EP2530237A1 - Station zur Aufbereitung von Schlämmen, die mit einem Tunnelbohrgerät mit unter Druck stehender Angriffsfläche verbunden ist, und Steuerungverfahren einer solchen Station - Google Patents

Station zur Aufbereitung von Schlämmen, die mit einem Tunnelbohrgerät mit unter Druck stehender Angriffsfläche verbunden ist, und Steuerungverfahren einer solchen Station Download PDF

Info

Publication number
EP2530237A1
EP2530237A1 EP12169815A EP12169815A EP2530237A1 EP 2530237 A1 EP2530237 A1 EP 2530237A1 EP 12169815 A EP12169815 A EP 12169815A EP 12169815 A EP12169815 A EP 12169815A EP 2530237 A1 EP2530237 A1 EP 2530237A1
Authority
EP
European Patent Office
Prior art keywords
sludge
pickling
tank
regenerated
mother
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP12169815A
Other languages
English (en)
French (fr)
Other versions
EP2530237B1 (de
Inventor
Alexandre Guillaume
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
M S
Original Assignee
M S
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by M S filed Critical M S
Publication of EP2530237A1 publication Critical patent/EP2530237A1/de
Application granted granted Critical
Publication of EP2530237B1 publication Critical patent/EP2530237B1/de
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/062Arrangements for treating drilling fluids outside the borehole by mixing components
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/06Arrangements for treating drilling fluids outside the borehole
    • E21B21/063Arrangements for treating drilling fluids outside the borehole by separating components
    • E21B21/065Separating solids from drilling fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for

