EP2603332A1 - Ermittlungsverfahren für steuergrössen einer walzstrasse mit mehreren walzgerüsten zum walzen eines metallbandes - Google Patents
Ermittlungsverfahren für steuergrössen einer walzstrasse mit mehreren walzgerüsten zum walzen eines metallbandesInfo
- Publication number
- EP2603332A1 EP2603332A1 EP11763870.0A EP11763870A EP2603332A1 EP 2603332 A1 EP2603332 A1 EP 2603332A1 EP 11763870 A EP11763870 A EP 11763870A EP 2603332 A1 EP2603332 A1 EP 2603332A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- rolling
- stand
- computer
- trajectories
- band
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/58—Roll-force control; Roll-gap control
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/041—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a variable is automatically adjusted to optimise the performance
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
Definitions
- the present invention relates to a determination method for control variables of a rolling mill having a plurality of rolling mills for rolling a metal strip.
- the present invention further relates to a Computerpro ⁇ program comprising machine code that can be executed directly by a computer and whose execution caused by the computer that the computer executes such a discovery information model.
- the present invention further relates to a computer which is designed such that it carries out such Ermitt ⁇ treatment method. Furthermore, the present invention relates to a rolling mill with several rolling mills for rolling metal strip, which is equipped with such a computer.
- rolling mills for example in the finishing train of a hot strip mill - mainly the band geometry, ie Di ⁇ bridge, profile and flatness, set.
- the rolling train consists of at least one scaffold, usually of several scaffolding.
- the rolling mill is provided with two automation ⁇ s ists really:
- the basic automation In the basic automation is the technological control, which works in real time and usually with Abtastra ⁇ th in the range of a few milliseconds allows the processing of very fast control operations. Due to the low computation power and the short sampling time, models used there are generally so simplified compared to reality that only local statements are possible.
- the strip thickness control In the basic automation ⁇ tion, the strip thickness control is executed. You rea- yaws mainly in retrospect, that is used mainly kei ⁇ nerlei knowledge, the band-temperature measurements were available, for example because of pre ⁇ . One exception is the FeedForward AGC, which is at least partially piloted.
- the setup for the tape head is calculated. Furthermore, the band-to-band adaptation is carried out there.
- the programmed there models are nonlinear, provide information on the global behavior of tape and rolling mill and are more complex than the models of the basic automation usually a saufa ⁇ ches. It is also common practice to derive sensitivities from process automation that can be used to build local models in basic automation. In the prior art, it is not common to run the process automation models in real time, except, of course, that a tape head setup is calculated before the tape head enters the mill train. Process automation initiali ⁇ thus Siert the thickness control of the basic automation on the tape head. Process automation are readings of game, discloses the pre-strip at ⁇ with which an anticipatory thickness control would be possible.
- the basic automation for the control, the process computer for the setup on the tape head and the adaptation is responsible.
- the process computer usually uses band segments. These are software representations of sections of rolled material of given length.
- a regulation in the prior art in the process computer only with respect to the final rolling temperature.
- a model predictive temperature control is known in the art, see for example DE 103 21 791 AI.
- the basic automation essentially takes over the calculation of the process computer for the tape head and then executes a control in real time along the tape.
- Vorzugswei- is se first carried out a correction of the calculated exit thickness with a so-called AGC, by the gemes ⁇ sene rolling force with the expected rolling force is compared and is carried Hooke than the spring constant of the framework according to the (linearized overbased) law correction of the exit thickness.
- the framework is more pressed than expect ⁇ tet, ie the thickness must be calculated exit ⁇ yaws upward Corridor. Since you do not want that, by reducing the setting of the framework of the roll gap immediately reduced by a corresponding amount, so that again the desired exit thickness arises.
- the basic automation is responsible for the adjustment of given trains and positions of the
- Ski lifter (Looper).
- the trains are set with the loopers and the engine speeds of the scaffold engines constantly adjusted so that the Looper come to rest in a certain position.
- the thickness control is also in the basic automation. Once a measured tape thickness is available (i.e., the tape head has exited the road), one can compare the measured thickness to the expected tape thickness and apply the zero point correction error to the zero point of the job. Since usually only behind the last framework the thickness is measured, the error must be distributed over several scaffolding usually. A relatively simple control corrects the settings of the scaffolds starting from the last scaffolding and, if necessary, also suitably adapts the scaffold speeds.
- the prior art is still a Smith predictor for the thickness control.
- the first thing that is deducted is what was activated earlier.
- the previously switched values are taken from a memory.
- the adjusted deviation is fed to a moving averaging, bounded, once again slightly smoothed and placed directly on the last stand.
- Upstream scaffolds also receive an intrusion, but attenuated with a respective time constant corresponding to the duration of a point from the respective band Ge ⁇ Jost until the thickness gauge. Thus, upstream scaffolds receive a corresponding correction.
- the last frame is usually the guide for the belt speed.
- Interference in the employment of scaffold The effect of a change in thickness is that the speeds of the upstream stands must also be changed.
- the speed of the scaffold motors of upstream stands is suitably precontrolled while the strip thickness is changed.
