EP2558647B1 - Offshore foundation structure, offshore foundation using such a structure and method of establishing an offshore foundation - Google Patents
Offshore foundation structure, offshore foundation using such a structure and method of establishing an offshore foundation Download PDFInfo
- Publication number
- EP2558647B1 EP2558647B1 EP10776340.1A EP10776340A EP2558647B1 EP 2558647 B1 EP2558647 B1 EP 2558647B1 EP 10776340 A EP10776340 A EP 10776340A EP 2558647 B1 EP2558647 B1 EP 2558647B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- seabed
- pile
- tubular hollow
- foundation
- foundation member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/02—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
- E02B17/027—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto steel structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/52—Submerged foundations, i.e. submerged in open water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B2017/0091—Offshore structures for wind turbines
Definitions
- the present invention relates to an offshore foundation structure.
- the present invention relates to a method of establishing an offshore foundation structure.
- a jacket construction is, for example, shown in US 5,988,949 or in EP 2 067 914 A2 , a tripod construction, for example, in DE 10 2004 042 066 A1 .
- a typical method for establishing a foundation based on a jacked construction or a tripod construction is to prepare the seabed prior to establishing the foundation which includes levelling out variations of the high of the seabed in order to achieve a construction in level. Furthermore, the method comprises establishing piles very accurately positioned in the seabed such as by means of a pre-fabricated and pre-positioned pile positioning template structure on the seabed.
- the piles are established by using e.g. hydraulic driven means which literally hammer the pile down into the seabed.
- a jacket or a tripod construction is set over a part of the pile (or piles in case of a tripod construction) and the space between the leg and the pile is grouted to establish a secure connection.
- WO 2005/040605 A1 discloses a foundation for an offshore wind energy plant with a number of foundation legs which support a load distribution element and which extend to the seabed. Piles are driven out of the legs by means of a hammer that acts on the piles through the hollow legs in which the piles are arranged.
- US 3,502,159 describes a mobile pile driving apparatus, in which a pile driving mechanism is adjustably and guidably suspended in a casing surrounding the pile. The driving mechanism is then sequentially rotated to drive the respective piles through relatively short increments of length.
- US 3,987,637 describes a method and an apparatus for transporting and erecting an offshore tower.
- the tower is a tower jacket with legs rigidly interconnected by a plurality of lattices comprised of struts.
- the jacket structure is secured by means of pilings which are guided by piling guides and which are driven into the seabed.
- the foundation structure comprises at least one tubular hollow foundation member with a longitudinal axis and an open longitudinal end.
- the tubular hollow foundation member is placed on the seabed such that the open longitudinal end shows towards the seabed.
- the longitudinal axis of the tubular hollow foundation member may be oriented vertically or skewed by a small angle, e.g. by an angle of 30° or less, in particular 10° or less as measured from the vertical direction when it is placed on the seabed, in particular in tripod constructions.
- the pile is inside located in the tubular hollow foundation member, when the foundation member is placed on a seabed. After placing the hollow foundation member with the pile located therein on the seabed, the pile is driven out of the tubular hollow foundation member along the longitudinal axis and rammed into the seabed to establish an anchor for the foundation structure.
- the inventive method allows to use the hollow member for guiding the pile and/or the driving means, when the pile it is rammed into the seabed.
- the pile is driven out of the tubular hollow foundation member and rammed into the seabed by means of a drive means or hammer means which is located inside the tubular hollow foundation member.
- the drive means or hammer means is at least partly integrated into the pile.
- the drive means or hammer means may stay inside the tubular hollow foundation member after the pile has been driven out of the tubular hollow foundation member and rammed into the seabed. If the drive means or hammer means is at least partly integrated into the pile this means that drive means is part of the pile itself.
- the vessel can be utilized on other sites.
- This in turn is cost effective and time saving.
- the operation of the driving means or hammer means is not dependent on a vessel it can be operated under substantially any weather conditions, which in turn is also cost effective and time saving.
- the drive means or hammer means can be established and operated in more than one hollow member at a time, i.e. timely parallel, whereas it is known from the prior art to install only one pile at the time as the pile driving of each pile is dependent on driving equipment connected to the crane of a vessel.
- the drive means or hammer means can be designed such as to be relative cheep to build and therefore can be left in the construction once used.
