CN113421035B - Resource allocation scheme recommendation method, device, equipment and storage medium - Google Patents

Resource allocation scheme recommendation method, device, equipment and storage medium Download PDF

Info

Publication number
CN113421035B
CN113421035B CN202110964768.0A CN202110964768A CN113421035B CN 113421035 B CN113421035 B CN 113421035B CN 202110964768 A CN202110964768 A CN 202110964768A CN 113421035 B CN113421035 B CN 113421035B
Authority
CN
China
Prior art keywords
project
resource
information
resource allocation
determining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110964768.0A
Other languages
Chinese (zh)
Other versions
CN113421035A (en
Inventor
何丙南
张俊
孙玉坤
任俊卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qihoo Technology Co Ltd
Original Assignee
Beijing Qihoo Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Qihoo Technology Co Ltd filed Critical Beijing Qihoo Technology Co Ltd
Priority to CN202110964768.0A priority Critical patent/CN113421035B/en
Publication of CN113421035A publication Critical patent/CN113421035A/en
Application granted granted Critical
Publication of CN113421035B publication Critical patent/CN113421035B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of data processing, and discloses a resource allocation scheme recommendation method, a device, equipment and a storage medium, wherein the method comprises the following steps: when a project resource application instruction is received, determining a corresponding resource configuration requirement according to the project resource application instruction; generating a plurality of groups of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool; determining scoring values respectively corresponding to the project resource allocation schemes according to preset rules; and selecting at least one target resource configuration scheme from the multiple groups of project resource configuration schemes based on the scoring values, and recommending the at least one target resource configuration scheme. Compared with the prior art that the resource information needs to be checked manually and the resource allocation scheme is determined according to the resource information, the method and the device directly generate and recommend a plurality of sets of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool, and therefore the optimal resource allocation scheme is provided for the user in a short time.