Definitions

  • the invention relates to a sludge treatment plant associated with a pressurized leading-edge tunneling machine and to a method for managing such a station.
  • a tunnel pressurized front end is a public works machine comprising, in the front part, a circular shield, one side is equipped with a rotary cutting wheel.
  • This cutting wheel digs a tunnel whose diameter substantially corresponds to the diameter of the shield.
  • the cutting wheel works under pressure. It is mounted at the front of a chamber, called the slaughter chamber, depending on the direction of travel of the tunnel boring machine.
  • the rear part of the tunnel boring machine comprises, in addition to various devices allowing the circulation of fluids between the tunnel and the surface, all the devices for piloting, safety and setting up the voussoirs constituting the tunnel.
  • a tunnel boring machine drills the ground a distance corresponding generally to the width of a voussoir before stopping to ensure the establishment of the latter from the follower train. To ensure its advance in the ground, the tunneling machine advances by building on the voussoirs previously set up.
  • the cutting wheel works under pressure to balance the hydrostatic pressure exerted by the geological layers on the TBM shield.
  • the pressures exerted by the ground on the cutting wheel are generally between 1 and 5 bar and may in some cases be greater than 12 bar.
  • TBM is particularly used either to intervene in terrain, having a high hydrostatic pressure, or in land with pulverulent materials and / or with high risk of clogging due, for example, to a clay soil nature.
  • Mud is injected under pressure to the front of the leading edge from the slaughter chamber.
  • This sludge in addition to a lubrication role of the cutting wheel, ensures the stability of the walls of the excavation.
  • the sludge, brought from the surface, also makes it possible, during its return trip to the surface, to ensure the transport of the materials resulting from the excavation.
  • the circulation of the sludge in the slaughter chamber thus makes it possible to maintain a constant pressure at the level of the cutting wheel. Pressurizing the mud thus injected at the front of the tunnel boring machine is carried out by pumps, called pickling pumps. If necessary, a compressed air bubble created behind the slaughter chamber completes the pressure maintenance.
  • the sludge used generally includes bentonite.
  • bentonite Such a clay, because of its rheological qualities, is injected on the cutting edge in order to consolidate and stabilize the latter by forming an impermeable coating on the walls, which makes it possible to keep the excavation in shape until it is put into place. in place of the voussoirs.
  • Bentonite is a non-Newtonian clay that has the property of being liquid when it is in motion, that is to say when it is conveyed in pipes and / or projected, and to form a rapidly drying paste in absence of stress, that is to say at rest, when projected on the walls of the excavation.
  • the sludge entering and leaving the tunnel boring machine is managed by a sludge treatment and preparation station which is permanently connected to the tunnel boring machine head.
  • This station must ensure a regular supply of sludge both in quantity, that is to say in flow, as in quality, especially with respect to specific rheological characteristics.
  • This soil can be more or less clay, more or less hard with the presence of so-called polluted areas, especially in urban areas. Polluted areas include, for example, portions of concrete structures, which is typically the case at the beginning and at the end of digging of the tunnel since the tunnel boring machine must drill the wall of the well through which it was lowered or by which it will be reassembled.
  • the pollution may also consist of gypsum or areas of salt that will also alter the characteristics of the mud.
  • the sludge injected on the cutting edge may thus consist exclusively of so-called mother sludge, that is to say an aqueous solution of bentonite or, conversely, consisting solely of recycled sludge and / or without bentonite .
  • the spent sludge from the cutting wheel comprises a portion of the injected mother sludge, unused, and clearing materials. This used sludge is, initially, recycled.
  • a sludge treatment station where, upstream of a tank forming a sludge buffer reserve prior to its injection at the cutting wheel, there is a treatment tank in which the mixing of the mother sludge and recycled .
  • This tank is provided, upstream, a means for evacuating the surplus of the slurry mixture.
  • This means is formed by a float valve. In this way, only a given quantity of the sludge mixture produced in the treatment tank is taken. Using this float valve, excess sludge is directed to a used sludge storage tank prior to its treatment as ultimate waste, for example, by pressing into slabs.
  • Such a solution makes it possible to have, permanently, a given amount of sludge corresponding to the mixture that is to be reinjected and which has been prepared in the pickling tank.
  • This tray provides a constant and steady flow of sludge at the cutting wheel.
  • mother sludge in the pickling sludge, which may be almost exclusively composed of regenerated sludge.
  • mother mud in the pickling sludge, for example when the tunnel boring machine drills in polluted soil, to avoid pollution of the mother sludge.
