EP2681696A4 - Project management system - Google Patents

Project management system

Info

Publication number
EP2681696A4
EP2681696A4 EP12752528.5A EP12752528A EP2681696A4 EP 2681696 A4 EP2681696 A4 EP 2681696A4 EP 12752528 A EP12752528 A EP 12752528A EP 2681696 A4 EP2681696 A4 EP 2681696A4
Authority
EP
European Patent Office
Prior art keywords
management system
project management
project
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP12752528.5A
Other languages
German (de)
French (fr)
Other versions
EP2681696A2 (en
Inventor
Steeve Teong Sin Kay
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US13/038,281 external-priority patent/US20120226513A1/en
Application filed by Individual filed Critical Individual
Publication of EP2681696A2 publication Critical patent/EP2681696A2/en
Publication of EP2681696A4 publication Critical patent/EP2681696A4/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
EP12752528.5A 2011-03-01 2012-02-29 Project management system Withdrawn EP2681696A4 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US13/038,281 US20120226513A1 (en) 2011-03-01 2011-03-01 Project management system
US13/189,374 US20120226617A1 (en) 2011-03-01 2011-07-22 Project management system and template
PCT/US2012/027159 WO2012118906A2 (en) 2011-03-01 2012-02-29 Project management system

Publications (2)

Publication Number Publication Date
EP2681696A2 EP2681696A2 (en) 2014-01-08
EP2681696A4 true EP2681696A4 (en) 2014-10-29

Family

ID=46753898

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12752528.5A Withdrawn EP2681696A4 (en) 2011-03-01 2012-02-29 Project management system

Country Status (4)

Country Link
US (1) US20120226617A1 (en)
EP (1) EP2681696A4 (en)
CN (1) CN103930911A (en)
WO (1) WO2012118906A2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB201100215D0 (en) * 2011-01-07 2011-02-23 Brm Fusion Ltd Projecting project outcome
US20130111480A1 (en) * 2011-11-02 2013-05-02 International Business Machines Corporation Smart Task Tracking
CN105787244A (en) * 2014-12-24 2016-07-20 北京奇虎科技有限公司 Data processing method and system for a business object and electronic device
WO2019046522A1 (en) * 2017-08-30 2019-03-07 4D Technologies, LLC System and method for determining competency deficiencies and matching between particular projects and available workers or candidates
CN108171418A (en) * 2017-12-27 2018-06-15 深圳春沐源控股有限公司 Data processing method, device, electronic equipment and computer readable storage medium
CN110135674A (en) * 2019-02-20 2019-08-16 深圳大维理文科技有限公司 Transaction management system and office management method
CN110310023A (en) * 2019-06-18 2019-10-08 平安普惠企业管理有限公司 A kind of project scheduling method, equipment, server and computer readable storage medium
CN110597899B (en) * 2019-09-18 2023-08-22 云南电网有限责任公司电力科学研究院 Project expense management method and system
CN110838000A (en) * 2019-10-22 2020-02-25 中核核电运行管理有限公司 Nuclear power plant pre-maintenance project overdue early warning method and device
CN113421035B (en) * 2021-08-23 2021-12-21 北京奇虎科技有限公司 Resource allocation scheme recommendation method, device, equipment and storage medium