Description

Resource allocation scheme recommendation method, device, equipment and storage medium
Technical Field
The present invention relates to the field of data processing technologies, and in particular, to a resource allocation scheme recommendation method, apparatus, device, and storage medium.
Background
With the rapid development and maturity of computer networks, more and more enterprises are dedicated to project development, but in the prior art, resource configuration for project development mainly includes manually checking resource information within a fixed time according to a project manager, then determining a resource configuration scheme according to the resource information, and supporting the project development according to the resource configuration scheme, but this way not only consumes more resource configuration time, but also results in failure to accurately obtain an optimal resource configuration scheme, and therefore, how to provide the optimal resource configuration scheme for users within a short time is an urgent technical problem to be solved.
The above is only for the purpose of assisting understanding of the technical aspects of the present invention, and does not represent an admission that the above is prior art.
Disclosure of Invention
The invention mainly aims to provide a resource allocation scheme recommendation method, a resource allocation scheme recommendation device, resource allocation scheme recommendation equipment and a storage medium, and aims to solve the technical problem of how to provide an optimal resource allocation scheme for a user in a short time.
In order to achieve the above object, the present invention provides a resource allocation scheme recommendation method, including:
when a project resource application instruction is received, determining a corresponding resource configuration requirement according to the project resource application instruction;
generating a plurality of groups of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool;
determining scoring values respectively corresponding to the project resource allocation schemes according to preset rules;
and selecting at least one target resource configuration scheme from the multiple groups of project resource configuration schemes based on the scoring values, and recommending the at least one target resource configuration scheme.
Optionally, the step of generating a plurality of sets of project resource configuration schemes according to the resource configuration requirement and the resource information in the project resource pool includes:
determining project planning time, project resource types and project scale grades according to the resource allocation requirements;
determining the project task amount according to the project resource type and the project scale grade;
determining resource information in an idle state in the project planning time from a project resource pool;
and generating a plurality of groups of project resource configuration schemes according to the project task amount and the resource information.
Optionally, the step of determining resource information in an idle state in the project planning time from the project resource pool includes:
determining the project resource level according to the project task amount;
and determining the resource information in an idle state in the project planning time from a project resource pool according to the project resource level.
Optionally, the step of determining resource information in an idle state in the project planning time from a project resource pool according to the project resource level includes:
determining resource information to be confirmed which is in an idle state within the project planning time from a project resource pool according to the project resource level;
acquiring idle time corresponding to the resource information to be confirmed;
and determining resource information according to the project planning time, the idle time and the resource information to be confirmed.
Optionally, the step of determining resource information according to the project planning time, the idle time, and the resource information to be confirmed includes:
judging whether the idle time is within the project planning time or not;
and when the idle time is in the project planning time, taking the resource information to be confirmed as resource information.
Optionally, the step of generating a plurality of sets of project resource configuration schemes according to the project task amount and the resource information includes:
determining resource level information according to the project task amount and the resource information;
determining a resource unit price value corresponding to the resource level information;
and determining a plurality of groups of project resource configuration schemes according to the project task amount, the resource unit price value and the resource level information.
Optionally, the step of determining a plurality of sets of project resource configuration schemes according to the project task amount, the resource unit price value, and the resource level information includes:
determining a multi-group cost resource configuration scheme according to the project task amount, the resource unit price value and the resource level information;
determining a plurality of groups of time resource configuration schemes according to the project task amount and the resource level information;
and determining a plurality of sets of project resource allocation schemes according to the plurality of sets of cost resource allocation schemes and the plurality of sets of time resource allocation schemes.
Optionally, the step of determining multiple sets of project resource allocation schemes according to multiple sets of cost resource allocation schemes and multiple sets of time resource allocation schemes includes:
respectively acquiring the total item cost values corresponding to the cost resource allocation schemes;
selecting a plurality of groups of resource allocation schemes to be processed from the plurality of groups of resource allocation schemes according to the total project cost scores and the project budget scores;
and determining a plurality of sets of project resource configuration schemes according to the plurality of sets of resource configuration schemes to be processed and the plurality of sets of time resource configuration schemes.
Optionally, the step of determining a plurality of sets of time resource configuration schemes according to the project task amount and the resource level information includes:
determining the working efficiency of the resource according to the resource level information;
and determining a plurality of groups of time resource allocation schemes according to the project task amount, the resource level information and the resource working efficiency.
Optionally, the step of selecting at least one target resource allocation scheme from the multiple sets of project resource allocation schemes based on the score value and recommending the at least one target resource allocation scheme includes:
sorting a plurality of groups of project resource configuration schemes according to the scoring values to obtain sorting results;
and determining at least one target resource configuration scheme based on the sequencing result, and recommending the at least one target resource configuration scheme.
Optionally, the step of determining at least one target resource allocation scheme based on the sorting result and recommending the at least one target resource allocation scheme includes:
determining a preset scheme strategy according to the sorting result;
determining the number of preset schemes according to the preset scheme strategies and the sequencing results;
and determining at least one target resource configuration scheme from the sequencing result according to the preset scheme strategy and the preset scheme quantity, and recommending the at least one target resource configuration scheme.
In addition, to achieve the above object, the present invention further provides a resource allocation scheme recommendation apparatus, including:
the determining module is used for determining a corresponding resource configuration requirement according to the project resource application instruction when the project resource application instruction is received;
the generating module is used for generating a plurality of groups of project resource configuration schemes according to the resource configuration requirements and the resource information in the project resource pool;
the determining module is further configured to determine scoring values corresponding to the project resource allocation schemes respectively according to preset rules;
and the recommending module is used for selecting at least one target resource configuration scheme from the multiple groups of project resource configuration schemes based on the scoring value and recommending the at least one target resource configuration scheme.
Optionally, the generating module is further configured to determine project planning time, project resource types, and project scale levels according to the resource configuration requirement;
the generating module is further used for determining project task amount according to the project resource type and the project scale grade;
the generating module is further configured to determine resource information in an idle state in the project planning time from a project resource pool;
the generating module is further configured to generate a plurality of sets of project resource configuration schemes according to the project task amount and the resource information.
Optionally, the generating module is further configured to determine a project resource level according to the project task amount;
the generation module is further configured to determine resource information in an idle state within the project planning time from a project resource pool according to the project resource level.
Optionally, the generating module is further configured to determine, from a project resource pool, to-be-confirmed resource information that is in an idle state within the project planning time according to the project resource level;
the generating module is further configured to obtain idle time corresponding to the resource information to be confirmed;
the generating module is further configured to determine resource information according to the project planning time, the idle time, and the resource information to be confirmed.
Optionally, the generating module is further configured to determine whether the idle time is within the project planning time;
the generating module is further configured to use the resource information to be confirmed as resource information when the idle time is within the project planning time.
Optionally, the generating module is further configured to determine resource level information according to the project task amount and the resource information;
the generation module is further configured to determine a resource unit price score corresponding to the resource level information;
the generating module is further configured to determine a plurality of sets of project resource configuration schemes according to the project task amount, the resource unit price value, and the resource level information.
Optionally, the generating module is further configured to determine a plurality of sets of cost resource configuration schemes according to the project task amount, the resource unit price value, and the resource level information;
the generating module is further configured to determine a plurality of sets of time resource configuration schemes according to the project task amount and the resource level information;
the generating module is further configured to determine multiple sets of project resource configuration schemes according to the multiple sets of cost resource configuration schemes and the multiple sets of time resource configuration schemes.
In addition, to achieve the above object, the present invention further provides a resource allocation scheme recommendation apparatus, including: a memory, a processor and a resource allocation scheme recommender stored on the memory and operable on the processor, the resource allocation scheme recommender being configured to implement the steps of the resource allocation scheme recommendation method as described above.
Furthermore, to achieve the above object, the present invention further provides a storage medium having a resource allocation plan recommendation program stored thereon, wherein the resource allocation plan recommendation program, when executed by a processor, implements the steps of the resource allocation plan recommendation method as described above.
The method comprises the steps of firstly determining corresponding resource allocation requirements according to project resource application instructions when the project resource application instructions are received, then generating a plurality of sets of project resource allocation schemes according to the resource allocation requirements and resource information in a project resource pool, then determining scoring values respectively corresponding to the project resource allocation schemes according to preset rules, finally selecting at least one target resource allocation scheme from the plurality of sets of project resource allocation schemes based on the scoring values, and recommending the at least one target resource allocation scheme. Compared with the prior art that the resource information needs to be checked manually and the resource allocation scheme is determined according to the resource information, the method and the device directly generate and recommend a plurality of sets of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool, so that the optimal resource allocation scheme is provided for the user in a short time, and the user experience is improved.
Drawings
FIG. 1 is a schematic structural diagram of a resource allocation scheme recommendation device of a hardware operating environment according to an embodiment of the present invention;
FIG. 2 is a flowchart illustrating a resource allocation plan recommendation method according to a first embodiment of the present invention;
FIG. 3 is a flowchart illustrating a resource allocation plan recommendation method according to a second embodiment of the present invention;
FIG. 4 is a flowchart illustrating a resource allocation plan recommendation method according to a third embodiment of the present invention;
fig. 5 is a block diagram illustrating a first embodiment of a resource allocation plan recommendation apparatus according to the present invention.
The implementation, functional features and advantages of the objects of the present invention will be further explained with reference to the accompanying drawings.
Detailed Description
It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Referring to fig. 1, fig. 1 is a schematic structural diagram of a resource allocation scheme recommendation device of a hardware operating environment according to an embodiment of the present invention.
As shown in fig. 1, the resource allocation plan recommending apparatus may include: a processor 1001, such as a Central Processing Unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Wherein a communication bus 1002 is used to enable connective communication between these components. The user interface 1003 may include a Display screen (Display), an input unit such as a Keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface, a wireless interface. The network interface 1004 may optionally include a standard wired interface, a Wireless interface (e.g., a Wireless-Fidelity (Wi-Fi) interface). The Memory 1005 may be a Random Access Memory (RAM) or a Non-Volatile Memory (NVM), such as a disk Memory. The memory 1005 may alternatively be a storage device separate from the processor 1001.
Those skilled in the art will appreciate that the architecture shown in FIG. 1 does not constitute a limitation of the resource configuration proposal recommendation device and may include more or fewer components than shown, or some components in combination, or a different arrangement of components.
As shown in fig. 1, a memory 1005, which is a storage medium, may include therein an operating system, a network communication module, a user interface module, and a resource allocation plan recommendation program.