  • recycled sludge may be suitable.
  • the invention particularly intends to meet by proposing a sludge treatment station to optimize the quality of pickling sludge, while limiting the loss of mother sludge before its first use.
  • the subject of the invention is a sludge treatment plant associated with a pressurized front-end tunneling machine, comprising at least one first means of regeneration of the sludge coming from the tunneling machine leading edge, a second means of preparation of new sludge called mother sludge, a third means for preparing a mixture of sludge for use in the leading edge, said pickling sludge, from sludge from the first and second means, a fourth feed means the pickling mud leading edge, a fifth means for collecting and discharging the unused and non-regenerable sludge, a sixth means, interposed between the first and third means and adapted to direct to the fifth means a portion of the sludge from the third means, characterized in that the sixth means is adapted to adjustably direct to the fifth means only a portion of the regenerated mud from the first way.
  • this sixth means it is possible to inject into the third preparation means of the sludge mixture only the necessary quantity of regenerated sludge and thus, thereby, to optimize the quantity of mother sludge to be incorporated into the pickling sludge. This allows, at least, to limit the release of "new" sludge before its first use.
  • the sludge discharge to be carried out to adapt the rheology and / or the flow rate and / or the density of the pickling sludge is made prior to the injection of mother sludge into the pickling sludge, from the regenerated sludge.
  • a tunnel boring machine 1 is schematically and partially shown, in longitudinal section, in the lower right part of the figure 1 . Only the front part of the TBM, ie the shield, is represented. The follower train, known per se, is not illustrated.
  • a cutting wheel forms the front end of the tunnel borer intended to be in contact with the ground to be excavated. It comprises a rotating wheel 2, provided with cutting and / or abrasive elements 3.
  • the cutting wheel 2 is rotatably mounted about a longitudinal axis A of the tunnel boring machine 1. The Thus, the wheel 2 drills the ground in a direction parallel to the longitudinal axis A of the tunnel boring machine 1, this direction corresponding to the path of the tunnel boring machine in the ground.
  • this cutting wheel 2 At the rear of this cutting wheel 2 is a chamber 4 maintained, if necessary, in pressure by a bubble of compressed air.
  • a chamber 4 maintained, if necessary, in pressure by a bubble of compressed air.
  • a bubble of compressed air is injected into this space.
  • This room 4 is called slaughter room. It communicates with the outside of the tunnel boring machine and participates with slurry injection pumps, called pickling pumps, to send under pressure, both laterally and frontally, sludge at the cutting wheel 2.
  • pickling pumps slurry injection pumps
  • This sludge is intended not only to facilitate drilling, by lubricating the wheel 2, but also, once solidified, to consolidate and stabilize the excavation, behind the wheel 2.
  • Such sludge is referred to in the following "mud of marinage B2 ".
  • the pickling sludge B2 is fed to the wheel 2 by pipes from the surface.
  • Other pipes allow, from the slaughter chamber 4, to collect unused pickling sludge, that is to say not solidified, as well as excavated materials. These are driven by the unused pickling sludge in order to evacuate them to the surface.
  • Waste sludge B is the mixture of unused pickling sludge B2 and excavation debris that is discharged to the surface. Thus, a portion of the pickling sludge B2 remains in the tunnel as wall reinforcement product and a part forms a means of transport excavated materials.
  • the spent sludge B coming from the tunneling machine 1 is collected at the rear of the chamber 4 and fed via conduits 5 to a first means 6 for regenerating the sludge.
  • This first means 6 is located on the surface, near the working area of the TBM. It comprises several devices, known per se, to recycle sludge B. For this, sludge B goes into a first device to evacuate debris of larger size, typically more than 6 mm. This first device performs an operation called scalping or precranking. In the following operations, the sands, that is to say the debris of caliber less than 6 mm, are evacuated. These operations are called desanding or desanding and desilting or trimming, depending on the size of the treated debris.
  • This first means 6 comprises, in the example, devices 60, 61, 62, known per se, successively respectively providing the pre-screening, the grit removal and the settling of the sludge B.
  • the pre-screening apparatus comprises a rotary filter 60 called trommel.
  • Descaling and settling devices include hydrocyclones 61, 62 whose characteristics are adapted to the geology of the lands crossed and therefore to the mud B to be treated.
  • the operations carried out by the first means 6 are adapted, in particular with regard to the characteristics of the apparatuses 60 to 62 and / or their number.
  • a sludge called regenerated sludge B0 comprising water, a certain quantity of fine, solid materials from the excavated soil and which have not been recovered by the apparatus 60 to 62 is obtained. and B2 pickling sludge.