- the at least one tubular hollow foundation member used in the inventive method may be a leg of a jacket or a tripod structure. It may be designed such that each leg of the structure is a tubular hollow foundation member with a pile located therein which is driven out of the respective leg and rammed into the seabed after the jacket or tripod structure is set on the seabed. In particular, the piles of the legs may be driven out of the respective leg and rammed into the seabed simultaneously.
- the legs of a jacket or tripod foundation can be anchored in the seabed simultaneously in a cost effective and time saving manner since it is not necessary to use three vessels to ram the piles into the seabed or to ram the piles into the seabed after each other when only one vessel is available.
- the space between the tubular hollow foundation member and a part of the pile remaining inside the tubular hollow foundation member can be grouted in order to increase the stability of the foundation.
- an offshore foundation structure in particular an offshore foundation structure for a wind turbine is provided.
- the foundation structure is adapted to being installed on the seabed and comprises at least one tubular hollow foundation member with a longitudinal axis and an open longitudinal end which is designed to be placed on the seabed such that the open hollow end shows towards the seabed.
- the tubular hollow foundation member may be formed by a leg of a jacket structure or a tripod structure. Note, that the tubular hollow foundation member may be oriented such that the longitudinal axis extends vertically or skewed with respect to the vertical direction. If the tubular hollow member is skewed, typical skew angles would be below 30° as measured from the vertical direction. Preferred skew angles are below 10°.
- a pile and a drive means or hammer means are located inside the tubular hollow foundation member.
- the drive means or hammer means is designed to drive the pile out of the tubular hollow foundation member along the longitudinal axis and to ram it into the seabed to establish an anchor for the foundation structure.
- the drive means is at least be partly integrated into the pile. Since the drive means or hammer means is located inside the hollow foundation member, the tubular hollow foundation member can act as a guide for the drive means or hammer means as well as for the pile.
- the pile By integrating the drive means at least partly into the pile the pile can be driven into the seabed without the necessity to occupy a crane vessel with a task of holding and operating the drive means. Hence, the vessel can be utilized on other sites. This in turn is cost effective and time saving. Moreover, since the operation of the drive means is not depending on a vessel it can be operated under substantially any weather conditions, which is in turn also cost effective and time saving. In addition, piles and drive means can be established and operated in more than one leg at the same time, i.e. timely parallel, whereas it is known from prior art to install only one pile at the time as the pile driving of each pile is depending on driving equipment connected to the crane of a vessel. Since the driving means can be designed such that it is relatively cheep to build it can be left in the construction once it has been used.
- the offshore foundation structure can further comprise at least one control unit for controlling the drive means.
- a control unit may operate two or more drive means, for example the drive means of different piles, so that driving the piles into the seabed can be done in parallel and, hence, in a time saving manner.
- an offshore foundation in particular an offshore foundation for a wind turbine installation
- the offshore foundation may, e.g., be implemented as a jacket structure or as a tripod structure.
- the offshore foundation is established on the seabed and comprises at least one tubular hollow foundation member with a longitudinal axis and an open longitudinal end which is placed on the seabed such that the open longitudinal end shows towards the seabed.
- the longitudinal axis of the tubular hollow foundation member may be oriented vertically or skewed. If skewed, the skew angle, as measured from the vertical direction, does not exceed 30°, and does, preferably, not exceed 10°.
- a pile is partly located in the tubular hollow foundation member and partly projecting out of the tubular hollow foundation member along the longitudinal axis so that the projecting part is located in the seabed to form an anchor of the foundation. Furthermore, a drive means or hammer means is located inside the tubular hollow foundation member. The drive means is attached to the pile or it is at least be partly integrated into the pile.
- the offshore foundation can be build by use of an inventive offshore foundation structure so that the offshore foundation offers the possibility to realise the advantages described with respect to the inventive offshore foundation structure when establishing the offshore foundation.
- Establishing the offshore foundation can be done according to the inventive method.
- a space may be present between the tubular hollow foundation member and the part of the pile which is located inside the tubular hollow foundation member. This space may be grouted to increase stability of the offshore foundation.
- the drive means or hammer means may be implemented as a hydraulic means, a pneumatic means, an electrically driven means, a motor driven means, etc.
- the number of tubular hollow foundation members shall not be restricted to any definite number but can be any number as long as at least one tubular hollow foundation member is present.
- a jacket or tripod structure offers the possibility to set the structure on the ground when driving the piles into the seabed.
- FIG. 1 An inventive jacket structure of an offshore foundation, for example for wind turbines, is shown in Figure 1 in highly schematic view.