- the expected exit thicknesses are compared with the target thicknesses assigned to the points,
- the scaffolding adjustments are connected before the shrinkage of the sheet to a curve such that the Anstel ⁇ ment is given as a function of sheet metal progress, and - the sheet is rolled in accordance with the predetermined adjustment curve of Ge ⁇ equipment.
- Heavy plate is, seen in the direction of the plate, relatively short.
- the plate is therefore divided in the prior art in a relatively small number of points, for example, seven Punk ⁇ te. Due to the small number of points, it is possible for heavy plate to execute the entire calculation before entering the heavy plate into the framework. Furthermore, there are no situations which simultaneously detects more than one scaffold, the heavy plate, and thereby couples the production process at rough ⁇ sheet.
- Steckel rolling mills have - also as heavy plate mills - usually only a single rolling stand on.
- the object of the present invention is to provide possibilities by means of which as far as possible a forward-looking control of the strip thickness in the rolling mill ⁇ road is possible, with known disturbances and plant limits can be considered.
- each parameter of the respective tape point are determined by means of the rolling-force model, to which the respective strip point enters into the respective rear roll stand,
- trajectories for the setting frame sizes can be calculated on the basis of the adjusting frame sizes assigned to the band points, at least for the rear rolling stands,
- Runs tape point in the front roll stand extend to the time at which the respective band point enters the respective rear roll stand.
- Einstellgerüstaisen usually the rolling force or the roll stand position are used.
- other Einstellgerüstissen are sorted ⁇ but used, either in addition, whether an alternative to the above sizes. Examples of other Einstellgerüstieren are the rolling moment, the trains (inlet and outlet side), the back bending and even ⁇ TULLE an intermediate stand cooling.
- the parameters of the band points can be temperature parameters, for example the temperature or the enthalpy, if appropriate including phase components.
- the parameters of the band points can be geometry parameters such as, for example, the strip thickness, the profile and the flatness.
- the Einstellgerüstieren are the approach control variables of the rolling mill.
- the term Einstellgerüstieren is narrower than the term control variables, since the Einstellgerüst ⁇ sizes are always based on a particular of the rolling stands.
- the trajectories can also be determined for the front rolling mill, provided that the determination of the setting stand sizes is completed in good time prior to the arrival of the respective hinge point in the front roll stand. But it is sufficient if the trajectories of setting ⁇ scaffolding sizes are calculated only for the rear roll stands.
- the trajectories are calculated. In this case, there are two ways to use the trajectories.
- the trajectories are at least partially transmitted to a basic automation, so that they are the basic control as the course of desired regulated ⁇ sizes for the rear roll stands are available.
- DA by the controller of the basic automation can regulate in advance and, for example, setpoint changes better vorsteu ⁇ ren.
- the trajectories are calculated with a modeling period.
- the trajectories are transmitted to ⁇ least for a control period of the basic automation, which is greater than the modeling period.
- DA by a continuous control by the base car ⁇ automation also possible if the parent process computer executing investigation according to the invention, due to special circumstances comes out of step (the process computer, so to speak "hat times").
- the trajectories it is possible for the trajectories to be evaluated before triggering the rolling stand for which the respective trajectory is valid and for it to be decided as a function of the evaluation whether and, if so, how the setting frame sizes are varied.
- loads which only arise from the synopsis of the rolling stands can be determined and evaluated.
- An example of such a load is the total power requirement of the mill train.
- performance limits of the system for example, the maximum possible torque of a rolling mill drive - be ⁇ reached.
- the trajectories are usually calculated with a modeling period. Takes place, however, the evaluation of Tra ⁇ trajectories with an evaluation horizon that is a multiple of the modeling period.
- the ratio of evaluation horizon Modell istsperio ⁇ de usually at least 10. 1,.
- the trajectories of the setting frame sizes can be determined.
- the respective Bandyak also the expected framework sizes are assigned and that also the trajectories for the expected framework sizes can be calculated.
- the determination method according to the invention is carried out cyclically and in real time. This is particularly desirable for the period during which at least ei ⁇ nes of the roll stands of the rolling train is engaged, that is, when at least one point of the metal strip is rolled.
- determination rules by which the expected framework sizes, the parameters of the band points and the Einstellgerüstieren are determined, continuous maps. This results in - at least as a rule - relatively smooth tra ectories.
- At least a definitive ⁇ term parameters of the respective tape point is detected after the expiry of the respective tape point from the rolling mill that the rolling-force model based on the detected final Parame ⁇ ters and behind the last roll stand of the rolling mill he ⁇ waited parameter in real time is adapted and that the expected parameters of those band points that have already run into the rolling mill, be tracked in real time.
- the erfindungsge ⁇ Permitted investigation by the adaptation of the rolling-force model and the tracking of the expected parameters for those those strip points whose parameters were tracked, is carried out again and that for the renewed execution of the investigation process that rolling mill is considered as a front rolling ⁇ scaffold, in which the respective band point whose parameters were tracked next enters.
- rolling mill is considered as a front rolling ⁇ scaffold, in which the respective band point whose parameters were tracked next enters.
- the time of detection of the initial parameters of the respective tape guiding principle a point schwindtechniksverlauf known, with which the respective band ⁇ point to pass through the rolling line at the latest.