  • This sludge B0 is in fact a sludge B resulting from the tunneling work from which excavation debris was removed, at least the largest ones.
  • This regenerated B0 sludge can be reinjected into the tunneling machine slurry supply system.
  • the regenerated sludge B0 is mixed with new sludge, called mother sludge B1, before being returned to the tunnel boring machine.
  • the sludge treatment plant comprises a second means 7 for preparing the new sludge B1.
  • the apparatus constituting this second means 7 comprises a silo 70 for storing bentonite.
  • the rheological characteristics of this type of clay are known and mastered.
  • bentonite is a non-Newtonian, thixotropic type clay, its apparent viscosity diminishing with shear and this in a reversible manner.
  • its ability to absorb water and inflate is used to seal some structures, for example basins.
  • a mixing apparatus 7 dissolves the bentonite from the silo 70.
  • the aqueous solution of the bentonite is made from water from the network stored in a reservoir 72.
  • new sludge, called mother sludge B1 which is stored in at least one buffer tank 73 before any use.
  • the sludge treatment plant comprises a third means 8 for preparing the sludge intended to be re-injected at the leading edge of the tunnel boring machine 1.
  • This sludge referred to as a pickling sludge B2
  • a pickling sludge B2 is prepared in a tank 8, called tank marinating, having two compartments 80, 81 independent and not communicating with each other.
  • the tray 8 comprises more than two compartments.
  • a compartment 80 is connected to the first means 6 for regenerating the sludge.
  • the compartment 80 receives the regenerated sludge B0.
  • the other compartment 81 is connected to the buffer tank 73 containing mother sludge B1.
  • This second compartment 81 is also connected to the tank 72 of clean water and another tank 82 of recycled water.
  • This recycled water comes, on the one hand, from the first means 6 for treating the sludge B and, on the other hand, from a treatment of the unused sludge B3 which is stored in a fourth means 13 for collecting and separating the sludge B. evacuation of unused and non-regenerable sludge.
  • This sludge B3 is, in ultimate treatment, separated by means 9 in water and solid waste 10.
  • the solid waste 10 are, in known manner, compacted and intended for use in public works, for example as backfill.
  • the compartment 81 is connected only to a tank 72 of clean water or a tank 82 of recycled water.
  • the compartment 81 is also equipped with devices 11 for injecting additives, for example polymers, carbon dioxide to adjust the pH or any other element that one would like to incorporate into the mixture intended to prepare the pickling sludge B2.
  • the two compartments 80, 81 are provided with adjustable flow inlet and outlet lines either by gravity or by means of valves known per se. These valves allow, if necessary, to prevent any circulation in the pipe.
  • the means 8 makes it possible to collect sludge B0 and B1 before distributing them, in a controlled manner, in a means of feeding the tunnel boring machine.
  • the pickling sludge B2, obtained at the outlet of the third preparation means 8, by mixing mother sludge B1 and regenerated sludge B0, is thus directed towards a fourth means 12 for supplying the tunneling machine 1 with pickling sludge B2.
  • This fourth means 12 comprises at least one tank 120 for temporary storage of the sludge B2, the capacity of which, if necessary, ensures the supply of sludge B2 of the cutting wheel 2 of the tunnel boring machine, for the time necessary to the security of the attack front, that is to say for example when setting up a voussoir.
  • the capacity of the tank 120 generally corresponds to at least 15 minutes of operation of the tunnel boring machine.
  • the tray 120 is connected by at least one pipe 121 variable flow allowing, if necessary, to isolate the tray 120 to a tank 122 supply tunneling machine.
  • This tray 122 is also connected by a variable flow line 810 to the compartment 81.
  • the valve known per se, ensuring the variation of the flow is not illustrated.
  • the fourth means 12 also comprises an intermediate tray 123, connected to the pickling tank 8.
  • the connection is double. It is carried out directly with the compartment 80 and with an outlet of the tank 8 common to the two compartments 80, 81.
  • the tank 123 can receive the mother sludge B1 and / or the regenerated sludge B0.
  • the tank 123 is fed simultaneously and adjustably sludge B0 and B1. In other words, the tank 123 homogenizes the sludge B0, B1 prior to their injection into the tank 120.
  • the tank 123 is connected, with a possibility of variation of the flow, and therefore of the insulation, to the tank 120, which makes it possible to adjust in quality and in quantity the sludge buffer stock B2 before its injection into the tunnel boring machine.
  • valves are isolation valves, all-or-nothing type.
  • the tray 123 is also connected, directly and in a controlled manner, to the feed tray 122 by an adjustable flow pipe 124, thus providing a bypass type connection. It is possible, thanks to the pipe 124, to inject sludge into the tunnel boring machine, without passing through the buffer tank 120.
  • the tank 123 is also connected to the fifth means 13 for collecting and evacuating the unused sludge B3.
