to the job site and installed on ground that has been prepared to receive the units (e.g., compacted earth or stone).
  • the bridge units 14 are placed after the precast foundation units 160 are set.
  • the cells 154 remain open and unfilled during placement of the bridge units 14 (with the exception of any reinforcement that may have been placed either prior to delivery of the units 160 to the job site or after delivery).
  • shims may be used for leveling and proper alignment of bridge units 14. Once the bridge units 14 are placed, the cells 154 may then be filled with an on-site concrete pour.
  • the pour will typically be made to the upper surface level 180 of the foundation units 160, resulting in capture and embedment of the bottom portion of the bridge unit side walls within the concrete.
  • the bottom surface of the bridge unit side walls may be formed with suitable reinforcement extensions or reinforcement openings such that vertical reinforcement can extend from the bottom of the unit.
  • the foundation unit 160 may also be used in combination with various features and aspects of the other foundation unit embodiments described above, including the wingwall foundation and/or pedestals.
  • the precast foundation unit 160 is shown in combination with a precast pedestal unit 190.
  • the two units are formed separately and delivered to a job site.
  • the precast foundation unit 160 is first placed and then the precast pedestal placed within the foundation unit.
  • the foundation unit cross-members 152 include recesses 192 and the pedestal unit includes upwardly extending cut-outs or slots 194 that fit over the cross-members in the vicinity of the recesses 192.
  • Exemplary reinforcement 196 of the pedestal having both an embedded vertical portion and a protruding lateral portion is shown, it being understood that the reinforcement(s) would extend or be distributed along the axial length of the pedestal.
  • an on-site concrete pour is then performed to produce a unitary structure.
  • the central extent of the pedestal unit may be formed with a raised, transverse bottom channel to allow poured concrete to flow from one side of the pedestal to the other. Once cured, the system is ready to receive the bridge units.
  • the pedestal 190 includes an upper recess to receive the bottom of the bridge units.
  • FIG. 33-35 another embodiment having precast foundation units 200 with a ladder configuration is shown.
  • the units have spaced apart and elongated upright walls 202 and 204 forming a channel 205 between the walls and cross-member supports 206 extending transversely across the channel to connect the walls 202 and 204.
  • the foundation units 200 lacks any bottom wall, such that open areas or cells 208 extend vertically from the top to bottom of the units in the locations between the cross-members 206.
  • Each cross-member support 206 includes an upper surface with a recess 210 for receiving the bottom portion of one side of the bridge units 214.
  • the side wall portions of the bridge units 214 extend from their respective bottom portions upwardly away from the combination precast and cast-in-place concrete foundation structure and inward toward the other combination precast and cast-in-place concrete foundation structure at the opposite side of the bridge unit.
  • the recesses 210 extends from within the channel 205 toward the inner upright wall member 204, that is the upright wall member positioned closest to central axis 212 of the bridge system.
  • the upright wall member 202 has a greater height than the upright wall member 204.
  • Each cross-member support 206 also includes one or more larger through openings 216 for the purpose of weight reduction and allowing concrete to flow from one open area or cell 208 to the next.
  • Each cross-member support also includes multiple axially extending reinforcement openings 218. In the illustrated embodiment, an upper row 220 and lower row 222 of horizontally spaced apart openings 218 is shown, but variations are possible. Axially extending reinforcement may be extended through such openings prior to delivery of the foundation units 200 to the installation site, but could also be installed on-site if desired.
  • openings 218 are also used to tie foundation units 200 end to end for longer foundation structures.
  • the ends of the foundation units 200 that are meant to abut an adjacent foundation unit may be substantially open between the upright wall members 202 and 204 such that the abutting ends create a continuous cell 224 in which cast-in-place concrete will be poured.
  • the far ends of the end foundation units 200 in a string of abutting units may typically include an end-located cross-member 206 as shown.
  • the walls 202 and 204 include reinforcement 226 that includes a portion 228 extending vertically and a portion 230 extending laterally into the open cell areas 208 in the lower part of the foundation unit 200.
  • reinforcement 226 that includes a portion 228 extending vertically and a portion 230 extending laterally into the open cell areas 208 in the lower part of the foundation unit 200.
