EP2888147A1 - Vorrichtung für ein schienenfahrzeug - Google Patents
Vorrichtung für ein schienenfahrzeugInfo
- Publication number
- EP2888147A1 EP2888147A1 EP13763038.0A EP13763038A EP2888147A1 EP 2888147 A1 EP2888147 A1 EP 2888147A1 EP 13763038 A EP13763038 A EP 13763038A EP 2888147 A1 EP2888147 A1 EP 2888147A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- rail vehicle
- bogie
- monitoring
- electronic
- diagnostic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61F—RAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
- B61F5/00—Constructional details of bogies; Connections between bogies and vehicle underframes; Arrangements or devices for adjusting or allowing self-adjustment of wheel axles or bogies when rounding curves
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61F—RAIL VEHICLE SUSPENSIONS, e.g. UNDERFRAMES, BOGIES OR ARRANGEMENTS OF WHEEL AXLES; RAIL VEHICLES FOR USE ON TRACKS OF DIFFERENT WIDTH; PREVENTING DERAILING OF RAIL VEHICLES; WHEEL GUARDS, OBSTRUCTION REMOVERS OR THE LIKE FOR RAIL VEHICLES
- B61F5/00—Constructional details of bogies; Connections between bogies and vehicle underframes; Arrangements or devices for adjusting or allowing self-adjustment of wheel axles or bogies when rounding curves
- B61F5/02—Arrangements permitting limited transverse relative movements between vehicle underframe or bolster and bogie; Connections between underframes and bogies
- B61F5/22—Guiding of the vehicle underframes with respect to the bogies
- B61F5/24—Means for damping or minimising the canting, skewing, pitching, or plunging movements of the underframes
- B61F5/245—Means for damping or minimising the canting, skewing, pitching, or plunging movements of the underframes by active damping, i.e. with means to vary the damping characteristics in accordance with track or vehicle induced reactions, especially in high speed mode
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61K—AUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
- B61K9/00—Railway vehicle profile gauges; Detecting or indicating overheating of components; Apparatus on locomotives or cars to indicate bad track sections; General design of track recording vehicles
- B61K9/12—Measuring or surveying wheel-rims
Definitions
- the invention relates to a device for a rail vehicle with a diagnostic device, which has an electronic diagnostic device and arranged on a bogie of the rail vehicle acceleration sensors for suspension diagnosis, the acceleration sensors for Fahrtechnikdiagnosis output acceleration signals to the electronic diagnosis ⁇ device.
- Such a generic device is known for example from the document EP 2 050 639 Bl.
- the invention is based on the object to further improve the diagnosis of the chassis.
- the invention provides that the electronic diagnostic device is arranged on the bogie of the rail vehicle.
- the electronic diagnostic device is arranged on the bogie of the rail vehicle.
- At least one of the acceleration sensors for diagnosis chassis at a first wheel set bearing of a wheel set of the bogie ers ⁇ th is arranged, in particular in such a way that its detection direction extending in the longitudinal direction of the rail vehicle. It is particularly advantageous if, in each case one of the acceleration sensors for chassis diagnosis is arranged on each wheelset bearing of the bogie, in particular such, that its detection direction extends in the longitudinal direction of the rail vehicle.
- At least one of the acceleration sensors for chassis diagnosis is arranged on a bogie frame of the bogie.
- at least one of a log in the direction of travel of the rail vehicle Vietnamesere--bridging first longitudinal beam of the bogie frame insbesonde ⁇ re opposite to one of the outer side of a wheel end portion of said first longitudinal member may be arranged and / or at least one at a extending in the direction of travel of the rail vehicle second longitudinal beam of the bogie frame, in particular at a second end portion of this second long beam, the diagonally opposite the first end portion of the first long beam with respect to the central axis of the Drehge ⁇ frame, be arranged and / or at least one be arranged centrally on the first long beam and / or be arranged at least one centrally on the second long beam.
- the diagnostic device is formed preferably adapted to be subjected to the acceleration signals of the acceleration sensors a method of diagnosis and sever driving to generate diagnostic data as a result of the diagnosis, and it is advantageous ⁇ way, when the electronic diagnostic unit in particular for the transfer of the diagnostic data by means of a data bus to a train bus of the Rail vehicle is connected.
- ⁇ that can be formed from the diagnostic device and / or connected to the data bus or the train bus further device suitable from ⁇ to save the diagnostic data.
- the device is provided with a monitoring device that outputs an electronic monitoring device and at least one acceleration sensor for chassis monitoring, which outputs an acceleration signal to the monitoring device.
- ⁇ ⁇
- ⁇ ⁇
- ⁇ ⁇
- the invention also relates to a rail vehicle with at least one carriage, in which the at least one carriage has a device according to one of claims 1 to 13.
- Figure 1 is an inventive rail vehicle with cars, each two bogies, one of the two Have carried bogies carriage body and a device according to the invention, the
- Figure 2 is a schematic representation of a carriage of Figure 1 with the inventive device
- FIG. 3 shows a first detail from FIG. 2, which shows in more detail the function of a control device of the device according to the invention, which
- FIG. 4 shows a second detail from FIG. 2, which shows a first monitoring function in the form of roll monitoring of a monitoring device of the device according to the invention, which
- Figure 5 shows a third detail of Figure 2, the one
- first part of a second monitoring function in the form of a hot runner monitoring function of the monitoring device shows in more detail
- FIG. 6 shows a fourth detail from FIG.