- the jacket structure shown in this Figure comprises three hollow legs 1 each forming a tubular hollow foundation member.
- Each leg 1 is equipped with an open longitudinal end 11 which is placed on the seabed 3 such that the open longitudinal end 11 shows towards the seabed.
- the legs are slightly tilted with respect to the vertical direction.
- Piles 2 project through the open longitudinal ends into the seabed 3 to form anchors for the foundation structure.
- the legs 1 may be grouted, in particular the space between the piles and the inside wall of the legs, in order to increase stability of the structure.
- tripod structure Another possible offshore foundation structure by which the invention can be realised is the so called tripod structure that is schematically shown in Figure 2 .
- three legs 1 forming tubular hollow foundation members support a main tube 8 carrying an installation like a wind turbine.
- the three legs 1 are anchored in the seabed by means of piles 2 extending out of the legs into the seabed 3.
- the present invention also relates in general to an advantageous method of establishing an offshore wind turbine tower foundation such as a jacket or tripod structure as described above with respect to Figures 1 and 2 , respectively, on the sea bed.
- FIG 3 shows a first embodiment of establishing an offshore foundation as described above with respect to Figures 1 and 2 .
- a pile 2 is inserted in a jacket or tripod leg 1 and forced to penetrate the seabed 3 and to be driven into the seabed 3 in order to establish a secure "anchor" for the foundation construction.
- the pile 2 comprises a drive means 4 which is directly attached to the pile 2.
- the drive means 4 is prepared for being able to force the pile 2 into and through the seabed 3 along the longitudinal axis of the pile 2 or the hollow foundation member 1, respectively.
- the drive means 4 may for various embodiments be hydraulic, pneumatic, electrically and/or fuel driven and can in principle be any type of pile hammer which is known in the art.
- a second embodiment of establishing an offshore foundation as described above with respect to Figures 1 and 2 is schematically illustrated in Figure 4 .
- This embodiment of the invention is characterized in that the driving means 4 is at least partly integrated in the pile 2 itself.
- a conventional way of establishing an offshore foundation as described above with respect to Figures 1 and 2 is schematically illustrated in Figure 5 .
- the pile 2, inserted in the jacket or tripod leg 1 is driven into the seabed 3 by a hammer means 5.
- the hammer means 5 is operated in the jacket or tripod leg 1 such as by sliding on prepared portions of the wall of the jacket or tripod leg 1, and/or the hammer means 5 is operated by control means such as by one or more wires 6, said control means being external to the hammer means 5.
- the hammer means 5 may be made of e.g. concrete, iron, reinforced concrete etc.
- the driving means 4 is dimensioned so that its physical dimensions are smaller than the internal diameter of the jacket or tripod leg 1 and consequently can be positioned and operate inside the jacket or tripod leg 1.
- the space between the jacket or tripod leg 1 and the pile 2 may be grouted subsequently to the establishment of the pile 2 in the seabed.
- the driving means 4 may be removable so that it can be removed after establishing the pile 2 and/or grouting, or the driving means 4 may be non-removable so that it stays installed after establishing the pile 2 and/or grouting.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Mechanical Engineering (AREA)
- Foundations (AREA)
- Wind Motors (AREA)
Description
- The present invention relates to an offshore foundation structure. In addition the present invention relates to a method of establishing an offshore foundation structure.
- It is known to establish jacket constructions or tripod constructions on the seabed as foundations in particular for offshore wind turbine installations. A jacket construction is, for example, shown in
US 5,988,949 or inEP 2 067 914 A2DE 10 2004 042 066 A1 . - A typical method for establishing a foundation based on a jacked construction or a tripod construction is to prepare the seabed prior to establishing the foundation which includes levelling out variations of the high of the seabed in order to achieve a construction in level. Furthermore, the method comprises establishing piles very accurately positioned in the seabed such as by means of a pre-fabricated and pre-positioned pile positioning template structure on the seabed.
- The piles are established by using e.g. hydraulic driven means which literally hammer the pile down into the seabed. When the pile is established, a jacket or a tripod construction is set over a part of the pile (or piles in case of a tripod construction) and the space between the leg and the pile is grouted to establish a secure connection.