- One way to determine a Leit eins is described in particular in the older, on the filing date of the present invention not yet disclosed European Patent Application 10162135.7 from 06.05.2010.
- the object is further achieved by a computer program of the type mentioned.
- the Ab ⁇ processing causes the machine code by the computer, that the computer executes an inventive investigation.
- the object is further achieved by a computer which is configured such that it performs an inventive Determined ⁇ averaging method.
- the object is further achieved by a rolling mill with several rolling stands for rolling metal strip, which is equipped with a computer according to the invention.
- a rolling train has a plurality of rolling stands 1. Shown in FIG 1 are four such rolling stands 1. This number is usually the minimum. Often even five to eight rolling stands 1 are present, for example six or seven rolling stands 1.
- a metal strip 2 is rolled.
- the metal strip 2 may alternatively be cold rolled in a roughing or finishing train or cold rolled in a tandem mill.
- the metal strip 2 may for example consist of steel, aluminum or copper.
- the rolling train is equipped with a computer 3.
- the computer 3 is programmed with a computer program 4.
- the computer program 4 has been supplied to the computer 3, for example via a conventional storage medium 5, for example a USB memory stick. Due to the programming with the computer program 4, the computer 3 is designed such that it carries out a determination process, which will be explained in more detail below.
- the computer program 4 comprises machine code 6.
- the machine code 6 can be processed directly by the computer 3.
- the processing of the machine code 6 by the computer 3 effects the execution of the determination method according to the invention.
- the behavior of the metal strip 2 in the rolling train is modeled in the computer 3 by means of a rolling force model 7.
- Appropriate models are well known to those skilled in the art.
- the band 2 of Figure 2 is represented in ⁇ nergur of the computer 3 by a plurality of band-times 8.
- Each relating to a band of items 8 getrof ⁇ fene statement is self-evident for a corresponding Length range of the metal strip 2, wherein dividing lines between the band points 8 are usually in the middle between the band points 8.
- the number of band points 8 is usually several 100 to more than 1000 band points 8.
- a distance a of the band points 8 from each other can be defined for example by a fixed timing T.
- the time clock T is in this case usually at 100 ...
- the distance a can be defined by a geometric distance of, for example, 20... 100 cm.
- the distance a between the band points 8 is defined at ⁇ metal ribbon 5 by the located between in each case two belt points 8 mass.
- the distance a can be, for example, between 10 and 50 kg, in particular between 15 and 30 kg.
- the metal band 2 is divided into a plurality of band points 8 with respect to its representation in the computer 3.
- Metal strip 2 run successively into a front rolling stand 1 of the rolling train, for example in the first rolling stand 1 of the rolling train. Even before the running in of the sections of the real metal strip 2, the respectively corresponding strip points 8 are taken over into the active evaluation.
- Applying to the active evaluation is connected to a detection of initial parameters P of the corresponding band points 8.
- the initial parameters P are recorded one after the other for one of the band points 8 in each case.
- capturing the initial parameter P - take groups vorzu ⁇ - possibly including the acquisition of the corresponding points on the strip 8 in the active evaluation. It is even possible to carry out the detection of the initial parameters P for all band points 8 at once.
- the parameters P can be supplied to the computer 3 by a superordinate computing device or by another control computer which controls a system arranged upstream of the rolling train. Examples of such pre ⁇ arranged plants are an oven, a roughing and a
- the parameter P for example, the temperature of the band corresponding to point 8, a phase fraction or contained ⁇ pie may be. Also combinations of these are possible. It is also possible that the parameter P describes the geometry of the respective band point 8, for example its thickness, its profile or its flatness. A combination of several geometry parameters is possible. It is also possible to record both temperature parameters and geometry parameters.
- a single value may be given, for example the value immediately at the center of the band segment defined by the band point 8.
- the temperature at the top or bottom or - as seen in the strip thickness direction - are used in the center of the corresponding location.
- it may be a temperature distribution.
- the temperature distribution can be spatially resolved in this case in the band thickness direction, in the band width direction and / or possibly also in the band longitudinal direction. Averaging in one or more of the named directions is also possible.
- the temperature at the top can be used spatially resolved in the bandwidth direction.
- Wei ⁇ terhin can be used instead of the temperature and the enthalpy. Possibly.
- phase proportions and parameters for material properties such as, for example, the grain size and / or the solidification, can be taken into account.
- a single value may be given, for example, the strip thickness directly telbar at the center of the defined by the band point 8 band segment.
- it may be a Geometrievertei ⁇ development.
- the geometry distribution can be spatially resolved in the case of the band thickness in the bandwidth direction and possibly also in the band longitudinal direction.
- the geometry distribution may possibly be spatially resolved in the band longitudinal direction.
- an averaging in the band longitudinal direction, in the case of the band thickness alternatively or additionally also in the band width direction is possible.
- the band points 8 are taken over by the computer 4 in a step Sl in the active evaluation. If necessary, the computer 3 also accepts target frame sizes G * in step S 1 for the corresponding strip points 8.