- FIG. 7 shows a fifth detail of Figure 2, a
- FIG. 3 shows a monitoring function in the form of a running stability monitoring of the monitoring device
- FIG. 8 shows a modified embodiment of the device according to the invention, which is modified with respect to FIG
- FIG. 9 shows a sixth detail from FIG. 2, which shows in more detail a diagnostic function of a diagnostic device of the device according to the invention.
- FIG. 10 shows an embodiment of the device modified with respect to FIG. 9.
- 1 shows an inventive rail vehicle 1 with several cars 2, 3, 4.
- Each car has a two bogies 5, 6 formed chassis and a car body 7.
- the bogies 5 and 6 each have two sets of wheels 8, 9 and 10, 11, which are attached via a primary suspension 12, 13 and 14, 15 to a bogie frame 16 and 17 respectively.
- the car body 7 is supported by a secondary suspension 18, 19 of the bogie frame 16, 17.
- Each of the wheelsets 8, 9, 10, 11 has a two Radsatz ⁇ bearings 20 and 21, 22 and 23, 24 and 25, 26 and 27 rotatably ge ⁇ stored shaft 28, 29, 30, 31, on the two wheels 32 and 33, 34 and 35, 36 and 37, 38 and 39 and two brake discs 40 and 41, 42 and 43, 44 and 45, 46 and 47 are attached (see also Figure 2).
- Each of the carriages 2, 3, 4 is equipped with a device 48 according to the invention.
- Each of the devices 48 according to the invention comprises two combined electronic control and monitoring devices
- each of the devices 48 according to the invention further comprises four acceleration sensors 49 to 52 for chassis monitoring, which are connected via acceleration signal lines 53 to 56 to electronic running stability monitors LSÜ.l, LSÜ.2 of the combined control and monitoring devices SG / ÜG.l , SG / ÜG.2 Output acceleration signals a y .Ül.l, a y .Ü2.1, a y .Ü1.2, a y .Ü2.2 for chassis monitoring.
- each of the devices according to the invention comprises 48 eight speed sensors 57 to 64, which according to FIG 4 via the speed signal lines 65 and 72 to electronic Rollüberwa ⁇ deviations RÜ.l, RÜ.2 the combined control and monitoring SG / ÜG.l, SG / ÜG.2 output speed signals n.1.1, n.2.1, n.3.1, n.4.1, n.1.2, n.2.2, n.3.2, n.4.2 for chassis monitoring.
- the speed sensors 57 to 64 are further referred to as rotational speed sensors
- the speed signal lines 65 to 72 as rotational speed signal lines
- the rotational speed signals as rotational speed signals be ⁇ draws.
- each of the devices according to the invention comprises 48 sixteen temperature sensors 73-88 to gear monitoring, in accordance with Figures 5 and 6 over temperature signal ⁇ lines 89-104 to electronic monitoring hot runner HLÜ.l, HLÜ.2 the combined control and monitoring devices SG / ÜG.l , SG / ÜG.2 temperature signals T.la.l, T.2a.l, T.3a.l, T.4a.l, T.la.2, T.2a.2, T.3a.3, T .4a.2, T.lb.l, T.2b.l, T.3b.l, T.4b.l, T.lb.2, T.2b.2, T.3b.3, T.4b .2 output to chassis ⁇ monitoring.
- each of the devices according to the invention comprises 48 twenty-four acceleration sensors 105-128 for chassis diagnosis, according to FIG 9 via Beministerungssig ⁇ nal Harten 129-152 to the diagnostic devices DG.l, Dg.2 Be ⁇ admirungssignale a .Dl.l x, a x .D2 .1, a x .D3.1, a x .D4.1, a x .D5.1, a x .D6.1, a x .D7.1, a x .D8.1, a x .D9. 1, a x .D10.1,
- a z .Dll.l a z .D12.1, a x .D1.2, a x .D2.2, a x .D3.2, a x .D4.2, a x .D5.2, a x .D6.2, a x .D7.2, a x .D8.2, a x .D9.2, a x .D10.2,
- the two combined control and monitoring ⁇ devices SG / ÜG.l, SG / ÜG.2 the inventive device 48 of a car in the car body 7 are arranged.
- the sensors 49 to 52, 57 to 64, 73 to 88 and 105 to 128, however, are distributed to the bogies 5, 6 of the respective car.
- connectors 153, 154, 155, 156 are provided.
- the connectors 153, 154, 155, 156 consist of carriage-box-side connectors and associated bogie-side connectors.
- the bogie ⁇ frame 16 and 17 comprises two longitudinal beams 157, 158 and 159, 160 which extend in the longitudinal direction (direction) x of the rail vehicle 1 and at least one cross member 161 and 162 of the extends in the transverse direction y of the rail vehicle 1.
- the one SG / ÜG.l the combined control and monitoring devices comprises an electronic control unit SG.l in the form of a Bremssteu ⁇ er sheeps and an electronic monitoring device ÜG.l, wherein the electronic control unit SG.l and the electronic monitoring device ÜG.l are combined to form a structural unit.
- the electronic control unit also includes an electronic slip SG.l ⁇ protective control GS .1.
- the electronic monitoring device ÜG.l includes a RÜ.l electronic roll monitoring, a HLÜ.l the electronic hot runner monitoring and a LSÜ.l the electronic running stability monitoring.
- the electronic anti-skid control GS .1 and the electronic roll monitoring RÜ.l are also combined to form an electronic unit, so that the Drehgeschwin ⁇ speed signals are also processed by the electronic Gleitschutzsteu- tion GS .1. About this electronic ⁇ A uniform rotational speed signals also reach to the brake control ⁇ BS .1.