-
WO 2005/040605 A1 discloses a foundation for an offshore wind energy plant with a number of foundation legs which support a load distribution element and which extend to the seabed. Piles are driven out of the legs by means of a hammer that acts on the piles through the hollow legs in which the piles are arranged. -
US 3,502,159 describes a mobile pile driving apparatus, in which a pile driving mechanism is adjustably and guidably suspended in a casing surrounding the pile. The driving mechanism is then sequentially rotated to drive the respective piles through relatively short increments of length. -
US 3,987,637 describes a method and an apparatus for transporting and erecting an offshore tower. The tower is a tower jacket with legs rigidly interconnected by a plurality of lattices comprised of struts. The jacket structure is secured by means of pilings which are guided by piling guides and which are driven into the seabed. - With respect to the mentioned state of the art it is an objective of the present invention to provide an advantageous method of establishing an offshore foundation. Further objectives are to provide an advantageous offshore foundation structure and to provide an advantageous offshore foundation.
- These objectives are solved by a method of establishing an offshore foundation as claimed in claim 1, by an offshore foundation structure as claimed in
claim 7. The depending claims contain further developments of the invention. - In the inventive method of establishing an offshore foundation structure on the seabed, in particular an offshore foundation structure for a wind turbine installation, at least one pile is driven into the seabed in order to establish an anchor for a foundation structure. The foundation structure comprises at least one tubular hollow foundation member with a longitudinal axis and an open longitudinal end. The tubular hollow foundation member is placed on the seabed such that the open longitudinal end shows towards the seabed. Note that the longitudinal axis of the tubular hollow foundation member may be oriented vertically or skewed by a small angle, e.g. by an angle of 30° or less, in particular 10° or less as measured from the vertical direction when it is placed on the seabed, in particular in tripod constructions. The pile is inside located in the tubular hollow foundation member, when the foundation member is placed on a seabed. After placing the hollow foundation member with the pile located therein on the seabed, the pile is driven out of the tubular hollow foundation member along the longitudinal axis and rammed into the seabed to establish an anchor for the foundation structure.
- The inventive method, as defined by claim 1, allows to use the hollow member for guiding the pile and/or the driving means, when the pile it is rammed into the seabed. The pile is driven out of the tubular hollow foundation member and rammed into the seabed by means of a drive means or hammer means which is located inside the tubular hollow foundation member. According to the invention, the drive means or hammer means is at least partly integrated into the pile. The drive means or hammer means may stay inside the tubular hollow foundation member after the pile has been driven out of the tubular hollow foundation member and rammed into the seabed. If the drive means or hammer means is at least partly integrated into the pile this means that drive means is part of the pile itself. Hence, for driving the pile into the seabed it is not necessary to occupy a vessel like a crane vessel, with a task of holding and operating the driving means. Hence, the vessel can be utilized on other sites. This in turn is cost effective and time saving. Furthermore, since the operation of the driving means or hammer means is not dependent on a vessel it can be operated under substantially any weather conditions, which in turn is also cost effective and time saving. In addition, in case of more than one hollow tubular member the drive means or hammer means can be established and operated in more than one hollow member at a time, i.e. timely parallel, whereas it is known from the prior art to install only one pile at the time as the pile driving of each pile is dependent on driving equipment connected to the crane of a vessel.
- The drive means or hammer means can be designed such as to be relative cheep to build and therefore can be left in the construction once used.
- As already mentioned, the at least one tubular hollow foundation member used in the inventive method may be a leg of a jacket or a tripod structure. It may be designed such that each leg of the structure is a tubular hollow foundation member with a pile located therein which is driven out of the respective leg and rammed into the seabed after the jacket or tripod structure is set on the seabed. In particular, the piles of the legs may be driven out of the respective leg and rammed into the seabed simultaneously. By this method the legs of a jacket or tripod foundation can be anchored in the seabed simultaneously in a cost effective and time saving manner since it is not necessary to use three vessels to ram the piles into the seabed or to ram the piles into the seabed after each other when only one vessel is available.
- After the pile has been a driven out of the tubular hollow foundation member and rammed into the seabed the space between the tubular hollow foundation member and a part of the pile remaining inside the tubular hollow foundation member can be grouted in order to increase the stability of the foundation.