  • opposing portions 230 of the two side walls can then be tied together by a lateral reinforcement section 232.
  • the subject foundation units 200 can manufactured in a manner similar to units 160 as described above, with cross-member supports 206 also including reinforcement similar to that of cross-member supports 152.
  • the precast foundation units 200 are delivered to the job site and installed on ground that has been prepared to receive the units (e.g., compacted earth or stone).
  • the bridge units 214 are placed after the precast foundation units are set.
  • the cells 208 remain open and unfilled during placement of the bridge units 214 (with the exception of any reinforcement that may have been placed either prior to delivery of the units 200 to the job site or after delivery). Shims may be used for leveling and proper alignment of bridge units 214.
  • the cells 208 may then be filled with an on-site concrete pour. The pour will typically be made to the upper surface level of the foundation units 200.
  • the bottom portion 240 of the bridge unit will be captured and embedded within the cast-in-place concrete 242 at the outer side of bottom portion 240.
  • the cast-in-place concrete at the outer side of the bottom portion 240 of the bridge unit is higher than a bottom surface of the bottom portion 240 to embed the bottom portion at its outer side, and the cast-in-place concrete at the inner side of the bottom portion of the bridge unit is substantially flush with the bottom surface of the bottom portion 240. In this manner, the flow area beneath the bridge units is not adversely impacted by embedment of the bottom portions 240 of the bridge units.
  • the foundation unit 200 may also be used in combination with various features and aspects of the other foundation unit embodiments described above, including the wingwall foundation and/or pedestals.
  • the precast foundation unit 200 may be used in combination with a pedestal structure.
  • the foundation units 160 and 200 are both well adapted for use in connection with pile foundation systems. That is, the support piles can be driven into the ground at the intended use location of the unit (before or after placement of the unit) with the upper ends of the piles protruding into the open cell areas. When the on-site pour is carried out, the piles become embedded in the cast-in-place concrete, structurally tying the combination precast and cast-in-place foundation structure to the piles.
  • the pedestal unit 250 includes a central bottom portion 254 that seats within the recesses 156 of the cross-member supports 152, and integrated side supports 256 that rest on the upper surfaces of the cross-member supports 152, and in the illustrated embodiment partly on the upper surfaces of the elongated upright sidewalls 150, to provide lateral support to the pedestal.
  • side supports 256 are provided only at the ends of the pedestal unit 250, but the side supports could also be provided elsewhere along the length of the pedestal unit.
  • cast-in-place concrete poured at the use location and within the cells 154 of the unit 160 embeds the bottom of the pedestal unit 250 and integrates the precast pedestal unit 250 with to precast foundation unit 160 to form an integrated foundation structure.
  • reinforcement 260 having a part 262 extending within the pedestal unit 250 and a part 264 extending out of the bottom of the pedestal unit into the cast-in-place concrete aids in the integration.
  • the cast-in-place concrete also ties the precast concrete foundation unit 160 to the piles 252.
  • precast concrete foundation units 16, 160 and 200 have spaced apart elongated upright wall members to define a channel therebetween, and multiple upright supports located within the channel.
  • the units In the illustrated embodiments of precast concrete foundation units 16, the units have a bottom wall and the supports extend upward from the bottom wall. In the illustrated embodiments of foundation units 160 and 200 the units have no bottom wall and the supports extend between and connect the elongated upright wall members.
  • the multiple supports of one precast concrete foundation unit e.g., supporting one side of a bridge structure
  • the elongated upright wall members may have the same height (e.g., as in the illustrated embodiments of units 16 and 160) or the elongated upright wall members may have different heights (e.g., as in the illustrated embodiment of unit 200).
  • the top recesses of the supports when present, may be located entirely within the channel of the unit (e.g., as in some of the illustrated embodiments of units 16 and in the illustrated embodiments of units 160), or the recesses may be extend from the channel to one of the elongated walls (e.g., as shown in the illustrated embodiment of units 200).
  • supports of the precast foundation units may in some cases have recesses and in other cases not have recesses.
  • other embodiments may utilize channel members that are mounted to the supports.