- the target frame sizes G * are sizes that should occur during rolling of the corresponding band point 8 in the rolling stands 1. They are broken down for each Walzgerüs ⁇ te 1 defined. It may be * act at the target frame sizes G to manipulated variables of the respective roll stand 1, such as the roll force F, the appointing s or the rolling ⁇ moment M. Preferably, it is the geometry parameters such as the outlet-side target thickness, the outlet-side target profile and / or the outlet side Sollplanheit. It may also be relative sizes, for example, a certain proportion of the total, applied by all rolling mill drives power. In a step S2, the computer 3 assigns the initial parameters P and the set values G * to the corresponding band points 8.
- step S3 in which the computer 3 determines or accepts a characteristic course for those band points 8 which it has taken over into the evaluation in step S1.
- the Leitiere indicates with wel ⁇ chem speed profile (for example as a function of time) the band 8 points should pass through the rolling mill.
- a suitable method of determining the course of the process variable is For example, in the aforementioned European Patent ⁇ application 10162135.7 from 06.05.2010 described.
- step S3 only the addition of the Leitierenverlaufs is answered ⁇ or determined, ie the Leitierenverlauf for the period in which the respective strip points of the step Sl 8 leaving the rolling train.
- a step S4 the computer 3 selects the front rolling mill 1, for example the first rolling mill 1 of the rolling mill.
- step S5 the computer 3 determines for each band point 8 of the step Sl for the selected stand 1 at least one expected stand size G, which is expected during rolling of the corresponding band point 8 in the selected stand 1. The determination takes place by means of the rolling force model 7.
- the computer 3 can determine in particular at least one of the following variables: the rolling force F, the inlet-soaking train in the metal strip 2, the run-out train in the metal strip 2, the stand position s, the frame speed or the roller peripheral speed, the rolling moment M, the Adjustment of a loop lifter arranged on the inlet or outlet side, nominal values for coolant actuating elements acting on the rolls of the respective rolling stand 1 and / or the metal strip 2, auslaufseifige geometry pa ⁇ parameters of the corresponding band points 8, temperature-related parameters of the corresponding band points 8 during leakage, etc.
- the computer 3 assigns the determined quantities to the corresponding band points 8 in a step S6.
- step S7 the computer 3 checks whether the selected rolling stand 1 is the last rolling stand 1 of the rolling train. If this is not the case, the computer 3 goes in a step S8, in which he selects the next rolling stand 1.
- a step S9 the computer 3 determines for the corresponding band points 8 by means of the rolling force model 7 respectively parameters P of the band points 8, with which the respective band points 8 einlau ⁇ fen in the now selected mill 1.
- the step S9 is trivial, since the outlet geometry, with which a certain band point 8 runs out of the previously selected rolling stand 1, is identical to the inlet geometry with which this band point 8 enters the newly selected rolling stand 1 .
- temperature parameters for example, based on the distance of the rolling stands 1 vonein ⁇ other in conjunction with the Leit einsverlauf (or a fixed predetermined speed) the Temperaturent ⁇ winding the band points 8 are updated. If necessary, cooling by means of a corresponding intermediate cooling device can be taken into account.
- step S9 The quantities determined in step S9 are also assigned to the respective band points 8, see a step S10 in FIG. 3. From step S10, the computer 3 returns to step S5.
- step S7 the computer 3 compares the expected framework sizes G determined by it with the setpoint size. . G * of the step Sl. Furthermore, the computer 3 determines in step Sil for each band point 8 of the step Sl on the basis of the comparison in each case at least one Einstellgerüstdonating A *. Usually - though not necessarily - determined the accounting ner 3 in step Sil for each rolling stand 1 a Sollanstel ⁇ lung s * or set rolling force F *.
- the setting frame sizes A * are variables different from the expected and the set frame sizes G, G *. For example, if the rolling force as he waited ⁇ and target frame size G, G * is used, the rolling force can not be used as Einstellgerüstiere A * at the same time.
- the determined Einstellgerüstieren A * assigns the computer 3 in a step S12 the respective band point 8.
- the computer 3 adds the band points 8 to which it has assigned the setting frame sizes A * in step S12 to the totality of the band points 8 managed by it.
- the entirety of the managed by the computer 3 band points 8 regar ⁇ sent those sections of the metal strip 2, which were ⁇ already taken in the active evaluation and have not yet leaked out of the mill.
- the step S13 and with it, the steps Sl to S12 will therefore be ⁇ leads before the corresponding points on the strip 8 enter into the front roll stand. 1
- the determination rules by means of which the adjustment gantry sizes A * are determined are also continuous maps.
- a target function is set up in the calculations into which at least the deviation between an expected stand size G behind the respective rolling stand 1 and subsequent rolling stands 1, for example an expected thickness of the associated set stand size, is received.
- equation constraints formulated for the plant limits.
- the mathematical minimization algorithm for example. For example, a SQP method or a Gauss-Newton method, the required settings for the rolling stands 1 are calculated.
- a step S14 the computer 3 determines the trajectories and evaluates them.
- a step S15 the computer 3 performs path tracking with respect to all band points 8 of the totality of band points 8. The computer 3 thus determined for each managed band 8 point where the respective band ⁇ point 8 is currently located.
- the computer 3 is at least the ermit telten ⁇ and the tape points 8 * associated time and location correctly to a base automation 9 from Einstellgerüstieren A.