- According to a further aspect of the present invention, as defined by
claim 7, an offshore foundation structure, in particular an offshore foundation structure for a wind turbine is provided. The foundation structure is adapted to being installed on the seabed and comprises at least one tubular hollow foundation member with a longitudinal axis and an open longitudinal end which is designed to be placed on the seabed such that the open hollow end shows towards the seabed. The tubular hollow foundation member may be formed by a leg of a jacket structure or a tripod structure. Note, that the tubular hollow foundation member may be oriented such that the longitudinal axis extends vertically or skewed with respect to the vertical direction. If the tubular hollow member is skewed, typical skew angles would be below 30° as measured from the vertical direction. Preferred skew angles are below 10°. A pile and a drive means or hammer means are located inside the tubular hollow foundation member. The drive means or hammer means is designed to drive the pile out of the tubular hollow foundation member along the longitudinal axis and to ram it into the seabed to establish an anchor for the foundation structure. The drive means is at least be partly integrated into the pile. Since the drive means or hammer means is located inside the hollow foundation member, the tubular hollow foundation member can act as a guide for the drive means or hammer means as well as for the pile. - By integrating the drive means at least partly into the pile the pile can be driven into the seabed without the necessity to occupy a crane vessel with a task of holding and operating the drive means. Hence, the vessel can be utilized on other sites. This in turn is cost effective and time saving. Moreover, since the operation of the drive means is not depending on a vessel it can be operated under substantially any weather conditions, which is in turn also cost effective and time saving. In addition, piles and drive means can be established and operated in more than one leg at the same time, i.e. timely parallel, whereas it is known from prior art to install only one pile at the time as the pile driving of each pile is depending on driving equipment connected to the crane of a vessel. Since the driving means can be designed such that it is relatively cheep to build it can be left in the construction once it has been used.
- The offshore foundation structure can further comprise at least one control unit for controlling the drive means. In particular, such a control unit may operate two or more drive means, for example the drive means of different piles, so that driving the piles into the seabed can be done in parallel and, hence, in a time saving manner.
- According to a third aspect of the present disclosure, an offshore foundation, in particular an offshore foundation for a wind turbine installation is provided. The offshore foundation may, e.g., be implemented as a jacket structure or as a tripod structure. The offshore foundation is established on the seabed and comprises at least one tubular hollow foundation member with a longitudinal axis and an open longitudinal end which is placed on the seabed such that the open longitudinal end shows towards the seabed. The longitudinal axis of the tubular hollow foundation member may be oriented vertically or skewed. If skewed, the skew angle, as measured from the vertical direction, does not exceed 30°, and does, preferably, not exceed 10°. A pile is partly located in the tubular hollow foundation member and partly projecting out of the tubular hollow foundation member along the longitudinal axis so that the projecting part is located in the seabed to form an anchor of the foundation. Furthermore, a drive means or hammer means is located inside the tubular hollow foundation member. The drive means is attached to the pile or it is at least be partly integrated into the pile.
- The offshore foundation can be build by use of an inventive offshore foundation structure so that the offshore foundation offers the possibility to realise the advantages described with respect to the inventive offshore foundation structure when establishing the offshore foundation. Establishing the offshore foundation can be done according to the inventive method.
- In the offshore foundation, a space may be present between the tubular hollow foundation member and the part of the pile which is located inside the tubular hollow foundation member. This space may be grouted to increase stability of the offshore foundation.
- In all aspects of the invention described above the drive means or hammer means may be implemented as a hydraulic means, a pneumatic means, an electrically driven means, a motor driven means, etc. Furthermore, the number of tubular hollow foundation members shall not be restricted to any definite number but can be any number as long as at least one tubular hollow foundation member is present. However, a jacket or tripod structure offers the possibility to set the structure on the ground when driving the piles into the seabed.
- Further features, properties and advantages of the present invention will become clear from the following description of exemplary embodiments in conjunction with the accompanying drawings.
- Figure 1
- shows an inventive jacket structure of an offshore wind turbine foundation in a highly schematic view.
- Figure 2
- shows an inventive tripod structure of an offshore wind turbine foundation in a highly schematic view.
- Figure 3
- schematically shows driving a pile into the seabed according to a first embodiment of the invention.
- Figure 4
- schematically shows driving a pile into the seabed according to a second embodiment of the invention.
- Figure 5
- schematically shows a conventional way of driving a pile into the seabed.
- Figure 6
- schematically shows driving a pile of a tripod structure into the seabed.
