EP2669023A1 - Apparatus and method for manufacturing a large-caliber product using hydroforming - Google Patents

Apparatus and method for manufacturing a large-caliber product using hydroforming Download PDF

Info

Publication number
EP2669023A1
EP2669023A1 EP11856774.2A EP11856774A EP2669023A1 EP 2669023 A1 EP2669023 A1 EP 2669023A1 EP 11856774 A EP11856774 A EP 11856774A EP 2669023 A1 EP2669023 A1 EP 2669023A1
Authority
EP
European Patent Office
Prior art keywords
axial
punches
hydroforming
steel substance
manufacturing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP11856774.2A
Other languages
German (de)
French (fr)
Other versions
EP2669023A4 (en
EP2669023B1 (en
Inventor
Gi Suk Chung
Han Ho Choi
Jin Ho Oh
Yeon Sik Kang
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Posco Holdings Inc
Original Assignee
Posco Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Posco Co Ltd filed Critical Posco Co Ltd
Publication of EP2669023A1 publication Critical patent/EP2669023A1/en
Publication of EP2669023A4 publication Critical patent/EP2669023A4/en
Application granted granted Critical
Publication of EP2669023B1 publication Critical patent/EP2669023B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/041Means for controlling fluid parameters, e.g. pressure or temperature
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/045Closing or sealing means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D26/00Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces
    • B21D26/02Shaping without cutting otherwise than using rigid devices or tools or yieldable or resilient pads, i.e. applying fluid pressure or magnetic forces by applying fluid pressure
    • B21D26/033Deforming tubular bodies
    • B21D26/047Mould construction
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/10Die sets; Pillar guides
    • B21D37/12Particular guiding equipment, e.g. pliers; Special arrangements for interconnection or cooperation of dies
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D53/00Making other particular articles
    • B21D53/26Making other particular articles wheels or the like
    • B21D53/30Making other particular articles wheels or the like wheel rims