- the further SG / ÜG.2 of the combined control and monitoring devices in each of the devices 48 according to the invention comprises a further electronic control device SG.2 in the form of a brake control device and a further electronic monitoring device ÜG.2, wherein the further electronic control Erêt SG.2 and the other electronic monitoring device ÜG.2 are combined to form another structural unit.
- the further electronic control unit comprises a white SG.2 ⁇ tere electronic brake controller BS.2.
- the further electro ⁇ African monitor ÜG.2 comprises a further RÜ.2 the electronic roll monitoring, another HLÜ.2 the electronic monitoring hot runner and another LSÜ.2 the electronic monitoring running stability.
- the rotational speed signals are sent over the wide ⁇ re electronic roll monitoring RÜ.2 to the further electronic brake control BS.2.
- SG / ÜG.2 can also be designed like the one combined control and monitoring device SG / ÜG.l - ie also have an electronic anti-slip control.
- control units SG.l and SG.2 the rotational speed sensors 57 to 64 and the rotational speed signal lines 65 to 72 of the inventive device 48 of a carriage together form a control device SE for controlling a braking device BE of the respective car.
- the brake control via braking control signal BS .1 ⁇ lines 163-166 brake control signals bs.1.1 bs.2.1 bs.3.1 .4.1 controls, bs to valve devices 167 to 170 of the braking device of BE. To these valve devices 167 to 170 are connected via supply lines 171 to 174 not shown here pneumatic supply facilities.
- the anti-skid control GS .1 via anti-skid signal lines 175 to 178 controls anti-skid control signals gs .1.1 gs.2.1, gs.3.1, gs .4.1 to the valve devices 167 to 170.
- the valve devices 167 to 170 regulate based on the Brems Kunststoff- and Gleitschutzsignale the pressure in brake cylinders 179 to 186 of the braking device BE, by means of which at a brake request provided with brake pads brake shoes come into frictional engagement with the brake discs 40 to 47.
- the brake cylinders 179-186 connected via pneumatic INTR ⁇ gen 187-194 with the valve devices 167-170.
- the further brake control BS.2 can redundantly control further brake control signals bs.1.2, bs.2.2, bs.3.2, bs.4.2 to the valve devices 167 to 170 via further brake control signal lines 195 to 198.
- the monitoring devices ÜG.l and ÜG.2, the Drehgeschwindig ⁇ keitssensoren 57 to 64, the temperature sensors 73 to 88 and the acceleration sensors 49 to 52 and the corresponding signal lines 65 to 72, 89 to 104 and 53 to 56 of the device 48 according to the invention of a car together form a monitoring device UE of the chassis of the respective carriage formed here from the two bogies 5, 6.
- SG / ÜG.l, SG / ÜG.2 are on the one hand a bogie 5 assigned.
- a first 57 of the rotational speed ⁇ sensors on a first 20 of the wheelset bearing of the wheelset 8 of a bogie 5 is arranged.
- This first bogies speed sensor 57 outputs its first Wheelgeschwindig ⁇ keitssignal n.1.1 from the anti-skid brake control and the GS .1 .1 BS of an electronic control unit SG.l.
- a first of the temperature sensors 73 is also disposed on the first wheel set bearing 20, and gives his first temperature signal to the T.la.l surveil an electronic monitoring device ⁇ ÜG.l from.
- a first 49 of the acceleration sensors which are connected to the bogie frame 16 of a bogie 5 is arranged, its first acceleration signal a y .Ül.l outputs to the one electronic monitoring device ÜG.l.
- a second 58 of the speed sensors is arranged on a second 23 of the wheelset bearing of the wheel set 9 of a bogie 5 and outputs its second rotational speed signal n.2.1 to the further electronic control unit SG.2.
- a second 82 of the temperature sensors is also arranged on the second wheelset bearing 23 and outputs its second temperature signal T.2b.l to the further electronic monitoring device ÜG.l.
- a second loading ⁇ acceleration sensors 50 is also arranged on the bogie frame 16 and outputs its second acceleration signal ay from .Ü2.1 to the further electronic monitoring device ÜG.2.
- the two combined control and monitoring devices SG / ÜG.l, SG / ÜG.2 are assigned to the further bogie 6 of the rail vehicle.
- a further first 61 of the rotational speed ⁇ sensors on a first 24 of the axlebox of the wheelset 10 of the second bogie 6 is arranged and outputs its first further n.1.2 rotational speed signal to the one electronic control unit SG.l.
- a further 85 of the first temperature sensors in Tem ⁇ is also disposed on the first wheel set bearing 24 of the other bogie 6, and are to be further first temperature signal T.lb.2 to the electronic monitoring device from ÜG.l.
- a further 51 of the first loading is admirungssensor arranged on the bogie frame 17 of the other bogie 6, and are to be further first acceleration signal ay from .Ü1.2 to the electronic bank ⁇ wachungs réelle ÜG.l.
- a further second 62 of the rotational speed sensors is arranged on a second 27 of the wheelset bearing of the wheel set 11 of the second bogie 6 and outputs its second second rotational speed signal n.2.2 to the second tere electronic control unit SG.2.
- Another second 78 of the temperature sensors is arranged on the second wheelset bearing 27 of the further bogie 6 and outputs its further second temperature signal T.2a.2 to the further electronic monitoring device ÜG.2.
- Another second loading ⁇ acceleration sensors 52 is disposed on the bogie frame 17 of the other bogie 6, and are to be further second acceleration signal ay from .Ü2.2 to the further electro ⁇ African monitor ÜG.2.
