EP2616306A1 - Verfahren zur visualisierung der gleisbelegung - Google Patents
Verfahren zur visualisierung der gleisbelegungInfo
- Publication number
- EP2616306A1 EP2616306A1 EP11757230.5A EP11757230A EP2616306A1 EP 2616306 A1 EP2616306 A1 EP 2616306A1 EP 11757230 A EP11757230 A EP 11757230A EP 2616306 A1 EP2616306 A1 EP 2616306A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- train
- time
- diagram
- visualizing
- coordinate system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 7
- 238000010586 diagram Methods 0.000 claims abstract description 15
- 230000001934 delay Effects 0.000 abstract description 7
- 230000003111 delayed effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 229940000425 combination drug Drugs 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or trains
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L21/00—Station blocking between signal boxes in one yard
- B61L21/06—Vehicle-on-line indication; Monitoring locking and release of the route
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/02—Indicating or recording positions or identities of vehicles or trains
- B61L25/025—Absolute localisation, e.g. providing geodetic coordinates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L25/00—Recording or indicating positions or identities of vehicles or trains or setting of track apparatus
- B61L25/06—Indicating or recording the setting of track apparatus, e.g. of points, of signals
- B61L25/08—Diagrammatic displays
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/14—Following schedules
Definitions
- the invention relates to a method for visualizing the track occupancy in a train running succession and / or Werner- planning system of the railway safety technology for at least one train on the basis of a time-way-line diagram (ZWL diagram), as Computer graphics is created.
- ZWL diagram time-way-line diagram
- a means to detect track occupancy conflict immediately is the visual representation by means of a time-distance line Dia ⁇ program, which is commonly referred to as ZWL diagram.
- a time-distance line is entered for each train. This makes it clear for each train run, at what time the train should be scheduled at what place.
- a line indicates the current situa ⁇ tion at time t.
- Train tracking systems in the form of ZWL diagrams with target and actual data for each train at time t enable the detection of delays and the risk of collision.
- the clarity of the graphical visualization, ie the user interface is rather suboptimal.
- the invention is based on the object of providing a method for visualizing the track occupancy in a train track Railway and / or train scheduling system of the railway safety technology for at least one train on the basis of a ZWL diagram that is created as a computer graphic, admit ⁇ , which allows a better visibility of a track occupancy ⁇ conflict in connection with a delay situation.
- the object is achieved in that the path is graphically displayed in a three-dimensional coordinate system as a function of time and another, a Versharidian ⁇ tungszeit characterizing coordinate.
- Figure 1 is a diagram according to the prior art and Figure 2 is a diagram of the invention.
- FIG. 1 shows a ZWL diagram (time-distance-line diagram) of a form of representation which is widely used and explained above.
- FIG. 2 shows the use according to the invention of a delay time as the third dimension.
- ⁇ be ZWL diagram according to FIG. 1
- the 3D display Positioning is possible for both train scheduling and train running in real time. The higher the bar, the longer the delay. In the 3D diagram it can be seen immediately that in the future, delays can suddenly arise, which are slowly reduced in the course of time.
- suitable software components the parameters can be continuously recalculated during real operation.
- a scheduling component of a traffic ⁇ medium operator calculates the delay of rail vehicles ⁇ based on an actual-target comparison with respect to the Fahr ⁇ plan. This allows you to anticipate how delays affect the entire system. Appropriate measures to minimize delays can be initiated and optimized at an early stage.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Processing Or Creating Images (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102010045461A DE102010045461A1 (de) | 2010-09-14 | 2010-09-14 | Verfahren zur Visualisierung der Gleisbelegung |
PCT/EP2011/065250 WO2012034878A1 (de) | 2010-09-14 | 2011-09-05 | Verfahren zur visualisierung der gleisbelegung |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2616306A1 true EP2616306A1 (de) | 2013-07-24 |
EP2616306B1 EP2616306B1 (de) | 2017-06-28 |
Family
ID=44651714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11757230.5A Not-in-force EP2616306B1 (de) | 2010-09-14 | 2011-09-05 | Verfahren zur visualisierung der gleisbelegung |
Country Status (7)
Country | Link |
---|---|
US (1) | US8662454B2 (de) |
EP (1) | EP2616306B1 (de) |
CN (1) | CN103097227B (de) |
DE (1) | DE102010045461A1 (de) |