In the resource allocation scenario recommendation apparatus shown in fig. 1, the network interface 1004 is mainly used for data communication with a network server; the user interface 1003 is mainly used for data interaction with a user; the processor 1001 and the memory 1005 of the resource allocation plan recommendation device of the present invention may be disposed in the resource allocation plan recommendation device, and the resource allocation plan recommendation device calls the resource allocation plan recommendation program stored in the memory 1005 through the processor 1001 and executes the resource allocation plan recommendation method provided by the embodiment of the present invention.
An embodiment of the present invention provides a resource allocation scheme recommendation method, and referring to fig. 2, fig. 2 is a flowchart illustrating a first embodiment of the resource allocation scheme recommendation method according to the present invention.
In this embodiment, the resource allocation scheme recommendation method includes the following steps:
step S10: and when a project resource application instruction is received, determining a corresponding resource configuration requirement according to the project resource application instruction.
It is easy to understand that the execution main body of this embodiment may be a communication device having functions of data processing, network communication, program operation, and the like, the device may further generate a plurality of sets of project resource configuration schemes according to resource configuration requirements and resource information in the project resource pool, and perform scheme recommendation and the like based on the plurality of sets of project resource configuration schemes, and may also be other computer devices having similar functions, and the present embodiment is not limited.
The project resource application instruction can be a resource application instruction input by a provider on a resource configuration system, the resource application instruction includes resource configuration requirements corresponding to project development of the provider, the resource configuration requirements include a project development budget, project development contents, project planning time and the like, the project planning time can be project development starting time, project development finishing time and the like, the project development budget can be a maximum expenditure value of the project development and the like, and the project development contents can be function introduction and the like of a project required to be developed by the provider.
Step S20: and generating a plurality of groups of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool.
It should be noted that the resource information in the project resource pool may be a project person name, a project person level, a project person unit price, project person idle time, and project person work efficiency, the project person name may be a project person name or a project person name, the project person level may be a project person post level, such as a high-level engineer, a medium-level engineer, or a low-level engineer, the project person unit price may be a project person daily salary, and the project person idle time may be a date without work status, etc.
The project resource pool comprises a plurality of project personnel names, a plurality of project personnel levels, a plurality of project personnel unit prices, a plurality of project personnel idle time and a plurality of project personnel working efficiency, and the project personnel names, the project personnel levels, the project personnel unit prices, the project personnel idle time and the project personnel working efficiency have one-to-one correspondence relationship.
The project resource configuration scheme comprises project personnel names, project personnel levels, project personnel unit prices, total project cost scores, project planning time and the like required by project development.
The processing mode of generating the multiple groups of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool is to determine project planning time, project resource types and project scale grades according to the resource allocation requirements, then determine project task quantities according to the project resource types and the project scale grades, determine the resource information in idle time in the project planning time from the project resource pool, and generate the multiple groups of project resource allocation schemes according to the project task quantities and the resource information.
It should be understood that the resource allocation system may determine the project planning time, the project resource type, and the project scale level according to the project development budget, the project development content, and the project planning time in the resource allocation requirement, where it is to be noted that different project resource types, different project planning times, and different project development budgets are different, and the corresponding project scale levels are different, for example, the project scale levels may be a project scale low level, a project scale medium level, and a project scale high level, and the project task volumes corresponding to the project scale low level are divided into relatively small quantities each day, and the project task volumes corresponding to the project scale high level are divided into relatively large quantities each day, and the like.
The processing mode of determining the resource information in the idle state in the project planning time from the project resource pool may be determining a project resource level according to the project task amount, and determining the resource information in the idle state in the project planning time from the project resource pool according to the project resource level.
In this embodiment, the resource information to be confirmed that is in an idle state within the project planning time may be determined from the project resource pool according to the project resource level, then the idle time corresponding to the resource information to be confirmed is obtained, and then the resource information is determined according to the project planning time, the idle time, and the resource information to be confirmed.
The processing mode for determining the resource information according to the project planning time, the idle time and the resource information to be confirmed can be to judge whether the idle time is in the project planning time or not, and to take the resource information to be confirmed as the resource information when the idle time is in the project planning time.
Assuming that the project planning time is 7 months 12 days-7 months 27 days, the project resource level of project development comprises project resource high level and project resource low level, if two resource information of project high level resources are needed and four resource information of project low level resources are needed, the resource information to be confirmed in an idle state in the project resource pool comprises high resource information A, high resource information B, high resource information C, low level resource information D, low level resource information E, low level resource information F and low level resource information G, the idle time corresponding to the high resource information A is 7 months 12 days-7 months 30 days, the idle time corresponding to the high resource information B is 7 months 12 days-7 months 20 days, the idle time corresponding to the high resource information C is 7 months 12 days-7 months 28 days, the idle time corresponding to the low level resource information D is 7 months 12 days-7 months 28 days, the idle time corresponding to the low-level resource information E is 7 months, 12 days to 7 months, 27 days, the idle time corresponding to the low-level resource information F is 7 months, 12 days to 7 months, 29 days, the idle time corresponding to the low-level resource information G is 7 months, 12 days to 7 months, 30 days, and the resource information is high-level resource information A, high-level resource information C, low-level resource information D, low-level resource information E, low-level resource information F and low-level resource information G.
The processing mode of generating the multiple sets of project resource allocation schemes according to the project task amount and the resource information may be to determine resource level information according to the project task amount and the resource information, determine resource unit price scores corresponding to the resource level information, and determine the multiple sets of project resource allocation schemes according to the project task amount, the resource unit price scores and the resource level information.
The processing mode of determining the multiple groups of project resource configuration schemes according to the project task amount, the resource unit price values and the resource level information is to determine multiple groups of cost resource configuration schemes according to the project task amount, the resource unit price values and the resource level information, determine multiple groups of time resource configuration schemes according to the project task amount and the resource level information, and determine multiple groups of project resource configuration schemes according to the multiple groups of cost resource configuration schemes and the multiple groups of time resource configuration schemes.
In specific implementation, the resource working efficiency may be determined according to the resource level information, and then a plurality of sets of time resource allocation schemes and the like may be determined according to the project task amount, the resource level information, and the resource working efficiency.
It should be noted that the multiple sets of cost resource allocation schemes may be cost resource allocation schemes formed by respectively mixing high-level resource information, intermediate-level resource information, and low-level resource information within a project development budget range, and the like.
The multiple sets of time resource allocation schemes may be time resource allocation schemes formed by respectively mixing high-level resource information, medium-level resource information and low-level resource information in the project planning time, and the like.
The processing method for determining the multiple sets of project resource allocation schemes according to the multiple sets of cost resource allocation schemes and the multiple sets of time resource allocation schemes may be to respectively obtain total project resource scores corresponding to the cost resource allocation schemes, then select multiple sets of resource allocation schemes to be processed from the multiple sets of resource allocation schemes according to the total project cost scores and preset project scores, and determine the multiple sets of project resource allocation schemes according to the multiple sets of resource allocation schemes to be processed and the multiple sets of time resource allocation schemes.
In a specific implementation, the total value of the project cost is the total sum of the project development cost corresponding to the cost resource configuration scheme, and the preset value of the project can be understood as the project development budget and the like. And finally, determining a plurality of sets of project resource allocation schemes according to the plurality of sets of resource allocation schemes to be processed and the plurality of sets of time resource allocation schemes, wherein the plurality of sets of project resource allocation schemes can be understood as project resource allocation schemes meeting project development preset time and project planning time provided by suppliers.
Step S30: and determining scoring values respectively corresponding to the project resource allocation schemes according to preset rules.
It should be noted that the preset rule may be understood as a scoring rule set for a condition that the provider selects the optimal project resource configuration scheme, for example, if the condition that the provider selects the optimal project resource configuration scheme is cost, the corresponding scoring value is determined according to the total score of the project cost, if the condition that the provider selects the optimal project resource configuration scheme is time, the corresponding scoring value is determined according to the project completion time, and if the condition that the provider selects the optimal project resource configuration scheme is cost and time, the corresponding scoring value is determined by integrating the total score of the project cost and the project completion time, and the scoring value may be represented by a number or a letter.
Assuming that a corresponding scoring value is determined according to the total cost score of the project, if the total cost score of the target resource allocation scheme a is 1.2W, the total cost score of the target resource allocation scheme B is 1.1W, and the total cost score of the target resource allocation scheme C is 1.3W, the scoring value corresponding to the target resource allocation scheme B may be 10, the scoring value corresponding to the target resource allocation scheme a may be 8, the scoring value corresponding to the target resource allocation scheme C may be 6, and the like.
Assuming that the corresponding score value is determined according to the project completion time, the project planning time is 6 months, 7 days to 6 months, 15 days, the project completion time of the time resource configuration scheme D is 6 months, 7 days to 6 months, 11 days, the project completion time of the time resource configuration scheme E is 6 months, 7 days to 6 months, 12 days, and the project completion time of the time resource configuration scheme F is 6 months, 7 days to 6 months, 14 days, the score value corresponding to the time resource configuration scheme D may be 10, the score value corresponding to the time resource configuration scheme E may be 9, the score value corresponding to the time resource configuration scheme F may be 7, and the like.
Step S40: and selecting at least one target resource configuration scheme from the multiple groups of project resource configuration schemes based on the scoring values, and recommending the at least one target resource configuration scheme.
It should be noted that, based on the score value, a target resource allocation scheme or a plurality of target resource allocation schemes may be selected from the plurality of sets of project resource schemes and recommended to the supplier, so that the supplier selects an optimal target resource allocation scheme according to the requirement.
The processing mode of selecting at least one target resource configuration scheme from the multiple sets of project resource configuration schemes based on the scoring values and recommending the at least one target resource configuration scheme may be to sort the multiple sets of project resource configuration schemes according to the scoring values to obtain a sorting result, determine the at least one target resource configuration scheme based on the sorting result, and recommend the at least one target resource configuration scheme.
And (4) assuming that the scoring value corresponding to the project resource configuration scheme H is 10, the scoring value corresponding to the project resource configuration scheme J is 6, and the scoring value corresponding to the project resource configuration scheme K is 8, sorting according to the scoring values from high to low, wherein the sorting result is the project resource configuration scheme H-the project resource configuration scheme K-the project resource configuration scheme J.
The processing mode of determining at least one target resource allocation scheme based on the sorting result and recommending the at least one target resource allocation scheme may be determining a preset scheme policy according to the sorting result, determining a preset scheme quantity according to the preset scheme policy and the sorting result, where the preset scheme quantity is a quantity corresponding to the item resource allocation scheme of the recommendation provider, then determining at least one target resource allocation scheme from the sorting result according to the preset scheme policy and the preset scheme quantity, and recommending the at least one target resource allocation scheme.