Definitions

  • the present invention relates, in general, to an apparatus and method for manufacturing a large-caliber product using a hydroforming process and, more particularly, to an apparatus and method for manufacturing a large-caliber product which can minimize a sealing force that acts in an axial direction of the large-caliber product when the product is manufactured.
  • large-caliber products such as wheel rims for vehicles are produced mainly by roll forming processes.
  • a tube is shaped by several stepwise roll forming operations such that a flange is expanded to reach an area at which a wheel rim makes contact with a tire.
  • the expanded tube is shaped by an additional two or three roll forming operations using rolls which are disposed inside and outside the tube.
  • a size compensation operation using an expander is carried out, thus completely forming a wheel rim for vehicles.
  • the roll forming process is used to manufacture a wheel rim for vehicles, because a tubular steel substance is processed by several stepwise roll forming operations, the productivity is comparatively low.
  • a heat treatment process such as an annealing process must accompany the roll forming process, since severe local work hardening is induced during the roll forming process which is carried out at room temperature.
  • a typical hydroforming process which is used to manufacture a torsion beam for vehicles includes: an operation of bending a tubular steel substance in response to the shape of a final product; an operation of forming the bending-processed steel substance through press work into a shape in which it can be seated into a hydroforming mold; and a hydroforming operation of supplying fluid onto an inner surface of the steel substance and pressurizing the inner surface thereof to expand the diameter of the steel substance, thus completing a final product.
  • the method for manufacturing a large-caliber product using the hydroforming process can provide several advantages, compared to the method using the roll forming process.
  • the problem is that because sealing force that acts in the axial direction of a steel substance when the large-caliber product is formed is very large, it is not easy to manufacture an axial pressurization cylinder or mold which can withstand the large sealing force.
  • an object of the present invention is to provide an apparatus and method for manufacturing a large-caliber product using a hydroforming process which is configured such that axial punches which are disposed at opposite sides of the apparatus so as to be movable towards each other can be coupled to each other, whereby sealing force that acts in the axial direction when the large-caliber product is manufactured can be minimized.
  • the present invention provides an apparatus for manufacturing a large-caliber product using a hydroforming process, including: upper and lower molds into which a tubular steel substance having a large caliber is seated; a first axial punch and a second axial punch disposed on opposite sides of the steel substance so as to be movable towards each other, the first and second axial punches having front surfaces configured so as to be insertable into each other; a first pressurization cylinder and a second pressurization cylinder respectively moving the first axial punch and the second axial punch towards each other and inserting the first and second axial punches into each other, thus forming a sealing space defined by the first and second axial punches and a pressurization space defined by an inner surface of the steel substance and the first and second axial punches; and a hydroforming control unit supplying fluid into the pressurization space through an oil-pressure passage formed in at least one of the first and second axial punches so as to pressurize the inner surface
  • the present invention provides a method for manufacturing a large-caliber product using a hydroforming process, including: a hydroforming preparation operation of seating a steel substance having a large caliber onto a lower mold and moving an upper mold downwards, thus closing an entirety of the upper and lower molds; an axial punch setting operation of moving a first axial punch and a second axial punch towards each other from opposite sides of the steel substance and inserting the first and second axial punches into each other, thus forming a sealing space defined by the first and second axial punches, and a pressurization space defined by an inner surface of the steel substance and the first and second axial punches; and a hydroforming operation of supplying fluid into the pressurization space through at least one of the first and second axial punches and pressurizing the inner surface of the steel substance, thus forming the large-caliber product.
  • an apparatus and method for manufacturing a large-caliber product using a hydroforming process according to the present invention it is possible to produce a final product using only a single process. Thanks to a reduced number of processes, the production cost can be reduced, and the productivity of the apparatus can be markedly enhanced.
  • the hydroforming manufacturing apparatus is advantageous in that a steel substance can be uniformly shaped by hydrostatic pressure of fluid without local work hardening being caused. Therefore, a separate heat treatment process is not required.
  • the hydroforming manufacturing apparatus makes it possible to precisely shape the steel substance.
  • the products produced by the present invention are superior in terms of shape uniformity and roundness (the center of gravity).
  • a hydroforming manufacturing apparatus includes upper and lower molds 1 and 2 into which a steel substance 3 is seated, first and second axial punches 10 and 20 which are moved from opposite sides of the upper and lower molds 1 and 2 into the upper and lower molds 1 and 2 to seal the steel substance 3, and first and second pressurization cylinders 15 and 25 which respectively move the first and second axial punches 10 and 20 in the horizontal direction.
  • first and second pressurization cylinders 15 and 25 which respectively move the first and second axial punches 10 and 20 in the horizontal direction.
  • the steel substance 3 is placed onto the lower mold 2.
  • the upper mold 1 is moved downwards to close the entirety of the molds.
  • the first and second pressurization cylinders 15 and 25 respectively move the first and second axial punches 10 and 20 towards each other from the opposite sides of the upper and lower molds 1 and 2, thus sealing opposite sides of the steel substance 3.
  • a diameter do of each of the first and second axial punches 10 and 20 is the same as a diameter do of the steel substance 3 so that the opposite sides of the steel substance 3 can be sealed.
  • fluid is supplied into the steel substance 3 through an oil-pressure passage 22 which is formed in at least one of the first and second axial punches 10 and 20, thus pressurizing an inner surface of the steel substance 3.
  • Hydrostatic pressure of the fluid that is applied to the steel substance 3 expands the diameter of the steel substance 3.
  • the steel substance 3 is brought into close contact with the upper and lower molds 1 and 2 and thus shaped into a shape of a wheel rim for vehicles.
  • high pressure is also applied to the first and second axial punches 10 and 20.
  • Sufficient sealing force to withstand the high pressure must be applied to the first and second axial punches 10 and 20 so that hydrostatic pressure of the fluid can be continuously applied to the inner surface of the steel substance 3.
  • the sealing force applied to the first and second axial punches 10 and 20 is increased in proportion to a cross-sectional area of a portion to which fluid is applied.
  • the sealing force is increased in proportion to the square of the diameter of the steel substance 3. The reason for this is due to the fact that if the diameter of the steel substance 3 is d0, fluid is applied to the entirety of the cross-sectional area ( ⁇ d 0 2 ) of the first or second axial punch which has the same diameter as that of the steel substance 3. Therefore, when a large-caliber product such as a wheel rim for vehicles is manufactured, sealing force applied to the first and second axial punches 10 and 20 is exponentially increased as the diameter of the product is increased.
  • the apparatus must be remodeled to have high-pressure cylinders which are required to manufacture a large-caliber product. For this, a massive remodeling process is required, and this process is expensive. In the worst case, a layout of the apparatus would be changed in such a way that the molds are not installed, making it impossible to produce a large-caliber product.