- the one combined control and monitoring device SG / ÜG.l transmits the first signals n.1.1, T.la.l, a y .Ül.l and the other first signals n.1.2, T.lb.2, a y . Ü1.2 via the device GBUS.Ü to the other combined control and surveil ⁇ monitoring device SG / ÜG.2.
- a combined control and monitoring device SG / ÜG.l also transmits the signals n.3.1, T.2a.l, T.3a.l, T.4a.l, n.3.2, T.2b.2 , T.3b.2, T.4b.2 via the device bus GBUS.Ü to the further combined control and monitoring devices SG / ÜG.2.
- the other combined control and over- ⁇ wachungs réelle SG / ÜG.2 transmits the second signals n.2.1, T.2b.l, a y .Ü2.1 and the further second signals n.2.2, T.2a.2, a y .Ü2.2 via the device bus GBUS.Ü to the one combined control and monitoring device SG / ÜG.l.
- the further combined control and monitoring device SG / ÜG.2 also transmits the signals n.4.1, T.lb.l, T.3b.l, T.4b.l, n.4.2,
- Each of the acceleration sensors 49 to 52 is arranged on its associated bogie frame 16 or 17 such that its detection direction runs in the transverse direction y of the rail vehicle.
- the first acceleration sensors 49 and 51 are each at a first 157 or 159 of extending in the direction of travel x of the rail vehicle long carrier of the respective bogie frame, in particular on one of the outside of the first wheel 32 and 36 of the respective bogie gege ⁇ nüberrien End portion 199 and 203 of this first long beam, arranged.
- the second acceleration sensors 50 and 52 are respectively on the second 158 and 160 extending in the direction of travel x of the rail vehicle long carrier of the respective bogie frame, in particular at a second end portion 200 and 204 of this second long carrier, the first end portion of the first Long carrier relative to the center axis Al or A.2 of the bogie frame 16 and 17 diagonally gege ⁇ nüberliegt arranged.
- the device according to the invention comprises 48 rotational speed signal lines, temperature signal lines and acceleration signal lines.
- the device 48 according to the invention comprises terminal boxes 207 to 214, which are arranged on the end sections 199 to 206 of the elongate carriers.
- the first rotational speed sensor 57 is connected via a first 65 of the rotational speed signal lines, the first temperature sensor 73 sensors by means of a first 89 of the temperature signal lines and the first 49 of the Bevantungssen- means of a first 53 of the Bevantungssignallei ⁇ obligations to which a combined control and monitoring unit SG / ÜG .l connected.
- a first 207 of the terminal boxes is arranged.
- the three first signal lines 65, 73 and 89 are laid together as a first cable strand from the first terminal box 207 to the one combined control and monitoring device SG / ÜG.l.
- the further first Drehgeschwindig ⁇ keitssensor 61 are schwindtechnikssignal effeten means of a further first 69 of the bogies, the further first temperature sensor 85 signal lines by means of a further first 101 of the temperature and of the further first 51 of the acceleration ⁇ sensors by means of a further first 55 of the Acceleration signal lines to the one combined control and monitoring SG / ÜG.l connected.
- a further first 211 of the terminal boxes is arranged.
- the three further first signal lines 69, 101 and 55 are laid together as another first cable harness from the further first terminal box 211 to the one combined control and monitoring device SG / ÜG.l.
- the second rotational speed sensor 58 are gen means of a second 66 of the Dreh michssignalleitun-, the second temperature sensor 82 by means of a second 98, the temperature signal lines and the second acceleration sensor 50 via a second 54 of the acceleration signal ⁇ lines to the other combined control and surveil ⁇ monitoring device SG / ÜG.2 connected.
- a second 208 of the terminal boxes is arranged. The three second signal lines are laid together as a second cable harness from the second terminal box 208 to the other combined control and monitoring device SG / ÜG.2.
- the further second rotational speed sensor 62 is connected by means of a further second 70 of the rotational speed signal lines, the further second temperature sensor 78 by means of a further second 94 of the temperature signal lines and the further second acceleration sensor 52 by means of a further second 56 of the Bevantungssig- more combined control and surveil ⁇ monitoring device SG / ÜG.2 connected.
- a further second 212 of the terminal boxes is arranged.
- the three other second Signal lines 70, 94 and 56 are laid together as another second cable harness from the second terminal box 208 to the further combined control and monitoring device SG / ÜG.2.
- the first terminal box 207 is attached to the first longitudinal beam 157 of the bogie frame 16 and the second Klemmkas ⁇ th 208 is attached to the second longitudinal beam 158 of the bogie frame 16.
- the further first terminal box 211 is fastened to the first longitudinal carrier 159 of the bogie frame 17 and the further second terminal box 212 is fastened to the second longitudinal carrier 160 of the bogie frame 17.
- the acceleration sensors 49 to 52 are fastened directly to the longitudinal carriers 157 to 160, the acceleration sensors 49 'to 52' in the modified embodiment 48 'of the device according to the invention shown in FIG Terminal boxes 207, 208, 211, 212 arranged.
- the first acceleration sensor 49 ' is thus arranged in the first terminal box 207 and the second acceleration sensor 50' is arranged in the second terminal box 208.
- the inventive device 48 has a third speed sensor 59 which is disposed at a first wheel set bearing 22 of the second gear set and a third rotational speed signal to the n.3.1 outputs an electro ⁇ African controller SG.l.
- the device has a fourth rotational speed sensor 60, which is arranged on a second wheelset bearing 21 of the first gearset and outputs a fourth rotational speed signal n.4.1 to the further electronic control unit SG.2.
- another third rotational speed sensor 63 is provided, which is arranged on a first wheel set bearing 26 of the second wheel set of the further bogie and outputs a further third rotational speed signal n.3.2 to the one electronic control unit SG.l.