It should be noted that the sorting result includes a cost sorting result, a time sorting result, a comprehensive sorting result of cost and time, and the like corresponding to the project resource configuration scheme, and the preset scheme policy is a sorting result determined by the provider and a recommended quantity of recommended project resource configuration schemes.
And if the sequencing result is the project resource configuration scheme Q-project resource configuration scheme W-project resource configuration scheme R, taking the project resource configuration scheme Q and the project resource configuration scheme W as target resource configuration schemes, and recommending the target resource configuration schemes to the suppliers so as to enable the suppliers to use the target resource configuration schemes.
In this embodiment, first, when a project resource application instruction is received, a corresponding resource allocation requirement is determined according to the project resource application instruction, then, a plurality of sets of project resource allocation schemes are generated according to the resource allocation requirement and resource information in a project resource pool, then, a scoring value corresponding to each project resource allocation scheme is determined according to a preset rule, and finally, at least one target resource allocation scheme is selected from the plurality of sets of project resource allocation schemes based on the scoring value, and the at least one target resource allocation scheme is recommended. Compared with the prior art that the resource information needs to be checked manually, and the resource allocation scheme is determined according to the resource information, in the embodiment, a plurality of sets of project resource allocation schemes are generated and recommended directly according to the resource allocation requirements and the resource information in the project resource pool, so that the optimal resource allocation scheme is provided for the user in a short time, and the user experience is improved.
Referring to fig. 3, fig. 3 is a flowchart illustrating a resource allocation plan recommendation method according to a second embodiment of the present invention.
Based on the first embodiment, in this embodiment, the step S20 includes:
step S201: and determining project planning time, project resource types and project scale grades according to the resource allocation requirements.
It should be understood that the resource allocation system may determine the project planning time, the project resource type, and the project scale level according to the project development budget, the project development content, and the project planning time in the resource allocation requirement, where it is to be noted that if the project resource type is different, the project planning time is different, and the project development budget is different, the corresponding project scale level is different, for example, the project scale level may be a project scale low level, a project scale medium level, and a project scale high level.
In this embodiment, the type of the project resource may be determined according to the project development content, the project development content requires a provider to provide a project development function requirement and a project application scenario for a developer, the resource configuration system may determine the type of the project resource according to the project application scenario and the project development function requirement, and the type of the project resource may be an entertainment type, a management type, or the like.
Step S202: and determining the project task amount according to the project resource type and the project scale grade.
It should be noted that, corresponding project task volumes are not used due to different project scale levels and different project resource types, and the project task volumes may be determined according to the functional requirements, for example, if a supplier provides 9 functional requirements for project development, the project task volume is represented by 9.
Step S203: and determining resource information in an idle state in the project planning time from a project resource pool.
In this embodiment, the project resource level may be determined according to the project task amount, the to-be-confirmed resource information in the idle state within the project planning time is determined from the project resource pool according to the project resource level, then the idle time corresponding to the to-be-confirmed resource information is obtained, and then the resource information is determined according to the project planning time, the idle time, and the to-be-confirmed resource information.
The processing mode for determining the resource information according to the project planning time, the idle time and the resource information to be confirmed can be to judge whether the idle time is in the project planning time or not, and to take the resource information to be confirmed as the resource information when the idle time is in the project planning time.
Assuming that project planning time is 4 months 2 days-4 months 9 days, project resource levels of project development comprise project resource high levels and project resource low levels, if two resource information of project high level resources are needed and three resource information of project low level resources are needed, resource information to be confirmed in an idle state in a project resource pool comprises high level resource information a, high level resource information b, high level resource information c, low level resource information d, low level resource information e, low level resource information f and low level resource information g, idle time corresponding to the high level resource information a is 4 months 2 days-4 months 5 days, idle time corresponding to the high level resource information b is 4 months 2 days-4 months 9 days, idle time corresponding to the high level resource information c is 4 months 2 days-4 months 10 days, idle time corresponding to the low level resource information d is 4 months 2 days-4 months 5 days, the idle time corresponding to the low-level resource information e is 4 months, 2 days to 4 months and 10 days, the idle time corresponding to the low-level resource information f is 4 months, 2 days to 4 months and 13 days, and the idle time corresponding to the low-level resource information g is 4 months, 2 days to 4 months and 11 days, so that the resource information is high-level resource information b, high-level resource information c, low-level resource information e, low-level resource information f and low-level resource information g.
Step S204: and generating a plurality of groups of project resource configuration schemes according to the project task amount and the resource information.
Determining resource level information according to the project task amount and the resource information, determining resource unit price values corresponding to the resource level information, and determining a plurality of groups of project resource configuration schemes according to the project task amount, the resource unit price values and the resource level information.
The processing mode of determining the multiple groups of project resource configuration schemes according to the project task amount, the resource unit price values and the resource level information is to determine multiple groups of cost resource configuration schemes according to the project task amount, the resource unit price values and the resource level information, determine multiple groups of time resource configuration schemes according to the project task amount and the resource level information, and determine multiple groups of project resource configuration schemes according to the multiple groups of cost resource configuration schemes and the multiple groups of time resource configuration schemes.
In specific implementation, the resource working efficiency may be determined according to the resource level information, and then a plurality of sets of time resource allocation schemes and the like may be determined according to the project task amount, the resource level information, and the resource working efficiency.
It should be noted that the multiple sets of cost resource allocation schemes may be cost resource allocation schemes formed by respectively mixing high-level resource information, intermediate-level resource information, and low-level resource information within a project development budget range, and the like.
The multiple sets of time resource allocation schemes may be time resource allocation schemes formed by respectively mixing high-level resource information, medium-level resource information and low-level resource information in the project planning time, and the like.
The processing method for determining the multiple sets of project resource allocation schemes according to the multiple sets of cost resource allocation schemes and the multiple sets of time resource allocation schemes may be to respectively obtain total project resource scores corresponding to the cost resource allocation schemes, then select multiple sets of resource allocation schemes to be processed from the multiple sets of resource allocation schemes according to the total project cost scores and preset project scores, and determine the multiple sets of project resource allocation schemes according to the multiple sets of resource allocation schemes to be processed and the multiple sets of time resource allocation schemes.
In a specific implementation, the total value of the project cost is the total sum of the project development cost corresponding to the cost resource configuration scheme, and the preset value of the project can be understood as the project development budget and the like. And finally, determining a plurality of sets of project resource allocation schemes according to the plurality of sets of resource allocation schemes to be processed and the plurality of sets of time resource allocation schemes, wherein the plurality of sets of project resource allocation schemes can be understood as project resource allocation schemes meeting project development preset time and project planning time provided by suppliers.
In the embodiment, project planning time, project resource types and project scale levels are determined according to resource configuration requirements, project task volumes are determined according to the project resource types and the project scale levels, resource information in an idle state in the project planning time is determined from a project resource pool, and a plurality of sets of project resource configuration schemes are generated according to the project task volumes and the resource information.
Referring to fig. 4, fig. 4 is a flowchart illustrating a resource allocation plan recommendation method according to a third embodiment of the present invention.
Based on the first embodiment, in this embodiment, the step S40 includes:
step S401: and sequencing a plurality of groups of project resource configuration schemes according to the scoring values to obtain a sequencing result.
It should be noted that the sorting result includes a cost sorting result, a time sorting result, and a comprehensive sorting result of cost and time corresponding to the project resource configuration scheme. And (4) assuming that the scoring value corresponding to the project resource configuration scheme H is 10, the scoring value corresponding to the project resource configuration scheme J is 6, and the scoring value corresponding to the project resource configuration scheme K is 8, sorting according to the scoring values from high to low, wherein the sorting result is the project resource configuration scheme H-the project resource configuration scheme K-the project resource configuration scheme J.
Step S402: and determining at least one target resource configuration scheme based on the sequencing result, and recommending the at least one target resource configuration scheme.
And determining a preset scheme strategy according to the sorting result, determining the number of preset schemes according to the preset scheme strategy and the sorting result, wherein the number of the preset schemes is the number corresponding to the item resource configuration schemes of the recommended suppliers, then determining at least one target resource configuration scheme from the sorting result according to the preset scheme strategy and the number of the preset schemes, and recommending the at least one target resource configuration scheme.
And if the sequencing result is the project resource configuration scheme k-the project resource configuration scheme s-the project resource configuration scheme q, taking the project resource configuration scheme k and the project resource configuration scheme s as target resource configuration schemes, and recommending the target resource configuration schemes to the suppliers so as to enable the suppliers to use the target resource configuration schemes.
In this embodiment, firstly, a plurality of sets of project resource configuration schemes are ranked according to the score values to obtain a ranking result, then at least one target resource configuration scheme is determined based on the ranking result, and the at least one target resource configuration scheme is recommended, compared with the prior art that only a manually determined unique resource configuration scheme exists, and thus a supplier has no selective right, in this embodiment, at least one target resource configuration scheme is determined according to the score values and the ranking result, so that a plurality of choices are provided for the supplier, and further, the user experience is improved.
In addition, an embodiment of the present invention further provides a storage medium, where a resource allocation plan recommendation program is stored on the storage medium, and when executed by a processor, the resource allocation plan recommendation program implements the steps of the resource allocation plan recommendation method described above.
Referring to fig. 5, fig. 5 is a block diagram illustrating a first embodiment of a resource allocation plan recommendation apparatus according to the present invention.
As shown in fig. 5, a resource allocation scheme recommendation apparatus provided in an embodiment of the present invention includes:
the determining module 5001 is configured to determine, when a project resource application instruction is received, a corresponding resource configuration requirement according to the project resource application instruction.
The project resource application instruction can be a resource application instruction input by a provider on a resource configuration system, the resource application instruction includes resource configuration requirements corresponding to project development of the provider, the resource configuration requirements include a project development budget, project development contents, project planning time and the like, the project planning time can be project development starting time, project development finishing time and the like, the project development budget can be a maximum expenditure value of the project development and the like, and the project development contents can be function introduction and the like of a project required to be developed by the provider.
A generating module 5002, configured to generate a plurality of sets of project resource configuration schemes according to the resource configuration requirements and the resource information in the project resource pool.
It should be noted that the resource information in the project resource pool may be a project person name, a project person level, a project person unit price, project person idle time, and project person work efficiency, the project person name may be a project person name or a project person name, the project person level may be a project person post level, such as a high-level engineer, a medium-level engineer, or a low-level engineer, the project person unit price may be a project person daily salary, and the project person idle time may be a date without work status, etc.