- An inventive jacket structure of an offshore foundation, for example for wind turbines, is shown in
Figure 1 in highly schematic view. The jacket structure shown in this Figure comprises three hollow legs 1 each forming a tubular hollow foundation member. Each leg 1 is equipped with an openlongitudinal end 11 which is placed on theseabed 3 such that the openlongitudinal end 11 shows towards the seabed. The legs are slightly tilted with respect to the vertical direction.Piles 2 project through the open longitudinal ends into theseabed 3 to form anchors for the foundation structure. The legs 1 may be grouted, in particular the space between the piles and the inside wall of the legs, in order to increase stability of the structure. - Another possible offshore foundation structure by which the invention can be realised is the so called tripod structure that is schematically shown in
Figure 2 . In a tripod structure, three legs 1 forming tubular hollow foundation members support amain tube 8 carrying an installation like a wind turbine. The three legs 1 are anchored in the seabed by means ofpiles 2 extending out of the legs into theseabed 3. - The present invention also relates in general to an advantageous method of establishing an offshore wind turbine tower foundation such as a jacket or tripod structure as described above with respect to
Figures 1 and2 , respectively, on the sea bed. - More specifically the invention is explained by the schematically illustrated embodiments shown in
Figures 3 to 6 . -
Figure 3 shows a first embodiment of establishing an offshore foundation as described above with respect toFigures 1 and2 .
According to the first embodiment, apile 2 is inserted in a jacket or tripod leg 1 and forced to penetrate theseabed 3 and to be driven into theseabed 3 in order to establish a secure "anchor" for the foundation construction. - This embodiment is characterized in that the
pile 2 comprises a drive means 4 which is directly attached to thepile 2.
The drive means 4 is prepared for being able to force thepile 2 into and through theseabed 3 along the longitudinal axis of thepile 2 or the hollow foundation member 1, respectively. The drive means 4 may for various embodiments be hydraulic, pneumatic, electrically and/or fuel driven and can in principle be any type of pile hammer which is known in the art.
A second embodiment of establishing an offshore foundation as described above with respect toFigures 1 and2 is schematically illustrated inFigure 4 .
This embodiment of the invention is characterized in that the driving means 4 is at least partly integrated in thepile 2 itself.
A conventional way of establishing an offshore foundation as described above with respect toFigures 1 and2 is schematically illustrated inFigure 5 .
According to the conventional way, thepile 2, inserted in the jacket or tripod leg 1, is driven into theseabed 3 by a hammer means 5.
The hammer means 5 is operated in the jacket or tripod leg 1 such as by sliding on prepared portions of the wall of the jacket or tripod leg 1, and/or the hammer means 5 is operated by control means such as by one or more wires 6, said control means being external to the hammer means 5. - The hammer means 5 may be made of e.g. concrete, iron, reinforced concrete etc.
- For various embodiments of the invention, the driving means 4 is dimensioned so that its physical dimensions are smaller than the internal diameter of the jacket or tripod leg 1 and consequently can be positioned and operate inside the jacket or tripod leg 1.
- For various embodiments of the invention the space between the jacket or tripod leg 1 and the
pile 2 may be grouted subsequently to the establishment of thepile 2 in the seabed. - For various embodiments of the invention, the driving means 4 may be removable so that it can be removed after establishing the
pile 2 and/or grouting, or the driving means 4 may be non-removable so that it stays installed after establishing thepile 2 and/or grouting.
Claims (11)
- A method of establishing an offshore foundation structure, on the seabed (3) in particular an offshore foundation structure for a wind turbine installation, in which at least one pile (2) is driven into the seabed (3) in order to establish an anchor for the foundation structure,
wherein- the foundation structure comprises at least one tubular hollow foundation member (1) with a longitudinal axis and an open longitudinal end (11) which is placed on the seabed (3) such that the open longitudinal end (11) shows towards the seabed (3),- the pile (2) is located in the tubular hollow foundation member (1) when it is placed on the seabed (3),- the pile (2) is driven out of the tubular hollow foundation member (1) along the longitudinal axis and rammed into the seabed (3) to establish the anchor for the foundation structure after placing the hollow foundation member (1) on the seabed.- the pile (2) is driven out of the tubular hollow foundation member (1) and rammed into the seabed (3) by means of a drive means (4) or hammer means (5) which is located inside the tubular hollow foundation member (1),characterised in that
the pile (2) is driven out of the tubular hollow foundation member (1) and rammed into the seabed (3) by means of the drive means (4) or hammer means (5) which is at least partly integrated into the pile (2). - The method as claimed in claim 1, wherein the drive means (4) or the hammer means (5) stays inside the tubular hollow foundation member after the pile (2) has been driven out of the tubular hollow foundation member (1) and rammed into the seabed (3).