- a white ⁇ more excellent fourth rotational speed sensor 64 is disposed on the second wheel set bearing 25 of the first wheel set of the bogie and further there is another fourth Wheelgeschwin- n.4.2 made to the further electronic control unit SG.2 dtechnikssignal.
- each one of the two temperature sensors which are assigned to a wheelset, its temperature signal to an electronic monitoring device ÜG.l outputs and the respective second temperature sensor its temperature signal the second electronic monitoring device ÜG.2 outputs.
- the third and fourth Wheelge ⁇ schwindtechnikssensoren are means Dreh michssignallei- obligations 67, 68 and 71, 72 connected to their associated monitoring devices.
- the additional temperature sensors 73 to 88 are correspondingly connected via the temperature signal lines 89 to 104 with their associated monitoring devices.
- the electronic control units are SG.l ⁇ its control signals as a function of a setpoint value, which is output from a central control unit SPCS. In this case, is regulated by means of the control signals ⁇ a value determined from the determined rotation speed actual value signals to said predetermined target value.
- SG / ÜG.l and SG / ÜG.2 are over a data bus in the form of a Switzerlandbusses ZBUS, the PN interfaces 220, 221 of the two combined control and monitoring devices SG / ÜG.l and
- SG / ÜG.2 connects to a PN interface 223 of the central control ⁇ unit SPCS, connected to the central control unit SPCS.
- a display device (display) 224 and a voice output device also are still closed at 225 ⁇ to the train bus ZBUS.
- the two combined control and monitoring devices are connected via power connections 226, 227 to a Bordenergynetz 228.
- the two combined control and monitoring devices SG / ÜG.l, SG / ÜG.2 each have an I / O interface 229 or 230, a channel evaluation unit 231 or 232 and a channel state evaluation unit 233 and 234 respectively.
- the sections of the signal lines which each connect one of the plug-in connections 153 to 156 to one of the I / O interfaces 229 and 230 form in each case one of the strands designated here by the reference symbols 235 to 242.
- the two combined control and monitoring devices SG / ÜG.l, SG / ÜG.2 also each have a device bus interface 243 or 244 via which they are connected to the GBUS.Ü.
- the monitoring devices ÜG.l ÜG.2 From the device bus interface 244, there is ⁇ Henden signals over the channel state judging unit 234 to the monitor ÜG.2 reach.
- the monitoring devices ÜG.l ÜG.2 and generate on the basis of the incoming signals where the warning and / or Alarmsig ⁇ dimensional, which are evaluated in an evaluation unit 245, the central control unit ⁇ SPCS, wherein the central control unit ⁇ SPCS as a result the evaluation, for example, a reduction of the maximum speed of the Schienenfahrt- zeugs (coating) and / or the output of messages on the display device 224 and / or the voice output device 225 can veranlas ⁇ sen.
- the electronic diagnostic devices DG.l and DG.2 are arranged on the chassis in the individual cars.
- an electronic diagnostic device DG.l is arranged in each case on the one Wheelge ⁇ stell 16.
- the further electronic diagnostic device DG.2 is in each case arranged on the second bogie 17.
- the diagnostic devices each have a separate power connection 246 or 247 and are connected via connecting lines 248, 249 and a current transformer 250 to the Bordenergynetz 228 connected.
- the diagnostic devices furthermore each have a device bus interface 251 or 252. Furthermore, the two combined control and monitoring devices SG / ÜG.l, SG / ÜG.2 depending ⁇ Weil a device bus interface 253 or 254, wherein the diagnostic device DG.l and DG.2 and the two combined control and Monitoring devices SG / ÜG.l, SG / ÜG.2 via their interfaces 250 to 254 to a data bus in the form of another device bus for diagnosis GBUS. D are connected.
- one of the acceleration sensors for chassis diagnosis is designated such that its detection direction runs in the longitudinal direction x of the rail vehicle.
- the acceleration sensors for chassis diagnosis are on the bogie frame 16 and another four - here by the reference numerals 125 to 128 designated - the acceleration sensors for chassis diagnosis are arranged on the bogie frame 17.
- a first 115 on the first longitudinal beam 157 of the bogie frame 16 extending in the direction of travel of the rail vehicle is arranged on the end section 201.
- a second 116 is arranged on the extending in the direction of travel of the rail vehicle second longitudinal beam 158 of the bogie frame 16 on the end ⁇ section 202.
- a third 113 is arranged centrally on the first longitudinal beam 157 and a fourth 114 is arranged centrally on the second longitudinal beam 158.
- a first 127 is provided on the first longitudinal carrier 159 of the bogie frame 17 extending in the direction of travel of the rail vehicle 17 arranged at the end portion 205.
- a second 128 is arranged at the in the direction of travel of the rail vehicle extending second long beam 160 of the bogie frame 17 on the end portion ⁇ 206th
- a third 125 is arranged centrally on the first longitudinal beam 159 and a fourth 126 is arranged centrally on the second longitudinal beam 160.
- the acceleration sensors 115, 116, 127, 128 are arranged such that their detection direction runs in the vertical direction z of the rail vehicle.
- the acceleration sensors 113, 114, 125, 126 are arranged such that their detection direction runs in the longitudinal direction x of the rail vehicle.
- Each of the axles 28 to 31 of a carriage is assigned a motor 257 to 260, which drives the jewei ⁇ lige axis via a gear 261 to 264.
- the diagnostic equipment DG.l and DG.2 are each suitably form ⁇ to undergo the acceleration signals a diagnostic method and generate the result of the diagnostic method diagnosis ⁇ data.