- the base automation 9 receives the Einstellgerüstgrö ⁇ Shen A * and controls using the adjustment frame sizes A * the rolling mill.
- the basic automation 9 can use the values transmitted from the computer 3 as pilot control and possibly even execute a local regulation that deviate ⁇ tions minimized by the given trajectories. Such a method is known. This prediction can be used at ⁇ play as for determining the energy consumption, to Progno ⁇ se of future electricity consumption for pilot control of other control circuits, for the calculation of engine loads and so on.
- the computer 3 can additionally output the expected framework sizes G to the basic automation 9 in step S16.
- the basic automation 9 can regulate the rolling train with additional consideration of the expected gantry sizes G.
- the computer 3 checks whether just a band ⁇ point 8 from leaking out of the rolling line. If this is the case, the computer 3 removes the corresponding band point 8 from the entirety of the band points 8 it manages in a step S 18.
- step S19 the computer 3 checks whether straight (Minim ⁇ least) a tape point to be re-taken into the evaluation. 8 Depending on the result of the examination of step S19, the computer 3 returns to step S1 or to step S14.
- the steps S17 and S19 are always required, ie not only when the distance a of the band points 8 from each other is determined as a geometric distance or as between the band points 8 mass.
- the steps S17 and S19 are also required if the distance a of the band points 8 from each other is determined by the timing T, the method of FIG 3 is thus executed not only cyclically, but even clocked. For if the first band points 8, so the tape head, run into the rolling mill 8, yet no tape points 8 run out of the rolling mill. Conversely, the last strip points 8, ie the strip foot, only run out of the rolling mill long after the last strip points 8 have entered the rolling train.
- the abscissa can alternatively be the time t or the mass flow m '-. From FIG 4 is further ersicht- lent that the trajectories for each rear roll stand 1 in each case at least from the time at which the respective band point 8 enters the front roll stand 1, extend to the time to which the respective band point 8 in the respective rear roll stand 1 enters.
- the computer 3 calculates the trajectories in a step S21.
- the computer 3 evaluates the determined trajectories.
- the computer 3 checks whether the evaluation has revealed that the adjustment frame sizes A * must be changed. If necessary, the computer 3 makes the necessary changes in a step S24.
- the computer 3 in steps S22 to S24 check whether plant limits of the rolling mill are met.
- the computer 3 can check whether the rolling torque M and the rolling force F remain within the permissible framework for each rolling stand 1. If this is not the case for one of the rear roll stands 1, a Lastum ⁇ distribution can for example be made.
- the predicted state variables can be evaluated.
- the performance curve of one of the rear rolling stands 1 can be used to predict the resulting temperature profile of the corresponding rolling stand drive.
- varying the Einstellgerüst sexualn A * may be required if a maximum permissible limit tempera ⁇ ture is exceeded.
- the trajectories are usually calculated with a modeling period t '.
- the modeling period t ' generally corresponds to the distance a of the band points 8 from each other or an integer multiple thereof.
- jectors are performed with an evaluation horizon H, which is a multiple of the modeling period t '.
- the ratio of Austechnischsho ⁇ rizont H is to modeling period t 'is 10: 1 or above. Even values of 20: 1 or 30: 1 and even higher ratios are possible.
- the adjustment frame sizes A * may possibly be changed on the basis of the steps S21 to S24.
- the corresponding evaluations must therefore before driving the roll stand 1, for which the particular trajectory is valid, ⁇ follow.
- the evaluation is carried out even before the driving of the front rolling mill 1.
- the determination method according to the invention is usually carried out cyclically and / or in real time.
- the last-mentioned statement ("before the control of the roll stand 1") Refers only to the strip points 8 which were actually added in the last cycle.
- step S16 As part of the procedure described above in connection with FIG 3 of the base automation ⁇ tion 9 "correctly timed" in step S16, the A * Einstellgerüstieren vorgege- ben. It is possible that the computer 3, the corresponding
- step S16 of FIG 3 is replaced by a step S26 shown in FIG 5.
- the computer 3 transmits the trajectories of the Einstellgerüst supportiven A * at least partially to the base automation 9.
- the Calculator 3 for each rear roll stand 1 determine which band point 8 is currently in the sphere of influence of the respective roll stand 1.
- the computer 3 For each rolling stand 1, the computer 3 then transmits to the basic automation 9 the current setting stand size A * for the respective rolling stand 1 and a - usually low - number of subsequent Einstellge ⁇ set sizes A * for the respective rolling mill 1 (for example, the next 2, 3 or 5 adjustment frame sizes A *).
- the base automation 9 are therefore provided at least for the rear rolling stands 1 corresponding courses of Einstellgerüst sexualn A * as a setpoint control variables.
- the trajectories are calculated with a modeling period t ', wherein the modeling period t' generally corresponds to the distance a of the band points 8 from each other or an integral multiple thereof.
- the Re ⁇ gelzeitraum R is greater than the modeling period t '.
- Modellie ⁇ approximately period T 'of the (simple, not multiple) distance a of the strip points 8 is assumed to each other and the control period R is t three times the modeling period' is.
- control cycle Z is the basic automation 9.
- the control cycle Z of the basic automation 9 is considerably smaller than the modeling period t '.