  • FIGs. 36-38 embodiments of supports 24, 152, 206 having a channel member 250a, 250b, 250c mounted thereon are shown, with the channel member receiving the bottom portion 260a, 260b, 260c of a bridge unit.
  • the channel member may be mounted to the support using any suitable attachment structure 252a, 252b, 252c (e.g., bolt(s) or other anchor(s)).
  • the channel member itself may be partly embedded in the precast concrete or may be secured by a construction adhesive.
  • the channel member may take on various shapes (e.g., U-shaped, L-shaped or an irregular shape).
  • the channel member may typically be of metal plate construction (e.g., U-channel or L-channel), but other materials may be used.
  • the channel member acts to receive and support the bottom portion of the bridge units, in a similar manner to the recesses described above.
  • Both the recesses and the channel members are examples of "receiving channels" for the bottom portions of the bridge units. Shims may be used in combination with receiving channels as well (e.g., between the receiving channel and the bottom surface of the bridge unit side).
  • embedded reinforcement may typically be used to lock the wingwall foundation units 54 to the foundation units 16, 160, 200 to provide a rigid, integrated structure.
  • Cast-in-place concrete provides at least part of the embedment of the reinforcement.
  • the cast-in-place concrete embedment may be in the concrete poured in the channel of the foundation units 16, 160, 200 and in other examples the cast-in-place concrete embedment may be in an end channel of the wingwall foundation unit 56.
  • part of the reinforcement may be embedded in part of the precast concrete before the final embedment in the cast-in-place concrete is achieved.
  • a first portion of the reinforcement is embedded in the precast concrete and has a surface exposed/accessible internally threaded socket end to which a second reinforcement portion is threadedly connected after curing of the concrete, such that, the first portion is embedded and the second portion initially protrudes.
  • a continuous unitary piece of reinforcement has one part embedded in the precast concrete and one part protruding from the precast concrete.
  • the combination precast and cast-in-place concrete foundation structures described herein can be utilized to support virtually any type bridge structure. Moreover, other types of structures could be supported as well. On-site time and expense associated with foundation placement is reduced (e.g., the need for form placement and much of the reinforcement placement is eliminated).
  • FIG. 42-45 another foundation unit embodiment is shown, with the lengthwise direction of the unit represented by axis 290 and the lateral direction of the unit represented by axis 292.
  • axis 290 the lengthwise direction of the unit represented by axis 290
  • the precast foundation unit 300 includes a spaced apart elongated upright wall members 302 and 304 to define a channel 306 therebetween.
  • Multiple upright supports 308 extend laterally across the channel and interconnect the elongated upright wall members 302 and 304 to define open cells 310 within the channel.
  • the cells are open at both the top and bottom of the unit.
  • the number of supports 308 and cells 310 could vary.
  • one or more of the end portions of each unit 300 could be formed with open U-shaped channel portions (e.g., per Fig. 34 above) to facilitate end to end placement of units.
  • An inner side 312 of elongated upright wall member 304 includes lengthwise recesses 314 and 316 facing each open cell 310 and an inner side 318 of the upright wall member 302 includes lengthwise recesses 320 and 322 (shown in dashed line form) facing each open cell 310.
  • recess 316 is positioned below recesses 314 and extends substantially parallel thereto.
  • recess 322 is positioned below recess 320 and extends substantially parallel thereto.
  • Recess 320 is positioned in opposed and aligned relationship with recess 314, and recess 322 is positioned in opposed and aligned relationship with recess 316.
  • the upright supports 308 each include a plurality of lengthwise extending through openings 324 for receiving reinforcement.
  • a set 326 of six laterally spaced apart reinforcement openings 324 are located along an upper part of the support 308 and a set 328 of six laterally spaced apart openings 324 are located along a lower part of the support, but numerous variations of the number and position of reinforcement openings are possible.
  • All or some of the supports 308 may also include a larger through opening 330 for the purpose of facilitating concrete flow from one cell to another as described above.
  • the top of each of the supports also includes a recess 332, which is used to receive the bottom portion 334 of a precast bridge unit to be supported on the foundation (e.g., per the embodiments previously described above).
  • a precast concrete foundation unit 300 as described, an advantageous method of constructing a combination precast and cast-in-place concrete foundation structure can be implemented.