Family Cites Families (36)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7103560B1 (en) * 1996-01-18 2006-09-05 Planalytics, Inc. System and method for weather adapted, business performance forecasting
JPH10261122A (en) * 1997-03-18 1998-09-29 Sumitomo Wiring Syst Ltd Work distribution optimization method
US7212986B1 (en) * 1999-06-16 2007-05-01 Metier, Ltd. Method and apparatus for planning and monitoring multiple tasks based on user defined criteria and predictive ability
US6714829B1 (en) * 2000-06-22 2004-03-30 Thomas K F Wong Dual path scheduling method
US20020065702A1 (en) * 2000-08-25 2002-05-30 Caulfield David L. Real-time production tracking and scheduling system
US7283975B2 (en) * 2001-02-05 2007-10-16 Broughton W Curtis System and method for tracking and managing construction projects
US7149702B1 (en) * 2001-12-31 2006-12-12 Bellsouth Intellectual Property Corp. System and method for document delays associated with a project
US20030233267A1 (en) * 2002-05-30 2003-12-18 Martin Hertel-Szabadi Project management
US20040015376A1 (en) * 2002-07-03 2004-01-22 Conoco Inc. Method and system to value projects taking into account political risks
US20040128188A1 (en) * 2002-12-30 2004-07-01 Brian Leither System and method for managing employee accountability and performance
US20040148209A1 (en) * 2003-01-28 2004-07-29 Church David E. System and method for producing an infrastructure project estimate for information technology
US20040267589A1 (en) * 2003-06-25 2004-12-30 International Business Machines Corporation System and method for applying human resources to a project plan
EP1738307A4 (en) * 2004-03-24 2009-04-22 Clevor Technologies Inc A system and method for constructing a schedule that better achieves one or more business goals
US20050288948A1 (en) * 2004-06-23 2005-12-29 Bellsouth Intellectual Property Corporation Systems, methods and computer readable media for measuring the performance and travel efficiency of a technician
US8533027B1 (en) * 2004-07-30 2013-09-10 Hewlett-Packard Development Company, L.P. User interface enabling approval/disappoval of revised contract performance indicators
US7970639B2 (en) * 2004-08-20 2011-06-28 Mark A Vucina Project management systems and methods
US7596416B1 (en) * 2004-08-25 2009-09-29 The United States Of America As Represented By The Administrator Of The National Aeronautics And Space Administration Project management tool
US7693735B2 (en) * 2004-11-23 2010-04-06 Etadirect Holdings, Inc. Dynamic schedule mediation
US8510148B2 (en) * 2005-03-01 2013-08-13 Alcatel Lucent Methods and apparatus for associating and displaying project planning and management information in conjunction with geographic information
US20070038494A1 (en) * 2005-08-15 2007-02-15 Cognetics Corporation Team management system and method
US20070288283A1 (en) * 2006-06-09 2007-12-13 Devshop Inc. Method for project management
US7996257B2 (en) * 2007-02-09 2011-08-09 International Business Machines Corporation Collecting, calculating, and reporting quantifiable peer feedback on relative contributions of team members
US20080243581A1 (en) * 2007-03-27 2008-10-02 Jennings Derek M Personnel management method and system
US20080255910A1 (en) * 2007-04-16 2008-10-16 Sugato Bagchi Method and System for Adaptive Project Risk Management
US20080294504A1 (en) * 2007-05-23 2008-11-27 Mortensen William A Method of Evaluating a Project Manager of a Project of a Provider
JP5125307B2 (en) * 2007-08-15 2013-01-23 富士通株式会社 Man-hour estimation program, recording medium recording the program, man-hour estimating device, and man-hour estimating method
US8972276B2 (en) * 2007-08-29 2015-03-03 Sap Ag Executed workload
US8280796B2 (en) * 2008-05-28 2012-10-02 Mp&S Intellectual Property Associates, Llc Method for aggregating and valuing intellectual property in an exchange
US8156065B1 (en) * 2008-06-30 2012-04-10 Sprint Communications Company L.P. Data structure based variable rules engine
US8234143B1 (en) * 2008-09-12 2012-07-31 Intuit Inc. Method and system for automated resource skillset matching
US20100280959A1 (en) * 2009-05-01 2010-11-04 Darrel Stone Real-time sourcing of service providers
US9779386B2 (en) * 2009-08-31 2017-10-03 Thomson Reuters Global Resources Method and system for implementing workflows and managing staff and engagements
US20120215574A1 (en) * 2010-01-16 2012-08-23 Management Consulting & Research, LLC System, method and computer program product for enhanced performance management
US8983918B2 (en) * 2010-04-30 2015-03-17 Bank Of America Corporation International cross border data movement
US20120109707A1 (en) * 2010-10-28 2012-05-03 Marianne Hickey Providing a status indication for a project
US9659260B2 (en) * 2011-03-15 2017-05-23 Dan Caligor Calendar based task and time management systems and methods

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
No further relevant documents disclosed *

Also Published As

Publication number Publication date
EP2681696A2 (en) 2014-01-08
WO2012118906A2 (en) 2012-09-07
WO2012118906A3 (en) 2014-05-08
CN103930911A (en) 2014-07-16
US20120226617A1 (en) 2012-09-06

Similar Documents

Publication Publication Date Title
EP2783332A4 (en) Interaction management
ZA201400611B (en) Shelf-monitoring system
EP2741020A4 (en) Energy management system
EP2673739A4 (en) Inventory management system
EP2751771A4 (en) Health management system
EP2715645A4 (en) Financial management system
GB201106021D0 (en) Management system
GB201105902D0 (en) Location system
EP2731574A4 (en) Medication management system
EP2677682A4 (en) Key management system
HK1200636A1 (en) Energy management system
EP2672674A4 (en) Network system
EP2756576A4 (en) Power-centric system management
GB201213263D0 (en) Meeting management system
EP2838280A4 (en) Location management system
EP2719500A4 (en) Workpiece-processing system
EP2705484A4 (en) Product level management system
EP2681696A4 (en) Project management system
EP2773011A4 (en) Electricity-storage system
IL237496A0 (en) Move management system
GB2500948B (en) Ablutionary system
SG2014012959A (en) Energy management system
GB2495599B (en) Database management system
PL2785385T3 (en) Haushaltsgerät mit desodorierendem system
EP2695031A4 (en) Thermal management system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130924

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
R17D Deferred search report published (corrected)

Effective date: 20140508

REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1193667

Country of ref document: HK

A4 Supplementary search report drawn up and despatched

Effective date: 20141001

RIC1 Information provided on ipc code assigned before grant

Ipc: G06Q 10/06 20120101ALI20140926BHEP

Ipc: G06Q 10/10 20120101ALI20140926BHEP

Ipc: G06Q 10/00 20120101AFI20140926BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20161110

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20170321

REG Reference to a national code

Ref country code: HK

Ref legal event code: WD

Ref document number: 1193667

Country of ref document: HK