- the control cycle Z is usually a few milliseconds ⁇ customers, usually at 20 milliseconds or less.
- the belt points 8 are assigned to the A ⁇ alternate scaffold sizes A *. It is also possible to additionally assign the expected framework sizes G to the band points 8. In this case, it is of course also possible to calculate the trajectories for the expected framework sizes G.
- a temperature profile as a function of time t before ⁇ be given - see FIG 8.
- the Leit Anlagensverlauf therefore a related to a particular rolling mill 1 temperature profile can be determined, with which the metal strip 2 of this rolling mill passes through or the band points 8 gradually pass through this Walzge ⁇ rüst 1, see FIG. 9
- FIG. 10 essentially shows measures which, in addition to removing a band point 8 from the totality of the managed band points 8, can be picked up by the computer 3 when a band point 8 has run out of the rolling train.
- a final parameter PE of the respective band point 8 is detected.
- the Erfas ⁇ solution is generally carried out at a respective measuring station 10.
- the sensed parameters PE example, the Tempe ⁇ temperature or the geometry of the respective tape point 8 may be. It is also possible to record several PE parameters - for example, temperature and final thickness or final thickness and flatness.
- the rolling-force model 7 is adapted based on the detected final parameter PE and the korrespondieren-, expect ⁇ th behind the last stand 1 of the rolling mill parameter P.
- the adaptation takes place in the step
- step S34 may be further included. However, the step S34 is only optional and therefore shown in dashed lines in FIG. If step S34 is present, the determination method explained above in connection with FIGS. 3 and 5 is executed again for those band points 8 whose parameters P have been tracked in step S33. For the renewed execution of the investigation, ie the execution of the investigation in the context of step S34, but for each such band point 8 that rolling mill 1 is considered as a front mill stand 1, in which the respective band point 8 enters next.
- the step S34 will be explained in more detail below - first in conjunction with FIG. 11, and later also in conjunction with FIG. 12.
- a step S41 the computer 3 selects the first rolling stand 1 arranged downstream of the front rolling stand 1 of FIG. 3, for example the second rolling stand 1 of the rolling train.
- the computer 3 selects those band points 8 which are now in front of the selected rolling stand 1, ie at the time of the execution of step S42. These strip points 8 thus have that rolling mill 1, which is the upstream of the selected rolling stand 1, already pass, but have not yet run into the selected mill stand 1.
- the computer 3 checks whether the selected rolling stand 1 is the last rolling stand 1 of the rolling train. If this is not the case, the computer 3 proceeds to a step S44 in which it performs a subroutine call.
- step S45 the computer 3 selects the next roll stand 1. Then, the computer 3 proceeds to step S42 to ⁇ back.
- step S46 calculates the computer 3 for each now selected band point 8 by means of the rolling force model 7 for the (now se ⁇ selected) last rolling stand 1 of the rolling mill at least one expected during rolling of the selected band points 8 in the last rolling stand 1 of the rolling mill frame size G.
- Step S47 assigns the computer 3 to the erstoff in step S46 ⁇ th stand sizes G the corresponding tape times 8. In the context of this assignment, any previous values of the expected framework sizes G are overwritten.
- a step S48 the computer 3 compares the determined framework sizes G with the corresponding nominal framework sizes G *. Furthermore, in step S48 the computer 3 determines at least one adjustment frame size A * for the last rolling stand 1 based on the comparison. In a step S49, the computer 3 assigns the determined setting frame sizes A * to the corresponding strip points 8.
- the steps S46 and S47 correspond substantially to - based on the last stand 1 of the rolling mill - the crotch ⁇ th S5 and S6 of FIG 3.
- the steps S48 and S49 correspond to steps Sil substantially and S12 of Fig. 3
- Step S51 the value of the at calling the subroutine selec ⁇ oriented roll stand 1 and the selected points on the strip 8 (a ⁇ finally their associated values) counter. Due to the nature of the transfer of the value for the roll stand 1 (namely, call by value), changes in the value of the selected rolling stand 1 made within the subroutine of FIG. 12 have no influence on FIG. 11.
- band points 8 themselves are not changed within the subroutine of FIG.
- the changes in the band points 8 associated values ⁇ SUC gene within the subroutine act due to the nature of the value transfer (namely call by reference) to FIG 11 back.
- the values of the band points 8 changed as part of the subroutine of FIG. 12, if necessary, enter into the results which are determined in the steps S46 and S48 of FIG.
- a step S52 the computer 3 for each selected strip point 8 determined by means of the rolling-force model 7 for the selected roll stand 1 is at least an expected when rolling the se ⁇ lected tape point 8 in the selected rolling mill 1 stand size G.
- a step S53 assigns the computer 3, the calculated Framework size G to the corresponding band point 8 too.
- the steps S52 and S53 correspond to the steps S5 and S6 of FIG. 3 with respect to the rolling stand 1 selected in the execution of the step S52.
- the computer 3 checks whether the currently selected as part of the subroutine mill 1 is the last rolling stand 1 of the rolling mill.
- step S55 in which the computer 3 - with respect to the subroutine of FIG 12 - selects the next rolling stand 1.