- the diagnostic method includes a
- the oscillations ⁇ diffraction analysis can for example be based on a Fou ⁇ riertransformation.
- the two electronic diagnostic devices DG.l and DG.2 are, in particular for the transmission of diagnostic data, on the other device bus GBUS. D and the two combined control and monitoring devices SG / ÜG.l, SG / ÜG.2, which are serve as a gateway, connected to the train bus ZBUS of the rail vehicle.
- the diagnostic devices DG.l and DG.2 are adapted to store the diagnostic data. For storing the diagnostic data but also one to the other device bus GBUS. D or the train bus ZBUS connected further device be vorgese ⁇ hen.
- the monitoring devices ÜG '2 include' .1 and TG ''.
- modifi ⁇ decorate embodiment 48 '' of the device according to the invention no electronic monitoring running stability. Rather, these are an electronic diagnostic device DG '' .1 and an electronic monitoring device ÜG.3, which includes an electronic run ⁇ stability monitoring LSÜ.3 summarized to a structural unit.
- the more diagnostic device DG '' .2 and another elekt ⁇ ronisches monitor ÜG.4 which see another electronic stability control are running LSÜ.4 includes summarized in a further structural unit in this execution ⁇ form.
- the two units each form a bogie 5 and 6 respectively associated kom ⁇ bintechnischs diagnostic and monitoring device DG / TG '' .1 or
- the electronic roll monitors and / or the electronic hot runner monitors could not be provided in the vehicle body 7, but rather - as part of the combined diagnostic and monitoring devices SG / ÜG '' /ÜG''.2 - be arranged in the bogies 5, 6.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102012217721.3A DE102012217721A1 (de) | 2012-09-28 | 2012-09-28 | Vorrichtung für ein Schienenfahrzeug |
| PCT/EP2013/068982 WO2014048768A1 (de) | 2012-09-28 | 2013-09-13 | Vorrichtung für ein schienenfahrzeug |
Publications (4)
| Publication Number | Publication Date |
|---|---|
| EP2888147A1 true EP2888147A1 (de) | 2015-07-01 |
| EP2888147B1 EP2888147B1 (de) | 2020-02-19 |
| EP2888147B9 EP2888147B9 (de) | 2020-08-19 |
| EP2888147B2 EP2888147B2 (de) | 2023-05-31 |
Family
ID=49209349
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13763038.0A Active EP2888147B2 (de) | 2012-09-28 | 2013-09-13 | Vorrichtung für ein schienenfahrzeug |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP2888147B2 (de) |
| DE (1) | DE102012217721A1 (de) |
| ES (1) | ES2779675T5 (de) |
| HU (1) | HUE049753T2 (de) |
| WO (1) | WO2014048768A1 (de) |
Families Citing this family (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104155968B (zh) * | 2014-07-17 | 2016-08-24 | 南京航空航天大学 | 一种针对高速列车悬架系统执行器的微小故障诊断方法 |
| CN105128881B (zh) * | 2015-10-09 | 2017-09-22 | 中车唐山机车车辆有限公司 | 转向架锁轴故障监测方法、装置及系统 |
| IT201700050006A1 (it) * | 2017-05-09 | 2018-11-09 | Faiveley Transport Italia Spa | Sistema e procedimento per il rilevamento di una condizione di andatura anomala di un carrello di un veicolo ferroviario. |
| DE102017213970A1 (de) * | 2017-08-10 | 2019-02-14 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Verfahren und Vorrichtung zum Bestimmen von Veränderungen im längsdynamischen Verhalten eines Schienenfahrzeugs |
| AT521735A1 (de) | 2018-09-19 | 2020-04-15 | Siemens Mobility GmbH | Verfahren und Vorrichtung zur Diagnose und Überwachung von Fahrzeugkomponenten |
| AT521038B1 (de) | 2018-10-02 | 2019-10-15 | Siemens Mobility GmbH | Verfahren und Vorrichtung zur Detektion von Störungen eines Sensors |
| CN112082782B (zh) * | 2020-08-28 | 2022-08-26 | 中车南京浦镇车辆有限公司 | 城市轨道交通列车走行部故障数字诊断系统及其诊断方法 |
Family Cites Families (31)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE3123858A1 (de) | 1981-06-16 | 1982-12-30 | Fried. Krupp Gmbh, 4300 Essen | Laufwerk fuer ein schienenfahrzeug |
| WO1996000159A1 (en) † | 1994-06-23 | 1996-01-04 | Groenskov Leif | Arrangement for measuring the quality of rails, in which a movable frame is connected to the bogie |
| DE19502670C2 (de) | 1995-01-20 | 1999-03-18 | Mannesmann Ag | Fahrwerk für Schienenfahrzeuge |
| DE19824125C1 (de) | 1998-05-29 | 1999-09-16 | Eras Entwicklung Und Realisati | Verfahren und Schienenfahrzeug zur aktiven Unterdrückung von fahrwerksbedingten Schwingungsanregungen im Fahrgastraum von Schienenfahrzeugen |
| DE19826422C2 (de) | 1998-06-05 | 2002-09-26 | Bernd Woop | Vorrichtung zur kontinuierlichen Kontrolle der Radsätze von Schienenfahrzeugen auf mechanische Defekte und fehlerhaften Radlauf, sowie Detektion von gefährlichen Fahrzuständen |
| DE19827271C5 (de) | 1998-06-19 | 2008-11-27 | MÜLLER, Andreas | On-line Erfassungssystem mit Auswerteteil für rad- und gleisbezogene Daten für Hochgeschwindigkeitszüge |
| GB9911170D0 (en) * | 1999-05-14 | 1999-07-14 | Aea Technology Plc | Track monitoring equipment |
| DE10020519B4 (de) | 2000-04-19 | 2004-02-12 | Db Reise & Touristik Ag | Verfahren zum Überwachen von Fahreigenschaften eines Schienenfahrzeuges |
| DE10020520B4 (de) | 2000-04-19 | 2004-02-12 | Db Reise & Touristik Ag | Verfahren und Vorrichtung zum Überwachen von Fahreigenschaften eines Schienenfahrzeuges |