  • the inventor of the present invention introduces a method in which the sealing force can be effectively reduced by changing the shaft of the axial punches rather than remodeling the cylinders.
  • an apparatus and method for manufacturing a large-caliber product using a hydroforming process according to the present invention will be described in detail with reference to the attached drawings.
  • a hydroforming manufacturing apparatus includes: upper and lower molds 1 and 2 into which a steel substance 3 having a large caliber is seated; a first axial punch 30 and a second axial punch 40 which are disposed on opposite sides of the steel substance 3 so as to be movable towards the steel substance 3 and respectively have front surfaces that are configured so as to be insertable into each other; a first pressurization cylinder 50 and a second pressurization cylinder 60 which respectively move the first axial punch 30 and the second axial punch 40 and inserts the first and second axial punches 30 and 40 into each other to form a sealing space A defined by both axial punches and a pressurization space B defined by an inner surface of the steel substance and both axial punches; and a hydroforming control unit (not shown) which supplies fluid into the pressurization space through an oil-pressure passage 42 formed in at least one of the first and second axial punches 30 and 40 so as to pressurize the inner surface of
  • the construction of the hydroforming manufacturing apparatus according to the present invention is the same as that of the conventional hydroforming manufacturing apparatus in terms of the fact that the apparatus includes the upper and lower molds 1 and 2 into which the steel substance 3 is seated, the first and second axial punches 30 and 40 which are moved from the opposite sides of the upper and lower molds 1 and 2 towards the steel substance 3 so as to seal the steel substance, and the first and second pressurization cylinders 50 and 60 which horizontally move the first and second axial punches 30 and 40.
  • the hydroforming manufacturing apparatus is configured such that the first axial punch 30 and the second axial punch 40 can be moved towards each other and inserted into the steel substance 3.
  • a diameter d 1 of the first axial punch 30 is smaller than the diameter do of the steel substance 3.
  • a diameter d 2 of the second axial punch 40 is also smaller than the diameter d 0 of the steel substance 3.
  • the diameter of each of the first axial punch 30 and the second axial punch 40 is formed such that a distance between the axial punch and the steel substance is minimized without making contact therebetween.
  • the hydroforming manufacturing apparatus is configured such that the first axial punch 30 and the second axial punch 40 are inserted into each other in the steel substance 3.
  • a protrusion and a depression are formed in the front surface of each axial punch such that the axial punches can correspond to each other.
  • the sealing space A is defined by both axial punches
  • the pressurization space B is defined by the inner surface of the steel substance and both axial punches are formed.
  • the protrusion and the depression of each axial punch can be formed in any shapes, so long as the sealing space A and the pressurization space B can be formed when the axial punches are coupled to each other.
  • the axial punches are coupled to each other, whereby space into which fluid is drawn is limited. Thereby, the cross-sectional area of a portion of each axial punch that makes with fluid can be reduced. As a result, the sealing force corresponding to the hydrostatic pressure of fluid can be reduced.
  • the present invention is based on this technical idea. The inventor of the present invention introduces the following additional elements to embody the above-stated technical idea.
  • Separate sealing members 70 are provided on portions of the first and second axial punches 30 and 40 which form the sealing space A.
  • the technical idea of the present invention is that the sealing space A into which no fluid flows is formed by coupling the first and second axial punches 30 and 40 to each other. Therefore, if fluid enters the sealing space A during the hydroforming process, the effect of reducing the sealing force cannot be obtained.
  • the sealing members 70 are preferably provided on the portions that form the sealing space A.
  • each sealing member 70 is preferably an O-ring. Furthermore, any member can be used as the sealing member 70, so long as it can provide a sealing effect that can prevent fluid from entering the sealing space A.
  • an air hole 32 is formed in at least one of the first and second axial punches 30 and 40 so that air can be discharged to the outside from the sealing space A through the air hole 32. Because the first axial punch 30 and the second axial punch 40 are continuously moved towards each other during the hydroforming process, if the air hole 32 is not formed, air that has been in the sealing space A is compressed, thus acting as reaction force which impedes movement of the first and second axial punches 30 and 40. Since fluid does not enter the sealing space A, the air hole 32 may be configured such that it communicates with the outside of the axial punch.
  • the oil-pressure passage 42 may be formed such that fluid is supplied through a junction 44 between a body of the second axial punch 40 and the inner surface of the steel substance 3.
  • the body of the axial punch and the inner surface of the steel substance are spaced apart from each other by the minimum distance without making contact therebetween. Therefore, when fluid is supplied through the junction between the body of the second axial punch and the inner surface of the steel substance 3, the fluid can be drawn into the pressurization space B through the space between the second axial punch and the steel substance.
  • the oil-pressure passage 42 may be configured such that it communicates with the pressurization space B at a portion 46 that directly meets the pressurization space B.
  • a stepped portion 48 is preferably provided on the second axial punch 40 to seal the corresponding side end of the steel substance 3.
  • the steel substance 3 having a large-caliber is seated onto the lower mold 2, and the upper mold 1 is moved downwards to close the entirety of the molds. Thereafter, the first and second axial punches 30 and 40 which have the front surfaces that can be coupled to each other are respectively disposed on the opposite sides of the steel substance 3 [(a) of Fig. 4 ].
  • the first axial punch 30 and the second axial punch 40 are moved towards the steel substance 3 from the opposite sides of the steel substance 3 and then inserted into each other.
  • the sealing space A which is defined only by the first and second axial punches 30 and 40
  • the pressurization space B which is defined by the inner surface of the steel substance 3 and the first and second axial punches 30 and 40 are formed [(b) of Fig. 4 ].
  • the air hole 32 is formed in at least one of the first and second axial punches 30 and 40, when the first and second axial punches 30 and 40 move forwards, air can be discharged out of the sealing space A through the air hole 32.
  • the reason for this is due to the fact that, if air is compressed in the sealing space A, the compressed air may impede the operation of the first and second axial punches 30 any 40.
  • Fig. 4 shows an embodiment in which fluid is supplied into the junction between the body of the second axial punch 40 and the inner surface of the steel substance 3 through the oil-pressure passage 42 and then drawn into the pressurization space B that is defined in front of the junction.
  • the stepped portions 48 are respectively provided on the first and second axial punches 30 and 40 so that the opposite side ends of the steel substance 3 can be reliably sealed.
  • the oil-pressure passage 42 may be configured such that it directly communicates with the pressurization space B has been illustrated with reference to Fig. 3 .
  • the first axial punch 30 and the second axial punch 40 gradually move forwards to enable the fluid to compensate for expanded space and continuously pressurize the inner surface of the steel substance 3 [(d) of Fig. 4 ].
  • a large-caliber product formed by the hydroforming method is ultimately produced.
  • Fig. 5 shows the result of analysis on the formation of a wheel rim 80 for vehicles produced by the manufacturing method according to the present invention.
  • the present invention makes it possible to more precisely form the steel substance compared to that of the typical roll forming process. Therefore, the products produced by the present invention are superior in terms of shape uniformity and roundness (the center of gravity).