- a step S56 ermit ⁇ the computer 3 for the now selected roll stand 1 telt by means of the rolling-force model 7 each parameter P is the selec ⁇ oriented strip points 8, with which the selected points on the strip entering the now selected roll stand 1 8.
- a step S57 the computer 3 assigns the determined parameters P to the corresponding band points 8. The computer 3 then returns to step S52.
- the steps S55 to S57 entspre ⁇ chen essentially steps S8 to S10 of Fig. 3
- step S58 the computer 3 compares the determined framework sizes G with the corresponding target framework sizes G *. Further, the computer 3 determines in step S58 using the equalization Ver ⁇ at least a Einstellgerüst sexual A * for the roll stands 1. In a step S59, the computer assigns the determined Einstellgerüst sexualn 3 A * the corresponding band to 8 points.
- the steps S58 and S59 substantially correspond to the steps S11 and S12 of FIG. 3.
- the step S58 is executed from the rolling stand 1, the value of which was taken in step S51, to the last rolling stand 1.
- step S60 the computer 3 returns to step S44 of FIG. 11, from which the subroutine of FIG. 12 has been called.
- the "duplicate" presence of steps S48 and S58 is only seemingly given, because steps S48 and S58 handle only the values of the currently selected band points 8, as an alternative to the presence of both steps S48 and S58 also of the step S58, it is possible to provide only the step S48, but not the step S58. In this case, in step S48, all band points 8 must be handled. In this case, of course, step S59 also disappears together with step S58.
Landscapes
- Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Evolutionary Computation (AREA)
- Medical Informatics (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Abstract
Description
Claims
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP11763870.0A EP2603332A1 (de) | 2010-09-16 | 2011-09-02 | Ermittlungsverfahren für steuergrössen einer walzstrasse mit mehreren walzgerüsten zum walzen eines metallbandes |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP10177114A EP2431105A1 (de) | 2010-09-16 | 2010-09-16 | Ermittlungsverfahren für Steuergrößen einer Walzstraße mit mehreren Walzgerüsten zum Walzen eines Metallbandes |
EP11763870.0A EP2603332A1 (de) | 2010-09-16 | 2011-09-02 | Ermittlungsverfahren für steuergrössen einer walzstrasse mit mehreren walzgerüsten zum walzen eines metallbandes |
PCT/EP2011/065220 WO2012034875A2 (de) | 2010-09-16 | 2011-09-02 | Ermittlungsverfahren für steuergrössen einer walzstrasse mit mehreren walzgerüsten zum walzen eines metallbandes |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2603332A1 true EP2603332A1 (de) | 2013-06-19 |
Family
ID=44025228
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10177114A Withdrawn EP2431105A1 (de) | 2010-09-16 | 2010-09-16 | Ermittlungsverfahren für Steuergrößen einer Walzstraße mit mehreren Walzgerüsten zum Walzen eines Metallbandes |
EP11763870.0A Withdrawn EP2603332A1 (de) | 2010-09-16 | 2011-09-02 | Ermittlungsverfahren für steuergrössen einer walzstrasse mit mehreren walzgerüsten zum walzen eines metallbandes |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10177114A Withdrawn EP2431105A1 (de) | 2010-09-16 | 2010-09-16 | Ermittlungsverfahren für Steuergrößen einer Walzstraße mit mehreren Walzgerüsten zum Walzen eines Metallbandes |
Country Status (3)
Country | Link |
---|---|
EP (2) | EP2431105A1 (de) |
CN (1) | CN103402661B (de) |
WO (1) | WO2012034875A2 (de) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2679317A1 (de) * | 2012-06-29 | 2014-01-01 | Siemens Aktiengesellschaft | Verfahren zum Betrieb eines Steckelwalzwerks |
JP6315818B2 (ja) * | 2014-10-07 | 2018-04-25 | 株式会社日立製作所 | タンデム圧延ミルの制御装置および制御方法 |
CN107350295B (zh) * | 2017-08-09 | 2019-04-16 | 中冶南方工程技术有限公司 | 一种轧钢系统生产能效评估方法 |
CN110653269B (zh) * | 2018-06-29 | 2021-04-06 | 上海梅山钢铁股份有限公司 | 热连轧板带平直度在线闭环控制方法 |
DE102019103012A1 (de) * | 2019-02-07 | 2020-08-13 | Thyssenkrupp Ag | Verfahren zur Produktion eines Metallwerkstücks |
DE102019132029A1 (de) * | 2019-11-26 | 2021-05-27 | Thyssenkrupp Steel Europe Ag | Herstellung eines gewünschten Metallwerkstücks aus einem Metallflachprodukt |
EP3888810B1 (de) * | 2020-04-03 | 2023-08-02 | ABB Schweiz AG | Verfahren zur steuerung der planheit eines bandes aus walzgut, steuerungssystem und produktionslinie |