  • a plurality of elongated metal reinforcement members 340 are inserted into each open cell 310 such that each elongated metal reinforcement member 340 extends laterally between the opposed lengthwise recesses (e.g., 314 and 320 or 316 and 322).
  • the opposed lengthwise recesses e.g., 314 and 320 or 316 and 322
  • one end of the elongated metal reinforcement member is positioned in one lengthwise recess and the opposite end of the elongated metal reinforcement member is positioned in the lengthwise recess on the other side of the open cell.
  • a plurality of reinforcement members 340A may be positioned in the upper region of the cell (e.g., extending between recesses 314 and 320) and a plurality of reinforcement members 340B may be positioned in the lower region of the cell (e.g., between recesses 316 and 322).
  • a plurality of elongated metal reinforcement members 342 are inserted through the lengthwise extending through openings 324 such that each elongated metal reinforcement member extends lengthwise along the precast concrete foundation unit 300.
  • a multiplicity of reinforcement members 342A may be positioned in the upper region of the cell (e.g., by insertion through opening set 326) and a multiplicity of reinforcement members 342B may be positioned in the lower region of the cell (e.g., by insertion through opening set 328).
  • each elongated metal reinforcement member 340 may be tied (e.g., using concrete ties 344) to at least one elongated metal reinforcement member 342 (and visa versa) to maintain a desired position of each elongated metal reinforcement member 340 within its cell.
  • the height of opening set 326 is proximate the height of lengthwise recesses 314 and 320, and the height of opening set 328 is proximate the height of lengthwise recesses 316 and 322. Regardless of when the lengthwise and lateral reinforcement is inserted, the reinforcement is not embedded within the precast concrete of the unit 300.
  • the precast concrete foundation unit 300 is placed at a desired use location of the construction site, and then concrete is delivered into the open cells 310 while the precast concrete foundation unit remains at the desired use location.
  • the concrete is allowed to cure-in-place within the cells such that the elongated metal reinforcement members 340 and the elongated reinforcement members 342 become embedded in the cured-in-place concrete (e.g., per Fig. 45 which shows en elevation view of a cell with cast-in-place concrete therein, that also embeds the bottom portion 334 of a bridge unit in the recess 332).
  • a lateral distance between the opposed lengthwise recesses in each cell may be less than a lengthwise distance between the upright supports at opposite ends of each cell.
  • the step of inserting the lateral metal reinforcement members involves orienting each of the elongated metal reinforcement members at an angle that is offset from perpendicular to the lengthwise axis 290 of the precast concrete foundation unit, moving the elongated metal reinforcement member into the cell to a depth aligned with a pair of the opposed lengthwise recesses (e.g., either ecesses 314 and 320 or recesses 316 and 322) and then rotating the elongated metal reinforcement such that one end moves in one lengthwise recess and the opposite end moves into the other lengthwise recess.
  • a pair of the opposed lengthwise recesses e.g., either ecesses 314 and 320 or recesses 316 and 322
  • one or more vertical recesses that intersect with the lengthwise recesses may be provided (e.g., per 350 shown in dashed line form in Fig. 42 ).
  • the step of inserting the elongated metal reinforcement members involves orienting each of the elongated metal reinforcement members such that one end is aligned with a vertical recess of one wall 302 and the opposite end is aligned with the vertical recess of the other wall 304, and moving the elongated metal reinforcement member depthwise along the vertical recesses until the ends are positioned in the respective lengthwise recesses, at which point the reinforcement member can be shifted in the lengthwise direction of the foundation unit to a desired position along the lengthwise recesses.
  • foundation unit 300 also enables an advantageous construction operation that is adaptable to specific needs of a given project.
  • the method involves identifying a lay length of each of multiple precast concrete bridge units to be placed atop the precast concrete foundation unit when installed.
  • the lay length is the dimension of the bridge unit in the lengthwise direction of the precast concrete foundation unit, also referred to above as the depth of the bridge unit (shown as D B in Fig. 1 ).
  • the precast concrete foundation unit is manufactured such that a center to center distance between the upright supports on opposite ends of each cell (e.g., distance L C ) corresponds to the identified lay length. In this manner, each support can be used to support two adjacent precast bridge units that abut each other atop the support.