  • This fifth means comprises a tank 13 connected to the various means 6, 8, 9 and 12.
  • This tank 13 has a volume adapted to the quantities of sludge to be treated and their solid particles charge, so the nature of the drilled soil.
  • the tank 13 is adapted to receive the unused sludge produced during the operation of the tunnel boring machine. If necessary, several tanks 13, possibly of different volumes, are cascaded or in parallel.
  • the tank 13 is connected to the tank 123 by a pipe 130 with an adjustable flow rate.
  • the pipe 130 makes it possible, if necessary, to inject sludge into the intermediate tank 123. This injection via the pipe 130 is particularly usable when the tank 13 essentially comprises regenerated sludge B0.
  • An overflow 131 makes it possible to return sludge B2 from the tank 123 into the tank 13.
  • a pipe 132 connects the tank 13 to means 9 and 10 for separating the sludge B3 in water and in the solid phase in the form of pressed slabs.
  • the means 9, 10 thus ensure the final treatment of unused B3 sludge to turn it into ultimate waste.
  • the tank 13 is also connected to a sixth means 14 for selective distribution of the regenerated sludge B0.
  • This sixth means 14 is interposed in the path of the regenerated sludge B0 between the outlet of the first means of regeneration of sludge B0 and the third means 8 for preparing pickling sludge B2. It allows to adjustably direct part of the regenerated sludge B0 to the fifth means 13. In other words, once recycled, that is to say freed of solid waste, the regenerated sludge B0 is not all redirected to the third means 8 to be mixed with mother sludge B1 in view of the preparation of sludge B2 and its sending into the tunnel boring machine. Only the necessary quantity of sludge B0 is reinjected into the circuit for preparing the pickling sludge B2 at the third means 8. The unused sludge B0 is directed directly to the fifth means 13 through the same means 14 to be processed and turned into ultimate waste.
  • the sixth means 14 advantageously comprises at least one butterfly valve 140 or any other type of valve allowing a controlled and therefore variable opening of the regenerated sludge feed B0 of the third means 8.
  • At least one level sensor is installed in at least one of the bins 120, 122, 123.
  • sensors are installed in the bins 120 and 123.
  • all the tanks 120, 122, 123 are provided with a level sensor.
  • At least one safety valve 141 is provided upstream of the valve 140 in the direction of flow of the sludge B0.
  • a butterfly valve 140 makes it possible to control the instantaneous and cumulative flow rates of the sludge B0 coming from the first means 6. It is possible to dispose otherwise the constituent members of the first means 6.
  • the hydrocyclones 61, 62 are not more necessarily arranged in height to feed by gravity means 14.
  • the fifth means 13 collects only the amount of regenerated sludge B0 that will not be reused.
  • the tank 13 is fed, in normal operation, only by regenerated sludge B0 and not by mother sludge B1.
  • a large quantity of high quality sludge B1 so with a content of strong bentonite, in B0 sludge directed towards the tank 13 and then to the means 9, 10 of treatment, induces difficulties of preparation, clogging apparatus.
  • the presence of pickling sludge B2 in the tank 13 is exceptional and only occurs by overflow of the tank 123 into the tank 13, by the overflow 131.
  • the compartment 81 is the only one to supply the tank 123, it can, by overflow via the overflow 131, feed sludge B2, the tank 13. In this case, it is possible to reinject it into the circuit, that is to say in the tray 123 by driving 130.
  • the pipe 130 is used to feed the tank 123 connected directly via the pipe 124 to the tank 122 when the tank 120, is isolated.
  • the pipe 130 from the tank 13 and through the tank 123, it ensures the supply of the sludge B2 of the feed tray 122.
  • Such a circuit is used, for example, when the ground is contaminated with concrete and that it is desired to protect the tank 120 containing pickling sludge B2.
  • the pipe 130 thus allows, in a controlled manner, by gravity, to supply the tank 123 with regenerated sludge B0, in order to adapt the characteristics of the pickling sludge B2 injected into the tunnel boring machine.
  • Such a configuration and the presence of the sixth means 14 does not pollute the feed bins 120, 122, 123 containing pickling sludge B2, that is to say any plant potentially containing mother sludge B1, therefore bentonite in large proportions.
  • All the tanks 13 and the tanks 80, 81, 120, 122, 123 in which the sludges B0, B1, B2, B3 are stored for a longer or shorter duration are provided with mixing means known per se, as well as with other instruments and sensors such as flowmeter, sampler, density, turbidity, pH, temperature or other parameters.
  • This processing station equipped with the sixth means 14 optimizes the management of sludge B, B0, B1, B2 and B3, including mastering the costs associated with the production of mother sludge B1. This optimization is carried out on the basis of a process which is now described with reference to the figure 2 .
  • the station is adapted to, if necessary, operate even when the tunnel boring machine is at a standstill, for example to reconstitute the sludge reserves B1, B2 or to treat the sludge B3 in order to empty the tank 13. It is thus possible, when the tunnel boring machine is stopped, treat the sludge B and B3, redo the levels in the different tanks and / or prepare mother sludge B1.