CN115041528A (zh) * | 2022-06-18 | 2022-09-13 | 首钢智新迁安电磁材料有限公司 | 一种钢卷卷间厚度偏差的修正方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1233165B (de) * | 1962-09-28 | 1967-01-26 | Siemens Ag | Verfahren zur Bildung einer der Laengsspannung in laufenden Bahnen mehrteiliger Arbeitsmaschinen proportionalen Groesse |
DE19522494C2 (de) * | 1994-07-07 | 1997-06-19 | Siemens Ag | Verfahren zum Walzen eines Metallbandes |
SE512824C2 (sv) | 1997-09-25 | 2000-05-22 | Anders Samuelsson | Marin propeller |
DE10156008A1 (de) * | 2001-11-15 | 2003-06-05 | Siemens Ag | Steuerverfahren für eine einer Kühlstrecke vorgeordnete Fertigstraße zum Walzen von Metall-Warmband |
DE10321791A1 (de) | 2003-05-14 | 2004-12-30 | Siemens Ag | Verfahren zur Regelung der Temperatur eines Metallbandes, insbesondere in einer Fertigstraße zum Walzen von Metall-Warmband |
JP3947116B2 (ja) * | 2003-02-26 | 2007-07-18 | 東芝三菱電機産業システム株式会社 | 連続圧延機の走間板厚変更装置 |
CN101683659B (zh) * | 2008-09-28 | 2012-05-30 | 宝山钢铁股份有限公司 | 冷轧带钢平直度和横向厚差综合控制方法 |
-
2010
- 2010-09-16 EP EP10177114A patent/EP2431105A1/de not_active Withdrawn
-
2011
- 2011-09-02 WO PCT/EP2011/065220 patent/WO2012034875A2/de active Application Filing
- 2011-09-02 CN CN201180044718.5A patent/CN103402661B/zh not_active Expired - Fee Related
- 2011-09-02 EP EP11763870.0A patent/EP2603332A1/de not_active Withdrawn
Non-Patent Citations (1)
Title |
---|
See references of WO2012034875A2 * |
Also Published As
Publication number | Publication date |
---|---|
EP2431105A1 (de) | 2012-03-21 |
WO2012034875A2 (de) | 2012-03-22 |
CN103402661B (zh) | 2016-03-09 |
CN103402661A (zh) | 2013-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2603332A1 (de) | Ermittlungsverfahren für steuergrössen einer walzstrasse mit mehreren walzgerüsten zum walzen eines metallbandes | |
DE19963186B4 (de) | Verfahren zur Steuerung und/oder Regelung der Kühlstrecke einer Warmbandstrasse zum Walzen von Metallband und zugehörige Vorrichtung | |
EP2603333B1 (de) | Echtzeit-ermittlungsverfahren für temperatur und geometrie eines metall-warmbandes in einer fertigstrasse | |
EP2697001B1 (de) | Steuerverfahren für eine walzstrasse | |
EP2566633B1 (de) | Betriebsverfahren für eine fertigstrasse mit prädiktion der leitgeschwindigkeit | |
EP2697002B1 (de) | Steuerverfahren für eine walzstrasse | |
DE10156008A1 (de) | Steuerverfahren für eine einer Kühlstrecke vorgeordnete Fertigstraße zum Walzen von Metall-Warmband | |
EP2712332B1 (de) | Steuerverfahren für eine warmbandstrasse | |
EP2691188B1 (de) | Betriebsverfahren für eine walzstrasse | |
DE102006047718A1 (de) | Verfahren zur Nachverfolgung des physikalischen Zustands eines Warmblechs oder Warmbands im Rahmen der Steuerung einer Grobblechwalzstraße zur Bearbeitung eines Warmblechs oder Warmbands | |
EP3107666A1 (de) | Einfache vorsteuerung einer keilanstellung eines vorgerüsts | |
EP2790846B1 (de) | Verfahren zur bearbeitung von walzgut in einem warmwalzwerk | |
EP3194087B1 (de) | Breiteneinstellung bei einer fertigstrasse | |
EP2480351B1 (de) | Steuerverfahren für eine behandlungsanlage für ein langgestrecktes walzgut | |
EP3714999B1 (de) | Ermittlung einer anstellung eines walzgerüsts | |
EP4061552B1 (de) | Verfahren, steuervorrichtung sowie walzanlage zur einstellung einer auslauftemperatur eines aus einer walzstrasse auslaufenden metallbands | |
EP2957360A1 (de) | Betriebsverfahren für eine Walzstraße | |
EP3974073B1 (de) | Walzen unter berücksichtigung von frequenzverhalten | |
EP3002068A1 (de) | Walzstraße mit modellgestützter Vorsteuerung für Kühlpausen | |
WO2013160166A1 (de) | Angleichung von bandeigenschaften durch breitenabhängige vorbandkühlung |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20130314 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAX | Request for extension of the european patent (deleted) | ||
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: PRIMETALS TECHNOLOGIES GERMANY GMBH |
|
17Q | First examination report despatched |
Effective date: 20150724 |
|
APBK | Appeal reference recorded |
Free format text: ORIGINAL CODE: EPIDOSNREFNE |
|
APBN | Date of receipt of notice of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA2E |
|
APBR | Date of receipt of statement of grounds of appeal recorded |
Free format text: ORIGINAL CODE: EPIDOSNNOA3E |
|
APAF | Appeal reference modified |
Free format text: ORIGINAL CODE: EPIDOSCREFNE |
|
APBT | Appeal procedure closed |
Free format text: ORIGINAL CODE: EPIDOSNNOA9E |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
18W | Application withdrawn |
Effective date: 20170123 |