  • each of the multiple supports 308 of the precast foundation unit 300 has a bottom surface 360 that is coextensive (entirely, or at least partially) with the bottom surfaces 362, 364 of the elongated walls 302 and 304.
  • This arrangement assures that when the foundation unit 300 is placed on the ground at an installation location, the supports 308 will also be in contact with the ground (e.g., per Fig. 44 ).
  • bridge units or another structure
  • the supports 308 are interconnected with the elongated walls 302 and 304 by embedded reinforcement 370 and 372 (e.g., similar to that described above).
  • embedded reinforcement 370 and 372 e.g., similar to that described above.
  • Another benefit to having a bottom surface portion 360 of supports 308 in the same plane as bottom surfaces 362 and 364 is that the overall foundation unit to ground surface area contact is enhanced, reducing the likelihood, or at least the degree, that the foundation unit may be pushed into the ground under loaded conditions that occur before the on-site concrete pour into the cells.
  • the precast foundation units 400 are constructed with a width that extends the full span of the precast bridge units 402 to be supported thereon.
  • foundation units 400 may be of a type 400a with or a type 400b.
  • Foundation units 400a include elongated upright wall members 404 and 406 spaced apart to define a channel 408 therebetween, and multiple upright supports 410 extending laterally across the channel 408 and interconnecting the upright wall members.
  • Foundation unit 400b which is generally I-shaped in top plan view, includes elongated upright wall members 412 and 414 spaced apart to define a channel 416 therebetween, and a single upright support 418 extending laterally across the channel 416 and interconnecting the upright wall members. It is recognized that more than one foundation unit 400b could be interposed between end foundation units 400a. It is further recognized that all foundation units of a given installation could be of a type with multiple lateral supports (e.g., 2 or more). Each lateral support 410, 418 has end portions that are recessed slightly relative to its adjacent upright wall member to define bridge unit support surfaces 420, 422 upon which the bottom ends of the precast bridge units are placed. However, the recessed surface portions 420, 422 could be eliminated in favor of surface 425 extending all the way from the inner side of wall 440 to the inner side of wall 406. The lengthwise axis 450 of the foundation units and foundation system is also shown.
  • Fig. 48 shows an exemplary elevation view of a typical lateral support member 410 or 418 of the foundation units.
  • the lateral support includes internal reinforcement 424 extending through the support and linked with internal reinforcement (e.g., U-shaped) of the upright walls.
  • the upright lateral supports also include a plurality of through openings 428 for receiving reinforcement.
  • a set of laterally spaced apart reinforcement openings 428 are located along a lower part of the supports, and a pair of laterally spaced reinforcement openings 428 are located at an upper part of the support near each end of the support, but numerous variations of the number and position of reinforcement openings are possible.
  • All or some of the supports may also include one or more larger through openings 430 for the purpose of facilitating concrete flow from one cell to another as described above.
  • an inner side 432 of upright wall member 404 includes lengthwise recesses 434 and 436 facing the channel 408, and the inner side 438 of upright wall member 406 includes similar lengthwise recesses 440 and 44, with recess 440 having a height aligned with that of recess 434, and recess 442 having a height aligned with that of recess 436.
  • the recesses 434, 436 and 440, 442 can be used, in combination with the openings 428, for holding reinforcement that will become encased in cast-in-place concrete as the site of installation, in a manner similar to that described above with respect to Figs. 42-45 .
  • the channel of the foundation units is filled with cast-in-place concrete after the foundation units have been placed at the final installation location of the bridge unit or other structure to be supported.
  • the cast-in-place concrete is delivered to a height 452 that just matches the bottom of the bridge units, but in another embodiment the cast-in-place concrete may be delivered to a slightly higher level 454 so as to partially embed the lower ends of the bridge units therein.
  • the bridge units may be placed upon the foundation before or after pouring of the concrete, while in the latter embodiment the bridge units must be placed before final pouring the level 454.
  • Figs. 46-49 is a full span foundation system in which the distance between the upright wall members of the foundation units is slightly greater than the span of the bridge units that will be place upon the foundation. It is recognized that such full span foundation units could be incorporated into one or more of the previously described embodiments as well.