The project resource pool comprises a plurality of project personnel names, a plurality of project personnel levels, a plurality of project personnel unit prices, a plurality of project personnel idle time and a plurality of project personnel working efficiency, and the project personnel names, the project personnel levels, the project personnel unit prices, the project personnel idle time and the project personnel working efficiency have one-to-one correspondence relationship.
The project resource configuration scheme comprises project personnel names, project personnel levels, project personnel unit prices, total project cost scores, project planning time and the like required by project development.
The processing mode of generating the multiple groups of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool is to determine project planning time, project resource types and project scale grades according to the resource allocation requirements, then determine project task quantities according to the project resource types and the project scale grades, determine the resource information in idle time in the project planning time from the project resource pool, and generate the multiple groups of project resource allocation schemes according to the project task quantities and the resource information.
It should be understood that the resource allocation system may determine the project planning time, the project resource type, and the project scale level according to the project development budget, the project development content, and the project planning time in the resource allocation requirement, where it is to be noted that different project resource types, different project planning times, and different project development budgets are different, and the corresponding project scale levels are different, for example, the project scale levels may be a project scale low level, a project scale medium level, and a project scale high level, and the project task volumes corresponding to the project scale low level are divided into relatively small quantities each day, and the project task volumes corresponding to the project scale high level are divided into relatively large quantities each day, and the like.
The processing mode of determining the resource information in the idle state in the project planning time from the project resource pool may be determining a project resource level according to the project task amount, and determining the resource information in the idle state in the project planning time from the project resource pool according to the project resource level.
In this embodiment, the resource information to be confirmed that is in an idle state within the project planning time may be determined from the project resource pool according to the project resource level, then the idle time corresponding to the resource information to be confirmed is obtained, and then the resource information is determined according to the project planning time, the idle time, and the resource information to be confirmed.
The processing mode for determining the resource information according to the project planning time, the idle time and the resource information to be confirmed can be to judge whether the idle time is in the project planning time or not, and to take the resource information to be confirmed as the resource information when the idle time is in the project planning time.
Assuming that the project planning time is 7 months 12 days-7 months 27 days, the project resource level of project development comprises project resource high level and project resource low level, if two resource information of project high level resources are needed and four resource information of project low level resources are needed, the resource information to be confirmed in an idle state in the project resource pool comprises high resource information A, high resource information B, high resource information C, low level resource information D, low level resource information E, low level resource information F and low level resource information G, the idle time corresponding to the high resource information A is 7 months 12 days-7 months 30 days, the idle time corresponding to the high resource information B is 7 months 12 days-7 months 20 days, the idle time corresponding to the high resource information C is 7 months 12 days-7 months 28 days, the idle time corresponding to the low level resource information D is 7 months 12 days-7 months 28 days, the idle time corresponding to the low-level resource information E is 7 months, 12 days to 7 months, 27 days, the idle time corresponding to the low-level resource information F is 7 months, 12 days to 7 months, 29 days, the idle time corresponding to the low-level resource information G is 7 months, 12 days to 7 months, 30 days, and the resource information is high-level resource information A, high-level resource information C, low-level resource information D, low-level resource information E, low-level resource information F and low-level resource information G.
The processing mode of generating the multiple sets of project resource allocation schemes according to the project task amount and the resource information may be to determine resource level information according to the project task amount and the resource information, determine resource unit price scores corresponding to the resource level information, and determine the multiple sets of project resource allocation schemes according to the project task amount, the resource unit price scores and the resource level information.
The processing mode of determining the multiple groups of project resource configuration schemes according to the project task amount, the resource unit price values and the resource level information is to determine multiple groups of cost resource configuration schemes according to the project task amount, the resource unit price values and the resource level information, determine multiple groups of time resource configuration schemes according to the project task amount and the resource level information, and determine multiple groups of project resource configuration schemes according to the multiple groups of cost resource configuration schemes and the multiple groups of time resource configuration schemes.
In specific implementation, the resource working efficiency may be determined according to the resource level information, and then a plurality of sets of time resource allocation schemes and the like may be determined according to the project task amount, the resource level information, and the resource working efficiency.
It should be noted that the multiple sets of cost resource allocation schemes may be cost resource allocation schemes formed by respectively mixing high-level resource information, intermediate-level resource information, and low-level resource information within a project development budget range, and the like.
The multiple sets of time resource allocation schemes may be time resource allocation schemes formed by respectively mixing high-level resource information, medium-level resource information and low-level resource information in the project planning time, and the like.
The processing method for determining the multiple sets of project resource allocation schemes according to the multiple sets of cost resource allocation schemes and the multiple sets of time resource allocation schemes may be to respectively obtain total project resource scores corresponding to the cost resource allocation schemes, then select multiple sets of resource allocation schemes to be processed from the multiple sets of resource allocation schemes according to the total project cost scores and preset project scores, and determine the multiple sets of project resource allocation schemes according to the multiple sets of resource allocation schemes to be processed and the multiple sets of time resource allocation schemes.
In a specific implementation, the total value of the project cost is the total sum of the project development cost corresponding to the cost resource configuration scheme, and the preset value of the project can be understood as the project development budget and the like. And finally, determining a plurality of sets of project resource allocation schemes according to the plurality of sets of resource allocation schemes to be processed and the plurality of sets of time resource allocation schemes, wherein the plurality of sets of project resource allocation schemes can be understood as project resource allocation schemes meeting project development preset time and project planning time provided by suppliers.
The determining module 5001 is further configured to determine scoring values corresponding to the resource configuration schemes of the respective projects according to preset rules.
It should be noted that the preset rule may be understood as a scoring rule set for a condition that the provider selects the optimal project resource configuration scheme, for example, if the condition that the provider selects the optimal project resource configuration scheme is cost, the corresponding scoring value is determined according to the total score of the project cost, if the condition that the provider selects the optimal project resource configuration scheme is time, the corresponding scoring value is determined according to the project completion time, and if the condition that the provider selects the optimal project resource configuration scheme is cost and time, the corresponding scoring value is determined by integrating the total score of the project cost and the project completion time, and the scoring value may be represented by a number or a letter.
Assuming that a corresponding scoring value is determined according to the total cost score of the project, if the total cost score of the target resource allocation scheme a is 1.2W, the total cost score of the target resource allocation scheme B is 1.1W, and the total cost score of the target resource allocation scheme C is 1.3W, the scoring value corresponding to the target resource allocation scheme B may be 10, the scoring value corresponding to the target resource allocation scheme a may be 8, the scoring value corresponding to the target resource allocation scheme C may be 6, and the like.
Assuming that the corresponding score value is determined according to the project completion time, the project planning time is 6 months, 7 days to 6 months, 15 days, the project completion time of the time resource configuration scheme D is 6 months, 7 days to 6 months, 11 days, the project completion time of the time resource configuration scheme E is 6 months, 7 days to 6 months, 12 days, and the project completion time of the time resource configuration scheme F is 6 months, 7 days to 6 months, 14 days, the score value corresponding to the time resource configuration scheme D may be 10, the score value corresponding to the time resource configuration scheme E may be 9, the score value corresponding to the time resource configuration scheme F may be 7, and the like.
A recommending module 5003, configured to select at least one target resource configuration scheme from the multiple sets of project resource configuration schemes based on the score value, and recommend the at least one target resource configuration scheme.
It should be noted that, based on the score value, a target resource allocation scheme or a plurality of target resource allocation schemes may be selected from the plurality of sets of project resource schemes and recommended to the supplier, so that the supplier selects an optimal target resource allocation scheme according to the requirement.
The processing mode of selecting at least one target resource configuration scheme from the multiple sets of project resource configuration schemes based on the scoring values and recommending the at least one target resource configuration scheme may be to sort the multiple sets of project resource configuration schemes according to the scoring values to obtain a sorting result, determine the at least one target resource configuration scheme based on the sorting result, and recommend the at least one target resource configuration scheme.
And (4) assuming that the scoring value corresponding to the project resource configuration scheme H is 10, the scoring value corresponding to the project resource configuration scheme J is 6, and the scoring value corresponding to the project resource configuration scheme K is 8, sorting according to the scoring values from high to low, wherein the sorting result is the project resource configuration scheme H-the project resource configuration scheme K-the project resource configuration scheme J.
The processing mode of determining at least one target resource allocation scheme based on the sorting result and recommending the at least one target resource allocation scheme may be determining a preset scheme policy according to the sorting result, determining a preset scheme quantity according to the preset scheme policy and the sorting result, where the preset scheme quantity is a quantity corresponding to the item resource allocation scheme of the recommendation provider, then determining at least one target resource allocation scheme from the sorting result according to the preset scheme policy and the preset scheme quantity, and recommending the at least one target resource allocation scheme.
It should be noted that the sorting result includes a cost sorting result, a time sorting result, a comprehensive sorting result of cost and time, and the like corresponding to the project resource configuration scheme, and the preset scheme policy is a sorting result determined by the provider and a recommended quantity of recommended project resource configuration schemes.
And if the sequencing result is the project resource configuration scheme Q-project resource configuration scheme W-project resource configuration scheme R, taking the project resource configuration scheme Q and the project resource configuration scheme W as target resource configuration schemes, and recommending the target resource configuration schemes to the suppliers so as to enable the suppliers to use the target resource configuration schemes.
In this embodiment, first, when a project resource application instruction is received, a corresponding resource allocation requirement is determined according to the project resource application instruction, then, a plurality of sets of project resource allocation schemes are generated according to the resource allocation requirement and resource information in a project resource pool, then, a scoring value corresponding to each project resource allocation scheme is determined according to a preset rule, and finally, at least one target resource allocation scheme is selected from the plurality of sets of project resource allocation schemes based on the scoring value, and the at least one target resource allocation scheme is recommended. Compared with the prior art that the resource information needs to be checked manually, and the resource allocation scheme is determined according to the resource information, in the embodiment, a plurality of sets of project resource allocation schemes are generated and recommended directly according to the resource allocation requirements and the resource information in the project resource pool, so that the optimal resource allocation scheme is provided for the user in a short time, and the user experience is improved.
Further, the generating module 5002 is further configured to determine project planning time, project resource types, and project scale levels according to the resource configuration requirement;
the generating module 5002 is further configured to determine a project task amount according to the project resource type and the project scale level;
the generating module 5002 is further configured to determine resource information in an idle state in the project planning time from a project resource pool;
the generating module 5002 is further configured to generate a plurality of sets of project resource configuration schemes according to the project task amount and the resource information.
Further, the generating module 5002 is further configured to determine a project resource level according to the project task amount;
the generating module 5002 is further configured to determine resource information in an idle state in the project planning time from a project resource pool according to the project resource level.
Further, the generating module 5002 is further configured to determine, according to the project resource level, resource information to be confirmed that is in an idle state in the project planning time from a project resource pool;