Abstract

The present invention relates to an apparatus and method for manufacturing using a hydroforming process. The apparatus includes: upper and lower molds; first and second axial punches which are disposed on opposite sides of the steel substance so as to be movable towards each other and which have front surfaces configured so as to be insertable into each other; first and second pressurization cylinders which move the first and second axial punches towards each other and insert them into each other, thus forming a sealing space defined by the first and second axial punches and a pressurization space defined by the steel substance and the first and second axial punches; and a control unit which, through an oil-pressure passage formed in at least one of the first and second axial punches, supplies fluid into the pressurization space to pressurize the steel substance, thus forming the large caliber product.

Description

    Technical Field
  • The present invention relates, in general, to an apparatus and method for manufacturing a large-caliber product using a hydroforming process and, more particularly, to an apparatus and method for manufacturing a large-caliber product which can minimize a sealing force that acts in an axial direction of the large-caliber product when the product is manufactured.
  • Background Art
  • Generally, large-caliber products such as wheel rims for vehicles are produced mainly by roll forming processes. In such a roll forming process, a tube is shaped by several stepwise roll forming operations such that a flange is expanded to reach an area at which a wheel rim makes contact with a tire. Thereafter, the expanded tube is shaped by an additional two or three roll forming operations using rolls which are disposed inside and outside the tube. Subsequently, a size compensation operation using an expander is carried out, thus completely forming a wheel rim for vehicles.
  • However, in the case where the roll forming process is used to manufacture a wheel rim for vehicles, because a tubular steel substance is processed by several stepwise roll forming operations, the productivity is comparatively low. In addition, a heat treatment process such as an annealing process must accompany the roll forming process, since severe local work hardening is induced during the roll forming process which is carried out at room temperature.
  • In an effort to overcome the above-mentioned problems of the apparatus using the roll forming process, methods for manufacturing large-caliber products such as wheel rims for vehicles using hydroforming processes are being studied.
  • A typical hydroforming process which is used to manufacture a torsion beam for vehicles includes: an operation of bending a tubular steel substance in response to the shape of a final product; an operation of forming the bending-processed steel substance through press work into a shape in which it can be seated into a hydroforming mold; and a hydroforming operation of supplying fluid onto an inner surface of the steel substance and pressurizing the inner surface thereof to expand the diameter of the steel substance, thus completing a final product.
  • In the case of a large-caliber product that is comparatively short and has a simple shape, such as a wheel rim, it can be formed only by the simple hydroforming process. Therefore, compared to the manufacturing process using the roll forming process which requires several steps to be carried out, the apparatus using the hydroforming process can markedly enhance the productivity. Furthermore, fluid applies hydrostatic pressure to the entirety of the inner surface of the steel substance, thus making it possible to uniformly shape the steel substance without causing local work hardening. Therefore, a separate heat treatment process is not required.
  • As such, the method for manufacturing a large-caliber product using the hydroforming process can provide several advantages, compared to the method using the roll forming process. However, there is a problem that must be solved in order to manufacture a large-caliber product using the hydroforming manufacturing apparatus. The problem is that because sealing force that acts in the axial direction of a steel substance when the large-caliber product is formed is very large, it is not easy to manufacture an axial pressurization cylinder or mold which can withstand the large sealing force.
  • Disclosure Technical Problem
  • Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and an object of the present invention is to provide an apparatus and method for manufacturing a large-caliber product using a hydroforming process which is configured such that axial punches which are disposed at opposite sides of the apparatus so as to be movable towards each other can be coupled to each other, whereby sealing force that acts in the axial direction when the large-caliber product is manufactured can be minimized.
  • Technical Solution
  • In order to accomplish the above object, in an aspect, the present invention provides an apparatus for manufacturing a large-caliber product using a hydroforming process, including: upper and lower molds into which a tubular steel substance having a large caliber is seated; a first axial punch and a second axial punch disposed on opposite sides of the steel substance so as to be movable towards each other, the first and second axial punches having front surfaces configured so as to be insertable into each other; a first pressurization cylinder and a second pressurization cylinder respectively moving the first axial punch and the second axial punch towards each other and inserting the first and second axial punches into each other, thus forming a sealing space defined by the first and second axial punches and a pressurization space defined by an inner surface of the steel substance and the first and second axial punches; and a hydroforming control unit supplying fluid into the pressurization space through an oil-pressure passage formed in at least one of the first and second axial punches so as to pressurize the inner surface of the steel substance, thus forming the large caliber product.
  • In another aspect, the present invention provides a method for manufacturing a large-caliber product using a hydroforming process, including: a hydroforming preparation operation of seating a steel substance having a large caliber onto a lower mold and moving an upper mold downwards, thus closing an entirety of the upper and lower molds; an axial punch setting operation of moving a first axial punch and a second axial punch towards each other from opposite sides of the steel substance and inserting the first and second axial punches into each other, thus forming a sealing space defined by the first and second axial punches, and a pressurization space defined by an inner surface of the steel substance and the first and second axial punches; and a hydroforming operation of supplying fluid into the pressurization space through at least one of the first and second axial punches and pressurizing the inner surface of the steel substance, thus forming the large-caliber product.
  • Advantageous Effects
  • In an apparatus and method for manufacturing a large-caliber product using a hydroforming process according to the present invention, it is possible to produce a final product using only a single process. Thanks to a reduced number of processes, the production cost can be reduced, and the productivity of the apparatus can be markedly enhanced.
  • Furthermore, the hydroforming manufacturing apparatus is advantageous in that a steel substance can be uniformly shaped by hydrostatic pressure of fluid without local work hardening being caused. Therefore, a separate heat treatment process is not required.
  • Moreover, the hydroforming manufacturing apparatus makes it possible to precisely shape the steel substance. Thus, the products produced by the present invention are superior in terms of shape uniformity and roundness (the center of gravity).
  • Description of Drawings
    • Fig. 1 is a view showing a conventional apparatus for manufacturing a large-caliber product using a hydroforming process;