DK (1) | DK2616306T3 (de) |
ES (1) | ES2641297T3 (de) |
WO (1) | WO2012034878A1 (de) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6498308B2 (ja) * | 2015-09-29 | 2019-04-10 | 株式会社日立製作所 | 運行状況表示システム |
US10279823B2 (en) * | 2016-08-08 | 2019-05-07 | General Electric Company | System for controlling or monitoring a vehicle system along a route |
CN107330012B (zh) * | 2017-06-15 | 2019-08-30 | 中国电子科技集团公司第二十八研究所 | 一种海量空间目标处理方法 |
EP3530547A1 (de) * | 2018-02-21 | 2019-08-28 | ALSTOM Transport Technologies | Verfahren und system zur durchführung eines planungsprozesses eines zugverkehrsdienstes |
CN110104025B (zh) * | 2019-04-24 | 2024-07-09 | 南京南瑞继保电气有限公司 | 一种轨道交通系统中列车实时位置可视化展示方法及系统 |
US11193683B2 (en) * | 2019-12-31 | 2021-12-07 | Lennox Industries Inc. | Error correction for predictive schedules for a thermostat |
CN112644559B (zh) * | 2021-01-04 | 2022-12-02 | 北京全路通信信号研究设计院集团有限公司 | 轨道区段显示状态的确定方法、装置、设备和介质 |
CN112793631B (zh) * | 2021-01-07 | 2021-07-06 | 北京交通大学 | 一种列车退出正线运营条件下的地铁行车调整方法及系统 |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE795267A (fr) * | 1972-02-10 | 1973-05-29 | Secretary Environment Brit | Systemes de transport |
US3953714A (en) * | 1972-09-22 | 1976-04-27 | Agence Nationale De Valorisation De La Recherche (Anvar) | Method of and means for controlling the movement of self-propelled bodies traveling in a fixed order along a track |
US5177684A (en) * | 1990-12-18 | 1993-01-05 | The Trustees Of The University Of Pennsylvania | Method for analyzing and generating optimal transportation schedules for vehicles such as trains and controlling the movement of vehicles in response thereto |
US7539624B2 (en) * | 1994-09-01 | 2009-05-26 | Harris Corporation | Automatic train control system and method |
US5623413A (en) * | 1994-09-01 | 1997-04-22 | Harris Corporation | Scheduling system and method |
US7092894B1 (en) * | 1994-09-01 | 2006-08-15 | Harris Corporation | Cost reactive scheduler and method |
JP3653954B2 (ja) | 1997-10-23 | 2005-06-02 | トヨタ自動車株式会社 | 移動体交通制御システムの移動体装置、移動体交通制御システムの管制局、移動体交通制御システム |
US6848657B2 (en) * | 2002-01-17 | 2005-02-01 | The Creative Train Company, Llc | Dynamic self-teaching train track layout learning and control system |
US7725249B2 (en) * | 2003-02-27 | 2010-05-25 | General Electric Company | Method and apparatus for congestion management |
DE102006002607B4 (de) | 2006-01-16 | 2007-12-27 | Siemens Ag | Verfahren und Vorrichtung zur Zugfolgesicherung |
EP1990788B1 (de) * | 2006-03-01 | 2012-09-05 | Toyota Jidosha Kabushiki Kaisha | Verfahren zur bestimmung eines fahrzeug-fahrwegs und vorrichtung zur bestimmung eines fahrzeug-fahrwegs |
US8082071B2 (en) * | 2006-09-11 | 2011-12-20 | General Electric Company | System and method of multi-generation positive train control system |
US8433461B2 (en) * | 2006-11-02 | 2013-04-30 | General Electric Company | Method of planning the movement of trains using pre-allocation of resources |
-
2010
- 2010-09-14 DE DE102010045461A patent/DE102010045461A1/de not_active Withdrawn
-
2011
- 2011-09-05 US US13/822,457 patent/US8662454B2/en not_active Expired - Fee Related
- 2011-09-05 ES ES11757230.5T patent/ES2641297T3/es active Active
- 2011-09-05 DK DK11757230.5T patent/DK2616306T3/en active
- 2011-09-05 CN CN201180043929.7A patent/CN103097227B/zh not_active Expired - Fee Related
- 2011-09-05 WO PCT/EP2011/065250 patent/WO2012034878A1/de active Application Filing
- 2011-09-05 EP EP11757230.5A patent/EP2616306B1/de not_active Not-in-force
Non-Patent Citations (1)
Title |
---|
See references of WO2012034878A1 * |
Also Published As
Publication number | Publication date |
---|---|
US8662454B2 (en) | 2014-03-04 |
DK2616306T3 (en) | 2017-09-18 |
CN103097227A (zh) | 2013-05-08 |
DE102010045461A1 (de) | 2012-03-15 |
ES2641297T3 (es) | 2017-11-08 |
WO2012034878A1 (de) | 2012-03-22 |
CN103097227B (zh) | 2016-03-23 |
EP2616306B1 (de) | 2017-06-28 |
US20130168504A1 (en) | 2013-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2012034878A1 (de) | Verfahren zur visualisierung der gleisbelegung | |
EP1466803A1 (de) | Verfahren zur Vorgabe einer Geschwindigkeit für ein Schienenfahzeug | |
EP1977950B1 (de) | Verfahren zur wirkungsbezogenen Beurteilung der Lagequalität eines Gleises | |
EP3089895B1 (de) | Verfahren und steuergerät zum betrieb eines fahrzeugs, insbesondere eines schienenfahrzeugs. | |
EP3782869B1 (de) | Verfahren zur steuerung eines zugs innerhalb eines zugsicherungssystems, zugsicherungssystem | |
DE19828878A1 (de) | Verfahren zur Datenreduktion im Bahnbetrieb | |
EP3787950B1 (de) | Verfahren und einrichtung zum erkennen hinterherfahrender fahrzeuge | |
EP2619067B1 (de) | Verfahren zur automatischen steuerung einer mehrzahl spurgebundener fahrzeuge | |
EP3075626B1 (de) | Verfahren und system zum betrieb einer gleisanlage | |
WO2018036759A1 (de) | Vorhersage des zuglaufs | |
DE102008027488B4 (de) | Vorrichtung zur Simulation von Balisen | |
EP4175864A1 (de) | Verfahren zur überprüfung eines lichtraums für ein schienenfahrzeug | |