the generating module 5002 is further configured to obtain idle time corresponding to the resource information to be confirmed;
the generating module 5002 is further configured to determine resource information according to the project planning time, the idle time, and the resource information to be confirmed.
Further, the generating module 5002 is further configured to determine whether the idle time is within the project planning time;
the generating module 5002 is further configured to use the resource information to be confirmed as resource information when the idle time is within the project planning time.
Further, the generating module 5002 is further configured to determine resource level information according to the project task amount and the resource information;
the generating module 5002 is further configured to determine a resource unit price score corresponding to the resource level information;
the generating module 5002 is further configured to determine a plurality of sets of project resource configuration schemes according to the project task amount, the resource unit price value, and the resource level information.
Further, the generating module 5002 is further configured to determine a plurality of sets of cost resource configuration schemes according to the project task amount, the resource unit price value, and the resource level information;
the generating module 5002 is further configured to determine a plurality of sets of time resource configuration schemes according to the project task amount and the resource level information;
the generating module 5002 is further configured to determine multiple sets of project resource configuration schemes according to multiple sets of cost resource configuration schemes and multiple sets of time resource configuration schemes.
Further, the generating module 5002 is further configured to obtain total project cost scores corresponding to the cost resource allocation schemes respectively;
the generating module 5002 is further configured to select multiple sets of resource allocation schemes to be processed from multiple sets of resource allocation schemes according to the total project cost score and the project budget score;
the generating module 5002 is further configured to determine multiple sets of project resource configuration schemes according to the multiple sets of resource configuration schemes to be processed and the multiple sets of time resource configuration schemes.
Further, the generating module 5002 is further configured to determine the resource working efficiency according to the resource level information;
the generating module 5002 is further configured to determine a plurality of sets of time resource configuration schemes according to the project task amount, the resource level information, and the resource working efficiency.
Further, the recommending module 5003 is further configured to rank the multiple sets of project resource configuration schemes according to the scoring values to obtain a ranking result;
the recommending module 5003 is further configured to determine at least one target resource configuration scheme based on the sorting result, and recommend the at least one target resource configuration scheme.
Further, the recommending module 5003 is further configured to determine a preset scheme policy according to the sorting result;
the recommending module 5003 is further configured to determine the number of preset solutions according to the preset solution policy and the sorting result;
the recommending module 5003 is further configured to determine at least one target resource configuration scheme from the sorting results according to the preset scheme policy and the preset scheme number, and recommend the at least one target resource configuration scheme.
Other embodiments or specific implementation manners of the resource allocation scheme recommendation device of the present invention may refer to the above method embodiments, and are not described herein again.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or system that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or system. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or system that comprises the element.
The above-mentioned serial numbers of the embodiments of the present invention are merely for description and do not represent the merits of the embodiments.
Through the above description of the embodiments, those skilled in the art will clearly understand that the method of the above embodiments can be implemented by software plus a necessary general hardware platform, and certainly can also be implemented by hardware, but in many cases, the former is a better implementation manner. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which is stored in a storage medium (e.g., a rom/ram, a magnetic disk, an optical disk) and includes instructions for enabling a terminal device (e.g., a mobile phone, a computer, a server, or a network device) to execute the method according to the embodiments of the present invention.
The above description is only a preferred embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.
The invention also discloses A1 and a resource allocation scheme recommendation method, which comprises the following steps:
when a project resource application instruction is received, determining a corresponding resource configuration requirement according to the project resource application instruction;
generating a plurality of groups of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool;
determining scoring values respectively corresponding to the project resource allocation schemes according to preset rules;
and selecting at least one target resource configuration scheme from the multiple groups of project resource configuration schemes based on the scoring values, and recommending the at least one target resource configuration scheme.
A2, the method of A1, wherein the step of generating multiple sets of project resource allocation schemes according to the resource allocation requirement and the resource information in the project resource pool comprises:
determining project planning time, project resource types and project scale grades according to the resource allocation requirements;
determining the project task amount according to the project resource type and the project scale grade;
determining resource information in an idle state in the project planning time from a project resource pool;
and generating a plurality of groups of project resource configuration schemes according to the project task amount and the resource information.
A3, the method of A2, wherein the step of determining the resource information in idle state during the project planning time from the project resource pool comprises:
determining the project resource level according to the project task amount;
and determining the resource information in an idle state in the project planning time from a project resource pool according to the project resource level.
A4, the method of A3, wherein the step of determining resource information in an idle state during the project plan time from a project resource pool according to the project resource level comprises:
determining resource information to be confirmed which is in an idle state within the project planning time from a project resource pool according to the project resource level;
acquiring idle time corresponding to the resource information to be confirmed;
and determining resource information according to the project planning time, the idle time and the resource information to be confirmed.
A5, the method of A4, wherein the step of determining resource information according to the project plan time, the free time and the resource information to be confirmed comprises:
judging whether the idle time is within the project planning time or not;
and when the idle time is in the project planning time, taking the resource information to be confirmed as resource information.
A6, the method of any one of A2-A5, wherein the step of generating sets of project resource allocation plans based on the project task volumes and the resource information comprises:
determining resource level information according to the project task amount and the resource information;
determining a resource unit price value corresponding to the resource level information;
and determining a plurality of groups of project resource configuration schemes according to the project task amount, the resource unit price value and the resource level information.
A7, the method of A6, wherein the step of determining a plurality of sets of project resource allocation schemes based on the project task size, the resource unit price points, and the resource level information comprises:
determining a multi-group cost resource configuration scheme according to the project task amount, the resource unit price value and the resource level information;
determining a plurality of groups of time resource configuration schemes according to the project task amount and the resource level information;
and determining a plurality of sets of project resource allocation schemes according to the plurality of sets of cost resource allocation schemes and the plurality of sets of time resource allocation schemes.
A8, the method of A7, wherein the step of determining multiple sets of project resource allocation schemes based on multiple sets of cost resource allocation schemes and multiple sets of time resource allocation schemes comprises:
respectively acquiring the total item cost values corresponding to the cost resource allocation schemes;
selecting a plurality of groups of resource allocation schemes to be processed from the plurality of groups of resource allocation schemes according to the total project cost scores and the project budget scores;
and determining a plurality of sets of project resource configuration schemes according to the plurality of sets of resource configuration schemes to be processed and the plurality of sets of time resource configuration schemes.
A9, the method of A7, wherein the step of determining multiple sets of time resource allocation schemes based on the project task volume and the resource level information comprises:
determining the working efficiency of the resource according to the resource level information;
and determining a plurality of groups of time resource allocation schemes according to the project task amount, the resource level information and the resource working efficiency.
A10, the method of A1, wherein the step of selecting at least one target resource allocation scheme from the plurality of sets of project resource allocation schemes based on the scoring values and recommending the at least one target resource allocation scheme comprises:
sorting a plurality of groups of project resource configuration schemes according to the scoring values to obtain sorting results;
and determining at least one target resource configuration scheme based on the sequencing result, and recommending the at least one target resource configuration scheme.
A11, the method of A10, wherein the step of determining at least one target resource allocation scheme based on the sorting result and recommending the at least one target resource allocation scheme comprises:
determining a preset scheme strategy according to the sorting result;
determining the number of preset schemes according to the preset scheme strategies and the sequencing results;
and determining at least one target resource configuration scheme from the sequencing result according to the preset scheme strategy and the preset scheme quantity, and recommending the at least one target resource configuration scheme.
The invention also discloses B12, a resource allocation scheme recommendation device, which comprises:
the determining module is used for determining a corresponding resource configuration requirement according to the project resource application instruction when the project resource application instruction is received;
the generating module is used for generating a plurality of groups of project resource configuration schemes according to the resource configuration requirements and the resource information in the project resource pool;
the determining module is further configured to determine scoring values corresponding to the project resource allocation schemes respectively according to preset rules;
and the recommending module is used for selecting at least one target resource configuration scheme from the multiple groups of project resource configuration schemes based on the scoring value and recommending the at least one target resource configuration scheme.
B13, the apparatus as described in B12, the generating module further configured to determine project planning time, project resource type and project scale level according to the resource allocation requirement;
the generating module is further used for determining project task amount according to the project resource type and the project scale grade;
the generating module is further configured to determine resource information in an idle state in the project planning time from a project resource pool;
the generating module is further configured to generate a plurality of sets of project resource configuration schemes according to the project task amount and the resource information.
B14, the apparatus as described in B13, the generating module further configured to determine a project resource level according to the project task amount;
the generation module is further configured to determine resource information in an idle state within the project planning time from a project resource pool according to the project resource level.
B15, the apparatus as described in B14, the generating module further configured to determine the resource information to be confirmed in an idle state in the project planning time from the project resource pool according to the project resource level;
the generating module is further configured to obtain idle time corresponding to the resource information to be confirmed;
the generating module is further configured to determine resource information according to the project planning time, the idle time, and the resource information to be confirmed.
B16, the apparatus as described in B15, the generating module further configured to determine whether the idle time is within the project plan time;
the generating module is further configured to use the resource information to be confirmed as resource information when the idle time is within the project planning time.
B17, the apparatus according to any one of B13-16, the generating module further configured to determine resource level information according to the project task amount and the resource information;
the generation module is further configured to determine a resource unit price score corresponding to the resource level information;
the generating module is further configured to determine a plurality of sets of project resource configuration schemes according to the project task amount, the resource unit price value, and the resource level information.
B18, the apparatus according to B17, the generating module further configured to determine multiple sets of cost resource allocation schemes according to the project task amount, the resource unit price scores and the resource level information;
the generating module is further configured to determine a plurality of sets of time resource configuration schemes according to the project task amount and the resource level information;
the generating module is further configured to determine multiple sets of project resource configuration schemes according to the multiple sets of cost resource configuration schemes and the multiple sets of time resource configuration schemes.
The invention also discloses C19, a resource allocation scheme recommendation device, the device includes: a memory, a processor and a resource allocation scheme recommender stored on the memory and operable on the processor, the resource allocation scheme recommender being configured to implement the steps of the resource allocation scheme recommendation method as described above.
The invention also discloses D20 and a storage medium, wherein the storage medium is stored with a resource allocation scheme recommendation program, and the resource allocation scheme recommendation program realizes the steps of the resource allocation scheme recommendation method when being executed by a processor.