    • Fig. 2 is a view illustrating an apparatus for manufacturing a large-caliber product using a hydroforming process, according to the present invention;
    • Fig. 3 is an enlarged view showing an axial punch of the apparatus of Fig. 2;
    • Fig. 4 is a view illustrating a hydroforming manufacturing method, according to the present invention; and
    • Fig. 5 is a view showing an example of a large-caliber product manufactured by the method according to the present invention.
  • Figure imgb0001
    Description of the Reference Numerals in the Drawings
    Figure imgb0001
    • 1: upper mold 2: lower mold
    • 3: steel substance 30: first axial punch
    • 40: second axial punch 50: first pressurization cylinder
    • 60: second pressurization cylinder 70: sealing member
    • 80: vehicle wheel rim
    Best Mode
  • As described above, if a large-caliber product such as a wheel rim for vehicles is manufactured by the conventional hydroforming manufacturing apparatus, sealing force acting in the axial direction markedly increases, thus making it difficult to operate the apparatus normally. The reason for this will be explained with reference to Fig. 1.
  • A hydroforming manufacturing apparatus includes upper and lower molds 1 and 2 into which a steel substance 3 is seated, first and second axial punches 10 and 20 which are moved from opposite sides of the upper and lower molds 1 and 2 into the upper and lower molds 1 and 2 to seal the steel substance 3, and first and second pressurization cylinders 15 and 25 which respectively move the first and second axial punches 10 and 20 in the horizontal direction. The operation method of the hydroforming manufacturing apparatus will be described below.
  • First, the steel substance 3 is placed onto the lower mold 2. The upper mold 1 is moved downwards to close the entirety of the molds. Thereafter, the first and second pressurization cylinders 15 and 25 respectively move the first and second axial punches 10 and 20 towards each other from the opposite sides of the upper and lower molds 1 and 2, thus sealing opposite sides of the steel substance 3. As shown in sectional view 1-1' of Fig. 1, a diameter do of each of the first and second axial punches 10 and 20 is the same as a diameter do of the steel substance 3 so that the opposite sides of the steel substance 3 can be sealed.
  • After the steel substance 3 has been sealed, fluid is supplied into the steel substance 3 through an oil-pressure passage 22 which is formed in at least one of the first and second axial punches 10 and 20, thus pressurizing an inner surface of the steel substance 3. Hydrostatic pressure of the fluid that is applied to the steel substance 3 expands the diameter of the steel substance 3. As a result, the steel substance 3 is brought into close contact with the upper and lower molds 1 and 2 and thus shaped into a shape of a wheel rim for vehicles. Here, when the steel substance 3 is being shaped by hydrostatic pressure of fluid, high pressure is also applied to the first and second axial punches 10 and 20. Sufficient sealing force to withstand the high pressure must be applied to the first and second axial punches 10 and 20 so that hydrostatic pressure of the fluid can be continuously applied to the inner surface of the steel substance 3.
  • The sealing force applied to the first and second axial punches 10 and 20 is increased in proportion to a cross-sectional area of a portion to which fluid is applied. In more detail, the sealing force is increased in proportion to the square of the diameter of the steel substance 3. The reason for this is due to the fact that if the diameter of the steel substance 3 is d0, fluid is applied to the entirety of the cross-sectional area (π d0 2) of the first or second axial punch which has the same diameter as that of the steel substance 3. Therefore, when a large-caliber product such as a wheel rim for vehicles is manufactured, sealing force applied to the first and second axial punches 10 and 20 is exponentially increased as the diameter of the product is increased.
  • However, because the maximum pressure of the first and second pressurization cylinders 15 and 25 of the hydroforming manufacturing apparatus that has been commercialized is comparatively low, the apparatus must be remodeled to have high-pressure cylinders which are required to manufacture a large-caliber product. For this, a massive remodeling process is required, and this process is expensive. In the worst case, a layout of the apparatus would be changed in such a way that the molds are not installed, making it impossible to produce a large-caliber product.
  • To solve the above-mentioned problems, the inventor of the present invention introduces a method in which the sealing force can be effectively reduced by changing the shaft of the axial punches rather than remodeling the cylinders. Hereinafter, an apparatus and method for manufacturing a large-caliber product using a hydroforming process according to the present invention will be described in detail with reference to the attached drawings.
  • As shown in Figs. 2 and 3, a hydroforming manufacturing apparatus according to the present invention includes: upper and lower molds 1 and 2 into which a steel substance 3 having a large caliber is seated; a first axial punch 30 and a second axial punch 40 which are disposed on opposite sides of the steel substance 3 so as to be movable towards the steel substance 3 and respectively have front surfaces that are configured so as to be insertable into each other; a first pressurization cylinder 50 and a second pressurization cylinder 60 which respectively move the first axial punch 30 and the second axial punch 40 and inserts the first and second axial punches 30 and 40 into each other to form a sealing space A defined by both axial punches and a pressurization space B defined by an inner surface of the steel substance and both axial punches; and a hydroforming control unit (not shown) which supplies fluid into the pressurization space through an oil-pressure passage 42 formed in at least one of the first and second axial punches 30 and 40 so as to pressurize the inner surface of the steel substance 3, thereby forming a large caliber product.
  • Comparing Figs. 1 and 2 to each other, the construction of the hydroforming manufacturing apparatus according to the present invention is the same as that of the conventional hydroforming manufacturing apparatus in terms of the fact that the apparatus includes the upper and lower molds 1 and 2 into which the steel substance 3 is seated, the first and second axial punches 30 and 40 which are moved from the opposite sides of the upper and lower molds 1 and 2 towards the steel substance 3 so as to seal the steel substance, and the first and second pressurization cylinders 50 and 60 which horizontally move the first and second axial punches 30 and 40.
  • However, unlike in the conventional technique, the hydroforming manufacturing apparatus according to the present invention is configured such that the first axial punch 30 and the second axial punch 40 can be moved towards each other and inserted into the steel substance 3. In other words, as shown in sectional view 2-2' of Fig. 3, a diameter d1 of the first axial punch 30 is smaller than the diameter do of the steel substance 3. A diameter d2 of the second axial punch 40 is also smaller than the diameter d0 of the steel substance 3. In more detail, the diameter of each of the first axial punch 30 and the second axial punch 40 is formed such that a distance between the axial punch and the steel substance is minimized without making contact therebetween.
  • Furthermore, the hydroforming manufacturing apparatus according to the present invention is configured such that the first axial punch 30 and the second axial punch 40 are inserted into each other in the steel substance 3. For this, a protrusion and a depression are formed in the front surface of each axial punch such that the axial punches can correspond to each other. When the first axial punch 30 and the second axial punch 40 are moved towards each other by the first pressurization cylinder 50 and the second pressurization cylinder 60 and are coupled to each other, the sealing space A is defined by both axial punches, and the pressurization space B is defined by the inner surface of the steel substance and both axial punches are formed. As such, the protrusion and the depression of each axial punch can be formed in any shapes, so long as the sealing space A and the pressurization space B can be formed when the axial punches are coupled to each other.