WO1998007609A1 (de) | Verfahren und vorrichtung zur steuerung und überwachung einer verkehrstechnischen anlage | |
DE102020213777A1 (de) | Simulationseinrichtung und Verfahren zum Simulieren einer Fahrt eines Schienenfahrzeugs | |
DE19924497C2 (de) | Verfahren zur Konsistenzprüfung von Informationen über Linienführungen | |
DE102019212655A1 (de) | Ermittlung und/oder Optimierung einer Effizienz einer Lichtsignalsteuerung | |
WO2014114485A2 (de) | Verfahren und vorrichtung zur etcs -l1 - und/oder -l2 - zugbeeinflussung | |
EP3541680A2 (de) | Verfahren und eisenbahnkomponente zum übertragen von nachrichten | |
DE102013003846A1 (de) | System und Verfahren zur interaktiven Projektierung von Freileitungsanlagen | |
EP4087766B1 (de) | Anordnung zum testen von etcs-level-2-funktionalitäten im schienenverkehr | |
Wagner | Influence of train and traffic control on railway station capacity | |
DE102016218460A1 (de) | Verfahren zum Betreiben einer rangiertechnischen Ablaufanlage sowie Steuereinrichtung für eine solche | |
DE102015217596A1 (de) | Kommunikationseinrichtung und Verfahren zum automatisierten Austausch von Nachrichten in einer eisenbahntechnischen Anlage | |
EP4378793A1 (de) | Verfahren zum bestimmen eines geschwindigkeitswertes eines spurgeführten fahrzeugs | |
EP3812239A1 (de) | Rechnergestützte plattform zur darstellung einer bahninfrastruktur und verfahren zu deren betrieb |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20130301 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20150629 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 502011012521 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: B61L0027000000 Ipc: B61L0025020000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 25/02 20060101AFI20170118BHEP |
|
INTG | Intention to grant announced |
Effective date: 20170206 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 904558 Country of ref document: AT Kind code of ref document: T Effective date: 20170715 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG, CH |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502011012521 Country of ref document: DE |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: SIEMENS AKTIENGESELLSCHAFT |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20170911 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PCOW Free format text: NEW ADDRESS: WERNER-VON-SIEMENS-STRASSE 1, 80333 MUENCHEN (DE) |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20170628 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170929 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2641297 Country of ref document: ES Kind code of ref document: T3 Effective date: 20171108 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170928 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171028 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502011012521 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
26N | No opposition filed |
Effective date: 20180329 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170905 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171002 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20180924 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20180911 Year of fee payment: 8 Ref country code: AT Payment date: 20180806 Year of fee payment: 8 Ref country code: BE Payment date: 20180919 Year of fee payment: 8 Ref country code: FI Payment date: 20180920 Year of fee payment: 8 Ref country code: NL Payment date: 20180911 Year of fee payment: 8 Ref country code: DK Payment date: 20180921 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20181119 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20181217 Year of fee payment: 8 Ref country code: CH Payment date: 20181210 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20110905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170628 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502011012521 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: MAE |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20190930 Ref country code: NO Ref legal event code: MMEP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190905 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20191001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 Ref country code: NO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191001 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200401 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170628 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190930 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 904558 Country of ref document: AT Kind code of ref document: T Effective date: 20190905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20190905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190930 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190905 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190905 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20210127 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190906 |