Claims (9)

1. A resource allocation scheme recommendation method is characterized by comprising the following steps:
when a project resource application instruction is received, determining a corresponding resource configuration requirement according to the project resource application instruction;
generating a plurality of groups of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool;
determining scoring values respectively corresponding to the project resource allocation schemes according to preset rules;
selecting at least one target resource configuration scheme from multiple groups of project resource configuration schemes based on the scoring values, and recommending the at least one target resource configuration scheme;
the step of generating a plurality of sets of project resource allocation schemes according to the resource allocation requirements and the resource information in the project resource pool includes:
determining project planning time, project resource types and project scale grades according to the resource allocation requirements;
determining the project task amount according to the project resource type and the project scale grade;
determining resource information in an idle state in the project planning time from a project resource pool;
and generating a plurality of sets of project resource configuration schemes according to the project task amount and the resource information, wherein the plurality of sets of project resource configuration schemes comprise a plurality of sets of cost resource configuration schemes and a plurality of sets of time resource configuration schemes.
2. The method of claim 1, wherein the step of determining resource information from a project resource pool that is idle during the project plan time comprises:
determining the project resource level according to the project task amount;
and determining the resource information in an idle state in the project planning time from a project resource pool according to the project resource level.
3. The method of claim 2, wherein the step of determining resource information from a project resource pool that is idle during the project plan time based on the project resource level comprises:
determining resource information to be confirmed which is in an idle state within the project planning time from a project resource pool according to the project resource level;
acquiring idle time corresponding to the resource information to be confirmed;
and determining resource information according to the project planning time, the idle time and the resource information to be confirmed.
4. The method of claim 3, wherein the step of determining resource information based on the project plan time, the idle time, and the resource information to be confirmed comprises:
judging whether the idle time is within the project planning time or not;
and when the idle time is in the project planning time, taking the resource information to be confirmed as resource information.
5. The method of any of claims 1-4, wherein the step of generating sets of project resource allocation plans based on the project task volumes and the resource information comprises:
determining resource level information according to the project task amount and the resource information;
determining a resource unit price value corresponding to the resource level information;
and determining a plurality of groups of project resource configuration schemes according to the project task amount, the resource unit price value and the resource level information.
6. The method of claim 1, wherein the step of selecting at least one target resource allocation scheme from a plurality of sets of project resource allocation schemes based on the scoring values and recommending the at least one target resource allocation scheme comprises:
sorting a plurality of groups of project resource configuration schemes according to the scoring values to obtain sorting results;
and determining at least one target resource configuration scheme based on the sequencing result, and recommending the at least one target resource configuration scheme.
7. A resource allocation plan recommendation apparatus, characterized in that the resource allocation plan recommendation apparatus comprises:
the determining module is used for determining a corresponding resource configuration requirement according to the project resource application instruction when the project resource application instruction is received;
the generating module is used for generating a plurality of groups of project resource configuration schemes according to the resource configuration requirements and the resource information in the project resource pool;
the determining module is further configured to determine scoring values corresponding to the project resource allocation schemes respectively according to preset rules;
the recommendation module is used for selecting at least one target resource configuration scheme from the multiple groups of project resource configuration schemes based on the scoring value and recommending the at least one target resource configuration scheme;
the generating module is further used for determining project planning time, project resource types and project scale grades according to the resource configuration requirements;
the generating module is further used for determining project task amount according to the project resource type and the project scale grade;
the generating module is further configured to determine resource information in an idle state in the project planning time from a project resource pool;
the generating module is further configured to generate a plurality of sets of project resource configuration schemes according to the project task amount and the resource information, where the plurality of sets of project resource configuration schemes include a plurality of sets of cost resource configuration schemes and a plurality of sets of time resource configuration schemes.
8. A resource allocation scheme recommendation apparatus, characterized in that the apparatus comprises: a memory, a processor and a resource allocation plan recommender stored on the memory and operable on the processor, the resource allocation plan recommender being configured to implement the steps of the resource allocation plan recommendation method according to any of claims 1 to 6.
9. A storage medium having stored thereon a resource allocation plan recommendation program which, when executed by a processor, implements the steps of the resource allocation plan recommendation method according to any one of claims 1 to 6.
CN202110964768.0A 2021-08-23 2021-08-23 Resource allocation scheme recommendation method, device, equipment and storage medium Active CN113421035B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110964768.0A CN113421035B (en) 2021-08-23 2021-08-23 Resource allocation scheme recommendation method, device, equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110964768.0A CN113421035B (en) 2021-08-23 2021-08-23 Resource allocation scheme recommendation method, device, equipment and storage medium