  • an existing sludge treatment station to incorporate the various means of treating the sludge evoked, in particular the means 14 for distributing the sludge B0.
  • the other facilities concern, in addition to the number, the dimensioning and connecting lines between the various tanks and tanks, the establishment of an automatic management of the operation of the station.
  • the geological nature of the soil to be drilled is known and thus, in a first step, the flow rate Q2 and the density d2 are defined, that is that is, the rheology, of the sludge B2 to be injected at the level of the cutting wheel 2.
  • the parameters of the first regeneration means 6 are adapted in a second step, in order to obtain a regenerated sludge B0 of known characteristics, therefore with a flow rate Q0 and a density d0 given.
  • mother sludge B1 is produced with given rheological characteristics, namely with a given flow rate Q1 and density d1, in particular by varying the concentration of bentonite.
  • a fourth step at the outlet of the first means 6, at the sixth means 14, it directs to the preparation tank 8 only the necessary amount of regenerated sludge B0 for, with the mother sludge B1, to obtain the quality and quantity wanted the B2 pickling sludge. If necessary, additives will be incorporated during the preparation of pickling sludge B2. The surplus, unused, sludge B0 is then discharged into the tank 13.
  • the valve 140 by opening the valve 140, provided that its dimensions are adapted if necessary to fill the tank 13, and by isolating the tank 8 from the tank 123, the sludge B0 of the tank 13 is injected through line 130 into the tray 123 and then directly into the tray 122, as before.
  • the management of the characteristics of the sludge B2 to be injected is carried out, by a PLC, based on calculations based on data collected at different locations of the station, among other things from measurements of flow, level in the tanks, density. This involves, among other things, defining the characteristics of the mother sludge B1 that must be prepared and the amount of regenerated B0 sludge to be incorporated according to the desired characteristics of the sludge B2 to be injected at the tunnel boring machine.
  • references Q0 to Q3 which represent the flow rates of sludge B0 to B3, expressed in m3 / h and the references d0 to d3 which represent the densities of these sludges.
  • the flow rate Q1 of the mother sludge B1 is equal to the flow rate Q2 of the sludge B2 multiplied by the density difference between the recycled sludge B0 and the pickling sludge B2 that divides the density difference between the recycled sludge B0. and mother B1.
  • Q ⁇ 1 Q ⁇ 2 x d ⁇ 0 - d ⁇ 2 / d ⁇ 0 - d ⁇ 1 .
  • the flow rate of sludge discharged to be treated as ultimate waste that is to say the flow rate Q3 of spent sludge B3 is equal to the flow rate Q0 of regenerated sludge B0 plus the flow rate Q1 of mother sludge B1 minus the flow rate Q2 of sludge. B2 marinage reinjected into the TBM.
  • the parent sludge B1 may include, if necessary, not only bentonite but also incorporation at a given percentage of local clay. This makes it possible to vary the mother sludge concentration B1 of a mother sludge composed exclusively of bentonite to a mother sludge composed exclusively of local clay, this sludge preferably having characteristics close to that of the bentonite when is in aqueous solution. This incorporation of local clay is advantageously carried out at the level of the second preparation means 7.
  • An automaton applying these equations from density and flow measurements, makes it possible to manage the opening and closing of the various valves arranged at various points of the circuit in order to vary the flow rate and / or the concentration and / or the density.
  • B2 sludge preparation including its content of bentonite, so mother sludge B1.
  • the automaton opens more or less the butterfly valve 140 in order to evacuate a given quantity of regenerated sludge B0, before being sent to the tanks 120, 123.
  • a volume is released in the circuit corresponding to that of the mother sludge B1 to be added: there is therefore no more loss, at the level of the sixth means 14, mother sludge B1 not yet used.
  • Such a station operates, preferably and if the nature of the ground so ready, using a gravity feed of different bins and tanks.
  • This treatment station not only makes it possible to manage the mud leaks occurring, for example, at the tunnel boring machine or the various pipes of the station but also to limit the use of mother sludge B1 based on bentonite which allows to limit the cost and to better manage the quantities injected and treated in the station and this by adapting the latter continuously if necessary in mud TBM.
EP12169815.3A 2011-05-31 2012-05-29 Station zur Aufbereitung von Schlämmen, die mit einem Tunnelbohrgerät mit unter Druck stehender Angriffsfläche verbunden ist, und Steuerungverfahren einer solchen Station Active EP2530237B1 (de)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1154763A FR2976016B1 (fr) 2011-05-31 2011-05-31 Station de traitement des boues associee a un tunnelier a front d'attaque pressurise et procede de gestion d'une telle station.

Publications (2)

Publication Number Publication Date
EP2530237A1 true EP2530237A1 (de) 2012-12-05
EP2530237B1 EP2530237B1 (de) 2015-07-08

Family

ID=46125330

Family Applications (1)

Application Number Title Priority Date Filing Date
EP12169815.3A Active EP2530237B1 (de) 2011-05-31 2012-05-29 Station zur Aufbereitung von Schlämmen, die mit einem Tunnelbohrgerät mit unter Druck stehender Angriffsfläche verbunden ist, und Steuerungverfahren einer solchen Station

Country Status (2)

Country Link
EP (1) EP2530237B1 (de)
FR (1) FR2976016B1 (de)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3231983A1 (de) * 2016-04-11 2017-10-18 Max Wild GmbH Verfahren zur aufbereitung und wiederverwertung von bohrschlamm

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3964557A (en) * 1974-10-11 1976-06-22 Gulf Research & Development Company Treatment of weighted drilling mud
US4636308A (en) * 1985-06-13 1987-01-13 Summers Don D Method and apparatus for reclaiming drilling fluids from undesirable solids in a drilling operation
FR2636669A1 (fr) * 1988-09-19 1990-03-23 Guillaume Jean Paul Unite mobile de regenerateur de boues de forage
FR2754850A1 (fr) 1996-10-18 1998-04-24 M S Dev Et Participation Sa Station de traitement des boues pour tunnelier a front de taille pressurise
DE19902784A1 (de) * 1999-01-07 2000-07-13 Akw Apparate Verfahren Verfahren und Anordnung zum Regenerieren einer Spülflüssigkeit, die für den Abraumtransport beim Tunnelvortrieb bei grobkörnigen oder kiesigen Böden eingesetzt wird
US6517733B1 (en) * 2000-07-11 2003-02-11 Vermeer Manufacturing Company Continuous flow liquids/solids slurry cleaning, recycling and mixing system
US20050074302A1 (en) * 2001-09-04 2005-04-07 Varco I/P, Inc. Apparatus and method for transporting waste materials
US20090145664A1 (en) * 2007-12-11 2009-06-11 Thomas Robert Larson Methods for recovery and reuse of lost circulation material

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3964557A (en) * 1974-10-11 1976-06-22 Gulf Research & Development Company Treatment of weighted drilling mud
US4636308A (en) * 1985-06-13 1987-01-13 Summers Don D Method and apparatus for reclaiming drilling fluids from undesirable solids in a drilling operation
FR2636669A1 (fr) * 1988-09-19 1990-03-23 Guillaume Jean Paul Unite mobile de regenerateur de boues de forage
FR2754850A1 (fr) 1996-10-18 1998-04-24 M S Dev Et Participation Sa Station de traitement des boues pour tunnelier a front de taille pressurise
DE19902784A1 (de) * 1999-01-07 2000-07-13 Akw Apparate Verfahren Verfahren und Anordnung zum Regenerieren einer Spülflüssigkeit, die für den Abraumtransport beim Tunnelvortrieb bei grobkörnigen oder kiesigen Böden eingesetzt wird
US6517733B1 (en) * 2000-07-11 2003-02-11 Vermeer Manufacturing Company Continuous flow liquids/solids slurry cleaning, recycling and mixing system
US20050074302A1 (en) * 2001-09-04 2005-04-07 Varco I/P, Inc. Apparatus and method for transporting waste materials
US20090145664A1 (en) * 2007-12-11 2009-06-11 Thomas Robert Larson Methods for recovery and reuse of lost circulation material

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3231983A1 (de) * 2016-04-11 2017-10-18 Max Wild GmbH Verfahren zur aufbereitung und wiederverwertung von bohrschlamm

Also Published As

Publication number Publication date
FR2976016B1 (fr) 2013-07-05
FR2976016A1 (fr) 2012-12-07
EP2530237B1 (de) 2015-07-08

Similar Documents

Publication Publication Date Title
AU2012241065B2 (en) Plant for treating drilling muds
CN104653191B (zh) 一种土压盾构机在富水圆砾地层中高效掘进的方法
EP2897913B1 (de) Wasserbehandlungsverfahren mit einer kombination aus flotation und schwerkraftfiltration sowie entsprechende ausrüstung
US4395338A (en) Method and system for dewatering reserve pits
EP0069136B1 (de) Vorrichtung zum auslegen von tonhaltigem schlamm zur bodenverbesserung
EP2530237B1 (de) Station zur Aufbereitung von Schlämmen, die mit einem Tunnelbohrgerät mit unter Druck stehender Angriffsfläche verbunden ist, und Steuerungverfahren einer solchen Station
EP2520726A1 (de) Vorrichtung und Verfahren zur Entnahme von Material-Ablagerungen aus dem Stauraum eines hydrotechnischen Bauwerkes
CN1280957A (zh) 陆地钻井现场“三废”治理再利用技术
CN114985414A (zh) 一种用于城市渣土筛选分离的方法及设备
CN204549338U (zh) 一种港口工程中淤泥脱水流水线中的送料机构
JP6207025B2 (ja) 地中掘削用掘進機における機内排土処理システム
CN102966135B (zh) 一种清淤机
CN208918541U (zh) 一种破除刀盘泥饼的装置
FR2928669A1 (fr) Machine de curage
CN210439363U (zh) 一种用于土石方工程的清渣装置
CN203603810U (zh) 一种废弃钻井物不落地随钻处理系统
JP4332080B2 (ja) シールド掘削機における掘削土処理装置
JP2010013905A (ja) シールド工法における掘削土砂処理システム
JP2003239686A (ja) 推進シールド工法および推進シールド掘進機
CN107559014B (zh) 移动式水上泥浆处理平台
CN217163364U (zh) 一种钻井废弃物用具有净化功能的处理装置
CN111962515B (zh) 一种自适应灌浆控制方法
Zhu et al. Slurry Circulation System of Slurry Shield Machine
JP2013057189A (ja) 土壌表面除染装置
TWI322843B (de)

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

17P Request for examination filed

Effective date: 20130409

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20150213

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 735581

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150715

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602012008539

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 735581

Country of ref document: AT

Kind code of ref document: T

Effective date: 20150708

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20150708

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151008

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151009

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151108

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20151109

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 5

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602012008539

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

26N No opposition filed

Effective date: 20160411

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20160529

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160531

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20160529

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20120529

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20150708

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20230323

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20220620

Year of fee payment: 12

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20230524

Year of fee payment: 12