| DE10020521B4 (de) | 2000-04-19 | 2004-01-29 | Db Reise & Touristik Ag | Verfahren und Vorrichtung zum Überwachen des Fahrverhaltens von Schienenfahrzeugen |
| AT413372B (de) | 2001-02-28 | 2006-02-15 | Siemens Sgp Verkehrstech Gmbh | Verfahren zur allgemeinen entgleisungsdetektion |
| ES2311650T3 (es) † | 2002-04-22 | 2009-02-16 | Bombardier Transportation Gmbh | Procedimiento para la reduccion de la transmision de sonido en vehiculos, chasis para vehiculos y actuador. |
| DE10233527B4 (de) | 2002-07-23 | 2004-07-22 | Db Reise & Touristik Ag | Verfahren zur Onboard Diagnose von Radsatzführungselementen |
| EP1534572A1 (de) | 2002-09-05 | 2005-06-01 | Bombardier Transportation GmbH | Verfahren und vorrichtung zur zustandsüberwachung von fahrwerken von fahrzeugen |
| GB2402983B (en) * | 2003-06-18 | 2006-07-19 | Westinghouse Brakes | Digital databus |
| US20080195265A1 (en) * | 2004-05-03 | 2008-08-14 | Sti Rail Pty Ltd | Train Integrity Network System |
| DE102005010118A1 (de) | 2005-03-02 | 2006-09-14 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Steuereinrichtung eines Schienenfahrzeugs |
| JP2007176400A (ja) | 2005-12-28 | 2007-07-12 | Hitachi Ltd | 鉄道車両の上下振動制御装置 |
| DE102006025773A1 (de) | 2006-05-31 | 2007-12-06 | Bombardier Transportation Gmbh | Verfahren zur Regelung eines aktiven Fahrwerks eines Schienenfahrzeugs |
| DE102006030312A1 (de) † | 2006-06-30 | 2008-01-03 | Schaeffler Kg | Sensoreinheit für ein Radsatzlager |
| DE102007024065B8 (de) | 2007-05-22 | 2009-05-14 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Vorrichtung und Verfahren zur Fehlerüberwachung von Fahrwerkskomponenten von Schienenfahrzeugen |
| DE102007024066B4 (de) | 2007-05-22 | 2017-06-14 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Drehgestell eines Schienenfahrzeugs mit einer Vorrichtung zur Fehlerüberwachung von Fahrwerkskomponenten |
| DE102007051126A1 (de) * | 2007-10-24 | 2009-04-30 | Bombardier Transportation Gmbh | Bestimmung der Restlebensdauer einer Fahrzeugkomponente |
| KR100921547B1 (ko) | 2007-12-26 | 2009-10-12 | 한국철도기술연구원 | 철도차량용 대차의 피로도 감시장치 및 이를 이용한철도차량 보호방법 |
| DE102008049224A1 (de) | 2008-09-27 | 2010-06-02 | Thales Defence Deutschland Gmbh | Verfahren und Vorrichtung zum Überprüfen mindestens eines Laufwerks eines auf einem Gleis fahrbaren Schienenfahrzeugs auf einen Defekt |
| DE102009020428A1 (de) † | 2008-11-19 | 2010-05-20 | Eureka Navigation Solutions Ag | Vorrichtung und Verfahren für ein Schienenfahrzeug |
| DE102009042555B4 (de) * | 2009-09-22 | 2021-06-17 | Siemens Mobility GmbH | Prüfverfahren für ein Schienenfahrzeug und Schienenfahrzeug |
| DE102009053801B4 (de) | 2009-11-18 | 2019-03-21 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Verfahren und Einrichtung zur Zustandsüberwachung wenigstens einen Radsatz aufweisenden Drehgestells eines Schienenfahrzeugs |
| IT1399071B1 (it) | 2010-03-23 | 2013-04-05 | Torino Politecnico | Dispositivo per diagnostica di carrelli ferroviari mediante l'applicazione di una vite di misura e trasmissione ad autonomia energetica e relativo metodo di controllo |
| DE102010052667C5 (de) | 2010-11-26 | 2015-05-21 | Knorr-Bremse Systeme für Schienenfahrzeuge GmbH | Vorrichtung und Verfahren zur Erfassung von Störungen einer Rollbewegung eines Wagonrades eines Zuges |
| JP2013169965A (ja) | 2012-02-23 | 2013-09-02 | Hitachi Ltd | 発電装置を備えた鉄道車両用台車およびその台車を備える鉄道車両 |
-
2012
- 2012-09-28 DE DE102012217721.3A patent/DE102012217721A1/de not_active Withdrawn
-
2013
- 2013-09-13 EP EP13763038.0A patent/EP2888147B2/de active Active
- 2013-09-13 WO PCT/EP2013/068982 patent/WO2014048768A1/de not_active Ceased
- 2013-09-13 HU HUE13763038A patent/HUE049753T2/hu unknown
- 2013-09-13 ES ES13763038T patent/ES2779675T5/es active Active
Non-Patent Citations (1)
| Title |
|---|
| See references of WO2014048768A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| HUE049753T2 (hu) | 2020-10-28 |
| EP2888147B9 (de) | 2020-08-19 |
| ES2779675T3 (es) | 2020-08-18 |
| DE102012217721A1 (de) | 2014-04-03 |
| EP2888147B2 (de) | 2023-05-31 |
| EP2888147B1 (de) | 2020-02-19 |
| WO2014048768A1 (de) | 2014-04-03 |
| ES2779675T9 (es) | 2020-09-24 |
| ES2779675T5 (es) | 2023-10-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2888147A1 (de) | Vorrichtung für ein schienenfahrzeug | |
| DE102011113086B4 (de) | Bremskrafterfassung für dynamische Bremsen eines Schienenfahrzeugs | |
| EP3216666B1 (de) | Bremsanlage eines schienenfahrzeugs | |
| EP3665048B1 (de) | Verfahren und vorrichtung zum bestimmen von veränderungen im längsdynamischen verhalten eines schienenfahrzeugs | |
| DE102011113069A1 (de) | Kraftschlussbestimmung bei einem Schienenfahrzeug | |
| EP3509923B1 (de) | Mehrteilig ausgeführte bremsregelung | |
| DE102016116414A1 (de) | Verfahren und Vorrichtung zur Verschleißoptimierung von Schienenfahrzeugen | |
| EP2888146B1 (de) | Vorrichtung für ein schienenfahrzeug | |
| WO2015128233A1 (de) | Verfahren und vorrichtung zur zustandsprüfung eines antriebsstrangs eines triebfahrzeugs | |
| DE19835352C1 (de) | Brems- und/oder Fahrwerkregelvorrichtung | |
| EP1572513A1 (de) | Bremssystem und verfahren zum betrieb eines bremsystems für elektrisch angetriebene fahrzeuge | |