  • After the sealing space A and the pressurization space B have been formed by coupling the first and second axial punches 30 and 40 to each other, fluid is supplied, under the control of the hydroforming control unit, into the pressurization space B through the oil-pressure passage 42 which is formed in at least one of the first and second axial punches 30 and 40, thereby pressurizing the inner surface of the steel substance 3. At this time, the fluid does not enter the sealing space A. Therefore, hydrostatic pressure applied by the fluid is limited to the pressurization space B. As a result, a cross-sectional area of a portion to which the hydrostatic pressure is applied is markedly reduced. The sealing force applied to the first axial punch 30 and the second axial punch 40 can also be markedly reduced.
  • As such, the axial punches are coupled to each other, whereby space into which fluid is drawn is limited. Thereby, the cross-sectional area of a portion of each axial punch that makes with fluid can be reduced. As a result, the sealing force corresponding to the hydrostatic pressure of fluid can be reduced. The present invention is based on this technical idea. The inventor of the present invention introduces the following additional elements to embody the above-stated technical idea.
  • Separate sealing members 70 are provided on portions of the first and second axial punches 30 and 40 which form the sealing space A. As stated above, the technical idea of the present invention is that the sealing space A into which no fluid flows is formed by coupling the first and second axial punches 30 and 40 to each other. Therefore, if fluid enters the sealing space A during the hydroforming process, the effect of reducing the sealing force cannot be obtained. To prevent this, the sealing members 70 are preferably provided on the portions that form the sealing space A.
  • Given the fact that each axial punch has a cylindrical shape, each sealing member 70 is preferably an O-ring. Furthermore, any member can be used as the sealing member 70, so long as it can provide a sealing effect that can prevent fluid from entering the sealing space A.
  • Preferably, an air hole 32 is formed in at least one of the first and second axial punches 30 and 40 so that air can be discharged to the outside from the sealing space A through the air hole 32. Because the first axial punch 30 and the second axial punch 40 are continuously moved towards each other during the hydroforming process, if the air hole 32 is not formed, air that has been in the sealing space A is compressed, thus acting as reaction force which impedes movement of the first and second axial punches 30 and 40. Since fluid does not enter the sealing space A, the air hole 32 may be configured such that it communicates with the outside of the axial punch.
  • As shown in the lower portion of Fig. 3, the oil-pressure passage 42 may be formed such that fluid is supplied through a junction 44 between a body of the second axial punch 40 and the inner surface of the steel substance 3. As stated above, the body of the axial punch and the inner surface of the steel substance are spaced apart from each other by the minimum distance without making contact therebetween. Therefore, when fluid is supplied through the junction between the body of the second axial punch and the inner surface of the steel substance 3, the fluid can be drawn into the pressurization space B through the space between the second axial punch and the steel substance. To increase the rate at which fluid is supplied into the pressurization space B, as shown in the upper portion of Fig. 3, the oil-pressure passage 42 may be configured such that it communicates with the pressurization space B at a portion 46 that directly meets the pressurization space B.
  • As shown in Fig. 3, when fluid is supplied through the oil-pressure passage 42 into the junction between the body of the second axial punch 40 and the inner surface of the steel substance 3, some of the fluid flows forwards and enters the pressurization space B, but the rest may flow backwards and leak out of the second axial punch 40. To prevent the leakage, as shown in the enlarged view of Fig. 3, a stepped portion 48 is preferably provided on the second axial punch 40 to seal the corresponding side end of the steel substance 3.
  • Hereinafter, the method for manufacturing the large-caliber product using the hydroforming process according to the present invention will be described in detail with reference to Fig. 4.
  • First, the steel substance 3 having a large-caliber is seated onto the lower mold 2, and the upper mold 1 is moved downwards to close the entirety of the molds. Thereafter, the first and second axial punches 30 and 40 which have the front surfaces that can be coupled to each other are respectively disposed on the opposite sides of the steel substance 3 [(a) of Fig. 4].
  • Subsequently, the first axial punch 30 and the second axial punch 40 are moved towards the steel substance 3 from the opposite sides of the steel substance 3 and then inserted into each other. Thereby, the sealing space A which is defined only by the first and second axial punches 30 and 40, and the pressurization space B which is defined by the inner surface of the steel substance 3 and the first and second axial punches 30 and 40 are formed [(b) of Fig. 4].
  • Because the air hole 32 is formed in at least one of the first and second axial punches 30 and 40, when the first and second axial punches 30 and 40 move forwards, air can be discharged out of the sealing space A through the air hole 32. The reason for this is due to the fact that, if air is compressed in the sealing space A, the compressed air may impede the operation of the first and second axial punches 30 any 40.
  • Thereafter, fluid is supplied into the pressurization space B through at least one of the first and second axial punches 30 and 40, thus pressurizing the inner surface of the steel substance 3 [(c) of Fig. 4]. Fig. 4 shows an embodiment in which fluid is supplied into the junction between the body of the second axial punch 40 and the inner surface of the steel substance 3 through the oil-pressure passage 42 and then drawn into the pressurization space B that is defined in front of the junction.
  • In this case, because some of the fluid may flow backwards and leak out of the second axial punch 40, the stepped portions 48 are respectively provided on the first and second axial punches 30 and 40 so that the opposite side ends of the steel substance 3 can be reliably sealed.
  • Meanwhile, the fact that the oil-pressure passage 42 may be configured such that it directly communicates with the pressurization space B has been illustrated with reference to Fig. 3.
  • After the diameter of the steel substance 3 has started to be expanded by hydrostatic pressure of fluid, the first axial punch 30 and the second axial punch 40 gradually move forwards to enable the fluid to compensate for expanded space and continuously pressurize the inner surface of the steel substance 3 [(d) of Fig. 4]. As a result, a large-caliber product formed by the hydroforming method is ultimately produced.
  • Fig. 5 shows the result of analysis on the formation of a wheel rim 80 for vehicles produced by the manufacturing method according to the present invention. As described above, thanks to the characteristics that hydrostatic pressure of fluid is uniformly applied to the entirety of a steel substance, the present invention makes it possible to more precisely form the steel substance compared to that of the typical roll forming process. Therefore, the products produced by the present invention are superior in terms of shape uniformity and roundness (the center of gravity).
  • Although the preferred embodiment of the present invention has been disclosed for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims.