- The method as claimed in any of the preceding claims, wherein the at least one tubular hollow foundation member (1) is a jacket or a leg of a tripod structure.
- The method as claimed in claim 3, wherein each leg of a jacket or tripod structure is designed as a tubular hollow foundation member (1) with a pile (2) located therein that is driven out of the respective leg and rammed into the seabed (3) after the tripod structure is set on the seabed (3).
- The method as claimed in claim 4, wherein the piles (2) of the legs are driven out of the respective leg and rammed into the seabed simultaneously.
- The method as claimed in any of the preceding claims, wherein a space between the tubular hollow foundation member (1) and a part of the pile (2) remaining inside the tubular hollow foundation member after its has been driven out of the tubular hollow foundation member (1) and rammed into the seabed (3) is grouted.
- An offshore foundation structure, in particular an offshore foundation structure for a wind turbine, which is adapted to being installed on the seabed (3), comprising:- at least one tubular hollow foundation member (1) with a longitudinal axis and an open longitudinal end (11) which is designed to be placed on the seabed (3) such that the open longitudinal end (11) shows towards the seabed;- a pile (2) located in the tubular hollow foundation member (1) ;- a drive means (4) or hammer means (5) being located inside the tubular hollow foundation member (1) and being designed to drive the pile (2) out of the tubular hollow foundation member (1) along the longitudinal axis and to ram it into the seabed (3) to establish an anchor for the foundation structure,characterised in that
the drive means (4) or hammer means (5) at least partly integrated into the pile (2). - The offshore foundation structure as claimed in claim 7, in which the foundation structure comprises a jacket with legs at least one of which forming a tubular hollow foundation member (1).
- The offshore foundation structure as claimed in claim 7, which comprises a tripod with legs at least one of which forming a tubular hollow foundation member (1).
- The offshore foundation structure as claimed in any of the claims 7 to 9, further comprising at least one control unit (10) for controlling the drive means (4).
- The offshore foundation structure as claimed in any of the claims 7 to 10, wherein a space between the tubular hollow foundation member (1) and the part of the pile (2) located inside the tubular hollow foundation member (1) is grouted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP10776340.1A EP2558647B1 (en) | 2010-05-28 | 2010-11-04 | Offshore foundation structure, offshore foundation using such a structure and method of establishing an offshore foundation |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP10164282 | 2010-05-28 | ||
PCT/EP2010/066814 WO2011147480A2 (en) | 2010-05-28 | 2010-11-04 | Offshore foundation structure, offshore foundation using such a structure and method of establishing an offshore foundation |
EP10776340.1A EP2558647B1 (en) | 2010-05-28 | 2010-11-04 | Offshore foundation structure, offshore foundation using such a structure and method of establishing an offshore foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2558647A2 EP2558647A2 (en) | 2013-02-20 |
EP2558647B1 true EP2558647B1 (en) | 2017-11-01 |
Family
ID=43569322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10776340.1A Not-in-force EP2558647B1 (en) | 2010-05-28 | 2010-11-04 | Offshore foundation structure, offshore foundation using such a structure and method of establishing an offshore foundation |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2558647B1 (en) |
WO (1) | WO2011147480A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3686348A1 (en) | 2019-01-22 | 2020-07-29 | Siemens Gamesa Renewable Energy A/S | Offshore foundation structure, offshore foundation with such offshore foundation structure and method for in-stalling an offshore foundation structure |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3502159A (en) * | 1968-03-26 | 1970-03-24 | Texaco Inc | Pile driving apparatus for submerged structures |
US3987637A (en) * | 1975-05-06 | 1976-10-26 | Brown & Root, Inc. | Method and apparatus for transporting and erecting an offshore tower |
US5988949A (en) | 1996-01-11 | 1999-11-23 | Mcdermott Int Inc | Offshore jacket installation |
DE10349109B4 (en) * | 2003-10-17 | 2008-02-07 | Aerodyn Engineering Gmbh | Foundation for an offshore wind energy plant |
DE102004042066B4 (en) | 2004-08-31 | 2006-12-14 | Bard Engineering Gmbh | Foundation for an offshore wind turbine |
EP2067914A2 (en) | 2007-12-04 | 2009-06-10 | WeserWind GmbH | Grid structure for an offshore construction, in particular an offshore wind energy converter, and method for manufacture thereof |
PL2208825T3 (en) * | 2009-01-16 | 2015-06-30 | Overdick Gmbh & Co Kg | Method for installing an offshore foundation structure on the sea bed and offshore foundation structure |
-
2010
- 2010-11-04 EP EP10776340.1A patent/EP2558647B1/en not_active Not-in-force
- 2010-11-04 WO PCT/EP2010/066814 patent/WO2011147480A2/en active Application Filing
Non-Patent Citations (1)
Title |
---|
None * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3686348A1 (en) | 2019-01-22 | 2020-07-29 | Siemens Gamesa Renewable Energy A/S | Offshore foundation structure, offshore foundation with such offshore foundation structure and method for in-stalling an offshore foundation structure |
Also Published As
Publication number | Publication date |
---|---|
WO2011147480A3 (en) | 2012-10-18 |
EP2558647A2 (en) | 2013-02-20 |
WO2011147480A2 (en) | 2011-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8657534B2 (en) | Floating platform with improved anchoring | |
EP3662111B1 (en) | System for anchoring a pile or jacket and corresponding method | |
EP2372143B1 (en) | Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine | |
US20200277936A1 (en) | Off shore wind energy installation foundation system | |
EP2574698B1 (en) | Method and device for driving a multiplicity of piles into a seabed | |
DK2931977T3 (en) | PROCEDURE FOR ANCHORING A FOUNDATION STRUCTURE AND FOUNDATION STRUCTURE | |
CN102767303A (en) | Precast concrete tower and construction method thereof | |
US20220195686A1 (en) | Anchoring Element | |
EP2495370A1 (en) | In-line piling method for offshore wind turbine foundation applications | |
KR101573064B1 (en) | Jig for constructing pile of green energy generating plant on the sea and method for constructing pile on the sea using this same | |
EP2558648B1 (en) | Offshore foundation structure, offshore foundation and method of establishing the same | |
EP2728179A1 (en) | Wind farm and method for installing a wind farm | |
CN109469089A (en) | A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing and construction method | |
US20130101359A1 (en) | Anchoring element for a hydraulic engineering installation | |
EP2534314B1 (en) | Foundation structure for wind turbine | |
US11105062B2 (en) | Methods for retrofitting a wind turbine foundation and wind turbine foundations | |
EP4211349A1 (en) | An offshore wind farm foundation | |
EP2796713A1 (en) | Floating precast-concrete structure for supporting a wind turbine | |
EP2558647B1 (en) | Offshore foundation structure, offshore foundation using such a structure and method of establishing an offshore foundation | |
GB2505192A (en) | A pile sleeve connection for a monopole foundation | |
CN210395407U (en) | Anchor rod gravity type offshore wind power foundation | |
CN104153366B (en) | The method of a kind of marine high wind wave high strength naked rock steel pipe pile foundation | |
JP7462114B2 (en) | Offshore Wind Energy Systems | |
KR101384168B1 (en) | installation method of slab foundation for offshore wind power generator using position senser | |
JP2020128672A (en) | Installation method of mono-pile foundation for offshore wind power generation and mono-pile foundation for offshore wind power generation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20121113 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS AKTIENGESELLSCHAFT |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20160620 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E02D 27/42 20060101ALI20170428BHEP Ipc: E02D 7/20 20060101ALI20170428BHEP Ipc: E02D 27/52 20060101ALI20170428BHEP Ipc: E02B 17/00 20060101ALI20170428BHEP Ipc: E02B 17/02 20060101AFI20170428BHEP |
|
INTG | Intention to grant announced |
Effective date: 20170530 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS AKTIENGESELLSCHAFT |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 942155 Country of ref document: AT Kind code of ref document: T Effective date: 20171115 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602010046390 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20171101 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 942155 Country of ref document: AT Kind code of ref document: T Effective date: 20171101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180201 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180301 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180202 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180201 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171130 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171130 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602010046390 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171104 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20171130 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171104 |
|
26N | No opposition filed |
Effective date: 20180802 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20101104 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602010046390 Country of ref document: DE Owner name: SIEMENS GAMESA RENEWABLE ENERGY A/S, DK Free format text: FORMER OWNER: SIEMENS AKTIENGESELLSCHAFT, 80333 MUENCHEN, DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20191128 AND 20191204 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171101 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20201112 Year of fee payment: 11 Ref country code: GB Payment date: 20201202 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20210119 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602010046390 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20211104 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211104 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220601 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211130 |