| EP3787946B1 (de) | Steuerungssystem zur steuerung eines bremssystems eines schienefahrzeugs | |
| DE102012013525B4 (de) | Prüfvorrichtung für einen Prüfradsatz für ein Schienenfahrzeug | |
| DE10143551A1 (de) | Vorrichtung zur Ansteuerung von Fahrzeugaggregaten | |
| WO2013024018A2 (de) | Magnetschienenbremseinrichtung für ein schienenfahrzeug | |
| DE102013019483A1 (de) | Verfahren und Vorrichtung zur Schwingungsdämpfung einer angetriebenen Achse mit Momentenquerverteilung | |
| WO2014048720A1 (de) | Vorrichtung für ein schienenfahrzeug | |
| DE102016012174A1 (de) | Antriebs- und/oder Bremsvorrichtung für ein Fahrzeug | |
| DE102017217408A1 (de) | Schienenfahrzeug zur Personenbeförderung | |
| EP2753511B1 (de) | Kraftschlussermittlung bei einem schienenfahrzeug | |
| DE102024203810A1 (de) | Verfahren zum Durchführen einer erweiterten Bremsprobe in einem Fahrzeugverband spurgeführter Fahrzeuge | |
| EP2598386A1 (de) | Verfahren zum reduzieren des antriebsschlupfes bei fahrzeugen mit mehreren motoren | |
| WO2014131758A1 (de) | Laufdrehgestell für schienenfahrzeuge | |
| WO2010046172A1 (de) | Verfahren zur durchführung einer rollprobe bei einem schienenfahrzeug und steuerungseinrichtung dafür | |
| DE102014219101A1 (de) | Verfahren zum Betreiben von Triebzügen mit zumindest einem Mehrganggetriebe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20150327 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS AKTIENGESELLSCHAFT |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
| 17Q | First examination report despatched |
Effective date: 20180913 |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS MOBILITY GMBH |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| INTG | Intention to grant announced |
Effective date: 20191014 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502013014316 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1234645 Country of ref document: AT Kind code of ref document: T Effective date: 20200315 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
| GRAT | Correction requested after decision to grant or after decision to maintain patent in amended form |
Free format text: ORIGINAL CODE: EPIDOSNCDEC |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20200219 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200519 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PK Free format text: BERICHTIGUNG B9 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2779675 Country of ref document: ES Kind code of ref document: T3 Effective date: 20200818 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200520 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200519 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200619 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 |
|
| REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E049753 Country of ref document: HU |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200712 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 502013014316 Country of ref document: DE |
|
| PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
| PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
| 26 | Opposition filed |
Opponent name: KNORR-BREMSE SYSTEME FUER SCHIENENFAHRZEUGE GMBH Effective date: 20201119 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HU Payment date: 20201115 Year of fee payment: 8 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG, CH |
|
| PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20200913 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20200930 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200913 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200930 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200913 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200913 |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1234645 Country of ref document: AT Kind code of ref document: T Effective date: 20200913 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200913 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200219 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210914 |
|
| PUAH | Patent maintained in amended form |
Free format text: ORIGINAL CODE: 0009272 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT MAINTAINED AS AMENDED |
|
| 27A | Patent maintained in amended form |
Effective date: 20230531 |
|
| AK | Designated contracting states |
Kind code of ref document: B2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R102 Ref document number: 502013014316 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: DC2A Ref document number: 2779675 Country of ref document: ES Kind code of ref document: T5 Effective date: 20231024 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502013014316 Country of ref document: DE Owner name: SIEMENS MOBILITY GMBH, DE Free format text: FORMER OWNER: SIEMENS MOBILITY GMBH, 81739 MUENCHEN, DE |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20250924 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250915 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20251120 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20251219 Year of fee payment: 13 |