Claims (8)

  1. An apparatus for manufacturing a large-caliber product using a hydroforming process, comprising:
    upper and lower molds into which a tubular steel substance having a large caliber is seated;
    a first axial punch and a second axial punch disposed on opposite sides of the steel substance so as to be movable towards each other, the first and second axial punches having front surfaces configured so as to be insertable into each other;
    a first pressurization cylinder and a second pressurization cylinder respectively moving the first axial punch and the second axial punch towards each other and inserting the first and second axial punches into each other, thus forming a sealing space defined by the first and second axial punches and a pressurization space defined by an inner surface of the steel substance and the first and second axial punches; and
    a hydroforming control unit supplying fluid into the pressurization space through an oil-pressure passage formed in at least one of the first and second axial punches so as to pressurize the inner surface of the steel substance, thus forming the large caliber product.
  2. The apparatus for manufacturing a large-caliber product using a hydroforming process according to claim 1, wherein sealing members are respectively provided on portions of the first and second axial punches that form the sealing space.
  3. The apparatus for manufacturing a large-caliber product using a hydroforming process according to claim 1, wherein an air hole is formed in at least one of the first and second axial punches so that air can be discharged out of the sealing space through the air hole.
  4. The apparatus for manufacturing a large-caliber product using a hydroforming process according to claim 1, wherein the oil-pressure passage directly communicates with the pressurization space.
  5. The apparatus for manufacturing a large-caliber product using a hydroforming process according to claim 1, wherein stepped portions are respectively provided on the first and second axial punches to seal opposite side ends of the steel substance.
  6. A method for manufacturing a large-caliber product using a hydroforming process, comprising:
    a hydroforming preparation operation of seating a steel substance having a large caliber onto a lower mold and moving an upper mold downwards, thus closing an entirety of the upper and lower molds;
    an axial punch setting operation of moving a first axial punch and a second axial punch towards each other from opposite sides of the steel substance and inserting the first and second axial punches into each other, thus forming a sealing space defined by the first and second axial punches, and a pressurization space defined by an inner surface of the steel substance and the first and second axial punches; and
    a hydroforming operation of supplying fluid into the pressurization space through at least one of the first and second axial punches and pressurizing the inner surface of the steel substance, thus forming the large-caliber product.
  7. The method for manufacturing a large-caliber product using a hydroforming process according to claim 6, wherein the axial punch setting operation comprises discharging air out of the sealing space by moving the first and second axial punches towards each other.
  8. The method for manufacturing a large-caliber product using a hydroforming process according to claim 6, wherein the hydroforming operation comprises sealing opposite side ends of the steel substance using the first axial punch and the second axial punch.
EP11856774.2A 2011-01-24 2011-01-24 Apparatus and method for manufacturing a large-caliber product using hydroforming Active EP2669023B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/KR2011/000486 WO2012102417A1 (en) 2011-01-24 2011-01-24 Apparatus and method for manufacturing a large-caliber product using hydroforming

Publications (3)

Publication Number Publication Date
EP2669023A1 true EP2669023A1 (en) 2013-12-04
EP2669023A4 EP2669023A4 (en) 2016-09-14
EP2669023B1 EP2669023B1 (en) 2019-12-25

Family

ID=46580976

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11856774.2A Active EP2669023B1 (en) 2011-01-24 2011-01-24 Apparatus and method for manufacturing a large-caliber product using hydroforming

Country Status (5)

Country Link
US (1) US20130298628A1 (en)
EP (1) EP2669023B1 (en)
JP (1) JP5838222B2 (en)
CN (1) CN103313808B (en)
WO (1) WO2012102417A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ307376B6 (en) * 2016-12-31 2018-07-11 Západočeská Univerzita V Plzni A method of hot production of hollow bodies from martensitic-austenitic AHS steels using internal overpressure with heating in the tool

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10722932B2 (en) * 2015-10-12 2020-07-28 Ali Sadri Method of fabricating a one-piece metal vehicle wheel by hydro forming process
US10220430B2 (en) * 2015-10-12 2019-03-05 Ali Sadri Method of fabricating a one-piece metal vehicle wheel by hydro forming process
CN110834176A (en) * 2018-08-17 2020-02-25 浙江金固股份有限公司 Rim manufacturing method and wheel manufacturing method
CN109821959A (en) * 2019-02-14 2019-05-31 佛山市南海兴迪机械制造有限公司 A kind of push top for high-pressure molding technique in Large Diameter Pipeline

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2203868A (en) * 1939-06-26 1940-06-11 Mueller Brass Co Apparatus for making wrought metal t's
US3335590A (en) * 1964-08-07 1967-08-15 Boeing Co Accurate control system for axial load bulge forming
US3487668A (en) * 1966-07-12 1970-01-06 Western Electric Co Shaping and forming articles
JPS5360867A (en) * 1976-11-12 1978-05-31 Hitachi Ltd Bulge forming device
JPS5788919A (en) * 1980-11-21 1982-06-03 Hitachi Ltd Bulging facility
US4414834A (en) * 1981-02-05 1983-11-15 Carrier Corporation Method for expanding tubular blanks
JPH02229626A (en) * 1989-02-28 1990-09-12 Showa Alum Corp Seal method for opening end part at the time of bulge working
JPH09239453A (en) * 1996-03-06 1997-09-16 Hitachi Ltd Formation of bellows and device therefor
AU734590B2 (en) * 1997-04-16 2001-06-21 Cosma International Inc. High pressure hydroforming press
JP2001334318A (en) * 2000-05-23 2001-12-04 Aisin Takaoka Ltd Nozzle for hydroforming
KR20030034912A (en) * 2001-10-29 2003-05-09 현대자동차주식회사 Hydroforming molding apparatus using compress casting
JP2004337898A (en) * 2003-05-14 2004-12-02 Nissan Motor Co Ltd Hydraulic forming method and hydraulic forming device for tubular member
DE10343868B3 (en) * 2003-09-23 2004-09-09 Daimlerchrysler Ag Internal high pressure forming plant for high pressure forming has filling attachment connected to transporting device
JP2005262307A (en) * 2004-03-22 2005-09-29 Aisin Takaoka Ltd Manufacturing method and apparatus of hollow metallic component
JP2006122943A (en) * 2004-10-28 2006-05-18 Nissan Motor Co Ltd Nozzle for hydraulic forming, and hydraulic forming apparatus
DE102006047017A1 (en) * 2006-10-02 2008-04-03 Fachhochschule Köln Fakultät für Angewandte Sozialwissenschaften Equipment used for high internal pressure forming of micro-components from tubular workpieces, incorporates carriage guidance system within mold body
KR100815724B1 (en) * 2006-12-21 2008-03-20 주식회사 포스코 Apparatus for manufacturing a pipe having partially expanded shape
DE102009012694A1 (en) * 2008-03-12 2009-12-03 Honda Motor Co., Ltd. Bulge formation process and bulge formation apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CZ307376B6 (en) * 2016-12-31 2018-07-11 Západočeská Univerzita V Plzni A method of hot production of hollow bodies from martensitic-austenitic AHS steels using internal overpressure with heating in the tool

Also Published As

Publication number Publication date
JP5838222B2 (en) 2016-01-06
EP2669023A4 (en) 2016-09-14
CN103313808A (en) 2013-09-18
US20130298628A1 (en) 2013-11-14
JP2014501624A (en) 2014-01-23
CN103313808B (en) 2015-09-09
EP2669023B1 (en) 2019-12-25
WO2012102417A1 (en) 2012-08-02

Similar Documents

Publication Publication Date Title
EP2669023B1 (en) Apparatus and method for manufacturing a large-caliber product using hydroforming
EP0873802B1 (en) Apparatus for hydroforming a metallic tube
KR100286623B1 (en) Metal tube hydraulic bulging processing method and apparatus
US7337641B1 (en) Hydroformed tubular members and method of hydroforming tubular members for vehicles
JPH0739965A (en) Production of hollow integral metal element
EP0588528A1 (en) Apparatus and method for forming and hydropiercing a tubular frame member
JP6638806B2 (en) Method of manufacturing panel-shaped molded product
JP4374399B1 (en) Hydroform processing method and hydroformed product
KR20010072873A (en) Method of hydroforming tubular members
JPH0890097A (en) Method for forming special cross-section tube and device therefor
CN104981305B (en) Multistage pipe fitting Hydroform process
US6237382B1 (en) Method and apparatus for hydroforming metallic tube
JP2007283389A (en) Hydroforming apparatus and hydroforming method
CN104438878A (en) High-pressure gas bulging thermoforming die of boron steel pipe
CN105246612A (en) Method and device for producing a shaped component
JP4696334B2 (en) Hydroform method
US20120139148A1 (en) Manufacturing method for diffuser
KR101916352B1 (en) Method for manufacturing outboard seal for bearing of vehicles
US20070017267A1 (en) Apparatus and method for performing a hydroforming process
US7472572B2 (en) Method and apparatus for gas management in hot blow-forming dies
JP4459834B2 (en) Hydroforming apparatus and method
EP1104688A1 (en) Method and Apparatus for simultaneously performing multiple hydroforming operations
KR101138187B1 (en) Apparatus for manufacturing large caliber product using hydroforming and method thereof
JP2012045618A (en) Method of manufacturing diffuser
US20070169530A1 (en) Techniques for reducing wall thinning during a hydroforming operation

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20130612

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20160811

RIC1 Information provided on ipc code assigned before grant

Ipc: B21D 53/30 20060101ALI20160805BHEP

Ipc: B21D 26/047 20110101ALI20160805BHEP

Ipc: B21D 26/045 20110101ALI20160805BHEP

Ipc: B21D 26/033 20110101AFI20160805BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190717

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011064286

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1216599

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200115

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20191225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200325

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200326

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200520

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200425

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602011064286

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200124

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1216599

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

26N No opposition filed

Effective date: 20200928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200124

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011064286

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG-SI, KR

Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011064286

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG- SI, KR

Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011064286

Country of ref document: DE

Owner name: POSCO HOLDINGS INC., KR

Free format text: FORMER OWNER: POSCO, POHANG-SI, GYEONGSANGBUK-DO, KR

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20221027 AND 20221102

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20221220

Year of fee payment: 13

Ref country code: FR

Payment date: 20221220

Year of fee payment: 13

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011064286

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG-SI, KR

Free format text: FORMER OWNER: POSCO HOLDINGS INC., SEOUL, KR

Ref country code: DE

Ref legal event code: R081

Ref document number: 602011064286

Country of ref document: DE

Owner name: POSCO CO., LTD, POHANG- SI, KR

Free format text: FORMER OWNER: POSCO HOLDINGS INC., SEOUL, KR

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20221220

Year of fee payment: 13