Publications (2)

Publication Number Publication Date
CN113421035A CN113421035A (en) 2021-09-21
CN113421035B true CN113421035B (en) 2021-12-21

Family

ID=77719077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110964768.0A Active CN113421035B (en) 2021-08-23 2021-08-23 Resource allocation scheme recommendation method, device, equipment and storage medium

Country Status (1)

Country Link
CN (1) CN113421035B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002259649A (en) * 2001-03-02 2002-09-13 Hitachi Ltd Cost managing method for project
US20060031078A1 (en) * 2004-08-04 2006-02-09 Barbara Pizzinger Method and system for electronically processing project requests
JP4998615B2 (en) * 2008-03-21 2012-08-15 富士通株式会社 Measure selection program, measure selection device, and measure selection method
US20120226617A1 (en) * 2011-03-01 2012-09-06 Kay Steeve Teong Sin Project management system and template
CN107679737A (en) * 2017-09-29 2018-02-09 广东掌中万维电子有限公司 The method and device of project recommendation

Also Published As

Publication number Publication date
CN113421035A (en) 2021-09-21

Similar Documents

Publication Publication Date Title
US11276120B2 (en) Dashboard interface, platform, and environment for matching subscribers with subscription providers and presenting enhanced subscription provider performance metrics
CN110286974B (en) Application configuration method, device, equipment and storage medium based on H5 page
US20120218594A1 (en) Method and system for fulfilling a customer's print job needs by selecting and assigning the print job to one or more qualified printers from a group of participating printers
CN108803970B (en) Scene matching display method and terminal equipment
CN108279954A (en) A kind of method and device of application program sequence
US7412417B1 (en) Loan compliance auditing system and method
KR100890426B1 (en) Method for integrally managing the product codes and the part codes which are used differently for the same products and the system thereof, and the method and system for product supply chain management using the same
CN113421035B (en) Resource allocation scheme recommendation method, device, equipment and storage medium
CN111209281A (en) Annuity data processing method, device, medium and electronic equipment
CN115619340A (en) Bidding purchase full-service management and control method, device, equipment, system and medium based on intelligent supply chain
CA2967552A1 (en) Infeasibility management in e-sourcing systems
CN116109285A (en) Human resource allocation method, device, equipment and storage medium
CN115222480A (en) Method, system, equipment and computer readable storage medium for generating purchase order
US20230316197A1 (en) Collaborative, multi-user platform for data integration and digital content sharing
CN114819490A (en) Task issuing method, device, equipment and storage medium
CN112132597A (en) Data processing method, device, equipment and storage medium
CN112328450A (en) Data monitoring method and device, computer equipment and storage medium
JP6653604B2 (en) Information processing apparatus and information processing program
CN117196270B (en) Method, system, equipment and medium for issuing work supervision information
CN113204400B (en) Schedule display space distribution method and device, storage medium and electronic equipment
US11126967B2 (en) Dynamic markup language-driven product administration system
Netto et al. An automated approach for scheduling bug fix tasks
CN116739612B (en) Method for displaying rights and interests information and electronic equipment
US11797943B2 (en) Machine learning-based recruitment system and method
Vasconcelos et al. Evaluating the engagement by design methodology in crowdsourcing initiatives

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant