EP2535462B1 - Device for producing a sheeted trench - Google Patents

Device for producing a sheeted trench Download PDF

Info

Publication number
EP2535462B1
EP2535462B1 EP12003861.7A EP12003861A EP2535462B1 EP 2535462 B1 EP2535462 B1 EP 2535462B1 EP 12003861 A EP12003861 A EP 12003861A EP 2535462 B1 EP2535462 B1 EP 2535462B1
Authority
EP
European Patent Office
Prior art keywords
trench
cuttershoe
ground
sheeting
sheeted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP12003861.7A
Other languages
German (de)
French (fr)
Other versions
EP2535462A1 (en
Inventor
Johan Van Wassenhove
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denys NV
Original Assignee
Denys NV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denys NV filed Critical Denys NV
Publication of EP2535462A1 publication Critical patent/EP2535462A1/en
Application granted granted Critical
Publication of EP2535462B1 publication Critical patent/EP2535462B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/13Foundation slots or slits; Implements for making these slots or slits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations

Definitions

  • the present invention relates to a device for producing a sheeted trench.
  • a device producing a “sheeted trench” according to the preamble of claim 1 is for instance known from JP-A-61134428 .
  • sheeted trench consists of making a trench by manually digging down vertically and then systematically sheeting the excavated trench with prefabricated concrete plates to support the walls of the excavated trench in order to absorb the pressure of the earth and thus prevent cave-ins or collapses.
  • concrete is poured into the trench to form a concrete wall, for example an underground tunnel wall or car park, and after the concrete has set the earth next to the wall is excavated, for example to clear the space of the tunnel or the car park.
  • the technique is primarily applied when there is insufficient space above ground to deploy large earthmoving machines for the realisation of the trench, for example on account of the presence of buildings or similar.
  • the work starts with a horizontal tunnel that is first dug out, after which the trench is manually excavated vertically downwards from the tunnel in the aforementioned manner.
  • the height of the sheeting elements and the steps for realising the sheeted trench are determined such that, taking the local specific internal angle of friction of the soil into account, the excavation can be done vertically to a depth of 20 metres and more without the risk of subsidence. For the stability, from a soil mechanics point of view, the effects of the horizontal arching action and vertical vaulting action are taken into account.
  • a disadvantage of such a construction technique is that the earthworks and the installation of the sheeting must be done completely manually, which is not without risk with regard to the personal safety of the worker.
  • Another disadvantage is that the concrete plates used for the sheeting are lost.
  • the purpose of the present invention is to provide a solution to one or more of the aforementioned and other disadvantages, by providing a device that enables sheeted trenches to be realised in mechanised way, whereby the worker does not have to work down in the trench, safety is absolutely guaranteed, and whereby the efficiency can be increased by a number of times with respect to the traditional method and the duration of the construction site can be substantially reduced.
  • the invention concerns a device for producing a sheeted trench, more specifically a trench made in the ground with a desired depth whose walls are supported by sheeting elements that are fitted together vertically, whereby the device consists of a series of sheeting elements fitted together vertically in the form of shaft segments or to compose such shaft segments; a cuttershoe in the form of a frame with a cutting edge oriented downwards of which the outer dimensions of the horizontal cross-section essentially match the outer dimensions of the sahft formed by the sheeting elements; a frame that is movable in at least the longitudinal direction of the trench provided with means to systematically push the cuttershoe vertically into the ground by machine over a depth essentially corresponding to the height of the shaft segments; means for evacuating the earth upwards from the trench by machine in order to form the trench, means to systematically bring the sheeting elements into place as the cuttershoe is pushed deeper into the ground in order to support the trench obtained, whereby the means (9) for pushing the cuttershoe (7) into the ground (11)
  • the cuttershoe is equipped with a ground cutter to loosen the earth at the level of the cutting edge in order to be able to evacuate the loosened earth upwards more easily, for example by means of a bucket chain or a ground bucket.
  • the frame and the aforementioned means are designed to be movable in a horizontal tunnel with a diameter of three metres for example, such that the device can be applied in situations where there is insufficient space above ground for the larger traditional excavating machines.
  • the sheeting elements are of a rectangular shape, such that flat concrete walls can be realised.
  • the device can also be applied beneficially above ground, as with known above-ground methods for forming concrete walls, for example diaphragm walls, flat walls are not obtained, which has the disadvantage that after the walls are released, an extra wall lining must be provided to make the walls even.
  • the sheeting elements stacked on one another and the cuttershoe are systematically pulled upwards when concrete is poured into the trench, as the level of the concrete rises in the trench, and the sheeting elements are removed one by one as they are pulled out of the trench for subsequent use.
  • coupling means are provided to fasten the cuttershoe and the sheeting elements together.
  • the device 1 shown in figure 1 is deployed in a movable manner in a horizontal tunnel 2 for the realisation of a vertical sheeted trench 3.
  • the device makes use of plates that can be put together to form a sheeting element 5 in the form of a shaft segment with rectangular cross-section, as shown in figure 5 .
  • the plates 4 are preferably prefabricated concrete plates that are strong enough to be able to absorb the pressure of the earth.
  • the ends of two opposite plates have a drop 6 into which the short plates can click when being affixed in the trench 3.
  • the device 1 contains a cuttershoe 7 in the form of a frame with a cutting edge 8 oriented downwards, of which the outer dimensions of the horizontal cross-section essentially match the outer dimensions of the shaft formed by the sheeting elements, essentially corresponding to the inner dimensions of the trench 3 to be produced.
  • the device 1 is further provided with means 9 to push the cuttershoe 7 vertically into the ground, and these means 9 are affixed on a frame 10 that can move in the longitudinal direction of the tunnel 2, which in this case is mounted on a tracked machine.
  • These means 9 for pushing the cuttershoe 7 into the ground 11 are formed by a rod 12 whose bottom end 13 is secured to the cuttershoe 7 and which is affixed movably in a vertical guide of the frame 10 and which can be operated by means of a press 14 on the frame 10.
  • the press can be provided with struts 15 in order to transmit the compression forces, for pushing the cuttershoe 7 into the ground, to the walls of the tunnel 2, more specifically to the ceiling of the tunnel 2.
  • the aforementioned rod 12 can be extended by means of extension pieces, not shown in the drawings, that can be connected together in line with one another as the depth of the trench 3 increases.
  • a drill carriage of a known type can be used as a frame 10 for example, whereby the drill is replaced by the rod 12.
  • the cuttershoe 7 has at least two upward-oriented parallel cutter walls 16 at a distance from one another over the width of the trench 3, whereby the device 1 contains means 17 to reduce the distance between the cutter walls 16 in order to be able to pull the cuttershoe 7 out of the sheeted trench 3 without removing the sheeting elements 5.
  • the cutter walls 16 concerned are fastened to the end of a transom 18 which, as indicated by the arrows A in figure 3 , can be tilted upwards around a horizontal shaft 19 that is secured to the aforementioned rod 12.
  • the device 1 is equipped with a ground cutter 20 to loosen the earth at the level of the cutting edge 8 of the cuttershoe 7 in order to be able to evacuate the loosened earth upwards more easily.
  • This ground cutter 20 is for example fastened detachably to the rod 12 and hydraulically driven around a horizontal shaft 21, for example by means of a hydraulic unit 22 on the frame 10.
  • the device 1 contains means 23 for evacuating the earth upwards from the trench 3 by machine in order to form the trench 3.
  • these means 23 are formed by a bucket chain 24 with dredging buckets 25, whereby the bucket chain 24 contains a horizontal section 24A and a vertical section 24B whose length can be adjusted to the depth of the trench 3 already excavated, and whereby the vertical section 24B extends to just above the ground cutter 20.
  • the earth evacuated from the trench is received in a container 26 in order to be taken away.
  • the device 1 contains means 27 to systematically put the plates 4 of the sheeting elements 5 in place as the trench becomes deeper, in order to support the trench 3.
  • the means 27 are formed for example by a lift 28 that can move up and down on the rod 12, for example, to supply the plates 4 from the tunnel 2 to the place where a section of trench is released between the cuttershoe and a sheeting element 5 already installed, whereby the lift 28 is provided with means 29 to push the plates 4 laterally against the wall of the released trench 3 section.
  • the method for producing a sheeted trench 3 with a device 1 according to the invention is simple and as follows.
  • Figure 1 shows a situation in which a sheeted trench 3 has already been realised up to a certain depth.
  • the cuttershoe 7 is pushed downwards more deeply, whereby if necessary the rod 12 can be made longer by affixing an additional length of the rod 12.
  • the earth under the cutter is loosened by the turning of the ground cutter and moved to above the cutter from where it is scooped up by the dredging buckets 25 of the bucket chain 24 and evacuated to the container 26 in the tunnel.
  • trench 3 is further deepened below the sheeting elements 5 already present, such that a section of unsheeted trench wall is released at the bottom.
  • the cuttershoe 7, the ground cutter 20, the rod 12, the lift 28 and the bucket chain 24 are removed from the sheeted trench 3, such that only the sheeting elements remain in place.
  • Figure 6 portrays an alternative embodiment of a sheeting element 5 that is constructed as a double-walled reusable shaft segment 30 with walls 31 made of sheet steel, 3 to 4 mm thick for example.
  • This sheeting element 5 is provided with coupling means 32-33 in order to fasten the sheeting elements 5, stacked on one another, together and to the cuttershoe 7, which also has suitable coupling means to this end.
  • the end sides of the outer wall 31 of the sheeting element 5 are provided with a tongue 34 and a groove 35 with which the sheeting elements, fitted against one another, fit into one another.
  • a further vertical groove 35 can be provided in the tongue and groove that is suitable for affixing an (additional) seal, for example in the form of an inflatable hose.
  • sheeting elements are used for example with a variant device different from the invention, as illustrated in figure 7 .
  • the frame 10 is a gantry 36 that can.be moved on rails 37.
  • a ground bucket 38 is suspended from the gantry 36 that can be operated by means of cables 39 and can be lowered into the sheeted trench 3, and which can be moved in the horizontal direction up to above a conveyor belt 40 for example.
  • the frame 10 is further provided with a hydraulic crown 41 with four vertical dual action hydraulic cylinders 42 with which the cuttershoe 7 or a stack of cuttershoes 7 and sheeting elements can be pushed into the ground and pulled from the trench 3.
  • hydraulic crown 41 is also equipped with coupling means for fastening to the sheeting elements 5 or to the cuttershoe 7.
  • the cylinders 42 can be controlled independently in order to be able to make control corrections during pressing, whereby the hydraulic crown is equipped with measuring apparatus to measure the horizontality in order to be able to adjust when necessary.
  • the cuttershoe 7 is also equipped with a detachable ground cutter 20.
  • the cuttershoe does not necessarily have to be provided with retractable walls as was the case with the embodiment of the invention of figure 1 .
  • the sheeted trench is self-stable without intermediate stays.
  • the workspace is larger and free of obstructions, firstly for excavating and removing the earth, and secondly for installing the reinforcement.
  • the earth under the ground cutter 20 is cut loose and is systematically evacuated as the cuttershoe descends more deeply, if applicable with a ground bucket 38 or a bucket chain 24, as in figure 4 .
  • the ground cutter 20 is manually removed from the cuttershoe 7 and the affixing of the reinforcement in the trench can begin.
  • the reinforcing basket is also sunk in modularly in elements as high as the workspace allows.
  • the sheeting elements are dismantled one by one as they come out of the trench 3 and are stored for re-use for the realisation of a subsequent shaft.
  • the "slime method" can be considered for the earth transport, whereby the bucket 38 is replaced by a concrete pump in the trenches with pipes to the exit from the workspace.
  • a device according to the invention can also be used above ground. In this case it may be necessary to embed extra anchors in the ground in order to keep the frame in place during the pushing if this frame 10 is not heavy enough to exert a sufficient pressing force on the cuttershoe 7 and/or sheeting elements 5.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Sewage (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

  • The present invention relates to a device for producing a sheeted trench.
  • For the realisation of foundations in underground excavations, the technique of the "sheeted trench" is frequently applied today. A device producing a "sheeted trench" according to the preamble of claim 1 is for instance known from JP-A-61134428 .
  • The technique of "sheeted trench" consists of making a trench by manually digging down vertically and then systematically sheeting the excavated trench with prefabricated concrete plates to support the walls of the excavated trench in order to absorb the pressure of the earth and thus prevent cave-ins or collapses.
  • Once the trench is complete, after affixing reinforcement, concrete is poured into the trench to form a concrete wall, for example an underground tunnel wall or car park, and after the concrete has set the earth next to the wall is excavated, for example to clear the space of the tunnel or the car park.
  • The technique is primarily applied when there is insufficient space above ground to deploy large earthmoving machines for the realisation of the trench, for example on account of the presence of buildings or similar.
  • Then the work starts with a horizontal tunnel that is first dug out, after which the trench is manually excavated vertically downwards from the tunnel in the aforementioned manner.
  • The height of the sheeting elements and the steps for realising the sheeted trench are determined such that, taking the local specific internal angle of friction of the soil into account, the excavation can be done vertically to a depth of 20 metres and more without the risk of subsidence. For the stability, from a soil mechanics point of view, the effects of the horizontal arching action and vertical vaulting action are taken into account.
  • A disadvantage of such a construction technique is that the earthworks and the installation of the sheeting must be done completely manually, which is not without risk with regard to the personal safety of the worker.
  • Another disadvantage is that manual earthworks are very labour intensive and consequently expensive, and detrimentally affect the duration of the construction site.
  • Another disadvantage is that the concrete plates used for the sheeting are lost.
  • The purpose of the present invention is to provide a solution to one or more of the aforementioned and other disadvantages, by providing a device that enables sheeted trenches to be realised in mechanised way, whereby the worker does not have to work down in the trench, safety is absolutely guaranteed, and whereby the efficiency can be increased by a number of times with respect to the traditional method and the duration of the construction site can be substantially reduced.
  • To this end the invention concerns a device for producing a sheeted trench, more specifically a trench made in the ground with a desired depth whose walls are supported by sheeting elements that are fitted together vertically, whereby the device consists of a series of sheeting elements fitted together vertically in the form of shaft segments or to compose such shaft segments; a cuttershoe in the form of a frame with a cutting edge oriented downwards of which the outer dimensions of the horizontal cross-section essentially match the outer dimensions of the sahft formed by the sheeting elements; a frame that is movable in at least the longitudinal direction of the trench provided with means to systematically push the cuttershoe vertically into the ground by machine over a depth essentially corresponding to the height of the shaft segments; means for evacuating the earth upwards from the trench by machine in order to form the trench, means to systematically bring the sheeting elements into place as the cuttershoe is pushed deeper into the ground in order to support the trench obtained, whereby the means (9) for pushing the cuttershoe (7) into the ground (11) are formed by a rod (12) that is expendable by connectable extension pieces and that is fastened by its bottom end (13) to the cuttershoe (7), and that is affixed movably in a vertical guide of the frame (10) and that is operated by a press (14)
  • With such a device, vertical sheeted shafts fitted next to one another are realised successively along the length of the trench, which are then cast with concrete in order to form a wall.
  • With this device, practically all operations and activities that are necessary for the realisation of a sheeted trench are mechanised, more specifically the activities that are necessary for excavating the trench and for affixing the sheeting.
  • Preferably the cuttershoe is equipped with a ground cutter to loosen the earth at the level of the cutting edge in order to be able to evacuate the loosened earth upwards more easily, for example by means of a bucket chain or a ground bucket.
  • This is certainly necessary for soil types with a high hardness, for example rocky soil (up to 50 MPa) or frozen soil.
  • Preferably the frame and the aforementioned means are designed to be movable in a horizontal tunnel with a diameter of three metres for example, such that the device can be applied in situations where there is insufficient space above ground for the larger traditional excavating machines.
  • Preferably the sheeting elements are of a rectangular shape, such that flat concrete walls can be realised.
  • The device can also be applied beneficially above ground, as with known above-ground methods for forming concrete walls, for example diaphragm walls, flat walls are not obtained, which has the disadvantage that after the walls are released, an extra wall lining must be provided to make the walls even.
  • The sheeting elements stacked on one another and the cuttershoe are systematically pulled upwards when concrete is poured into the trench, as the level of the concrete rises in the trench, and the sheeting elements are removed one by one as they are pulled out of the trench for subsequent use.
  • In order to be able to pull the cuttershoe and the sheeting elements out of the trench, coupling means are provided to fasten the cuttershoe and the sheeting elements together.
  • With the intention of better showing the characteristics of the invention, a few preferred embodiments of a device according to the invention for producing a sheeted trench are described hereinafter by way of an example, without any limiting nature, with reference to the accompanying drawings, wherein:
    • Figure 1 schematically shows a vertical cross-section of a device according to the invention in use for the realisation of a sheeted trench;
    • figure 2 schematically shows a vertical cross-section perpendicular to the plane of the cross-section of figure 1;
    • figure 3 shows on a larger scale the part indicated by the box F3 in figure 2;
    • figure 4 shows the device of figure 1 during a subsequent stage of usage;
    • figure 5 shows a cross-section on a larger scale according to the line V-V in figure 1;
    • figure 6 shows a sheeting element of the device according to the invention;
    • figure 7 shows an alternative device different from the invention during the use thereof;
    • figure 8 shows the device of figure 7 during a subsequent stage of usage.
  • The device 1 shown in figure 1 is deployed in a movable manner in a horizontal tunnel 2 for the realisation of a vertical sheeted trench 3.
  • The device makes use of plates that can be put together to form a sheeting element 5 in the form of a shaft segment with rectangular cross-section, as shown in figure 5.
  • The plates 4 are preferably prefabricated concrete plates that are strong enough to be able to absorb the pressure of the earth.
  • The ends of two opposite plates have a drop 6 into which the short plates can click when being affixed in the trench 3.
  • The device 1 contains a cuttershoe 7 in the form of a frame with a cutting edge 8 oriented downwards, of which the outer dimensions of the horizontal cross-section essentially match the outer dimensions of the shaft formed by the sheeting elements, essentially corresponding to the inner dimensions of the trench 3 to be produced.
  • The device 1 is further provided with means 9 to push the cuttershoe 7 vertically into the ground, and these means 9 are affixed on a frame 10 that can move in the longitudinal direction of the tunnel 2, which in this case is mounted on a tracked machine.
  • These means 9 for pushing the cuttershoe 7 into the ground 11 are formed by a rod 12 whose bottom end 13 is secured to the cuttershoe 7 and which is affixed movably in a vertical guide of the frame 10 and which can be operated by means of a press 14 on the frame 10.
  • The press can be provided with struts 15 in order to transmit the compression forces, for pushing the cuttershoe 7 into the ground, to the walls of the tunnel 2, more specifically to the ceiling of the tunnel 2.
  • The aforementioned rod 12 can be extended by means of extension pieces, not shown in the drawings, that can be connected together in line with one another as the depth of the trench 3 increases.
  • In this case a drill carriage of a known type can be used as a frame 10 for example, whereby the drill is replaced by the rod 12.
  • During use the cuttershoe 7 has at least two upward-oriented parallel cutter walls 16 at a distance from one another over the width of the trench 3, whereby the device 1 contains means 17 to reduce the distance between the cutter walls 16 in order to be able to pull the cuttershoe 7 out of the sheeted trench 3 without removing the sheeting elements 5.
  • To this end, in the example shown the cutter walls 16 concerned are fastened to the end of a transom 18 which, as indicated by the arrows A in figure 3, can be tilted upwards around a horizontal shaft 19 that is secured to the aforementioned rod 12.
  • At the cuttershoe 7 the device 1 is equipped with a ground cutter 20 to loosen the earth at the level of the cutting edge 8 of the cuttershoe 7 in order to be able to evacuate the loosened earth upwards more easily.
  • This ground cutter 20 is for example fastened detachably to the rod 12 and hydraulically driven around a horizontal shaft 21, for example by means of a hydraulic unit 22 on the frame 10.
  • Furthermore the device 1 contains means 23 for evacuating the earth upwards from the trench 3 by machine in order to form the trench 3. In the example of figure 1, these means 23 are formed by a bucket chain 24 with dredging buckets 25, whereby the bucket chain 24 contains a horizontal section 24A and a vertical section 24B whose length can be adjusted to the depth of the trench 3 already excavated, and whereby the vertical section 24B extends to just above the ground cutter 20.
  • The earth evacuated from the trench is received in a container 26 in order to be taken away.
  • Moreover the device 1 contains means 27 to systematically put the plates 4 of the sheeting elements 5 in place as the trench becomes deeper, in order to support the trench 3.
  • The means 27 are formed for example by a lift 28 that can move up and down on the rod 12, for example, to supply the plates 4 from the tunnel 2 to the place where a section of trench is released between the cuttershoe and a sheeting element 5 already installed, whereby the lift 28 is provided with means 29 to push the plates 4 laterally against the wall of the released trench 3 section.
  • The method for producing a sheeted trench 3 with a device 1 according to the invention is simple and as follows.
  • Figure 1 shows a situation in which a sheeted trench 3 has already been realised up to a certain depth.
  • In order to make the trench deeper, the cuttershoe 7 is pushed downwards more deeply, whereby if necessary the rod 12 can be made longer by affixing an additional length of the rod 12.
  • The earth under the cutter is loosened by the turning of the ground cutter and moved to above the cutter from where it is scooped up by the dredging buckets 25 of the bucket chain 24 and evacuated to the container 26 in the tunnel.
  • Thus the trench 3 is further deepened below the sheeting elements 5 already present, such that a section of unsheeted trench wall is released at the bottom.
  • When this released section is high enough to fit a new sheeting element, the necessary plates 5 for this are brought into position with the lift 28 and pushed in place against the trench wall with the means 29 on the lift 28, whereby the plates 5 click together thanks to the elasticity of the trench wall.
  • This action is continually repeated whereby the trench 3 is systematically sheeted up to the desired depth.
  • When the sheeted trench is complete, the cuttershoe 7, the ground cutter 20, the rod 12, the lift 28 and the bucket chain 24 are removed from the sheeted trench 3, such that only the sheeting elements remain in place.
  • Then reinforcement is affixed in the sheeted trench 3 and it is filled with concrete and the excavation of a subsequent sheeted trench 3 is started a few shaft lengths further on in the longitudinal direction of the tunnel 2, outside the zone of influence.of the shaft just realised. To this end the device is moved over a distance corresponding to a few lengths of the shafts measured in the longitudinal direction of the tunnel 3.
  • Thus a wall of close-fitting concrete shafts is realised, which together form an underground wall, an underground car park or similar, at least insofar the earth next to the sheeted trench 5 is removed for this purpose.
  • It is clear that the sheeting elements 5 left behind cannot be recovered and are thus lost.
  • It is also clear that the walls thus obtained are fairly even walls that do not necessarily require any final processing.
  • Figure 6 portrays an alternative embodiment of a sheeting element 5 that is constructed as a double-walled reusable shaft segment 30 with walls 31 made of sheet steel, 3 to 4 mm thick for example.
  • This sheeting element 5 is provided with coupling means 32-33 in order to fasten the sheeting elements 5, stacked on one another, together and to the cuttershoe 7, which also has suitable coupling means to this end.
  • The end sides of the outer wall 31 of the sheeting element 5 are provided with a tongue 34 and a groove 35 with which the sheeting elements, fitted against one another, fit into one another.
  • If necessary a further vertical groove 35 can be provided in the tongue and groove that is suitable for affixing an (additional) seal, for example in the form of an inflatable hose.
  • These sheeting elements are used for example with a variant device different from the invention, as illustrated in figure 7.
  • In this case the frame 10 is a gantry 36 that can.be moved on rails 37.
  • A ground bucket 38 is suspended from the gantry 36 that can be operated by means of cables 39 and can be lowered into the sheeted trench 3, and which can be moved in the horizontal direction up to above a conveyor belt 40 for example.
  • The frame 10 is further provided with a hydraulic crown 41 with four vertical dual action hydraulic cylinders 42 with which the cuttershoe 7 or a stack of cuttershoes 7 and sheeting elements can be pushed into the ground and pulled from the trench 3.
  • To this end the hydraulic crown 41 is also equipped with coupling means for fastening to the sheeting elements 5 or to the cuttershoe 7.
  • The cylinders 42 can be controlled independently in order to be able to make control corrections during pressing, whereby the hydraulic crown is equipped with measuring apparatus to measure the horizontality in order to be able to adjust when necessary.
  • In this case the cuttershoe 7 is also equipped with a detachable ground cutter 20. However, the cuttershoe does not necessarily have to be provided with retractable walls as was the case with the embodiment of the invention of figure 1.
  • As a result of the monolithic structure of the sheeting elements the sheeted trench is self-stable without intermediate stays.
  • As a result, the workspace is larger and free of obstructions, firstly for excavating and removing the earth, and secondly for installing the reinforcement.
  • The use of such a device according to the figure 7 is somewhat different to the case of the device of figure 1.
  • At the start of the works, a sheeting element 5, provided with a cuttershoe 7 underneath, is fastened to the hydraulic crown 41 in order to push the cuttershoe 7 into the ground.
  • The earth under the ground cutter 20 is cut loose and is systematically evacuated as the cuttershoe descends more deeply, if applicable with a ground bucket 38 or a bucket chain 24, as in figure 4.
  • As soon as the first sheeting element 5 has sunk down, a new sheeting element is screwed on and sunk in.
  • This is systematically repeated as illustrated in figures 7 and 8, until the trench 3 has reached the desired depth.
  • Then the ground cutter 20 is manually removed from the cuttershoe 7 and the affixing of the reinforcement in the trench can begin. As the entire opening of the trench is clear, the reinforcing basket is also sunk in modularly in elements as high as the workspace allows.
  • Now it can be concreted from the trench base up, while the sheeting is systematically pulled up as the level of the liquid concrete in the trench 3 rises, whereby the concrete takes over the supporting function of the retaining wall.
  • The sheeting elements are dismantled one by one as they come out of the trench 3 and are stored for re-use for the realisation of a subsequent shaft.
  • This last method has a number of advantages with respect to the previous method, i.e.:
    • no lost sheeting materiel;
    • due to the exclusion of intermediate stays there is a large clear space in the trench while digging and then when fitting the reinforcement;
    • no personnel are required in the trench for digging;
    • the reinforcement can be fitted and sunk in sections, whereby on account of the possible mechanisation of this the implementation speed can be increased with respect to manual implementation;
    • environmentally-friendly on account of the non-application of lost sheeting, or in other words a sustainable technological development;
    • more accurate excavations compared to manual work, such that there is less risk of subsidence;
    • in this case in every situation the ground is supported over the entire height;
    • no need for post-injection;
    • savings on the costs of specialised excavation personnel;
    • the investment in the sheeting modules is more than offset by the savings in lost sheeting material;
    • simple realisation of the tongue-groove connection between the wall sections due to suitable sheeting modules;
    • fairly even walls that (if applicable) do not require any final processing;
    • space saving of 10 cm wall thickness;
    • logistical saving on account of the elimination of lost sheeting;
    • the excavation with the ground cutter can also operate in frozen ground, thus without drainage.
  • For large projects the "slime method" can be considered for the earth transport, whereby the bucket 38 is replaced by a concrete pump in the trenches with pipes to the exit from the workspace.
  • It is clear that a device according to the invention can also be used above ground. In this case it may be necessary to embed extra anchors in the ground in order to keep the frame in place during the pushing if this frame 10 is not heavy enough to exert a sufficient pressing force on the cuttershoe 7 and/or sheeting elements 5.
  • The present invention is by no means limited to the embodiment described as an example and shown in the drawings, but a device according to the invention for producing a sheeted trench can be realised in all kinds of variants, without departing from the scope of the invention as defined by the following claims.

Claims (12)

  1. Device for producing a sheeted trench (3), more specifically a trench (3) made in the ground (11) with a desired depth whose walls are supported by sheeting elements (5) that are fitted together vertically, whereby the device (1) consists of a series of sheeting elements (5) fitted together vertically in the form of shaft segments (30) or to compose such shaft segments (30); a cuttershoe (7) with a cutting edge (8) oriented downwards of which the outer dimensions of the horizontal cross-section essentially match the outer dimensions of the shaft formed by the sheeting elements (5); a frame (10) that is movable in at least the longitudinal direction of the trench (3) provided with means (9) to systematically push the cuttershoe (7) vertically into the ground (11) by machine over a depth essentially corresponding to the height of the sheeting elements (5); means (23) for evacuating the earth upwards from the trench (3) by machine in order to form the trench (3), means to systematically bring the sheeting elements (5) into place as the cuttershoe (7) is pushed deeper into the ground in order to support the trench (3) obtained, characterised in that the means (9) for pushing the cuttershoe (7) into the ground (11) are formed by a rod (12) that is extendable by connectable extension pieces and that is fastened by its bottom end (13) to the cuttershoe (7), and that is affixed movably in a vertical guide of the frame (10) and that is operated by a press (14).
  2. Device according to claim 1, characterised in that the sheeting elements (5) have a rectangular cross-section.
  3. Device according to claim 1 or 2, characterised in that there is a ground cutter (20) at the level of the cuttershoe (7) to loosen the earth (11) at the level of the cuttershoe (7) in order to be able to evacuate the loosened earth.
  4. Device according to claim 3, characterised in that the ground cutter (20) is detached or can be detached from the cuttershoe (7).
  5. Device according to any one of the previous claims, characterised in that during use the cuttershoe (7) contains at least two upward-oriented parallel cutter walls (16) over the width of the trench (3), and that the device contains means (17) to reduce the distance between the cutter walls (16) in order to be able to pull the cuttershoe (7) out of the sheeted trench (3).
  6. Device according to claim 5, characterised in that the sheeting elements (5) stacked on one another in the trench (3) constitute lost formwork for casting concrete when the sheeted trench (3) is complete, and the cuttershoe (7) with its ground cutter (20) is removed and the reinforcement is affixed.
  7. Device according to claim 1, characterised in that the sheeting elements (5) are rectangular shaft segments that can consist of four plates (4) that are pushed against the trench wall and which have a click connection (6) at their ends that click into one another when pushing the plates (4) against the trench wall.
  8. Device according to claim 7, characterised in that it is equipped with a lift (28) to move the plates (4) up to an excavated section of trench wall between the cuttershoe (7) and an already installed sheeting element (5), and that the lift (28) is provided with means (29) to push the plates (4) against this section of trench wall.
  9. Device according to claim 1, characterised in that the means (23) to evacuate the earth upwards from the trench (3) by machine are formed by a bucket chain (24) with a horizontal section (24A) and a vertical section (24B), whose length is adjustable to the depth of the trench (3).
  10. Device according to claim 1, characterised in that the means (23) for evacuating the earth upwards from the trench (3) by machine are formed by a ground bucket (38) suspended from the frame (10) and with cable operation.
  11. Device according to claim 1, characterised in that the means (23) for evacuating the earth upwards from the trench (3) by machine are formed by a concrete pump in the trenches with pipes to the exit of the workplace for the application of the "slime method".
  12. Device according to claim 1, characterised in that the press or the frame (10) are equipped with struts (15) to transmit the compression forces, for pushing the cuttershoe (7) into the ground, to the walls of the tunnel (2).
EP12003861.7A 2011-05-23 2012-05-16 Device for producing a sheeted trench Active EP2535462B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
BE2011/0313A BE1020119A3 (en) 2011-05-23 2011-05-23 DEVICE FOR MAKING A FROZEN SLOT.

Publications (2)

Publication Number Publication Date
EP2535462A1 EP2535462A1 (en) 2012-12-19
EP2535462B1 true EP2535462B1 (en) 2016-03-09

Family

ID=46934356

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12003861.7A Active EP2535462B1 (en) 2011-05-23 2012-05-16 Device for producing a sheeted trench

Country Status (6)

Country Link
EP (1) EP2535462B1 (en)
BE (1) BE1020119A3 (en)
DK (1) DK2535462T3 (en)
ES (1) ES2570663T3 (en)
HU (1) HUE027432T2 (en)
PL (1) PL2535462T3 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1203843A2 (en) * 2000-11-03 2002-05-08 Herrmann Eurotechnic S.r.l. Bagger shovel for making slits for reinforced concrete walls

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4033138A (en) * 1976-02-09 1977-07-05 Griswold James L Trench shoring assembly with stacking accessory
GB1597833A (en) * 1977-03-05 1981-09-09 Treacy T P Shoring assembly for a trench or hole
JPS61134428A (en) * 1984-11-30 1986-06-21 Takenaka Komuten Co Ltd Device of pressing-in sheathing panel, excavating, and discharging soil
DE9012969U1 (en) * 1990-09-11 1991-02-28 Heß, Wilhelm, 5000 Köln Device for shoring up deep trenches
US5800096A (en) * 1995-04-27 1998-09-01 Barrow; Jeffrey Subsurface barrier wall and method of installation
JP3105196B2 (en) * 1997-07-09 2000-10-30 日本スピードショア株式会社 Sliding panel type earth retaining structure
DE10207126A1 (en) * 2002-02-20 2003-09-11 Tim Laemmle Trench digging and lining machine for preparing foundations for buildings has chain scraping up soil from bottom of trench and carrying it up to surface

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1203843A2 (en) * 2000-11-03 2002-05-08 Herrmann Eurotechnic S.r.l. Bagger shovel for making slits for reinforced concrete walls

Also Published As

Publication number Publication date
BE1020119A3 (en) 2013-05-07
EP2535462A1 (en) 2012-12-19
DK2535462T3 (en) 2016-06-06
HUE027432T2 (en) 2016-09-28
ES2570663T3 (en) 2016-05-19
PL2535462T3 (en) 2016-09-30

Similar Documents

Publication Publication Date Title
US11746493B2 (en) Wall sinking construction method
JP6010070B2 (en) Temporary closing method for existing underwater structures
EP3942154B1 (en) Method and system of constructing an underground tunnel
CA3188339A1 (en) Tunnelling shield
EP2535462B1 (en) Device for producing a sheeted trench
KR20090011442A (en) Tunnel boring method using sheet pile and tunnel structure therof
JP7177233B2 (en) Start Reaction Force Structure and Method for Concrete Box or Open Shield Machine
JP3205485B2 (en) Civil engineering method and device and earth retaining device
KR102289576B1 (en) Top-down type underground structure construction method using earth support plate
CN113047843A (en) Large-diameter pile or vertical shaft pore-forming soil body excavation device
KR101940812B1 (en) excavation method using propulsion of caisson
JP2004003229A (en) Method for constructing vertical shaft
CN114875925B (en) Construction method of oversized deep foundation pit of subway tunnel adjacent to sea-filling stratum
JP7461443B1 (en) How to assemble an open shield machine
CN211081874U (en) Shield tunneling machine cutter head access hole
JPH06346681A (en) Method and equipment for construction of shaft
NL2013275B1 (en) Method for constructing a tunnel in the ground, and corresponding tunnel excavator.
JP2024092472A (en) Method of entering an open shield machine into a vertical shaft in an open shield construction method and a vertical shaft of an open shield machine
EA046986B1 (en) METHOD AND SYSTEM FOR CONSTRUCTION OF UNDERGROUND TUNNEL
EA044537B1 (en) METHOD AND SYSTEM FOR CONSTRUCTION OF UNDERGROUND TUNNEL
CN117868207A (en) Construction method for tunnel open cut tunnel portal section to pass through urban landfill
GB2591691A (en) Method and system of constructing an underground tunnel

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20130521

17Q First examination report despatched

Effective date: 20140319

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150922

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 779647

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160315

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012015335

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: ORITI PATENTS - FRANCO ORITI, CH

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2570663

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20160519

REG Reference to a national code

Ref country code: RO

Ref legal event code: EPE

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20160520

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

Effective date: 20160530

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160609

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160610

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

REG Reference to a national code

Ref country code: HU

Ref legal event code: AG4A

Ref document number: E027432

Country of ref document: HU

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160709

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 21289

Country of ref document: SK

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012015335

Country of ref document: DE

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20161212

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160609

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

REG Reference to a national code

Ref country code: CH

Ref legal event code: PLI

Free format text: EXCLUSIVE LICENCE

Name of requester: FUTURE FOUNDATIONS, BE

REG Reference to a national code

Ref country code: DE

Ref legal event code: R088

Ref document number: 602012015335

Country of ref document: DE

REG Reference to a national code

Ref country code: BE

Ref legal event code: FP

Effective date: 20160513

Ref country code: BE

Ref legal event code: QB

Free format text: DETAILS LICENCE: LICENCE, ENREGISTREMENT D'UNE NOUVELLE LICENCE

Name of requester: FUTURE FOUNDATIONS NV

Effective date: 20180202

REG Reference to a national code

Ref country code: NL

Ref legal event code: QB

Free format text: DETAILS LICENCE OR PLEDGE: LICENCE, NEW LICENCE REGISTRATION

Name of requester: FUTURE FOUNDATIONS NV

Effective date: 20180228

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20180308 AND 20180314

REG Reference to a national code

Ref country code: LU

Ref legal event code: QB

Name of requester: FUTURE FOUNDATIONS NV

Effective date: 20180316

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

REG Reference to a national code

Ref country code: ES

Ref legal event code: GD2A

Effective date: 20180703

REG Reference to a national code

Ref country code: FR

Ref legal event code: CL

Name of requester: FUTURE FOUNDATIONS, BE

Effective date: 20180710

REG Reference to a national code

Ref country code: SK

Ref legal event code: QB4A

Ref document number: SK

Free format text: EXCLUSIVE LICENCE

Name of requester: FUTURE FOUNDATIONS, GHENT, BE

Effective date: 20171219

Ref country code: SK

Ref legal event code: TE4A

Ref document number: E 21289

Country of ref document: SK

Owner name: DENYS NAAMLOZE VENNOOTSCHAP, GHENT, BE

Effective date: 20180730

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160309

REG Reference to a national code

Ref country code: AT

Ref legal event code: UEP

Ref document number: 779647

Country of ref document: AT

Kind code of ref document: T

Effective date: 20160309

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PL

Payment date: 20200311

Year of fee payment: 9

Ref country code: PT

Payment date: 20200327

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SK

Payment date: 20200311

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20200316

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: RO

Payment date: 20200424

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: HU

Payment date: 20200320

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20210526

Year of fee payment: 10

Ref country code: MC

Payment date: 20210511

Year of fee payment: 10

Ref country code: CZ

Payment date: 20210416

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20210419

Year of fee payment: 10

Ref country code: IE

Payment date: 20210419

Year of fee payment: 10

Ref country code: AT

Payment date: 20210421

Year of fee payment: 10

Ref country code: CH

Payment date: 20210420

Year of fee payment: 10

Ref country code: DK

Payment date: 20210421

Year of fee payment: 10

Ref country code: GB

Payment date: 20210419

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20210817

Year of fee payment: 10

REG Reference to a national code

Ref country code: SK

Ref legal event code: MM4A

Ref document number: E 21289

Country of ref document: SK

Effective date: 20210516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211116

Ref country code: RO

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210516

Ref country code: HU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210517

Ref country code: SK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210516

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20220314

Year of fee payment: 11

Ref country code: LU

Payment date: 20220314

Year of fee payment: 11

Ref country code: FR

Payment date: 20220315

Year of fee payment: 11

Ref country code: BE

Payment date: 20220308

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220426

Year of fee payment: 11

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

Effective date: 20220531

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 779647

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220516

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20220516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220517

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220516

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220516

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210516

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220516

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230316

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20230726

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220517

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602012015335

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20230601

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230516

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230601

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20231201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230531

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230531