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)
EP13862489.5A 2012-12-13 2013-12-10 Foundation system for bridges and other structures Active EP2931976B1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US201261736819P 2012-12-13 2012-12-13
US201361837853P 2013-06-21 2013-06-21
US14/098,615 US8925282B2 (en) 2011-07-08 2013-12-06 Foundation system for bridges and other structures
PCT/US2013/074129 WO2014093344A1 (en) 2012-12-13 2013-12-10 Foundation system for bridges and other structures

Publications (3)

Publication Number Publication Date
EP2931976A1 EP2931976A1 (en) 2015-10-21
EP2931976A4 EP2931976A4 (en) 2016-08-03
EP2931976B1 true EP2931976B1 (en) 2024-04-17

Family

ID=50934893

Family Applications (1)

Application Number Title Priority Date Filing Date
EP13862489.5A Active EP2931976B1 (en) 2012-12-13 2013-12-10 Foundation system for bridges and other structures

Country Status (8)

Country Link
US (1) US20170247843A1 (pl)
EP (1) EP2931976B1 (pl)
AU (1) AU2013359540B2 (pl)
CA (1) CA2891941C (pl)
CR (1) CR20150285A (pl)
NZ (1) NZ708317A (pl)
PL (1) PL2931976T3 (pl)
WO (1) WO2014093344A1 (pl)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040571A (zh) * 2015-06-09 2015-11-11 中交第二公路勘察设计研究院有限公司 预制钢筋混凝土埋置式斜腿框架桥
US11174614B2 (en) * 2017-08-14 2021-11-16 Contech Engineered Solutions LLC Metal foundation system for culverts, buried bridges and other structures
CN111485490A (zh) * 2020-04-09 2020-08-04 苏交科集团股份有限公司 一种宽幅预制桥面板及其施工方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE207995T1 (de) * 1996-07-17 2001-11-15 Mose Monachino Fundamentelement und verfahren zur konstruktion von vorgefertigten strukturen mit solchen elementen, insbesondere vorgefertigte tunnel
US6640505B1 (en) * 2001-10-25 2003-11-04 Bebotech Corporation Hybrid arched overfilled structure
CN100529274C (zh) * 2004-02-12 2009-08-19 马拉研究所D.O.O. 具有纵向插槽的条形基础的快速建造方法
JP6061154B2 (ja) * 2011-07-08 2017-01-18 コンテック エンジニアード ソリューションズ エルエルシー 橋梁及び他の構造物のための基礎システム
CN104160093B (zh) * 2012-02-06 2017-02-22 康泰工程解决方案有限责任公司 混凝土桥梁系统及其相关方法

Also Published As

Publication number Publication date
AU2013359540B2 (en) 2017-04-20
US20170247843A1 (en) 2017-08-31
CA2891941C (en) 2020-08-18
AU2013359540A1 (en) 2015-06-04
EP2931976A1 (en) 2015-10-21
PL2931976T3 (pl) 2024-07-22
NZ708317A (en) 2017-08-25
EP2931976A4 (en) 2016-08-03
CR20150285A (es) 2015-09-01
WO2014093344A1 (en) 2014-06-19
CA2891941A1 (en) 2014-06-19

Similar Documents

Publication Publication Date Title
EP2729627B1 (en) Foundation system for bridges and other structures
US8925282B2 (en) Foundation system for bridges and other structures
US9695558B2 (en) Foundation system for bridges and other structures
US20050008438A1 (en) Synthetic deformed bars and retaining walls
KR101084615B1 (ko) 피씨벽판을 이용한 선반식 옹벽 구조 및 그 시공방법
US12116798B2 (en) Border walls and related systems and methods
US10060087B2 (en) Fully adjustable suspended post and panel modules and installation methods
US5356242A (en) System and method for adjustably connecting wall facing panels to the soldier beams of a tie-back or anchored wall
US20170247843A1 (en) Foundation system for bridges and other structures
JP6543077B2 (ja) 構造物の施工方法
CN113417300A (zh) 边坡支护系统及其施工方法
US9951493B2 (en) Precast integral post and retaining wall and method for installing same
KR20120125805A (ko) 분할형 프리캐스트 콘크리트 옹벽 및 그 제조방법
KR101262781B1 (ko) 프리스트레싱에 의해 일체화된 제형 박스 구조물 및 그 시공 방법
KR100601126B1 (ko) 선반식 녹화 옹벽의 앵커링 구조
KR101190280B1 (ko) 조경석이 고정된 옹벽 구조체
KR200345934Y1 (ko) 선반식 녹화 옹벽의 앵커링 구조
JP3108112B2 (ja) 基礎構造
AU2010201761A1 (en) Wall panel and installation thereof
WO2007073570A1 (en) Building block
JP2009185601A (ja) 浄化槽基礎構造体及びその構築法

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20150612

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20160706

RIC1 Information provided on ipc code assigned before grant

Ipc: E02D 27/32 20060101ALI20160630BHEP

Ipc: E01D 19/02 20060101AFI20160630BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20170725

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170929

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

INTC Intention to grant announced (deleted)
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20180308

RIN1 Information on inventor provided before grant (corrected)

Inventor name: CREAMER, PHILIP A.

Inventor name: CARFAGNO, MICHAEL G.

Inventor name: ASTON, SCOTT D.

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20231114

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602013085598

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20240417

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1677353

Country of ref document: AT

Kind code of ref document: T

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240817

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240718

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240819

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240819

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240717

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240817

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240718

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240717

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602013085598

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20250120

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602013085598

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241210

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20241210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240417

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20241231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20250701

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241231

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241210

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20241210

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20251118

Year of fee payment: 13